HomeMy WebLinkAboutRPT 3 ENGR'G DSGN SVCS 1-18-82OATE:
JANUARY 13, 1982
REPORTS
No, 3
1-18~82
Inter-Corn
TO:
FROM:
SUBJECT:
WILLIA~ HUSTON, CITY ~ANAGER
BOB T,Rtr)ESI)EfXER, DIRECTOR OF PUBLIC ~)RKS/CIT~ ENGIhmm~
SOLICITATION OF P~Q~ FOR PROPOSALS FOR NDULTON PARKWAY/
IRVINE C]~TER DRVE ENGI~IN3 DESIGN SERVICES
(INFOf~¥ATION REPORT) FILE ~2305A
During the week of January 18, 1982, staff will be soliciting Request for
Proposals on the Moulton Parkway/Irvine Center Drive engineering design services.
The City of Tustin is acting ss the lead agency for both the City of Irvine and
Tustin on this project which consists of realiguing and/or widening Monlton
Parkway/Irvine Center Drive between Culver Drive and Red Hill Ave., and the
construction of Myford Road between ~{oulton Pa~y and the A.T. & S.F. Railroad.
We have elected to proceed with the process of selecting a consultant due to the
extensive tt~ required to cc~plete the process under Federal
regulations/guidelines, usually 4-6 months.
An additional roadblock to this project is the Environmental Protection Agency,
(E.P.A.) sanction on the project. Currently, we have applied for a waiver to this
sanction and are awaiting final approval or disapproval. In the event the waiver
is denied, the consultant selection process will be aborted.
The Irvine Cc~pany has offered to dedicate all required right of way for the
project at no cost to either city, if a construction contract can be awarded prior
to July 1, 1983. Consequently, we are proceeding with the consultant selection
process prior to obtaining final Federal approval of the waiver.
Attached is a draft copy of the R.F.P. letter for your information.
BOB 1' ,ED]~TDEC'Kg~
D:]:RgCTOR OF :P~I'C
db
Attachment
January 5, 1982
Gentlemen:
The City of Tustin, acting as lead agency for the Cities of Irvine and Tustin,
invites your proposal to provide services for the design of roadway realignment
and improvements, drainage facilities and bridge structures along Moulton
Parkway/Irvine Center Drive between Culver Drive and Red Hill Avenue and along
Myford Road between the realigned Moulton Parkway and the northerly right of way
line of the A.T. & S.F. Railroad. This is a Federal Aid Urban (F.A.U.) project
and will be required to conform to all Federal and State of California
requirements related to an F.A.U. project.
This project is currently under the Environmental Protection Agency's (E.P.A.)
Sanction as a growth inducing project, but a waiver to this sanction has been
applied for and is currently being considered by both Caltrans and the Federal
Highway Works Administration (F.H.W.A.). We are procccding with the solicitation
of proposals and processing of the consultants agreement to helpmeet the
accelerated scheduling of this project. This scheduling will be outlined in the
later portion of this request for proposal.
The scope of work for this project will include street improvements along Moulton
Parkway consisting of the construction of four lanes of new pavement within the
realigned portion of the project, road widening to four lanes along the remaining
portion of Moulton Parkway, a bridge structure spanning Peter's Canyon Wash
(Facility F06), County Flood Control Facility Fl0 and other miscellaneous drainage
facilities, and traffic signal design at the intersection of Harvard Ave. The
improvements along Myford Road will consist of ultimate improvements for a major
arterial highway and a bridge structure spanning the A.T. & S.F. Railroad right of
way. The requested services for this proposal will include, but not be limited
to, the following:
1. Technical and engineering requirements necessary to prepare plans,
specifications and estimate.
2. Preparation of a cost estimate for work within each city, as well as one
total project cost estimate.
e
Calculation of a precise alignment for both Moulton Parkway/Irvine Center
Drive and Myford Road. The Myford Road precise alignment will extend
frcm the realigned portion of Moulton Parkway to the Santa Ana (I-5)
Freeway.
Moulton Parkway/Irvine Center Drive Realigr~nent
January 5, 1982
Page Two
4. Structural calculations for all bridge and reinforced concrete box
culvert structures.
Be
Preparation of hydrology/hydraulic calculations for all drainage
facilities that are not available frc~n the Orange County Flood Control
District.
6. All necessary topographical surveying services.
7. Ail required soils investigations required for structure foundation
design and asphaltic concrete pavement design.
Preparation of plans with ink on linen or mylar drafted at a scale of
1 "--40' or larger as required by detail drawings. Plans should include
cross-sections along the entire roadway excavation limits of eaoh roadway
at 50 foot intervals.
An erosion control plan will be prepared by the ~ontractor. The
specifications will include a section in the special provisions stating
that the contractor has this obligation.
10.
Preparation of a "Letter of Notification" on City letterhead that will be
sent to all affected utility companies during the early stages of plan
preparation. This letter should contain the following:
a. Project scope of work and time frs~es.
b. Request for plan review and location of all utilities within the work
area.
c. Request for return of plan with utility information shown thereon,
including any utility "prior rights".
d. Request for any utility relocation where they may conflict with the
proposed work.
11. Processing of plans, specifications and estimate with the offices of
Caltrans and F.H.W.A. to obtain final project approval.
It is requested that the consultant fees be submitted in three segments, "A", "B"
and "C". Segment "A" would include the total consultant fees for all work related
to improvements along Irvine Center Drive between Culver Drive and the centerline
of the existing Harvard Avenue. Segment "B" would include the total consultant
fees for all work related to Moulton Parkway between the centerline of existing
Harvard Avenue and Red Hill Avenue. Segment "C" would include the total
consultant fees for all work related to Myford Road.
Attaohed for your information is a draft copy of the consultants agreement which
will be submitted to Caltrans and F.H.W.A. for approval. Also attaohed are oopies
of the original project maps submitted by each City in their initial 1978 F.A.U.
project request. These maps have been revised in red to reflect the hr)st recent
Moulton Parkway/Irvine Center Drive Realignment
January 5, 1982
Page Three
project concept ~hanges. Additionally, the alignment of the Myford Road extension
northerly will be determined as a part of the consultant's service for this
project.
The scheduling for this project is critical in that a construction contract must
be awarded no later than Mard~ 1, 1983. Therefore, it is requested that your
proposal be submitted to the City of Tustin, Engineering Division no later than
February 12, 1982. Following is a tentative project schedule:
. F.H.W.A. approval of the Environmental Assessment Document . . .
Initiate Final Design ...............
Submission of P.S. & E. t~ Cait~s ~d'F.H.W.A .........
Caltrans Authorization to ~vertise for Bids ..........
Award of Bid .........................
Nov., 1981
Mar., 1982
Oct., 1982
Jan., 1983
Mar., 1983
The execution of the Consultant's Agreement for these services will depend upon
the granting of a waiver to the E.P.A. Sanction and the approval of funds by
Caltrans and F.H.W.A.
Very truly yours,
BC8 LEDENDECKER
DIRECTOR OF PU~IC WORKS/
CITY ENGINEER
db
Attachments