Attached are the capital project recaps for the City, South Redevelopment AEency
project area, the Central Redevelopment A~ency project area smd the Tustin
C~.~,,nity Redevelopment project area. These recaps have been compiled from data
contained within the existing Five-Year Capital Prc~rsms and are referenced in
1981-8~ dollare.
Also attached is an inter-corn memo dated 11-10-81 re$~rding a very ~ener~l recap
of the Water Service ,~tu nccds. Staff is presently processing the solicitation
of R.F.P. 's for the ~eneral analysis of the water system which will identify both
the short term ~nd long term improvement needs of the system. There will be no
problem to generate a sufficient number of capital projects for the 1982-83 fiscal
year.
~ny of the projects within the two ne~ Redevelopment Agency areas have ~cn
r~ved from other areas of the budget as indicated by the fund designations.
There are additional projects that could be included within these areas such as
utility under,rounding, street lighting and median installation; however, these
ite~ have been withheld until a policy direction h,~ ~cn established for these
At this time, five projects have ~-cn co,.~,;tted to by prior agrccments or
applications for cooperative projects with other agencies. These projects are
delineated with an asterisk (*) on the attached recaps and should have a high
priority when establi~hing future capital fmprovement programs. These projects
are shown below:
TUSTIN CC~$fJNITT REDEVELOi~NT AGENCY
Irvine Blvd. Landscape and Irri~tion
Prospect Ave. Street Widenin~ at 130 Prospect
E1 Camino Real Street Improvements Reappropriation
$130,000. O0
14,000.00
220,000.00
CITY CAPITAL I~q~(Yv'~ENTS
Moulton Parkway Reali~m~ut (GT)
1982-83
1983-84
Valencia Ave. Reconstruction (GT)
$294,000
294,000
63,500
An additional consideration to be discussed at the workshop is the funding of
water n~in replac~nt utilizing Redevelopment Agency monies. These replacements
would be ]imtted to those areas within each project area boundary. When a policy
CAPITAL IMPR~
FEBRUARY 94, 1989.
P~3E TNO
is est~blished to include ~hese water projects within the respective Agenc~
budgets, the progr--~ Will be revised accordingly.
DIRECTOR OF PUbliC ~RK~/
CIT~ EN3~mm~
Attachments
~on Nault
~e Bro~ ~-,~rkle
Ken Fles~le
CAPITAL I~PR~ ~ORKSHOP
FEBRUARY 24, 1989.
PAGE THREE
CENTRAL REDEVELOP~EN~r AGENCY PROJECT AREA
60. TRANSPORTATIC~ FACILITIES
1. Orange Street between Laguna Road and *
San Juan Street GF
2. San Juan Street between N~port Avenue
and Orange Street GF
3. Walnut Avenue between N~wport Avenue and
Orange Street GF
4. Alley Southerly of Walnut Street, between
Newport Avenue and Orange Street GF
5. Alley Southerly of San Juan Street between
N~wport Avenue and Orange Street GF
sOUrH REDEV~OI~ENT AGENCY PROJECT AREA
60. TRANSPORTATION FACILITIES
1. Newport Avenue Extension at Grade to
Edifier Street
2. Widening of Edinger Street between
Red Hill Avenue and the Costa Mesa Freeway
(No cost esttm, tes available)
3. '~" Street between McFadden Avenue and
Mitchell Avenue
4. Mitchell Avenue and '~" Street between
Newport Avenue and Nisson Road
5. "C" Street between Mitchell Avenue and
its Northerly Te~,;nus
65. TRAFFIC CONTROL~
GF
GT
70.
GT
GT
GF
SUBTOTAL
1. N~port Avenue Interconnect between
Nisson Road and Sycamore Avenue with a *
New Installation at Syc,mnre Avenue GT
2. New Signal Installation at Walnut Avenue
and McFadden Avenue GT
3. New Signal Installation at Edinger Street
and Del Arno Avenue GT
FLOOD CC~KI~OL FACILITIES
1. Mitchell Avenue Drain between N~wport
Avenue and a Point 100'± Westerly
$140 000.00
50,000.00
55,000.00
28,000.00
28,000.00
$301,000.00
$63,400.00
361,600.00
307,100.00)
$164,000.00
149,000.00
53,000.00
$791,000.00
$250,000.00
50,000.00
50,000.00
$350,0O0.OO
$26,000.00
CAPITAL I~M~(Y~ ~DRKSHOP
FEBRUARY 24, 1989.
PAGE FOUR
70. FLOOD CONTROL FACILITIES (Continued)
2. McFadden Avenue Drsin between Myrtle
Avenue and Pssadena Avenue
*These fund desigm-tions represent the
present source of funding that will be
r~mnv~d from the existing capital
improvement funding requirements.
TOWN CENTER REDEVELOPMENT AGENCT PROJECT AREA
10. PUBLIC FACILITIES
!And Pur~e for City Hall Expansion
City Hall Facility Enlargement
30.
BEAUTIFICATION PROJECTS
Irvine Boulevard T~-dscape and
Irrigation between Prospect Avenue and
Newport Avenue
Irvine Boulevard Undergrcunding and
Street Lighting between Holt Avenue and
N~wport Avenue
3. Holt Avenue Undergrounding and Street
Lighting bet~ccn Newport Avenue and
I rvine Boulevard
4. Newport Avenue Undergr~unding and Street
Lighting between Bryan Avenue and Irvine
Boulevard
5. First Street Undergrounding and Street
Lighting between Prospect Avenue and
N~w~ort Avenue
6. Prospect Avenue Undergrounding and Street
Lighting between First Street and Beneta Way
40. PARKS AND RECREATION FACILITIES
1. Columbus Tustin P~rk Site Development
2. Columbus Tustin ~ark Building Facility
3. Peppertree P~rk P~rking Area Site
Acquisition and Development
$47,000.00
$73,000.00
$t,515,000.00
$900,000. O0
9.,000,000.00
$~,900,000.00
$130,000.00
200,000.00
148,800.00
ddO,O00.O0
430,000.00
350,000.00
$1,698,800.00
$450,000.00
1,258,000.00
200,000.00
$1,908,000.00
CAPITAL I~{PR~ ~ORKSHOP
FEBRUARY 24, 1982
PAGE FIVE
60. TRANSPORTATIC// FACILITIES (Continued)
Prospect Avenue Widening and
Reconstruction betwccn N-! n Street and
Beneta Way
*2. Prospect Avenue Widening at 130 Prospect
Avenue
3. Alley Southerly of Bonita Street between
N~port Avenue and Orange Street
4. Reappropriation for E1 C.mt uo Real Street
Improvements
65. TRAFFIC CONTROLS
1. First Street and Prospect Avenue Traffic
Signal Modification
70. FLOCO CONTROL FACILITIES
1. Prospect Avenue Relief Drain between
First Street and Irvine Boulevard
$455,000.00
14,000.00
27,000.00
220,000. O0
$716,000. O0
$55,000. O0
$55,000. O0
$84,000.00
$84,000. O0
$7,361,800.00
CITY CAPITAL IMPROVEMENT PROGRAM
10.
PUBLIC FACILITIES
1. Miscellaneous Building Modifications
City Hall/Recreation Dept.
Rehabilitation to Clifton C. Miller
C~ity Center
Carpet and Vinyl Tile Replacement
GF
1982-83 1983-84 1984-85 1985-86
$100,000 ......
$z13,ooo $
$ $
30.
BFAUTIFICATIC~ PROJ~
1. General Street Lighting Program
a. w_~_sterly side of Red Hill Avenue,
Warner Avenue to Valencia Avenue
b. v,.~terly side of Red Hill Avenue,
Ba~£-~nca Road to Warner Avenue
2. Seventeenth Street Center Island,
Yorba Street to Prospect Avenue
3. N~wport Avenue Center Is~-d,
McFadden Avenue to Syc~rmnre Avenue
TOTALS
GF
GF $49,200
GF $49,200
GT 84,900
B -- 13,000
GT
B
~ $147,100
110,100
12,800
,-~----75--~$162,900
0e
PARKS AND RECREATION FACILITIES
1. Columbus Tustin Recreation Facility GF
Architecture and Engineering SPB
Facility Construction PD
$535,000
150,000
56,800
$741,800
CITY CAPITAL INPR~ PRCGRAN
0e
TRANEPORTATIC~ FACILITIES
1. Major Maintenance Program
2. Red Hill Avenue Widening, Bell
to Valencia
*3. Moulton Parkway Reali~.~,nt
e
*7.
e
e
10.
11.
12.
13.
14.
15.
16.
Tustin Meadows Area Pedestrian
Lighting
Kin~sboro Circle to Walnut Ave
Royal Rd. to Green Meado~
Green Meadow to Braebourn
Amherst to Em~rywood
Royal Oak to Fallen Leaf
Red Hill Ave. (Westerly Side) frcm
670' to 810' Northerly of Walnut
Red Hill Avenue (Easterly Side
Northerly of Walnut) & Walnut Ave.
(Northerly Side Easterly of Red
Hill)
Valencia Avenue Reconstruction
Red Hill to Casta Mesa Fwy (34)
Bryan Avenue Widening, frcm
Browning to Myford
Utt Street, San Juan to Andrews
Green Valley, San Jl,-n to Lance
Red Hill Avenue Bike Trail,
Vicinity of Santa Ana Freeway
Yorba Street, From 130' N/O
Laurie to Leafwood
First Street, Costa Nesa Fwy to
Westerly City Limits
Nisson Road, from Browning to
Red Hill
Newport Avenue Bike Trail,
Vicinity of Santa Aha Freeway
Stonehenge Dr., from Bryan to
Crc~e 11
GT
GT
FAU
GF
GF
GF
GF
GF
GT
GT
GT
AHFP
GT
AHFP
GF
GF
GF
1982-83
$213,000
39,000
294,000
7,200
2,200
98,000
63,500
(63,500)
250,000
(~0,000)
1983-84
$211,000
294,000
(3,612,000)
7,200
3,400
2,200
250,000
(200,000)
100,000
123,200
1984-85
$215,800
44,000
(30,000)
32,000
(21,000)
73,000
1985-86
$215,000
51,000
CITY CAPITAL ~ PROGRAM
TRANSPORTATIC~ FACILITIES (Cont.)
17. Will~,-~ Street Widening,
from Nc F~dden to
18. "A" Street, from First St. to
250' S/O Irvine
19. '~" Street, from First St. to
250' S/O Irvine
20. Alley w,.~terly of Yorba Street
and Southerly of Linda Lane
TOTALS
GF
GF
1982-83 1983-84 1984-85 1985-86
151,000
(151,000)
104,000
-- -- 46,000
$1,2~O,900 $1,073,000 $414,400 $ 593,000
65.
TRAFFIC CONTROLS
1. Red Hill Avenue at Valencia Avenue GT
(Signal Relocation) RS
2. Harvard Avenue at Moulton P~rkway GT
3. Yorba Street at Vandenberg I~ne GT
4. Walnut Avenue at NcFadden Avenue GT
5. First Street at Tustin Avenue
(Nodification)
GT
6. Walnut Avenue at Nyford Road GT
7. Red Hill Avenue at Bell Avenue GT
8. Browning Avenue at Bryan Avenue GT
9. Bryan Avenue at Nyford Road GT
10. Irvine Boulevard at Myford Road GT
$16,800
7,700
25,000
$49,500
$50,000
50,000
$50,000
27,000
50,000
&52,000
55,000
55,000
$100,000 $127,000 $162,000
FLOOD CONTROL FACILITIES
1. Santa Fe and Industrial Way at
]{ed Hill Avenue CatchBasin
Construction
2. Red Hill Drain No. 2, Walnut
Avenue to M_itchell Avenue
GF
$13,000
(6,0OO)
237,000
CITY CAPITAL L~ PROGRAM
FLCOD C~L FACILITIES
3. Utt Drive Drain, Mitchell Avenue
to Veeh Drive
GF
4. Sixth Street Drain, '~" Street
to Pacific Street GF
5. Pacific Street Drain, Sixth Street
to M-in Street GF
Bryan Avenue Flood Channel,
from Browning Avenue to
4000 ' ± Easterly
7. San J,,an Street Drain, Red Hill
Avenue to Utt Drive
8. Green Valley Drain, San Juan
Street to 700' Northerly
9. Utt Drive Drain, San Jl,,n Street
to 700' Northerly
10.
11.
Yor~ Street Kh*ain, Seventeenth
Street to Laurie Lane
Venta Storm Drain, F-10 Channel
to Walnut Avenue (23)
F-10 Channel to Sycamore Avenue
Sycamore Avenue to V;alnut Avenue
Stonehenge Drive Drs~n, Bryan
Avenue to C~ll Drive
~.~ganset Way Drain, Prospect
Avenue to Brookline Avenue
12.
13.
GF
GF
GF
GF
1982-83 1983-84 1984-85
34,000
129,000
103,000
($1,665,000) ($1,665,000)
1,665,000 1,665,000
130,000
72,000
$72 ,ooo
$177,000
$51,~ $1,939,000 $2,090,700
1985--86
$216,300
151,000
135,000
$502,300
Central Redevelopment A~ency Project Area
South Redevelopment A~ency Project Area
Town Cen~er Redevelopment AEency Project Area
$301,000
$1,515,000
$7,361,800
City Capital I~rovem~nt
1982-83
GF $1,222,600
GT 1,040,300
B
SPB 150,000
PD 56,800
RS 220,700
FAU
AHFP 263,500
(/~3NTY 6,000
1983-84
$2,306,200
728,900
13,000
211,000
3,612,000
200,000
1,665,000
1984-85
$2,253,300
203,000
215,800
51,000
1,665,000
1985-86
$769,300
423,100
12,800
215,000
151,000
PU~IC FACILITIES (NON~)
~EAUTIFICATION PROJECTS
1. Red Hill Avenue Center Islands frcm S. nta Aha Freeway to T~nce Drive ...... $126,800
2. Red Hill Avenue Center Islands frcm Walnut to Santa Aha Frcc-~ay ............ 145,800
3. Red Hill Avenue Center Islands from N/O First St. to Irvine Boulevard ...... 130,000
4. Red Hill Avenue Center Islands from Warner Avenue to A.T.~.F. R_-ilroad .... 368,400
5. Irvine Boulevard Center Islands from 01d Irvine to Red Hill ................. 81,000
PARK AND RECREATION FACILITIES (NONE)
TRANSPORTATION FACILITIES
1. "C" Street, First NorTherly ................................................
2. Mountain View, First Street to 250' S/O Irvlne Boulevard ................... 100,
3. Second Street, from "A" Street to '~" Street ................................ 17,
4. California Street, from N-i n Street to Third Street ......................... 24~
5. M-~n Street, frcm l~_de~. Avenue to '~" Street ............................ 196,
8. Alley Northerly of First Street, frc~ '~" Street to 150' E/O "C" Street ..... 14~
?. Alle~ NorTherly of Second Street, frcm Pasadena Avenue to ~{yrtle Avenue ...... 8
000
000
000
000
2OO
000
000
TRAFFIC CO~
1. Harvard Avenue at Valencia Avenue ..........................................
2. Red Hill Avenue, Irvine Boulevard to Barranca Road Cc~0uterization .........
· $55,000
700,000
FLOOD CONTROL FACILITIES
1. Red Hill Avenue Drain, 400' Northerly of Industrial Way to Edinger Street ..
$76
2. ~am.~sanset Way Drain, Brockline Way to Yorba Street .......................... 172
3. First Baptist Church Drain, from Tract 10628 to Newport Avenue .............. 56
4. Freeway R. mp Drain, P~ena Avenue to N~wporT Avenue ....................... 68,
5. Niitchell Avenue Drain, Browning to 1300'~ Westerly ......................... 158
8. Tustin Meadows Area Nusiance Water Drains .................................. 434~
7. Holt Avenue Drain, Irvine Boulevard to Lillian Way .......................... 55
8. Acacia Drive Drain, Jacaranda Avenue Southerly .............................. 87,
9. Laguna Road Drain, Red Hill Avenue to Tustin High School ................... 155,
10. OlwTn Drive Drain, Red Hill Avenue to Labmrnum Drive ........................ 03
11. Carfax Avenue Drain, Syc.-.~re Avenue to Scherer .............................. 120
12. Wildeve T~ne Drain, Walnut Avenue to Wind.~-~re Drive ......................... 90
13. ~W_ltchell Avenue Drain, Utt Drive to Del Arno Avenue .......................... 128
· 14. San Juan Street Drs/n, 600'~ Westerly of Browning to Falmouth Drive .......... 54~
· 15. Laguna Road Drs/n, Browning Avenue to Red Hill Avenue ....................... 386
· 10. Prospect Avenue Drain, Wellington Drive to Arbolada T~ue ..................... 8?,
000
000
000
000
000
000
000
000
000
000
000.
000
000
000
000
000
80. WASTE DISPOSAL FACILITIES (NCNE)
WATER SUPPLY AND DISTRIBUTION (N(2~E)
*Denotes projects that are presently within County islands.
DATE:
TO:
FROM:
S UBJ ECT:
~ER 10, 1981
Inter- C om
BOB T,R~EI~)E(i~EI{, DIRECTOR OF PUBLIC WORKS/CITY ENSIbmNR
DAT,~, WICK, ASSISTANT CITY ENGINEER
CGtDITIGI OF WATER MAINS FOR FUTURE ~JDGETIN3 PURPOSES
i-~LU£ Mtlx'pny UOO~ ~ Ou '~ uuu~- bCX~&y o~ Che G~SblC w~uer G1S~z-~LRi~ion sys~e~ anc~
pointed out some of the deficiencies. In cur 3 1/2 hour tour of the system, P~ul
felt that we probably covered about 75% of the problem areas. The ~eeults are as
follows:
There ar~ 5 locations north of Fairhaven with old steel m~ins which nccd
replacing due to leak probl~m~, or the area north of Fsztrhxven could be
detached and sold off to e]imi~te the problem.
There are 7 locations in the system south of Fairhaven which have old 4"
steel mains which are not leaking, but have pressure problems due to
.... 11 size of m~in. These should be scheduled for replacement in a five
year progrsm.
There a~e two locations (on Laguna Road & Nisson Rd. between Newport and
Red Hill) which have old steel mains which are not leaking yet, but the~
should be scheduled for replac~n~nt in a five year program.
w..~Li.llJ.ted l~epl~,~lxt ~ ..... :$~1").,000.00
There are 50 locations in the system south of Fairhaven Avenue which have
old steel ~ins that are leaking badly and should be scheduled for
replac~-~nt in a five year program.
There are 5 locations in the system south of Fairhaven Avenue which have
old steel m,.ins with critical leak problems and in addition, due to
plmnned paving projects should be budgeted in F.Y. '82-'83 for
replacement.
Many of the old steel rains are located in Hillside areas. Due to their rotted
condition, they are brittle and would probably be first to go in the event of an
earth quake. Because of their hillside locations, d,~ge to expensive private
hor~s and property surely would occur. I feel the situation is critical at best.
DALE A. WIUK