Loading...
HomeMy WebLinkAboutCC 7 PUBLIC IMPROV'S 05-17-82DATE: MAY 12, 1982 CONSENT CALENDAR NO. 7 5-17-82 Inter-eom TO: FROM: SUBJECT: WILLIAM HUSTON, CITY MANAGER DALE WICK, ASSISTANT CITY ENGINEER FINAL ACCEPTANCE OF PUBLIC IMPROVEMENTS - RED HILL AVENUE AHFP PROJECT NO. 1064 BETWEEN LANCE DRIVE AND IRVINE BLVD. ~ATIN: That the Tustin City Council, at their meeting of May 17, 1982, adopt the attached resolution accepting subject project and authorizing the recordation of the Notice of Completion. Assuming no claims or stop payment notices are filed within 30 days of the date of recordation of the Notice of Completion, it is further rec~tm~nded that the City Council authorize payment of the final 10% retention amount ($17,059.61) at that time. This amount together with previous payment of $153,536.50 represents 100% of the final contract amount. BACKGROUND: Subject project enog0assed removal & replacement of deteriorated pavement, heater remix of existing remaining pavement and installation of an asphalt concrete overlay overall. In addition, added to the project as a contract change order was recc~ction of the existing OCSD $7 sanitary sewer trench between First Street and Irvine Blvd. This particular sewer trench has been a continual problem for the City, in that frequent street failures have occurred. That portion of the trench between Tance Dr. and First St. was previously reco~pacted in 1972 & 1973. At that time, the City entered into an agreement with OCSD $7 whereby the district agreed to pay the costs of recompaction in the event of future failures. The section of the trench between First St. and Irvine Blvd. ws not originally included for recompaction in this project since it was felt there had not been 'that much of a problem with settlement. However, just prior to start of the project, a large section of .the street failed and subsequent investigation revealed that the entire trench needed rec~k0action. It was determined that for public safety reasons, the trench should be reco~pacted prior to the paving operation. All of the work has been completed to the satisfaction of the Engineering Division. The rpeliminary contract amount including the contract change order for sewer trench rec~,i~action work was $163,119.92. The final contract amount based on "as build" quantities is $170,596.11 for an over run on the contract of 4.6%. This over run was due to the fact that during the sewer trench reccmpaction work the trench settled more than was anticipated making it necessary to replace a larger pavement area. FINAL ACCEPTANCE OF PUBLIC IMPROVEMENTS MAY 12, 1982 PAGE TWO The funding split for this project is as follows: CITY AHFP FUNDS CfTJNTY AHFP FUbDS COUNTY ROAD DEPT. ~3NDS OCSD 97 FUbDS $68,723.53 66,523.53 27,849.05 7,500.00 TOTAL $170,596.11 There is presently $107,800 in Gas Tax Funds budgeted for the City share of this project. There are five sewer laterals which were installed along with the OCSD ~7 sewer (approximately 20 years ago). After the work on this project was oh.~leted, one of these sewer laterals settled making it necessry for the City to have its local contractor make repairs. It would be our intent to invoice OCSD ~7 for the additional cost of this repair and to keep an eye on the other 4 laterals and watch for any settlement. In the event repair is necessary, staff feels this should also be OCSD %7's responsibility under the terms of our previous agreement. DALE A. WICK ASSISTANT CITY ENGINEER db cc: city Clerk Finance Director Street Maintenance Supt. OCSD %7 Attn: Ray E. Lewis RESOLUTION NO. 82-37 2 3' 4 5 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUSTIN ACCEPTING WORKS OF IMPROVEMENT AND AUTHORIZING RECORDATION OF NOTICE OF COMPLETION (RED HILL AVENUE RECONSTRUCTION) 6 WHEREAS, R.J. Noble Company, having a contract with the City 7 of Tustin to construct the hereinafter described public work and improvement; and 8 WHEREAS, the City Engineer has duly certified to the 9 construction and completion of said public improvements hereinafter mentioned in a manner satisfactory to the City 10 Council of the City of Tustin; and 11 WHEREAS, the City Council finds that said contractor has completed said public improvement hereinafter more particularly 12 described in accordance with the provisions of the contract documents and the notice of completion and acceptance of said 13 public work and improvement should be filed and payment of the balance due said contract authorized in accordance with the 14 contract documents. 18 19 15 NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Tustin that said pubic work and improvement be, and the 16 same is hereby accepted. Said public work and improvement is more particularly described as follows: 17 RED HILL AVENUE RECONSTRUCTION - AHFP PROJECT NO. 1064 & COOPERATIVE PROJECT NO. D82-002 FROM LANCE DRIVE TO IRVINE BLVD. AND BE IT FURTHER RESOLVED that the City Engineer of the 20 City of Tustin be, and is hereby authorized to execute and file a notice of completion and acceptance of said public work and 21 improvement described herein as required by law. 22 PASSED AND ADOPTED at a regular meeting of the City Council of the City of Tustin on 1982. 23 24 25 MAYOR 26 ATTEST: 27 28 CiTY CLERK C I TY C LEP < COPY low 1qW CITY OF TUSTIN ORANGE Co[]NW, CALIFORNIA CONTRACT FOR RID HILL AVENUE RECONSTRUMON AHFP PRcjEC1' No. 1064 COOPERATIVE PROJFCT No. D82-002 This agr nt, made and concluded, in triplicate, thisA day of � one thousand nine hundred and eighty-two between the City of Tustin, California, party of the first part, and R.J. Noble Company, a corporation organized and existing under and by virtue of the laws of the State of California and authorized to do business in the State of California. Contractor, party of the second part. ARTICLE I. Witnesseth, that for and in consideration of the payments and agreements hereinafter mentioned, to be made and performed by the said party of the first part, and under the conditions expressed in the two bonds, bearing date with these presents, and hereunto annexed the said party of the second part agrees with said party of the first part, at his own proper cost and expense, to do all the work and furnish all the materials, except such as are mentioned in the Specifications to be furnished by said party of the first part, necessary to construct and complete in good workmanlike and substantial manner and to the satisfaction of the said party of the first part, in accordance with the plans and specifications entitled, Red Hill Avenue Reconstruction AHFP Project No. 1064 and in accordance with the "StandarU Specifications" dated January 1981 of the State of California, Business and Transportation Agency, Department of Transportation, which said plans and specifications and standard specifications are hereby specifically referred to and by such references made a part hereof. Said plans and specifications are on file in the office of the City Engineer of the City of Tustin, California. ARTICLE II. And said Contractor agrees to receive and accept the following prices as full compensation for furnishing all materials and for doing all the work contemplated and embraced in the Agreement; and also for all loss or damage arising out of the nature of the work aforesaid, or from the action of the elements, or from any unforseen difficulties or obstructions which may arise or be encountered in the prosecution of the work until its acceptance by the City of Tustin, and for all risks of every description connected with the work; also for all expenses incurred by or in consequence of the suspension or discontinuance of work and for well and faithfully completing the work, and the whole thereof, in the runner and accordinq to the plans and specifications, and the requirements of the Engineer under them, to wit: C-1 SCHEDULE OF WORK ITEMS AND CONTRACT PRICES RID HILL AVENUE RECONSTRUCTION AHF? MJECT NO. 1064 Item Item With Unit Price Approximate Unit Price Total In No. Written In Words Quantity In Figures In Fiqures 1 . 5awcu t Asphalt Concrete Pavement at Twenty-one cents _ 1 ,956 L.F. $0.21 $410.76 Per Lineal Foot 2. Cold Plane 5'-0" Wide at Fifty.-two and five tenths cents 5,915 L.F. $0.525 $3,105.38 Per Lineal Foot 3. Excavation at Five dollars and ninety-five cents 779 C.Y. $5.95 $4,635.05 Per Cubic Yard 4. Furnish and Construct Asphalt Concrete Base Course 1 .10' Thick 1,577 Tons $22.03 $34,741 .31 at Twenty-two dollars and three cents Per Ton 5. Heater Remix 3/4" to 1" Depth, Screed, Compact and Apply 191,300 S.F. $0.11 $21,043.00 Recycling Ageng at Eleven cents Per Sq. Ft. 6. Furnish and Construct Variable Thickness Asphalt Concrete Wearing Course Overlay at Twenty-four 120 Tons $24.35 $2,922.00 dollars and thirty-five cents Per Ton 7. Furnish and Construct 0.15' Thick Asphalt Concrete Wearing Course Overlay at Twnety-four dollars and 2,367 Tons $24.35 $57,636.45 thirty-five cents Per Ton C-2 SCHEDULE OF WORK ITEMS AND CONTRACT PRICES (Continued) RID HILL AVENUE REODNSTRUMCN pHFp PRCITECr No. 1064 Item Item With Unit Price Approximate Unit Price Total In No. Written In Words Quantity In Figures In Figures 8. Adjust Manhole Frame & Cover to Finished Grade At One hundred and fifty dollars and no cents 11 Each $150.00 $1 ,650.00 Per Each 9. Adjust Water Valve Box to Finished Grade at One hundred and ten dollars and no cents 23 Each $110.00 $2,530.00 Per Each 10. Traffic Striping as Detailed on Sheet No. 3 at Two thousand two hundred and ninety-one dollars 1 L.S. $2,291 .00 $2,291 .00 and no cents Per Lump Sum TOTAL CONTRACT $130,964.95 Total or gross sum writtren in words One hundred and thirty thousand nine hundred and sixt :four dollars and ninety-five cents. Cr-3 ARTICLE III. The said party of the first part hereby premises and agrees with the said Contractor to employ, and does hereby employ, the said Contractor to provide the materials and to do the work according to the terms and conditions herein contained and referred to, for the prices aforesaid, and hereby contracts to pay the same at the time, in the manner and upon the conditions above set forth; and the said parties for themselves, their heirs, executors, administrators, successors, and assigns do hereby agree to the full performance of the covenants herein contained. ARTICLE IV. It is further expressly agreed by and between the parties hereto that should there be any conflict between the terms of this instrument and the bid or proposal of said Contractor, then this instrument shall control and nothing herein shall be considered as an acceptance of the said terms of said proposal conflicting herewith. ARTICLE V. 1 . The CITY OF TUSTIN has obtained from the Director of Industrial Relations the general prevailing rate of per diem wages and the general prevailing rate for legal holiday and overtime work in the locality in which the work is to be performed for each craft or type of work needed to execute this contract and maintains copies thereof in the office of the City Clerk. The Contractor agrees that not less than said prevailing rates shall be paid to workers employed on this public works contract as required by Labor Code Sections 1771 and 1774 of the State of California. 2. The Contractor shall, as a penalty to the CITY OF TUSTIN, forfeit Twenty-Five Dollars ($25.00) for each calendar day or portion thereof for each worker paid (either by Contractor or any subcontractor under Contractor) less than the prevailing rate set forth herein on the work provided for in this contract, all in accordance with Sections 1774 and 1775 of the Labor Code of the State of California. 3. Section 1773.8 of the Labor Code of the State of California, regarding the payment of travel and subsistence payments, is applicable to this contract. 4. Section 1777.5 of the Labor Code of the State of California, regarding the employment of apprentices, is applicable to this contract if the prime contract involves Thirty Thousand Dollars ($ 30,000.00) or more, or twenty (20) working days or mare, or if contracts of subcontractors not bidding for work through the general or prime contractor are Two Thousand Dollars ($2,000.00) or more, or five (5) working days or more. 5. In performance of this contract, not mare than eight (8) hours shall constitute a day's work. The Contractor shall conform to Article 3, Chapter 1, Part 7 {Sections 1810 et seq. } of the labor Code of the State of California, and shall forfeit to the City as a penalty, the sum of Twenty Five Dollars ($25.00) for each worker employed in the execution of this contract by Contractor or any subcontractor for each ealandar day during which any worker is required or permitted to labor more than eight (8) hours in any one calendar day and Forty (40) hours in any one week in violation of said Article. Contractor shall keep an accurate record showing the name and actual hours worked each calendar day and each calandar week by each worker employed by Contractor in connection with the public work. 6. Contractor agrees to keep accurate payroll records showing the name, address, social security number, work classification, straight time and overtime hours worked C-4 each day and week and the actual per diem wages paid to each journeyman, apprentice or worker employed by him in connection with the public work, and aqrees to insist that each of his subcontractors do the same. Contractor further agrees that his payroll records and those of his subcontractors shall be available to the employee or his representative, the Division of Labor Standards Enforcement, and the Divison of Apprenticeship Standards, and shall comply with all of the provisions of Labor Code Section 1776, et seq., in general. 7. Contractor is also aware of the provisions of Section 3700 of the Labor Code which requires every employer to be insured against liability for worker's Compensation or undertake self--insurance in accordance with the provisions of that rode and will comply with such provisions before commencing the performance of the work of this contract. ARTICLE VI. The Contractor shall indemnify and save harmless the City of Tustin and County of Orange and all officers and employees thereof from all claims, suits, or actions of every naive, kind and description, brought for, or on account of, injuries to or death of any person including but not limited to workmen and the public, or damage to property resulting from the construction of the work or by or in consequence of any negligence regarding the work, use of improper materials or equipment in construction of the work, neglect or refusal of Contractor to faithfully perform the work and all of Contractor's obligations under the contract, or by or on account of any act or omission by the Contractor or his agents or a subcontractor or his agents or a third party during the progress of the work or at any time before its completion and final acceptance, or which might arise in connection with the agreed work or is caused by or happening in connection with the progress of said work, or on account of any passive or active negligent act or omission by the City of Tustin or County of Orange, its officers, employees and agents, save and except claims arising through the sole and exclusive negligence or sole and exclusive wilfull misconduct of the City of Tustin or County of orange. The defense in indemnification by Contractor shall include all costs and expenditures including attorney's fees incurred by the City of Tustin and County of Orange or its employees, officers or agents with respect to such claim or suit and Contractor will, if requested by the City of Tustin or County of Orange, defend any litigation arising out of such claim at the sole cost and expense of Contractor. In addition to any remedy authorized by law, so much of the money due the Contractor under and by virtue of the contract as shall be considered necessary in the sole discretion of the City of Tustin may be retained by the City until disposition has been made of such claims for damages as aforesaid. ARTICLE VII. The Contractor shall take out, maintain and pay all premiums during the life of the contract canprehensive automobile and general liability insurance that provides protection from claims which may arise from operations or performance under this contract with the City of Tustin or County of orange and its officers, employees and agents as named additional insureds. The Contractor shall require any subcontractor to provide him with evidence of the same liability insurance coverages. The failure of. the Contractor to require any subcontractor to provide him with such evidence of the same liability insurance coverages shall constitute a material breach of this contract. The amount of insurance shall not be less than single limit coverage applyinq to bodily and Personal injury liability and property damage in the amount of $1 ,000,000. The following endorsements must be indicated on all certificates of insurance: ( 1 ) The City of Tustin and County of Oranqe, its officers, employees and agents are named as additional insure(Is in the policy as to the work being Performed under the contract; C-5 1►' "40 (2) The coverage is PRIMARY and no other insurance carried by the City of Tustin or County of Orange will be called upon to contribute to a loss under this coverage; (3) The policy covers blanket contractual liability; (4) The policy limits of liability are provided on an occurrence basis; (5) The policy covers broad form property damage liability; (6) The policy covers personal injury as well as bodily injury liability; (7) The policy covers explosion, collapse and underground hazards; (8) The policy covers products and completed operations.- (9) perations;(4) The policy covers use of non-owned automobiles; (10) The coverage shall not be cancelled nor materially altered unless and until thirty (30) days written notice is given to the City of Tustin. C-6 In Witness Whereof, the parties of these presents have hereunto set their hands and seals the year and the date first above written. THE CITY OF TUSTIN DATE OF EXECUTION BY CITY OF TUSTIN (Seal) Mayor ATTEST: Ci Clerk Contract and Bo Approved: &LOV Date City Attorney APPROVED AS TO CONTENT: -11to'!J1 f , Y Date 311.9192- 55r 1}1z.55r. City Engineer R.J. NOBLE CD. A California Corporation (Seal) BY Neil , Evan President BY William Timv r Timothy Car , Secretary STATE OF CALIFORNIA } COUNTY OF ORANGE } On March 18 , 1982, before me, the undersigned, a Nortary Public in and for the sand state personally appeared Neil R. Evans, }norm to me to be the Vice President, and William Timothy Carver, known to me to be the Secretary of R.J. Noble Company, the corporation that executed the within instrument, known to me to be the persons who executed the within instrument on behalf of the corporation herein named, and acknowledged to me that such corporation executed the within instrument pursuant to its bylaws or a resolution of its Board of Directors. Witness my hknd and official seal: Y14 A NJIDTARY PUBS IAND ID STATE OFFICIAL SEAL C-7 ` M- A. GROSKOPF NOTARY PUBLIC CALIF)RNIA PRINCIPAL OFFICE IN ORANGE COUNTY IIFY[:OM1AI35ION EXPIRES APRIL 9, 198.5 CrrY OF TUSrIN r.r CF�I'IFICATE OF INSURANCE ::AlE & ADDRESS OF AGENCY R.J . Noble Company , P .O. Box 620 , Orange, Calif . , 92666 It is certified that a waiver of subrogation is hereby issued to the City of Tustin as pertains to the teras of all Workers Ccmpensaticn Insurance. .Vn� E & ADDRESS OF INSCFRANCE AGENCY: Insurance Incorporated of So . California P .O. Box 54679, T.A. , Los Angeles, Calif . ,90054 s This is to certify that policies of insurance listed below have been issued to the insured named abcve and a>-e in force at this t irre. _ Type of Insurance Policy Policy Limits of Lia i ity ir. T ousands Insurance Company ;lumber Expiration Each Date Occurrence ggrecate Ga�EA.L LI SILTI"_' Ecdlly Injury $ $ Co=rehensive form Pranises--operations Property Damage $ Explosion and coll.anse Western GL01-0781- hazard Employers 15185 7/1/82 Underground Hazard Products;'ca:pleted operations hazard Bodily Injury S 500 $ 500 Contract-al insirance & property Broad form property uamage combined da.magz i deparident contractors Pers--nal Injury 'PERSUIr-.L I"JU Y S AUTO�UBILE Bodily Injury S S LIABILITY (each person) Carrarehensy;ve fog Western BA01-0781- Employers 15185 7/1/82 Bodily Injury $ S Craned each :cou rrence Hired Proper i y Damage $ S y Injury & Combined Property Da.:'o-ge Ccmbined S 500 EXCESS LIABILI'T'Y Bodily Injury & Mission Property Damare $10 000$1[1 000 Umbrella form Insurance M880786 7/1/82 Other than Umbrella Cc tined S S Form 4d7RKER.S' Cot 2E*:SAT I CSI S Ga to tory and Western CC01-0781- teach ETLCyE?S, Employers 10480 7/1/82 $ 2 OOoccident) LIABILITY Tip issuing company will give thirty (30) days written notice to the below-na- ed certificate holder prior to modification or cancellation. Job,# 5345- Red Hill Ave. Construction,Tustin ,CA "IA! E -D ADDRESS OF CERTIFICPTE HOLDER ante Issue: March 18 , 1982 CIT`! OF TUSi'RI County of Crange, FMA - , 300 Centennial Way 400 Civic Center Drive West AL2tnorized Fepresentat9of the 3.',;<)V( Tustin, California 92680 Santa Ana, CA 92702 nar-ed 'nsucanae company(ies) C-12