Loading...
HomeMy WebLinkAboutRDA CONST ENGR SVCS 07-06-82AGENDA DATE: JUNE 28, 1982 REDEVELOPMENT AGENCY No. 4 7-6-82 Inter-Corn TO: FROM: SUBJECT: WILLIAM HUSTON, EXECUTIVE DIRECTOR, TUSTIN COMMUNITY REDEVELOPMENT AGENCY DALE WICK, ASSISTANT CITY ENGINEER SELECTION OF AGENT TO PROVIDE CONSTRUCTION ENGINEERING SERVICES FOR EL CAMINO REAL/MAIN STREET IMPROVEMENTS RECOMMENDATION: It it recommended that the Tustin Community Redevelopment Agency~ at their meeting of July 6, 1982, award the contract for subject construction engineering services to the firm of Berryman & Stephenson Inc. and authorize the Chairman to execute the attached proposal submitted by Berryman & Stephenson Inc. BACKGROUND: Pursuant to the Agency's directive at their meeting of June 21, 1982, staff has met with Berryman & Stephenson (B.S.I.) to determine if costs for subject services could be reduced from their first proposal of a not to exceed figure of $79,617.00 for all four tasks involved. B.S.I. has submitted the attached new proposal as outlined below: TASK I ..... Contract Administration ...... $ 5,834.00 TASK II .... Construction Inspection ...... 22,781.00 TASK III .... Construction Surveys ....... 33,386.00 TASK IV .... Misc. Right-of-Way Services .... 3,840.00 TOTAL QUOTE $65,841.00 B.S.I. was able to reduce the cost of Task I & II with the possibility that City staff may become more involved in these two tasks, if the demand arises. Task III (construction surveying) was not reduced from their first proposal because B.S.I.'s original estimate for construction surveying was $47,000.00. This was reduced to $33,386.00 in their first proposal. On a normal, simple type project, construction surveying usually runs about 2.5% of the total project construction cost. This particular project is very involved and complicated. Taking this fact into consideration, the estimator came up with the $47,000.00 figure, or 3.6% of the estimated $1,300,000.00 construction cost. This was reduced to $33,386.00, or 2.6% of the construction. Staff feels that, for this project, this is a reasonable figure. Task IV was also not reduced, since it was felt this a minimum figure for this phase of the work. SELECTION OF AGENT TO PROVIDE CONSTRUCTION ENGINEERING SERVICES FOR EL CAMINO REAL/MAIN STREET IMPROVEMENTS JUNE 28, 1982 PAGE TWO Staff has also analyzed the fees charged to date by Berryman & Stephenson, including their latest proposal, and compared them against the ASCE median compensation curves. The results are tabulated below: ASCE Design Phase ............... $125,905. Contract Administration & Inspection . . 14,528. Construction Survey ............ 32,500. TOTAL . . . $172,933. B.S.I. $98,078. 28,615. 33,386. $160,079. The ASCE median compensation curves are considered to be fair & just charges for professional engineering services, but, again, these curves do not take into consideration the nature of this very compl£cated p~o~ect. DALE A. WICK ASSISTANT CITY ENGINEER db Attachment cc: City Clerk Finance Director Consultants to Governmental Agencies 1360 S. Anaheim Blvd.. Suite 200, Anaheim. California 92805 (714) 956-4770 June 22, 1982 Mr. Bob Ledendecker City Engineer ATTN: Mr. Dale Wick Assistant City Engineer Tustin Community Redevelopment Agency 500 Centennial Way Tustin, CA 92680 SUBJECT: Updated Proposal for Construction Phase of E1 Camino Real RECEIVED JUN 2,3 1982 TIJSTINsv PI./I~L~$ DEPT. Dear Bob: Pursuant to my recent conversation with Mr. Dale Wick of your office on June 22, 1982, please find attached a revised manhour estimate for construction engineering services for subject project. The previous proposal dated June 15, 1982 is a conservative not to exceed estimate on the manhour commitment necessary to supervise the construction of a major specialized project in a downtown business area. The manhours commitment is a variable depending on who is the successful bidder and his ability to work with the local business community, staff and ourselves during the project construction. A reanalysis of our time commitments for administering the construction contract and shifting the proposed inspection personnel to include supplemental personnel at lower billing rates or less hours per day can reduce the estimated not to exceed 83 working day budget to $65,841. The new estimates for the four tasks are as follows: Task I Contract Administration Task II Construction Inspection Task III Construction Surveys Task IV Misc. Right of Way Services $ 5,834 22,781 33,386 5,840 $65,841 Mr. Bob Ledendecker June 22, 1982 Page 2 It is recognized that this is a very tight schedule that we believe is realistic, but the time demands are interdependent on several factors. If events occur that are beyond our proposed time co~umitment, assistance from your office may be necessary to supplement that of the consulting engineering personnel. We will be pleased to work with the Agency on this important phase of the E1 Camino Real project. If this revised proposal meets with your approval, please execute in the space indicated below. Sincerely, ~. ecutive Vice President RWW: dw APPROVED: TUSTIN COMMUNITY REDEVELOPMENT AGENCY BY TITLE DATE