Loading...
HomeMy WebLinkAboutRPT 4 WTR STUDIES 07-19-82AGENDA DATE: JULY 9, 1982 REPORTS NO. 4 7-19-82 Inter-Corn TO: S UBJ ECT: WILLIAM HUSTON, CITY MANAGER BOB LEDENDECKER, DIRECTOR OF PUBLIC WORKS/CITY EJtGINEER WATER SERVICE STUDIES TIMETABLE BACKGROUND: The City has currently engaged a consultant, James M. Montgomery, Inc., to perform a water system financial review and rate study of the Tustin Water Service and is in the process of selecting a consultant firm to prepare the Water Service Management Program and System Analysis. Per the City Council's request, a timetable of events has been prepared for each study. DISCUSSION: Water Service Financial Review and Rate Study Consultant: James M. Montgomery, Inc. Required Time of Completion: 90 days Consultant Commenced Work: 6/16/82 Consultant Completion Date: 9/14/82 Staff Review Completion Date 9/27/82 Presentation to City Council: 10/4/82 Water Service Management Program and System Analysis Staff is still in the process of selecting a consultant for recommendation to the City Council for this study from a final list of four consultants. As a result of the consultant selection process not being completed as 6f this date, a firm timetable for this study cannot be provided at this time. However, a quick review of the proposals provides two possible timetables; the minimum and maximum times required by the various consultants: Staff Interview of Consultants: 7/19/82 Council Authorization to Award Contract: Consultant Commences Work: 8/16/82 8/2/82 MINIMUM MAXIMUM TIME TIME Phase I Completion: 9/13/82 Phase II Completion: 1/3/83 BOB LEDENDECKER DIRECTOR OF PUBLIC WORKS/ CITY ENGINEER 11/8/82 5/9/83 db