I~TE September 2, 1983
S USJ [CT:
William Huston, City Manager
Bob Ledendecker, Director of Public Works/City Engineer
FEDERAL AID URBAN PROJECTS, 1983-84 THROUGH 1987-88
Recommendation:
That the Tustin City Council at their'meeting of September lg, lg83 approve the
submission of the Newport Avenue traffic signal interconnect and modification
project for the 1983-84 through lg87-88 Federal A~d Urban (F.A.U.) Program and
direct staff'to submit this project to the-Orange County Transportation Commission
(O.C.T.C.) for inclusion in the program.
Background:
The O.C.T.C. is soliciting applications for the 1983-84 through 198~-88 F.A.U.
Program. It has been indicated that there are limited funds available for the
upcoming program, but staff feels that this project is a viable one due to it
being a continuation of a previous signal interconnect and modification project
which was also funded by F.A.U. monies.
Discussion:
The attached application/project statement provides for the installation of a
traffic signal interconnect system and modifications to the signal installations
at Newport Avenue and the I-5 Freeway, Mitchell Avenue, McFadden Avenue, Walnut
Avenue, and Sycamore Avenue with striping and channelization as required.
This project was submitted several years ago as the Newport Ave. interconnect
between Irvine Blvd. and Sycamore Ave. Due to a shortage of F.A.U. funding at
that time, the project was reduced to between the limits of Irvine Blvd. and
Laguna Rd. This proposed project would now complete the original project.
If the project is approved by the O.C.T.C., the following is a tenative schedule
and funding recap:
June, 1984 - Environmental clearance
July, 1984 to October, 1984 - Engineering design
December, 1984 to June 1985 - Construction
September 2, 1983
William Huston, City Manager
Federal Aid Urban Projects, 1983-84 through 1987-88
Page 2
Engineering Design
Construction
TOTAL F.A.U. TUSTIN
COST SHARE (86%) SHARE (14%)
$5',500 $4,700 $800
228,500 196,500 32,000
$234,000 $201,200 $32,800
The City would be required to budget $32,800 during the 1984-85 fiscal year for
this'project.
ob~e~Led;ndecker ~
Director of Public Works/City Engineer
bh
attach
ORANGE COUNTY TRANSPORTATION CO.MMISSION
FEDERAL AID URBAN PROGRAM
CANDII)ATE PROJECT STATEMENT
Agency Tustin
Arterial
Name of Street Newport Ave. Classification Primary
Limits of Improvement(Attach vicinity map): Between Laguna Road and Sycamore Avenue
The proposed work consists of:Installation of a traffic signal interconnect system,
modifications to signal installations at Newport Ave. and I-5 Freeway, Mitchell Ave.,
McFadden Ave., Walnut Ave., and Sycamore Ave., striping and channelization as requlre~.
(Please provide a complete description, including items such as right-of-way, grading, paving, constructing
curbs and gutters, etc.)
STREET DATA
Traffic - ADT
Existing 10-Year Forecast
26,600 31,000
Right-of-way
minimum
maximum
Width to Edge of Pavement or
Exterior Curb
minimum
maximum
Number of Traffic Lanes
Width of Traffic Lanes
bIedian Width
Existing Proposed
Left Right Left Right
50 Ft. bO ~t. bO hr. bO rt.
50 Ft. SO ~t. bU hr. bU ~t.
Left Right Left Right
4E Ft. 4Zht. 4Z Ft. 4Z hr.
42 Ft. 42 Ft. 42 Ft. 4E ~t.
2 2 2 2
12 Ft. 12 Ft. 12 Ft. 12 Ft.
14 Ft. 14 Ft.
Prel. Engr.
Right-of-way
Construction (including
construction Engr.)
COST AND SOURCE OF FUNDS
Total FA U Agency
5,500 $ 4,700 $ 800
-0- -0- -0-
Other
0 -
228,500 196,500 32,000 - 0 -
Total $ 234,000 $ 201,200 $ 32,800
Project Schedule and Environmental Status
When did or will initial work on this project begin? July, 1984 or sooner
When do you expect the total project to be completed? June 1985
What is the status of environmental clearance for this project?
Required
Expected Completion Date
Initial Study NO N/A
Negative Declaration NO N/A
EIR NO N/A
EIS NO N/A
Categorical Exemption YES ---
Statutory Exemption NO N/A
In what month and year is each element of the project scheduled for beginning and completion?
Planning and Feasibility
Environmental Clearance
Acquisition of Right-of-way
Final Engineering
Censtruction
Begin Work
Compl ere
6-84
N/A
7-84
12-84
Completion
Complete
6-84
N/A
10-84
6-85
Date 9-2-83
Director, Public Works/
City Engineer
Title