HomeMy WebLinkAboutCC 4 STORM DR IMPROVE 05-16-83AGENDA DATE: MAY 5, 1983 CONSENT CALENDAR 5-16-83 Inter-Corn F ROM: SUBJECT: WILLIAM HUSTON, CITY MANAGER D;J_E WICK, ASSISTANT CITY ENGINEER AUTHORIZATION TO ADVERTISE FOR BIDS FOR F.Y. '82-'83 BUDGETED STORM DRAIN IMPROVEMENT PROJECTS, LOCATION A, LOCATION B, AND LOCATION C RECOMMENDATION: It is recommended that the City Council, at their meeting of May 16, 1983, adopt the attached resolution approving plans and specifications for subject work and directing the City Clerk to advertise for bids. BACKGROUND: Subject project encompasses construction of storm drain improvements as follows: LOCATION A - On Red Hill Avenue from Walnut to Mitchell and on Mitchell Avenue westerly to connect to an existing dry storm drain that was constructed in conjunction with Frontier Park. LOCATION B - On the northerly side of Main Street between Pasadena and the Costa Mesa Freeway. This drain will eliminate the existing drainage ditch at this location which presently drains the Pasadena Cul-de-Sac. LOCATION C - Project consists of construction of catch basins on Red Hill Avenue at Industrial Drive and Santa Fe Drive. When the storm drain in Red Hill Avenue was originally constructed, it was constructed as a dry drain and provisions were made for these catch basins, but they were not installed, the intent being to install the basins when the downstream outlet for the Red Hill Storm Drain was completed. This outlet was completed several years ago. DISCUSSION: These three projects are presently budgeted within the F.Y. 1982-83 Capital Improvement Program. The budgeted amount and Engineer's estimate for each is as follows: BUDGET AMOUNT FUND ENGINER'S ESTIMATE LOCATION A $237,000 GF $244,500.00 LOCATION B 21,000 RS 19,500.00 LOCATION C 19,000 RS & GF 17,500.00 TOTALS $277,000 $281,500.00 .£ AUTHORIZATION TO ADVERTISE FOR BIDS MAY 5, 1983 PAGE TWO Depending on bid results, it may be necessary to appropriate additional funds in the F.Y. '83-'84 budget for this project. The tentative schedule for this work is as follows: City Council Authorization to Advertise ......... May 16, 19831 1st Legal Advertisement ................. May 26, 1983 2nd Legal Advertise~nt ................. June 2, 1983 Open Bids ........................ June 10, 1983 City Council Awards Contract ............... June 20, 1983 Begin Construction .................... July 18, 1983 Complete Construction .................. Oct. 1, 1983 ASSISTANT CITY ENGINEER db Attachment CC: City Clerk Finance Director Street'Maint. Supt. 2 3 4 5 6 7 8 9 10 11 12 13 14 15 17 18 19 2O 21 22 23 24 25 26 27 28 RESOLUTION NO. 83-36 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUSTIN, CALIFORNIA, APPROVING PLANS AND SPECIFICATIONS FOR STORM DRAIN IMPROVEMENTS LOCATIONS A,B, & C WHEREAS, it is the intention of the City Council of the City of Tustin, California to construct certain storm drain improvements designated as Locations A,B, & C, and; WHEREAS, the City Engineer has presented plans and specifications for the construction of said work; NOW THEREFORE, BE IT RESOLVED that the plans and specifications presented by the City Engineer be and are hereby approved as the plans and specifications for: LOCATION A - Red Hill Storm Drain Facility No. FLOP01 & SIP 58 LOCATION B - Main Street Storm Drain Pasadena to Freeway LOCATION C - Catch Basins on Red Hill at Santa Fe and Industrial Drive BE IT FURTHER RESOLVED that the City Clerk is hereby authorized and directed to advertise as required by law for the receipt of sealed bids or proposals for the doing of the work specified in the aforesaid plans and specifications which said advertisement shall be substantially in the following words and figures to-wit: "NOTICE TO CONTRACTORS" SEALED PROPOSALS will be received at the office of the city Clerk, Tustin City Hall, 300 Centennial Way, Tustin, California, until 10:00 A.M. on the lOth day of June, 1983, at which time they will be publicly opened and read, for performing work as follows: CONSTRUCTION OF: LOCATION A- Red Hill Storm Drain Facility No. FLOP01 & SIP 58 LOCATION B - Main Street Storm Drain Pasadena to Freeway LOCATION C - Catch Basins on Red Hill at Santa Fe and Industrial Drive Bids are required for the entire work described herein: A-1 SCHEDULE OF WORK ITEMS ITEM NO. DESCRIPTION UNIT QUANTITY LOCATION A 8 9 10 11 12 13 14: 15 16 17 18 19 20 21 5 1. 6 2. 7 3. 4. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 54" RCP 1100D 48" RCP 1100D 36" RCP 1100D 24" RCP 1300D 18" RCP 1300D Junction Structure Type I Junction Structure Type II Junction Structure Type III Catch Basin Type OS Catch Basin Type OL L:7' Catch Basin Type OL L=iO' Catch Basin Type OL L=21' Brick & Mortar Plug Modify Pump Station Concrete Pipe Collar Sawcut AC or PCC PCC Sidewalk Asphalt Concrete Pavement Sheeting, Shoring & Bracing Sewer Lateral Support Lin. Ft. Lin. Ft. Lin. Ft. Lin. Ft. Lin. Ft. Each Each Each Each Each Each Each Each Lump Sum Each Lin. Ft. Sq. Ft. Ton Lump Sum Each 716 695 191 31 196 3 4 1 1 1 2 1 3 1 1 3,500 430 1,640 1 1 26 27 28 A-2 2 2 ITEM NO. 4 LOCATION B 5 1. 6 2. ? 3. 8 4. 9 5. 10 LOCATION C 12 16 17 19 20 22 23 25 26 2? 28 2. 3. 4. 5. 6. 7. 8. SCHEDULE OF WORK ITEMS DESCRIPTION Clearing & Grubbing 33" RCP 1750D Connection to Exist. Headwall Select Material Backfill Brick & Mortar Plug Sawcut AC or PCC Catch Basin Type OL L=IO' Catch Basin Type OL L=7' Catch Basin Type OS Catch Basin Type OS PCC Sidewalk Type A-2 PCC Curb & Gutter Asphalt Concrete Pavement A-3 UNIT Lump Sum Lin. Ft. Each Cu. Yd. Each Lin. Ft. Each Each Each Each Sq. Ft. Lin. Ft. Ton QUANTITY 1 195.47 2 153 2 519 1 1 1 1 181 335 5O The foregoing quantities are approximate only being given as a basis for the comparison of bids, and the City of Tustin does not, expressly or by implication, agree that the actual amount of work will correspond therewith, but reserves the right to increase or decrease the amount of any class or portion of the work or to omit portions of the work as may be deemed necessary or advisable by ~he Engineer. Plans, specifications and proposal forms to be used for bidding on this project can only be obtained by prospective bidders at the office of the City Clerk, Tustin City Hall, 300 Centennial Way, Tustin, California, 92680, upon payment of $15.00 per set, which amount shall be non-refundable. 10 11 12 13 Plans and specifications will only be mailed out upon payment of $25.00 per set, which amount shall be non-refundable. In conformance with Section 37931 of the Government Code, all bids shall be presented under.sealed cover on the proposal form provided and accompanied by one of the following forms of bidder's security: a. Cash b. Cashier's check made payable to the City of Tustin. c. Certified check made payable to the City of Tustin. d. Bidder's bond executed by an accredited surety insurer, made payable to the City of Tustin . A Security Bond for payment of.labor and materials will be required 14 in the amount of fifty percent (50%) of the estimated total contract price and a Faithful Performance Bond in the amount of one hundred percent 15 (100%) of the estimated total contract price in the form attached to the contract documents. Said bonds shall be issued by a Surety Company rated 16 grade A or better and Class IX or better by the latest edition of Best's Key Rating Guide. City of Tustin reserves the right to reject any or all bids, and/or 18 waive any informality on a bid. No bidder may withdraw his bid for a period of thirty (30) days after the date set for the opening thereof. The contract will be awarded to the lowest qualified bidder. 20 Provisions of the State Contract Act are not applicable, and 21 prospective bidders will not be required to be prequalified. All work to be done under the direct supervision of the City Engineer, City of Tustin. All work to be paid for at the unit prices bid from appropriated monies. 25 Pursuant to California Government Code Section 4590, the contractor will be entitled to post approved securities with the City or an approved 26 financial institution in order to have the City release funds retained by the City to insure performance of the contract. 28 A-4 The City Council of the City of Tustin has obtained from the Director of Industrial Relations the general prevailing rate of per diem wages and the general prevailing rate for legal holiday and overtime work in the locality in which the work is to be performed for each craft or type of work needed and a copy of the same is on file in the office of the City Clerk. Not less than said prevailing rates shall be paid to workers employed on this public works contract as required by Labor Code Sections 1771 and 1774 of the State of California. 6 this ? 8 PASSED AND ADOPTED by the City Council of the City of Tustin, California, day of , 1983. 9 10 Mayor 11 ATTEST: 12 Mary E. Wynn City Clerk. 12 14 15 Advertise in the Tustin News: May 26, 1983 June 2, 1983 18 19 20¸ 21 22 23 24 25 26 27 28 A-5 STATE OF CALIFORNIA ) COUNTY OF ORANGE ) SS ~CITY OF TUSTIN ) MARY E. WYNN, City Clerk and ex-officio Clerk of the City Council of the City of Tustin, California, does hereby certify that the whole number of the members of the City Council is five; that the above and foregoing Resolution No. was duly and regularly introduced, read, passed and adopted at a regular meeting of the City Council held on the day of , 1983. 8 AYES : COUNCILMEMBERS: 9 10 11 12 13 14 15 16 17 18 19 20 21 23 25 26 27 28 NOES : COUNCILMEMBERS: ABSENT: COUNCILMEMBERS: Mary E. Wynn, City Clerk City of Tustin A-6