HomeMy WebLinkAbout13 DSGN ZONE INTERCON 10-6-03AGENDA REPORT
Agenda Item I ~>
~itvlewM;::ager ~,.
Finance Director ~
MEETING DATE: OCTOBER 6, 2003
TO:
FROM:
SUBJECT:
WILLIAM A. HUSTON, CITY MANAGER
PUBLIC WORKS DEPARTMENT/WATER SERVICES DIVISION
CONSULTANT SERVICES AGREEMENT FOR DESIGN OF THE ZONE
3 AUTOMATED EMERGENCY INTERCONNECT (CIP NO. 6153)
SUMMARY
A Consultant Services Agreement for the design of the Zone 3 Automated Emergency Interconnect
(CIP No. 6153)for the Water Services Division is submitted for consideration by the City Council.
RECOMMENDATION
It is recommended that City Council approve the submitted Consultant Services Agreement with Tetra
Tech, Inc. of Irvine, California, in the amount of $22,100.00 and authorize the Mayor and City Clerk to
execute the agreement on behalf of the City.
FISCAL IMPACT
Adequate funds are available in the Public Works Department Water Division's Operating Budget,
Account Numbers 70-452-6018 and 70-459-6010, for this project.
BACKGROUND
Tustin Water Services (TWS) has an emergency interconnection with the Southern California Water
Company (SCWC) in the Zone 3 area. This interconnect consists of a pipeline between each
distribution system with two water valves that are normally closed. In the event of an emergency in
the TWS distribution system area, operators from 'BNS and SCWC must meet at the interconnect and
open their respective valve. Due to the hydraulics of the two systems, TWS can only receive water
from SCWC and cannot provide water to SCWC.
In order to improve the reliability of the water supply in the Zone 3 area and to reduce the time
required to open the interconnect, TWS proposed the construction of an automated interconnect at
the location of the existing interconnect. This automated facility would consist of an automatic valve
that opens when the downstream (TWS) system pressure falls below a preset pressure, water meter,
backflow preventer, isolation valves, sump pump, and other equipment located in an underground
vault.
Four Requests for Proposals were received from a select list of consultants. Based on the
consultant's qualifications, project understanding and approach, staff recommends that Tetra Tech,
Inc. be selected to prepare the design plans for a not-to-exceed fee of $22,100.00.
Consultant Services Agreement for Design of the Zone 3 Automated Emergency Interconnect
October 6, 2003
Page 2
The following is the anticipated schedule for the project:
Consultant Services Agreement Approval
Notice to Proceed
Completion of Design
Completion of Construction
10-06-03
10-07-03
12-15-03
04-30-04
Tim D Serlet
Director of Public Works/City Engineer
TDS:BAR:cccj:CSA for Design of Zone 3.doc
Attachment: Location Map
Consultant Services Agreement
Brian A. Ragland g
Water Services Manager
Z
GLEN DR.
CONSULTANT SERVICES AGREEMENT
THIS AGREEMENT FOR CONSULTANT SERVICES, is made and entered into
this __ day of ,20 , by and between the CITY OF TUSTIN, a municipal
corporation, hereinafter referred to as "City", and Tetra Tech, Inc. a Delaware
corporation, hereinafter referred to as "Consultant".
RECITALS
WHEREAS, City requires the services of a consultant to furnish the necessary
engineering services Zone "3" Emerqency Interconnect hereinafter referred to as
"Project"; and
WHEREAS, Consultant has submitted to City a proposal dated May 15, 2003 a
copy of which is attached hereto, marked as Exhibit "A" and is by this reference
incorporated into this Agreement; and
WHEREAS, Consultant is qualified to provide the necessary services for the
Project and desires to provide said services; and
WHEREAS, City desires to retain the services of Consultant for said Project.
NOW, THEREFORE, for the consideration and upon the terms and conditions
hereinafter set forth, the parties agree as follows:
AGREEMENT
Section 1: Scope of Consultant's Services.
Consultant shall perform all work necessary to complete in a. manner satisfactory
to City, the services set forth in Exhibit "A".
Section 2: Order of Precedence.
In the event of a conflict between or among any of the documents comprising this
Agreement, the following order of precedence shall govern the provision in question:
1. This Agreement
2. Consultant's Proposal (Exhibit "A")
-1-
Section 3: Time for Completion.
The time for completion of the work to be performed by Consultant is an essential
condition of this Agreement. Consultant shall prosecute regularly and diligently the
work of this Agreement according to reasonable schedules established by the City for
various items described and as outlined within Consultant's proposal. Consultant shall
not be accountable for delays in the progress of its work caused by any condition
beyond its control and without the fault or negligence of Consultant. Delays shall not
entitle Consultant to any additional compensation regardless of the party responsible for
the delay.
Section 4: Compensation.
The compensation to be paid under this Agreement shall be as set forth in
Exhibit "A", not to exceed a total cost of $22,100~00.
Consultant shall submit detailed invoices, based upon the actual work performed
accompanied by backup documentation as requested by the City.
Progress payments for work completed shall be paid by City as the work
progresses, within thirty (30) days of the date of Consultant's invoice.
Consultant shall provide City with a monthly itemization of all work performed,
and the fees accrued thereon, in complete and sufficient detail to fully apprise
City thereof.
Section 5: Independent Contractor.
Consultant's relationship to City in the performance of this Agreement is that of
an independent contractor. Consultant's personnel performing services under this
Agreement shall at all times be under Consultant's exclusive direction and control and
shall be employees of Consultant and not employees of City. Consultant shall pay all
wages, salaries and other amounts due its employees in connection with this
Agreement and shall be responsible for all reports and obligations respecting them,
such as social security, income tax withholding, unemployment compensation, workers'
compensation and similar matters.
Section 6: Indemnification.
Consultant agrees to indemnify, defend and hold City, its officers, agents,
employees, successors and assigns harmless from any loss, damage, injury, sickness,
death, or other claim made by any person and from all costs, expenses and charges
including attorney's fees caused by or arising out of Consultant's, its officers', agents',
subcontractors', or employees' negligent acts, negligent errors, or negligent omissions
or willful misconduct, or conduct for which the law imposes strict liability on Consultant
in the performance or failure to perform this Agreement.
-2-
Section 7: Insurance.
Consultant shall maintain in full force and effect during the term of this
Agreement policies of comprehensive general liability, personal injury and
automobile liability insurance with limits of at least $1,000,000 combined single
limit coverage per occurrence.
Consultant shall maintain in full force and effect during the term of this
Agreement a policy of professional liability insurance coverage with limits of at
least $1,000,000 combined single limit coverage per claim or per occurrence. If
Consultant provides claims made professional liability insurance, Consultant shall
also agree in writing either (1) to purchase tail insurance in the amount required
by this Agreement or to cover claims made within five (5) years of the completion
of Consultant's service under this Agreement, or (2) to maintain professional
liability insurance coverage with the same carrier in the amount required by this
Agreement for at least five (5) years after completion of Consultant's services
under this Agreement. Consultant shall also provide evidence to the City of the
purchase of the required tail insurance or continuation of the professional liability
policy by executing the attached Letter Agreement on Consultant's letterhead.
Consultant shall carry and pay for such compensation insurance as is necessary
to fully protect Consultant and its employees under California Worker's
Compensation Insurance and Safety Laws, and shall relieve the City from all
responsibility under said laws in connection with the performance of this
Agreement.
All insurance required pursuant to this Section shall be issued by a company
admitted in the State of California and rated A, VII or better by the latest edition
of Best's Key Rating Guide.
Upon execution of this Agreement, Consultant shall provide to City certificates of
insurance on the City's form evidencing the required insurance. If self-insured for
worker's compensation, Consultant shall submit to City a copy of its certification
of self-insurance issued by the Department of Industrial Relations.
Section 8: Termination of Agreement.
City shall have the right to terminate any or all of the services covered by this
Agreement at any time for any reason by giving written notice to Consultant.
Upon termination of this ,Agreement, Consultant shall be paid for services
rendered by the effective date of the termination.
Upon termination of this Agreement or completion of the Project, all documents
relating to the Project shall become the sole property of City. Should City
terminate .this Agreement pursuant to subparagraph A. of this Section,
Consultant shall, within ten (10) business days of receipt of notice of termination,
-3-'
provide City with all documents within Consultant's possession relating to this
Agreement and the Project, including but not limited to all completed documents
and all drafts of uncompleted documents.
Section 9: Notices
Any notice allowed or required to be given shall be effective upon personal
delivery thereof, or upon depositing thereof in the United States Postal Service, certified
mail, return receipt requested, postage prepaid, addressed as follows:
To City:
City of Tustin
Attn.: Director of Public Works/City Engineer
300 Centennial Way
Tustin, CA 92780
To Consultant:
Tetra Tech, Inc.
Mr. Steve Tedesco, P.E.
16241 La,quna Canyon Road, Suite 200
Irvine, CA 92618
Section 10: Miscellaneous Provisions.
Consultant shall proceed immediately and diligently to perform the services
provided for in this Agreement upon. receipt of notice from City to proceed
therewith.
Bo
No part of this Agreement may be assigned by Consultant without the prior
written approval of City.
This Agreement shall extend to and be binding upon and inure to the benefit of
heirs, executors, administrators, successors and assigns of the respective parties
hereto.
Do
Consultant shall perform all services required under this Agreement using that
degree of care and skill ordinarily exercised under similar conditions in similar
localities, and shall be responsible for all errors and omissions for services
performed by Consultant under the terms of this Agreement.
Consultant certifies that there shall be no discrimination against any employee
who is employed in the work covered by this Agreement, or against any
application for such employment, because of race, religion, color, sex or national
origin including but not limited to, the following: employment, upgrading,
demotion or transfer, recruitment, or recruitment advertising, lay-off or
termination, rate of pay or other forms of compensation, and selection for
training, including apprenticeship.
-4-
IN WITNESS WHEREOF, this Agreement was executed by the parties on the
day and year first above written.
"CITY"
CITY OF TUSTIN
By
Tracy Wills Worley, Mayor
ATTEST:
Pamela Stoker, City Clerk
APPROVED AS TO FORM:
Lois E. Jeffrey, ~/A~fornef¢
"CONSULTANT"
TETRA TECH, INC.
/// Ste~e Tedesco
Divisional Senior Vice President
-5-
i
TF_T~ATECH, iNC.
infrastructure §ervices Group
EXHIBIT
May 15, 2003
Mr. Brian Ragland
Water Services Division
City of Tustin
1472 Service Road
Tustin, CA 92780
Reference: Proposal for Zone 3 Emergency Interconnect
Dear Mr. Raglan&
'Tetra Tech, Inc. is pleased to provide our proposal for design engineering for the Zone 3 Emergency
Interconnect. Attached is our proposed scope of work along with our estimated fee.
We uaderstand the critical nature of this project to the City. Our staff is available to begin work on
the project immediately upon receipt of your authorization. Our draft 50 percent plans and
specifications can be completed within 20 working days of receipt of all existing street and utility
drawings. We expect that after allowing for City review periods we can have the project ready to
bid by the end of July 2003.
Construction on the project could begin in early October 2003. After several months of material
procurement the actual field construction should take approximately eight (8) weeks. Final start-up
of the facility is estimated to be late April 2004.
If you have any questions please feel free to contact us.
stew
Vice President
SDT/cg
I:\prop02\p234sdt.doc
Attachment
16241 Laguna Canyon Road, Suite 200, h-vine, CA 92618
Tel 949.727.7099 Fax 949.727.7097
www.tetl-arech.com
TETP.~ TECH, INC.
CITY OF TUSTIN
Zone 3 Emergency Interconnect
SCOPE OF SERVICES
Tetra Tech, Inc. will provide the following detailed scope of services for the Zone 3 Emergency
Interconnect:
Visit the project site and discuss the proposed project with City and SCWC staff. Verify the
existing site conditions and the planned operations.
Prepare a set of construction plans based on the City provided as-built drawings. Plans will
include:
a. Title Sheet
b. Site Plan
c. Mechanical Plans and Details
d. Electrical and Instrumentation
o
Prepare construction specifications
Specifications will include:
a.
b.
C.
d.
e.
f.
g.
h
including City supplied from-end documents.
Pressure Sustaining Valve
Steel and/or Ductile Piping
Miscellaneous Gages and Appurtenances
Electrical and Instrumentation
SCADA Equipment
Coatings
Street Repaying
Precast Concrete Vault
FEE SUMMARY
Tetra Tech will provide the services outlined in our Scope of Services for the following not-to-exceed
fee:
Design Services Total $22,100
Our services will be billed monthly in accordance with the attached fee schedule.
I:\prop03\p133sdt.doc Page 1 of 3
TETRATECH, INC.
EXHIBIT "A"
2003
HOURLY CHARGE RATE AND
EXPENSE REIMBURSEMENT SCHEDULE
Professional
Engineering Intern/Technician ................... $ 45.00
Designer/CAD Operator/Engineer I ........... $ 85.00
Engineer II and III/Senior Designer ........... $ 96.00
Biologist ..................................................... $ 95.00
Planner ....................................................... $ 95.00
Senior Engineer/Landscape Architect ........ $110.00
Project Engineer/Project Coordinator ........ $125.00
Senior Planner ............................................ $135.00
Senior Scientist .......................................... $135.00
Project Manager/Sr. Project Coordinator... $140.00
Senior Project Manager .............................. $155.00
Program Director/Project Director ............. $180.00
Administrative
Adm/nistrative Clerk .................................. $ 40.00
Word Proeessor/Admin. Support ............... $ 56.00
Graphic Designer ....................................... $ 90.00
SurvevfMaooine
Survey Technician I ................................... $ 84.00
Survey Technician II .................................. $ 90.00
Surveyor/Field Supvsr./Sr. Survey Tech.... $100.00
Two-Person Survey Party .......................... $178.00
Two-Person Survey Party with GPS .......... $ 217.00
Three-Person Survey Party ........................ $ 258.00
Survey Travel Time (Two-person) ............ $ 85.00
Survey Travel Time (Three-person) .......... $122.00
Construction Management
Construction Observer ............................... $ 75.00
Senior Construction Observer ....................$ 80.00
Resident Engineer ...................................... $115.00
Conslruction Manager ................................ $145.00
Reproduction, special photography, postage, delivery services, express mail, om-of-area telephone calls,
printing and any other services performed by subcontractor, will be billed at cost plus 15%.
Reimbursable In-House Costs
Photo Copies (B&W 8.5"x11") ...... $ 0.10/Each
Photo Copies (B&W 1 l"x17") ....... $ 0.35/Each
Color Copies (up to 8.5"xl 1") ........ $ 1.50/Each
Color Copies (to 1 l"x17") ..............$ 2.50/Each
Large Format Copies .....................$ 0.30/S.F.
Computer Time ............................. $10.00/Hour
Mileage ........................................... $ 0.40gVrile
NOTE: All rates are effective to October 1, 2003. There will be a negotiated increase in rates, 5% minimum
per year, for contracts extend'rog beyond October 1, 2003.
I:\prop03\p133sdt.doc .Page 2 of 3
TETRA TECH, INC.
SECRETARY'S CERTIFICATE
I, Richard A. Lemmon, Secretary of Tetra Tech, Inc. a Delaware Corporation (the "Corporation"),
do hereby certify as follows:
I hereby certify that in lieu of a meeting of the Board of Directors of Tetra Tech, Inc., a
corporation existing under the laws of the State of Delaware the followmg resolution was duly passed and
adopted:
'~[ESOLVED, that the followmg employees of this corporation are hereby authorized and
empowered to make, enter into, sign, seal and del~ver, m behalf of this Corporation a_ny
and all proposals, contracts and subcontracts for engineering services with the
authorization limits set forth after their respective names;
RESOLVED FURTHER, that any and ail proposals, m excess 6f'two he, tired fifty
thousand dollars ($250,000) shall be reviewed and sigmd by two ~nclividnals, one of whom
shall be listed below;
RESOLVED FURTHER., that any and all proposals, Jn excess of five hundred thousand
dollars ($500,000) sh~]] be reviewed and si~cnexl by the Strare~c Busmess Area Director
(SBAD) listed below or Douglas J. Reinhart;
Name Stratego Business Area
Douglas J. Reinhart
Title Signing Authca-iW ] .]mit
Divisional Executive Vice President $ 2,000,000
William E. Bennett (SBA_D)
]effcry Fromhertz
lekoa Anderson
William Young
A1 Needham
Peter Klm
Transportation
Transportation
Transportation
Transportation
Transportation
Transportation
Divisional Senior Vice President 1,000~000
Divisional Senior Manager 250,000
Divisional Senior Manager 100,000
Divisional Senior Manager 100,000
Divisional Senior Manager 50,000
Divisional Manager 50,000
Ken Sheldon (SBAD)
Bob Ozibko
Neff Mm-risen
Jim Lenzot~
Joe Thomson
David Currington
~eorge Chan
Site De*elopment
Site Development
Site Development
Site Development
Site Developmem
Site Development
Site Development
Divisional Senior Vice President L000,000
Divisional Seniar Vice President 500,000
Divisional Vice President 500,000
Divisional Vice President 250,000
Divisional Senior Manager 250,000
Divisional Senior Manager 200,000
Divisional Senior Manager' 100,000
Steve Tcdeseo (SBAD)
[Ioward Arnold
Mike Hoover
Waterff~aste~'ater
Water/Wastewater
Water/Wastewater
Divisional Senior Vice President L000,000
Divisional Vice President 500,000
Divisional Vice President 500.000
Tom Epperson
Robert Ohlund
T~rry Iierger
Dak Wah
A1 Groves
Brad Groves
S~p Lewis
Louis Yu
Steve Agor
Eliot Epstein
lien Berard
Chm'les Eg/gian-Nichols
Larry Saaser
Strate~-ic Business Area
Title
Warer[Wastewater
Warer/Wastewamr
Water/W asrewater
Water/Was[ewater
Water/Wastewater
Water/Wastewarer
Water/Wastewater
Water/Wasrewater
Water/Wastewater
Water/Wastewa[er
Water/Wastewater
Water/Wastewater
Water/Wastewater
Divisional Vice President
Divisional Vice President
Divisional Vice President
Divisional Vice President
Divisional Vice President
Divisional Vice President
Divisional semor Manager
Divisional Senior Manager
Divisional Senior Manager
Divisional Senior Manager
Divisional Manager
Divisional Manager
Divisional Manager
Simin~ Authoh~,l,imit
250 WOO
250 000
250 000
250 000
250 000
25O 000
150 000
100 000
100 000
100 000
50,000
50,000
10,000
Mark Williams (SBAD)
Ira Artz
BiLl Fullerton
Bob lq[all
Lan Weber
Dong Wolf
Peggy Bailey
Jimmy O'Bricu
Harry Gibbons
Merri Martz
Mark Seits
Sugaee Water
Surface Water
Surface Water
Surface Water
Surface Water
Surface Water
Surface Water
Surface Water
Surface Water
Surface Water
Surface Water
Divisional Senior Vice President 1,000,000
Divisional Vice President 500,000
Divisional Vice President 500,000
Divigional semor Manager 250,000
Divisional Senior Manager 150,000
Divisional Manager 100,000
Divisional Manager 100,000
Divisional Manager 100,000
Divisional Manager 100,000
Dihsional Manager 100,000
Divisional Manager 100,000
Rich Clark (SBAD)
Manricio Argente
Frank Cakill
Angel Fuertes
Lermy Reidling
Pat Fan:ar
Telecommunications
Telecommumcadons
Telecommurfications
Telecommunications
Telecommunicationz
Telecommunications
Divisional Senior Vice President 1,000,000
Divisional Manager 500,000
Divisional Manager 100,000
Divisional_ Manager 100,000
Divisional Manager 100,000
Project Manager 50,000"
I farther certify, that said resolution is now in full force and effect.
IN WITNESS WHEREOF I have hereunto set my hand and affixed the official seal of the
corporation this 5t~ day of April 2002.
(SEAL)