HomeMy WebLinkAboutPH VARIANCE 81-8 12-21-81DATE:
TO:
FROM:
SUBdECT:
December 21, 1981
7:30 PUBLIC ~EARING
Inter-Corn
Honorable Chairman and Planning Agency Members
Community Development Department
Variance No. 81-8
Location: 14882-14942 Newport Avenue, R3(1750) District
Applicant: Cal State Associates CCLV "A"
REQUEST:
Authorization to convert the 296 unit Californian Apartment Complex into resi-
dential condominums, and to vary with the development requirements set forth in
the Planned Development District Regulations.
RECOI~4ENDED ACTION:
If the Agency considers the letter from the school district as sufficient
evidence of the applicant's progress in purchasing the adjacent parcel, it
would be appropriate to review the application. A draft resolution of approval
accompanies this report which recommends favorable consideration.
BACKGROUND:
The Planning Agency first heard public testimony on the subject application on
September 30, 198.1. Part of the plan was the proposal to use a 14,890 square
foot parcel owned by the Tustin Unified School District to satisfy open space
requirements of the Planned Development District. At that time Planning Agency
felt it was not appropriate to review the proposal without a firm commitment
from the school district to lease or sell the land to the applicant. As a re-
sult, the public hearing was continued until such time as the applicant has a
commitment from the district. The Applicant has since entered into
negotiations with the school district for purchase of the property. A letter
from Mr. Larry Sutherland of the district indicates favorably on the ultimate
acquisition of the property by Cal State and recommends the Agency can take
action on their request.
DI~USSION:
The first report was primarily concerned with the zoning and design questions
of the site plan. The plan is unchanged from the first meeting and the report
is included for further consideration.
Planning Agency Report/V.81-8 -2- December 21, 1981
In further review of the staff's concerns over the conversion, the applicant
has proposed the following checklist of items which he believes are appropriate
to the successful completion of the conversion process:
1. Provide additional parking per code, as may be required by City Ordinance
through installation of two {2) first and second story parking structures;
2. Provide an adequate noise abatement structure at locations to be deter-
mined, at the South property line;
3. Acquire and improve approximately 14,890 sq.ft., of land from the Tustin
Unified School district to provide sufficient "open space" in accordance
with the 45% "open space" Tustin requirements;
4. Provide individual metering for all units in areas of electrical and plumb-
ing (gas and water) services;
5. Correct the problems existing to the new owners satisfaction, all hot and
cold malfunctions in water systems;
6. Correct all roof leaks and include a new superficial material for sloping
surfaces to permit proper drainage;
7. Provide a one (1) hour fire separation between all units;
8. Provide new guest and handicapped parking together with a new Parking As-
signment Plan for all owners;
g. Provide new heating/air conditioning systems in individual units as may be
required.
10. Provide new structural elements as where may be required, i.e., stairs,
canopies, etc.;
11. Paint exterior of project throughout;
12. Repair and replace all paving and subbase as may be required;
13. Correct leaking ceramic tile installations as may be required;
14. Provide new security system per code as required throughout;
15. Other modifications as may be required by the Tustin Planning Agency;
16. Provide approved trash collecting systems;
- Planning Agency Report/V.81-8 -3- December 21, 1981
17. Up-grade and repair all recreational (In-door and out-door), amenities as
may be required;
18. Provide added landscaping throughout project including approximately 35, 15
gallon, potted and irrigated trees interspersed throughout project;
19. Provide new security lighting system.
As part of the review process, the applicant submitted a consultant report on
the condition of the faulty heating and hot water system. This document was
reviewed by the City's building consultant who agreed with its conclusions and
recommendations. The City's consultant also recommended analysis of the
found-ation, framing, wall coverings, roof, utility systems and built-in
appliances through on-site inspections.
Also included with this report is a letter from the Tustin Unified School Dis-
trict confirming the purchase agreement. Staff has been contacted by the
school district's engineer who is drafting a subdivision map for the parcel.
FINDINGS AND CONCLUSIONS:
Staff's recommendation has been based upon the following:
i. The development can satisfy the intent of Planned Development District re-
gulations if the following items are accomplished:
a. Construction of two parking structures for 698 vehicles, and;
b. The purchase of the 14,890 sq.ft, parcel for addition into the complex
for open space use, and;
Authorization by variance approval to allow covered patios to be count-
ed towards open space requirements (approximately 2%, total coverage
would be 57%).
2. The useable on-site open space will be increased by consolidation of park-
ing and the incorporation of additional land area.
3. The on-site noise level generated by the railroad should be reduced by the
incorporation of a sound attenuation wall in the south parking structure.
4. The vacant school district property will be improved by the incorporation
of passive open space activities.
The complex has, in recent times, suffered from lack of adequate mainten-
ance and repair and that some of the problems in this area may be due to
design deficiencies, i.e. flat roofs. Extensive work is needed to bring
the buildings up to an acceptble condition. This can be accomplished
through improvements required in the use permit procedure.
Planning Agency Report/V.81-8 -4- December 21, 1981
As evidenced by structural investigations, the re-design, repair and
construction of the buildings will be an extensive project. Some of the
problems and remedies may still not be known until work has commenced. It
is, therefore, recommended that if the project is approved, a condition of
the permit should be the retention of a deputy inspector {at developer
expense) for full-time duty at the site.
The seemingly never ending problems of the roofs and hot water system
appear to be a problem of design. These two elements should be re-designed
and re-built as a condition of approval.
A relocation assistance plan should be provided for review by the Agency
prior to any construction permits being issued. This plan should include:
a. Relocation benefits.
b. Time periods for construction work and notification procedures to
tenants.
c. Temporary relocation plan for those tenants wishing to buy their units.
d. A parking plan for the construction time period.
AGW/mi
November 2¢, 1981
Cal State Associates
17777 Crenshaw Boulevard, Suite 1'02
Torrance, California 90504
Attention: Eugene E. Vollucci, President
Gentlemen:
i
Re: Sale of Vacant Parcel, 15,000+/- square feet
This is in response to your letter of November 23, 1981, regarding the
intended sale of the above-referenced real property, owned by this school
district, adjacent to the California Apartments.
Unfortunately, I am unable to execute the "Letter of Intent" as presented,
inasmuch as it portends that the school district can agree to a sale to a
particular party. We are obliged by law (the California Education Code and
Government Code) to follow procedures which require advertising the property
for sale by competitive bidding, after offering it to the City, County and
certain other public agencies for park, recreation or housing uses.
Eealistically, considering the size and location of the property, we do not
expect t~at any of those agencies will desire to purchase it. However, we
must comply with the legal requirements, which include a 60-day period for
those agencies to respond. Also realistically, we do not expect any other
party to be interested in purchasing the property at a price as high as your
firm ~ay expect to pay for it. However, we must advertise for and receive
bids, which process normally takes 45-60 days.
Recognizing the foregoing, however, it is the school district's present
intention to proceed wit~ the steps )eading toward a sale, which we expect
will be to Ca1 State Associates, Inc., essentially on the basic terms as out-
lined in your letter of November 23. Accordingly, we recommend to the City
of Tustin Planning Agency that they recognize that the proposed sale likely
will take place, and proceed with the review of your condominium project,
to include the portion of property which you expect to acquire from the school
district.
Sincerely, ~ . ~
L. E. Sutherland~J~r.
F!anager, Support Services
LES:cmc
', 500 sooth C str eet: e sei , catigor nia 996 0 * 714-730-7301 ,
DATE:
September 30, 1981
7: PUBLIC HBARING
Inter-Corn
TO:
FROM:
SUBJECT:
Honorable Chairman and Planning Agency Members
Community Development Department
Variance No. 81-8
Location: 14882-14942 Newport Avenue, R3(1750) District
Applicant: Cal State Associates CCLV "A"
REQUEST:
Authorization to convert the 296 unit apartment complex at 14882-14942 Newport
Avenue into residential condominiums, and to vary with the open space require-
ments set forth in the Planned Development District Regulations.
RECOMMENDED ACTION:
Due to the complexity of this proposal, it is recommended that the Planning
Agency review and approve the zoning code considerations of the site and
continue the review of the building code items until the October 19, 1981
meeting.
BACKGROUND:
The Californian Apartments were developed in November of 1969 as authorized by
the now defunct Architectural Review Committee. Since its inception, the
complex has gone through a number of owners and an apparent lack of adequate
maintenance. The City Council and staff in recent years have received numerous
complaints regarding problems with the water and heating systems, and the roofs
and stairwells. The City Planning and Building staff have been working exten-
sively with contractors representing the owners since October of 1980 on a case
by case basis to ensure compliance with building codes. The latest permit
applied for (September 29, 1981) was for roof repair of one structure.
DISCUSSION:
Due to the extensive building problems, the question of conversion to condo-
miniums for this project must be divided into two distinct aspects. In
addition to the zoning and site design consideration normally reviewed, the
City should seriously look into the adequacy of the structures and their
components for condominium ownership and management.
To ease the hearing process, staff is recommending that these two aspects,
zoning and building, be reviewed separately due to the scope of the project.
The report for this meeting will center around the zoning requirements of the
Planned Development District (PD). It is recommended that the next meeting
deal solely with the building concerns. By that time, staff should have
completed an analysis from the City's Building consultant regarding code
problems with the structures.
SITE AND DESIGN REVIEW:
In order
proposed
to com~ly with the provisions of the PD District, the architect has
the following modifications to the 296 unit complex:
The construction of two 229 space parking structures (one along each
interior side property line). The total of 598 spaces satisfies
minimum requirements. A parking space allotment plan has been sub-
mitted. The longest distance from any one unit to a reserved space
is 120 yards.
A portion of the rear property line abuts the City-owned tennis
courts along School Lane. The applicant is therefore requesting
authorization to develop the 45% open space as allowed in the PD
District.
In order to attain the 45% open space, the applicant is requesting
the following:
a)
b)
The inclusion of 14,890 square feet of developed open space
leased from the Tustin School District into the project's net
land area. This should be accomplished by subdivision with a 35
year lease agreement.
The allowance of approximately 5300 square feet of first and
second floor covered patios in the open space allotment. The
applicant is agreeable to removing the roof covering on all the
second floor patios.
Without these considerations the proposal would fall short of the
open space requirements. The lease agreement land, which will
require a parcel map, is about 6% of the open space area and the
covered patios are approximately 2% of the open space.
Emergency access through the project is to be provided with the aid of a
combination walkway and turf block system along the rear quarter of the
project. This emergency route would be open only for emergency purposes. The
remainder of the time it will form a part of the landscaped open space. The
parking structures must be designed to a minimum clearance of 13'-6" to allow
for fire vehicles and the roadway should satify all fire department require-
ments.
A tentative and final map will be required to be filed for a condominium
conversion.
All future buyers of these units will require notification that Newport Avenue
may be extended southerly to connect with Edinger St. Notification of same by
the developer should be a condition of approval of both this variance/use
permit and the tract map.
The extension of Newport Avenue could have an impact on some of the future
buyers/residents of this development, especially those units adjacent to and
near Newport Avenue.
MOSt Of the public improvements have been constructed with the previous apart-
ment development. However, any missing or damaged improvements adjacent to
this development will require replacement.
There is an approximate i 1/2:1 slope at the back edge of sidewalk sloping
down to the on site development. Either this slope should be regraded to
provide a one foot wide level area at the back of sidewalk or a fence/wall
should be installed to prevent pedestrians from falling down the slope.
An on site trash collection program needs to be clarified and reviewed by the
refuse hauler (SCA). Interior pickups to one or two central stations for
collection has been discussed.
The parking structures should be modified for hammer head turn around capacity
and the ramp design should be studied for adequate width and motorist
visibility.
FINDINGS AND CONCLUSIONS:
1. The useable on site open space will increase by the consolidation of
parking and the addition of the lease land.
The on site noise level generated by the railroad should be reduced
by the incorporation of a sound attenuation wall in the south parking
structure.
3. The vacant school district property will be improved by the incor-
poration of passive open space activities.
4. The development will satisfy the intent of the PD District regula-
tions.
BUILDING REVIEW:
As suggested earlier in this report, it is recommended that the Agency tenta-
tively approve the site plan proposal. Then it would be appropriate for the
Agency to take further testimony regarding Building Code items. Staff under-
stands that a great many of the concerns by the tenants will revolve around
these items. From this testimony and input from the Building Consultant,
staff will prepare an in-depth study for the next meeting.
Specific subjects which will be discussed in that report include:
1. Roof leakage
2. Heating problems
3. Water problems
4. Structural concerns with the stairways
5. Tenant purchase and relocation plans
6. Phased construction program
AGW/llh
1
$
4
5
?
gO
RESOLUTION NO. 2013
A RESOLUTION OF THE PLANNING AGENCY OF THE CITY
OF TUSTIN, GRANTING AUTHORIZATION TO VARY WITH
PLANNED DEVELOPMENT DISTRICT PROVISIONS AND ALLOW
CONVERSION OF THE CALIFORNIAN APARTMENTS TO 296
RESIDENTIAL CONDOMINIUMS
The Planning Agency of the City of Tustin does hereby resolve as fol-
lows:
I. The Planning Agency finds and determines as follows:
Ae
That a proper application (Variance No. 81-8), was filed on
behalf of Cal State Associates CCLV "A" requesting authoriza-
tion to vary with the requirements of the Planned Development
District to allow 43% open space and convert the Californian
apartments 14882-14942 Newport Avenue to 296 condominium
units.
B. That a public hearing was duly called, noticed and held on
said application.
Ce
That because of special circumstances applicable to the sub-
ject property, relative to size, shape, topography, location
or surroundings, a strict application of the Zoning Ordinance
is found to deprive the subject property of privileges enjoy-
ed by other properties in the vicinity and under identical
zone classification, evidenced by the following findings:
1. The use is in conformance with the land use element of
the Tustin Area General Plan.
The conversion will imporve the project by incorporating
amenities and repairs as required by development standard
as condition of variance approval.
That the granting of a variance as herein provided will not
constitute a grant of special privilege inconsistent with the
limitations upon other properties in the vicinity and dis-
trict in which the subject property is situated.
E. That this project is categorically exempt from the require-
ments of the California Environmental Quality Act.
That the granting of the variance as herein provided will not
be contra~ to the intent of the Zoning Ordinance or the pub-
lic safety, health and welfare, and said variance should be
granted.
Proposed development shall be in accordance with the
development policies adopted by the City Council; Uniform
Building Codes as administered by the Building Official; Fire
Codes as asministered by the Orange County Fire Marshall; and
street improvement requirements as administered by the City
Engineer.
Resolution No. 2013
Page 2
December 21, 1981
H. Final development plans shall require the review and
approval of the Community Development Director.
II. Planning Agency hereby grants a variance as applied for, to
authorize the conversion of the Californian Apartments to
condominiums, subject to the following conditions:
Ae
That a total of 598 parking spaces shall be provided on-site
for the exclusive use of the residents. The parking shall be
provided in two parking structures which shall include the
following items in their designs:
10
11
The interior height clearance shall be 13'-6" to allow
for emergency fire vehicle access.
The strucjture along the northern property line shall not
exceed 20'-0" in height.
The northerly face of the northern structure shall
incorporate amenities such as texture designs and
planters to mitigate any visual impact upon the
neighboring condominium project.
The parking structures shall be integrated with the
existing residential structures in conformance with
zoning code provisions.
16
19
2O
21
24
25
Be
5. The parking structures shall be designed to accommodate
fire department apparatus and shall be sprinklered.
That a 20'-0" emergency fire lane shall be provided around
the complex with an access/exit drive at the Carfax Avenue
cul-de-sac.
Compliance with the Subdivision Map Act by the submission of
Tentative Tract Map, the recordation of a Final Map and of
Covenants, Conditions, and Restrictions for the project prior
to the issuance of building permits. The Tract shall include
the adjacent parcel purchased from the School District.
The construction of all missing or damaged street
improvements adjacent to the property is required to include,
but not limited to, the following:
1. Curb and gutter
2. Sidewalk
3. Drive aprons
4. Street trees
Final site plan shall indicate the appropriate City standard
drawing numbers for any proposed work.
1
5
?
8
10
!0
Fe
Je
te
Me
That a 3'-0" garden wall shall be provided along the front
property line adjacent to the public side walk
That the Covenants, Conditions, and Restrictions shall
contain, but not limited to, the following items:
1. Notification to owners of the possible extension of
Newport Avenue to Edinger Street.
2. A parking allocation plan which will limit the distances
from an owner's unit to their reserved parking spaces.
That construction plans and specification for the repair and
improvement of the structures shall be submitted t~ the City
for review. These plans shall include grading, structural,
electrical, plumbing, and landscaping specifications and they
shall address, but shall not be limited to the following:
a) Roof reconstruction
b) Heating system
c) Water system
d) Stairway repair
That the hot water loop system shall be eliminated by means
of making each building or small cluster of buildings operate
on an independent system.
That the space heating coils located above the ceiling shall
be replaced with wall mounted heating units, or with one
central unit per apartment.
All overhead electrical and similar service wires or cables
will require conversion to underground services.
Approval of the final parking layout and trash enclosure
location by the City's contract refuse collection service.
On-site trash enclosures shall be located for convenient
resident use and shall include:
1. Trash compactors for each unit, and;
2. Local containers for resident use, and;
3. On-site pick-up service, provided by the association, to
the main enclosures for City pickup.
Compliance with all provisions of Conversion Ordinance No.
822 and of the Planned Development District.
The applicant shall provide a deputy inspector, the selection
to be approved by the Community Development Director, for the
entire construction period.
1
2
3'
4
51
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
O. That new security lighting shall be provided throughout the
compl ex.
PASSED AND ADOPTED at a regular meeting of the Tustin Planning AgenCy,
held on the day of , 1981.