HomeMy WebLinkAboutCC 3 AHFP 938 & 939 10-05-81NDAY
CONSENT CALENDAR
No. 3
10-5-81
DATE: SEPTEMBER 28, 1981 Inter � C 0111
TO: WILLIAM HUSTON, CITY MANAGER
FROM: DALE WICK, ASSISTANT CITY ENGINEER
SUBJECT: FINAL REPORT FOR BRYAN AVENUE AT BROWNING AVENUE
A.H.F.P. PROJECT NO. 938 AND 939
RECOMMENDATION:
It is reconamnded that the City Council, at their meeting of October 5, 1981
receive and file subject attached final report as is required by the Arterial
- Highway Financing Program (A.H.F.P.) procedural manual.
BACKGROUND:
- Sub3 eteTproject encompassed widening to ultimate of the intersection of Bryan
Avenue and Browning Avenue and construction of a major flood control facility
through the intersection.
Conceptual design was begun on the project in late 1977 after the area was annexed
to the city and improvement of the intersection became City responsibility.
In 1978, a Cooperative Agreement was entered into with the County for the flood
control work and the project was also approved for funding as an A.H.F.P.
project. The project was completed on Dec. 15, 1980 at a total cost of
- $1,026,081.06 including conceptual design engineering, environmental impact report
preparation, right of way acquisition, design engineering, project construction,
and construction engineering.
The completion of the final report was delayed until a final invoice was received
from the Edison company for the cost of relocating a major prior right
transmission line pole.
The project involves $776,461.00 in County A.H.F.P. and Flood Control District
funds and $249,620.06 in City funds. A major portion of the project design was
performed by staff with only the structural design and structural drafting being
"farmed" out to consultants. Design costs amounted to $45,050.85 including
consultant's fees, or 4.9% of the contract cost. The median compensation curve
for this type of project indicates that the consultant's fee, had the design
been farmed out 100%, would have been 6.3%, or $57,500.00.
DALE A. WICK
ASSISTANT CITY ENGINEER
cc: City Clerk
Finance Director
CITY OF TUSTIN
FINAL REPORT
AHFP PROJECT NO. 938
AHFP PROJECT NO. 939
COOPERATIVE AGREEMENT NO. D78 - 168
FOR
WIDENING OF THE INTERSECTION OF
BRYAN AVENUE AND BROWNING AVENUE
AND
IMPROVEMENTS TO FACILITY F07 EL MODENA-
IRVINE FLOOD CONTROL CHANNEL
TOTAL PROJECT COST $1,026,081.06
CITY OF TUSTIN
AHFP PROJECT NO. 939
AGREEMENT NO. D78 - 168
FINAL REPORT FOR THE IMPROVEMENT OF THE
INTERSECTION OF BRYAN AVENUE AND BROWNING AVENUE
Type of Improvement: Widen intersection to ultimate width and construct
appurtenant improvements to major flood oontrol channel.
Description of Work Performed: Clearingand
grubbing, demolition of existing
bridge structure, relocate existing utilities,
construct 460 foot long triple cell reinforced
concrete box culvert, construct inlet and outlet
structures and misc. storm drain facilities,
grading, curb & gutter, sidewalk and paving.
Length in Miles: 0.15
Engineer in Charge: Robert S. Ledendecker, Director of Public Works/City Engineer
Dale A. Wick, Project Engineer
Date Work Began: July 14, 1980
Date Work Completed: December 15, 1980
-1-
CONTRACT COSTS
ITEM
NO. ITEM OF WORK
TOTAL
QUANTITY UNIT PRICE AMOUNT
1.
Road Closure, Barricades & Signs
1 L.S.
$4,000.00
2.
Clearing, Removals & Dispositions
1 L.S.
67,538.00
3.
San. Sewer Main Relocation
1 L.S.
20,000.00
4.
Water Main Relocation
1 L.S.
16,000.00
5.
Irrigation Line Relocation
1 L.S.
18,000.00
6.
Storm Drain Facilities & Conn.
1 L.S.
20,000.00
7.
Excavation & Earthwork
11,742.5 C.Y.
8.00
8.
Triple Cell RCB
460 L.F.
980.00
9.
RC Outlet Transition Struct.
1 EA.
58,000.00
10.
RC Outlet Wingwall
1 EA.
8,400.00
11.
RC Inlet Transition Struct.
1 EA.
24,000.00
12.
Stone Rip -Rap
2005 S.F.
4.00
13.
Chain Link Fence
185 L.F.
14.00
14.
Driveway & Pedestrian Gate
1 L.S.
1,000.00
15.
Type A-2 PCC Curb & Gutter
751 L.F.
8.00
16.
Type A PCC Median Curb
330 L.F.
8.00
17.
Concrete Median Nose
1 EA.
200.00
18.
PCC Sidewalk
1633 S.F.
2.00
19.
PCC Driveway Apron
465 S.F.
4.00
20.
Class 2 Aggregate Base
4195.78 T.
10.00
21.
AC Pavement & Joins
1573.50 T.
28.00
22.
Traffic Striping & Signing
1 L.S.
14,000.00
23.
Traffic Signal Conduit
392 L.F.
8.00
24.
24" Dia. Steel Casing Pipe
205 L.F.
28.00
25.
Sheeting, Shoring & Bracing
1 L.S.
400.00
CCO
#1 Deduct For Irr. Line Not Constructed (Bid Item
No. 5)
COO
#2 Sawcut (No Bid Item)
4 L.F.
2.00
CCO
#3 Deduct for Deletion of AB Primecoat
COO
#3 Add "Stop" Legends
7 EA.
23.00
TOTAL CONTRACT COST
WORK BY CITY FORCES AND OTHERS
DESIGN ENGINEERING
LABOR
Principal Engineer 3.5 Hrs. @ 10.87 . . .
. . . $ 38.05
Principal Engineer 282 Hrs. @ 11.48 . . . .
. . 31237.36
Principal Engineer 286.5 Hrs. @ 12.51 . .
. . . 3,584.12
Principal Engineer 414 Hrs. @ 13.79 . . . .
. . 5,709.06
Asst. Civil Engineer 41.5 Hrs. @ 9.63 . .
. . . 399.65
Asst. Civil Engineer 36 Hrs. @ 10.04• .
. . . 361.44
Asst. Civil Engineer 17.5 Hrs. @ 11.61 .
. . . 203.18
Asst. Civil Engineer 31.5 Hrs. @ 9.17 . .
. . . 288.86
Asst. Civil Engineer 1 Hr. @ 9.56 . .
. . . 9.56
Asst. Civil Engineer 33 Hrs. @ 11.06 . .
. . . 364.98
Engineering Aide 24.5 Hrs. @ 8.53 . . . .
. . . 208.99
Engineering Aide 5 Hrs. @ 8.88 . . . . .
. . . 44.40
Overhead @ 18% . . . . . .
. . . 2,600.88
Consultant Structural Engineering . . . .
. . . 12,590.00
Consultant Design Engineering . . . . . .
. . . 12,038.28
Consultant EIR Preparation . . . . . . .
. . . 2,000.00
-2-
$4,000.00
67,538.00
20,000.00
16,000.00
18,000.00
20,000.00
93,940.00
450,800.00
58,000.00
8,400.00
24,000.00
8,020.00
2,590.00
1,000.00
6,008.00
2,640.00
200.00
3,266.00
1,860.00
41,957.80
44,058.00
14,000.00
3,136.00
5,740.00
400.00
-2,135.54
+8.00
-810.00
+161.00
$912,777.26
WORK BY CITY FORCES AND OTHERS (Continued)
EQUIPMENT
400 Miles @ 0.15 . . . . . . . . . . . . . . . $ 60.00
Surveying Equipment . . . . . . . . . . . . . . 61.00
Misc. Equipment . . . . . . . . . . . . . . . . 42.00
MATERIALS & SUPPLIES
Blue Printing . . . . . . . . . . . . . . . . . $1,192.83
Misc. Supplies . . . . . . . . . . . . . . . . . 16.21
CONSTRUCTION ENGINEERING
1W.T.-3i10
Principal Engineer 6 Hrs. @ 13.79 . . . . . . . 82.74
Principal Engineer 448.5 Hrs. @ 16.38 . . . . . 7,346.43
Asst. Civil Engineer 155.5 Hrs. @ 12.83 . . . . 1,995.07
_... Asst. Civil Engineer 78.5 Hrs. @ 12.22 . . . . 959.27
Public Works Inspector 8 Hrs. @ 9.79 . . . . . 78.32
Public Works Inspector 442 Hrs. @ 11.21 . . . . 4,954.82
Engineering Aide 40 Hrs. @ 7.72 . . . . . . . . 308.80
Engineering Aide 22 Hrs. @ 8.51 . . . . . . . . 187.22
Overhead @ 188• . . . . . . . . . . . . . . 2,864.28
Consultant SoilsCompaction . . . . . . . . . . 80.25
EQUIPMENT
600 Miles @ 0.15 . . . . . . . . . . . . . . . 90.00
MATERIALS & SUPPLIES
$45,050.85
Survey Stakes . . . . . . . . . . . . . . . . . . 95.29
Blue Printing . . . . . . . . . . . . . . . . . . 67.58
Misc. Supplies . . . . . . . . . . . . . . . . . 13.00 . . . . $19,123.07
OTHER WORK BY CITY FORCES AND OTHERS
_ +PRIOR RIGHT POLE RELOCATION
Relocate P. Pole N.E. Cor. By Edison Co. . . . $34,457.59
INSTALL METAL BARRICADE STA. 14+25
Labor288.00
-- Materials & Supplies 326.38
Equipment . . . . . . . . . . . . . . . . . . . . 280.00
+See Pages 8,9,10, & 11
-3-
WORK BY CITY FORCES AND OTHERS (Continued)
*COUNTY EXPENSES
Labor . . . . . . . . . . . . . . . . . . . . . 6,623.00
Equipment. . . . . . . . . . . . . . . . . . 130.00
Overhead @18% . . . . . . . . . . . . . . . . 1,192.14 . . . . $43,297.11
TOTAL WORK BY CITY FORCES AND OTHERS . $107,471.03
TOTAL CCNSTRUCTION COST OF PROJECT . .$1,020,248.29
DIVISION OF COSTS
COUNTY
CITY
OTHER FUNDS
TOTAL
AHFP FUNDS
FUNDS
(O.C.F.C.D.)
AMOUNT
Contract Cost$188,599.33
$205,241.73
$518,936.20
$912,777.26
Work By City Forces & Others . 33355.43
41,461.94
32,653.66
107,471.03
+Riot Of Way Acquisition . . . 2,916.38
2,916.39
-0-
5,832.77
"TOTALS $224,871.14 $249,620.06 $551,589.86 $1,026,081.06
* See Page 7
** See Exhibit 15 Pages 5 and 6
+ See Final Report of Right Of Way Acquisition Page 22
-4-
-5-
r
W
S
W
O000000000000000000000
00O0000000000000000c000
. . . . . . . .
J
. . . . . . . O O . . . O . O . O . O . W
O b O W
O W O O O O O O n O
QU
OMOOO VOOOON01O0R bb b10O
O1nOO0001 W O V OOIliOObNN W 0100
HH
00
rU
RSO b W OMO W W et W Nr bN 1.-1ra Q
bN.-••-•NTN"• N C<-•
.-.
N •0000000 1 1 1 1 1 Ob 1
r
01Opp O OWOOOO N 01O 1 1 1 1 I\p 4L91
MbOOOOOl0O 1 1 1 1 1 TN 1
O
#
N
O
m1�OOb0 W 1 1 1 1 1 •� I
m ll'1W WRW N•--1 1 1 1 1 1 N� I
d LL
W
L N I I I I I I
C,
-Q
1 1 1 1 1 1
r U
00
•
M 33 ?re LE 2Q ae r O 10 10 �O lf9 23 1 1 1 1 1 1
W WOtfIO 1 1 1 1 1 tpN I
�
O'
mOOOOOm(nW
10O0N b1�N O W O I I I I I Tlfl 1
M r.l r1 w4 wY •••I w •.•1 p -I I 1 I I 1 N •"1 1
M T N 1 1 1 1 1 1
1 I 1 I I 1 O I I 1 1 1 1 1 I 1 I
I I 1 1 I 1 O I I I I I I IlO 1 1 1y O O N 1
r
N
1 1 1 1 1 1 1 1 1 1 I I I Ol 1 1 10 W 1[] I
1 1 I I I I N l l l l l l l b I I r1W N N I
O
Z W
1 1 1 1 1 1 1 1 1 1 1 1 1 tF 11 N r 1
Z
I 1 1 1 1 I I I 1 1 I 1 I I I M I[I W T I
I 1 1 1 1 1 l('1 1 1 I I I 1 1 n I 1 n l0 N I
I I 1 1 I 1 I I 1 1 I 1 1 co 1 1 O R 1
r
1 1 I
O,
1 1 I 1 1 I w•1 1 1 11 I 11 1 1 w•1 1
I
I I I 1 1 1 1 I I 1 1 1 I 1 I I 1 I I I 1 I
11 1 1 I I I 1 I 1 1 1 1 I I I 1 1 I 1 1 1
r
N
11 1 1 1 1 I 1 I I 1 I 1 1 1 1 1 1 I I 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
O
T
a#
11 I 1 1 I I I I 1 1 I I I 1 I 1 1 1 I 1 1
W 3
11 1 1 I 1 1 1 1 1 I I 1 I 1 I 1 1 I I 1 1
.~.•
S�
1 I I 1 I 1 1 1 1 I I I I 1 1 1 I I 1 I 1 I
O
1 I I 1 I 1 I I 1 1 I I I 1 I 1 1 1 1 1 I I
1
b .O
M 1 1 OCJ OO 1 1 1 1 1 1. • 1 co
MW 11000011 1 1 1 1 110000 O
2
r
m(I'> 1 1 NOO ^ I I 1 1 I I {nN O10 1 mnO
0
O
M 1 1 ^ N I 1 1 1 I 1 t0 m '•1 In 1 ^ w
•••'b I In�WO 1 1 1 1 I I 1TT1�
r
d U
U
W •� 1 I ••-I I 1 I 1 1 1 •••1 1 •--1 •--1
� 1 1 1 1 1 1 I W N
Q r
•
� O ILI 1 1 1 1 1 1 IO I
MIre 3E 22323000 1 1 1 1 1 1 W I
M
OCD
•1000000•-1 11 I I 1 I NIn O I MOO
O
V
d
MN �N I II 1 I 1 W l0W 1 T1�10
M •--1 1 I I I 1 I H N 1 •--1
1 I 1 1 I 1 1 1 1 1 I 1 1 I 1 1 1 I I 1 I 1
F
y
I I 1 1 1 1 1 1 1 1 1 1 1 I 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 I 1 I 1 1 I 1 1 1 I 1 1
0
11 1 1 1 I I 1 I 1 I 1 I 1 1 1 1 1 1 1 1 1
U
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
2 LL
O
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Y
1 I 1 1 1 1 1 1 1 I 1 1 I I 1 I 1 1 1 I 1 1
r
I I 1 1 1 1 1 1 I I 1 1 I I 1 I 1 1 1 I 1 1
b
I I 1 1 1 1 1 1 1 1 1 I I 1 1 1 I I 1 I I 1
1 1 1 1 1 1 I I I 1 I I 1 1 1 1 I 1 1 1 1 I
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
r
1 1 1 I 1 1 I 1 1 1 1 1 1 I 1 1 1 I I 1 1 1
N
O
I I 1 1 1 1 1 1 I I 1 1 1 I 1 1 1 I 1 I 1 1
11 1 1 1 1 1 1 I 1 I I I 1 1 1 1 1 1 1 1 1
T
#
V
11 1 1 1 I 1 1 I 1 I 1 I 1 I 1 I 1 1 I 1 I
11 I 1 I 1 1 1 1 1 1 I I 1 I 1 I 1 I 1 1 I
zLdL
3
1 1 I 1 1 1 I I I 1 I I 1 1 I 1 1 1 I 1 I I
o
a 0•.
V
l l l l 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
T
r
1 I 1 1 I 1 1 1 1 I 1 1 I 1 1 I 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
O
I I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
I
N I I 0 1 1 1 1 1 1 • I
a 1 I C"D 1 1 1 1 1 1 boCD I Wuio
z
r
mm I I ooOrn 1 1 1 1 1 1 10Nob I tor. o
O
N
M W 1 1 NOO 1 1 1 1 1 1 bm•--1 L0 1 MIS O
r
O
V
M 1 1 • N 1 1 1 1 1 1 w 1
r b t 1 n V W O 1 1 1 I I 1 • ti 1 T T
d V
2P O 1 I I I 1 1 I OJ b
1 1 1 1 A 1 N
LL O
Sd O'.
r
N
Y
M O 1 1
m LC 3F O 1Lf 1 1 1 1 1 I N W O 1111 31t
2
r
TO
InOOO 0 1 1 1 1 1 1 Wlp W 1 M10O
(Do CD
O
O
M N t} N •••1 H I 1 1 I I 1 .-w � N 1 T O N•f
•ll'1LL NLL •LLLL LLLLWO
J
NNNNNN •N NNt�InN
4
N J 10 N IO 111 J J J m m
rY
JJJJJJd'O WWW O J W M101nM J
O r
(� 10 O 1n .•1 O 1D t0 01
M
NN
r d
.••1 ••-1 •••1 .-1 •••1 .y .--1 Q •r .r ••-1 W .-1 Ili .-1 V' .--1 IP1 •••1
N �
O O
U U
W
W O O o O O O O O Opp O O O po 0 c 0 000 0 0
OOOOOOO
.rw .V.•
OMOOOOO -00000
O O
O (00000 Ov•�
NNt72
2K
O Wo NC0co
rr2O
�d
-1-WW
WO WOO
I�Ob W Wet•
y1 (/Irr
C bNr••+N T10 N N •�
UU W r
•
N
N
O o
h
Cr
O •w0• a+ O �•` U �+
ie r •� .� O V +O C In
1- CC Z �
CO.1
3
.0 41 CO L N L O A
LCO 01
UWWQ
OC U A•u a-1 L N+1 C77
0
IOW V N d C
LL
0 O D U UN�1+ U
V1 L O 10 � N C O U 1/1 4 N
CZZY
V
O
.--
NNW C 10 CLN C O Q
r
W
1
Z
NO 3CNLL m •U 10ZY Jy•�
NL7 ••+3r
7
O
L N K C r C T In C U •- r A m+ L
C
a8 N C C b C C I Y NGC C N 3 N C YI
Z Z r N
O W U LL O
O
CC
r
1A N A O N L •� A 6 C d N 1O 3 N L y N
U S O U
ZC
G
Q-
O M J'110 C L•.•Ur3 i•�•� NF•r N> 01 E
C if •�O �` rocJm I CC•� ITN Urrz
J
G'
U�� b J 10 N Y N 6Q N•r LQ >•�
4r1/1S W
Q
V
L V L E >r• N N++ N C N f NO N V-
rIn ZC7S
N
V1
C N N L q dr �- N •- > N N N d'�
•�66VUU T
O W O r r
rOUd'O
O
r
W
O
NNCa+LO U••-i+Y��10
CZ
N LN
LOOrIn L• TTV V UJU L
I
1YUN W
W
1-O
tiNM�10 bI�W 01OrINm10 bIlWTOrN
r 2
r-1 r-1 •-1 ^1 .--1 w•1 •r .-1 .--1 .--1 N N N
-5-
r
W
S
W
41 d d W
t 2 S Q
N Q Q O
00 0a008
OO O IC!O OC
N000�.+
m
^O'
I� O m N I�
J
MVOMO �tD
O!
tp
1�C. co N
N
O O
OJ •"1
.
m In N
1
e -• m
Q! V
q
^•
1 I 11 I I
1 I 1 1 I 1
O tD O 1
b
co
# O
C
1 1 0 1 1 I 1
1 1 b I 1 I I
N 1� Ol 1 1
I I
O!
1••!
I l r l I I I
N I I
co
� U
1 1 I 1 I I
q
mm
M O! 1p 1 I
�
LL
=
O! W 1
w 1 1
w
1 1 I I I I
I I
V
�. ••-I O I 1
rN•�+
w-1
0
?;
I I I I
1 1 1 1 1 1
I I.
11
417
o
CY
1 I C 1 I I 1
q
q
1 1 I I I I
O
N O 1 I 1 1
O Ot •••1 1
~
•
{nn 1 I p 1 1
• 11
q 1 1 1 1
1� M I 1
t�
Z LL
t0
1 1 1 1
1 1 1 1
w-1 I
1 1
N
Ch0 1 1 1 1
b
O! O I I {{ 1 1
q 1 1
q
•••1 N 1 I 1 1
1 1 1 1 1 1 1
1 1 1 1 1 1 1
11 I 1 1
1
N
1 1 1 1 1 1 1
11 I 1 1
1
p
1 1 1 1 1 1 1
I I 1 1
Y
d#
1
1
F-
LL3
i i i i l
1
11 1 I 1 1 I
1 1 1 1 1
1
r
b
1 1 1 1 1 1 1
1 1 1 1 1 1 1
1 1 1 1 1
1 1 1 1
1
1 1 1 1 1 1 1
n I o un
v l 0 1
m o mo!'�!
'^
z
O
1 M
O
N
O1
n 1 w -I 10 I O co
0
. . . N
r
�"!
O I
q l H I I
MO�IlYM.R
n.
O
d 6~i
LL=
m
to nOl O!
I M N N
N
1•••
1 I
w
N
Y
I AQ 2C 13C \
r
N
Z
00 1 0 0 I O m
1 In
q
q
1 1 1 1 1 1 1
H
1 1 1 1 1 1 1
1 1 1 1 1 1 1
1 1 1 1 1
1
U
1 1 1 1 1 1 1
I I 1 1
d
1 1 1 1 1
1
Z LL
1 1 1 1 1
1
p
1 1 1 1 1 1 1
1 1 1 1 1
1
Y
1 1 1 1 1 1 1
1 1 1 1
H
1 1 1 1 1 1 1
I I 1 1 1
I
b
1 1 1 1 1 1 1
1 1 1 1 1
I
1 1 1 1 1 1 1
H
1 1 1 1 1 1 1
I I I I
N
p
1 1 1 1 1 1 1
1 1 1 1 1 1 1
1 1 1 1 1
1 1 1 1 1
I
I
Y
#
U
1 1 1 1 1 1 1
1 1 1 1 1
I
2
3
I I I I I 1 1
i i i i 1
I
4d.
1
1
V
�
>
1 1 1 1 1 1 1
1 1 1 1 1
1
b
c
1 1 1 1 1 1 1
1 1 1 1 1 1 1
1 1 1 1 I
1
1 I I I 1
O O
1 O 1� 1
M O O N
•••I
i a m
Ma am
O
1 O
1 1
C
O W w !O �
r
n
d V
O! � lA •--1 l0
G7
01
M N
N
N
00n
N
O
b
O! I Mtn 14(! M
V
I I
q
q
LL LL N N LL N
J
ro
Q
J J J J J J W
F -b
m0
NN
O O
UU
I--CW�
000000
O •In
NNC7Z
Z_C
•fOOMNOM
HHZO
d
qN V N [ON
00¢F -
U U W r
W In
N
U
N
CV
CD
OI y.
C C d E E
O Z ••'• �
p b
O
3
U N O�a+a+ In
I U W WQ
V
- O
roV TSV d
i H.Z.OQtn
W
Z
I ZZF-3N
O
y
•r Y C J
IAN OOi•+
O W U W O
U OOU
¢
d
d�
ro C roY_ a+
I Q•--• V!2 W
Q
U
�•^•� O yUy
IF p i
O W p. -•S
r U EN
p
p
L a L L ro L C
FNN•-•N dQ
f
r N M M
HO
Mau'l0000
r Z
N N N U U U V
EXPENDITURES BY THE COUNTY OF ORANGE
for the
IMPROVEMENT OF BRYAN AVENUE
AHFP # 939
ENGINEERING
Material Test
Labor
$ 564.00
Equipment
84.00
Overhead
203.00
$ 851.00
Soil Test
Labor
$ 424.00
Equipment
46.00
Overhead
113.00
583.00
Plans & Sepcifications
Labor
$5,635.00
Equipment
0.00
Overhead
1,559.00
7,194.00
$ 81628.00 Total
Less Overhead in excess
of 18% Labor
682.86
6
7,945.14 Sub Total
Total progress payments made
to City of Tustin
163,200.00
TOTAL AMOUNT EXPENDED BY COUNTY
$171,145.14
This is to certify that no charges
incurred prior to
July 1, 1976 are included
in the above figures.
GV:mlA100(20)
ris Arnold, Acting Chief
Financial Operations
-7-
Southern California Edison Company SCE
INVOICE
Purchase Order No. 7976
Dated 5-28-80
TO City of Tustin
INVOICE NO. 9-131-07-81
INVOICE DATE September 17, 1981
TERMS: nOt Cash
I DESCRIPTION AMOUNT
Cost to relocate facilities located at Bryan and Browning Avenue to
clear for street improvements.
R/W File No. 4-2555 JE
W.O. 6229-6731
Total Cost Per Statement attached $15,868.01
W .O. 4805 - 0857
Total Cost Per Statement attached 17, 089.61
W .O. 9310-3923
Total Cost Per -Statement attached
Amount Due
1,499.97
$34,457.59
RECEIVED
SEP 18 1981
TsUSTIN PUBLIC 9RKS DEPT.
-8-
Make checks payable to: SOUTHERN CALIFORNIA EDISON COMPANY
and mail to: P.O. Box 800, Rosemead, California 91770, Attention: FINANCIAL ACCOUNTING DIVISION
sce AD 70-0 NZw 3/711 PLEASE REMIT ONE COPY OF INVOICE WITH PAYMENT
LOCMBER WORK BEOLR
Southern California Edison Company NYM�iR NYMNUMBER
ITEMIZED STATEMENT OF COSTS 6229 6731
DESCRIPTION QUANTITY AMOUNT TOTAL
MATERIAL:
POLES 1 ea s 250.54
ACSR. 633.9 18/3 750 ft 468.75
MISCQI.ANEOUS MATERIAL COSTS I LOT 4, osis. 4y
S 4,777
78
TOTAL MATERIAL COSTS
LABOR:
7,578
22
NORMAL TIME 367.00 MAN HOURS 4, 630.12
OVERTIME 5.50 MAN HOURS 110.76
PAYROLL TAX 262.17
--
TOOL EXPENSE 238.16
DIVISION OVERHEAD 2 337.01.
TOTAL LABOR COSTS
OTHER COSTS:
2,006
42
• MOTOR VEHICLE EXPENSE 988.51
EOUIPMENT RENTAL
EMPLOYEE EXPENSE
'-
RIGHT OF WAY COSTS 1 017.91
SHOP AND TEST COSTS
ENGINEERING COSTS .
sun TOTAL OTHER COSTS
SUB TOTAL
14,362
42
ADMINISTRATIVE EXPENSE 2,338.20
2,338
20
CONTRACT WORK
EDISON SUPERVISION OF CONTRACT WORK
JOINT POLE COSTS:
TOTAL OTHER COSTS
TOTAL CHARGES
16,700
62
CREDITS:
832
1 61
SALVAGE CREDITS 736.84
ALLOWANCE FOR DEPRECIATION 95.77
JOINT POLE CREDITS:
TOTAL CREDITS
-
TOTAL COSTS • 15.868
1 01
-9-
SM AD 545 REV 2/72
LOCATION WORK ORDER
Southern California Edison Company NUMBER NUMBER
ITEMIZED STATEMENT OF COSTS 4805 0857
DESCRIPTION QUANTITY AMOUNT TOTAL
POLES - 1 2 ea _ IB 1.072.15 I
MISCELLANEOUS MATERIAL COSTS
TOTAL MATERIAL COSTS
LABOR:
NORMAL TIME
OVERTIME
PAYROLL TAX
_ TOOL EXPENSE
DIVISION OVERHEAD
TOTAL LABOR COSTS
OTHER COSTS:
MOTOR VEHICLE EXPENSE
EQUIPMENT RENTAL
EMPLOYEE EXPENSE
RIGHT Of WAY COSTS
SHOP AND TEST COSTS
ENGINEERING COST'S
SUB TOTAL OTHER COSTS
ADMINISTRATIVE EXPENSE
CONTRACT WORK
EDISON SUPERVISION OF CONTRACT WORK
JOINT POLE COSTS:
TOTAL OTHER COSTS
CREDITS:
SALVAGE CREDITS
ALLOWANCE FOR DEPRECIATION
JOINT POLE CREDITS:
-10-
AD $45 REV 2/72
LOT
MAN HOURS
MAN HOURS
SUB TOTAL
TOTAL CHARGES
TOTAL CREDITS
TOTAL COSTS
S
s
851
LOCATIONWORK ORDER
Southern California Edison Company NYMBIER�[R NYM[[R
ITEMIZED STATEMENT OF COSTS 9310 3923
DESCRIPTION QUANTITY AMOUNT TOTAL
MATERIAL:
POLES s
MISCELLANEOUS MATERIAL COSTS
TOTAL MATERIAL COSTS
LA13OR:
NORMAL TIME
OVERTIME
PAYROLL TAX
TOOL EXPENSE
DIVISION OVERHEAD
TOTAL LABOR COSTS
OTHER COSTS:
MOTOR VEHICLE EXPENSE
EQUIPMENT RENTAL
EMPLOYEE EXPENSE
RIGHT OF WAY COSTS
SHOP AND TEST COSTS
ENGINEERING COSTS
SUB TOTAL OTHER COSTS
ADMINISTRATIVE EXPENSE
CONTRACT WORK
EDISON SUPERVISION OF CONTRACT WORK
JOINT POLE COSTS:
TOTAL OTHER COSTS
CREDITS:
SALVAGE CREDITS
ALLOWANCE FOR DEPRECIATION
JOINT POLE CREDITS:
.1011 AD 545 REV 2/72
I LOT
50 MAN HOURS
5 MAN HOURS
-11-
SUB TOTAL
TOTAL CHARGES
TOTAL CREDITS
TOTAL COSTS
II
III
0
234 1 541
There were no significant changes in estimated quantities.
Deviations from approved plans consisted of:
(1) Elimination of fillets in RCB to expedite the project by permitting use
of span-alls for pouring of the RCB top slab.
(2) The contractor elected to install chain link fence along the top of one
wall of the RCB inlet structure where guard cable fence was indicated.
(3) The City revised the grading plan around the RCB inlet structure to
permit any overflow to escape out the westerly side of the channel
before overflowing the easterly side.
(4) The City replaced the existing curb return and sidewalk at the
southwesterly corner of the intersection due to its broken condition.
(5) During the irrigation line relocation work it was discovered that the
existing line along the southerly side of Bryan Avenue was already
located outside of street R/W, consequently this relocation work was
deleted from the contract.
(6) The cross sections indicated a triangular wedge of native material to be
-- placed over the top of the RCB from about Sta 12+25 to 13+00. This was
deleted and 100% aggregate base backfill was utilized over the top of
the RCB.
(7) To expedite the paving operations the primecoat specified to be applied
to the aggregate base was deleted.
*There were three contract change orders initiated during the course of the work,
as follows:
CCO #1 - Provided for contractor to refund the cost of unused irrigation line
pipe due to fact that irrigation line relocation was a lump sum Bid
Item.
CCO #2 - Provided for replacing existing curb and sidewalk at southwesterly
corner of intersection.
CCO #3 - Provided for contractor to refund cost of aggregate base primecoat
deletion. also provided for added cost of 7 each "stop" legends
which were added to lump sum traffic striping bid item.
CONTRACTOR'S PERFORMANCE
The contractor's performance was excellent. The project was completed 55
calendar days ahead of schedule. On September 16, 1980, an accident occurred
at the site whereby the crane inadvertently contacted a high voltage line
while setting forms for the RCB walls. This occurrence resulted in the death
of one workman and injury to two others.
QUALITY OF WORK
The City of Tustin is well satisfied with the quality of the work performed
by the contractor.
* See Pages 13,14 & 15
-12-
CONTRACT CHANGE ORDER.
REQUEST FOR APPROVAL
CITY— Tu5n Q AHFP NO. 1319
PROJECT BR-eA#j QU6 (. 52owu.wk; AVB CCO NO• 1
CONTRACTOR N A I�.x..
DESCRIPTION IT WNS bl5CLVM9V 'Du(L _ rou6r9Lvcr7°Q -rjAr 1r'WAS NOT _
- t,jL-CESAev-M rZVW=r><.a Pbj2x7rx, Op r%4 O2n.c.neu Liuc (/Lv"#p SVM 810ir-cu
1u0.5) ou rile Sa,M S oS OF $RYA V. Tj-{IS GCo 1S Foa A R6CVwD FoQ
77440 vuuseo EtOw,
QUANTITY
SUiINARY - THIS CCO
2135,5
$
ITEM
INCREASE
-�"
NO.
DESCRIPTION
(DECREASE)
AMOUNT
S
26o L.F. 12 C4 loo ACP
2(eo L• F•
$ 2 119 °—�
c.1. 4$ ° 6Ir,Ls
2 ¢z
s 340 °=
G L 15-0 AC GASKerS
20 eii
$ 72 m
S A UtS TAS(
S I SI. 8L
TOTAL
$L2,135~. Sd
EXTRA, WORK DESCRIPTION
COST SUMMARY
Increase (decrease)
of Contract Items
Extra work
TOTAL
Percent Change
TOTAL CHANGE
THIS CCO PREV. CCO'S
Approved
Concurred
Approved
-13-
AHFP
NON
AHFP
2135,5
$
$�
2135.54
-�"
Approved
Concurred
Approved
-13-
AHFP
NON
AHPP
$�
2135.
1$
B�Z, 1-3.1r. 5 9)
TOTAL TO DATE
AHFP
"0"
AHFP
2135.
1$
11-13-
Contractor
1 -Contractor Date
Date
/-/8�0
iv/e/- ,,D9atee
Date
C
EXTRA FORK DESCRI?TION
4 L.F. SAwc.+r Gr 2.Cb POIL L.F.
COST SL=.1t 6RY
Increase (decrease)
OF contract Items
Extra ,dork
TOTAL
Percent Change
THIS CCO
1101-.1
AHFP
$ 23G4.av
-6—
0. 24,7.
TOTAL CHANGE
PREV. CCO'S
AHFP
NON
AIIFP
215SS4
_19.
-$-
-I&-
CONTRACT CHANGE ORDER
-8-
0.13%
O•?b�
REQUEST FOR
APPROVAL
Concurred
Orange AHFP F Representative
CITYI
-T
VSTI w1
�County
AHFP NO.
Approved
PROJECT
'�pp
R12YAAJ Ave. 4 Byto Vmuloa
Qyu.
CCO 140.
Z
CONTRACTOR
H. A. S1-r5stA m IUG.
—14—
DESCRIPTION
REMOw it 96VtACE CXtST[
X—, 51Q=U416c
+ (=4
e—_ dT ILY_
e,04woQ
IiuL TD FA,=r
IT IV $20KR1.1
A&Q
PQ'IVGW OIIT
(nir aaJcc
IU Aoe,na,.I fZel 0V9 AA,o
121!L a
ADQ,r+ew -
s,o •. -�-
A. _,AC.MMIr
'M CArCU Brteu d.l W'I-Y Sd0f
13 MAJ SSMAUM
5,DdWALW-
141<5'
$&r ASJ
15CI.V W T9W 09 CA rl!!iJ SA 5d
al
QUAI:TITY
SUMMARY - THIS CCO
ITEM
NO.
DESCRIPTION
INCREASE
(DECREASE)
AMOUNT
IS
TYPE A-2 (=46
_55 L.F.
$. 44o.c�?
—1
PGc_ S104wALlc
644 5.F,
$ 1,292.00
20
GL 2 Arga-asawls BASE
28 Taus
S 28�.m
21
AG PAvaluour
9 Toles
s 252.x0
7
�^cGvAno�u
l 1. s G:,Y.
s 92.00
TOTAL
$ Zl35ri.=
EXTRA FORK DESCRI?TION
4 L.F. SAwc.+r Gr 2.Cb POIL L.F.
COST SL=.1t 6RY
Increase (decrease)
OF contract Items
Extra ,dork
TOTAL
Percent Change
THIS CCO
1101-.1
AHFP
$ 23G4.av
-6—
0. 24,7.
TOTAL CHANGE
PREV. CCO'S
AHFP
NON
AIIFP
215SS4
_19.
-$-
-I&-
2135 54
-8-
0.13%
O•?b�
TOTAL TO DATE
AHFP
HON,
AHFP
2155.54
X21". ex
-$-
-I&-
Approved✓`n
A
AZM4.
ZM4.
0.13%
O•?b�
�LG
Contractor/
Date 1
Approved✓`n
/ ./.r
//
City Engineer
Date
Concurred
Orange AHFP F Representative
Date
�County
Approved
Date
Orange County )La-
—14—
CONTRACT CHANGE ORDER
REQUEST FOR APPROVAL
CITY _ TU5r-,w A11FP NO. 939
` PROJECT 139--fAW AVE -L, BQOWLJIua AVE. CCO NO. 3
CONTRACTOR r'''111 low
c.
5cml-m I C'
DESCRIPTION (1 / DWL,91W AaWasaerE BASE 'Pa .AeCotT _
(Z) AVC) i e7eN "STeP", CZ ws AT Lt -F,- wA.0 qum rr
beers (5,D irs-n M0.22
QUANTITY 'SUD114ARY - THIS CCO
ITEM INCREASE
NO. DESCRIPTION (DECREASE) AMOUNT
22. -7 W20W '*STOPS L62067'05'C 23= e3c" $ �O
$
cc
$
TOTAL
EXTRA WORK DESCRIPTION
ELart P2ianr (o,k a.,,.n SIS G+uous) $
s
$
s
$
TOTAL CHANGE $
COST SUMMARY
THIS CCO PREV. CCO'S TOTAL TO DATE
Increase (decrease)
of Contract Items
- Extra Work
TOTAL
Percent Change
AHFP
NON
AHFP
1 & I °ev
-e-
(910 eg
-0-
(/a4i®
$"
0.070)
-8-
AHFP
NON
AHFP
(1174,S'A
2344.eav
BlD.do
$
?,3S,S4
2364.
(o.2ax
o.2G�
AHFP
H O::
AHFP
(1174,S'A
2344.eav
BlD.do
$
-sY�✓_r�C�G��CIC�
(0.3C y
10.261
-Contractor
Date
-sY�✓_r�C�G��CIC�
/2 -P -B0
Approved
- .
Date
City ngi eer
2 '9
Concurred
!�
Orange Co�un AHFP
Field Representative Date
/2 -
Approved
Date
Orange Uunty EMA-Da
_
-15-
}tl � I m P'N^ eiyy II n u i wxa a
kA � Ipyi,N y,�lll V 4. SII •'
e II
Illy, �h
4R• �I �^f�
I
P
waon
�
4.^,�,
I��
lily _
1,
1C Iu01
+Ilulll
q
Jdm'�'etlRIR4�l,'
d
d
,{II om* III , ,VI 'i'IIhFtSnh'iit
-
7wO.P
OPI
PHOTOGRAPHS
BEFORE AFTER
Looking W ly along centerline of Browning Ave. from 25' S'ly of Bryan Avenue.
v
I-
BEFORE
AFTER
Looking S'ly along centerline of Browning Ave. from 150' W ly of Bryan Avenue.
X IL
-Orl
J�✓-.dmrp� I
F
l 4 11
7"
br
10 1
AFTER
from 500' Ply of Browning Avenue.
M -
Ilk,
PHOTOGRAPHS
BEFORE AFTER
Looking W'ly along centerline of Bryan Ave. from 250' Ply of Browning Avenue.
BEFORE AFTER
Looking W'ly along centerling of Bryan Ave. from 100' Ply of Browning Avenue.
PHOTOGRAPHS
I
.a
r
1.4kw-
BEFORE AFTER
Looking south along Flood Control channel from 230' north of CC Bryan and Browning
. .........
1 71
Completed RCB Inlet Structure Completed RCB Outlet Structure
-2o-
CERTIFICATION
We, the undersigned, Finance Director, City Engineer and Project Engineer, certify
that expenditures of $1,026,081.06 have been made in accordance with the
provisions of our cooperative agreements for AHFP Project No. 938, 939 and
D78 - 168.
We have in our possession copies of invoices, auditors warrants and other
substantiating documents that such expenditures have been made. These documents
are available for inspection upon request.
We certify that this report is a true and correct statement of the work performed
and costs incurred on the above project and that no charges incurred prior to
March 1, 1977, are included in the above figures.
Date Date Date '9L26
8/
—I OF
Ron Nault
Finance Director
Director of Public Works/ Project Engineer
City Engineer
-21-
CITY OF TUSTIN
FINAL REPORT OF RIGHT OF WAY ACQUISITION
AHFP PROJECT NO. 938
STREET NAME: Intersection of Bryan Avenue and Browning Avenue
DESCRIPTION: Acquire right of way to permit widening of intersection to ultimate
width and to permit construction of Q100 Flood Control Facility through the
intersection and easterly 500'*. This consisted of acquiring a 7' wide strip from
the easterly side of Browning, a 17' to variable width strip from the northerly
side of Bryan and a 17' to variable width strip from the southerly side of Bryan.
Easterly of Browning ultimate width right of way was acquired on Bryan, for the
length of the project, to provide in the future for the flood control facility to
be located in the median.
OFFICIAL RESPONSIBLE FOR ACQUISITION: Security Land and Right of Way Services
Inc.
TOTAL WIDTH OF STREET RIGHT OF WAY: Browning Avenue 80'. Bryan Avenue 100' to
153.44'.
LENGTH IN MILES: 0.15
DATE WORK BEGAN: Feb. 21, 1979
DATE WORK COMPLETED
July 23, 1980
COUNTY AHFP FUNDS
CITY AHFP FUNDS
Budgeted $13,300.00
$13,300.00
Expended 2,916.38
2,916.39
Unexpended 10,383.62
10,383.61
SUMMARY OF EXPENDITURES
Payment to Property Owners . . . . . . . . . . . -0-
Operating Expenses . ... . . . . . . . $5,300.00
Legal Descriptions & Maps by City Forces . . . . 532.77
TOTAL COST $5,832.77
I hereby certify that the above is a true and correct statement of the
transactions and expenditures of funds incurred on the above project.
The expenditures of all funds shown in this report have been reconciled with the
official records of the City of Tustin.
r
Date By
Title
-22-
SUMMARY OF RIGHT OF WAY ACQUISITION
PARCEL NO.
AHFP
CITY
OTHERS
TOTAL
AP
#104-350-12
$729.09
$729.09
-0-
$1,458.18
AP
#104-350-11
729.10
729.10
-0-
11458.20
AP
#104-350-27
729.09
729.10
-0-
1,458.19
AP
#104-350-01
729.10
729.10
-0-
1,458.20
TOTALS
$2,916.38
$2,916.39
-0-
$5,832.77
-23-
INDIVIDUAL PARCEL REPORTS
ASSESSOR'S PARCEL NO.: 104-350-12
GRANTOR: The Irvine Co.
GRANTOR'S ADDRESS: 550 Newport Center Drive, P.O. Box 1, Newport Beach, CA 92663
DESCRIPTION OF PARCEL OBTAINED: 7' width on Browning Avenue and 17' width on
Bryan Avenue plus 27' radius corner art -off.
Value Paid for Land . . . . . . . . . . . . . . -0-
Title Report . . . . . . . . . . . . . . . . . $ 75.00
Appraisal Report . . . . . . . . . . . . . . . 625.00
-- Acquisition Agent Fees . . . . . . . . . . . 625.00
Legal Description & Map by City Forces . . . . 133.18
TOTAL $1,458.18
APPRAISED VALUE $2,250.00
EXPLANATION: Property Acquired by negotiation and no fee dedication.
ASSESSOR'S PARCEL NO.: 104-350-11
GRANTOR: Southern California Edison Co.
_. GRANTOR'S ADDRESS: P.O. Box 410, Long Beach, CA 90801
DESCRIPTION OF PARCEL OBTAINED: Variable width strip from 17' to 27.48' wide.
Value Paid for Land . . . . . . . . . . . . . . -0-
Title Report . . . . . . . . . . . . . . . . . $ 75.00
Appraisal Report . . . . . . . . . . . . . . . 625.00
Acquisition Agent Fees . . . . . . . . . . . 625.00
Legal Description & Map by City Forces . . . . 133.20
TOTAL $1,458.20
APPRAISED VALUE $11,900.00
-- EXPLANATION: Property acquired by negotiation and no fee dedication
-24-
INDIVIDUAL PARCEL REPORTS
ASSESSOR'S PARCEL NO.: 104-350-27
GRANTOR: The Irvine Co.
GRANTOR'S ADDRESS: 550 Newport Center Drive, P.O. Box 1, Newport Beach, CA 92663
DESCRIPTION OF PARCEL OBTAINED: Variable width strip frau 27.48' to 43.72' wide.
Value Paid for Land . . . . . . . . . . . . . . -0-
Title Report . . . . . . . . . . . . . . . . . $ 75.00
Appraisal Report . . . . . . . . . . . . . . . 625.00
Acquisition Agent Fees . . . . . . . . . 625.00
Legal Description & Map by City Forces . . . . 133.19
TOTAL $1,458.19
APPRAISED VALUE $16,400.00
EXPLANATION: Property acquired by negotiation and no fee dedication.
ASSESSOR'S PARCEL NO.: 104-350-01
GRANTOR: The Irvine Co.
GRANTOR'S ADDRESS: 550 Newport Center Drive, P.O. Box 1, Newport Beach, CA 92663
DESCRIPTION OF PARCEL OBTAINED: 7' wide strip on Browning Ave., 27' radius corner
oat off, variable width strip frau 17' to 43.72' wide on Bryan Avenue.
Value Paid for Land . . . . . . . . ... . . . . -0-
Title Report . . . . . . . . . . . . . . . . $ 75.00
Appraisal Report . . . . . . . . . . . . . . . 625.00
Acquisition Agent Fees . . . . . . . . . . 625.00
Legal Description & Map by City Forces . . . . 133.20
TOTAL $1,458.20
APPRAISED VALUE $31,800.00
EXPLANATION: Property acquired by negotiation and no fee dedication.
-25-
X104_
AP#
BRYAN AVENUE
AHFP PROJECT NO. 938
STRIP MAP OF RIGHT-OF-WAY ACQUISITIONS
-26-
4P#/04-3,50-/2
® A•PE,4 TO BE,4lp111oPED
706 Sr. FT.
-27-
W141MG AVE:
APnO�/04-350-//
®AREA TO BE AIgU/.PE,D
4537 Sq. FT
Q
Q
...,,0,
Q
71 104 -."61
® 4RS.4 TO BEAIq!//.PED
A807 Sq FT.
-29-
_._BROWN/NG AYf.
r,
�SCAtE�/"=SD'
AP''6�/04 350-0/
-- ® AREA 70 ACOW1..PIED
%//B2 51P. A
-30-
• 0
ACTION OF THE CITY COUNCIL
CITY OF TUSTIN
A regular meeting of the City Council of the City of Tustin, California, was held
on Monday September 21, 1981 at 3:46 p.m.
PRESENT: Edgar, Hoesterey, Kennedy, Saltarelli, Sharp
ABSENT: None
SUBJECT: ESTABLISHMENT OF CITY OF TUSTIN MINORITY BUSINESS ENTERPRISE (MBE)
PROGRAM
Moved, seconded and duly carried, to ABPROVE AND ADOPT THE CITY OF TUSTIN MINORITY
BUSINESS PROGRAM WHICH WAS ATTACHED '1A0 THE ENGINEERING REPORT DATED SEPT. 14,
1981.
STATE OF CALIFORNIA)
COUNTY OF ORANGE )SS
CITY OF TUSTIN )
I, MARY E. WYNN, City Clerk and ex -officio clerk of the City Council of the City
of Tustin, California, do hereby certify the foregoing to be the official action
taken by the City Council at the above meeting.
IN WITNESS WHEREOF, I have hereunto set my hand and seal this 22nd day of
September, 1981.
IqJw F-.
MARY E. WYNN, Ci Clerk an Ex -officio
Clerk of the City of Tustin, California
8(C�'