HomeMy WebLinkAboutCC 9 WTR SVC RATES 07-06-81DATE:
July 2, 1981
CONSENT CALENDAR
NO. 9
Inter-Corn
FROM:
SUBJECT:
HCNORABLE MAYCR AND CITY COUNCIL
CHARLES THAYER, INTERIM CITY MANAGER
RESOLUTICN ADOPTING ~ ~ATER SERVICE RATES
RECf~MENDATICN:
Approve Resolution No. 81-82 increasing water rates for Tustin Water
Service 12% for FY 81/82 effective July 1, 1981.
DISCUSSICN:
The attache0 Rmsolution establishes the new water rates incorporating the
12% increase, as approved by Council at the June 15, 1981 meeting.
$
4
5
?!
10
gO
£§
RESOLUTION NO. 81-82
A RESOLUTION OF THE CITY COUNCIL OF THE
CITY OF TUSTIN, CALIFORNIA, ADJUSTING
CERTAIN TUSTIN WATER SERVICE USAGE RATES.
WHEREAS, the Tustin Water Service has experienced increased costs of
operations; and
WHEREAS, it has become necessary to adjust certain water service usage rates
by 12%;
NOW, THEREFORE, the City Council of the City of Tustin does hereby resolve as
follows:
Effective July 1, 1981, the adjusted bi-monthly water usage rates and charges
are hereby established:
0 to 600 cubic feet ................................. $0.295 .per 100 cubic feet
Over 600 cubic feet ................................. 0.467 per 100 cubic feet
Plus bi-monthly service charge per meter:
5/8" x 3/4" meter .... ~ ............................. $ 6.50
1" meter ................................... 9.74
i 1/2" meter ................................... 13.10
2" meter ........................... ~ ....... 17.85
3" meter ................................... 33.04
4" meter ................................... 44.55
6" meter ................................... 74.50
Bi-monthly fire line and detector check valve charges:
4" fire service ........................... $31.36 per service
5" fire service ........................... 39.20 per service
6" fire service ........................... 47.04 per service
8" fire service ........................... 62.72 per service
10" fire service ........................... 78.40 per service
12" fire service ........................... 94.08 per service
Construction water from metered fire hydrants:
All water sold ............................. $0.39 per 100 cu.ft.
Construction water from un-metered fire hydrants:
All water sold ............................. $0.11 per 100 gallons
Minimum charge .............................. 5.60 per application
1
4
?
9
10
11
lZ
15
14
15
16
17
18
19
2O
21
~4
£§
28
Resolution No. 81-82
page 2.
Water usage rates for un-metered developments during construction:
For each commercial or
industrial unit, or each
residential dwelling unit
of a development ........................... $10.00 for first two mos.
of the construction period
and $5.00 for each month
_ . additional or portion
thereof.
PASSED AND ADOPTED at a regular meeting of the City Council of the City of
Tustin, California, held on the day of , 1981.
ATTEST:
James B. Sharp
Mayor
Mary E. Wynn
City Clerk