Attached is a report from c~ryNapper on the status of the City's private
telephone system. No specific action is required by Council at this time.
would like to emphasize several points.
His reconmendations (Sec. II System ~c~s, pg. 2) on adding an additional 25
new extension lines from the switc~h to the distribution closets in both City
Hall a.~d the Police De~t at a total cost of $5,418.49 will probably be
necessary although it should be considered once we have a definite plan for
space r~cds expansion. This is not an unreasonable cost to add capacity.
The labor ar~ materia]~ to go from the distribution closets to new p~ones
where eventually r~ccded will be an additional cost in later years as new
phones are needed.
It is encouraging to note that the system's COndition (Sec. III System
~ondition, pg. 2) is ~n good shape and is still "state of the art".
At times, Council ha~ e~xpressed interest in a comparison of costs with a
standard telephone utility system. We have not ignored this possibility but
carrot m~ke the ~-nalysis when we cannot find the cost of a oomparable
tele~.one COmpany_ system's monthly charge. (Sec. IV Pacific Telephone
Compar_ ative Costs, pg 3) The City may have to hire a telephone consultant to
calculate such an eof. divalent monthly charge. We paid off our system's cost
in a very short period of time (four or five years starting in 1974). It was
envisioned that the system cost would break even in about 5 or 6 years, with
the following years realizing a significant cost savings. As our maintenance
COsts have stayed in line and the telephone company's costs have not
decreased, I am 95% certain an independent study would verify the' ~ceess of
the program.
If the Council wanted a more specific evaluation, I would suggest a COnsultant
specializing in that area be utilized.
DB:dmt
DATE: March 19, 1981
Inter-Corn
TO: DAN BLkNFd~SHIP, CITY ADMINISTRATOR
FROM: GARY NAPPER, ADMINISTRATIVE A~SISTANT
SUBJECT: STATUS OF CITY-CWNED. TR.r.~HONE SYSTEM
We have reached the p~intwherewe can no longer squeeze anymore new telephone
extensions frcm our system without making a major capital outlay expenditure. The
following information is p~ovided as a status-information report to you and
department heads contemplating telephone modifications.
I. SYSTEM S~
A. Main Switch
Bo
Our I.T.T. switch (in the basement) has the capacity to serve 200
different extension numbers. Currently, we are operating with 145
extensions, pe~raitting room to add 55 new stations to our entire city
operation.
There is e~0u~h equi~aent capacity to add 18 outside trunk lines for
incoming-ou=~oingpurposes. We are currently operating with 16 trunk
lines (12 .to City Hallf 4 to Police for business ooncerns). In
addition, ~ePoliceDepartment has 4 dedicated emergency lines that
ring direc~ly to the Police facility and dispatcher.
City Hall Closet (in Personnel Department)
There is r~ble capacity to add only one new extension to City Hall,
either as a single line set or on a multi-button set.
There exists enough equipment to add 12 lines with holding capability,
if there was cable available to support this ncc~ (which there is not).
Police Closet (in hallway behind Becords Supervisor office)
The Police Department can only add 5 new single line sets with existing
equi~nent. No new extensions can be added to existing multi-button
sets. .,
II.. SYSTEM NEEDS
City Hall Closet
The following cDsts and equil~nent will permit City Hall to add 25 new
extensions to new or existing l~hone sets:
200 ft. of 25 pair cable $132.00
(2) 66 B 25 mini-blocks and bracket.s 37.86
(1) 584 C panel (13 hold lines) 21~.20
(1) panel apparatus & mount.bracket ~04.50
(1) IT~ interrupter 78.75
(25) '400 E key cards (provides h°ld) 1473.25
12 hours labor 420.00
service charge 17.50
sales tax 122.24
City Hall estimate
$2597.30
Be
Police Facility
The following costs and equipment will permit the Police Department to
add 25 new extensions to new or existing phone sets:
200 ft. of 25 pair cable $ 132.00
(2) 66 B 25 mini-blocks a,J brackets 37.86
(2) 584 C i~neis (26 hold lines) 422.40
(1) panel ~aratus & mount bracket 104.50
(1) I%T int~-~cu_~ter 78.75
(25) 400 E key ~rds (provides hold) 1,~73.25
12 hours labor 420.00
service ~-..~rge 17,50
sales tax 134.93
Police estL~.~.te
$2821.19
Both above costs do not include necessary cable and telephone sets for
locating extensions in desired departments.
III. SYSTtlMCONDITION
After discussing the condition of our main switc~with a technician, our ITT
400 PBX system is in relatively good shape. Major repairs have recently been
performed on the switch at their cost, and our 1974 system remains close to
the state-of-the-art. ,
The switchboard requires peri~dicmaintenance, and it is highly recor~nen~ed
that a headset be purchased for the switchboard operator to enhance
productivity in this area. Investigation should be conducted into the
possibility of improving our system for better paging/music capability (new
amplifier and tuner, outside antenna) as well as providing music-on-hold
functions (a nice public relations touch).
IV. PACIFIC TEL~.PHONE CC~4PARATIVE COSTS
We have periodically requested Pacific Telephone to review our system setup
and inform us what it would cost to be renting the equilanent from them.
Unfortunately, they have repeatedly ignored our requests. Assumably, they do
not see any benefits to them in expending the effort to compile the data;
there is only slight potential the City would ~zrap our system and convert to
their rented equi~nent.
V. OVERALn EVALUATION
Owning one's telephone system inevitably requires constant staff monitoring
and coordination of both the private maintenance company and Pacific
Telephone. To determine whether it has been cost-effective over the past 7
year period w~uld require extensive research into our initial capital outlay
and modification costs to be compared with Pacific Telephone Data. Since
their information is not readily available, an evaluation is difficult to
make.
Phone problems occur in any telephone system, irregardless of system owner.
I am inclined to believe that administrative headaches and user nuisance
would be a trade-off under any system that routes calls through a central
EwitcD~oard.
GN:dmt
cc: Finance Dept.
A Oiv/sion of international Telephone and Telegraph Corporation
RECEIVED
JUN 2.5 i976
CITY OF fUSfii'l
June 23, 1976
One City Boulevard West, Suite 1434
Orange, California 92668
Telephone: ~714)
Mr. Dan Blankenship,
Assistant City Administrator
City of Tustin
Third and Main
Tustin, California 92680
Dear Dan:
I hope this information is more helpful than it has been
timely.
SYSTEM CONFIGURATION
770A 1i0 Trunk, 400 Line PABX
Trunks, incoming and outgoing 18
DID t~anks to Dispatch, full transfer 4
Installed station line capacity 150
Installed trunk line capacity 48
Trunk terminations 28
Working station lines 136
Six-button telephones w/Touch Tone 37
Call Director.telephones w/Touch Tone 8
Line light equipment 47
Dial intercom arrangements 4
Manual intercom arrangements 6
Extension bells 7
Attendant console with key-per-trunk
operation
Touch Tone
Toll Restriction
Transfer of incoming and outgoing calls
Consultation Hold
Conference
UNA
ANA
Trunk test line circuits
Battery reserve maximum
2 Attendant lines
Camp-on busy with indication and automatic recall
Automatic recall of unanswered calls
Mr. Dan Blankenship
City of Tustin
June 23, 1976
Page two
Installation: $10,852.00
Monthly: $ 1,875.95
X 20 months
$10,852.00 + $37,500.00
Total: $48,352.00
You elected to pay for your ITT system over a 48 month
period and with NO escalation from PT&T that equals
$90,000.00 monthly rental plus the installation charge
of $10,852.00 or $100,852.00 vs. $105,000.00 plus
$3,800.00 for the U.P.S. system.
If you want to escalate the Telco figure by 6%, then it
would be $98,478.00 plus $10,852.00 or $109,330.00 for
Telco vs. $108,800.00 for ITT, which means that in 4 years
the system paid for itself. And from that point on you
save upwards of $26,000.00 per year.
Dan, if you or the Council require additional information,
please advise.
Sincerely,
Donald W. Wooda~an,