SEPTEMBER 29, 1980
NEW BUSINESS
Inter-Corn
FROM:
sUBJECT:
DAN BLANKENSHIP, CITY ADMINISTRATOR
BOB LEDENDECKER, DIRECTOR OF PUBLIC WORKS/CITY ENGINEER
TRANSPORTATION DEVELOPMENT ACT PROGRAM- APPROVAL OF PROJECT
AND CLAIM FOR "PROGRAM" FUNDS.
As established by SB 821, 2 % of each county's total local transportatiOn
fund is annually set aside to fund the development of bicycle and
pedestrian facilities.
The City in order to receive it's share of said funds must:
1. Approve said project.
2. Approve the claim for said funds. (see attached)
The City's fair share allocation is $7,750.00 and will be spent to
construct handicapped ramps at the following street intersection
locations:
Northerly'side of Main Street at Prospect
Avenue. (2 each)
2. Northerly side of Main Street at Prebte
Drive. (2 each)
3. Preble Drive at Third Street. (4 each)
4. Prospect Avenue at Third Street. (4 each)
5. Northerly side of Main Street at Centennial
Way. (2 each)*
* This item may be deleted depending on bid results.
A copy Of the project submittal is attached for your information.
Reconm~endation:
It is recommended that the City Council at it's meeting of October
6, 1980, adopt a Minute Order approving the construction of the
handicapped ramps as proposed and authorizing the City Engineer
as designated contact person and also authorize the submittal of
the attached application for all funds available to the City of
Tustin for fiscal year 1980-81.
BOB LEDENDECKER
DIRECTOR OF PUBLIC WORKS/
CITY ENGINEER
BL:dph
cc: Mary Wynn
SOUTHERN CALIFORNIA ASSOCIATION OF GOVERNMENTS
TDA BICYCLE AND PEDESTRIAN FACILITIES CLAIM - ARTICLE 3
CHECKLIST OF ITEMS TO BE FILED
FY 1980-81
Claimant: City of Tustin Date: Septpmh~r lQ, IgR~
The items checked below are enclosed in connection with the claim filed herein:
X
X 3.
X 4.
X 5.
X
6.
Nontransit Claim Form
See instructions for completing the form in the instruction package.
Governing Body Authorization
Submit a certified copy of a resolution or minute order.
TDA Guide Section 1.5, page 5.
See SCAG
Project Information Form
See instructions for completing the form in the instruction package.
Projec~ Map
See TDA Guide Section 4.5, page 31.
Financial Reporting Form
See insSructions for completing Schedule A-3 in the instruction
package.
Pending Project Schedule
See instructions for ~ompleting Schedule B-3 in the instruction
package.
Other - Optional
Additional exhibits are enclosed as listed below:
SCAG - TDA (2/80)
GOVERNMENT BODy AUTHORIZATION
(COPy OF ADOPTED NXNUT£ ORDER)
SOUTHERN CALIFORNIA ASSOCIATION OF GOVERNMENTS
TDA NON-TRANSIT CLAIM FORM
¢ISCAL YEAR:
1980-81
CLAImaNT:City of Tu§t~n :
COUNTY LTF:
Orange
PURPOSE: (Check one box only)
(X) Article 3, Puc Section 99234
Bicycle and Pedestrian Facilities
( ) Article 8, Puc Section 99400a
Local Streets and Roads
( ) Article 8, Puc Section 99400a
Bicycle and Pedestrian Facilities
DATE:
September 19, 1980
PAYMENT RECIPIENT:
(Claimant)
300 Centennial Way
(Hailing Address)
Tustin, Ca 92680
(City and Zip Code)
City Engineer
Bob Ledendecker Director of Public Works
(Attention-Nam~ and Title)
Bob Ledendecker
Con~act person
544-8890
Phone no.
DETAIL OF REQUESTED ALLOCATION:
1. Payment from Unallocated Funds
2. Payment from Reserves (Drawdown)
helo by County Auditor
3. Total Allocation Requested
C'n,n~T,~,, OF APPROVAL: Aparoval of
this claim and payment by the County
Auditor to this claimant are subject
to monies being available, and to the
provision tha~ such monies will be
used only in accordance with the
allocation instructions.
i ' Amount I ~etnod of Payment
$7,750.00 tSingle lump sum
S 50.00 ! (single)
S7,800.00 !Single lump sum
~U,,,ORIZIJG SIG',~IURE(CL~I,'IA.~ S
CHIEF ADMINISTRATOR OR FINANCIAL
' - /" (~ignature~
.L=oni Hamblin, Actinq Finance Director
(Print Na~ and Title)
CTC USE ONLY
1. DATE APPROVED
2. SIGNED:
1. CLAIM NO.
2. DATE APPROVED
FOR PAYMENT
FOR RESERVE
3. ALLOCATION NU~ER
4. BY:
SCAG-TDA
(2-aO)
SCAG USE ONLY
Claimant: City of'~Tus~in
°~3ject Name:Installation of Handicapped ~amps
Project Type:
2icvcle Faci}i:y
( ) Bike Lane (Class II)
( )Bike Path (Class I)
r ) Other (specify)
BICYCLE AND PEDESTRIA:~ FACILITIES CLAIM
Project Information Form FY 1980-81
2.
Date: Spptp6her 19, 1980
Pedestrian Facility
( ) Sidewalk
~) Handicapped sidewalk ramps
( ) Other (specify)
~ect ....... .n,.~qm~ts:Main and Third Streets frnm Prn~pprt Avenue to
Preble Drive and Centennial b/ay at ,Main Strept
]CSTS
Preliminary Engineering and ~sign:
Righ:-of-Way Acquisition:
Constructicn:
TOTAL PROJECT COST:
REVE~¢UE
TranSpor:a%ion Development Act:
Other :
TOTAL PROJECT REVENUES:
fl.O0
~ O0
7,800.00
7,800,00
7,800.00
0.00
7.800.fl0
7. Estfmated Starting Date (n~nth/year):
8. Estimated Con~pletion Date (n~/year):
9. Does project involve multiple govern~ntal jurisdictions?
If yes, identify participating agencies.
10. Project Description (Use additional sheets as necessary.)
Yes No X
SCAG-T~A (2/80) 1. Northerly side of Main Street at Prospect Avenue (2 each) 2. Northerly side of Main Street at Preble Drive. (2 each)
3 Preble Drive at Third Street. (4 each)
4. Prospect Avenue at Third Steet. (4 each)
5. Northerly side of Main Street at Centennial Way. (2 each)*
® · ............... · ......... 8 o' ....
C)
C~
0
C)