Loading...
HomeMy WebLinkAboutCC 8 VARIOUS PROJ'S 07-08-80CONSENT CALENDAR No. 8 7/8/80 / DATE: JUNE 179 1980 / Inter~Coli! TO: DAN BLANKENSHIP, CITY ADMINISTRATOR FROM: DALE WICK, ASSISTANT CITY ENGINEER SUBJECT: PROJECT I - MAIN STREET SIDEWALK CONSTRUCTION PROJECT II - PROSPECT AVENUE SIDEWALK CONSTRUCTION Subject project has been completed by BJ Construction Company and the Engineering Department is well satisfied with the quality of the work. The preliminary contract amount based on estimated quantities was $27,317.60. The final contract amount based on "as constructed" quantities is $27,855.10, for an overrun on the contract of $537.50 or 2%. Attached is the resolution for the City Council's acceptance of the work and authorization for recordation of the Notice of Completion. RECOMMENDATION: It is recommended the the City Council at its meeting of July 8, 1980, adopt the attached Resolution accepting said work and authorizing the filing of the Notice of Completion. Assuming that no claims or stop payment notices are filed within 30 days of the date of recordation of the Notice of Completion, it is further recommended that the City Council authorize payment of the final 10% retention ($2,785.51) at that time. This amount together with previous payments of $25,069.59 represents 100% of the final contract amount. &DALICK Assistant City Engineer DAW:rve Attachment cc: City Clerk City Attorney Finance Director Hugh West 1 2 3 - 4 5 6 7 8I 9 10 11 12 13 14 15' 16 17 18 19 20 21 22 23 24 25 26 27 28 29 RESOLUTION NO. 80-66 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUSTIN ACCEPTING WORKS OF IMPROVEMENT AND AUTHORIZING RECORDATION OF NOTICE OF COMPLETION. WHEREAS, BJ Construction Co., having a contract.with the City of Tustin to construct the hereinafter described public work and improvement; and WHEREAS, the City Engineer has duly certified. to the construction and completion of said public improvement hereinafter mentioned in a manner satisfactory to the City Council of the City of Tustin; and WHEREAS, the City Council finds that said contractor has completed said public improvement hereinafter more particularly described in accord- ance with the provisions of the contract documents, and the notice of completion and acceptance of said public work and improvement should be filed and payment of the balance due said contractor authorized in accord- ance with the contract documents. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Tustin that said public work and improvement be, and the same is hereby accepted. Said public work and improvement is more particularly described as follows: Project I - Main Street Sidewalk Construction Project II - Prospect Avenue Sidewalk Construction AND BE IT FURTHER RESOLVED that the City Engineer of the City of Tustin be, and is hereby authorized to execute and file a notice of completion and acceptance of said public work and improvement described herein as required by law. PASSED AND ADOPTED at a regular meeting of the City Council of the City of Tustin on , 1980. ATTEST: CITY CLERK MAYOR C (Ti' e --Le W- COPY CITY OF TUSTIN ORANGE COUNTY, CALIFORNIA CONTRACT FOR THE CONSTRUCTION OF (PROJECT I) MAIN STREET SIDEWALK CONSTRUCTION AND (PROJECT II) PROSPECT AVENUE SIDEWALK CONSTRUCTION This agreement, made and concluded, in triplicate, this j� day of , one thousand nine hundred and eighty, between the City 6,1F Tustin, California, party of the first part, and Bonch T. Nagata doing business under the firm name and style of B J Construction Company Contractor, party of the second part. ARTICLE I. Witnesseth, that for ardin consideration of the pay- ments and agreements hereinafter mentioned, to be made and performed by the said party of the first part, and under the conditions expressed in two bonds, bearing date with these presents, and hereunto annexed, the said party of the second part agrees with said party of the first part, at his own proper cost and expense, to do all the work and fur- nish all the materials, except such as are mentioned in the Specifica- tions to be furnished by said party of the first part, necessary to construct and complete in a good workmanlike and substantial manner and to the satisfaction of the said party of the first part, in accordance with the plans and specifications entitled, "(Project I) - Main Street Sidewalk Construction and(Project II)- Prospect Avenue Sidewalk Construction,° and also in accord- ance with the Standard Specifications of the State of California, Busi- ness and Transportation Agency, Department of Transportation, dated January, 1978,, which said plans and specifications and Standard Speci- fications are hereby specifically referred to and by such reference made a part hereof. The work to be done is shown upon a set of plans numbered R -1049A, R-10498, R -1049C and R -1049D, on file in the office of the City Engineer, Tustin, California. The undersigned Contrac ties are approximate only, be bids, and the City of Tustin agree that the actual amount serves the right to increase tion of the work, or to omit necessary or advisable and in Engineer. for understands that the foregoing quanti- ing given as a basis for the comparison of does not, expressly or by implication, of work will correspond therewith, but re - or decrease the amount of any class or por- portions of the work as may be deemed the best interests of the City by the C-1 ARTICLE II. And the said Contractor agrees to receive and accept all the following prices as full compensation for furnishing all materials and for doing all the work contemplated and embraced in this Agreement; and also for all loss or damage arising out of the nature of•the work aforesaid, or from the action of the elements, or from'any unforeseen difficulties or obstructions which may arise or be encountered in the prosecution of the work until its acceptance by the City of Tustin, and for all risks of every description con- nected with the work; also for all expenses incurred by or in Conse- quence of the suspension or discontinuance of work and for well and faithfully completing the work, and the whole thereof, in the manner and according to the plans and specifications, and the requirements of the Engineer under them, to -wit: C-2 SCHEDULE OF WORK ITEMS AND CONTRACT PRICES PROJECT I - MAIN STREET SIDEWALK CONSTRUCTION C-3 Unit Price Total item No. Item with Unit Price Written in Words Approximate Quantity in Figures in Figures 1. Sawcut existing P.C.C. sidewalk at 11 L.F. $ 7.00 $ 77.00 seven dollars I per lineal foot. 2. Earthwork, excavation, removals, 1 Lump Sum $2,500.00 $2,500.00 I disposals and relocations at two thousand five hundred dollars lump sum. 3. ; Furnish and construct 3 block high I concrete block retaining wall and 53.2 L.F. $ 35.00 $1,862.00 reinforced concrete footing per Detail "A" at thirty five dollars per lineal foot. 4. -Furnish and construct 4 to 5 block high concrete block retaining wall and reinforced concrete footing 62.5 L.F. $ 38.00 $2,375.00 per Detail "B" at thirty eight dollars per lineal foot. 5. Furnish and construct 4 to 6 block high concrete block retaining wall 203.49 L.F. $ 40.00 $8,139.60 and reinforced concrete footing per Detail "C" at forty dollars per lineal foot. C-3 SCHEDULE OF WORK ITEMS AND CONTRACT PRICES PROJECT I - MAIN STREET SIDEWALK CONSTRUCTION continued Unit Price Total Item do, Item with Unit Price Written in Words Approximate Quantity in Fiqures in Figures 6. Furnish and construct 4" thick Port- 2531 Sq. Ft. $ 2.00 $5,062.00 land Cement Concrete sidewalk at — two dollars per square foot. 7. Furnish and install 5' high chain 519 Lin. Ft. $ 8.00 $4,152.00 link fence at eight dollars per lineal foot. 8. Furnish and construct Portland 1 lump sum $300.00 $ 300.00 Cement Concrete junction structure and 6" P.V.C. drains at three hundred dollars per lump sum. TOTAL PROJECT I $ 24,467.60 C-4 SCHEDULE OF WORK ITEMS AND CONTRACT PRICES (Project II) Prospect Avenue Sidewalk Construction - Unit Price Total Itec. 1,40 Item with Unit Price Written in Words Approximate Quantity in F gures in F gures 1. Sawcut existing A.C. or P.C.C. 30 L.F. $ 7.00 $ 210.00 pavement at seven dollars r per lineal foot. 2. Earthwork, excavation, removals, 1 Lump Sum $350.00 $ 350.00 Idisposals and relocations at three hundred and fifty dollars lump sum. f ' 3. Furnish and construct Type "A-2" 24 L.F. $ 15.00 $ 360.00 Portland Cement Concrete curb and gutter at fifteen dollars i per lineal foot. 4. i Furnish and construct 4" thick 565 Sq. Ft. $ 2.00 $ 1,130.00 Portland Cement Concrete sidewalk at two dollars per square foot. 5. Remove existing wood fence and 40 L.F. $ 20.00 $ 800.00 furnish and construct new 6' high grape stake fence with 15' wide gate at twenty dollars per lineal foot. TOTAL PROJECT II $ 2,850.00 GRAND TOTAL CONTRACT $ 27,317.60 Grand Total or Gross Sum written in words for Projects I and II twenty seven thousand three hundred and seventeen and 60/100 dollars C-5 ARTICLE III. The sa party of the first part hereb, romises and agrees with the said Contractor to employ, and does hereby employ, the said Contractor to provide the materials and to do the work according to the terms and conditions herein contained and referred to, for the prices aforesaid, and hereby contracts to pay the same at the time, in the manner and upon the conditions above set forth; and the said parties for themselves, their heirs, executors, administrators, successors, and assigns do hereby agree to the full performance of the covenants herein contained. ARTICLE IV. It is further expressly agreed by and between the parties hereto that should there be any conflict between the terms of this instrument and the bid or proposal of said Contractor, then this instrument shall control and nothing herein shall be considered as an acceptance of the said terms of said proposal conflicting herewith. In Witness Whereof, the parties of these presents have hereunto set their hands and seals the year and the date first above written. THE CITY F TUSTIN (Seal) BYE/ Mayor he City of Tustin BY E. 1i City Cler of the C y of Tustin CONTRAC,T.' PPROUE, Date of Execution by City: 5- 14 -90 Date:�j%z-- orney APPROVEA AS TO C JTENT: 4b�, g Date: $ F02:City Engineer STATE OF CALIFORNIA ) COUNTY OF ORANGE ) SS BONCH T. NAGATA, DOING BUSINESS AS B/Z1 CONSTRUCTION COMPANY On this _ day of M o-.4 , 19 ?0 , personally appeared before me, the undersigned, a Notary Publid in and for said State, Bonch T. Nagata, known to me to be the sole proprietor of the proprietorship B J Construction Company, subscribed to the within instrument, and acknowledged to me tha a executed the ame. Witness my hand and official seal. &Inftv- & otary Public in and for said e OFFICIAL SEAL DONNALEE SANCHEZ m NOTARY PUBLIC - CALIFORNIA LOS ANGELES COUNTY 4 ' My comm. expires APR 12, 1981 C-6 ..CERTIFICATE OF 1NSUi2ANCE AND DESIGNATION Oi- � i i i : r. '.772 ESS OF AC -VCY, MAICO ASSOCIATES, INC. 750 E. GREEN STREET, PASADENA, CALIF. 91101 it is certifi�.d that a waiver of subrogation is lw-rLby issued to the City of Tustin as r•:'i ,sins to the terms Of all Workers Compensation Insurance.AS TO OPERATIONS PREFORMED FOR OR ON BEHALF OF THE CITY 0; �\RADDRESS OF INSURED Y -THE -MANFIl'rasumj,-NIDA_nIJTS-OR EMPLOYEES. DBA: B J CONSTRUCTION COMPANY 1360 SIMROSE DRIVE, MONTEREY PARK, CALIF. 91745 This is to certify that policies of insurance listed below have been issued to the insured name a5ove and are in force at this time and shall be primary coverage as to the City of Tustin. Policy V -Limits of Liabili y in Tnousan s (0 003 COMPTT f{ WnugaSige PolicyNumber Expiration Date 500000 Each i IL�ESS GL346-059510 12-5-80 _ CSL Occurrence A regate GcNERAL LIABIL�Y� Bodily Inlu -- 00,000 500,000 Comprehensive form Premises -operations Explosion and collapse hazard Underground Hazard products/ completed operations hazard ,contractual insurance Broad form property damage Independent contractors Personal injury AUTOMOBILE -" _ • -.� -" _ r-- _ ___. 6nLIABILITY Comprehensive form rn awned d Dred 5 Non -Owned E -XC S LIABILITY-- Umbrella form Other than Umbrella Form WORKERS' COMPENSATION and EMPLOYERS' LIABILITY LyC349-68094 Property Damage�00,000 $500,000 Bodily Injury . & property �00 , 000 $500,000 damage combined PERSONAL INJURY $ Bodily Injury $ $ (each person) Bodily Injury each Occurrence Property Damage Bodily Injury & Property Damage Combined $ —Nodi y InjurycN Property Damage$ $ Combined 12-5-80 CALIFORNIA Statutory- • --(e-;;CW $100,000 accident) The issuing company will give thirty (30) days written notice to the below named certificate holder prior to modification or cancellation. NAME AND ADDRESS OF CERTIFICATE HOLDER AND NAMED ADDITIONAL INSURED: Date Issue: may 6, 1980 (rd) CITY OF TUSTIN 300 Centennial Way At horiz Representath he above-named Tustin, California 92680 insurance company(ies) 7GR:se:1/31/79 Cert of Ins DO ,, „