Loading...
HomeMy WebLinkAbout05 ANN'L MJR MAINT. 01-20-04AGENDA REPORT Agenda Item Reviewed: City Manager Finance Director MEETING DATE: JANUARY 20, 2004 TO: FROM: SUBJECT: WILLIAM A. HUSTON, CITY MANAGER PUBLIC WORKS DEPARTMENT/ENGINEERING DIVISION AWARD OF CONTRACT FOR THE CONSTRUCTION OF THE ANNUAL MAJOR MAINTENANCE PROJECT, FY 2003-2004 (CIP NO. 7001), AND ANNUAL SIDEWALK, CURB AND GUTTER REPAIR PROJECT, FY 2003-2004 (PROJECT NO. 402-6235) SUMMARY Bids for the combined Annual Major Maintenance Project, FY 2003-2004 (CIP No. 7001), and Annual Sidewalk, Curb and Gutter Repair Project, FY 2003-2004 (Project No. 402-6235), have been received and a construction contract is ready to be awarded. RECOMMENDATION It is recommended that the City Council award the construction contract for the Annual Major Maintenance Project, FY 2003-2004 (CIP No. 7001), and Annual Sidewalk, Curb and Gutter Repair Project, FY 2003-2004 (Project No. 402-6235), to Sequel Contractors, Inc., the Iow responsible bidder in the amount of $633,306.70 and authorize the Mayor and the City Clerk to execute the contract documents on behalf of the City. FISCAL IMPACT The FY 2003-2004 Capital Improvement Program (CIP) Budget provides $600,000 for all of the various components in the Annual Major Maintenance Project (CIP No. 7001), including design, construction and contract administration. The bid amount for this portion of work is $472,435.50. The Public Works Department/Engineering Division Operating Budget for FY 2003-2004 provides $200,000 to cover all of the costs associated with the Annual Sidewalk, Curb and Gutter Repair Project (Project No. 402-6235). The bid amount for this portion of work is $160,871.20. Both of these projects are part of the City's on-going Maintenance of Effort (MOE) requirement to maintain eligibility for Measure M funding. The total bid amount for both projects is $633,306.70. BACKGROUND The Annual Major Maintenance Project, FY 2003-2004 (CIP No. 7001), and Annual Sidewalk, Curb and Gutter Repair Project, FY 2003-2004 (Project No. 402-6235) were again bid as one project to simplify the contract administration process and to reduce duplication of effort in coordination of the two projects. Combining the two projects will reduce disruption in the areas where both projects have construction impacts and will facilitate contract administration efforts by City staff during construction. Annual Major Maintenance Project, FY 2003-2004 (CIP No. 7001), and the Annual Sidewalk, Curb, and Gutter Repair Project, FY 2003-2004 (Project No. 402-6235) January 20, 2004 Page 2 Bids were opened on January 6, 2004, and the seven (7) bids received are summarized as follows: · Sequel Contractors, Inc., Santa Fe Springs ........................... $633,306.70 · R.J. Noble Company, Orange ............................................... $660,247.36 · Hardy & Harper, Inc., Santa Ana ........................................... $668,411.75 · Elite Bobcat Service, Inc., Corona ......................................... $696,836.50 · All American Asphalt, Corona ................................................ $714,590.20 · PALP, Inc., dba Excel Paving Company, Long Beach ........... $732,736.90 · International Pavement Solutions, Inc., San Bernardino ........ $537,039.50 (withdrawn) International Pavement Solutions, Inc. submitted the initial Iow bid in the amount of $537,039.50. However, International Pavement Solutions, Inc. acknowledged that a clerical error was committed in the preparation of their bid and requested withdrawal of the bid via letter dated January 7, 2004. Their request for withdrawal was submitted within five days from the bid opening date pursuant to the requirements of the Government Code and their bid bond will be returned to them. As a result of the bid withdrawal by International Pavement Solutions, Inc., Sequel Contractors, Inc. becomes the lowest responsible bidder. The references and the contractor's State License for Sequel Contractors, Inc. have been checked and are appropriate for the subject project. Sequel Contractors, Inc. bid for the Annual Major Maintenance Project (CIP No. 7001) and for the Annual Sidewalk, Curb and Gutter Repair Project (Project No. 402-6235) is about 8% above the engineer's estimate of $585,000. The bid amount is higher than the engineer's estimate due to the recent increase in oil prices which directly effects the price of asphalt concrete paving. There are, however, sufficient funds within the two project budgets to accommodate the cost of this work. Tim D. Serlet Director of Public Works/City Engineer Engineering Services Manager Attachments: Location Map-Annual Major Maintenance Program S:\City Council Items~004 Council Items~Award of Annuat Pavement Maintenance & Sidewalk Repair FY 03-04 Project.doc Z