HomeMy WebLinkAbout05 APPROVE PLANS & SPECS FOR ADVERTISEMENT FOR BIDS FOR ANNUAL ROADWAY REHABILITATION & SIDEWALK REPAIR (CIP NO. 70016)r4.WA.Qk
AGENDA REPORT
yAw
��ss��
MEETING DATE: APRIL 18, 2017
TO: JEFFREY C. PARKER, CITY MANAGER
Agenda Item 5
Reviewed.-
City
eviewed:City Manager
Finance Director
FROM: DOUGLAS S. STACK, DIRECTOR OF PUBLIC WORKS/CITY ENGINEER
SUBJECT: APPROVE PLANS AND SPECIFICATIONS AND AUTHORIZE
ADVERTISEMENT FOR BIDS FOR THE ANNUAL ROADWAY
REHABILITATION AND CITYWIDE SIDEWALK REPAIR PROJECT CIP NO.
70016
SUMMARY
The plans and specifications for the Annual Roadway Rehabilitation and Citywide Sidewalk Repair
Project CIP No. 70016 have been prepared and the project is now ready for bid.
RECOMMENDATION
It is recommended that the City Council adopt Resolution No. 17-12 approving the plans and
specifications for the Annual Roadway Rehabilitation and Citywide Sidewalk Repair Project CIP
No. 70016, and authorize the City Clerk to advertise to receive bids.
FISCAL IMPACT
Funding in the amount of $1,725,000 has been budgeted and appropriated in the Fiscal Year
2016-2017 Capital Improvement Program for the Annual Roadway Rehabilitation and Citywide
Sidewalk Repair Project. The project is part of the City's on-going Maintenance of Effort (MOE)
obligation to maintain eligibility for Measure M2 funding. The total engineer's estimate is
$1,465,000.
CORRELATION TO THE STRATEGIC PLAN
Rehabilitation of roadways and repair of sidewalks contributes to the fulfillment of the City's
Strategic Plan Goal B: Public Safety and Protection of Assets. Specifically, the project implements
Strategy #3, which among other items, is to ensure continuous maintenance and improvement of
public facilities.
DISCUSSION AND BACKGROUND
The Annual Roadway Rehabilitation and Citywide Sidewalk Repair Project CIP No. 70016 for
Fiscal Year 2016-2017 includes asphalt concrete pavement repair, asphalt concrete overlay, slurry
sealing, and traffic striping on various streets throughout the City within Zone 5 of the City's
Pavement Management Program. The City is divided into seven pavement management zones
with one zone targeted each year for pavement maintenance. Through a rolling seven year cycle,
this program is intended to maintain the integrity of City streets. The current phase, Zone 5 (see
attached map), is generally bounded by North City Limit to the north, along Browning Avenue and
West City Limit to the west, Santa Ana Freeway (SR -5) to the south, and Jamboree Road to the
east.
Annual Roadway Rehabilitation and Citywide Sidewalk Repair Project
April 18, 2017
Page 2
Effective July 1, 2017, the Measure M2 Ordinance (Ordinance No. 3) requires each City to maintain a
minimum level of local streets and roads expenditures from the City's General Fund regarding the
Maintenance of Effort (MOE) benchmark of $1,455,691 for this fiscal year in order to avoid the risk of
becoming ineligible for M2 funds.
CIP No. 70016 also includes the Annual Sidewalk Repair Project which focuses on removal and
replacement of damaged sidewalk to correct tripping hazards at numerous locations throughout the
City based on an annual field survey conducted by the Engineering Division. The field survey
identifies and evaluates locations where tree roots are causing sidewalk and curb and gutter
damage. Under the project, some of these trees will be removed and replaced with trees of an
acceptable species more suitable to the parkway area as recommended by the City's Contract
Certified Arborist. This project also provides improvements throughout the City to comply with the
Americans with Disabilities Act (ADA). These locations are typically requested by citizens or are
identified by City staff to provide for completion of missing segments of sidewalk and curb ramps to
improve pedestrian access.
The tentative schedule for construction of this project is as follows:
• Authorization to Advertise for Bids......................................................0411812017
• First Legal Advertisement...................................................................04/2712017
• Second Legal Advertisement.............................................................. 05/04/2017
• Bid Opening........................................................................................05/30/2017
• Award of Contract.. . ............................................................................ 06/20/2017
• Start Construction...............................................................................07/24/2017
• Complete Construction........................................................................10/26/2017
Since this project involves the replacement and repair of existing facilities with minor modifications,
it is Categorically Exempt under California Environmental Quality Act (CEQA) requirements. A
Notice of Exemption has been prepared for the project, and will be recorded with the County of
Orange.
Stack, P.E.
Public Works/City Engineer
Attachments
1. Resolution No. 17-12
2. Location Map
SACity Council Items52017 Council Itams104-18-201TApprove P&S for Roadway Rehab and Sidewalk Repair (CIP 70016)SApprovai of P&S Roadway Rehab & Sidewalk Repair (CIP
70016).docx
ATTACHMENT 2
Location Map
a g
RESOLUTION NO. 17-12
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUSTIN,
CALIFORNIA APPROVING PLANS AND SPECIFICATIONS FOR THE
ANNUAL ROADWAY REHABILITATION AND CITYWIDE SIDEWALK
REPAIR PROJECT CIP NO. 70016 AND AUTHORIZING
ADVERTISEMENT FOR BIDS
WHEREAS, it is the intention of the City Council of the City of Tustin, California to
contract for the construction of the Annual Roadway Rehabilitation and Citywide Sidewalk
Repair Project CIP No, 70016, FY 2016-2017; and
WHEREAS, the City Engineer has presented plans and specifications for the
construction of said work; and
WHEREAS, the CIP No. 70016 project is categorically exempt from the requirements of
the California Environmental Quality Act (CEQA); Class 1, Section 15301: Existing Facilities;
and
NOW, THEREFORE, BE IT RESOLVED that the plans and specifications presented by
the City Engineer are hereby approved as the plans and specifications for:
FY 2016-2017 Annual Roadway Rehabilitation and Citywide Sidewalk Repair Project
CIP No. 70016
BE IT FURTHER RESOLVED that the City Clerk is hereby authorized and directed to
advertise as required by law for the receipt of sealed bids or proposals for the performance of
the work specified in the aforesaid plans and specifications;
PASSED AND ADOPTED at a regular meeting of the City Council of the City of Tustin
held on the 18th day of April, 2017.
Dr, Allan Bernstein, Mayor
ATTEST:
Erica N. Rabe
City Clerk
STATE OF CALIFORNIA )
COUNTY OF ORANGE )SS
CITY OF TUSTIN }
1, Erica N. Rabe, City Clerk and ex -officio Clerk of the City Council of the City of Tustin,
California, do hereby certify that the whole number of the members of the City Council is five;
that the above and foregoing Resolution No, 17-12 was duly and regularly passed and adopted
at a regular meeting of the City Council held on the 18th day of April, 2017 by the following vote:
COUNCILMEMBER AYES:
COUNCILMEMBER NOES:
COUNCILMEMBER ABSTAINED:
COUNCILMEMBER ABSENT:
Erica N. Rabe,
City Clerk
ATTACHMENT 1
Resolution No. 17-12
z
LL
0
0
cD
0
0
O
z
IL
U
w
O
CD
O
w
CL
w
U
z
z
w
H
z_
w
D
H
U
F-
W
LL
z_
U_
J
CL
06
0
Q
0
J
z
z
Li
z
U
w
O
w
CL