Loading...
HomeMy WebLinkAbout08 NOC FOR MAIN ST WELL #4 02-05-07AGENDA REPORT MEETING DATE: FEBRUARY 5,2007 TO: WILLIAM A. HUSTON, CITY MANAGER FROM: PUBLIC WORKS DEPARTMENT/ENGINEERING DIVISION SUBJECT: ACCEPTANCE OF PUBLIC IMPROVEMENTS AND AUTHORIZATION TO FILE THE NOTICE OF COMPLETION FOR THE MAIN STREET WELL NO.4 REHABILITATION PROJECT (CIP NO. 6157) SUMMARY Construction of the Main Street Well No.4 Rehabilitation Project (CIP No. 6157) has been completed to the satisfaction of the City Engineer and is now ready for City Council acceptance. RECOMMENDATION It is recommended that the City Council adopt Resolution No. 07-13 accepting the Main Street Well No.4 Rehabilitation Project (CIP No. 6157), and authorizing the recordation of the Notice of Completion, and direct the City Clerk to: 1. Release the Labor and Materials Bond not sooner than thirty-five (35) days after the date of recordation of the Notice of Completion; and 2. Release the Faithful Performance Bond not sooner than one year after the date of recordation of the Notice of Completion. Assuming no claims or stop payment notices are filed, it is further recommended that thirty- five (35) days after the date of recordation of the Notice of Completion, the City Council authorize payment of the final retention in the amount of $12,255.00 to General Pump Company, Inc. FISCAL IMPACT The final construction contract cost for the Main Street Well No.4 Rehabilitation Project (CIP No. 6157) is $156,736.00. The project was funded by the City's Water Capital Improvement Program (CIP No. 6157) and Water Operations budget (70-459-7130). Acceptance of Public Improvements and Authorization to File the Notice of Completion for the Main Street Well No.4 Rehabilitation Project (CIP No. 6157) February 5, 2007 Page 2 Project completion, along with design and construction management, has increased the City's infrastructure assets by $194,176. The increased infrastructure valuation will be added to the City's infrastructure inventory as required by Statement 34 of the Governmental Accounting Standards Board (GASB 34): Detailed cost information is shown on the attached GASB 34 Infrastructure Inventory Valuation Form. BACKGROUND AND DISCUSSION The Main Street Well No.4 Rehabilitation Project (CIP No. 6157) was substantially completed on November 30, 2006. This project provided for the refurbishment of the existing Main Street Well No.4. The pump components and column pipe were replaced as part of the rehabilitation. All of the work for this project has been completed to the satisfaction of the City Engineer and is now ready for City Council acceptance. Tim D. Serlet Director of Public Works/City Engineer Attachments: Resolution No. 07-13 Location Exhibit GASB 34 Infrastructure Inventory Valuation Form S:\City Councilltems\2007 Councilltems\NOC Main Street Well No.4 Rehab Proj & Reso 07-13.doc RESOLUTION NO. 07-13 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUSTIN, CALIFORNIA, ACCEPTING THE' WORKS OF IMPROVEMENT AND AUTHORIZING THE RECORDATION OF THE NOTICE OF COMPLETION FOR THE CONSTRUCTION OF THE MAIN STREET WELL NO.4 REHABILITATION PROJECT (CIP NO. 6157) WHEREAS, General Pump Company, Inc., having a contract with the City of Tustin to construct the hereinafter described public works and improvement; and WHEREAS, the City Engineer has duly certified to the construction and completion of said public improvement hereinafter mentioned in a manner satisfactory to the City Council of the City of Tustin; and WHEREAS, the City Council finds that said contractor has completed said public improvement hereinafter more particularly described in accordance with the provisions of the contract documents and the Notice of Completion, and acceptance of said public works and improvement should be filed and payment of the balance due said contract authorized in accordance with the contract documents; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Tustin that said public works and improvement is found to be complete, and the same is hereby accepted. Said public works and improvement is more particularly described as follows: Main Street Well No.4 Rehabilitation Project (CIP No. 6157) BE IT FURTHER RESOLVED that the City Engineer of the City of Tustin is hereby authorized to execute and file a Notice of Completion for the acceptance of said public works and improvement described herein as required by law. PASSED AND ADOPTED at a regular meeting of the City Council of the City of Tustin held on the 5th day of February 2007. Lou Bone, Mayor ATTEST: City Clerk \J ::D o c.... m () -I Z )> ~ fI1 ~ )> z ~ ::D m m -I ::e m r r z o ~ ::D m I )> to r ~ o Z \J ::D o c.... m () -I ~ () \J Z o 0) .... 01 '-J '-" PROSPECT AVENUE 3:: > Z ~ ::c m m -I PREBLE DRIVE r-u 0:0 aO }>'- -1m -a 0-1 z -4 I ~ o if) -4 ~ rrl rr1 -4 ~ () ~ o " -I C en -I z CITY OF TUSTIN GASB 34 INFRASTRUCTURE INVENTORY VALUATION FORM Department: Public Works Division: Water Services Prepared by: Victor SaQredo Phone/Extension: 714/573-3380 Date Prepared: January 29. 2007 Description of the Asset: Main Street Well No.4 Rehabilitation Proiect Date: D Acquired I:8J Constructed D Removed: November 30, 2006 Basis of Valuation: (Please check one) I:8J Actual Cost (should include design, construction mgmt, fees, transportation, etc.) D Estimated Cost If Estimated Cost, describe the method used: Quantity: Description Quantitv Total Amount Well Rehabilitation Construction A Well Rehabilitation Construction B Replacement of components New Column Pipe Construction Management Services Preparation of Specifications SUBTOTAL LUMP SUM LUMP SUM LUMP SUM LUMP SUM LUMP SUM LUMP SUM $96,700 $25,850 $26,507 $7,679 $22,440 $15.000 $194,176 TOTAL $194,176 Source of Document /Information: Actual Contract Cost Total Valuation Amount $194,176 S:\GASB\GASB - CIP 6157.doc