HomeMy WebLinkAbout01 TENTATIVE TRACT MAP 17080: SUNCAL WALNUT/RED HILL 03-20-07MEETING DATE: MARCH 30, 2007
TO: WILLIAM A. HUSTON, CITY MANAGER
FROM: COMMUNITY DEVELOPMENT DEPARTMENT
SUBJECT: TENTATIVE TRACT MAP 17080
SUMMARY:
The project site consists of two parcels currently developed with 57 apartment units.
The project is proposed on a 4 -acre site located at the northwest corner of Walnut
Avenue and Red Hill Avenue. The City Council is requested to approve Tentative Tract
Map 17080 for a subdivision of the site and development of 75 condominium units. On
March 13, 2007, the Planning Commission conducted a public hearing and
recommended approval of the project.
APPLICANT/OWNER:
Suncal- Red Hill LLC
C/O Southwind Realty Group LLC
18301 Von Karman Avenue, Suite 710
Irvine, Ca 92612
Attn: Jim Magstad.t
RECOMMENDATION:
That the City Council:
1. Adopt Resolution No. 07-31 adopting Final Mitigated Negative Declaration prepared for
Tentative Tract Map 17080 and Design Review 06-011; and,
2. Adopt Resolution No. 07-32 approving Tentative Tract Map 17080 to merge two
existing parcels into a 4 -acre (net area) site for the purpose of subdividing and
developing 75 residential condominium units.
FISCAL IMPACT:
The requested tentative tract map is an applicant -initiated project. The applicant has paid
applicable fees for the processing of this project.
City Council Report
March 20, 2007
TTM 17080
Page 2 of 5
BACKGROUND:
The proposed site includes two parcels that are currently developed with two apartment
complexes including 57 units known as Whispering Woods and Tustin Terrace
Apartments. The Whispering Woods site is 1.87 acres and contains 27 two-story
apartments, and the Tustin Terrace site is 2.14 acres and includes 30 one-story
apartments. All existing units on the site are proposed to be demolished. To redevelop the
site with 75 condominium units, a tentative tract map and a design review application need
to be approved for subdivision of the land and the site amenities and building designs.
The project site is surrounded by commercial uses on the south and east, an office
building and residential uses on the north, and a residential neighborhood (Broadmoor
Park) on the west (Attachment A —Location Map). The site is zoned Multiple Family
Residential (R-3) District and designated by the General Plan as High Density
Residential (HDR) which provide for the development of residential condominiums.
DISCUSSION
Site Development
The site includes two apartment sites with 57 units that were constructed in the 1960s. The
proposed project is intended to demolish the existing apartments and replace them with 75
new condominium units (Attachment B —Submitted Plans). The site currently has two
vehicular accesses on Red Hill Avenue and a secondary access on Walnut Avenue. The
proposed site layout would eliminate the Walnut Avenue access and the only access to
and from the site would be provided from Red Hill Avenue approximately 120 feet from the
northerly property line.
The project site is proposed to be developed with 16 buildings of four-plex, five-plex and
six-plex designed in rows with entries facing one another and garages arranged back to
back. The buildings are set back 10 feet from the residential uses to the west and 16 feet
from the residential and office uses on the north.
The proposed buildings are typically three stories and 35 feet in height with the exception
of the units located along the property lines adjoining a neighboring residential site. These
"rear" units are designed with a third floor loft and an overall height of 30 feet.
The project will comply with the development standard for the City's Multiple Family
Residential (R-3) District as follows:
Standards
Required
Proposed
Density
max. 25 du/acre
18.75 du/acre
Site Area
min. 7,000 sq.ft.
174240 (net)
Minimum lot area per unit
1,750 sq.ft.
2,323 sq.ft.
Building Height
max. 35 feet
35 feet (average)
Lot Width
min. 70 feet
331 feet
Lot Coverage
max. 65 percent
65 percent
City Council Report
March 20, 2007
TTM 17080
Page 3of5
Landscape Open Space
Front Setback
Side Yard Setback
Rear Yard Setback
Off-street parking
min. 35 percent
min. 15 feet
min. 5 feet
min. 10 feet
min. 150 garage spaces
plus 19 guest stalls
35 percent (includes
2.7% decorative paving)
15 feet to the building
(12 feet to balconies)
10 feet
19 feet
150 garage spaces
plus 27 guest stalls
Access, Circulation, Parking, and Traffic Analysis
A traffic study was submitted and reviewed by the City's Engineering Division (Exhibit 2
of MND analysis). The study concluded that the proposed project is expected to
generate approximately 718 daily trips, which in comparison with the existing
development, would be an increase of 342 daily trips. This is a relatively significant
increase in comparison with the previously existing land use.
The more detailed peak hour intersection analyses for future conditions with the project
show that no significant traffic impacts would occur as a result of the project. However,
for long range projections (post -year 2020), the intersection of Red Hill/Walnut is shown
to have "over capacity" operations if the current intersection geometry is maintained.
However, there are improvement projects anticipated to be implemented at this
intersection to maintain acceptable operations for long range future conditions. Based
on current City policies, the project is not anticipated to cause any significant traffic
impacts.
Access to and from the site is provided at Red Hill Avenue which will be open to both
northbound and southbound traffic. The traffic analysis also determined that the 25 foot
wide access on Red Hill Avenue is adequate to allow for one outbound lane and one
inbound lane. At the completion of the project, the access is shown to maintain
acceptable operations. Under the build -out (post -year 2020) scenario, the left turn
egress from the Project site would result in significant project impacts. Condition 4.11 of
Planning Commission Resolution 4054 (Attachment D) and a mitigation monitoring
measure (Exhibit B of Resolution 07-31) is included to allow the City to reconsider the
left turn from the project site in the future, which notes the left turn may be prohibited if
determined necessary by the City's Traffic Engineer. Conditions 3.1(T) and 4.1(M) are
included to provide disclosure regarding the left turn egress from the property to the
future homebuyers.
Parking
Tustin City Code Section 9226a1(j) requires a minimum of two (2) covered parking spaces
per unit and each unit is designed with a two car -garage. The Tustin City Code also
requires a minimum of one (1) unassigned open guest parking space for every four (4)
units or 19 guest parking spaces. The project site provides a total of 27 guest parking
spaces including 25 parallel stalls and two standard parking stalls (Attachment B —
Submitted Plans). The guest parking spaces are evenly dispersed along the main private
City Council Report
March 20, 2007
TTM 17080
Page 4 of 5
drive within an adequate distance to all units. The private drives that provide access to
garages are required to remain accessible at all times. Condition 3.1(J) of Resolution No.
07-32 requires provision included in the CC&Rs to restrict use of garage spaces for vehicle
storage. On -street parking is also currently available on Red Hill Avenue and Walnut
Avenue. The City is currently conducting a traffic study to restrict parking on Red Hill
Avenue that may be implemented in the future. Condition 4.1(N) of Resolution No. 07-32
includes the restriction provision in the homebuyer notification so that future residents are
made aware of on -street parking issues.
ENVIRONMENTAL
A Mitigated Negative Declaration was prepared for this project (Exhibit A of Resolution No.
07-31). The attached Initial Study discusses potential impact categories and appropriate
mitigation measures. Any potential impacts can be mitigated to a level of insignificance
and mitigation measures have been included as conditions of approval. The draft
mitigated declaration was made available for public review from February 16, 2007, to
March 7, 2007. A comment letter was received from Orange County Transit Agency
(OCTA) recommending a bus turnout west of Walnut Avenue along the project site (Exhibit
4 of Mitigated Negative Declaration). Since no roadway improvements are required with
this project, consideration of the bus turnout would be deferred to a later date with road
widening project. At that time additional environmental documents will be prepared and
circulated.
CONCLUSION
A decision to approve the Tentative Tract Map 17080 can be supported by the following
findings:
• That the proposed subdivision is in conformance with the Tustin General Plan land
use designation of High Density Residential (HDR) and Multiple Family Residential
(R-3) zoning district in that these designations provide for the development of
residential condominium units;
• As conditioned, the map would be in conformance with the State Subdivision Map
Act and Tustin City Code Section 9323 (Subdivision Code);
• That the Public Works Department has reviewed the tentative map and determined
that it is technically correct;
• That the site is physically suitable for the proposed density and type of
development;
• That the design of the subdivision or the types of improvements proposed are not
likely to cause serious public health problems;
City Council Report
March 20, 2007
TTM 17080
Page 5of5
• The proposed subdivision is not located within a 100 -year flood plain according
to the Federal Emergency Management Agency map for the area dated February
18, 2004;
• That development of the site will require the developer to dedicate in fee title
property to the City of Tustin including a 10 -foot side dedication in fee along Red
Hill Avenue and 10 -foot side dedication in fee along Walnut Avenue for future
roadway widening.
• The project includes dedication in fee along a portion of Red Hill Avenue and
Walnut Avenue to revise ownership of an existing street with 33 foot wide
highway easement as depicted on Tentative Tract Map 17080.
• That the Building Official has considered and approved deviations to the Private
Improvement Standard to allow turning radii of less than 25 feet for private drives
accessing private garages;
• That the parcel map or the proposed improvements are not likely to cause
substantial environmental damage or substantially and avoidably injure fish or
wildlife in their habitat;
Minoo Ashabi
Associate Planner
s
Elizabeth A. Binsack
Community Development Director
Attachments: A - Project Location
B - Submitted Tentative Tract Map
C - March 13, 2007, Planning Commission Report and submitted
plans
D - Planning Commission Resolutions 4053, 4054, and 4055
E - Resolution No. 07-31
F - Resolution No. 07-32
ATTACHMENT A
Location Map
LOCATION MAP
PROJECT NO.
„"` - f i� ` .5 A
ADDRESS
too
Tentative Tract Map 17080
top
Design Review 06-011
M .`4. }, ':` ' � % Red Hill Avenue
14421-14471
VIA
-14
Ll
000�
Project Location
TUSTM
Crry
MAP
4k
Lin
rift
400
3VW LOOM rigs AAO TWA V VMS
EXI Ing
4e QVM IWASM
- rrst _
%
_ _ : ��
WMAW Two am
UIL Ta
47'
Elzj
,� ' �" ��`
F
NosCt !
r4- 'it rtti im tall
"i 4W
1% i 1 Devi
ttCtfor loci
I
utt
Urt
lock
let
loci
V
Oct
T -lot, Hoftn rt:
Litt tact
Left left
act
Lai
lift 11tri
Oct
MIS tat WES
1 MCI 7
mi mi Um
Left 494 INS 491
tat Min KIII
ust 013^ "rat m" Amu dab
Ing
X
ATTACHMENT B
Submitted Tentative Tract Map 17080
--
! _ _
.
I
! _ _ _ _ _
:
1 ,I
: _.._ _..... ..................
. .... . .,...�..
. .
;. o. E4JO
: 24
.
I�i1z-
RYAS SUDDrvuIOW
.
. ' :: I : LDr 4 . o LDr D Lor a A,IRJ.,d Y89
L T iD
/ I ? _ . - ... LD7
`.
i : : ! ! .. - LOT 4T BLOCJ( tj
LOT 3 I
:
r � e , r y.
.
;.
.. J ! ! EXISTING WALL i _._ ..: ... . .. � _ t
x r
' PRNA. PA.: 6
�fl
I
O lfn7 BIRLDING ATE PAIR) (1YP
or
.. : 'ac I 1c )
: - � _ .....-. . .:... . .... . ... ...
.: V ; .. .o ... ......... 6!4x.' -'?'Y: ... .... -- ��.'"SCE. U.iiY.. F.SUt.:1 ._o �:iKx ,n':' b II ... • 1-. +;x iv_ .. c...--
:!
: : 4. . .. y ..... _ '. OZ :,.I! ... o, ... ..... .... . . .. ...... sZ .. ........ -- - -- . - -SCE. IDYL/TY. ESIET . K!?r.. �i
1# gATCIHARJ)1
' 1 - I 1 .. /
.. W itY 1 , _ �S' ' ,N Ji ... .
, - ,i
I.,
n e a t �} r 99.0.9 tl Jt4•r s 5' 1 ( \ 1
.. :t
96.95 I •itt,
!: S t t n i n! _ _
u ' ,o , : o � n . , x7.51 ,Y ..i c b x v � �101.3�2 � 1 'r 7
' , 1 yy
............. : . - ... - / 1
' A
I
' _ m
a ---.. ..-.. a q i o; '> . ,Z p, / -_ - Z. ' a a 'i O _ o EDp O r."yam+ /
i i : i � :.Y.3 :� -- M 9 IL M £, / a ••. Y T O = - ..A'. .. 1 ^ t J' 1 I .- .+'..
f f a .: _ x - % _ _ ksy_1iir_ PAR ,2
1 i a y I 4 ss.G� - (., .Y
1 i -s, ;�,
_ 1 -
, . .: ! : : ,... !1 .
a \ �, -
2 . , p.. ...............,...,' 1 ,.....,,. .... /.
' fi I• 97.51 11,
I o i - " s N o N r.?J I 1 £ / ....
.
N EE
1. F .. 3 a J• ; 'S. Z a ...... Z n 1 . m - I tl 6.i \
I'd�,
p N �y p p
' -i`Y.s q 1 ._.. JI• : ; ; a al :: a OI oe ani ` 4 O Z Ni �- � .....
1` \
"0 2�� g o i
- F I� ': .L
jj K •• _._r. .e. �Q Y:. . i3 23 1. k' ! t� y f ,! tt .t•'! "'.' ft --:i 1 r r 1� i ..�_._J I i,
1 • :,. 1 Oczi I , \ L�: �. ! - 'S♦' `i -�: t� It ►a I Q 1< - V L , �\
11 N v v :r t- 1
--�
. :.'
. ----. •
. N .
1 /
O /.
t : Ti's i 1 96.5 "£tf...t>. i) : p X t :AUN". '. t • � q >T{ .: : >; IVC j '`Q `: $f (�, 3'r'^ I i < I x� ^ � ( '
E: 3 ~ w ~ k i?i E;C: n: . - N >i POG, ! _ +K u N 7 i v i \.
:\ ' ' ' iS wl... I a t 2Cx• .. q h q ! ,2 o :'X b - _ / \
o
! ° i .ix ^ i 2x� �_ t. 2 d ( 1 Z Nfi ii !i! ! ° o S' ${
,N . ¢ (.• R y .i : t :.!...` ( i a i _+-2RX. t a �, 1• ( J.. <S I - ::, 4 �
-'o s . - ' r ----.._...._.. o£ y 'l :a 1 +Ii a >~ 13 � . 1
U4 - aSI�t�:. . =1`., I t • . � I - ---r------ i 't - ......._. .i. .i.. ..............._. ---- - ..__ °985' ,❑ 8*V_'C:'1 ; ........../ �
"; i ;: ev i ! ; "o i N tk a 97.0; n a N f N r . N� , ,-•_:::�:_::::: I: (....t. N n -.It - n n+ v \ \
5f , 7 I ,
1
` u v.•
". ; '�ayC (' ILt a : b: 1 . 25• : :: w : a Z /� � t. 25' .1 ah f Z 4 I 01 m z q S _ r......} i �� j
' :.. ,14 'A i; 1: .- ..1 a .. _._ aT a .� ,�•' :7, O O Sf "I`\
q
. - of .-....h , Y ♦� 1 : N I N C 3'i '�y' ..r }i .
QQ .,Z a I; R t kyr ��y
tt,,,, I.. QQ _
W : { ' z • t ' El lr ! c5 i ' Q. � - i / J IZ L C 4rQ, Z i 1 I Ir �.. /
I'
g
I•
st
( 4
;.r h :t ( a i Il 3 is
:''
.. � _.
Sip : ,: , N ^ !. .1 I v _ , A I i i q $ _ f k+ i
Q.
4 \
c�
P o I- - M N N
"RryA !
:: y� $��� : �: ! I i,' i 3b 0 t -_q- /i/ n� . •- n:♦ t _ t" T �.• a i :3 { xi1+ '.'£. I
k t J is $, 6 ! c ! a �, �E: f - Z a * ! * Z 'Ni ' . './ p. Z f; . a Z q �, , I•W >.. o % t o
. : taw R - �i TREL fS. YP. g
a
-=
_ _-
q C
tl t-- -t 3F•
• : O t . ._Q : . ::! "• Q ..� , 4 L T' k- 3 i ?:: rill2 .-.'N_. _9' Q- " : r. \ ` 1: 3 `./
.11
r _.__._ ....__._._ _.- i .. ac 1 ,tis J _ .j' x ci y .,Si o I 4 .� '+ c a " !
c 'c
1
/ Pr •'Y a ;. N ! I i.. r .' it h L
L _.. ti v
/ ! 1
:
24
.. NQ p ..... ...... ..... ... ..........s...... ...... :f 9%Q(: - -`e'�3- A A o -4..
�: - I .
P' 2 t 1 : -- -1 --- _ j i t
_.... L
i'
. : : :....•a,. ' T iso V ' _ ' I ti . I a. E:. F" f a
yn
- -4 I .. 4.. is 9s./5. 1 ..J 9s.4sr r„ -!� [. 71 ::. wZ `e�,� 6 26 f. u "s'(
- _ _ x:s : Tr " a 97.9 w.. ;,_�_ _ `�_.-_.-
:�.. < i. ;:, : t SCE u.111 .sM - *: <.:. - :i:'. •7 3 i 4
_ -
G: Em !S �::: e• ' .:},. : ! £ < a - f X10 tar O�IItLYAfIMEO / r._. : y . `. _5.. "S 1"r". .tl, A I Ste- `
".
�. � ..:. J ♦,, , `., ice.: t;•.' " ♦ ..._, ._.- , . , .... .. -.�.. ... .-. ...-........ _. ... • .....-... -. >-f.,.:11H.. , w: "'�. tr, ' ' \ ~ .=::ti..a : !
I.."cZ'L : !! „ti -9!6 ...... - --, - : 1---t : �- >T 11 .+1 .\;. .. Y .I. _ t; `L ,,� ., __may, t+ a
.
v
--- "�
o: - ,
0
. ��r I < L. -_ 5, I L : ;2'.. +I . :�-, n Io1 .� li ` -,t H 1 ; (.... .. ..... y4-.........
:...
i
-,}'� z, y. # .. ur. ' ; \, v �. a :m I 1-P•' m f a. \,.._ r.OX a,l �1 �il -ft 1- .` '�i I ;- - _. _.-......
. ,- _._._ -. •._ ..I.. .. ."". I .... .... .......... , .(T d I
i f,.. 3• ... __ .f' ar 1 -+�-: > ,moi i'
L �� I �. 7�t.. n... i �. ,` \ i
.•
.-
" 1 J.
y .......
en h . 75f.� `. i . .. .. h
��: Vr :•0. O - 666 r _. P •3;.7 t I• `i Y i n a L y' h t g
�i
g
.. ..
!'
O fl:d , . `� n.+ ............. 46.:i : 0"` r O
`.-- ..!'I 4,W i:0 . a I ..................... .___ ! __..- --_. -.f_ _ _3_._ -
I 1 :�97. .... ... .-... i ..-......... .w � : t V I.
J, I.la ;*i.� 4 . T : \/ 1hf:et.15 M•I' I .o "_G:.r..__.j_«A._... I F...:. 'y - .->. .I... -.a. , i ♦ t '..1 : i
Z
A- .
. . I. .. i- ` \ ('�
L !: �. 1 ✓. 1 -' �. .-..:....:: i.... h .: :> 'y.. i ... ... I!' :%% ...,. TSS rill l;
,: J o: : t *.... .. NN, I. ny a �� a In I�a�\ P, -- a �1 >t. -,_ _ - s
t, o, ! i i 1 1 h f....; v T'y -- r7 :: k J:! M n n ! . n 1 N^ R
:. �4i t: ,n I.: S ,U1, i 'O 0 n 1 ,,; i'.i:> o I , � ( :! tO. N L .I;i `:' ., ^! P>414 2.. '
:. 'm }t I: I : ; a : "' 1::' '... J m'�', tl Z ki 1 :ti 0 .�.� G '�. I 1 .... �,I, r5 -
ti
z 4 i
�iC
z zp
* I
Q` 2
- 10 1 .] .J i I: j 1 S� . I. :� .it 'Y '>;5'\ ♦ - N: ,Q1. .....
�. _ ., ..,,t � � i 3 r ,, i r.
Y,
J a
1 I i
7 �
t. ,, Q. d E Yt CL CL ti I 1e I�Y , /
i Wti - _
� 2
. :.c- 7 . V4 7 % NN y,n c 1 X N „ N X :1 I Nh w• . � " S4 I
... ! l Z ,Z
_y !
. .-- 4 :
t e a 1 n N o :: n Y i " 1 i
. .: k.1, _� ..... . a I: I+y.-= _"_._T: a z 4. Z' I 25' 2 of �+ ! a . F e. I ' o ° !6•f ...
ii :1 f
31 '. .. , , - ... C I ,.' n' Y ,fit �4• ,:r:> ' C , -'A .-J..-....
: ! ._-:.
.. - .r]`I 1 ... ..
i
E
L d i. r; I Y ' A 970 r1. t1: tai .. _ Y 23' r ..
n. .
Z c
1 �..
Q
-]
Ili 4
1.s. Li. �
�. 1 .. . : ... .... - ...
.$ 1 ,! N x N" rI ; N \ i 2
�� o
: Z
'd?;.y. ! Z n I a! 1 : ! q .� .a. t f. .. "% : Ij_'S I ,oL. . I : O J t •�A N YT < ?.OX-I-�.- 1 2 Y;.
n
III I
z
+
• 85•
:. S 4t Y- " : i 1 4' n • ::t Y 1--�
j
_
. L` + !I.
i
-, i i` cf L1 , .1 t T h I I a i..
b� I^~ • �t I I -1'i ........ ..... _ ...^......... .O t 0.. ............. _-.._- .. ....... fl -------- .-T..---- _. - - .^ i i i 3 `> -•
! 1 ) 11 0" a i M R I.T n t7 51.fs I I M n i o .. _ � N R
r.
_Y
3 , i ! ; z� p4ox-._ ! 2 e >r:. ,p- 1 n n �.axl..�.; :� cam: ` ii p -.+ i. o P 20x:_. "s - ..e . 1 i Di.G 6 i
,,, . Y 0 a 3' 1 I a : i ' A.,T��
- i e. r.....A. ti Vi a ?_ rJi•LJYL fOfl/fi 7
>s i a b
:::'- -w
;� r nrO. trr�s
+ (' 1 1 Y � W 1 15 I J' I 1
l;tI. >o- "?3 ;l, (- 'M e�/s J; a ; pb`ti 4 Q. w X47.45 �> 4 h 4 4. 1 9Y.83 c L i 4 . i I i Q .., 1101.12 i i 0. t` i
/ 7
.
/ e
;: ,
✓n z
sc
.
T f : ;. K........ r.<. �. ............ t
..........
ri
.-.: : :.I i% ZY ... , bl ..:..-+.--.-:.vr: ':..- ::: ^. - - 1:.:.; .... .....:.. f"^11:x. V
1..: �fXt51' _ ..... -.. .- .,,.: - F..,_I. -G:E D1Y/1. EG11I.- -?D' .:a A�.\1:w: ') �� t, .1 • b
SCE' .. ..... ....... ::: _ - mf - - ---
.........i ...... ........
. / / `?., - t, I, fSNT. -__"_'-_-__l-._.+--___- -: --L+' ={..._..__.-__._- --- _-1 - (ro 5E OUTCUrME'C � } j S84' ..i7 d iy -+1.
n . - ' --- - - -{-- ML -- I . `
... , . , .k .d': nc Rrm"ll , } _ �{ ' LL6' snrme wAt TRELLIS (11'F.)-• I / ? - ! -6. Srt,Ccor , q ,. �.. �'� / �_, _
"' ; u, T;TITc� :IN:nr 1crocw. a 6M ' EX:S:. SC•, UrK TTY SMi _ 1 .t rryy,� ( jti'i s ♦ T, f 1 % ....... ..
:.. ' ::.;. 1 (T ^.ui CWNEO r rn ov. , j • 3. b .I OFFMb� WN+ LN6E/PROPOSED R.C.iY. I
4
J
a,
' �,; ; _i RED HR3. AVENUE -. .
L
;. Oo
e rS' b
>JhR
F 60`'
I ! 1 P CL1N:i;H(X; LYON ..'(;'? �\
„.. - .... ': : C. - ... -` . ' 'C:1'! CF TUS�N' ,gr., , . .I...T ''X.e,ry \.;••.: w �,St' A EEy D \\ a .0Y717 ,y;..•
. x.. i _____........-------t--- ------. f---••------- - ...._..-- ------- -'-- --- - -- _. _ :.a>.i ' '�'.. a:..� a\ . sTuccO ! 97.6 5- tri `` ['
......... - Ofµ L Aro talr r tc>,P, ._ .. W Y ,
': .: : PtoposrD' !S ER, -� ! .. RE _ h.., .E1E.. ....._ Lr:.TIMAYr"�^ . I 7 F .-7M A .. _ .- ..
(( ..
. Exsx .n• RCP SIDRN ORVN1-- .. .- ... , SEWER a S. t. 1 .. ! OT7aREO fOrr DEO ATew . CURB L NF- .MR'F1TTeNW. R.O.W.- L `L ULTIAM7E CURB FiNf. �0!P FUfiJRF ri.C.w. .
:
.... . /.. ... .. ..... ..... .... ... ..
] . r .. ar OF ,TusTU1
: . : ... -. ., ... .. ..
.,..r. ....... t T. 1._.-. _ __
:'_ „
1 1......... .. ..... --
. . ; - .- .. ... .. .... .... ..... .-. - . ... ..... ... .. ...
1.
. ....-.. ,.... 'E5a4T- II pro Rx, 1. AVT. StRFET t 44 -WY ... ,� a: �. � ,�"'I.. Imr. J4• ,RCA 91TM•M f NA:µ_ . � ••
.. . _ - .... .... _
..... ESMi., IAN. 10 1964. eJLKllf L679 !�t..1to6 rtI I Y Awl •\ `�..
... � .:..; _.••. ... .... EIOST. 3J'. RED Rot AVE.'. SWI T k i s 7 � •"
..:....._ �...... .., OF OrrtLw;FecarS(Tc ar,F6IITFO w RE (C RfWlr) ..tib.. ♦ ...
::/fit' -
. .,I ' - . ; :vr>HNAY EiXT. MAR!>r ;.5. 1929. '-� /:. r :
33 ....
... a..._.... MILE TO ,ITE T' 0. 1USTw, ..
. tXXN! ?.8, 161 OF CfTTC;At RFCr,Rf J /�'1`.
. - - - _ - IStt T �' NCv SEM£ .. )JCI l CITNTED W I tOF ' TITLC � EMST ;Jr IK'v STOfrIY rXEnw-•-� : `
............ > , c.' �.
'
Y. 1 .. .:: ...... ..................................... .:... ... ., .
4i16r
v .. :• . -
-_' - -
. .. .... . .......... ......... ......
5
...-. _...... .. .... .............................. .... .... -..... ... .. ..
1... ..... ...:................. _ ._ -:.. -- .
+�..-.... .... - +:...-....- ::..:......... .1....... .. : ..... . - - ..-..-...... ... ......... ........
� 11
>' fXLST: 1XSF _Jt" .-.. - ..11 �.... .:. .. ... .:::: . ... ...
. / : .TQ SEi6FJF I RED.... .. _ ...... .. ... u._ .- ....... -- EA^SI..31e' K7' r9EM£X
i
' fMST, tr IYA•LR ... .... ...... .....,
: : ' (XLS/ I -X
.. .. .. ..
.... ........ ............... �.<,� I ::; ................ ., .... ... ........ ..
>. _
.-.. ..... ....
.... .. - .... ..... ... ........
� .. ...,
'\ ' ... ................. .... ....... - - ... - ............
... .. ..
......
,, ,. , �� , .. .. .... .... .. - - .. ........ ..... 1
-
STREET SECTIONS BL&DING TYPE SUMMARY NOTES PROJECT SUNMARY STATEMENT OF OWIMWHIP
M, 2s' f_ ?,+ BUS i�tfc 11'PE N0. 8LDC STORIES DU/HLDG / OP DU 1. £XISTR.G LAND USC: MI.100 r'4d,LY RES4)L` TIAL GROSS AREA. 4.77 AC / 207.07% SE' HEREBY STATE THAT D41S MAP WAS PREPARED UNDER 4µ0f
......................
4' ' 16' 16' 4'-�-L'4 �.................... . ruttTlYc 't` I ?.A:Ic.^. t"A J ;O :q 1. PZIOSFO LAND USE "'AN.YOMC.S NET AREA: EXCLUDITS EXISTRIC PU&JC RM,NT OF WAY (0.7% ACi MY SUPERVISION AND THAT rHE OWNER OF RECORD FAS 3j �e �'t•
_ -- ;---->y--._---r:-_fLlr_.___-- !T5___._ _�'4 .404* �_.._JO...- ._-.._. �?:? ...... �..... -..it.5......... *._ IG..... Ir m I Z.ATnC I.Wi e J •I '1 J. GENERAL PLAN LANG U:SF UE3K:NATION: Ftl�•H OF.NS:TY RESIDE�NTHI. - 4.0 AC 174.019 SF XNOWLCOOC OF AND CONSENTS TD "IF. :A -INC OF Ti!IS AMP. '" � �
' A(Dwr T t
f ( A ! DRM. ?I 6 ..ATTY .OR k J .Xi /
i t C , ---_-__._--_-.......... ........... .. ......'- 4. ZONING. R-3 NUL 1T FAMILY RESIfk:N1UL.
RUK
......` _;....... ,,,,,..-. -. _._._: rola: 1.1 rt!rs ( ) E'AN,LW[S EtOSTRNC PUBLIC RKift p' WAY (0.%7 AC)
I EMT /,/y @I tltl•ApY S. Ai5E5SOR PARCf:I NLIMt7ERS: 432-111-03 A 432-111-04 ! AREA YYfIy1N 7ifE OFfMML PLAN LINE OF RED HILL
I Wil I /AI/A u7i/f/Alf1 /7 6 PROPOSED D YELOPNENT 15 NIiNIN TW TI StN UNkIEO SCHCXJL f4]R1CT, k iKAtNUT AVENUE. (0.?1 ACJ � `� . o:Y,,,
N' SR9RMR .' JCL -M R-- r' ftlrmwilf I' SN,ET ALR -I PLAN 17ESCR4PTION SD. FT: (WT) TOTAL 2
INTERIOR STREET rkiny bo}h •ldsa) PRIVATE DRIVES 7 attar. PRovOERs: 1'79 AC ra4,956 SF t)OtrC1A5 L. STAI.EY, P.- 2 �� °` of
�6E�py MAN I 7 AR ++ Lear / Z MIN +,637 16 +2tx / r
i/{,LLSl MMI t 7 6R / 15 6ET4 : no J• r+Ii wATfli - C.`ry 01' TUSrIN UNTS: 75 O.U.
(PRIVATE) PRNATF) 1 PLAN J .1 OR / 3 RAIZ+ I.7C6 rs '6X VICE PRES70EM-PRRYC,Y]AL v
Mr$ ( NTS (PRIVATE) 'IAN 1 7 OR • R[TAfAI _7 RAfY :,67r y (;7 SEWF:4 - ORAk(:F, r(R/ATY .SANRATr(Mr ga.ST4lC'T GROSS DF111$(TY: 15.7 DU./AC
,TrS ---------__r___._______ _._ -_- rELEr>HGNE -sac
LEGEM) rclSt w 01. A•hRIX NEI S.I FTW to;k WTY, 17a, c' _--_ --_ _.___ - NET OCN9Tn 19.8 C-D./AC ;, PREPARED FOR: PREPARED BY: ti
CARLE TEL.VTSX)N - COMCASI
e x:ST. EXIST. CAS - SOi/rNLNN C411FpRNN US CGMYAN( ��
I• , 02/01/07
R/• 00. R/I# * PN0IOSE:D SB 1025 ,*, "'ROPOSED FTNE HYDRANT OPEN SPACE SUMMARY ELECTRIC ' SOUTHERN rA;.IFGRW E015GN COMPANY -- �1e- SLWCw
.._........__......-.---.--- --------------....-...... I ArCCS.SIBIF UNIT W.0 A Ll
i 64' 6' fu' 00' ML IM TYPE FOOTPRINT AREA NO. BUKDINCS TOTAL AREA R. GRADIN'C A i 4PROW MENTS SrA.I f?E Pfit THF CITY FN' TVSTW MUN'ICIPA.L CIXx' OAIi ............................. -. - / A C
'r ''"' ,1 LR3 1M. UStr OFTT:CTOR CNF.CK AND N:Rt� A' .1.1i, G.' 7 W1. r.. 3; ANI) CI!Y SIANOARDS. GROSS AREA ............. 6:7� .'.CR:? -t- ,/ tar 183 K R AN .4V NUE
ME -L. �_----. J2' J2' : [ 11111 >'� "r"""'• yLnt LUNG MA*X0 - u:.rrwc v• e.stu sr - r E,53 S.!. It, 20 .t•
-"_ S"MLW � w '�'�''I r,w /iCPARTMFNr ,•ONNECr1UN 91%N.UJM" •C'" 6.!Se5 S.f.• 9,158 5.r. 9 PRGJECT SI7 IS LOCATFJ WI'h?N AN AREA OF.TE.RMINF.l7 TO AF• OUTSW THF 0,2: CONTOUR INTERVAL !'
: �i6F�n wwr R.mm - - .... SUITE 710 �'�
tliALDRAi I' IJ10 S..I.• 6 i`.sw S.r. --.t.-
-- r 5 �:�"' •te a co Ai UN17 PrXIt lY:,AOwO .17..' 5. �;! >.I.. ANNLM, C+WNCF rLGOO PIAN PER FLD00 INSURANCE RAT MAP NtIMBFR TOTAL LOTS _...._..... NUWA.l?t<U-. o-.. +/i'- 1'-'-..-.-.-.---"-i IRVINE, CA 92612
I ---_- ADA ?ATP OF IRAVP -- ____..-_--..._-_--._-...... _. _.____ _ _-_...._._..._ ..A ...... 06059C'0277;1 LIA ED FCDRUARY IM, 2.'K14 (cR.ANr,E CJUNIY - PANEL 277 OF S5C.) .-2 LETTERED wotrf C-
-, Ilt Al* -A - 6=.]N ' ` PHONE: (949) 756-1710 cl
NfIF • RIRLO" rmmw:s NaL:us UTILITY cicsls 1G. AI.I FX1511NG STRUCTURE'S CN -SITE TO W GENCUSHIT).
Ex1sTiNc wAiNur AVE_-__ PARKING SIANMARY NET LOT COVERAGE: :I THIS 1ENTADVE T4ACT ,IMP IS FGR CONOOMINILIAI PURIPOSES AND S yV 1kOV1OE rHE WCWY MAP FAX: (949) 756-1720 HUNSAICFIE ASSOCIATES
(PURrTr+ X>rT r1ArANC uT,rRkx. 6-,..151 .". - Ise AC
PARXINO 1]ROVA)f0 RIGHT 10 CRFarE CCNDGMINIUM AIR SPM.E MIN 1.HL- RECORDATION OF A f rW MAP I 6 IF . E • IN c .
NIS' . i / ..�� /."/'; w•Y.NTF OR"A'S: JG.6.56 S./: , OR9 AC
h% I- j .,/, / /''ii/ ti rt>was ,n (7.o/tar:} I•saJJs sr - 066 AC - LXCLW'S AatA •/w n.r O# ."L PLAN LRE, AND CDNX/MrNIUM PA1N5. ew.iy« mo w.. CA 9"
:_ % aiy.,/ / /: -.i:: , oncN n rneveC n ;OJ6/um) .. J w.-ers.•xEtE wylfwl : J.53. xr: - 0.06 AC nE W 6raw NEMA Ya+o�
CXIST. - "- 12. PA.RKLANO DEDICATION WILL BE SA'ISnEO rHROUCH PAYME,YT OF AN IN IJEN FEE PER
EXIST. rOLk 177 (2. J6/UA:) IO:AL I.Or COW.MAO(: 107,!," SF. - 2,-7 Ac r6l.dS) SV~ o
.4/W R^y C ' a �_p.Y 1'01.:27 Sr. . 2.16 AC t6I,I, EXfteXA-5 AREA W/',W Tek" C#TCW PL" LwEI IUSi1N CITY CODE SECTION 9J3T.D.3.
_ _ 100' PARKING REOIARED
1 i1, NET OPEN SPACE: 13. PARKING StW L. BE RESTRICTED MONC RTE PROJECT FRONTAGE ON BOTH RED HILL
fO r0' r' ... 1..-. 0- O4RNcr ISOi2.1)^M!} %.� f
S t>PL'N S KE": 67.0!5 S.i t..? Ac IXR1 SPIE' .1,.KZI
/...........,T........... r.-....... y .............................. .. .....-.............._...............7:........... L: '-;+ L1PEN ^AA+fwc 1► 2.25/ONF:/ { AVF.NUC ANO WAI NEJI AVFMIF.
8>ro,Ytr' axnu rAtsrYY6
47• SITE PLAN FOR
: 1wak 71' ------------------ xC Lf]V_ rSM4&. 4,4-0 4.r...- 152 K: rti4N 9 -AC _ Ez.iX)-- o
•mN0ror6o.t n.w Tri SY(r,tr l........._.-._.!i____.__.�... ._.-. -_. - -- ( /�- �
t I"" W. ,Ni .... • ........ ..-..._. . -� 6y(MkR r!RE I14ut.K TURNING fOtAt tt:i (2. ZS/UMt) i•OTAL O/KN SPATS: 56,417 S.I. .. 1.57 AC 087x) 1
X"` If 'Ctl"� A'fwg -� ' r- NET OPEN SPACE: (I'M WFN MFA r1IIIIM rK OFFNSG. ^IAN CW OF 1*11 MEL A RW.NL.
LEGAL DESCRIPTION T T NO X7080
_--_�_. ______..�_.-_._. __- wYN SFAC .. SJ•286 S.F . 17? AC OPEN SPACE '32.7X) T. T. 1
•i66DCCOMTIY[ !!?!!!: 4.4-0 .S.r . 0.10 AC OPEN SPO F?.7X 1"HAi PORTION OF THE SOUTHWESTCRI.Y hw.r OF LOT 47 OF BLOCK 11 OF RHINE'S
- -- - - � FOR CONDOiM AUUM PURPOSES
�Ypry EXISTING RED HILL AVENUE ---.---------------.._...---_---- - M'At IY'TN sPAcc' - . J7.?29 s.I•. /J? AC (33aX) ,ursnrrslGN. rN THE ryrr OF n)snN, cr'uNTY of CHANGE: sTAtE OF CA[R'ORNi•� AS
"rFM6 (PUBLIC) WN SPACT PIC mcs 1AIDSPJ.. 6MLKfIMYS. P*WrE PAIM ANG P1YJt MICA SIKYWTv GF A MAP RCCORGEO IN BOOK : PAGE N Of MISCELLANEOUS 6KOS, M4 PTE ( �
HTS DATE RE'ASI(NL dY CFFICE OF THE COV.NrY RECORDER Or SAID COUNTY. SHEET C-� lot
PLOTTED BY: PI:illp WOugh DATE: Fhb. 01. 2007 10:40:49 AM F;: -E. F: 0338\P:cnnin0 �F4oieet 33BP_Tr-17C80_.SP a.0
. I . I
� ;
-
. I I .
� I
� '!
V, :
.
I ;,! L I
. Ir
� / !
, , I
----T,4ucr NO
_ ------ .. I , �_! Do !
" .
- -1 I
i ; � i :
I I :
: ; I
� !
. . Y'
I ------- I
"I 1, - I
\ 11 --,,/ /' I
, I
r:--- I : I
I
! �
i ! ! � \,
. I I
I!i,: I ;
I I
; .
il ; �; •: ! I
I : . .
y . , ;
!it' � ! I
; I I
I I /
� I / - I I
. I 11 - __ �
. I ; , I r !
� - I I
I I - .
I I
11 � _ � - - _____
- ��,_- "
. - /
I � \1 � 'I �
� I
� MM 240112-�4 � I
: ! ; . �
1 -.-! . .
I I - I .
'-. _ i I
I � I I . . :
I . !
. . . ; I !
I
I v -1 I �
, I A �i
1,
� I I I . "I', \ /•I
: 1� \ .
I I / I
I \ I ��,,� I "
\ I \ 1, . / I
\ 1 I 1 ,-�7,
, iRVffiEvS SUBD1VJSl0N ---
- .
,- I I
I
I . I
i ! \ v
11
': ! I I :
I . ! .
! ! . : I
I !
\ LOT 3 1 i : .
I I ' I LOT 4 � L � �
I ,,� ".� - - , - - - ;
� �/ I I I
---
I
- LOT_ 6 1 ______L_ O -T-1-4, � - - -- L07'1-
I T .
� i
� . I
! LOT 8 � � J
: ; I . I - - - LOT -D
I I I .��
I I, � T- -- J � � %<
I ; .
I I 1. \
\ \ �
11 \. I
' "'
LOT ?!(, \ - 1077"12 —
11 I 1'�
�\ AdR.Ad 1/99
i )
I __;
I I•
IF
; i
I
,
, I .
I 111 : , i
1 , ;
I . I . ! ,
. I I_ -.,-. __ - ,
9,-. - - I I �
_
- I I � - - ____
_ .
- . - G wAil 1
;>, _EXISvN - I � --- --- 1,
. LA --- --- -- _________k__i.__.. _____ -- _ :
- ---
: : �l
I
,--.-, . ,
. � - - ___ .. �11 __ _± "I
-.------- ---. -_ 6.51, 1
� �
___ � ----.--,
. . t I -"� \
I .POOL------ i I - \
. .
-\ --1--1 \
I BUILDING I I ,."
:r �
-1 . -, ,
I �l I
, \ 1-11
I "
i 1 . I LOT 47 BLOCK V
I;
r- . . I,
I !
-
tL------k
- . i ;
- �!
I -..---., . i
. � I
_! I : ,1!
; ! I
:!
I
i I I
. I
I I I
i
h
.1 I
t �2 - i
I I
I
. -__-- �_'
- .--. I
\ *
. �- I ,
� I 1\ � z��.
! ' '
� . , .11 I
I � , ";'\ I
7ZI6, I ,
" 'IS' I
� 1,1 Iq I I
I 1,
�l N,
X,
: \' .
\\ Z
\ I ,
1, �'l �1,
I I.
, .
,
" 1\ I
ll\ �
\ / I "
, ,� I /
-
I t i4O' I i
; .
I ! ! I 1
I I : i , ;
! , : t 1 ;
� i
I : I I , I
. �
i : � ; . � �
I J3
. .
.- 1.
. . I
1 I : sb -
. - . I
; I � ,
r I ;' , ,
i j2i 1
1. --TO-
, , - -
. /
. I I
_ __--i-M
!, t
/
- I
8,
. :
I - - -_ -_ - , . . , I — I
F_ _,c;CE.11�11NII - - .. - , I �!� 11 I ., I
- - --- .-I - - - , . - 1�; , , tAlb i OVE,
L-4 - ;_ __ - � it . _ . , j / 1, , . -, - I -t
- ` --- � L � t - - -_ - - '. _77 - - . - - ,4,0,7 1 1 -
, - - I �� 1�7 . A . :1, - , � � � � - - .- UTILITY Esm . ... --- - .- - � I - . j . I .11 ,- - - . - _. - .
� - - obfMAIMED) - - - , ... - -_ . . - . -SrIfte! �Pfi: -_ _. - _ - . . -_ - _____ - _.- .. , -- - ---- ,_ (TO
I - - � - I - � '-, I - - - -_ - - - - .- "---, -_ -_ - - (T.--� . - . .- I
: 1 . - (101�v ----T--- -_ - - �_V_ - ________ --- .. I -.---. — , __�_;r�,____
1 _ - . I
_. --- , -7 r------- - 1 -7'*� 1 ____l___l (_.�._ _. -
9IL9 ; i 1�_ll _- ___ - - -, r____ -l------7- - --- I I- - I
, , ! I ; -,-- - - - - I
: I ! . 1 I 11 I i , I I -
- I I 1,
! I I . _ / I 99.09
, ,
I I � I I- - -=_l-____ 7 - ! __ -,-- -_ I— , -tel-F.....- I
, �l 1 - __ - -7-- __ _�
I I ., '.
: -:1 I , I .97.67 - -
t p w .- '. , 14- 1 ! 4 , ==_� - __ ! t " �_ - __w .7_,______ .
I I I I - - I I
i _L
, -
" .. .- i I I _F_ -------- I - - J- . - 1. __1 I .
__ -,
I I. , � 7"r 'I __ __ - - - �.4J7 4 � - _- -, �a - � _. �
� As � , , _7 _. - L . � -_ - - - -
. , - I -
:,, it , " " f I , '-_.__-__l_ - I- __ -1 .- 'a . -
, - .m. , . - -0 --- ,-. . P -ma- NI --l-_ .- - - --,--
I P_K _. - __ - � - - t � - � _97JI; - -1 � - " �� ; . _ 11 \1�1
-
1 - " _f�. ! , -1 . .-N97.49 � •,,, " , i ; . ,q ��� 9. \ p 1 \ . ; 10 I
- - � - I— -
- I
I . I , .- - - i I . I � , I I . . : 1, - j :, \! I I ,
t I :- i ; I ! 'I i �7,5 1 1 - , � _ ; I , I
-) I I " ; . . ,- , I � � k/ ,
. - \ I I /
� 1 " , " , � - ,
I I I i I : . ." I I . 1 I "', .
- .1 I . I . I I ;_ ; I . __-.1 _ ....... _ _j__/, :;
4 - , -1 ---I - - 1-11 -_ - I . I � i . j . / I - - j - I i �
: I , -_ . I : � I - I I-, - -- - -! i . .
1, . - , -_ I - � -_ .1 - - i 4 .
, � .
u_ - ; ! , . ! ; I . ; I :1 . I � ) I ! I , i '. I . I I - - - - -1 ;
I I , I :
� � .
- T I - ,_ . - [_ I I - i (' I 1 ! i � ! I I i .- I
I �� I
I I I I I I
. i . I I ;
-_ - � -1 - I ;,,. � i i � I . . . ; I " .� � 1 4 1 , -2ax. 1 1 - I'. I
! I I I I .\ - . : i ; I '. : I --- -_ - � -
. I I I 11 I . � I \%', j i ,
I . : � : . - t __ .1 1 P -90.q � I - � , i 1 .97 is ,� I, ,- _[ __111 P-97.18 I : ! I . I P .66 .� I I p-jass � ; ! I I.- _._:�S:- - ._ .. -.-- __J P�Jftb i I ; � / "I, '. 1.\ __ I
, . . . . I
I I I . .--- . I .
I P�-Ks I I I I � j : , � , I ! ! I r� , . ,
1 ; ; I : I , � " I j , - , 4 ,.I I - I -_ , - � : - , r It: , ! . i701.0 i - ; � i �'] . k I
"--. _-.7; � ; I "I '. , , i : I : - I p __ - __ i .
! ; , ; 1 t�l � ; . : ; I ; I
I : ;, � I 1 ll7_,_,._ . / , I
)l I - I - -1 _.-, ** , , I . I I - -1 � "I I - .1 - - . - I . i I I � . 1 : . � / , I,
I I �� I . ._" 1: . � .. - . _ I I 1� � I � I ', _. I - I I 1� L � - �` tl . I I I ; I I I I I / , k, I
I ; ; j ! i , - � I I- - . I � , -1 - - I , 1 11 I i �_ -_ 4 - I I I ;; 9! � , \ \ \ \
I ! : 9'.1c - , , � �l [ . I I ) t I - - I �
� ---- -- I � - � i 4 I , - " - - . - .A.i.-i .- I I .1 � ), , � I , , � . -1 , \
I ,�. BLDrI. lly, . 9 I I .
I [ 11 . � � 916 . � ,c,. 11 I � .1 I 1 7 ; ; 1. ! � 11, , I 11,
; FL, ! i . -- -4f, - -- - - - 1� "' I . , "
i I I I I � -, ;B It' 1 , , * , � I I /I , ,
I i I I I i I , i �_ ; � , t F41rxi. ,w, , I .�...'_, "t" . ,/ ,
I I . ; : P_K26 1 _?�L., -.11L , N: I ".97 1 Kv 1 2 � , 9 ; ! 11 I I � I : . / I .,
I ,I 1 � � ; I � I � � , ,,, , I " . I �, I RLDr- ly! r, � I I , I ! I � . I
I i I R / I , ;4 1 1 1 . I 1, 011 ! \ ,
I I i I I �d I r< X , I ig ! P-9"6.45 : P -K#5 , : [ - I I ;
A! I � -176 __ N. � : __ ,,I, 1* - � : - '�,�'
� : \ \ 1 F \ \1_11,
1, . � . I __ �2.f I , g I P-Jolkm I ; I
. � � a t � - , � � � _ .- .
. � � ? , N ! 'I- I � 4 . - . I I \\
�. : I I � I . I � . . ; -
, 11 . i I .-; - � if I . I I , I . . I . I I
I
- . I F- T � , i , � ,. 1, I - _1 . 1 ; e I , I I i I � Q_ I I : ; .. ,/ I ,., " I I
11 I 6N . � - _�_ .- -I' � - I- — !p -!, 1-1 , Fl -31 � . .
� ii . . . '" .11 �
. , F, b -1 98.5 � I ____ \1 ,
I ! P�111& 1 d I ��Ah J91, . i , I � - ; 4 �; 2.0%-- P-1 96A , It, I i \
1, � . 11 )S-- !,I , If I - - r. Ii� I I 4.
! - - -, I , a. vj� � 2f * '! '\, I I . " ! F, 1 , : n12 � � ! \ / I
. ; . , � : t - , . � / \
I �� 4, , ; I . I ! RLCIC. 'C"
1, ! � I I . - I . I -_ - I - _. . I -1, I � ..- 1. _. _ - _. - _. � - i I . t.- _ I i �, � I .. " ,
, 's I , : I . . ! ; I p �i �. . I . f� -- -_�: ---- :-_--_::�_N� , � I — -_ -1 . �
I � - ,- _ --I ,
,z. " I& I /� I ! I I� i I .- L , -, . ; I f . ,,\ ; , \ , , ,
, . ,��'l : I I . I � I � ," ,=! _�', , ,
- . . . � I ! 97.0 - I . ,\\
-
11, � I � Ly ( , -1 I I d I : I . , I
� - I � , j ,( I . I - � . I � . I , ,
� � I t� I __ � ... , . I . I I— - -�� � I , I
� I . --- - I �
I
! � � i i � . I i�- I ____ -, I " I , �� _____ � , * _ I I , •,\" I I i i , L H - I
. . � i . 'I p K05 ! I I : . 1� i - I : , P-1 " I X "
- ; ! �Lh ! : � A I I *1 __ ___ r 25 - � , 1 _��, - _-_ . i5 1 14 : �� I r I \ \" -
.., I -� : : I'll , 1 f i I � ,,, \ 11 1�\ � .1
Z . I *,� L "M , I A -M.78 � � . i �� : , , : I i - 10�4117 ( I *, I
. : , th : � _ , I � / ! " P�Kx ., � _: . �, '. .4 _ - - I � P -M.24 � I . I " - P.." : � . ; .. �� I � ____ _ - � , ,,, 1,
I ... I * . / I � I , I I t � . x , .�., - I_ / A-1 47 ,; 19, -- ---- , - : .- I "", !
, i , i I - , I \ . 07 ,
! I . i - I I 1. , I � I �: i I ,-,--. ly,� : , I 9 i , I 1\ I \
I I . � L�.. , - . . . , , , i , I 4;Y -_ I � i , L 1�1
. I q . . � - . I t- - - - -- -- �.-;-- , I - . _ �� �� m. - - I - _ --- ) . _ t .- _. _.- - ,� � , I I , I., I I / -_ .4 1 . I I-.. - , .- - 1. , / - ,
; . I I i - : \ : I . \\'�
I � ;*, I I I � I � I . j \, �: , I ; I �, I ! � 11 , JKS �
I I
�, , �-,z�",! I . , 111. \ L-1
I , � :.�,
: . . I I _ .
�� ; I - ..� i. � . I ! ,� I
<1 I , I ! I III r , ,. ,�,� -, - . el- . � - _'�,�- L I I V 4 I - 1\. -
I . l , , . �. � . , . I I -
� I >- 9 I , ". I ! I I I � 2 �*' 1, , �\
. , : ; ! . ) I -IT " � I"
, ��'; "�. __.. - - - .. - __ � - � t
.!, I 1 2 � - - " III . �4111 . .i " _.. i 1� \ . �
11
I , I I r I I i ! . � i .- - I ---- --- I-,- -(' I I , ;11. , 1"", ___----,l., � .. I .1
, I ; , I
,
" I I .. i .1 . -1 __ . "� -AC, I I . � . . 1 -�-- �� 1-..-. ", 11 , , 1,
: - �1* , - .. - \
,
-, ,
.1 I ", : 1 ;,3. �p� " , . � I " - - 1. �
'I 4 11 � �t ! 1 � ,�'. I - - �:� - .- I _. ,... '' I . - _. - � - __i_ --.---- _l: k. z�.,! I . . , It , , ; , �` , , I 1 , I . ,
. I
I , , ��_ % I I . / I - \ I "� , . !
, I I , I ` I _/ Ir i I , 'A �T , 1, ,�,� ! I I \
: . i L ��\ Nam * , . _.. __ .. _ . � __ __ i 1_� , I i : I" I .".' "I. !
� ; - , -6 -
I .. I I i ,i,L,.. -1 � � � I I ,\ � I ./ , � , I;; I - I I I I ��"",,., � .,-i \ \\,
I + iw,l, :I � I - : pi�ew \ .- _ -.--.-, - __ 1. , pr j; � P�111�a ,,, � , , . i i, _, , c . �, -_ I I
� 55--,, .". . , _. _ _11 I— �11 - " . . .,x
I . - �• lr� " I
. ,
, I L �7�11
.. . I t '! I I(.11 , .. I
I I I �- I _: 1 , 'L . � ; II �,� , ,\. I I
h . . I I - , : \ \ I
I I. , I -1 � I 3 .- . ;
I - _T , �- - _`� - I. . I 1. � _ it - _ - �
I I i , - - i I L 1--l. ________ : --- -1--..i �\ ]�'�_ — _ _:_ .
i , - - , I � - --t --- -7 _' ! �l t ra I :
I .28i g � � I ;! . I ; - - 1. , - -4f . �; I , - -, L, "
I I 7 1 \ �,,`, �Z,, I - 7!&ft-W . I P.Olk I _. � - I : � � I , As I I I \
� : ,1`,�I - , . \ q_ -1 i . li , I
� I - . I I i I � : - I
I I ! - - , . I i - - -- I
�
I � r, - -4-.'m . . It, - � ,-- _ 4 i , I . , . ..
; I ; 'i � - � - - I - , I-,-. � _ !�i � � i ., \ \ "
r1l � L , i i
:a � , �_ - - i A �_. i - I � : 11 "I I
1! Z 1:; , ! � - -.-----.- - i : I
. . I ." I , I , " � 1 � - I � -��- --( )- 7, 1 � 1`- I -_--r , ll.,�, ,,, , I \ ; .1
. - I I , -, �, . ,
i L � 1_ i 11 - - . - , I . I I � , , . . I,-
I : 'r � I 198.0 1. N 1 1 ; I p "
I 11; .1 . ! I . , "I ', \ I I I . :
I ,IQ ! I I_ . I I .. I - -
I . -4 1 ��. . � " ; ,
" _ _\ ----.-.--. A . . ;I - . � __ , 11 __ . m ,,.�.,. - I ! � � � I. I I
. I'll
I L !Z, -i ! 1: / * - � . ---------- --- , f . I ,_ I . --: " .� I : - _�,� .
, , � - _ , - � P-11101611 �,� _\ �, ___777 4 , r I i 1 �l I I -
4, J r, , '.. I . ; � � 06.5 1 1. / j ; ,- - I' - '. \ ; \� f 1, I /
, � .", , I . __ - I � �, . 10#10&w / �i/
... . - - i Imt : - 4__ _i� __ ,, ... _[ Al -AA -1 1.1:7�I�/ I I , - . I � I � ! . i ., I. "" . � � -- - v
11 �!.` �. ; , I
I - - � I I _ i Sl 6.46 . I I 11 - k ;_ �,, I . �17
. I
. .
"
- I 2 , I ; . . 1( .1 , ! �l -\.-\, �i �4 , ! 1 IV. C , 4 .. , . I ;t=--\! --i i _). ", , I
� I Liu.. . co !T , ; I � I - ;:-, : -I I - . � .M I , ". . _11. � I -1 -_ f
I- , � EXIST. SCE UtIL . ll� ii � I I
. 117 L�l I.-\ � �� - � - I . .. ,. I
___ -1 - i� ; X , "': �� 7771" '.'�,l 1, " ,�'. , �, 11 I . .,� : ,
i , - ,
. . I ___ --.--- - ... Pf NMED� , --s-..•t- , I, 1, 1, -1 " .,'�: .- , � .." I
__QV - . 11 ." �L
I , !TC�_ : . ': . � .." I .1 ,,�l . -T--- � - I
� - - �, I - , 1. ! 1 -, i - .. - , . I , - X - : , , �� , '. . � _ . � ". � , r-, - - - - � 1'.N�•� � I I ; i
- � �
, , ,, � .:.
� '; --+, � � .� I I - .11 It' : - �: : 11 11 , - 1111,, LLLL, ( _+�
_ ", .. t - -_ -_ ! . :. 1\ � , : : " " : 1 - -
- Ic " , � , to , 1, , . . , I _ _ _ _ � � Ll, , ;-;. . � - � .,
- .11, .f. , - - . , -i 'N 'r , �,, - ,� � - I ____ . _ _�_Jzr_l . . . I- I - - - I ____ __ __ - __ - . _. - _'_ . __.",
� , - V, - .- . ,.t
,
,. . I , ' ,, . . . , q , - < . , , . I.. I .
. .1 ,��, I, .", � , �4 - 'N � " I ! ,
\ , . ,� I w� , , ,....: � , , , "I " I N " ., . I I . , 1, - I � � - .."
,
- I � & , , - ;. I 1� � , , ,. I,, .� , ill . I I .�:"" , � , ! .
, Z�. I � 3 . :� , � � � 1 N 0 �_ i � - L',,"- � " - I :
.
,
, -
I - , , , -_ _ _ - r . I \, . . . I ,,,� . � a - I L j' , lt�
- ... I altim, ! " u, , ; - q, - - �, I - I . �� " -, . .�.," , , , \ , � I . . tt--1 ,
,
, � 'lla , - . ', ,,� : .; ; �o .11! ,< I . l< Q I - * -'�',, , , Z ., .- ".1 N' -- \�. � � � _ ...
� I., ",,%' " , -I,. ", ' ' I - I
�l � *�l , - _," N," , .I--- .- - . . -_ - -_ I -- _'-.1 _--- - I , � . , , ": . I ! � *t�
, . - I W,? ,
I. . � L, I . � IN. -:i--.._
_
I " � , - I . - � ,&i m , i I ,, -_�r I � 1. , , , r " I " � . ; ;� 00 ;
__� b . -I
� 1 4 - ,
�
I , : . I. --v * A _i�gml I - 1. � \ . . " m 01 -.1 .. , ,;� 1 ; . N I 1. I � ��, � ,,�N -' ,.'.4�F' cl,kjk,,,�, ,4�-�� _�11:3
-
! 5 - " " . e, - - 01 _' . ..109 , I I ,, - . , , '�11' \
- :', .* 1. _. I �,_ I __ _______ I ___z I ,�.� � � �
I
, � .: . � :"� -�'7`-' -l - I _____�� �.! 'd _�� I" , - -'. - - t -, -", i 7 ,
- , . I � .� � � , _ I I� � 1� , � , I i j , � �
, � � :��p , PT , ,- _l_A__._ , � ,�� ,�I--- � ----� , - , 44 -`,4 -".� "4-- .
. R b - " � I- __ , - 1 , ; I ! ; . � ... , -,RL---4 i - I � , .. :1 ��,,� _� "; " , .� , , '. " -"7�,. . ._,_�l . ., . _4
: . I . .1� . \,��7_ � �,�`, � I , L - � I ... , - N� I \:" � J-11- Z,
_7 .0
I . _�_ - 1, . . . 7 . .. ", ,� I !! M I
. I - . .1 _' " �', _ J.'_, _.)�': L." -, _�,- IS-, - ::� , , , �,, I' � ; .
L L.. � . . I ,
. * I I . I - - _-_7 _-
I -1 I : , I � . 1, I I , - ; . I -9,1 I . � . I � I I., . lll�� '\' k I , . � ! --- - --
I - . " , -�:l ,\ �
, , '. . � , 1, " ,� - - 4, I : I - �� ; -------, � ; !
,
, I � ,• . I - . , . , '. , - � � I
! I / — --l_ 5 1 1 1 . - � ��__,_A_�
. p*ft54 t� '. �,. - I 1". . � - : I I � � � �j,,,,� - .� ; :! � ; .; �CN � - ---'
. . � . .1 �\_.4 1, . " 1 1 1. 1� 11 %�, I vaes I I ,: . I
. . . I 1 98.0 , - i I . I . . -, -,�. _. . : I
I - .. i I I .1 ; i ! I " , . _: . - , I I
, , 1 1 . ; �, I . I ! I . � , -_ - ,,�• ,,7.,L I ; ,
1 6 : R . I �'�, : , ." . �-'7 % I : .gh Z, I I ;
ik�: N �, ; i 71 . . �
+I - � -11 I , , , I -!Ib.46 ., .97. 1
Tl_ - � I I ! : � , . ....... r : . � - .�,�, \ " 1� � ,-, I ! I
- �\�,,�_,� I . ; �
" I r,h . L 11 I "I' �� I � , - - �- -.;;--- ,.\. , _. :1, _. , I �l � � -, I t�,� " ,;i I I I I I ;
I . � ": L' I . i � .1 - 411 -,,- ---- I -
__ _j ,�l 1 , "___,7_,_. __*____--l ._ _______ _� . - - Ir - I.., .. .. -- ----.t;.--! _j � I , . . r
� ; 1 1 � I I �, - .I- , , , , I I ...I� i --.-,! .... .. I—- -, I I . , _.. . � ./ .... - -T --- L i
, � h! - I , I , - , , . � ��- . .
� _111, _, .,.,\
'� `L: ' "' - — -Li I - .-- -- .. . . - , ., . � �
I I - . I � k: � oK � , 1. r •, -7 ",-- 1?_,� 9217I
� rf I z . . . * I ", .� ,. 6 � 1 14 i _� - _._� � I __j � . � �.j I - -1 - � - _ �..:- � _7..N% - I I -
I
11 � � ! - , V, . , ii,
I I ;� 1 4 "', �, ,"I ��, " - -. ,, '-" .
I I .) , ,� I , - ;\- . . t:! ; 11 ! rt 117' . !, -, , (, _�. I . 1) ? -_
I I , � I : �-" . � , ? I � \i��_ 1. I ,`, . I � ". I I I I
I . ' ' � I � _j . I - � I'll �,� I ; , � I , � �', , "*.."_ V , t - _.
I
" . I I . ! � w , � I ' ' 4 i � 'm I ! i ! ., i % . I .. , � .1 , .,�, " t. , , f ,\t. , I . : : -.4 PAR '9� ", "i �,
. I
. . , o . . 1 2&85 , 1 Z7,�;,' .; , I � I , ! , � ; ! . -
� . I I! � : - 0 . .
I I I I I I : " -
I I . 1�, . 1-1.1 �l I
I % I ; - I P-9185 , . I I i ! ; I " , . I 1, %,
� I ' L I
, 1 : I,: . . -, I : � � , "': : I , , , . P. 1027 : . I /'
1, ,
1.6- �, 1 A. Il �:L -10�11_*'.. , .11 , I i I I I i , � �� ;� �,�,, ".) I � " �-, , . I 1, , , I , / : I
! "'. ; f. w . z I I i t� ,
. I ,�; I � . I � I , ! P -MOO _ , . I , I ! . ,
; . I .1 F 1 p_qv(6 :1 I 1 P -96-u ; I � . ! . P-90.04 -� - I�� � *\ __ � 'p -low I : 1, I
I I . � I ; ; i . ��-�� " . I I I ; , I 11 011 A I I :: .1 , ; .
I � . . � ,, I , .-Il-,.l. , ; I :
�,;
. ! . ilp-i , : . t .�-. I , I I i i I 1. � ,�,; ,;,/ 1. X
'. . * ,` I . I 1 i � -_ � __ __l -
I- - � - - I I . 1. : I � 'I 11 � I , : . !� 11 , t, ��,, , \ �_W, , 1 �4 ; .4 ! :
, I ; t ; . � . � . ! � 1 : ') 11 --..- �/ 1� 1� I - ,� � � I I ,
I . � - I . � I I . - � I -1 - I : I . I-. - L'. R$, : �j . -- -, -_
I I I q " I t)�4 1 1 �: 4q, I ,1� ") . _ , . I .
9 - . � I ! . -1 I ' I ) . f . . 11 ,I i ) . I I - ". ,."� ! . r� I % 1. I 11 ; I . 11
il , I I I I t� li . T . ., � : I , �. I - _� .� I � � I
" , � 11, - � .# �, � �- I . � ( il""
I I F, _� -_ _7 ; F7J ? I . � 11
" j r- _7�1 . I ; ll"� � . � . : - � -; " - I.- - - ; I- - , - .� , �� I � , 11 � � _ � - � ... �_ I . I I : 1 ! .1
; � I 1. --- � � . 2 1 . I I I : �� . I I I , i i i
� .1 I I I . . � � '. I . � ., � I I I . .
�l �_ . T � : , , - I . ; I : I I I . . , , I : 1
� : .- . ; . ; : ! . i - � " ! I ! I * ;
�., ; - -4 ; I ; . I . � L .
� ; ., ! Pi-kos I Ili . ;. . t. __Nftw� _ I . I � � _I , , ; � ,� - , I - . 1. -_ ; 25, � -_ I A I I � I . I I � I. . . I il "I _.
I , " . a . � 1j,!, . '. I-, � I :I- - , A-94.77 I '� �-9)`7� _'; I , �f P 9815 i, , , . ! P- 1646 ; � I 1 I.
1 . >- it , .. I ! 25' ; I" I I - � -
, . I I . In I . - -1 - , . 1\
! : - . , I I I � * , 1- .- .: I - � � - 25, , � i
'. ,. I : ,- TV [ !!� I I I : . � � I , i - I i , ; ;=A " ,; � -iz� - - 1 - - . � ,i �i 01IM48 1 1 1 1 .
I �A , I � 131.6c : I ,-.� -�! i . _t : � , _ - 1; - : � ; I I . I
.- I , .11 I 1 1 ., ,N� cL, ,
, � I , ! , ( tR 06. 'A * - . . 1�: v..O 1
: - �,,� - 11: � a I . . I . I : . 1,
I Q. ", " ,_j '9 Fi C LK; .,% I I � I - \ � -
. I � . I ' ' �l ol � -- � I : � . .1 I ,- I - _. � . I _ .; . W: L - .. I I � I I f_ ..
. I t � I N ; cmL ; ; I I I .
I !''. � . .-,-. I . : . i - I I" I , I . .
I q 11 Pb -K27 I 1* CL I I ; ' I �;, � , '7�� - _Z�_ 1 . I I , 1 1
1 . I . I, � : , I .
,./ tTo , i i
I I : � - - - I - - - A I I _ I , ) - 4AW;,�A.` _: t< i . , �,, : I , /,/, g �", �- ,,,. I - I
1�; i 3Z � � - I I - i , , o' t'"' _ � I t , 98.!; , 51
F�-4 , , , I I -: � . .� I
0, i" i i I
I , I � �. I I � i I , I,---- -Ef - i ��.__,� _A, , , ; [�] I' [ -_ I :' / 02j.. . 1 1 i;l: I
� I !qe�'ii I : : I � I I I I -1 'A-. ; � - ''\ L:51 j- __ . _� 1�1 I ,< 1! I . � 2.09�- I ;
I !. - I
. . I I I I ; i I %, I I ,� I , I . P.S�r I ; I ; 11 I I I , P.tpmw , � I
I , -X27 I . , •.1 ft"'98 I I , 46 , '' I 0 �
I , , L�� . . . I -� I � 0 If - I �
.1.1 . I i P ; P�jqf.m . . I , P-90-49 1 ; ! :
I : i ! � . � . � 9 � 5 - . I. , - � _ -..---- I . I . - _ _1_ - .- -,- - .. - I I , :, L i� " tx
I , , . '. -� I : -_ i I I � . I " " ; . �i I i � � - _ .. I - ! . I : -
. I . . i I i . . 1, � I I
� . . . . I i ; I � .. .- " I . : :
( I [ �
- I I ..�,�. - -,
, f< ) - I � I
t I � �•
I I ;I, . .,
- - - - - ..� ; ; , r I
. '� ; � I ;m; I - I
! . A - I - 1 , , I q - ---- J: , I I
I I I
- : - . � - , I � " j I
L
P i I
\ I I .
i I I / I'L, , . r I '. i". ; � � � ; , N, I I ?(Lt. 1 ' I I .
. I . . 11, , " --i I' I -1 � I., � , I I � I I I I I : ; � ! _rPW T. NO.- �, )V4V
If le i � 4'-.I 1 . I : i I I � � i . I I I -+2.OT, - I .- i I ! . - - ... 1�
; � I I I : I I . , -_ . - , " 42 , � i I ; I . I ; \ � I i I ll�
I I i I . - I � ' ' ! �l i 11 - :
i . t, I -,-� , :-j - � - -_ - 4 - � �,_ .__.__ . , � 1� -1 � 111�91&67 - 1�6. k# P-leat I \
� �,,II I . I ; , I -1 , 02� - - 4�qilv.'_! " � �; , I . 1 6 , . P.,Rts�: ! , . . I : :
i ., I 11, -- � - _ - _W 1�,._ - I �\"- --- Ip.0)r.w , � -, r- I 1: I 1 i I)VM 5OD16-7
I 1� . . . 1. I i. .
, ,�._ � � I It , . I . I I - / +
I .. i . w . . " I : ; : � � . I . . .p - . � � .. ;I m ; I - I I' ! I ...
I '� - �� ,,, I ! \; )iI,. .__..J___p.",__._� I—— _1 , , " " i � ;
V I 11 I I 1# , - z . _�_ I �,,. j ".��- I ! ; t- -Y,4 1 7.15 " ; 4 1 v � . 8.64___,� i __ _. lL.t_l - -7 - - -� I --- - _�_ - I - _.;
. , I I I it : I- - %.� 1. . . I 1 qf�K i I , . ; � I . i I b, I -1 ,:� -_ .- _ . 1, - ` ... . I I - I , .- 104-.17 - \ I � � I
-, , I I I � �,�' 1� . I .
11\ , "t, , I -Al- i I 9 , � , . - I "
I - � 4�1 -i_ I I - , I I
777 - - __ . I . - . - - __ .- i v, �- 7 _T --- - t- 1� - - -L� - I .. I - 4 - -, - - __ - __ , - - __ - ____ ___7 [ -,- -
, - __ _� ---- ---- . .., � -.1.-- s
, , ! ! � , ;; I,r , I - , - I _� I
, _1 _�., I -,. ,- ,.- � I I I . �1` -N\ -- ---- I i I , ��.. _r - -
"I I A I ., t" '�'l I I __'��l - ,,:�:, -, � 584'.- - "' ., / I I - .. I - --fir —
/ - �, . - �� I .,.C* _.- __ 'l -) i I.,
I I
�� , I k - - _ . _r_�` I I I I " - �7 �
/, ) i, ," ! 1�1,�_. I I J * , j - � Ir - " 1 \ If I.m �w - . --- - - __,_,A = . :_ =,..� __z_ �',
. I I �l �4 i ,�, I I ! .
� / 11 '. , _.- - I � , I \ , . _ --
. 11 , 11 " IX'ST zz,�"j -�- I 7 \ --- o
Y--., / ,�� � 1 i 11 1. \ I - , - I - J, I I - �.. �_. (I, Bcwc=pj wl � , , 11 � __ - - - ___ 3� 1 !, rl
: I ts" i , / .1 , ", i ---- - -_� - ( - i . _�
-
j _/ I ., I 3, \ ., .- I -, i L - __t - - I I 11 41 1 � I— - _ .:
11, .r, � It- � ,
, - - 'I. .4 --.-- 11
, - _.J�
_ ;--/ / � I ; , I -t!O I _. i \' -_ � ._, - �\� � I -_ 4 � '�- --- \ - vpAi6p6', " -_ , , 10"' �
I -_-_1 � . I I ) - - , I., , - � \-..-.._-, ........ L .lr,,-- * � I - �1* - M:Y..O--- . -1 L-
; , . . i - = I--,- -l. -:n-7_-_-, -_- -- - :� I ,- I --
II ' ! ' 4 _ �. — . I I .- -.,-. ______ - - I . -.1 _ �L .. �
. '. k CONSTRUCTION Eswr--y i "I : ; , lor_ I i - \ . i i I . i
� _' -
- - 6 -�� �y - � I
" 1_41 I � (CITY 9F A01, : I -i '*"� -- -_ ; -,:% \ 2�"' ff,W, �'�� -\�&" , - _�&_..
-5 / Z::t - N, " -; - - !IS TRUSI-1)" . � - ,� �� - 7.6 .'--: � FED'ZLL�M& I - _ ! .
__ _�� ; I I ! : 1. , ,.'.- ��i __ . ,
_V - '
" " "_,.� �l _1 � ; �_ -:. crry_- � -_ -, . -_ -
I .�_ , _,___..__ I \ 1
/I - - I I . ;1' - _ l.. 4 ( " I 1 _7 GT- � -:�-; �,
�� / _ __ - - - . . _'I - 10, TEMP. - ....... _ ____ '_ _., _ __ - I _ - I );,
:7,T J.1- �:_ . i i c5 ,�T i -
. . � � - I � � __ � - f- I - / � . I -1 � =_' - -, " . ,,, , � Q
_j I - ... - MILI, �� .
I . 4s . - . . lvll7iz&_l .___ ___ __.____ I __�.7:___ - - - -_ -_ , ---- -
I- _1 ! I I , . . . I".-.��-.--..-�l----,-,.,�..--- . I - __ �__ _ __Q - __ I -L - . ._,_____' - I
,
__l I., � :t:t' - - - - , __ _ ! "74) � -.,= . _ - - ---- -11TIMAIE I _VllW--F(W-Fb , _ . _ _:.�_ _ , , _. -, ____ � __ii��..__ ___ _ -, - - - _ - , _ . - _. ".t.. ------- ---- l__ _._.__T._.__ - � -
- ,I1 '7� ; __ j ., .- w .CtM: -
j-,"' k w. 4e na. StDRM ~ . _. - . __T � & S.D. T. i - "" f . - - - .1. a . ........ ,.,
- - - _ � - .: I _. - R.O. W.
- . ; : --z.-.- - - ..., .z_---_- I- - - - ��, .1 � - -_ - - � _ - .. , .-.-.,--;-----�.----:;-.�-----:,� _. _t -
; r I zt- �_�___to Tw a - ST#4) - - __ � - __1 - __ ____ - _.__
- � - - - , * --- * `.-
__ , . - - . - . _ -.--.
I I I I - - -, � _ - - Z _ zl_ - � - I --- � . I --- - - __ _ ... � ... I . - -
� I - . ____ -.-.-,--- .. _ -------------- , , 7 o - -, __ - -, -
: . , 4 ---- , -�--*�� __ - -- -_-___... ..__.. .- . - __..____.______._l -- -_-:��_j;__ -_ - _.__________ _ .-.-.---.-------.--.----- . ! .. -, - --' - -
I _- .- , . :� ��..7.!!�=�� - .... j __77 — .. ... � - - ___ -I.--.- �__ ------7--.-- --.----.----.------
- _ - - .
. _�±,_ - 1 -- -- - - -- -- -- -- - - - !-la - .- __ __ __ - - - - I I- _ ___ - - __ __ .- I- .-
: , - -- -- - - -: --_ - _. - -_ _ ___ - . _ �._7_ �� _ -_ - _ - - _ � - - _ _ -:71 ... --- -_ - -_ - - -_ .- `373 1�&� '& .
I I -- __:.-t_-- - -- -- - - - - - -- -- -- _�.--- .:_ -.-.. - _ __ . - _ .- _ __ --- -_ - - -_ _ _
; I ; C� . I - , ... ;�_. _ _. _ ; ; a ,7� -
! I . . _1 --------- .. ........... .. ncef. FAL AW. STREET & HIGHWAY _' - - ExIsT SCE -H EXIST. 54, Nvp smRu ;�;� - - , I
; : I � 1 ! . -w __ _. - .. ....... ___ - , - ; ____-9 . - ,ol
-�,. . I—- - _. _ - .- - -.--. I ____ - . , - !�
i I I . � . ; ....... _4------,--- . ....... . ! E.SF%11�AM -1'1�.'.9164' ROOK 6874_ PG r,;E. EXMI- Jj-'--WD HILL AW. srRErr & _"Ill;'A� _ __ - ___ . _.__ N �l _ ___
, . . - ....... ; . - IS BE- , -, - � I .- I- -_ _ - -
� . I , - ---
! : .1 - - --I+ ��, I '5 19 9 RECORDS: - �_ 7 � n _ - _'
I I I ___ - � wu ro rw cffy OF LO Tim)"& ,W,ny,M IV - 2 - _ L - __ ,- __ ,.�)_
_ " . OF OFFIC10i I
; .... ... _.4 11 I I 9E GR4WTD IN FEE TME ; I - ,_ 21
I " " J. st Exw. ur #CF, STORK ORAAV � . I .
! . -.-. i_ .... .. - , , I CrW. 21* vr n:��. .� r- ,. , -:1
_-A-.. 4 ; ! SE- - , I.. ---.. -.,-. -.----. -,.-- -- ___ ____ -_ - , - _. � -- - - - � I - - I -_ - _. - .- --.--- � I � - �_
: i I I_ - -1 __.61 .... ... ... __.___._____ _ , �.O THE Cl IY OF TUS TIN) . ; ,
__ - .1 ' - I— __ - - I . � I � - I- ____._ll"7_7=..____ ,-.--I--.- I n - .I,,--. .- _ - -_ ,_ --- _._____�
- I � I , 0 1 � , �� _r` ____
. I . . m - - �_ �* . - � . - , -_ 2.- - � Its -, I - _1 --
1. . ; . _12� __ . . . - - . __.__..__.__- -_ . - - __ --- - __.
7 7f, L 4' I . , - � �l - 4- -_ -
. � : 1, ; j : ! 1� I I, 11 !I 2 " 1. I q �, . . . . . . _��. - — _____.__ ___ —L _ ., I- A16 - - ,��: % — �,, I I --w-'.1 — —
- L= --;"� _.__.*-.._-_l_-_-_ , �_. _ - .1 I
- i �, - -- _1 ._- ---.----.----.,.--------.,-------,---- � I - __ . - --- -- � --- _�L__._!.�., I--------,_-
• .----�--.--.----�_-_---------7t----
I ,� ,�, � , - -,x-E �. _.- -_ , I --- �-� , �.
, / - - ; - -�.I.....;�-Q----:.-----.---.--.-
- - - - - - _= `
" 1 �41 I 7��..'�'. _ - - -
I . - - � - --- . I � rXIST. 3r R7 Sn"
. - f -, � - . . � : RtEaMr -A YENUE- �- -- , - - ;
� . .- ../, '. , - 1. I . I . - .1 - 1.
. I I - � . � ,..__�,�.,." I lr_,-, ". - - _.l_,_.:�_*_.... .---...-- -1-..,z-_'- I ; I I I � . Q
" I , I - - - ----. __ - _ __.. - __ - __ - - __.. � - ___ �:- ----- -,-.---,- --1,- - - , - _1 1-1 � . - __ � - -,--. -, _. - __ � - . - -.-., - - -_ - . .
___ _. - -1---1, '.. - !---Eiyff. . I , � - 1. I- . . " - . -- - __ - . ... I __ - - . __ - ___ .-.-,- --- _ __ - __ 4 -- �.�, 7_ - __ __ _ - --'--- 7�77_ __ -- -.-
-
- ,,, , � . I.. - . I .- - --- .
� - ir vmTER , I _ cm
I " . ! _i_._:6_�� . � _. - .. I �. , _: - - , - - . �7 , . - I _ `7-- --:,-- --- -_
- . i I , .. - . . . 1 7 _
I I I . I -1 ,, - DisT. ' . I
(1, - - _ I - -.,. I
i � I I�6_ . - .1-1 -, .
--- % �l - -, _`* -N �
I , ; I
. �
.. -. - .1_.___. . . - ---------- � ___4'_llff ! I -y- - - -- - - - - - - - - - -- - - .11 �'_ _ - -7 - _ , - � � .- .. - " --- I__ - � . I - -, - __ -
. -.1-1 _ . - - 2
_ _ Q11 __ � - - __
- 11 , , ,.:�' -- _ __ - -_ ...... � - - -_ I _. - � -1 . I --- _ - . - . . -- -, , �j 9
� K I * I ; �� - 1, , -, " , "-- ----- �- - _ _
,�; I I : _. -, ..
- � .
, : : v - - -
.", I "
-
-_ -
-
,,, ,." - _'. _.- 11 .
- -
- � , 11\1 I ; . --- � , .. - I .. � - � 1 1
\,.......... . _ . . ........ _ - � - ---. __ - -.- - - - -
I �, ,- 1-. I � - - --.------".----,...-,�.----..-.-.--.-----,---.-.---.-----.-.----,-,--.-..-.,�---,.-.--. .__ ... _-..- ----------.------ ---------
- - " 11 ;l
- - , - - , .�'.
, , . , _/l � - - , I I . ... � /I , ,,, -
, '. \� '. �,, , ", . -- .. - - __ - . ! �l . I I . ., , -
, . , - , , . - _. " 4� , - - - I .- I - . I - . _ I � - _. 11 - .. " I - � . . , . I__.\ / " .- - :.
, , 7L � " , I ".. , _ -_ -_ __.. - _ --- _ 1. . � _ _. , , I . I I I " - . I / , -_ 11- . ---I.--.-. _ - I.-
I
4 /1,
SITE SUMMARY NOTES APPROX&IATE RAW STATEMENT OF OWMMSHP ,I
I
E li
CROSS AREA. 4.71 AC / 207,577 SF I EXISTING LAND USE MULTI FAWY RESIDENIIAL EARTHWORK QUANTITIES I HEREBY STATE POT THIS MAP WAS PREPARED UNDER LS' It
NET AREA: EXCLIADES EX51ING PUBLIC RtOttl OF WAY (0.77 AQ 2. PROPOSED LAND USE: FOWNHOMES MY SUPERVISION AND THAT THE OWNER OF RECORD HAS
- 4,0 AC / 174.019 SF
J. �;FWQAL PLAN LAM) USE DESIGNATION. HIGH' DENSITY RESIDENTIAL CUT: 3,500 Cys I e -
4. ZONING: R -J (MULTI FAMILY RESIDENTIAL) nLL. 3,500 CYS KNOKEDCE OF AND CONSENTS TO THE FILING OF THIS "AP. - A �
STREET SECTIONS FXCtUDFS 1XISTINC PUBLIC NICHT Of WAY (0.7) AC) & ARTA WITHIN 5. ASSESSOR PARCEL NUMBERS: 1,T2 -171 -OJ * 4J2-711-04 . NO 3111796 T �
Do: .vjt,w
THF OFTICIA1. PLM LINE OF REO !fkl_ & WALNUT AVE (0.21 AC) 6. PROPOSED DEVELOPMENT IS WHIN THE WSTIN UNIFIED SCHOOL DISTRICT -
� 36' - - ' 79 AC / 164,956 SF 7. lITfLl`TY PROVIDERS: .--.---. ._____.__________._ I&A s;?6/ '40 I. ,CIA �Ll -
- ____._ DATE _29161 �
, 4. - - to . - -, 4. - ". 25' 1 — ", I �-_ UNffS. 75 D.U. WATER - QTY OF TUSTIN DOUGLAS L. SMEY, P.E. w f
1. _LR -ORANGE COUNTY SANITATION DISTRICT
I .- - is.50 � F2.3, to' ,., ., :1- 11 L,-i-_� � Q� GROSS DENSITY. 1!;.,' DJ#./AC SEWE Wa PRES9XWr-PR#JCJPAL
.. - I I NET DENSITY: 19.8 V.U./AG TELEPHONE - SBC DATE REVISION . Err PREPARED FOR PREPARED BY. �
.
\ - . - - � I - - CABLE TELEVISION - COAOCAST
P is. -1 , I
... 7 +�
. -.* sar,"W', V swr." I - mmum ... . I GAS - SOUTHERN CALnRN14 GAS COMPANY DATE ______ 02/01/07
4, fo�. " mvl!�'j LEGEW ELECTRIC - SOUTHERN CALIFORNIA EDISON COMPANY W.O. ----.-____ - 3150-3 SUWJVAL-
INTERIOR STREET (pgrking both sides) ENTR PRIVATE DRIVES R. GRADING dk IMPROVEMENTS SHALL BE PER THE CITY OF TUSTIN ULAN$CIPAL CODE GROSS AREA, 4.77 ACRES± I'm RED HALL, LLC I
(PRIVATE) (PRIVATE) (PRIVATE) MALOING NUA08f R AND CITY STANDARDS: CONTOUR INTERVAL ---,--.- I._ 0 ,4 20 4o 18301 VON KARWAN AVENUE
NTS NTS NTS Fil 9. PROJECT SITE I'S LOCATED W7WW AN AREA DETERMINED TO BE OUTSIDE THE 0.2X -"
ANNUAL CHANCE FLOOD PLAIN PER FLOOD INSURANC TOTAL LOTS I NUMBERED __6esQ___ , SUITE 710
X WE UAP NUMBER 2 LETTERED - " IRVINE. CA 92612
945059CO277H DATED FrEORLORY 18. 2004 (ORANGE COUNTY - PANEL 277 OF 5_50.) u
,_& . ALL EXISTING STRUCTURES ON-SITE To BE XMOLISHED. PHONE: (949) 756-1710
F
�
/]
�';
, _ 10.
N , �r � If. THIS TENTATIVE TRACT MAP IS FOR CONDOMINIUM PURPOSES AND SHALL PROVIDE THE VICMTY MAP FAX: (949) 756-1720 HUNSAKER & ASSOCI T13 .
EXIST. EXIST. EXIST EXIST. nRE TRUCK TURNING RIGHT TO CREATr CONOOAA&VUM AIR SPACE WITH THE REtVROATION OF A FINAL MAP , a I . . a , , c I i
R/w too- R1W R/* 80' P/ , w% rLmsec . w.cpsowc .
I
I -1 � - ------, I I AND CONDOMINIUM PLANS. :. tb=. : %ft CA 11111
to' I to, t a' - a. . I. v* __ 64- 11' . 10' _4_10'"� IZ. PARKLAND DEDICATION WILL BE s4nsFxo nowucH PAYMENT or AN mv LIEN FEE PER - 00 m"mvill 4
. ---------.- CONCEPTUAL p_
E Ju, 1-9015"W. , QFr.3.L m,
� , ...." m. � Lm jamm"awl 2f, TUSrw CITY COX SECTION 9331.0.3. I /;,." i
,,,v, I ftm LwE �
Iwo � ; I __ oxmul uamm 13. PARKINC SHALL BE RESTRICTED ALONG THE PROjFCT FRONTAGE ON BOTH RED MILL �:,_-Zl i
I I , . i
,
, It �
I I li � - " I
I 1, I � _.
-
I I � I I I _,�
I I I , , �
�
r I j Ni I 'I , -1
I - �
'! - .,
" I -1 )
I
"
- .,
__
- , - I
,
__ �1_ I :
- - ��_ , 11,
-
-
..
I
I
p
I
-
ow cr �_ .4 r 0 _. - -,_ 5_9�w_%w - � � fff or ftm.� AVENUE AND WALNUT AVENUE. .. >� / GRADING PLAN a
I " - � = 60 /�l
I — =� I �
rxz __ A EXISTING WALNUT AVENUE'\\e� LOT NUMBER LEGAL DESORPTION STE i T. T. NO. 17080 1
(PUBLIC) (Pusluc) (D � T) -AT PORTION Or THE SOUTHWESTERLY Wr OF LOT 47 or aLocK 11 or *"'S
NTS NTS SUBDIVISION. IN THE CITY OF TUSTIN. COUNTY OF ORANGE, STATE OF CA"MA. AS . 0
"". SHOWN OF A MAP RECORDED IN WOK I PAGE M OF 4NSCELLANEOUS AMPS, IN THE FOR CONDOMIARAW PURPOSES *'.'
PROPOSED FIRE HYDRANT OFFICE OF rh'f COUNTY RECORDER OF STUD COUNTY. a
L AK I "
_j SWET C-2 li
PLOTTED BY: Phillip Waugh DATE: F.D. 01, 2007 10:41:18 AM FILE: F:\ 0338\ Plann,nq\OA- Project Tr- 1 7080_ "ding, dwq
ATTACHMENT C
March 13, 2007, Planning Commission Report and
Submitted Development Plans
ao% loft
Ar Is
DATE: MARCH 13, 2007
SUBJECT: TENTATIVE TRACT MAP 17080
DESIGN REVIEW 06-011
OWNER: SUNCAL- RED HILL LLC
C/O SOUTHWIND REALTY GROUP LLC
18301 VON KARMAN AVENUE, SUITE 710
IRVINE, CA 92 612
ATTN : JIM MAG STADT
APPLICANT: KAREN SULLY
THE SULLY GROUP INC.
161 FASHION LANE, SUITE 116
TUSTIN, CA 92780
LOCATION:
GENERAL PLAN:
ZONING:
ENVIRONMENTAL
STATUS:
REQUESTS:
14421-14471 RED HILL AVENUE
HIGH DENSITY RESIDENTIAL (HDR 15-25 DU/ACRE))
MULTIPLE -FAMILY RESIDENTIAL (R-3)
Q MITIGATED NEGATIVE DECLARATION HAS BEEN
PREPARED IN ACCORDANCE WITH THE PROVISIONS OF THE
CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) ARTICLE
6 OF CALIFORNIA CODE OF REGULATIONS, TITLE 14,
CHAPTER 3.
1. TENTATIVE TRACT MAP 17080 TO MERGE TWO EXISTING PARCELS
DEVELOPED WITH 57 APARTMENT UNITS INTO ONE 4 -ACRE PARCEL
FOR THE PURPOSE OF SUBDIVIDING AND DEVELOPING A 75 -UNIT
RESIDENTIAL CONDOMINIUM PROJECT.
2. DESIGN REVIEW 06-011 FOR APPROVAL OF BUILDING
ARCHITECTURE AND SITE DESIGN AND AMENITIES OF THE
CONDOMINIUM PROJECT.
RECOMMENDATION
That the Planning Commission:
1. Adopt Resolution No. 4053 adopting the Mitigated Negative Declaration (MND) as
adequate for Tentative Tract Map 17080 and Design Review 06-011 for
development of the proposed 75 residential condominium unit project.
2. .Adopt Resolution No. 4054 approving Design Review 06-011 for architectural/site
design and amenities of the proposed condominium project.
3. Adopt Resolution No. 4055 recommending that the City Council adopt the MND for
Tentative Tract Map 17080 and Design Review 06-011 and approve Tentative
Tract Map 17080 to merge two existing parcels into a 4 -acre net area site for the
purpose of subdividing and developing 75 residential condominium units.
BACKGROUND
The proposed site includes two parcels that are currently developed with two apartment
complexes including 57 units known as Whispering Woods and Tustin Terrace
Apartments. The Whispering Woods site is 1.87 acres and contains 27 two-story
apartments, and the Tustin Terrace site is 2.14 acres and includes 30 one-story
apartments. All existing units on the site are proposed to be demolished. To redevelop
the site with 75 condominium units, a tentative tract map and a design review application
need to be approved for subdivision of the land and the site amenities and building
designs.
The project site is surrounded by commercial uses on the south and east, an office
building and residential uses on the north, and a residential neighborhood (Broadmoor
Park) on the west (Attachment A -- Location Map). The site is zoned Multiple Family
Residential (R-3) District and designated by the General Plan as High Density
Y
Residential (HDR) which provide for the development of residential condominiums.
DISCUSSION
The following discussion includes analyses of the project description and site plan,
access, architecture, landscaping, and environmental documentation.
Project Description and Site Plan
The site includes two apartment sites with 57 units that were constructed in the 1960s.
The proposed project is intended to demolish the existing apartments and replace them
with 75 new condominium units (Attachment C — Submitted Plans). The site fronts onto
Walnut Avenue on the south and Red Hill Avenue on the east. The site currently has two
vehicular accesses on Red Hill Avenue and a secondary access on Walnut Avenue. The
proposed site layout would eliminate the Walnut Avenue access and the only access to
Planning Commission Report
March 13, 2007
TTM 17080, DR 06-011
Page 2 of 9
and from the site would be provided from Red Hill Avenue approximately 120 feet from
the northerly property line.
The project site is designed with a main drive 36 feet wide that runs parallel to Red Hill
Avenue and secondary drives that are 24 feet wide running perpendicular to Red Hill
Avenue and each providing vehicular access to 10-11 units. Adequate turn around space
for emergency vehicles is provided at the terminus of the main drive.
The project site is proposed to be developed with 16 buildings of four-plex, five- lex and
six-plex design. The buildings are designed in rows with entries facing one another and
garages arranged back to back. Each unit is designed with a privatep atio at the front
entrance and a balcony on the second floor. The end units also have an opportune for a
opportunity
private patio on the side. Common landscape areas between the units would also be
provided with decorative walkways and landscape areas (Attachment C - Submitted
fitted
Plans), The buildings are set back 10 feet from the residential uses to the west and 16
feet from the residential and office uses on the north.
The proposed buildings are typically three stories and 35 feet in height with the exception
of the units located along the property lines adjoining a neighboring residential site. These
"rear" units are designed with a third floor loft and an overall height of 30 feet.
Four different plans are proposed which range in size as follows:
Plan
Bedrooms
- Baths
Scare Footage
1
2 BR and loft
2
11803
2
3 BR
3.5
11863
3
313R
3
11997
4
2 B D and loft
2
19743
The project will comply with the development standard for the City's Multiple Family
Residential (R-3) District as follows:
Standards
Required
Proposed
Density
max. 25 du/acre
18.75 du/acre
Site Area
min. 7,000 sq.ft.
174240 (net)
Minimum lot area per unit
1,750 sq.ft.
2,323 sq.ft.
Building Height
max. 35 feet
35 feet (average)
Lot Width
min. 70 feet
331 feet
Lot Coverage
max. 65 percent
65 percent
Landscape Open Space
min. 35 percent
35 percent (includes
2.7% decorative paving)
Front Setback
min. 15 feet
15 feet to the building
(12 feet to balconies)
Side Yard Setback
min. 5 feet
10 feet
Planning Commission Report
March 13, 2007
TTM 17080, DR 06-011
Page 3 of 9
Rear Yard Setback
Off-street parking
min. 10 feet 19 feet
min. 150 garage spaces 150 garage spaces
plus 19 guest stalls plus 27 guest stalls
A solid block wall with stucco finish ' is proposed along Red Hill Avenue with several
breaks to provide pedestrian access to the public right-of-way. The entrance to the
project is accented by a four foot high curved wall on both sides.
Access, circulation, Parking, and Traffic Analysis
Traffic Analysis
A traffic study was submitted and reviewed by the City's Engineering Division Exhibit 2
of MND analysis). The study concluded that the proposed project is expected to
generate approximately 718 daily trips, which in comparison with the existing
development, would be an increase of 342 daily trips. This is a relatively significant
increase in comparison with the previously existing land use.
The more detailed peak hour intersection analyses for future conditions with the project
show that no significant traffic impacts would occur as a result of the project. However,
for long range projections (post -year 2020), the intersection of Red Hill/Walnut is shown
to have "over capacity" operations if the current intersection geometry is maintained.
However, there are improvement projects anticipated to be implemented at this
intersection to maintain acceptable operations for long range future conditions. Based
on current City policies, the project is not anticipated to cause any significant traffic
impacts.
Access to and from the site is provided at Red Hill Avenue which will be open to both
northbound and southbound traffic. The traffic analysis also determined that the 25 foot
wide access on Red Hill Avenue is adequate to allow for one outbound lane and one
inbound lane. At the completion of the project, the access is shown to maintain
acceptable operations. Under the build -out (post -year 2020) scenario, the left turn
egress from the Project site would result in significant project impacts. Condition 4.11 of
Resolution 4054 is included to allow the City to reconsider the left turn from the project
site in the future, which notes the left turn may be prohibited if determined necessary by
the City's Traffic Engineer.
Pedestrian Circulation
The project site is designed with three direct pedestrian accesses to Red Hill Avenue and
one to Walnut Avenue. The pedestrian access points to Red Hill are accented with a
wood trellis at the entries that connect to a 6 foot high perimeter block wall. The main
driveway is designed with a four foot sidewalk on both sides that lead to the front entries
through the open space separating the building rows. Units along Walnut Avenue are
Planning Commission Report
March 13, 2007
TTM 17080, DR 06-011
Page 4 of 9
raised 3-4 steps from the existing grade at the public sidewalk. Each unit is designed with
a private patio fence and gate to provide a buffer from the public right-of-way. In addition,
a wheelchair access is provided through a paseo between the two buildings along Walnut
Avenue that connects the public sidewalk on Walnut Avenue to the project site
(Attachment C — Submitted Plans).
Waste Management Plan
To minimize trash hauler trucks backing up from the garage drives and to ensure that the
trash carts do not impede site circulation, the applicant has proposed a Waste
Management Plan (Attachment C — Submitted Plans) with centralized location for trash
pick up. The plan proposes to use 11 of the 27 guest stalls for storing trash and recycling
g
carts during the trash pick up days. Residents would be required to store containers next
to their garage during trash collection days where an employee of the homeowners
association would relocate the carts in designated parkin areas; the em containers
9 empty
would be returned upon collection. The parking areas designated for storing trash carts
g g
would be posted with informative signage and enforcement regulations. Condition 9.2 of
Resolution No. 4054 is included to require adequate signage for the waste management
plan.
P.
Tustin City Code Section 9226a1(j) requires a minimum of two (2) covered parking
spaces per unit and each unit is designed with a two car -garage. The Tustin City Code
also requires a minimum of one (1) unassigned open guest parking space for every flour
(4) units or 19 guest parking. spaces. The project site provides a total of 27 guest parking
spaces including 25 parallel stalls and two standard parking stalls (Attachment C —
Submitted Plans). The guest parking spaces are evenly dispersed along the main private
drive within an adequate distance to all units. The private drives that provide access to
garages are required to remain accessible at all times. Condition 3.1(J) of Resolution No.
4055 will be included in the CC&Rs to require that the garage spaces be used for vehicle
storage. On -street parking is also currently available on Red Hill Avenue and Walnut
Avenue. The City is currently conducting a traffic study to restrict parking on Red Hill
Avenue that may be implemented in the future. Condition 4.11 of Resolution No. 4054 is
included to restrict on -street parking along Red Hill Avenue and Walnut Avenue.
Condition 4.1(N) of Resolution No. 4055 also includes the restriction provision in the
homebuyer notification so that future residents are made aware of on -street parking
issues.
Architecture
The buildings are designed in Country French and Italian styles. The units are
staggered 2-3 feet to create an interesting street elevation. Each building includes two
to three units with front porches covered by a second floor balcony.Wrought iron railing
9 g
Planning Commission Report
March 13, 2007
TTM 17080, DR 06-011
Page 5 of 9
is proposed for all balconies with the exception of units along Walnut Avenue that are
designed with a solid stucco barrier to mitigate traffic noise. The project requires a 10
foot wide dedication along Walnut Avenue, which will remain open until future street
widening is implemented. Currently, the balconies are designed with a three foot
encroachment into the setback area which results in a 22 foot setback from the current
right-of-way and a 12 foot setback from the future right-of-way. These balconies will be
g Y
covering mainly the front entries and provide for a variety of architectural features along
the street rights-of-way without compromising the setback requirements from other
structures. In addition, sound attenuation is provided to make the balconies a usable
outdoor space for the residents.
Tustin City Code Section 9271(J) indicates that architectural features on the main
building such as cornices, eaves, and canopies may extend three feet into the required
front yard setback. In this case, since the balconies= are designed as an architectural
element enhancing the Walnut Avenue streetscap a and provide a usable exteriors ace p
for the residents, staff believes that this exception can be applied to allow thero osed
p p
balcony encroachment a maximum of three feet into the required front yard setback.
along Walnut Avenue.
The courtyard between the buildings will be landscaped and designed with walkways
connecting the parking areas to unit front entrances. Units with a raised finished. floor
(along the main entry and Walnut Avenue) have a small private patio Y
separated b a
p
three foot tall wrought iron fence. The exterior elevations are enhanced with
architectural details reminiscent of Portofino, Tuscan, and Provence architecture such
as dormer attic vents, wood shutters, brick veneer, decorative chimneys, Juliet
balconies, and various stucco colors to create visual interest. The roof material is
proposed to be concrete s -tile in various terra cotta colors to complement thero osed
p p
architectural style and color scheme.
The applicant proposes five (5) stucco color schemes for each of the architectural
styles. The Tuscan and Provence color scheme are earth tones and the Portofino color
scheme includes brighter colors. Each unit is proposed with a base color and two
accent colors and the shutters, railing, and other architectural elements are proposed
with contrasting colors. Material and color sample boards for the project will be
• pro1
available at the Planning Commission meeting.
Building Height
In general, the buildings are three stories with an average height of 35 feet that include
41 5, or 6 attached units (Attachment C — Height Exhibit). The project site is located
adjacent to a planned community of single family units (Broadmoor Park) within the
Suburban Residential (R-4) zoning district, developed with shallow rear yards. During
•
early submittal, staff received complaints from the neighboring homeowners association
regarding the height, shadow impacts, and possible privacy intrusion associated with
Planning Commission Report
March 13, 2007
TTM 17080, DR 06-011
Page 6 of 9
the proposed development of the project. In response, the applicant has revised the
design to include: 1) a wider than required rear setback of 10 feet from the neighboring
properties, 2) limited window and door openings and no balconies facing onto the
adjacent properties, and 3) lower height for the end units with a third floor loft and a
reduced overall height of 30 feet. In addition, since the buildings are placed
perpendicular to the residential property line, shadow impacts to the residences are
minimized (Exhibit A of Mitigated Negative Declaration -- Resolution 4053).
Pool/Recreation Area
A common pool/recreation area would be constructed and maintained by the
homeowners association that consist of a pool/spa, restrooms for men and women,
pool equipment enclosure, a shower, outdoor fire place, and a seating area. The design
of the pool/recreation building is similar to the Tuscan Italian architecture.
A six foot wrought iron safety fence would enclose thep ool area. A wood trellis is also
proposed at the entrance to the pool as a focal point for the community that would be
visible from Red Hill Avenue entrance.
Landscape/Hardscape
The project site is currently heavily landscaped along Red Hill Avenue with mature pine
and palm trees. Since the project requires a 10 foot wide dedication along Red Hill
Avenue, most of the existing landscaping will remain in place until the street widening
project commences. Condition 8.1 of Resolution No. 4054 is included to require the
minimum size and spacing of shrubs and groundcover and ensure that no additional
planting is installed in the dedication area with the exception of ground cover.
The project also requires a 10 -foot dedication alongWalnut Avenue; however since the
,
Walnut widening is not anticipated to take place in the near future, additional trees are
permitted to be installed within the future right-of-way.
On-site trees include a variety of palms, evergreens and semi -evergreens. The entrance
driveway is accented by 10 date -palms and the main drive includes Tipu trees and
Magnolias. Fourteen Chinese Pistache trees are proposed along Walnut Avenue
accented by Brisbane box trees.
To provide a diverse landscape barrier to the residential neighborhood to the west and
residential and office buildings to the north, a variety of Sweet Shade, Brisbane box,
Jacaranda, and Palm trees are proposed.
Planning Commission Report
March 13, 2007
TTM 17080, DR 06-011
Page 7 of 9
Noise Analysis
The project site is located at the northwest corner of Walnut Avenue and Red Hill
Avenue, and therefore is exposed to significant traffic related noise. The City's General
Plan recognizes that residents adjacent to major and secondary arterials are typically
exposed to a CNEL over 65 dB. Table N-2 of the Tustin Noise Element identifies
potential conflicts between the land uses and the noise environment. Per Table N-2
most of the project site falls within Zone A through Zone B with the exception of units
along Red Hili Avenue and Walnut Avenue which fall under Zone C. Zone A requires
no mitigation measures for noise while Zone B requires minor 9
sound roofin as
needed.
soundproofing.
The City's noise ordinance requires a maximum 45 dB value for interior noise and 65
dB for exterior noise. An acoustical stud was submitted b '
Y y the applicant with
recommendations for exterior noise barriers for balconies alongWalnut
Avenue and
Red Hill Avenue and upgraded windows and doors to be incorporated '
p ed in the building
design (Exhibit 1 of MND). The noise study indicates an existing 70.2 dB reading along
the southeasterly building line and 68.7 dB along the southwesterly buildin line which
concludes that the buildings along Red Hill Avenue and Walnut Avenue mustp rovide
an A -weighted noise reduction value of at least 26.1 dB to achieve a maximum interior
45 dB value.
Condition 11.1 of Resolution No. 4054 is included to require implementation of the
a p
construction techniques recommended by the acoustical analysis be incorporated in the
66
projectss building construction and design.
Tenant Relocation Plan
The existing 57 apartment units are currently rented at market rate and the residents
are on a. month-to-month lease. The project is privately financed and no public funds
are involved that would trigger relocation pursuant to state law. Theapplicant has
•
submitted a Tenant Leasing and Relocation Plan. The plan indicates that a minimum
120 -day notice will be provided prior to vacation of the property, tenants would be on a
. Y
month-to-month lease bas and the last month's rent would be waived, which should
provide the tenants with adequate time and monetary incentives to relocate.
Public Notice
A public notice for the availability of the draft mitigated declaration and the time date
and location of the public hearing for the proposal was published in the Tustin News on
February 15, 2007. Property owners within 300 feet of the site and all neighboring
g g
Broadmoor homeowners and homeowners association were notified of the hearing by
mail. Public hearing signs were also posted on the site, and a notice wasosted at City
Hall on February 15, 2007.
p
Planning Commission Report
March 13, 2007
TTM 17080, DR 06-011
Page 8 of 9
Construction Phasing
The applicant is proposing three phases for construction of the project (Attachment C -
Phasing Plan). Phase one includes the models and two other buildings (total 12 units)
that are proposed to be built concurrently (referred to as Phase M). Phase 1 includes 25
units and Phase 2 includes 38 units. Condition 6.1 of Resolution No. 4054 requires
submittal of a model home site plan and improvement plan including a public parking
area, landscaping, lighting, and construction traffic plan for the model home site.
Environmental Analysis
___...
A Mitigated Negative Declaration has been prepared for this project (Exhibit A of
Resolution No. 4053). The attached Initial: Study discussesotential impact categories
P p g
and appropriate mitigation measures. Any potential impacts can be mitigated to a level of
insignificance and mitigation measures have been included as conditions of approval.
The draft mitigated declaration was made available for public review from February 16,
2007, to March 7, 2007. No comments were received during the public reviewp eriod.
Minoo Ashabi
Associate Planner
Attachments:
ier
Elizabeth A. Binsack
Community Development Director
A. Location Map
B. Land Use Fact Sheet
CO Submitted Plans
D. Resolution No. 4053 and Exhibit A (Negative Declaration)
E. Resolution No. 4054 and Exhibit, A (Conditions of Approval Design Review
pp 9
06-011)
F. Resolution No. 4055 and Exhibit A (Conditions of Approval Tentative Tract
Map 17080)
SACdd\PCREPORT\2007\TTM 17080.doc
ATTACHMENT A
Location Map
Noma
11%
I
ative'11'ract Map 170b
iyn Review 06-011
I -11A71 Dari MOM Aw7,,m
MAN AVET L
11%
I
ative'11'ract Map 170b
iyn Review 06-011
I -11A71 Dari MOM Aw7,,m
ATTACHMENT B
Land Use Fact Sheet
LAND USE APPLICATION FACT SHEET
1. LAND USE APPLICATION NUMBER(S): TENTATIVE TRACT MAP 17080, DESIGN REVIEW 06-011
2. LOCATION: NW CORNER OF RED HILL & WALNUT AVE.
3. ADDRESS: 14421-14471 RED HILL AVENUE
4. LOTS: APN(S): 432-111-03 AND 432-111-04
6. PREVIOUS OR CONCURRENT APPLICATION RELATING TO THIS PROPERTY: -NONE
7. SURROUNDING LAND USES:
NORTH: RESIDENTIAL/OFFICE
SOUTH: WALNUT AVE./COMMERCIAL
EAST: RED HILL AVE./COMMERCIAL
WEST: RESIDENTIAL
8. SURROUNDING ZONING DESIGNATION:
NORTH: DUPLEX RESIDENTIAL (R-2)
SOUTH: CENTRAL COMMERCIAL (C-2)
EAST: COMMERCIAL GENERAL (CG)
WEST: SUBURBAN RESIDENTIAL PLANNED DEVELOPMENT (R-4, PD)
9. SURROUNDING GENERAL PLAN DESIGNATION:
NORTH: MEDIUM DENSITY RESIDENTIAL
SOUTH: COMMUNITY COMMERCIAL
EAST: COMMUNITY RESIDENTIAL
WEST: HIGH DENSITY RESIDENTIAL
10. SITE LAND USE:
A. EXISTING: APARTMENTS B. PROPOSED: MULTIPLE FAMILY CONDOMINIUMS
C. GENERAL PLAN: HDR D. ZONING: MULTIPLE FAMILY RESIDENTIAL (R-3)
PROPOSED GP: SAME PROPOSED ZONING: SAME
DEVELOPMENT FACTS:
11. LOT AREA: 174,240 S.F. 4 ACRES
12. BUILDING LOT COVERAGE: 65% MAX. PERMITTED
65 % PROPOSED
13. LANDSCAPING/OPEN SPACE: 35% REQUIRED
35% PROPOSED (includes 2.7%
hardscape)
14. MINIMUM LOT AREA PER UNIT: 1,750 sq.ft. REQUIRED
PROPOSED: 2,323 sq.ft.
15. PARKING: 19 stalls REQUIRED
27 stalls PROPOSED
16. BUILDING HEIGHT: 35 feet max. REQUIRED
Average 35 feet PROPOSED
17. BUILDING SETBACKS: REQUIRED PROPOSED
FRONT: 15 feet 15 feet
SIDE: 5 feet 10 feet
REAR:. 10 feet 18 feet
OTHER UNIQUE CONDITIONS ASSOCIATED TO THE PROPERTY (I.E. SPECIAL STUDY ZONES,
EASEMENTS, ETC.) None
Forms: Land UseApplicationFactSheet
ATTACHMENT C
Submifted'Plans,
SHEETINDEX
C-1 SITE PLAN
C-2 CONCEPTUAL GRADING PLAN
F-1 FIRE MASTER PLAN
SL -1 PHOTOMETRIC PLANyy ,
T-1 WASTE MANAGEMENT PLAN
A-1 ARCHITECTURAL SITE PLAN''
a
A-2 UNIT PLAN ONE
A-3 UNIT PLAN TWO -
A-4 UNIT PLAN THREE,
A-5 UNIT PLAN FOUR 3
A-6 BUILDING PLAN - BUILDING "A"��`'
A-7 BUILDING ELEVATION - BUILDING A -, '
�n h '
"
A-8 BUILDING PLAN - BUILDING "B" "rtttw
A-9 BUILDING ELEVATION - BUILDING "B" A('
A-10 BUILDING PLAN - BUILDING "C"
A-11 BUILDING ELEVATION - BUILDING "C"
A-12 POOL BUILDING
A-13 ARCHITECTURAL STREET SCENES
A -13A ARCHITECTURAL STREET SCENES - ENLARGEMENTS
A-14 PERSPECTIVE AT CORNER OF WALNUT AND REO HILL
L-1 CONCEPTUAL LANDSCAPE PLAN
L-2 ENTRANCE ENLARGEMENT PLAN
L-3 POOL ENLARGEMENT PLAN
L-4 GARDEN COURTYARD ENLARGEMENT PLAN
L-5 GARDEN PASEO ENLARGEMENT PLAN
L-6 WALNUT AVENUE STREETSCAPE & CORNER ENLARGEMENT
L-7 PROPOSED ELEVATIONS
L-8 PROPOSED ELEVATIONS - WALNUT AVENUE ENLARGEMENT
L-9 PROPOSED ELEVATIONS - RED HILL AVENUE ENLARGEMENT
APPENDIX "A": SITE PLAN - BUILDING HEIGHT EXHIBIT
SUNCAL - RED HILL, LLC
KTGY ti0. 20051361.00
IMA NO. 05140.02
"will,
i
*�( ��1� i
r i�
k... r%
HUNSAKER ll
ASSOCIATES ' KTGY GROUP. lkc.
Ai N 11
t�[C�Y[ ►LA.
� 17.1. ttl, •CM[L .aNIM
Y TM
IR v M[. iA♦II OA It ...1.
• • Iwl .11.71.11 .Alf tsu! 091,0190
ocum A1♦ lrnws 11n�n�
Of ;hG U:
7RAC-t NO -10400
L J VWS SLW MON
Lor 19 LOT
I L.Or 0 L
J ier- *71
Wr ly
ALOT 47 BLOCK V
Fr PATIO (r?P.)
L 661- 1 -�
:40' 10 & - - - - - - - - - No"
- ----- - 2A
b - - - - J T - - - - - - 4
#LOS
97.61
MI.
In Pao
—5 PAR
Ix
-zo I
-,a 1
L
3 c4q —2 19
Z
qkLl
r, BLDG V: 0-1
6,5f g! 'BLDC, 1Y', Z BLDG 1YI a POOL C4!2 •a
va 5 /1
BM jy#1 :BLDG.
x
•
N 1 j
9
jz : i XS
J I I I
Ar rj R
Z Ig [14 '9 NZ
-LON� � � \
-
r: rJ
S9L5 F1 21 RLDCV
25-
N: . I i , " i -
j
g
ri
Z
�41
xv 7114
V,
V
15 16 117 18 19 1 20 �1 21 ZZ
23 V 26 .11
A
------------
�J. AU.
if 10 8 bfll 7 22 5 4 1 27 1
9 V I Jll� i JL7.9
airs
-----------
Twun= ( I I -- — ----------- I --------
8217
RS
Ng
r a r pA,& o",
J
27,
(. 9
7
40 2 cq 9
25-
RIDC '13, .97.0
"LDG. T
]LIX, 'A' UIDG 14, atf)c BLDG -W OG 'A' 'A,
i W5
F61 q F5 4 1 1 2
M 131 f � 9
ri
CC'
14 0 , 1 m
J� �5 :7
10 WI•P) D 1 IR 4 C T- SO, 190-
1 ii,�•�t NfIIIEE��LLLL•�''�.Q�1`7 ■■�i
141
IN --fff - I
Z
cA) 14 i I i
'sk— I I . 9 1 4 9 60WO-7
41 L
7 7 4- - 7 L L i 1 1
1 �
74 r'
N rj
97.45 W.89 101 .12 12
------------- ----
A T
84 - --
Sul
N SICE
LW4%wpmp Raw.
1z I ru APL 1 12
QWRAANW) MW Mill AMD"
---------
aw: I -r 7.6
7—'
44WAVIL ttIME1frqpn Q NOW- ......
'camur cm yif�- � ...........
..........
a - - ----- --- ---------
.... . ... . AW STOUT MOMMY
f9NfAK I a1 �_EwslRi
...... ..... ...... OR it I I
1,4
IF L I
........... ow ME I* IK CITY wf� F.
amfDlr!► 71'. or snmmw AWN
............... WIWW Orr or
-4
CAM.
RED HILL AMW ANN. y 1
'2
SIMI SECTOW
Witam Tm SLN~Y NOM pfKm r u IV STATENEff OF **IA90W
ankaw Wit Na, an Sww au'Oux I or qu 1. DOOM LAW use: WIT FAMILY IIIIESIDDIIIAL IJNOat AWk 4.77 Ac 2o?.s?7 Sir I HEREW SFAYE T44T TMIS MW INKS PREPAW WM
r 3 24
A I... WT i of to 2. PODPOSED LAND UK TOMOWS NET AM- EXCLUDES MING PWX ROO OF MY (0.77 AQ Aff SIMMM NO IWT IW Q419w OF REGM MS
F I NAIVE on i if 11 1 GEMEIK PLARI LAND I.W OESGMW* KIN DENSITY RESMTK - -to AC / M019 SF 017400,10W OF AMID C001SENTS 10 *f FXW Or TIM MAP.
No_ 36m
4. ZON111it- N-3 (MIN FAMILY RESIOVWW) DICLUOU EXISTING PLOLIC RON OF MY (0.77 AQ
W
I ASSEUM AMIZL AILIMSM 4M- I I I -W & 4M- 111 & AW WM TME O"VK PIM LW OF RW HU ff Am sulowy & FfINVOSED DEVELOPWINIT Is WINN TIC Wm LNWIED 300 owwr 0 WWr 40" (a2I AQ Cori
ft" scamm"m ML F7. (no IWAL A" *fftc DATE
MAWO haft -m" P"ATE OWES nm I mu ur4m PROWDEft- - 178 AC / IftW SIF U0tJQAS C STALU. P.E. W
�yplftm I I I NMN WATER - CRY Of mww umm 75 Au WW PRE31OW-4011010ft
^AN 1 3 &A#
MrE) I //
IvTsram 4 . - I sow/ I am KKR - Q"cc ORN" 54011INTION vmw DRAM. 13.) au/AC
LES TEL0410ME - sw N17 �11 ma au./Ac PRNPAMW FM ~A4w BY:
MW AMsW MY Sr. OW WK Lfgqj�. &I.Me Xjr. CARE TELEMSION - COMOUT
EXIST. EXIST]. OS - 304nMON ONAFORMA GAS COMPAW DATI Q21911107 SUMCAL-
miamosED so ia" X' PROPOSM FM HMIMAIT QWW AVACoff S(A~Y aEcmc - smamm okomm maw comw JIOQ-3 001,
I I ACCESS&I Wff WALSAIIIIII nm MOPOW1 AND M JIMILM0111111 IWAL AWA QW&W & WFNKVM SMALL K PM TW CITY OF Adft A"AWW COW W.O. 100 RW HLL. LLC
w OOUSLE Of=1001 04WK AAA JIM, Sr.: AND CITY SUND0111110S. AM_ 4.77 ACRES it 18301 VON KARMAN AVENUE
OLKOM Numm = f Ulf Sr. '. a 19
Fil FM DEPANTMEW COWACTIM %m sr: 0 P40ACT SNE 6 WCAIED WDW AN AM DE10111091) YQ W OUTSIDE THE 0,29 COWrOM INTEWWAL SUITE 710
&r. 21Z sr 4
r if. I U AWAL CHAICE FLOW PLAW PM FLOW IMMWE 01F AW MWAW MAL Wn IRVINE, CA 92612
• AC WT AM PATH Of MAMM IRMA Ar. WW"If QATEV FEWMAW I& "M MIMMINE COMAITV - AOa 277 OF WO.) 2 LETTID" PHONE: (949) 756-1710
- &Nam PWPWM mcuxn mfir amn 0. ALL ENSAW SnWCROM QV-= TO 11C
WA11mia-AISM PARK= SWOMY wr LW 90"mum 111. rMIS 110101W 1110117 AW IS MR CONDONIAM 001,0104SES AM SMALL PROMW 1W FAX: (049) 756-1720 HUMIA&EK &L ASSOCIATES
ll' 1 RyAANGW 'MOM ftJIW SF - 1.01 AC I fic
Sr SAM Ac XW 10 OWN C&AXIIIIIIIIIIN All STACIE MTM IW NfC=WW W A MK *W Me"
IF as AV - mawn 4w Win jw omw ftm Lao AND 001111AXIMIMILIM ALAN&
IS
EXIST. am Amm V AcIcamu 011111mm Sir as Ac it PARKL409D DED11041W WLL Or, 24USFNM NOW1,1214 PWWff OF AN IN LWO FnEr PW
EXIST. rm in oft Or 40010111111 1= Z1.41 A1 .As .
R^ r ANN= Amoullim my Wwf Vic awax Pup w" nAm am am SECRON out."
to, 11 Awavc sou a: m""Weam Amaw "a m"cr inwim CIA! H"
sr
AMID" 40 aw" Ago"
111110 WrAll- SLAM &r. - 1.4 Ic alm ow SITE PLAN FOR
mm:w~ own* 4,� If. - a» V NO W" Lagi
so XAM" NINE a" Slow #&An $I - Iww (Am
r nw nWK now PRfLOBI aw slow amuoiiiiiz Am 11� 49 "M ft4W off W no JAU mum MAL DANCW11
J- 111" af.: I.W 2 a" MAIN wo I T.T.NOS, 17080
goomm $0111110 4L4QSF &M No MW DOT MOM &F De UITMINESTEW MILF OF LOY 47 OF III= I I OF NMINIM
LIU= AIM i&L Ayr" on ow 914dw AyJW SK - Uff Ac In" 31401114904 IN TME CRY Dr 1`14704 COMIIN OF 0110011M SANE OF ON1.1110110110L AS
Mr MR= Samm Wwww ELMM PWAW how AsfactAm SkVW OF A AMP EX r rr W S" I AW W Or MWIMIMOLIS WS. IN VC F PER"W9
C-1
DATE REVISION per wwarywcouNry rrr 9 arswcoWly. I c
SFWT
PLOTTED Wf. FtOp Wmqh DATE: Feb. 01. 2OD7 10:40:49 AM FLE
UM 2444-14
jusavwiv
Rvws
s
LOT 9 Lar f-_..._tARAi 1/88
p. L07,
LOT 41 BLOCK V
0 WAU
d POOE---
;40' i lu N--
--- --------
77
D
f I Y 77,
IL7.3
H
C-7
49S
-1 pAdl?id Is f
1p
T
V
15LDG lY
RLDC. %I GLO", lly
p4am ;
ma
-j- r
4vwl"A=wl4L--- -8,
LL. its
Io!
101 E01
C
F 31
4 141'
20 1 PAW"
•
P-14 44?
A49
f
lit T J. M, Ar,.
N.
Y"
L Q(
1 97.9 f
NI
cr)
A -
cc
:q
V
p A-
%
§
j I
-1� JW 4112/7i
oft 0
ism
P."
'JA
p
L
! I t 'i . } , 1 \, � i.. r ! , I -"' `140R.lI �� .I � •f- � !'� \ �\.. 7 n .\ ♦, f./94X1 I i ! / ♦ !
PJM 1, 2
7
i 016" ----- -
kw"; I
f
OL
MOG 'A'
70 Jw
P-0mv
f I
it
--- -�K -- — �+lal-- 1, A I .. . - <
94
r
J
i Zoo
4-
7M r.W,-- t746
p ow" 60ale-7
All,
0
L45 Le
7r 1woo
i i t -T-�l �- �p - — -1 - - ;�,*
9-j
- ---------
J Lll-
k
41O
W flop
4w GIA11111 Zmllt� 1-10111111m R 11 w
CITY
Smm so.
10 1w
+
�, T
OW. I? NO MAL AIE 3111111 111 1 � ----F�-
"war !w wr ITA
MI.
-------- - - —4- jw-
-tn - - -
....... .. ..... &w. fir am swom
-1-1— EW. 21' KID'
T-
74!
J1,
7
N,
%
awle, SUMMARY NOTES APPRIO)MIMATE RAW STATEMENT OF OWNERSW
ONSS AffA; 4.77 AC 207,5" SF 1. EXISTIM LAND UU. 6UT? FAM&Y RESIDE EARTNWOJK QUANTTnES I HERMY SrAlr Tw This w INS pRrAWD UNDER
NET Affik OWUL40ES MIM MARX MW Or IMV (0.77 AC) P. PROPMED LAND (M., TOWNHOWS Nr S(MM" AND TOOT 7W OWOER OF RECORD W
- 4.0 AC / IXQIS SF .1 9WRAL " 1,011110 USE DEWMTXW W24 DENSFVY RESWEPOW cun x3m cys 000KOW Of AW CQNSMTS TO IW MW OF TMO AW
4. Z"WM R-3 (MAT) WILT RESIDEWME)FxL3.5m cis 31171041
STREET SECTIONS E=LIDES EXISIM PLULC M09 OF Wr ((L7? AC) At ARE4 WnW a ASSES90R PARM NVAISM. 432-111 -0 * 4J2-1 I 1 --04 to
TME WICIAL PLAN LOW OF 4W NU & MLhKff AW. (0.21 AQ IS. Pawcsw GEMLOPINIEW 3 WINK Tw Ram 40aw Sa4wc OWINICT
- 171 AC / IN.SW SF A
ml - - 7. U11119y JA OAFE
If umm 75 Wk INTER - CITY OF TLISM -- DOWJAS L SILEY. P.E. w
t-lix son peaffIr.- 15.7 au./Ac KKR - GO" C&AW SWIAMW Off"W 11019" wx PREsam-pnem
Wr MOM. 151 AU./AC TODWW - soc FM PWARM BY.
001" TEuvam - COMOIST
a" - soup*xm oug"m au COWNIff WE
LEGM ELECTRIC - SOUROW Q*AvM& MON CWWIY W.O. - 3150-3 stplQu
ky7mat mmrr 62KUN ham sun) AIM IWMTE DOVES 9L Guam * Allm"011e" swu K AN pw CRY or Rd" musow CODE 417 ACln* Rm LLC
"Mmm owl (prmlu Fil mullaw NUMMER AND MY SWAVAMS- 00~ WMWAL 18301 VON )CARMAN AVENUE
Nm a FROXTr SM 6 LOQ47W 110"M AV AREA GEnMNE11) TO Ill OUMM IM &At
ANP&M O%VVE ROOD RM FOE nOOD NGUWCE MTF MP NLFAER TGUL LATS SUITE 710
09999OWYN VATEID FENRLWr TAL =4 (4"" COLMY - AWEL 2" OF IWJ 2 WW" IRVINE, CA 92612
la AL nww snacRms ON -SRF To W Quamm vlcmrY PHONE., (949) 756-1710
EXIST It. TM VMTW Mff KV 0 FOR COMM" #WOSES AND SIALL PROVICE rW FAX: (949) 756-1720 HU14SAXER ASSOCIATES
EXIST. PIK TN= AMON NWr M CREATE COMMIN&W AIR "ff WN IW AWDIUMN Or A MW IMP fall"I'l 11c.
I - R/11 r Ittlum -
AND CONSION100.1101 PLANS.
W-1 or W W 11 AWMAND 01004M WU K SIWW DOOM MM W AN IN UN FW JIM CONCEPMAU 'all"mme 42rw=
0100k W RNM cay cow stim MAXI
- - - - - - - - - -
'woo aw
TH
r4l, 17)
0* r "V6 11 AMM SNAIL OF RESM0 ALOW TW PRMW AIDNOW ON MM RED MLL
m" sv wvJ%7 A"x GR"AVG PLAN
lzl5wm RIM MILL AVEIRK EZM7M LOT NWMER am& &4cwLwwl T. T, NO, 17080
(ftav
NFS ov") (D 7WT INORIM OF' *g SaUnfOESIMY 144f OF WT 41 OF K= I I OF PVVK'S
wS SUS W nif MY OF nfift COLWY OF QW41M. UM OF CALMINIK AS
,x SHOW Of A WP 111MMU IN SCOK I PAGE X Or MMLA=W WOK W TME FOR
Ak PROPOM FM WNW WIDE or 1w camly lammm of sw Cawm. awl
FL lb ONE; Feb. 01. 2007 10:41:18 AM FLE.C2—
FIRE BPLANUmAn
fp.
�x � C etre... wf L a•. a �.a,•.: ti.1rw
r froom 4%~
TRACT NO. 17080
RED HILL TCJV►INHCIMES L t,;nt � :
M 1paa lYrft
Q .10 0 t1 p w} It+••w 4. t 4 .a± r. tr .rr •..r w. 1
e ♦ t'l ,7Mr � rN. 'fMMIR fprtil► lttl6 !Mt f�Cl lilt' lf[ D/
S.R. N Q • 138524 w ,� 1^.•Mc :>~ r.�.t. b :. I .., s.�t.. I. �.l ..,,, .r*�.
����wtr
"AL w
1 "iY N. 1�1 �t. Iww, •.e :. t..r rr . .-,.few•-.:lf ..;..;d. r .K. l,.m ,.i,,., 1 i ��fJR�i7
a.>rs:a:.,l #r• wt rxww r r.:�.t v w ,:.. ti•J a•r,.wit{t. tr.- • .c.,:r•. l ,;w.:.
r•Irw7wwt"-.w+wrf.rk x�w:,arr�M}lyal�,*�,tfaftyllm
Rad f!r,R L.. • 1f4t rlrt. r>.w •.. t .,r . m 1►,f w[.pt .,:v. <.K r,t.. ,;.. •.wt.,.,.. L ''a: %M�N1��iaLrfIOR3 a •O IA/Rt M�� 00 rft
v1•wt3rg•tur r..r.,,Y.Lr Jap ta.�a..-s.. ,rw�af.Y tw ts.:ux:•w w. prle>.st ,s. �I�B[MML�.iK >b1.4A�A�f
,.rv. w :aw1A1 r1rF .ui.?•. Lw. Y flet !Ia`. B rtM TI afrmws Ar 19LL N wt"
a
VICI N1Y MAP4--wr'snonc�1 M soe
M L.•..•.rrw `M. .l. fq 1 r v t •w wr.. • �.,v w: ..n.. I, .
..lrlitrta•,i tri wta. �s a ic„ wI '•Ark `14 11r. w r:1v i .e t. •r v qfb •. 7t" •±.
sa vl[n r wW'ka: rw T1 . t ';w t • dwL i w . •:. r ,- a t...:.lt ar l ••A
l�EM"%f�EXISTING
EXISTING
y MINV foil" p
"�SINGLE FAMILY RESIDENCES SINGLE FAMILY t".a1r'1
t'
RESIDENCESR. /l++F iwv lir ant{•aa rh • .R ,w [ .i .w 1Ml rr. iwrlr c:,; a M�w� ��t fol iL Y3AMMt3
NOT A `r1 1
NOT A PART ,�. ,:�, . atw,w w.,r.,x .[ 1,«� �. ,..,ti :u w.f sr ; ► a, rs b a tc 492Mowtws ow ig Writ a K cwtl tlarlt.macim
Ma1R IMAM,t•.. i,.rrt atrnM r•: r.^a..ewk., ks. , i ..r.. tn...w.w r, gram ei. +w:
ICQia lWrl flMt fBLaltlar >ti.` nAk IC!)Iliwt• rrM ...�wra. laltw�bnt
fa Awn M >IJN.
t ••NC!'Me +t,rlrtr.arrl•cwwtcrrx :,aaJ.3arwrw: MIb��11i�^1MI����i1��
r '�� NrI .. i -r _...� }, •J N Mrtr+ti YeY��J' �� �
1� I 31 +1 I I .d f ,,t f.. 51
__Jr. ,. ! ;
1 n •n.: -Me
34 ' 33 f j Ott i 3 t SO f S1 , i -+.--i ��' r MCRIw``-'yy>r +' 1 i�"�ic'rwfl °ar�'4W 4L
[iwc.
1 k) w
J Aar amllfm►
.. .i. tm-rr t I ' i t 'Ii I N
• � �,. � 9 I 3! I� Ifttr amtl . aNar
/-''''� j r FAt aMCiH � -rff 4M t[Irrar
.�. / $ ■~ .[tr♦- '•'l 'Tt C' I aol�lrlr+ �rlir\.1t 71W/�.��VIA LGr tL7�
r 1
dam s . 1 .►; !z f" i3 a ft; '"'�Ir S11 : I:i I ''t3 ar.: I +mal" r.w►+�.c pe est+,
�. _ _ 1
• ;IAW rr •?I flan ( t a '.alms. >/ I • i walls 7 l if :I : 'krw. ry. t ^1. �rtr, a tow
+Nltt 1} clic "fi: m +MIS 11 74 M�N�ffH
4'S 1 4i SS 't 1 I ` ,--- V.7 35
: 47M [!t#NMk1tF
t•tK.t �v�:Y j `.•� J I k. } ,.,� _ } nn. -af' rwtcrw.r-:t1L,.1rywM menti yw. M..:s• atF� ,BA
t ', � i J a. -` [ .• ', .t r.UM
X .• r:. t •n,c•t _ 4. rtsM1evef. • aamruNrl Ilmftsfm a Y
1 I 46 i� f t f.a ,.�,,. N fi'7,
27 :� ab !,. 57 . tr,
56 I ? xi r in o.: u . vs+',, '> Mrllmil
i
Y �� 111 aFk arfl',Ima•
-. ,� .:f:,;t., .,:te:.Nw<••a :'a.^•vltv.nx t.•:rn:.1Lw•t.;tl•.*'.1RN R1ERtlaal'tMlfi�ltiawNllt�Imm011l4.
EXISTING 11�
26 Alp
+`/�F�Tii:R71 tiF7l tka[.al,»a tw.) :Sl ,n.d l., f.a,r:w.: 1 ......t..,.. 1. ll. f. ..l.e rI �,iMr'"•aNJJi 'Is
• .. .kip-..... al ..��.... �rlt�. r,�u `
NOT A PART
. • vs �' ;, •. .* a Ialvrts+,,,� t a ,.a•tt r a.wl t:miAr:r....ti t 1 v;s Iw ... 1 t f'MQ !+rOmtJllrs
.. , �: ^tW+tkd ort. f [ , •, wt• t n•.. [.: } . al+ . i .. n..J m mll. ^rt rMaIMI1111M1'Al1Y eImAM � fltR• � rllm�c
'�'• .,. .:,; ,.t,�. 900+fC A �. .ti, , s�?rt .rala.Aywsr.4.mJ<...1_N,}, �.[.dt+r s r: ti+� i•Jat rF 7NAIr. e
y
~) � r.t�rrwnN�•/rx..rgvkMrrp/a►..cyt,,u..weral:.u,O�.� M. �
' iRy lf� r M N �u►N? to � * 24
�jf
.-
u
.,:�,v i � w•w).., In r sol f!.p,r. •f W Wu:. .. t r.
t ''� '•,-:. .. 4f: ti tWr •tlw•. v�'iY: :•.'..•11K a..�. ['
� f I I T � �t Y \. .r' ��` > t • , w.t+ R M rR M1fN�1�4 IR iR�r 1p�rt1! ���
1 p .ti 'v �� ., 1' t 16 ,� "t .^ S Y - w. I - 76 ; y�t�� t; 4•r r I . i 11Mw.r,iL.
ffrA *Ma N + r. } IIEVELO OIS MATE:
i � i ri ; - 1 Ww. a� �r'.P•@9F NtNR 1'
7� f Wiu ! wr M Aa,,.wiP •rMw..w. '1Q RIM.I� K �f? 91Ni� wl 7U rJaG /lMi i1 i►i1G
f'- �• l� 15 1�-- -•••« iO 7 1 r I `i y i , a,ar,[•+N• l:.sLAM �sv.al•�.r W6IMIMM MINIM tom'"KomI��o x [MrIQ
1eRi 73,.f AIL
�' ' ' �+ 1 1 �x� �' � N� ` wertr y. •utxi ��� �"#' a•s,r •f> � � � � �NR�[k!�►R�Rf�N.11�i�if0[R
ef'st r 22 i 1 111 14 j lit i ;L<' 8 + K`i T 71 1
► + ma ala aaa awt go /al gala OWN
1 ��.t M n Ir
tj ►� ij } 72 ti Nr/ afl�a flli f� aIIMIt IrmR f1lw 4N MOM= I&= %Yx'-
1 a
-..
�I1 CI�eF P01� •AYlpM7• pl•
IL
,...,.�`... ; UWAa rw 1F "WAN wa
�. ,;.;. �, RI urn a mrw ..,. .. _. ,.. � w
q�+flarrt��� aNtn. b
INK
lie ��pY�N�is� af[norO�ftR+t � siMH►tfifrlfrf
CIL REO HILL VENUE vafy.twawwLocalpNt
:. - ...... ......!.. ... ... .- - -- .... ..._.. w Ulrr•mr•..nNf.++riw4wtrwrte��.wrlflljt•rgrASNwtarrrlrmpw
- - w•/rYMPMrrMwishrM.frMlwArrMaM�rMrNrwYrr[wMwrr�i t1Mtq ----
• f!t•teA•n[ttva•/. •tv'Y aw ttlrMr•rrA•ftrtllA tttfyuwrwfwwtrmtrf�rt
wsl; toaNr•.• Z}� �(`iT10N �` WWI. wA ft" r•owwwwo. pip I I frr■.r Mrawr.artaarr•
WD H11 TtgASAi('IIIE$-T1l�NII �.w..s,wwl.[rfw+f�+rwrrNrtrw•wlwrNN+w.awrar.�.rlr+lr.
.Ec>1raD: 2 FELE MASTER PI JW OM SHEET
ryamts rlwf nm mm N as
A� 4 lam• J >r�w r1 w1 [IpR1. Aar M
wNyr mal s twp ' 06MK •O f7•Y{y fKXi1 rystYrrr•/IrtwtWtYr/M
1 1 i Oaliftl�jlfai [NIONS9 1A1111NIN[t 2 wtatMttl M wflaMws ►wsf.4rr ;rarfrwnflaNa+w'rta.wfrsa F,Inwa "gm4+w; Ammom a Mrr r.fl..rar+4arrMraM.rwrwur[.[r.xr. _
Mmtatrwaal U ra[rtao alflaafl ama++a auarbrt�lr wrnlvtwe Yx►ppll, SIM�+ITaf 'w"f°iaaa wofl ;s*r w�i wc4tlfnt ��1[� y tt arws+sMffaw
"'t f wrrrD wl tIMU \ warm.. •af f f#1 a r/.l'�1 �P'f latCr, ,Nr Vasa
rM,�W/ 1 rN�W r1y�y ' R .f >�r4. 7rMM�ylMltftl/M*I'fIMFMs� MIrW. f>w?aw RI[NF ,
Q r' MIR own somm Mommas � \ f�'tj "1 yM�11p,y �!4fE Mf -�F fl.N[. ft �!iMtili ' IMII!►RfINt1�.'t
Q .. aw rs Ira \ ,arm ... fAwartelwrnmlt#•tywrmr�+wsar Nr[wnrMartpwA*M�tmfMn MOM
4rmMgr novas"
al lamas mommailtral foctpr Anofts armmllLlw tmfa Jr' h[rrwMltw+Topmol arw ++s wwamYMlM.w/tidMfNrwwtW
- - - - - Ufa tuff /u a ` I'+ .�iN r�inwl iM i t aaRw swat p wt+lmrvw ly a.amaL l..Naaat
ra0MllmmlA mswfa+tN 1M7Y'.NR all Balm mlt f.aa 'MR.� t �� w1
AifraR (Nr woo • waw wee dx w raN Ila altalec tNa6 1 f113wAf1f t a tlam w•Iw aslr t,+a +fw far f la attaf * �%rtRY �E +t[I+wmmsrr..N' wwaelwwrs•rwrr.waYr.rrrN•w1a,N�.��rw[Nr
�-'�'� AraarmdmM•rlAtArmutalmrmrm plmN ..... _
u.Aatww a loafer lm[ aaw /fr)Y at f.ar aIw §W,M I
480tmmllC mIKtU Ilafil fMltllt f aflmam r+NmaYtflfA7lfMl
RYl'+flaC 7
1"t -no 166 LaN .� ftM ctrl laR•mfa [ • IRMAmINN�'N.tINwMO' ,./�11NM�MtNNrIM Rt.rrrMM•[
LEGEND STREET SECTIONS++"«flwfwlNR/martarrrtNnwwrumlrrmitNrawfw►twwmwNr '"Jarwwa�e
lrx'.[I►P ° a i,fre .•wt � •Aam [,am YN : .err ` altl arm Ns ! 1
. „. A M[! M.•4Mt .�rN1RlM.�mfMg/ON�•\F0FAsun
of xwa fON r ti aft 1t_ a•Iw SIN 4 tU►wmtAMgalMttyls Ill fl+a _
0. PREMISES I"ftO an 941:; NT OF UhlT ADORE'S6 � •Pow I.mwrrrrlrrr• M,atlMmmr r....twrww+w•wawNw. w
1p�". Y frfY.ttMlMrfra,rwr•MhrRwOMrfYNiwrltrMwwnrrwwbMwMMrar
OrM 4� aaamaaf tlm6 a rltla w IN laaa aalam f<NL lar a `,.^e:+r i Mt aIIA'RrM fir{ Lal i NI► ymr�, MNRi tnl �Jm l limo R fi wawrMsrtrrrfdwa/My+wrr [tiws�rlwmwrCOAwthMViM�wtrrw
mwr taamM a mat t fmrwm tsl 0 RAW cm t 4 Af fMRi rmmm K» 4, 1 _ _ 10101 - _ 0^4
YNf NMr f/ aM at f� rR wIRIIM fewN ppm wwrmY tfM►AwMyM��'rr M/�r� r+arl M M��� o4w
M amr a mraft tt ranaw r alataflA aac MIM A AmmY. r,�r tarllMrfaMlo�mn�rr AbnNarflYM'IfNfWWNI.' 1111E
l 1t •� tai wmfi mwl Lal mrffofan Mo W �W dUL R t' aN fafR mal s'Iamaa► M w yam m s art# __ •rratr.w,t.11w SfMwAyfIrIN mmmeww"ewr•rwww"mov �brr•:wnrr
*h ya mtaf Nov aaa solo tmr Naar. wa► M 00 ora rn w wow Lal •r oat P1111 lfMKl inlrMM Mn Pint lfnma M/A MtltlNy c +rr rr. +r•flr•arpFwas••amaltMmgwtw r..wr+.r.a ••.rar..ww.
a x Nsae u► e t Aa a► t "01 a ffa A MISS rmr WL It l w•n,[a amt aw *" a Womwm�y�q llaa ft ImtRltr to.,l..+a+r«a[anurrwwrtwrwrMrr. r►sr.rtr Ns.amlrwr
w • MM n mat rw aaamfw faA mftr. ar-Na lata w K •5atf! of Ilma to "at a m w aaa1M Klmmis �r—qua, wamf + wr..rNt.++rm.►tl.nr rr+[.•+armw.rr.rrmr�ffmisartrr rrwrrwrwf r
t =aM t t a maoamt s tat Irmfwht tAara aamala aaaw At tail AiR1mf ramrt 0) Mr+M.gmmwerammrNlr.fMrmPa4[mwwamwaraa[m[Ma mmMrmmaemA
UIfM /IIwI Nm aama ! marwata wfor"Na N « 1� t,Mm1Mmr1a'#mraaFMmlMmM[waaM[IrM�MNMrR/maalaNmMs'. wrtt
IL mwalt wl IM awm oat ■ Romolo w ammo.. "ime tt a a oar a PLACEMENT OF muluxNG 10001F1GT10N NUMBERS -..-1111114"NNltr wwramrfk.wr..al.mmw..r.mw..a..r.f►umw.....PW
YM'tM: t rrrl► awrr M - , MwlaMwtt["# N IMIar1m[am�.ffmA�M111M[MVtM111ti�/11�_.
rf. at sw, a rs tADORESSES� . '...�".-_ .�..:..�"' mrm arttamtl mf mftlal wfa M rat r Ilmtt t > ? ; trw•w.fmpr rrsrfmarrtrwww• o.M
rM Irr mlrmritNf�
O tllMla Ifrrr a IQI Im rrlt imp atlrM1, t r4offto gtltlr•IAtlfra wfAstgarf.fn MtalA•rr~ a.atwfawusd••aw
w f11Vm• 7 Cflrlae IffNa6law MfM� aMt !i rltfamma imr1lAml ItIMIpMmml /�' i' am:aM yafiarM>A mf tafal lltN� MmtatamM. x• `War • t ` �mu wrwMNMrsM4mrrmrrwlmr�wrrtwMratef•IrMwrAirnrywfwo! Tomom
1f�o 9 mmM alai armarww `j' ,% ar N alr ifR �j IRmMa altl a al flt aliMmt a1�ImmL MI+.Mrm[MYraw R7iYMWtlsaMlff^t NwrN.tmMdNrrNRrrmmf � h
L Nt,Mt[at afLala - �mlr+ifa[ammrl rmmaM UNl a N14D M w faataa 7 •qi ftYltrt amRt'a01r mw ft" w mw 4w wrw tawf mrw N w IML IIM�m NNNsaemMNl1/amartrl'IR•+si./rralmMmrmmts Im41s*'ram{ta1►r
fttlmr NaMfa Nr MM aR/MaIYM M AN fffa arm fmM[r Alllmt 1 ort +' lJl OfJQ 'r i M[ mMMa 1111M t ' A ati •O« rreMNU1400111011148004'r"Iftw"mov'Mufammrrl► lm01111 [Nm�yr
MMmI/R ImrrL fMw M awts•. tAlal[ Amawta fK arfalat tmw Q M �[ I� nftft # lltRrlr oral tI11c a' , - s •. raf[ Ilft 011ttfK MIK fl4 a: AfIt11 •tanf.iwrafflrwyr�•ffiMMmflfrIYpNgMaarrMlmr-WrallitalRNlMar.
Iyer woom fM IOU rmtr a "no a ova SOL M mama am[ 4161 m 1"-i, M riI' a Mt Maa )� _ ... '�.. _,... ,_...,.,,.. lor•mai Olm�Alla' �.�.
l•rmfr mNmru Itf N► anf rnw Imo fmrrMmt •r lfmlro N a tllaam atfu (Dow I i tfr. N "a t'ma fwwml tar !oar f•1. am Mama mt. Mow a s nwrorwwxw.m+aNr arf►aat•I•aAq fwat•fa.aawar• rNrAlrr
IMV 9t fmtr a amfls OC M a K trlramt Aa M •fo wY Ilml h iflmm• a tmMt. I . -'• 1 a arm i • / l wwrww'MItM�O+artlr'a a rllrltwr. 44"w �IMmuswrr/ MrM t......
r• IALt-m I a. M - MSMram Nmmfaa a a1fI11fM:1 fMrl R rlmllr n IK Nall tw Alar +wf. B s flamia M >M NtM i.w••�- �+ N�[ wr ay6 ��� OOIAYNRC Oi014�It+C' 9r+E>ttfll
tA� I A. tAallat imR [Al 1K amlmmN arlf. w[Iwrm narrw a low to ar•r• r
aNrlalAa►•arMoaty'IOOmmq [w.rw..mww•awA7prr•w....t•.wr.•,y*%odw4 0WAakoww
INS Nm�fs�► a+w r w�ial i fat •�t w M Momma r�li ilnctr�rs�a »'Ina't r- x� w+�. a+r�.�r� f«�."/NYw...riww�+rw�w..�.wrffr:Ff.�N.,i «�1s"�+w�r.l�`..
O- I�y/�alMm� �Iw�Wtfwr M[fr♦mr�MR R[q�lirMas MN[f
arm{aM� #Ma/rwf�yralMatMm All......
PREMISES IDENTIFICATION & ADDRESSING FIRE LANE ENTRANCE SIGN RED CURBING DETAIL TYPICAL LADDER SECTION t
•tfimaw'I' ►weavwlwrfr
n.
ORa mKOow � i
1 4 V I% I ASSOCIATES ! I FIRE MASTER PLAN
NcrrTY , IIIC. �Tr 'j
AaCNITa6tYat �aAaalwa • ( � Y 1 * ! r t �i C } �
i Y 1 A ""'N Y If ii It t i "" i v T.f� r.IMlat 4t • a mK wflM[lfG • ILtm oz ,
_. f N v 1 r a. Q A L I I a t r 1 A 00414 f.rya 1" roam Ilt sy M44 I[tYm lair � pp Nlt�� TRO= NO. 17m
_. _.
MmM Ntralir g11Mmt N AL •aw alto fN Ham! •Noma atamAt gmlfl rfnalta 1At ffMal aa+•afM PAM �+"
l/ii1•
la 7ltflt'Jllpri p�YO r iwr ati Nm1 at�tls MN JAW CAPWFRI*A G 7f t�iwt Ito fw wlrman 1Iu.L if 11M'If E$ or I
a 1
affr:tat hatlmwnwua[ 441 AM /447+
REVISION _ . _... ,,.. r•uu.asfmmm+Irsaw;aw HU AVE.. tustMl _...
A S.R. N0.138524 °'n` 2Mf
Iao tlgrm
LEGEND
NUNN Path of Travel - Trash Disposal Truck
Trash Container
Recycling Conufirwr
SunGal - Red Hill, LLC
KTGY \O. 20061061.00
0 3C 120
Go
Waste Manaoement Plan
ReaHiff Town Homes
Tustin, California
ive
A ncu Waste NUnagonent Plan ha--. h;. -.,n &%dofvd which ininirnie,.N trash trucks Ncking up into priv.dc
sUvw (nac ft-%% W"w Marivigovion Site Pian map). CurrunXl% all units hat c tksjUnaW space in jarapos to
AMC mocay
nx%krib mill move "-tr uwjh oxf nw�vlmj imatainen to an am directly PA*cni u) their prate dmm. An
erripk,Avv afthe hmw%ft-T% aswtatton % ill Tmove the trash and recycling cwtainers to designawd trash
milcotion pamm located in peso parking stalls on the %xnW pnvate 3imvt Ttvw suits -*-III be
viatUd aid Jesupiltod as tt*A colkojoi point; during,kvrtain trach colleviion pickup uW perk*. Th%w,
S%46- will Alw b -C p#UW %%)Ah U 1OW U%V) Sip JbC VIOlUtion Vfthr.' PMAW C-All.-COU11 Ulnu-S.
1'r.oh dap" MKk-% will then cry"y all trash and Twyiling cont fmrs ttwn the vv" wrlp"Vati: sarvetml will
Upon collocation. the hamw%nefsoinploym %%ill mote the
SUOI pwk-iv SWIS will tv tbw for 114A Vollex-tion-Tbow pat Ming sWL% will only tv mpwud fog
sqvvtw WMrs during pomb U(MMIMUM VUWA fwk-iny u%W-
Trak & Ravele Bin Detag
0 '10 40
U
5 20
0
1: 1 -Oj 114.4 a
IG
;*�l f Vo f, ag ?1 -11 'i.j
0 P
T—j
KTGY GROUP,
-bar", '6!41*Uft&
wi-e-v i on t -e
6111 41. 4 A . I V 0 0 ft ' A 9 1 0 T :
001 -MM "At i 94V 091 .0. 11
C OWN" &A NOW% 4kM1*"
Sul- N KI
0
SunCal - Red Hill, LLC
KTGY -NO. 2CC51061.0C
10 40
Arcitecturaj site Pian
ReaHilt Town Homes
Tustin, California
V. It. WA
A-1
KTGY GROLMPI Ike.
9 3
ft': 60*-* *A was !940. *401-: 9449
a 8WIM 44 low?% 'SFAMM
F
20-10' `
/ 20-10 f
Rr•. NIS '
j}
KltChen
r
_ ,` ,.. , i
f�.4J il. PCi•wL i�ri�i..a a A
y
•
-`f{ ti`s � �v ,.1
� �
Lau.
n
Loft^
-
-ti
'I:
�Si'V ASV-'�Y
M-5Wh
40
Great :.
Roomji'
14
Master
Bedroom
16 4a', 6
yBalcony
Tbirb Floor
Seconb Ffoor
634 SF GROSS
813 SF GROSS
548 SF NET
766 SF NET
Pian one
NOTES : 'WINDOW SIZE AND LOCATION, EXTERIOR WALL FRAMING,
AND BALCONY SIZE AND CONFIGURATION VARIES PER
ELEVATION. REFER TO ELEVATION SHEETS.
SunCal - Red Hill, LLC
KTGY O.2CC-51061.00
2 BR 4 LOFT 12 6A
1,803 SF GROSS
1,637 SF NET
0 4 18
7 i3
Unit Pfans
Reb Hill Town Homes
Tustin, Catifornia
f 20'10. f
Garage
M .1
20�-2
1
R c
Rath'2
Bei! 2
Entry
First F[oor
356 SF GROSS
323 SF NET
}bli pit:
Din 11, W.
t til f'!.i\'• (.+\i.
A-2
KTGY GROUP. IAG
�. 4"". OCTONR �t A�1 v1'1Y
170 �• YI f N[ 1 Rft
F
Tbirb Ffoor
634 SF GROSS
544 SF NET
NOTES. 'WINDOW SIZE AND LOCATION, EXTERIOR WALL FRAMING,
AND BALCONY SIZE AND CONFIGURATION VARIES PER
ELEVATION. REFER TO ELEVATION SHEETS.
SunCal - Red Hill, LLC
KTGY '�U. 20051061.00
/
v
20-10r
............
.
Bralcony
tar1'xtio r
Kitchen
Tec'
,,.` ra
-'; Lau.
Pwdr,
•� ii
ef Great
Room I
'► `'` �
t
.,64.
se(;orlb Floor
853 SF GROSS
804 SF NET
Plan Two
38R/3.56A
1,863 SF GROSS
1,690 SF NET
0 4
2 8
Unit Pians
Rea Hit[ To
n Homes
Tustin, Catifornia
/ 20-10 !
20'-2•
N
Garage �
Y-?(a�.�r 2'
First Floor
376 SF GROSS
342 SF NET
i:1•d Ei�ii l.,ttt. i11:l::r . �(1 'r� 'if.
• rur i �, ',r,
�(1 i'( i�•�
A-3
KTG Y GROUP,
A11�r •t67YF� �t Aw�Iva
10
I)•07 M1'CMf 1.
■fi T:1
R Y M(• C A:1F0 RM' A •��'A
+Mf• Nrllff BAR �N� RR�•4'��
�. RfW 4-1 RRb�} Y w: A1Np t
LN
Tkrb iF6Y
645 SF GROSS
538 SF NET
NOTES: "WINDOW SIZE AND LOCATION, EXTERIOR WALL FRAMING,
AND BALCONY SIZE AND CONFIGURATION VARIES PER
ELEVATION- REFER TO ELEVATION SHEETS.
*VERSIONS OF THIS PLAN ARE COMPLIANT TO SB 1025 AND
ARE IDENTIFIED ON THE CIVIL SITE PLAN
SunCal - Red Hill, LLC
KTGY %0. 20051061.00
Oedroom 2
�,,Pixl-d ,I
Kitchen
Dining
Living fi
Room
Balcony
F -i
second Floor
946 SP GROSS
888 SF NET
Plan Tree
3 EM / 3 BA
1,997 SF GROSS
1,7W SF NET
0 4
. L
Unit Puns
RebHilf Town Homes
a
Tustin, Ca fqomia
,
Lau4h 3
",,Bedroom 3
M, Bath
is
Entry
h
.'PDT-.
a
Patio
vaiwft
Master
ti Bedroom!
Tkrb iF6Y
645 SF GROSS
538 SF NET
NOTES: "WINDOW SIZE AND LOCATION, EXTERIOR WALL FRAMING,
AND BALCONY SIZE AND CONFIGURATION VARIES PER
ELEVATION- REFER TO ELEVATION SHEETS.
*VERSIONS OF THIS PLAN ARE COMPLIANT TO SB 1025 AND
ARE IDENTIFIED ON THE CIVIL SITE PLAN
SunCal - Red Hill, LLC
KTGY %0. 20051061.00
Oedroom 2
�,,Pixl-d ,I
Kitchen
Dining
Living fi
Room
Balcony
F -i
second Floor
946 SP GROSS
888 SF NET
Plan Tree
3 EM / 3 BA
1,997 SF GROSS
1,7W SF NET
0 4
. L
Unit Puns
RebHilf Town Homes
a
Tustin, Ca fqomia
,
Lau4h 3
",,Bedroom 3
Entry
.1';. 0 KTGY GROUP, -tor
A V gas.
r 040
M 4: 9.169
C aim 14-1 ft'""s iv' 4M
Patio
vaiwft
First Ao+or
406 SF GROSS
372 SF NET
tV
b
C
A-4
.1';. 0 KTGY GROUP, -tor
A V gas.
r 040
M 4: 9.169
C aim 14-1 ft'""s iv' 4M
22.-a
Loft
b
Attic LOA
361 SF GROSS
334 SF NET
NOTES: 'WINDOW SIZE AND LOCATION, EXTERIOR WALL FRAMING,
AND BALCONY SIZE AND CONFIGURATION VARIES PER
ELEVATION. REFER TO ELEVATION SHEETS.
SunCal - Red Hill, LLC
KTGY\Q. 2CC61061.DC
22-C"
Master
Bedroom
M. Balh,
Moll
r. Kerchen,
Room
VyY
V.
Living
ROOM
76 ?0104 -0
4i
IT,
Balcony
seroma F100Y
946 SF GROSS
896 SF NET
PLan Four
2 BR + RETREAT t 2 BA
1, 743 SF GROSS
1,621 SF NET
0 4 1(j
L
2
unit Pians
Reb,Hill Town Homes
Tustin, Cati ornia
22-0�
21 '-4•
Garage
V
6 -4400-2
.A/'
-777-
Sedroom 2.,,.,,
ntry
0 0 0
.first F100T
436 SF GROSS
391 SF NET
1:1.41 H711 1i
I W.
Ott t; \1 U I t.,
A -i
KTGY GROUP, INC
11461 1101141-C 10 U' T.4
1 0 IF r an,, 0, 41a
PAR :w0: :41
E:
P
[an 1
T --r
TT'
Plan.
43-V
Third Floor
NOTES: 'WINDOW SIZE AND LOCATION, EXTERIOR WALL FRAMING,
AND BALCONY SIZE AND CONFIGURATION VARIES PER
ELEVATION. REFER TO ELEVATION SHEETS.
SunCal - Red Hill, LLC
KTGY \0. 2CC51061.00
Secotib Floor
0 8 32
7"
mom
4 115
Bui�aing Type "B" Composite Plans
Reaxi[[ Town Homes
Tustin, California
• Pan
_Fp
pal
Pian 2.
Pfall 1
f
Plan 4
42-0
First Floor
f) G") fjO
A-8
KTGY GROUP, Ift C
it IL P t $I Id & q Is I 'a a
n
4b I v
9. C A A
i P, f"
&St.*IS,
0F now & t "W41aasawav
Left Elevation
Roof Plan
0
SunCal - Red Hill, LLC
KTGY \0. 20051061. CC
Rear Elevation
TUSCAN
SCHEME SCHEME 1 SCHEME SCHEME 5
1 1 "42
T�, '7
UJ
1'1 si'. i
If I.
IJ I
Front Elevation
32
U
Builbin9 TNpe'A" Elevations
Rea Hill T 0 w n Homes
Tustin, Cali oYn•a
Arckedliral &I'Ifletil's
3i
Riot Elevation
jo.hilf; r ilk
A-7
0 KTGY GROUP, Mc.
O, 16G
&FILIalf.4 " &%.
1, 116 , Ow I - I-
r I * "
'• I ' .4. CA 6 f IP a It 0, A
VAX 49AP,
ftw;,& w wsow,
C
m T�r I xxfr
COW—rd e 6-46 itmi
''4` An44 WkAm-
wrwwt too" lwifiv
Skirt i*ud Garaw Wir
Bli"Ict) W006 56urr
w6"
it-Anjob mrm"I'rim
OWWAkV
3i
Riot Elevation
jo.hilf; r ilk
A-7
0 KTGY GROUP, Mc.
O, 16G
&FILIalf.4 " &%.
1, 116 , Ow I - I-
r I * "
'• I ' .4. CA 6 f IP a It 0, A
VAX 49AP,
ftw;,& w wsow,
C
Left Elevation
SunCal - Red Hill, LLC
<TOY NO. 2CC51051.00
Rear Elevation
PORTOFINO
SCHEME 5 SCHEME SCHEME4 SCHEME
nF
it
L
M
ut
Id
...... .....
'TT7-"
i k
I qV
it 7n
Fyont Elevation
c a 32
Lla 1s
MM
�uil�in Tvw "B" Elevations
RebH ll Town Homes
Tustin, Cati o•rnia
I
Arckecturaf Elements
Sig ury
i: Arc 6 WhOoll.
cowrVIC S- Vik Rt{/4
stTliowl Carive Luly
Wnglox mm 14-1i"
11Wnry wild ljuvr-n4 Punct
hfinut) WM).4)WIcr
Tkawa
fnlry Dwr
Riobt Elevation
hr di IN) lid
0) 1 G"t 'its
t!A"t tilfj*%, A-9
KTGY GROUP.
IV" r..r 4. 1
.WV N6. CA.IF4Alk A 984�.
i8af, *Ax t"t
C NAM #-% f"I's hs&"M
c
43'-0
Tbira Floor
NOTES: 'WINDOW SIZE AND LOCATION, EXTERIOR WALL FRAMING,
AND BALCONY SIZE AND CONFIGURATION VARIES PER
ELEVATION, REFER TO ELEVATION SHEETS.
SunCal - Red Hill, LLC
KTGY NO. 2CC51061.00
c
T
N
w
0
&cond Floor
0 B 32
Bu;taing Tve "c" composite Plans
RebHilf Town Homes
Tustin, California
L
1. • �' �w: r
' Plan i
It
i
t
s N
r
Plan 2
• Pian r 1
i
. Pan
4
First Floor
C
t:l •1% :iti! !�Itr I1 �j1:lt: !'n tli ��i �Il.
•,n { 1, 'oil
l -�.tirt •r�,r t r. 1'l. 1 \ A -Jo
.- 0 KTGY GROL . ,kr
•ACM •7 C 1 YM7 r'l • 11tl1�Y
1 1 1 1 7 71
c—lotre Oft
1"91 Sol-lts& PA4�6! .Nr $91.7•I•
Left Elevation
Foo f Plan
SunCal - Red Hill, LLC
KTOY -NO. 2CO51061.00
r., .2-
xwa. lifevation
FrontElevation
0 a 32
E:
4 10
Buibing Tine "C" Elevations
ReaHiif Town Homes
Tustin, California
OD
Ar4itecllfraf EfememLs
A n1t.,f) Wi"A'jr
PROVENCE
Lkwr
C4111crelc
I)iwnjr.r urd) Lamirr
W luigity,
Ut-tim d h or dil I owv
Poiwra W4VA hfAdler
Br i& watt' At
SCHEME i
SCHEME 3
SCHEME 5 SCHEMEI SCHEME
SCHEME
-T
RI
I'T L
FrontElevation
0 a 32
E:
4 10
Buibing Tine "C" Elevations
ReaHiif Town Homes
Tustin, California
OD
Ar4itecllfraf EfememLs
Xi* E6460N
I've?
UPI) p (i Pic
(A
G�j V4 WI
J1.41A0 MIA*
0 KTGY GROUP. IkC
•#4 L P G C I U ft: .4 r • C -I N 1,4
•11.
j9d#! j.jt&& pap; M.Vts
1 0=41% 44 �*=? I ,
A n1t.,f) Wi"A'jr
INIfiffa slumf'rril it
Lkwr
C4111crelc
I)iwnjr.r urd) Lamirr
W luigity,
Ut-tim d h or dil I owv
Poiwra W4VA hfAdler
Br i& watt' At
TAI rprp 1UN
I)twrx iter corivf
Xi* E6460N
I've?
UPI) p (i Pic
(A
G�j V4 WI
J1.41A0 MIA*
0 KTGY GROUP. IkC
•#4 L P G C I U ft: .4 r • C -I N 1,4
•11.
j9d#! j.jt&& pap; M.Vts
1 0=41% 44 �*=? I ,
eft
F,00f Plan
SunCal - Red Hill, LLC
KTGY \Q. 20051061.00
Rear
3W-8"
Pool V*mw's c Men's�
EquipnvM
I
r
Shmwf
Ffooi, Pan
t t
n, ir.
MN
F710fit
0 4 16
2
Pool Buff bi Pf an & elevations
RebHill Torun Homes
Tustin, California
F
Arcktamraf demwits
Cmvrdt bllr Fud
N411a) WWD SWII&F
dw
Rig
0 KTGY GROUP, 1kc.
aY-wtt. c A 1. 1 popft A *all&
(061W. e4wsiss VAX"s. W.S150
r umm A., low"S
1, 1
WALNUT AVENUE STREET SCENE
WEST EDGE SCENE
"N.
PL
I I T-1 � INA
M n it,"" 7 a, m, n
If
n M".
UD HILL AVENUE STREET SCENE
SunCal - Red Hill, LLC
KTGY NO. 20051061.00
OIL
PIL
0 16 64
32
ARCHITECTURAL STREETSCENFS
Rea HiII Town Home
Tustin, California
1:,-d HM Tok
'11,1
in
--7j
KTGY GROUP, INC
"ick-wr9lums V L A ""I":
ITg'L 'I .I
S&I MjVCj*
Owl OM , A 020,
MY
rr
WEST EDGE SCENE
"N.
PL
I I T-1 � INA
M n it,"" 7 a, m, n
If
n M".
UD HILL AVENUE STREET SCENE
SunCal - Red Hill, LLC
KTGY NO. 20051061.00
OIL
PIL
0 16 64
32
ARCHITECTURAL STREETSCENFS
Rea HiII Town Home
Tustin, California
1:,-d HM Tok
I I) - ?;r IXi
A-13
KTGY GROUP, INC
"ick-wr9lums V L A ""I":
ITg'L 'I .I
S&I MjVCj*
Owl OM , A 020,
SunCal - Red Hill, LLC
KTGY NO. 20051061.00
ENLARGEMENT -- WALNUT AVENUE STREET SCENE
ENLARGEMENT — NORTH EDGE SCENE
0 a sz
mom
a 16
ARCHITECTURAL STREET SCENES - ENLARGEMENTS - �11-.•l�
kt-d Plitt Toren llwn+r'. 111 +.'i Uli
xiif T ��Iw�Reb own Homes U; u•.-
Tustin, Cal omni KTGY GROUP INC
0'V
ANtN IE ft TUN[ PLANP/IN•
1 T• w 1 I T C M t l l •OUT N
iAC.10NM.A sa�lA
SRM! •Rh[IaR /AR tNR •fl•a1R•
a mom Au AaN.na NfA+H1YN{ �
10' ROW
Ilk. GY GROUP.,.,
?IV ". $1
IM
SUNCAL - RED HILL, LLC T u s tin, Call-tornia AMA I I
KTGY NO 2005 * 06 1.00 FISIL CA t
to**, off -IMS IPA% f"al "I-0100
IMA NO 05140 02 Li FMIW 0 am
02,0-07
kW.'
. . . . . . . . . .
NRF
J,
SIN
�4W
Mir
%kk
lig
10' ROW
Ilk. GY GROUP.,.,
?IV ". $1
IM
SUNCAL - RED HILL, LLC T u s tin, Call-tornia AMA I I
KTGY NO 2005 * 06 1.00 FISIL CA t
to**, off -IMS IPA% f"al "I-0100
IMA NO 05140 02 Li FMIW 0 am
02,0-07
0"I
x,
v.,
v
V, 'g
ien" Out
M
fa
a
J,
g
Z1.
00000 VANN*
W-
. . ... .....
RED HILL AVENUE
A A'
LPp4p
ENTRY DRIVE
SM WAI, K
TUltr ARr:A
KANTWO AREA
(D ViNk Ok THE WALL
PLANTING POCKET
(D DRIVEWAY
0 (A+WAAL PLAN LINE 4fd) MOLL AVkNVE
(1) ENK4W" PAVING
(3) AIR CON06NSIER
STARS
PATIO
n13 04TRAM;k WALL 4' WCAf-
N.7 Wdh *bA= AnO prevAM
GRFD P01.1 AVFMUF LANDSCAPE
La Ww tatmc44 with s0owt If"
b"aM4#Mv Wdh Vx1la"q IMM old FWw IMM,
owkibl, ww ""V rvwn
10' R.O.W.
Entrance Enlargement Plan
Reb Hit[ 'Town Homes
SUNCAL - RED HILL, LLC TuStin, Ca [if o-rnia KTGY GROLP.,"C
KI C12Y NO :.C%051 C-16 1 .00
MA NO 05141 02 0
L-2 __j
DoutWo Sided F#*pJW*
Wood TrWIn with Vines
•
Pool Enlargement Plan
R
eta Hill TOWH Homes
SUNCAL - RED HILL, LLC TUStinl Cali"fornia
11 Gy NO 200f)'061.00
IMA NO. 05140 02 Ll
LEGENO
WOOO TRELLIS WTI- VINES
UZ SIDEWALK
POOL
2W wife x 40'"pool
sft
(D EX)UkE s4*0FUREPLAck
w4hew4vama
ENWACE0 PAVOOG
op TABLE & GtWR AW LIM8RELIA
® VORNAMENTAL iww rcw-Lr
09 4-k LUW*%"k
to C+WUES AND TAMLL
PLAJ#4704(i AREA
Loprod Iwwaragw
HAMICAP PAMKIW
nt3 STAIRS
%..e
G6 HGti PERWIF"FA BLOCK %VAt ti
Wfort w4v= and pww W"Is cap
nIS PRIVATL PATIO
OpWwm4 kc umtw0a 40o. Dots Wxi!-1ww*
TG COWAM'STEPPING SToNr Accras
• 0KTGY GROUP. �ftc.• .j
Aoc. gcv*g
'1146*
poh."o
Mo "NoRo L-3 L -j
02 02-07
Garden CMAYSM
SUNCAL - RED HILL, LLC
K I GY NO 2005 1361.00
IMA NO 05 140.02
waw I Will W-0 vim"
Fountm
004
Garden Courtyard Enlargement Plan
Red Hill Town Homes
0
Gegen scut wm
W000 IRE .IS UVITH VW* S
(D SIDEWALK
GARDEN scutprukfi
PRIVATE PATIO
OPW,LnAY f0f W"bMAA, 1*4 ChMS MW kr4w4"
AIR CONOPMR
TURF ARTA
PLANTING AREA
QUEST PARKING
FOUNTAIN
t0 BkNCN
0 G'HK;64 PEMM TER $LOCK WAL
WO jbtor-v Ar4 proLost "V
32
COW;f*Tf
KTGY GROLPvc
R IS i )iCRL1 T o r n i a qcx
11
.NN.. efoohm L-4
SUNCAL - RED HILL, LLC
K I cly r\,IL) 200r) 106 1 00
IMA NO 05140 02
Gar -den Paseo Enlargement Plan
Red Hi Town Homes
THS tin, Ca fif o-rnia
J
LgAWNP
CONCRETE 'STEMISIG STOW ACCESS
94MWALK
Oj TL)Rr AREA
PLAW INQ AMLA
V MGH PERMC, TIER P..00K WALL
WAh SWCCO arXI PWAM Comte% Cap
PLANTING POCXVT
0FtIV9WAV
PRIVATE PATIO
Opporwoft (w WMOM44, towe, Ef"fs " W'dwarw
AM CONIX-14SER
• KTGY GROUP.�fdr.
AftrM It.f.40 d,6 :0.06, a .
• 4 61 - I 1" 9 L 1 0
Ova" au'" ft"W"M
L--5
W -MW
3
SUNCAL - RED HILL, LLC
K"rGy NO 20Z 1 n6i 00
IMA NO 061 02
RED HILLAVENUE
Nit
Walnut Avenue Streetscape & Corner Enlargement Plan
Rett Hit[ TOWK Homes
TUStini Catifoirilia
L
'w\-10' R.O.W.
l9GE14P
G PMVATC PAT*
) Umofe" W424 URNe WKI ctmrs
Oppariuftty 1w vanaa
(D SMEWALK
03 %W AN"
0 PLANTM AREA
0PERMFUR lk,OCK WALL.
w4h st"o ow pw*st ownift ev
is PLANTiNG POCKET
(D OMAWAY
0 Ct*Sf PARK104f;
UA F0411,4ANCE0 PAVING
14 AM CONMNSF0
STAkb
82 WOW TWUS
5'OFINMIENTAL ?* M. CA I b
D3
5' ORI Al -ATAL FIERCE
No anfiab h*O" AM "M *0 skcco p4saar
*Fdh pwl4wt ownctew w " Mod
8 FWD Hilt AVFNUr IANOSCAPr
oackftow wtttt ox wV be" " fw" this.
*wtbs ww woww wws
(Do WALMV AVE14UE LANDSCAPE
Lay~ *%ducApe w4h ~ tr"-
b*.kdm4Voo ** ejuWij koft " �* kms,
shn" &,4 qr*VM cootm
• KTGY GROLP,ftc:
IO
&MCIT41.S-L'S.I
9409 ftf.0
.?so& Mr#CM*L. lovy"
:.4.
11 'k 6. t IL , 1 Or � I . . I . I .
of .4 9 as . "s: N1 11*6
"It "'o
02.M-07
L-6 -
�Ak
RED HILLAVENUE
Nit
Walnut Avenue Streetscape & Corner Enlargement Plan
Rett Hit[ TOWK Homes
TUStini Catifoirilia
L
'w\-10' R.O.W.
l9GE14P
G PMVATC PAT*
) Umofe" W424 URNe WKI ctmrs
Oppariuftty 1w vanaa
(D SMEWALK
03 %W AN"
0 PLANTM AREA
0PERMFUR lk,OCK WALL.
w4h st"o ow pw*st ownift ev
is PLANTiNG POCKET
(D OMAWAY
0 Ct*Sf PARK104f;
UA F0411,4ANCE0 PAVING
14 AM CONMNSF0
STAkb
82 WOW TWUS
5'OFINMIENTAL ?* M. CA I b
D3
5' ORI Al -ATAL FIERCE
No anfiab h*O" AM "M *0 skcco p4saar
*Fdh pwl4wt ownctew w " Mod
8 FWD Hilt AVFNUr IANOSCAPr
oackftow wtttt ox wV be" " fw" this.
*wtbs ww woww wws
(Do WALMV AVE14UE LANDSCAPE
Lay~ *%ducApe w4h ~ tr"-
b*.kdm4Voo ** ejuWij koft " �* kms,
shn" &,4 qr*VM cootm
• KTGY GROLP,ftc:
IO
&MCIT41.S-L'S.I
9409 ftf.0
.?so& Mr#CM*L. lovy"
:.4.
11 'k 6. t IL , 1 Or � I . . I . I .
of .4 9 as . "s: N1 11*6
"It "'o
02.M-07
L-6 -
ELEVATION A -A'
ELEVATION FROM RED HILL AVENUE
SCALE V%4W-0"
ELEVATION B -S'
ELEVATION FROM WEST EDGE
'ScAt+ UTZ0,0
ELEVATION C -C
ELEVATION FROM WALNUT AVENUE
SCAtr I*.r2VV
ELEVATION DAY
ELEVATION FROM NORTH EDGE
SCAUT I%Mr
Proposed Elevations
Rei Hill TOWH Homes
!�TGY GRCXJP. -ftc;
SUNDAE -RED HILL, LLC Tustin Califo-rmia IN *q,,1F4.t
KTkY NO 20051 Q6 1. W Amw q1*6 87 1 V C N 9 . L 0 4) . T -4
a 11 to% 9" C 4 L 1 0' 044gft,. A I l•0 .•
IM, NO 05140 02
L-7
""Fu 0 FA 4 L 00016 oww" "% Ra
02-02.07
tjAf A
ELEVATION C -C
ELEVATION FROM WALNUT AVENUE
SCAtr I*.r2VV
ELEVATION DAY
ELEVATION FROM NORTH EDGE
SCAUT I%Mr
Proposed Elevations
Rei Hill TOWH Homes
!�TGY GRCXJP. -ftc;
SUNDAE -RED HILL, LLC Tustin Califo-rmia IN *q,,1F4.t
KTkY NO 20051 Q6 1. W Amw q1*6 87 1 V C N 9 . L 0 4) . T -4
a 11 to% 9" C 4 L 1 0' 044gft,. A I l•0 .•
IM, NO 05140 02
L-7
""Fu 0 FA 4 L 00016 oww" "% Ra
02-02.07
ELEVATION A -A'
ELEVATION FROM RED HILL AVENUE
SCALE VwM-0
ROM' Hill Avenue Elevation
Rea Hill Town Homes
A^
SUNCAL -RED HILL, LLC Tustin j C a f ox x i a KTGY GROUP. .#AI -
1• &109- W*C 1.609 1 . On k - k .
"061
KTGY NO 20105IQ61.00
IMA NO 05140 CV
-r W" A&, L-8
W-0-07
ELEVATION C -C'
ELEVATION FROM WALNUT AVENUE
SMS: I'm 10 -f'
SUNCAL - RED HILL, LLC
KTGY NO 20051061.00
IMA NO 05140.02
Walnut Avenue Elevation
Rea 117*11 Town Homes
Tustin, California
j0do
KTGY GROUT-'. LUG
�'' •w G qui C 7 YNR i • Mh INS
- • 7 1 1: ■ I D E M
Iwvlws t��+�ewwI. •tela
+11/ 1 •*-alai RAR ;Mb •a+.e��a
amo V. ..N71R..MF
02 -02 -Cl
L-9
L
L
�?I I`
A,— 1-11- VA 0, INI
oil
SunCal - Red Hill, LLC
KTOY NO. 200.51061,00
0 ' 2 ' 0
10 40
Site Plan - Builbiq HeiObt Exbibit
ReaHill Town Homes
Tustin, California
I
HEIGHT MEASUREM CNT I6LM§jB&Tj!2N
1 0 KTGY GROUP. ,,.c
^Mc'4fvcf.Tv49
"V . 11
.W.Vas PkA too# oll-:":
can M.. %a." %a~ I I
U
§ItII5ZI`IvI4s
egg
it
...
AE
11P"'A Fa"^
rM ^F
q`
_
A
401
w
aM
ice`
ap
-YAll
�?I I`
A,— 1-11- VA 0, INI
oil
SunCal - Red Hill, LLC
KTOY NO. 200.51061,00
0 ' 2 ' 0
10 40
Site Plan - Builbiq HeiObt Exbibit
ReaHill Town Homes
Tustin, California
I
HEIGHT MEASUREM CNT I6LM§jB&Tj!2N
1 0 KTGY GROUP. ,,.c
^Mc'4fvcf.Tv49
"V . 11
.W.Vas PkA too# oll-:":
can M.. %a." %a~ I I
U
Preowed 9y. R"si.n N.
ay..,• rrcr rmaA we a.:.. 13.
91I� p11V0►q 0 20
A•Qr...: ZYM sltr' S7uN R..si.p 11.
APAht CJ .i.t•
�� O 10 40 Pn:. it •.aas/pIAa R.:wn 19
re.. R ,.aaa.mR. fid,
OVIt)MO TYFE EIE .]X)N TYPE • • Project Addr.aR:
1.
AYc� itectuyal Site Play. VA
A . prpvtrlC•
IR ■ h.aea
rrcjrct Nana: R..Cn k o�-se-or
Rao XIL iban floss R..i�o. _, to-Pt-Od
Rea H T T o wn Homes .%.at Me:
Aw-wg 'L vmI' S1P¢ PLAN a+s'• a Dar. �-�"
SunCal - Red Hill, LLC TustinCalifornia � KTGY GROUP 1N�.
KTGY NO 20051061 00 w.s alTts*... .�w...
❑ I.v�we. a..l1. RSM . .�:
Y soe
rfvripI6�� plate
ATTACHMENT D
Planning Commission Resolutions No. 4053, 4054 and 4055
RESOLUTION NO. 4053
A RESOLUTION OF THE PLANNING COMMISSION ADOPTING
THE FINAL MITIGATED NEGATIVE DECLARATION FOR
TENTATIVE TRACT MAP 17080 AND DESIGN REVIEW 06-011, A
PROPOSAL TO MERGE TWO PARCELS DEVELOPED WITH 57
APARTMENT UNITS INTO ONE 4 -ACRE SITE FOR
DEVELOPMENT OF A NEW 75 -UNIT CONDOMINIUM PROJECT
LOCATED AT 14421 TO 14471 RED HILL AVENUE
The Planning Commission of the City of Tustin does hereby resolve as follows:
1. The Planning Commission finds and determines as follows:
A. The applicant (Sun -Cal Red Hill LLC) has requested to merge two
properties currently developed with 57 apartment units into one 4 -
acre site for development of a new 75 -unit condominium project.
The properties are located at 14421 to 14471 Red Hill Avenue;
B. That the requested tentative tract map and design review are
considered a' "project" subject to the terms of the California
Environmental Quality Act ("CEQA") (Pub. Resources Code §21000
et. seq.);
C. That City staff prepared an Initial Study to evaluate the potential
environmental impacts associated with Tentative Tract Map 17080
and Design Review 06-011 that concluded that with mitigation
measures potential significant impacts can be reduced to a level of
insignificance and a draft Mitigated Negative Declaration (MND)
was prepared;
D. That a Notice of Intent to Adopt a Mitigated Negative Declaration was
published and the Negative Declaration and Initial Study were made
available for a 20 -day public review and comment period from
February 16, 2007, to March 7, 2007, in compliance with Sections
15072 and 15105 of the State CEQA Guidelines;
E. No comments were received and a Final Negative Declaration was
prepared;
F. That the City Council is the final authority for the project and will
consider the MND prior to action on Tentative Tract Map 17080; and,
G. The Planning Commission considered the Initial Study and the
Mitigated Negative Declaration (Exhibit A) and finds it sufficient for
the proposed Design Review 06-011 and Tentative Tract Map
17080.
Resolution No. 4053
Page 2
II. The Planning Commission hereby adopts Final Mitigated Negative
Declaration for Tentative Tract Map 17080 and Design Review 06-011 for
the subdivision and development of 75 condominium units on properties
located at 14421 to 14471 Red Hill Avenue, attached hereto as Exhibit A.
PASSED AND ADOPTED at a regular meeting of the Tustin Planning
Commission held on the 13th day of March, 2007.
r
F
MFJt FLQYD
p
Chair ersok
ELIZABETH A. BINSACK
Planning Commission Secretary
STATE OF CALIFORNIA )
COUNTY OF ORANGE )
CITY OF TUSTIN )
I, ELIZABETH A. BINSACK, the undersigned, hereby certify that I am the
Planning Commission Secretary of the Planning Commission of the City of
Tustin, California; that Resolution No. 4053 was duly passed and adopted at a
regular meeting of the Tustin Planning Commission, held on the 13th day March,
2007.
ELIZABETH A. BINSACK
Planning Commission Secretary
PLEASE SEE
EXHIBIT A
CITY COUNCIL RESOLUTION NO. 07-31
FOR
FINAL MITIGATED NEGATIVE DECLARATION
RESOLUTION NO. 4054
A RESOLUTION OF THE PLANNING COMMISSION OF THE
CITY OF TUSTIN APPROVING DESIGN REVIEW 06-011
AUTHORIZING THE DEVELOPMENT OF A 75 -UNIT
CONDOMINIUM PROJECT ON A 4 -ACRE SITE LOCATED
AT 14421 TO 14471 RED HILL AVENUE (NORTHWEST
CORNER OF WALNUT AND RED HILL AVE.)
The Planning Commission of the City of Tustin does hereby resolve as follows:
I. The Planning Commission finds and determines as follows:
A. That a proper application for Design Review 06-011 was submitted
by Sun -Cal Red Hill LLC requesting authorization to demolish 57
apartment units and construct a 75 -unit condominium project
located at 14421 to 14471 Red Hill Avenue (APN 432-111-03 and
432-111-04);
B. That a public hearing was duly called, noticed, and held for said
application on March 13, 2007, by the Planning Commission;
C. That the site is located in the High Density Residential (HDR)
General Plan land use designation and Multiple Family (R-3)
Residential zoning district;
D. That, as conditioned, the proposed subdivision and development
will be in conformance with the Tustin Area General Plan, zoning
regulations, State Subdivision Map Act, and the City's Subdivision
Code;
E. Pursuant to Section 9272 of the Tustin Municipal Code, the Planning
Commission finds that the location, size, architectural features, and
general appearance of the proposed development will not impair the
orderly and harmonious development of the area, the present or
future development therein, or the occupancy as a whole. In making
such findings, the Commission has considered at least the following
items:
1. Height, bulk, and area of buildings.
2. Setbacks and site planning.
3. Exterior materials and colors.
4. Type and pitch of roofs.
5. Size and spacing of windows, doors, and other openings.
6. Towers, chimneys, roof. structures, flagpoles, radio and
television antennae.
Resolution 4054
DR 06-011
Page 2
7. Location, height, and standards of exterior illumination.
8. ' Landscaping, .parking area design, and traffic circulation.
9. Location and appearance of equipment located outside an
enclosed structure.
10. Location and method of refuse storage.
11. Physical relationship of proposed structures to existing
structures in the neighborhood.
12. Appearance and design relationship of proposed structures to
existing structures and possible future structures in the
neighborhood and public thoroughfares.
13. Proposed signage.
14. Development Guidelines and criteria as adopted by the City
Council.
F. The project requires a 10 foot wide dedication in fee along Walnut
Avenue, which will remain open until future street widening is
implemented. The buildings along Walnut Avenue are designed
with balconies that provide protection over the front entries, offer a
usable exterior open space for the residents, and create a variety of
architectural features along the street rights-of-way. It was
determined that provisions of Tustin City Code Section 92710) can
be applied to the balconies allowing them to encroach a maximum
of three feet into the required front yard setback along Walnut
Avenue which results in a 22 foot setback from the current right-of-
way and 12 feet from the future right-of-way without compromising
the setback requirements from other structures. In addition, sound
attenuation is provided to make the balconies a usable outdoor
space for the residents.
G. The project includes dedication in fee along a portion of Red Hill
Avenue and Walnut Avenue to revise ownership of an existing
street with 33 foot wide highway easement as depicted on
Tentative Tract Map 17080.
H. That the applicant has requested approval of Tentative Tract Map
17080 in conjunction with the application for Design Review 06-011,
and findings and conditions of approval related to site design, street
design, open space and park site design, dedication of necessary
rights-of-way, and provision of necessary infrastructure improvements
have been included in Resolution No. 4055 recommending City
Council approval of Tentative Tract Map 17080.
1. That a Mitigated Negative Declaration was adopted by Resolution
No. 4053 for the proposed development.
Resolution 4054
DR 06-011
Page 3
II. The Planning Commission hereby approves Design Review 06-011 for
development of a 75 -unit condominium project on a 4 -acre site located at
14421 to 14471 Red Hill Avenue, subject to the conditions contained in
Exhibit A attached hereto.
PASSED AND ADOPTED at a regular meeting of the Tustin Planning
Commission held on the 13th day of March, 2007.
1-1
�X-A-
BR LOYD
Chairperson
15
�f
EL"12ABETH A. BINSACK
Planning Commission Secretary
STATE OF CALIFORNIA )
COUNTY OF ORANGE )
CITY OF TUSTIN )
1, ELIZABETH A. BINSACK, the undersigned, hereby certify that I am the
Planning Commission Secretary of the Planning Commission of the City of
Tustin, California; that Resolution No. 4054 duly passed and adopted at a regular
meeting of the Tustin Planning Commission, held on the 13th day of March,
2007.
ELIZABETH A. BINSACK
Planning Commission Secretary
GENERAL
EXHIBIT A
DESIGN REVIEW 06-011
RESOLUTION NO. 4054
CONDITIONS OF APPROVAL
The proposed project shall conform with the Tustin City Code and
Tustin Design Guidelines and standards and be consistent with
submitted plans for the project date stamped March 13, 2007, on file
with the Community Development Department, except as herein
modified, or as modified by the Director of Community Development
in accordance with this Exhibit. The Director of Community
Development may also approve minor modifications to plans during
plan check if such modifications are consistent with the provisions of
the Tustin City Code and other applicable codes.
(1) 1.2 Unless otherwise specified, the conditions contained ' in this Exhibit
shall be complied with as specified or prior to the issuance of any
building permits for the project, subject to review and approval by the
Community Development Department.
(1) 1.3 Resolution No. 4054 shall become null and void in the event that
Resolution No. 4055 approving Tentative Tract Map 17080 is not
approved by the City Council.
(1) 1.4 The subject project approval shall become null and void unless
permits for the proposed project are issued and substantial
construction is underway within 24 months. All time extensions may
be considered if a written request is within thirty (30) days prior to
expiration date.
(1) 1.5 The development of the project described in Design Review 06-011
shall be designed and constructed in accordance with Tentative
Tract Map 17080 application as approved by Resolution Nos. 4053
and 4055 which are incorporated herein by reference.
(1) 1.6 Approval of Design Review 06-011 is contingent upon the applicant
returning to the Community Development Department a notarized
"Agreement to Conditions Imposed" form and the property owner
signing and recording with the County Clerk -Recorder a notarized
"Notice of Discretionary Permit Approval and Conditions of Approval"
form. The forms shall be established by the Director of Community
Development, and evidence of recordation shall be provided to the
Community Development Department.
SOURCE CODES
(1) STANDARD CONDITION (5) RESPONSIBLE AGENCY REQUIREMENT
(2) CEQA MITIGATION (6) LANDSCAPING GUIDELINES
(3) UNIFORM BUILDING CODE/S (7) PC/CC POLICY
(4) DESIGN REVIEW *** EXCEPTION
Resolution 4054
DR 06-011
Page 2
(1) 1.7 As a condition of approval of Design Review 06-011, the applicant
shall agree, at its sole cost and expense, to defend, indemnify, and
hold harmless the City, its officers, employees, agents, and
consultants, from any claim, action, or proceeding brought by a
third party against the City, its officers, agents, and employees,
which seeks to attack, set aside, challenge, void, or annul an
approval of the City Council, the Planning Commission, or any
other decision-making body, including staff, concerning this project.
The City agrees to promptly notify the applicant of any such claim
or action filed against the City and to fully cooperate in the defense
of any such action. The City may, at its sole cost and expense,
elect to participate in defense of any such action under this
condition.
GRADING PLAN SUBMITTAL
(1) 2.1 Prior to issuance of a grading permit all requirements related to
private infrastructure contained within Resolution No. 4055 shall be
met.
(1) 2.2 Four (4) sets of final grading plans, including a site plan, and
consistent with the landscaping plans, as prepared by a registered
civil engineer, shall be submitted and shall include the following:
A. Technical details and plans for all utility installations
including telephone, gas, water, and electricity.
B. Three (3) copies of a precise soils report provided by a civil
engineer and less than one (1) year old. Expanded
information regarding the levels of hydrocarbons and ground
water contamination found on-site shall be provided in the
soil report. All pavement "R" values shall be in accordance
with applicable City of Tustin standards.
C. Information demonstrating that all site drainage shall be
handled on-site and shall not be permitted to drain onto
adjacent properties.
D. Information demonstrating that drainage, vegetation,
circulation, street sections, curbs, gutters, sidewalks, and
storm drains shall comply with the City of Tustin`s
"Construction Standards for Private Streets, Storm Drain and
On -Site Private Improvements," revised April 1989.
E. Two (2) copies of a hydrology report.
F. Information demonstrating that vehicle parking, primary
entrance to the building, primary paths of travel, sanitary
Resolution 4054
DR 06-011
Page 3
facilities, drinking fountain, and public telephones for the
recreation building shall be accessible to persons with
disabilities.
G. Building and landscape setback dimensions and dimensions
for all drive aisles, back up areas, each covered parking
stall, and open parking stalls.
H. Details indicating that a maximum streetlight spacing of 200
feet staggered from side to side along the street shall be
used for on-site street fighting (per City standards for local
private residential streets) and placement of streetlights in
relation to the intersection locations and other driver decision
points for safe pedestrian access through the site.
(1) 2.3 The engineer of record must submit a final compaction report to the
Building Division for review and approval prior to the issuance of a
building permit.
(1) 2.4 The engineer of record must submit a pad certification to the
Building Division for review and approval prior to the issuance of a
building permit.
(1) 2.5 Prior to issuance of a grading permit, the applicant shall be required
to provide a performance bond to assure grading work is completed
in accordance with approved plans. The engineer's estimated cost
shall be submitted to the Building Official for determination of the
bond amount.
(1) 2.6 A note shall be provided on the final plans indicating that a six (6)
foot high chain link fence shall be installed around the site prior to
grading. A nylon fabric or mesh shall be attached to the temporary
construction fencing. Gated entrances shall be permitted along the
perimeter of the site for construction vehicles.
BUILDING PLAN SUBMITTAL
(3) 3.1 At the time of building permit application, the plans shall comply
with the 2001 California Building Code (CBC), 2001 California
Mechanical Code (CIVIC), 2001 California Plumbing Codes (CPC),
2001 California Electrical Code (CEC), California Title 24
Accessibility Regulations, Title. 24 Energy Regulations, City
Ordinances, and State and Federal laws and regulations. It is
expected that a new set of California Codes will take effect on
January 1, 2008. Please note that the current conditions are based
on current codes that maybe subject to change with adoption of
new codes.
Resolution 4054
DR 06-011
Page 4
(3) 3.2 Building plan check submittal shall include the following:
• Four (4) sets of construction plans, including drawings for
mechanical, plumbing, and electrical.
• Two copies of structural calculations.
• Two copies of Title 24 energy calculations.
• The location of any utility vents or other equipment shall be
provided on the roof plan.
• Details of all proposed lighting fixtures and a photometric study
showing the location and anticipated pattern of light distribution
of all proposed fixtures. All new light fixtures shall be consistent
with the architecture of the building. All exterior lighting shall be
designed and arranged as not to direct light or glare onto
adjacent properties, including the adjacent streets. Wall -
mounted fixtures shall be directed at a 90 -degree angle directly
toward the ground. All lighting shall be developed to provide a
minimum of one (1) foot-candle of light coverage, in accordance
with the City's Security Ordinance.
• A note shall be provided on the plans that "All parking areas
shall be illuminated with a minimum of one (1) foot-candle of
light, and lighting shall not produce light, glare, or have a
negative impact on adjacent properties."
• Noise attenuation features as required by Condition 11.1 of this
Resolution.
• Note on plans that no field changes shall be made without prior
approval from the Building Official and architect or engineer of
record.
(1) 3.3 Sufficiently sized concrete pad in front of mailbox structures shall
be provided to allow mail carrier to place mail and homeowner to
retrieve mail without standing in the street or landscape area.
(3) 3.4 Submitted plans shall comply with 2001 California Building Code
Chapter 3, Chapter 5, and minimum egress requirements in Table
10A or the latest adopted codes at the time of plan check submittal.
(3) 3.5 Area of third floors exceeding 550 sq. ft. shall have at least two
means of egress per CBC Section 1007.7.1 and as modified by the
City of Tustin Building Division Policy #C6.
(3) 3.6 All buildings shall be within maximum allowable floor area per Table
5-B of the 2001 CBC or the latest adopted codes at the time of plan
check submittal.
(3) 3.7 Escape or rescue windows shall be provided in all sleeping rooms,
in accordance with the 2001 California Building Code (Section
310.4).
Resolution 4054
DR 06-011
Page 5
(1) 3.8 The clear and unobstructed interior garage dimensions for each
parking space shall be a minimum of 10 feet in width and 20 feet in
length and shall be shown on the plans.
(1 } 3.9 No structures shall be permitted to be developed over active
pipelines, abandoned lines, or utility easements, except where
approved by the City Engineer and/or Building Official. The SCE
easements shall be quitclaimed prior to issuance of any grading
permit.
(1) 3.10 Prior to issuance of a demolition, precise/rough grading, and/or
building permit with valuation of $50,000 or greater, the applicant
shall submit for approval by the City of Tustin, Construction &
Demolition (C&D) debris collection, disposal, and diversion
information on the City -prescribed forms.
At least 50 percent of the construction debris shall be diverted from
landfill to the recycling plants. A security deposit in the amount of
$50 per ton (not to exceed $5,000 per project) for a C&D security
deposit will be collected prior to issuance the permit. Prior to final
inspection, the applicant shall submit to the City of Tustin
documents (i.e. receipt from vendor) showing actual weight or
volume of each material of C&D diverted to the recycling center.
For any questions or concerns, please contact Joe Meyers at (714)
573-3173.
(1) 3.11 The applicant shall comply with all City policies regarding short-
term construction emissions, including periodic watering of the site
and prohibiting grading during second stage smog alerts and when
wind velocities exceed 15 miles per hour.
PUBLIC WORKS DEPARTMENT
(1) 4.1 A 24" x 36" street improvement plan, prepared by a California
Registered Civil Engineer, shall be required for all construction
within the public right-of-way, including the Project entrance on Red
Hill Avenue. Said improvement plans shall include all
recommendations and mitigation measures included in the traffic
study prepared for the project and attached to the Mitigated
Negative Declaration.
(1 } 4.2 A 24" - x 36" reproducible construction area traffic control plan,
prepared by a California Registered Traffic Engineer or Civil
Engineer experienced in this type of plan preparation, shall be
required for work within the public right-of-way.
Resolution 4054
DR 06-011
Page 6
(1) 4.3 Preparation and submittal of a final grading plan showing all
pertinent elevations as they pertain to the public right-of-way along
with delineating the following information:
1. Final street elevations at key locations.
2. Final pad/finished floor elevations and key elevations for all site
grading. All pad elevations shall be a minimum of 1.0 foot
above base flood elevation as defined by FEMA.
3. All flood hazards of record.
(1) 4.4 Adequate horizontal and vertical intersection sight line shall be
provided. In general a 25' x 25' limited use area triangle provides
adequate sight at typical driveways. Additional sight evaluation,
however, could be required to satisfy City of Tustin Standard
Drawings and Design Standards for Public Works Construction No.
510 for all affected streets. The sight lines would be shown on the
grading plan and landscape plan. If detailed analyses are
requested, all landscaping within the limited use area would need to
comply with City of Tustin Standard Drawings and Design
Standards for Public Works Construction No. 510.
(1) 4.5 Existing sewer, domestic water, reclaimed water, and storm drain
service laterals shall be utilized whenever possible. On-site flows
shall be diverted into an approved storm drain, subject to review
and approval by the City Engineer.
(1) 4.6 Any damage done to existing street improvements and utilities shall
be repaired before issuance of a Certificate of Occupancy for the
development.
(1) 4.7 Prior to any work in the public right-of-way, an Encroachment
Permit shall be obtained from and applicable fees paid to the Public
Works Department.
(1) 4.8 Applicant shall provide and maintain the landscaping within the new
10 foot right-of-way dedications in fee on Red Hill Avenue and
Walnut Avenue. No new trees shall be planted along Red Hill
Avenue. Lawn, shrubs, and ground covers are acceptable.
(1) 4.9 With the exception of the 66 KV power lines and other aerial utility
lines sharing the poles on Walnut Avenue, the applicant shall
provide for the undergrounding of all existing and proposed utility
distribution facilities within the public right-of-way adjacent to the
project as well as within the project, unless exempt per the
Development Code. The applicant shall be responsible for the
associated costs and arrangement with each public utility.
(1) 4.10 Left blank intentionally.
Resolution 4054
DR 06-011
Page 7
(1) 4.11 The left turn from the project site onto Red Hill Avenue may be
prohibited in the future if determined necessary by the City's Traffic
Engineer.
(1) 4.12 Current Federal Americans with Disabilities Act (ADA) requirements
shall be met at the drive aprons and sidewalk.
(1) 4.13 Prior to issuance of any Building Permit, the applicant shall provide
written approval from the Orange County Sanitation District for
sewer connections to the Tustin Public Works Department.
(1) 4.14 This development shall comply with all applicable provisions of the
City of Tustin Water Quality Ordinance and all Federal, State, and
Regional Water Quality Control Board rules and regulations.
(1) 4.15 Project Recycling Requirement —The City of Tustin is required to
comply with the recycling requirements contained in the California
Integrated Waste Management Act of 1989. To facilitate City
compliance with this law, the Project Applicant is required to comply
with Section 4327 of the Tustin City Code which details
requirements for developing and implementing a Waste
Management Plan.
(1) 4.16 Multi -Family Recycling:
a. Pursuant to City Code Section 9275, The Applicant, Property
Owner, and/or tenant(s) are required to participate in the City's
recycling program.
b. Prior to issuance of a Grading Permit, a solid waste recycling plan
shall be submitted and approved by the City of Tustin Public Works
Department. The plan shall contain the following information:
i. The total quantity (lbs. or tons) of waste material to be
generated by the proposed development use(s).
ii. The types of waste materials likely to be generated by the
proposed use(s).
iii. The proposed method of recycling, including material types
and quantities.
iv. Identify any outside recycling equipment or services, other
than the City franchise hauler, proposed to service the
development.
v. Identify any special waste materials (cooking oils, hazardous
materials, lumber, etc.) which require special handling.
Resolution 4054
DR 06-011
Page 8
vi. Identify the types and number of collection receptacles to be
utilized and the proposed frequency of collection.
vii. Demonstrate that waste and recycling collection locations
are clearly identified and are equally and readily accessible
by property owners and tenants
viii. Demonstrate that waste collection locations can be readily
accessed by waste and recycling collection vehicles.
(1) 4.17 A complete hydrology study and hydraulic calculations shall be
submitted to the City for review and approval.
(1) 4.18 All sanitary sewer facilities shall be submitted as required by the
local sewering agency.
(1) 4.19 Water improvement plans shall be prepared and submitted for
City's review.
(1) 4.20 Water Improvement Plans shall be reviewed and approved by the
Orange County Fire Authority for fire protection purposes. The
adequacy and reliability of water system design and the distribution
of fire hydrants will be evaluated. The water distribution system
and appurtenances shall also conform to the applicable laws and
adopted regulations enforced by the Orange County Health
Department.
(1) 4.21 Hydraulic analysis of the proposed water system and ability to meet
OCFA fire flow demands and requirements be performed and
certified by the developer.
(1) 4.22 Location of fire hydrants to be approved by the City of Tustin and
the Orange County Fire Authority.
(1) 4.23 The Developer is responsible for all costs related to the
abandonment, at the water main, of all existing potable water and
fire service connections.
(1) 4.24 The Developer shall be responsible for all costs related to the
installation of new potable and firewater services.
(1) 4.25 Approval from Water Services Division is required for permitting or
construction of any new service connections, abandonment or
relocation of existing services, or improvements that will affect the
City's water facilities.
Resolution 4054
DR 06-011
Page 9
(1) 4.26 This development shall comply with all applicable provisions of the
City of Tustin Water Quality Ordinance and all Federal, State and
Regional Water Quality Control Board rules and regulations.
(1) 4.27 Water system improvements to be designed in accordance with the
requirements and standards of the City of Tustin Department of
Public Works or the American Water Works Association (AWWA).
(1) 4.28 Prior to issuance of Building Permit, the applicant shall provide fire
protection access easements, water easements and dedicate them
to the City. The easements shall be located within unobstructed
areas and clear access shall be provided at all time.
(1) 4.29 In addition to the normal full size plan submittal process, all final
development plans including, but not limited to: tract maps, parcel
maps, right-of-way maps, records of survey, public works
improvements, private infrastructure improvements, final grading
plans, and site plans are also required to be submitted to the Public
Works Department/Engineering Division in computer aided design
and drafting (CADD) format. The standard file format is AutoCAD
Release 2004 having the extension DWG. Likewise, layering and
linetype conventions are AutoCAD -based (latest version available
upon request from the Engineering Division). In order to
interchangeably utilize the data contained in the infrastructure
mapping system, CADD drawings must be in AutoCAD "DWG"
format (i.e., produced using AutoCAD or AutoCAD compatible
CADD software). The most current version of AutoCAD is Release
2004. Drawings created in AutoCAD Release 2004 are compatible
and acceptable.
The CADD files shall be submitted to the City at the time the plans
are approved and updated CADD files reflecting the "as built"
conditions shall be submitted once all construction has been
completed. The subdivision bonds will not be released until the "as
built" CADD files have been submitted.
WATER QUALITY
(1) 5.1 The applicant shall comply with the following conditions pertaining
to the requirement for a Water Quality Management Plan:
A. Prior to issuance of any permit, the applicant shall submit for
approval by the Community Development and Public Works
Departments, a Water Quality Management Plan (WQMP)
specifically identifying Best Management Practices (BMPs)
that will be used on-site to control predictable pollutant
run-off. This WQMP shall identify the structural and
non-structural measures specified detailing implementation
Resolution 4054
DR 06-011
Page 10
of BMPs whenever they are
assignment of long-term
(specifying the developer,
association, lessee, etc.); and,
structural BMPs.
applicable to the project; the
maintenance responsibilities
parcel owner, maintenance
reference to the location(s) of
B. Prior to submittal of a Water Quality Management Plan
(WQMP), the applicant shall submit a deposit of $5,000.00
for the estimated cost of review of the WQMP to the Building
Division. The actual costs shall be deducted from the
deposit, and the applicant shall be responsible for any
additional review cost that exceeded the deposit prior to
issuance of grading permits. Any unused portion of the
deposit shall be refunded to the applicant.
C. Prior to issuance of any permits, the property owner shall
record a Notice of Water Quality Management Plan (WQMP)
with the County Clerk Recorder on a form provided by the
Community Development Department to inform future
property owners of the requirement to implement the
approved WQMP.
D. The Community Development and Public Works
Departments shall determine whether any change in use
requires an amendment to an approved Water Quality
Management Plan.
(1) 5.2 Prior to issuance of grading permits, the applicant shall submit a
copy of the Notice of Intent (NOI) indicating that coverage has been
obtained under the National Pollutant Discharge Elimination
System (NPDES) State General Permit for Storm Water Discharges
Associated with Construction Activity from the State Water
Resources Control Board. Evidence that the NOI has been
obtained shall be submitted to the Building Official. In addition, the
applicant shall include notes on the grading plans indicating that the
project will be implemented in compliance with the Statewide
Permit for General Construction Activities.
(1) 5.3 The following requirements shall be defined on permit plan cover
sheets as either general or special notes and the project shall be
implemented in accordance with the notes:
A. Construction sites shall be maintained in such a condition
that an anticipated storm does not carry wastes or pollutants
off the site.
B. Discharges of material other than stormwater are allowed
only when necessary for performance and completion of
Resolution 4054
DR 06-011
Page 11
construction practices and where they do not cause or
contribute to a violation of any water quality standard; cause
or threaten to cause pollution, contamination, or nuisance;
or, contain a hazardous substance in a quantity reportable
under Federal Regulations 40 CFR Parts 117 and 302.
C. Potential pollutants include, but are not limited to, solid or
liquid chemical spills; wastes from paints, stains, sealants,
glues, limes, pesticides, herbicides, wood preservatives, and
solvents; asbestos fibers, paint flake or stucco fragments;
fuels, oils, lubricants, and hydraulic, radiator or battery fluids;
fertilizers, vehicle/equipment wash water and concrete wash
water, concrete, detergent or floatable wastes; wastes from
any engine equipment steam cleaning or chemical
degreasing; and chlorinated potable water line flushing.
During construction, disposal of such materials shall occur in
a specified and controlled temporary area on-site, physically
separated from potential storm water run-off, with ultimate
disposal in accordance with local, State, and Federal
requirements.
D. Dewatering of contaminated groundwater or discharging
contaminated soils via surface erosion is prohibited.
Dewatering of non -contaminated groundwater requires a
National Pollutant Discharge Elimination System Permit from
the California State Regional Water Quality Control Board.
MODEL HOME PLAN AND CONSTRUCTION PHASING
(1) 6.1 A site plan, street improvement plan including a public parking
area, landscape plans, lighting plans and striping plan for the model
home complex shall be submitted for review and approval of the
Community Development Department, in accordance with the
phasing requirements for the project contained within Resolution
4054. All required improvements for streets, landscaping, ADA
compliance, emergency access, security lighting, etc. shall be
installed prior to final inspection for the model homes and the sales
office.
(1) 6.2 The recreation area (pool/spa, pool buildings, etc.), all perimeter
block walls including a new 6' 8" block wall along the westerly and
northerly property lines, landscaping, and infrastructure shall be
installed with the first phase of development.
(1) 6.3 Temporary construction fencing shall be permitted to encroach into
required travelways of private streets or drives once constructed
and shall be removed prior to issuance of Certificate of Occupancy
for the model homes.
Resolution 4054
DR 06-011
Page 12
(1) 6.4 The developer shall close and convert the model homes to
occupancy within 90 days from the last home sale of the same style
home. Prior to issuance of building permits for the model homes, the
developer shall submit a bond to ensure the conversion.
ARCHITECTURE
(4) 7.1 Window trims, surrounds, and mullions shall be provided on all
elevations consistent with the architectural treatment and of the
buildings subject to final approval of the Community Development
Department.
(4) 7.2 All exterior colors and textures shall be submitted to review and
approval of the Community Development Department and final
inspection. Colors, materials, and textures shall be coordinated with
the architectural styles and noted in construction plans.
(4) 7.3 All mechanical and electrical fixtures and equipment shall be
adequately and decoratively screened. The screen shall be
included as an element of the overall design of the project and
blend with architectural design of the building. All telephone and
electrical boxes shall be identified on the construction plans.
Electrical transformers shall be located toward the interior of the
project to minimize visual impacts.
(4) 7.4 All portions of the buildings shall be located 15 feet from the
ultimate right-of-way along Walnut Avenue. The balconies along
Walnut Avenue that enhance the streetscape and provide a usable
open space for the residents can encroach a maximum of three feet
into the required front yard setback.
LAN D S CAP I N G/H AR D S CAP E
(1) 8.1 Submit at plan check complete detailed landscaping and irrigation
plans for all landscaping areas, including the model complex,
consistent with adopted City of Tustin Landscaping requirements.
The plans shall include the following:
■ Include a summary table identifying plan materials. The plant
table shall list botanical and common names, sizes, spacing,
location, and quantity of the plant materials proposed.
Show planting and berming details, soil preparation, staking,
etc. The irrigation plan shall show location and control of
backflow prevention devices, pipe size, sprinkler type,
spacing, and coverage. Details for all equipment must be
provided.
Resolution 4054
DR 06-011
Page 13
■ Show all property lines on the landscaping and irrigation
plans, public right-of-way areas, sidewalk widths, parkway
areas, and wall locations.
■ The Community Development Department may request
minor substitutions of plant materials or request additional
sizing or quantity of materials during plan check.
■ Add a note that coverage of landscaping and irrigation
materials is subject to inspection at project completion by the
Community Development Department.
■ Turf is unacceptable for grades over 25 percent. A
combination of planting materials shall be used. On large
areas, ground cover alone is not acceptable.
■ Shrubs shall be a minimum of five (5) gallon size and shalt
be placed a maximum of five (5) feet on center.
■ Ground cover shall be planted eight (8) to twelve (12) inches
on center.
■ Fences, wall, and equipment areas shall be screened with
walls, vines, and/or trees.
■ All plant materials shall be installed in a healthy vigorous
condition typical to the species and shall be maintained in a
neat and healthy condition. Maintenance includes, but is not
limited to, trimming, weeding, removal of litter, fertilizing,
regular watering, and replacement of diseased or dead
plants.
■ Major points of entry to the project, private streets, and
private drives and internal circulation shall receive specimen
trees to create an identifying theme.
■ No additional trees shall be planted within the future right-of-
way along Red Hill Avenue. The existing trees and
landscaping shall be maintained or replaced if necessary
until the road widening project is progress.
■ Any tree removed on the northerly property line shall be
replaced with a minimum 36 -inch box tree to provide
adequate screening.
Resolution 4054
DR 06-011
Page 14
(4) 8.2 On-site walls and fences shall be noted on the plans with specific
materials, colors, and decorative treatments. Interior wall/fences
shall be made of durable materials subject to review and approval
of the Community Development Department.
USE RESTRICTIONS
(4) 9.1 Parallel guest parking spaces, parking stalls, and driveway parking
spaces shall be maintained as shown on the approved "Site Plan"
and "Waste Management Plan." Any changes to the number,
location, or size of parking spaces shall be reviewed and approved
by the Director of Community Development.
(1) 9.2 Trashcans shall be placed only in the locations identified on the
approved "Waste Management Plan" up to twelve (12) hours prior
to regularly scheduled trash collection and shall be removed within
twelve (12) hours of trash collection. Adequate signs that post the
Waste Management Plan and designated parking spaces shall be
provided subject to final approval of the Community Development
Department.
(1) 9.3 No outdoor storage shall be permitted during grading or building
stages, except as approved by the Tustin Community Development
Director.
(1 } 9.4 During construction, permission from adjacent property owners
shall be required for any work located on adjacent properties.
(1) 9.5 Access to and from the site to Red Hill Avenue should be available
with completion of the project. The left turn egress from the project
site may be prohibited in the future if determined necessary by the
City's Traffic Engineer.
(1) 9.6 All on-site signs (i.e. stop signs, no parking signs) shall be designed
with decorative posts complementary to the light posts throughout
the site.
ORANGE COUNTY FIRE AUTHORITY
(5) 10.1 Prior to the issuance of any building permits, the applicant shall
provide evidence of adequate fire flow. The "Orange County Fire
Authority Water Availability for Fire Protection" form shall be signed
by the applicable water district and submitted to the Fire Chief for
approval.
(5) 10.2 Prior to the issuance,of a building permit, the applicant shall submit
plans for the required automatic fire sprinkler system in all
structures to the Fire Chief for review and approval. Please contact
Resolution 4054
DR 06-011
Page 15
the OCFA at (714) 573-6100 to request a copy of the "Orange
County Fire Authority Notes for New NFPA 13 Commercial
Sprinkler Systems." Prior to the issuance of a certificate of
occupancy, this system shall be operational in a manner meeting
the approval of the Fire Chief.
(5) 10.3 Prior to the issuance of any building permits, the applicant shall
submit plans and obtain approval from the Fire Chief for fire lanes
on required fire access roads less than 36 feet in width. The plans
shall indicate the locations of red curbs and signage and include a
detail of the proposed signage including the height, stroke and
colors of the lettering and its contrasting background. Please
contact the OCFA at (714) 573-6100 or visit the OCFA website to
obtain a copy of the "Guidelines for Emergency Access Roadways
and Fire Lane Requirements."
Prior to the issuance of any certificate of occupancy, the' fire lanes
shall be installed in accordance with the approved fire master plan.
The CC&R'S's or other approved documents shall contain a fire
lane map, provisions prohibiting parking in the fire lanes and a
method of enforcement.
(5) 10.4 Prior to the issuance of a building permit, the applicant shall submit
architectural plans for the review and approval of the Fire Chief if
required per the "Orange County Fire Authority Plan Submittal
Criteria Form." Please contact the OCFA at (714) 573-6100 for a
copy of the Site/Architectural Notes to be placed on the plans prior
to submittal.
(5) 10.5 Prior to the issuance of a building permit, plans for the fire alarm
system shall be submitted to the Fire Chief for review and approval.
Please contact the OCFA at (714) 573-6100 or visit the OCFA
website to obtain a copy of the "Guideline for New and Existing Fire
Alarm Systems." This system shall be operational prior to the
issuance of a certificate of occupancy.
(5) 10.6 Prior to the issuance of any building permits, the applicant shall
submit a fire hydrant location plan to the Fire Chief for review and
approval.
Prior to the issuance of a building permit, the applicant shall submit
evidence of the on-site fire hydrant system to the Fire Chief and
indicate whether it is public or private. If the system is private, it
shall be reviewed and approved by the Fire Chief prior to building
permit issuance, and the applicant shall make provisions for the
repair and maintenance of the system in a manner meeting the
approval of the Fire Chief. Please contact the OCFA at (714) 573-
Resolution 4054
DR 06-011
Page 16
6100 or visit the OCFA website for a copy of the "Guidelines for
Private Fire Hydrant Wor Sprinkler Underground Piping."
Prior to the issuance of any certificate of occupancy, all fire
hydrants shall have a blue reflective pavement marker indicating
the hydrant location on the street as approved by the Fire Chief,
and must be maintained in good condition by the property owner.
Please contact the OCFA at (714) 573-6100 or visit the OCFA
website for a copy of the "Guideline for Installation of Blue Dot
Hydrant Markers."
NOISE
(*) 11.1 The following mitigation shall be included in the plan check submittal
to mitigate the noise impacts:
• Roof ceiling construction shall be roofing on '/2 inch plywood.
Batt insulation shall be provided in joist spaces and the interior
ceiling shall be finished with one layer of 5/8 inch gypsum
board.
• All exterior walls shall be 2 x 4 studs at 16 inches on center with
batt insulation between studs. Exterior walls shall be plaster with
5/8 inch gypsum board on the interior.
• All southeast and southwest facing windows and glass doors
shall be glazed with STC 32 glazing with either 1/4 inch
laminated glass or dual pane assembly with '/2 inch air space. In
either case, a test report must be provided at the time of
installation to ensure compliance with the minimum
requirements. The report shall be prepared in an independent,
accredited testing laboratory in accordance with ASTM E-90.
• All entry doors shall be 1 3/4 inch solid core door with weather
stripping seals on the sides and top. No glazing shall be
permitted for the entry doors.
• Since meeting the minimum levels of interior noise standard
would require closed windows and doors, the structures shall be
equipped with ventilation or an air-conditioning system to
provide a habitable interior environment.
• Balconies six feet in depth along Walnut Avenue and the first
units of the multiple unit complexes along Red Hill Avenue shall
be designed with 42 inch high solid railings designed compatible
with the proposed architecture.
ENVIRONMENTAL
(*) 12.1 If buried resources are found during grading within the project area,
a qualified archaeologist would need to assess the site significance
and perform the appropriate mitigation. The Native American
Resolution 4054
DR 06-011
Page 17
viewpoint shall be considered during this process. This could include
testing or data recovery. Native American consultation shall also be
initiated during this process.
POLICE DEPARTMENT
(*) 13.1 The pool access gates need to be equipped with a knox box for
emergency access.
(*) 13.2 Landscaping should be designed with surveillance opportunities for
residents and police personnel in patrol vehicles.
(*) 13.3 Security devices such as double locking deadbolts, strike plates, with
1 1/2 inch screws and pin locks on windows and sliders shall be
installed minimizing the potential for criminals to access the units.
FEES
(1)(5) 14.1 Prior to issuance of any building permits, payment shall be made of
all applicable fees, including but not limited to, the following.
Payment shall be required based upon those rates in effect at the
time of payment and are subject to change.
a. Building plan check and permit fees to the Community
Development Department based on the most current schedule
at the time of permit issuance.
b. Engineering plan check and permit fees to the Public Works
Department based on the most current schedule at the time of
plan check and permit issuance.
C. orange County Fire Authority plan check and inspection fees
to the Community Development Department based upon the
most current schedule at the time of permit issuance.
d. Major Thoroughfare and Bridge Fees to the Tustin Public
Works Department based on the most current schedule at
the time of building permit issuance.
e. Transportation System Improvement Program (TSIP), Benefit
Area "B" fees in the amount of $3.31 per square foot of new or
added gross square floor area of construction or
improvements to the Community Development Department.
f. Water and sewer connection fees to City of Tustin Water
Services.
g. New development tax is $350.00 per unit.
Resolution 4054
DR 06-011
Page 18
(1)
h. School facilities fee in the amount as required by Tustin
Unified School District.
i. Applicable parkland in -lieu fees as required by Resolution No.
4054.
14.2 Within forty-eight (48) hours of final approval of the project, the
applicant shall deliver to the Community Development Department,
a CASHIER'S CHECK payable to the County Clerk in the amount
of $50.00 to enable the City to file the appropriate environmental
documentation for the project. If within such forty-eight (48) hour
period that applicant has not delivered to the Community
Development Department the above -noted check, the statute of
limitations for any interested party to challenge the environmental
determination under the provisions of the California Environmental
Quality Act could be significantly lengthened.
RESOLUTION NO. 4055
A RESOLUTION OF THE PLANNING COMMISSION OF THE
CITY OF TUSTIN RECOMMENDING THAT THE CITY COUNCIL
ADOPT MITIGATED NEGATIVE DECLARATION (MND) FOR
TENTATIVE TRACT 17080 AND DESIGN REVIEW 06-011 AND
APPROVE TENTATIVE TRACT MAP 17080 TO MERGE TWO
EXISTING PARCELS CONTAINING 57 APARTMENT UNITS
INTO ONE 4 -ACRE PARCEL FOR DEVELOPMENT OFA 75
UNIT CONDOMINIUM PROJECT LOCATED AT 14421 TO 14471
RED HILL AVENUE
The Planning Commission of the City of Tustin does hereby resolve as follows:
I. The Planning Commission finds and determines as follows:
A. That a proper application for Tentative Tract Map 17080 was submitted
by Sun -Cal Red Hill LLC requesting approval to merge two parcels into
one 4 -acre parcel for development of a 75 -unit condominium complex on
properties located at 14421 to 14471 Red Hill Avenue;
B. That a public hearing was duly called, noticed, and held for said map on
March 13, 2007, by the Planning Commission;
C. That the proposed subdivision is in conformance with the Tustin General
Plan land use designation of High Density Residential (HDR) and
Multiple Family Residential (R-3) zoning district in that these designations
provide for the development of residential condominium units;
D. As conditioned, the map would be in conformance with the State
Subdivision Map Act and Tustin City Code Section 9323 (Subdivision
Code);
E. That the Public Works Department has reviewed the tentative map and
determined that it is technically correct;
F. That the site is physically suitable for the proposed density and type of
development;
G. That the design of the subdivision or the types of improvements
proposed are not likely to cause serious public health problems;
H. The proposed subdivision is not located within a 100 -year flood plain
according to the Federal Emergency Management Agency map for the
area dated February 18, 2004;
1. That development of the site will require the developer to dedicate in
fee title property to the City of Tustin including a 10 -foot side dedication
Resolution No. 4055
Tentative Tract Map 17080
March 13, 2007
Page 2
in fee along Red Hill Avenue and 10 -foot side dedication in fee along
Walnut Avenue for future roadway widening.
J. The project includes dedication in fee along a portion of Red Hill
Avenue and Walnut Avenue to revise ownership of an existing street
with 33 foot wide highway easement as depicted on Tentative Tract
Map 17080.
K. That the Building Official has considered and approved deviations to
the Private Improvement Standard to allow turning radii of less than 25
feet for private drives accessing private garages;
L. That the parcel map or the proposed improvements are not likely to
cause substantial environmental damage, or substantially and avoidably
injure fish or wildlife in their habitat;
M. That a Notice of Intent to Adopt a Mitigated Negative Declaration (MND)
wasp ublished and the Draft Negative Declaration and Initial Study were
made available for a 20 -day public review and comment period from
February 16, 2007, to March 7, 2007, in compliance with Sections 15072
and 15105 of the State CEQA Guidelines;
II. The Planning Commission hereby recommends that the City Council approve
the Mitigated Negative Declaration and Tentative Tract Map 17080 to merge
two existing parcels into one 4 -acre parcel for development of a 75 -unit
condominium project located at 14421 to 14471 Red Hill Avenue, subject to the
conditions contained in Exhibit A attached hereto.
PASSED AND ADOPTED at a regular meeting of the Tustin Planning Commission
held on the 13th day of March, 2007.
FLO t0
Chairperson t
ELIZABETH A. BINSACK
Planning Commission Secretary
Resolution No. 4055
Tentative Tract Map 17080
March 13, 2007
Page 3
STATE OF CALIFORNIA )
COUNTY OF ORANGE )
CITY OF TUSTIN )
I, ELIZABETH A. BINSACK, the undersigned, hereby certify that I am the Planning
Commission Secretary of the Planning Commission of the City of Tustin, California;
that Resolution No. 4055 was duly passed and adopted at a regular meeting of the
Tustin Planning Commission, held on the 13th day of March, 2007.
ELIZABETH A. BINSACK
Planning Commission Secretary
GENERAL
(1)
(1)
(1)
(1)
EXHIBIT A
RESOLUTION NO. 4055
TENTATIVE TRACT MAP 17080
CONDITIONS OF APPROVAL
1.1 Thero osed project shall substantially conform with the submitted
p p
improvement plans on file, and the Tentative Tract Map 17080, dated March
13, 2007, on file with the Community Development Department, except as
herein modified, or as modified by the Director of Community Development in
accordance with this Exhibit. The Director of Community Development may
also approve minor modifications to plans during plan check if such
modifications are to be consistent with the provisions of the Tustin City Code
and other applicable codes.
1.2 Approval of Tentative Tract Map 17080 is contingent upon the applicant
returning to the Community Development Department a notarized
"Agreement to Conditions Imposed" form and the property owner signing and
recording with the County Clerk -Recorder a notarized Notice of Discretionary
Permit Approval and Conditions of Approval" form. The forms shall be
established by the Director of Community Development, and evidence of
recordation shall be provided to the Community Development Department.
1.3 As a condition of approval of Tentative Tract Map 17080, the applicant shall
agree, at its sole cost and expense, to defend, indemnify, and hold harmless
the City, its officers, employees, agents, and consultants, from any claim,
action, or proceeding brought by a third -party against the City, its officers,
agents, and employees, which seeks to attack, set aside, challenge, void, or
annul an approval of the City Council, the Planning Commission, or any other
decision-making body, including staff, concerning this project. The City
agrees to promptly notify the applicant of any such claim or action filed
against the City and to fully cooperate in the defense of any such action. The City may, at its sole cost and expense, elect to participate in defense of any
such action under this condition.
1.4 Within twenty-four (24) months from tentative map approval, the subdivider
shall record with appropriate agencies a final map prepared in accordance
with subdivision requirements of the Tustin Municipal Code, the State
Subdivision Map Act, and applicable conditions contained herein unless an
extension is granted pursuant to Section 9323 of the Tustin Municipal Code.
Time extensions may be considered if a written request is received by the
Community Development Department within thirty (30) days prior to
expiration.
SOURCE CODES
(1) STANDARD CONDITION (5)
(2) CEQA MITIGATION (6)
(3) UNIFORM BUILDING CODE/S (7)
(4) DESIGN REVIEW
*** EXCEPTION
RESPONSIBLE AGENCY REQUIREMENT
LANDSCAPING GUIDELINES
PC/CC POLICY
Exhibit A
Resolution No. 4055
TTM 17080, DR 06-011
Page 2
(1) 1.5 The subdivider shall
Subdivision Map Act,
regulations.
conform to all applicable requirements of the State
the City's Subdivision Ordinance, and the City's zoning
(1) 1.6 Prior to final map approval by the City Council, the subdivider shall execute
a hold -harmless agreement and provide a Certificate of Insurance pursuant
to Section 9325 of the Tustin City Code.
(1) 1.7 Prior to final map approval, the subdivider shall submit:
A. A current title report; and,
B. A duplicate mylar of the Final Map, or 8Y2 inch by 11 inch
transparency of each map sheet prior to final map approval and "as
built" grading, landscape, and improvement plans prior to Certificate
of Acceptance.
(*) 1.8 Prior to recordation of the final map, the existing SCE easement shall be
quitclaimed to the subdivider.
PUBLIC WORKS DEPARTMENT
(1) 2.1 Dedication in Fee Title of 10 feet additional street right-of-way along Red
Hill Avenue and Walnut Avenue plus the appropriate corner cut-off shall be
required for future street widening.
(1) 2.2 Dedication in fee along a portion of Red Hill Avenue and Walnut Avenue to
revise ownership of an existing street with 33 foot wide highway easement
as depicted on Tentative Tract Map 17080.
(1) 2.3 A statement shall be placed on the Final Map indicating that at the time
Red Hill Avenue and/or Walnut Avenue is widened, a 10 foot temporary
construction easement shall be granted to the City of Tustin beyond the
public right-of-way to accommodate construction. Any damage to the
existing improvements within the construction easement caused solely by
the City's construction shall be restored to its original condition at the City's
expense. Such temporary construction easement shall be granted at no
cost to the City. The right of entry (temporary construction easement) shall
terminate on the date that the notice of completion is recorded at the
orange County Recorder's office.
(1) 2.4 Prior to issuance of building permit or approval of final map, whichever
occurs first, the applicant shall be required to enter into a Landscape
Maintenance Agreement with the City of Tustin for parkway improvements
with public right-of-way along Red Hill Avenue and Walnut Avenue. The
applicant shall submit the Landscape Maintenance Agreement to the Public
Works Department for review and approval.
Exhibit A
Resolution No. 4055
TTM 17080, DR 06-011
Page 3
(1) 2.5 The subdivider shall satisfy grant in fee, dedication and/or reservation
requirements as applicable, including but not limited to dedication of all
required street and flood control right-of-way easements, vehicular access
rights, sewer easements, and water easements defined and approved as to
specific locations by the City Engineer and other agencies.
(1) 2.6 Subdivider's execution of a subdivision and monumentation agreement and
furnishing the improvement and monumentation bonds as required by the
City Engineer prior to recordation of the final map.
(1) 2.7 Preparation and recordation of a final subdivision map shall be required.
(1) 2.8 Prior to approval of Final Map or issuance of any Building Permit, whichever
occurs first, the applicant shall obtain a new address from the Engineering
Division.
(1) 2.9 In addition to the normal full size plan submittal process, all final development
plans including, but not limited to: tract maps, parcel maps, right-of-way
maps, records of survey, public works improvements, private infrastructure
improvements, final grading plans, and site plans are also required to be
submitted to the Public Works Department/Engineering Division in computer
aided design and drafting (CADD) format. The standard file format is
AutoCAD Release 2004 having the extension DWG. Likewise, layering and
linetype conventions are AutoCAD -based (latest version available upon
request from the Engineering Division). In order to interchangeably utilize the
data contained in the infrastructure mapping system, CADD drawings must
be in AutoCAD "DWG" format (i.e., produced using AutoCAD or AutoCAD
compatible CADD software). The most current version of AutoCAD is
Release 2004. Drawings created in AutoCAD Release 2004 are compatible
and acceptable.
The CADD files shall be submitted to the City at the time the plans are
approved and updated CADD files reflecting the "as built" conditions shall be
submitted once all construction has been completed. The subdivision bonds
will not be released until the "as built" CADD files have been submitted.
COVENANTS, CONDITIONS, AND RESTRICTIONS (CC&Rs)
(1) 3.1 All organizational documents for the project including any covenants,
conditions, and restrictions (CC&Rs) shall be submitted to and approved by
the Community Development Department and the City Attorney's Office.
Costs for such review shall be borne by the subdivider. The approved
CC&Rs shall be recorded with County Recorder's Office at the same time as
recordation of the final map. A copy of the final documents shall be
submitted to the Community Development Department after recordation.
Exhibit A
Resolution No. 4055
TTM 17080, DR 06-011
Page 4
No dwelling unit in the development shall be sold or a Certificate of
Occupancy issued, unless a homeowners association has been legally
formed with the right to assess all these properties which are jointly owned or
benefited to operate and maintain all other mutually available features of the
development including, but not limited to, open space, amenities,
landscaping, slope maintenance/landscaping, private streets, and utilities. No
dwelling unit shall be sold unless all approved and required open space,
amenities, landscaping, or other improvements, or approved phases thereof,
have been completed or completion is assured by a development agreement
or financing guarantee method approved by the City. The CC&Rs shall
include, but not be limited to, the following provisions:
A. The City shall be included as a party to the CC&Rs for enforcement
purposes of those CC&R provisions in which the City has interest as
reflected in the following provisions. However, the City shall not be
obligated to enforce the CC&Rs.
B. The requirement that association bylaws be established.
C. Provisions for effective establishment, operation, management, use,
repair, and maintenance of all common areas and facilities including
recreational buildings and amenities, landscaped areas and lots,
walls and fences, private roadways (i.e., walks, sidewalks, trails),
parkland facilities and bikeways, and open space areas.
D. Membership in the homeowners association shall be inseparable
from ownership in individual units.
E. Architectural controls shall be provided and may include, but not be
limited to, provisions regulating exterior finishes, roof materials,
fences and walls, accessory structures such as patios, sunshades,
trellises, gazebos, awnings, exterior mechanical equipment,
television and radio antenna, consistent with the Tustin City Code.
F. Maintenance standards shall be provided for applicable items listed
in Section C above in CC&Rs. Examples of maintenance standards
are shown below.
1. All common area landscaping and private areas visible from
any public way shall be properly maintained such that they
are evenly cut, evenly edged, free of bare or brown spots,
debris, and weeds. All trees and shrubs shall be trimmed so
they do not impede vehicular or pedestrian traffic. Trees shall
be pruned so they do not intrude into neighboring properties
and shall be maintained so they do not have droppings or
create other nuisances to neighboring properties. All trees
Exhibit A
Resolution No. 4055
TTM 17080, DR 06-011
Page 5
shall also be root pruned to eliminate exposed surface roots
and damage to sidewalks, driveways, and structures.
2. All private roadways, sidewalks, and open space areas shall
be maintained so that they are safe for users. Significant
pavement cracks, pavement distress, excessive slab
settlement, abrupt vertical variations, and debris on travel
ways should be removed or repaired promptly.
3. Common areas shall be maintained in such a manner as to
avoid the reasonable determination of a duly authorized
official of the City that a public nuisance has been created by
the absence of adequate maintenance such as to be
detrimental to public health, safety, or general welfare.
G. Homeowners association approval of exterior improvements
requiring a building permit shall be obtained prior to requesting a
building permit from the City of Tustin Community Development
Department. All plans for exterior improvements shall conform to
requirements set forth by the City and the CC&Rs.
H. Private open space areas within the common area shall be
illustrated on a "Private Open Space Exhibit" and shall be made part
of the CC&Rs and shall specify those portions of the common open
space area that are allocated for private use and public use and
access rights in perpetuity. The CC&Rs shall include a separate 8Y2
inch by 11 inch dimensioned site plan for each unit that is allocated
private open space.
I. The approved site plan showing the dedication areas and provisions
for maintenance of these areas by the Homeowners Association.
J The approved "Site/Parking Plan Exhibit" and "Waste Management
Plan Exhibit" shall be made part of the CC&Rs and shall be enforced
by the homeowners association. In addition to the exhibit, provisions
regarding parking shall be included in the CC&Rs, including the
following:
1. All units are required to maintain a two -car garage.
2. A minimum of 27 unassigned guest parking spaces shall be
permanently maintained in locations shown on the
"Site/Parking Exhibit."
3. Residents shall not store or park any non -motorized vehicles,
trailers or motorized vehicles that exceed 7 feet high, 7 feet
wide, and 19 feet long in any parking space, driveway, or
Exhibit A
Resolution No. 4055
TTM 17080, DR 06-011
Page 6
private street area except for the purpose of loading,
unloading, making deliveries or emergency repairs except that
the homeowners association may adopt rules and regulations
to authorize exceptions.
4. Residents shall park vehicles in garage spaces. Storage of
personal items may occur in the garages only to the extent
that vehicles may still be parked within the required garage
spaces.
5. The homeowners association shall be responsible for
monitoring and enforcing all parking and traffic regulations on
private streets. The proposed CC&Rs shall include provisions
requiring the association to develop and adopt an
enforcement program for parking and traffic regulations within
the development which may include measures for fire access
and enforcement by a private security company.
K. Provisions for enforcing the "Waste Management Plan" to minimize
backing into private streets. Residents are required to store their
trash and recycling carts within the area designated within the
garage. Prior to collection day, the residents need to move the carts
to an area immediately outside their garage, where a Homeowner
Association Employee will be in charge of relocating them to the
designated parking stalls that are marked and designated
accordingly. The carts shall be placed in the common drives no
earlier than noon on the day before scheduled collections and
removed within twelve (12) hours of collection.
L. Maintenance of lettered and numbered Lots A and B containing
dedication areas, common areas, streets, alleys, paseos, etc., shall
be by the homeowners association.
M. Television and radio antennas shall be installed in accordance with
the requirements of the Tustin City Code.
N. All utility services serving the site with the exception of the 66 KV
power lines shall be installed and maintained underground.
O. The homeowners association shall be required to file the names,
addresses, and telephone numbers of at least one member of the
homeowners association Board and, where applicable, a manager of
the project before January 1 st of each year with the City of Tustin
Community Development Department for the purpose of contacting
the association in the case of emergency or in those cases where
the City has an interest in CC&R violations.
Exhibit A
Resolution No. 4055
TTM 17080, DR 06-011
Page 7
P. The homeowners association shall be responsible for establishing
and following procedures for providing access to public utilities for
maintenance of their facilities within the project area, subject to
those agencies' approval.
Q. No amendment to alter, modify, terminate, or change the
homeowners association's obligation to maintain the common areas
and the project perimeter wall or other CC&R provisions in which the
City has an interest, as noted above, or to alter, modify, terminate, or
change the City's right to enforce maintenance of the common areas
and maintenance of the project perimeter wall, shall be permitted
without the prior written approval of the City of Tustin Community
Development Department.
R. No delivery and or moving trucks larger than 40 feet shall be
permitted on the private drives of the condominium projects with less
than 25 foot radius turns.
S. Balconies along Walnut Avenue shall be provided with a solid stucco
barrier. The balconies shall be used for open space. Storage of any
item visible from the public right-of-way with the exception of live
potted plants is prohibited.
T. Access to and from the site to Red Hill Avenue should be available
with completion of the project. The left turn egress from the project
site may be prohibited in the future if determined necessary by the
City's Traffic Engineer.
HOMEBUYER NOTIFICATION
(1) 4.1 Prior to recordation of the final map, the subdivider shall submit to the
Community Development Department for review and approval a
homebuyer notification document that includes the notifications listed
below. The notification document shall be signed by each homebuyer prior
to final inspection and occupancy, and a copy of the signed notification
shall be provided to the Community Development Department prior to final
inspection and/or issuance of each Certificate of Occupancy.
A. A notice for roadway noise from Red Hill Avenue and Walnut
Avenue that may impact the subdivision.
B. A notice, to be reviewed by the City of Tustin and the Tustin Unified
School District, regarding the location of existing and proposed
elementary, middle, and high schools which will serve the
subdivision (text and map).
Exhibit A
Resolution No. 4055
TTM 17080, DR 06-011
Page 8
C. A notice regarding units that are adjacent to aboveground utilities or
structures (such as light standards and fire hydrants) identifying the
type of structure and their locations.
D. A notice indicating that any use of a residence for a business shall
be subject to the City's Home Occupation Ordinance and may
require zoning clearance and a business license.
E. A notice explaining the easements, facilities, amenities, and
dedications that will be provided on lettered lots and indicating all on-
site streets, alleys, paseos, and common areas are to be maintained
by the homeowners association.
F. A notice, to be approved by the City Attorney, indicating that neither
the site, nor the project nor any part thereof any street or sidewalk,
alleyway, or paseo thereon shall be privately gated, provided
however that any swimming pool and/or spa facility within the
common area and any indoor common area improvements, including
any clubhouse and bathrooms, may be gated or locked and made
available solely to residents of the project and their guests.
G. A notice stating trash bins shall be placed in designated areas as
shown on the approved "Waste Management Exhibit" no earlier than
noon on the day before scheduled collections and removed within
twelve (12) hours of collection.
H. A notice indicating that surrounding properties may be developed in
accordance with City ordinances in a manner which may partially or
totally obstruct views from the owner's unit and that the City of Tustin
makes no claim, warranty, or guarantee that views from any unit will
be preserved as development of surrounding properties occurs.
I. A notice explaining and providing a copy of a "Private Open Space
Exhibit" and separate 8Y2 inch by 11 inch dimensioned site plan for
each unit that is allocated private open space within the common
area.
J. A notice explaining and providing a copy of the approved
"Site/Parking Exhibit" and related CC&R provisions.
K. A notice explaining the phasing of construction within the subdivision
and that activity may be disruptive.
L. The developer shall notify all homebuyers that future
Assessment/Maintenance Districts may affect the property.
Exhibit A
Resolution No. 4055
TTM 17080, DR 06-011
Page 9
M. Access to and from the site to Red Hill Avenue should be available
with completion of the project. The left turn egress from the project
site may be prohibited in the future if determined necessary by the
City's Traffic Engineer.
N. A notice statin that on -street parking currently available along Red
g
Hill Avenue and Walnut Avenue would be restricted in the near
future and upon construction of the project.
0. A notice about the location and upgrade of units that are required to
be constructed with sound attenuation per submitted acoustical
report.
FEES
(1) 5.1 Prior to issuance of the first building permit, the subdivider shall submit in -
lieu parkland dedication fees in an amount and form as required by the
Director of the Parks and Recreation Department.
(1) 5.2 The applicant shall submit all fees required by the City and other agencies
as identified in Resolution No. 4054.
(1) 5.3 The applicant shall reimburse the City of Tustin for the actual cost incurred
to the City by the City Attorney for review of the CC&Rs and homebuyer
notification per City Council Resolution 06-85.
ATTACHMENT E
Resolution 07-31
RESOLUTION NO. 07-31
A RESOLUTION OF THE CITY COUNCIL ADOPTING THE FINAL
MITIGATED NEGATIVE DECLARATION FOR TENTATIVE TRACT
MAP 17080 AND DESIGN REVIEW 06-011, A PROPOSAL TO
MERGE TWO PARCELS DEVELOPED WITH 57 APARTMENT
UNITS INTO ONE 4 -ACRE SITE FOR DEVELOPMENT OF A NEW
75 -UNIT CONDOMINIUM PROJECT LOCATED AT 14421 TO 14471
RED HILL AVENUE
The City Council of the City of Tustin does hereby resolve as follows:
I. The City Council finds and determines as follows:
A. The applicant (Sun -Cal Red Hill LLC) has requested to merge two
properties currently developed with 57 apartment units into one 4 -
acre site for development of a new 75 -unit condominium project.
The properties are located at 14421 to 14471 Red Hill Avenue;
B. That the requested tentative tract map and design review are
considered a "project" subject to the terms of the California
Environmental Quality Act ("CEQA") (Pub. Resources Code §21000
et. seq.);
C. That City staff prepared an Initial Study to evaluate the potential
environmental impacts associated with Tentative Tract Map 17080
and Design Review 06-011 that concluded that with mitigation
measures potential significant impacts can be reduced to a level of
insignificance and a draft Mitigated Negative Declaration (MND)
was prepared;
D. That a Notice of Intent to Adopt a Mitigated Negative Declaration was
published and the Negative Declaration and Initial Study were made
available for a 20 -day public review and comment period from
February 16, 2007, to March 7, 2007, in compliance with Sections
15072 and 15105 of the State CEQA Guidelines;
E. A comment letter was received from Orange County Transit
Authority (OCTA). At this time, no public roadway construction
would be required due to the scope of the project and the
recommended bus turnout was noted for future road widening
project for which additional environmental documents would be
prepared;
F. That the City Council is the final authority for the project and will
consider the MND prior to action on Tentative Tract Map 17080; and,
Resolution No. 07-31
Page 2
G. The Planning Commission considered the Initial Study and the
Mitigated Negative Declaration (MND) on March 13, 2007, and
adopted the MND with Resolution No. 4053.
II. The City Council hereby adopts Final Mitigated Negative Declaration for
Tentative Tract Map 17080 and Design Review 06-011, attached hereto
as Exhibit A, and adopts a Mitigation Monitoring and Reporting Program,
attached hereto as Exhibit B.
PASSED AND ADOPTED at a regular meeting of the Tustin City Council held on
the 20th day of March, 2007.
DOUG DAVERT
MAYOR
PAMELA STOKER
CITY CLERK
STATE OF CALIFORNIA )
COUNTY OF ORANGE ) SS
CIN OF TUSTIN )
I, Pamela Stoker, City Clerk and ex -officio Clerk of the City Council of the City of
Tustin, California, do hereby certify that the whole number of the members of the
City Council of the City of Tustin is five; that the above and foregoing Resolution
No. 07-31 was duly passed and adopted at a regular meeting of the Tustin City
Council, held on the 20th day of March, 2007, by the following vote:
COUNCILMEMBER AYES:
COUNCILMEMBER NOES:
COUNCILMEMBER ABSTAINED:
COUNCILMEMBER ABSENT:
PAMELA STOKER
CITY CLERK
Exhibit A of Resolution No. 07-31
Final Mitigated Negative Declaration
INITIAL STUDY
A. BACKGROUND
Project Title:
Lead Agency:
Lead Agency
Contact Person:
Project Location:
Project Sponsor's
Name and Address:
General Plan Designation:
Zoning Designation:
Project Description:
COMMUNITY DEVELOPMENT DEPARTMENT
300 Centennial Way, Tustin, CA 92780
(714) 573-3100
Red Hill Town Homes
City of Tustin
300 Centennial Way
Tustin, California 92780
Minoo Ashabi Phone: (714) 573-3126
14421-14471 Red Hill Avenue
SunCal- Red Hill LLC
c/o Southwind Realty Group
18301 von Karman, Suite 710
Irvine, CA 92612
High Density Residential
Multiple Family Residential (R-3)
A request to demolish two existing apartment complexes containing 57 units on a
4 -acre site and redeveloping the site with 75 three story condominium units
Surrounding Uses:
North: residential and office use East: commercial
South: commercial West: residential
Other public agencies whose approval is required:
Orange County Fire Authority F-1 City of Irvine
F-1 Orange County Health Care Agency F-1 City of Santa Ana
❑ South Coast Air Quality Management F-1 Orange County
District EMA
F-1 Other
B. ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED
The environmental factors checked below would be potentially affected by this project, involving at least one
impact that is a "Potentially Significant Impact" as indicated by the checklist in Section D below.
❑Land Use and Planning
F]Population and Housing
FIGeological Problems
E]Water
DAir Quality
[:]Transportation &Circulation
F]Biological Resources
❑Energy and Mineral Resources
C. DETERMINATION:
On the basis of this initial evaluation:
❑Hazards
❑Noise
F]Public Services
FlUtilities and Service
Systems
F]Aesthetics
❑Cultural Resources
FIRecreation
❑Mandatory Findings of
Significance
F-1 I find that the proposed project COULD NOT have a significant effect on the environment, and a
NEGATIVE DECLARATION will be prepared.
® I find that although the proposed project could have a significant effect on the environment there will
not be a significant effect in this case because the mitigation measures described on an attached sheet
have been added to the project. A NEGATIVE DECLARATION will be prepared.
F-1 I find that the proposed project MAY have a significant effect on the environment, and an
ENVIRONMENTAL IMPACT REPORT is required.
❑ I find that the proposed project MAY have a significant effects on the environment but at least one
effect 1) has been adequately analyzed in an earlier document pursuant to applicable legal standards, and
2) has been addressed by mitigation measures based on the earlier analysis as described on attached
sheets, if the effect is a "Potentially Significant Impact" or "Potentially Significant Unless Mitigated."
An ENVIRONMENTAL IMPACT REPORT is required, but it must analyze only the effects that
remain to be addressed.
F-1 I find that although the proposed project could have a significant effect on the environment, there WILL
NOT be a significant effect in this case because all potentially significant effects 1) have been analyzed
adequately in an earlier EIR pursuant to applicable standards, and 2) have been avoided or mitigated
pursuant to that earlier EIR, including revisions or mitigation measures that are imposed upon the
proposed project.
F-1 I find that although the proposed project could have a significant effect on the environment, there WILL
NOT be a significant effect in this case because all potentially significant effects 1) have been analyzed
adequately in an earlier NEGATIVE DECLARATION pursuant to applicable standards, and 2) have
been avoided or mitigated pursuant to that earlier NEGATIVE DECLARATION, including revisions or
mitigation measures that are imposed upon the proposed project.
Preparer:
Minoo Ashabi
Elizabeth A. Binsack, Community Development Director
Title Associate Planner
Date .�•s=dam
I. AESTHETICS — Would the project:
a) Have a substantial adverse effect on a scenic vista?
b) Substantially damage scenic resources, including, but not
limited to, trees, rock outcroppings, and historic buildings
within a state scenic highway?
c) Substantially degrade the existing visual character or
quality of the site and its surroundings?
d) Create a new source of substantial light or glare, which
would adversely affect day or nighttime views in the area?
II. AGRICULTURE RESOURCES: In determining
whether impacts to agricultural resources are significant
environmental effects, lead agencies may refer to the
California Agricultural Land Evaluation and Site Assessment
Model (.1997) prepared by the California Dept. of
Conservation as an optional model to use in assessing impacts
on agriculture and farmland. Would the project:
a) Convert Prime Farmland, Unique Farmland, or Farmland
of Statewide Importance (Farmland), as shown on the maps
prepared pursuant to the Farmland Mapping and Monitoring
Program of the California Resources Agency, to non-
agricultural use?
b) Conflict with existing zoning for agricultural use, or a
Williamson Act contract?
c) Involve other changes in the existing environment, which,
due to their location or nature, could result in conversion of
Farmland, to non-agricultural use?
III. AIR QUALITY: Where available, the significance
criteria established by the applicable air quality management
or air pollution control district may be relied upon to make the
following determinations. Would the project:
a) Conflict with or obstruct implementation of the applicable
air quality plan?
b) Violate any air quality standard or contribute substantially
to an existing or projected air quality violation?
c) Result in a cumulatively considerable net increase of any
criteria pollutant for which the project region is non -
attainment under an applicable federal or state ambient air
quality standard (including releasing emissions, which exceed
quantitative thresholds for ozone precursors)?
d) Expose sensitive receptors to substantial pollutant
concentrations?
e) Create objectionable odors affecting a substantial number
of people?
F-1
Less Than
a
Significant
o
�
Potentially
With
Less Than
Significant
Mitigation
Significant
Impact
Incorporation
Impact
No Impact
❑
❑
❑
❑
❑
❑
❑
❑
®
❑
F-1
a
❑
o
�
F-1
E]
M
0
F-1
F-1
IV. BIOLOGICAL RESOURCES: - Would the project:
a) Have a substantial adverse effect, either directly or
through habitat modifications, on any species identified as a
candidate, sensitive, or special status species in local or
regional plans, policies, or regulations, or by the California
Department of Fish and Game or U.S. Fish and Wildlife
Service?
b) Have a substantial adverse effect on any riparian habitat
or other sensitive natural community identified in local or
regional plans, policies, regulations or by the California
Department of Fish and Game or U.S. Fish and Wildlife
Service?
c) Have a substantial adverse effect on federally protected
wetlands as defined by Section 404 of the Clean Water Act
(including, but not limited to, marsh, vernal pool, coastal, etc.)
through direct removal, filling, hydrological interruption, or
other means?
d) Interfere substantially with the movement of any native
resident or migratory fish or wildlife species or with
established native resident or migratory wildlife corridors, or
impede the use of native wildlife nursery sites?
e) Conflict with any local policies or ordinances protecting
biological resources, such as a tree preservation policy or
ordinance?
f) Conflict with the provisions of an adopted Habitat
Conservation Plan, Natural Community Conservation Plan, or
other approved local, regional, or state habitat conservation
plan?
V. CULTURAL RESOURCES: - Would the project:
a) Cause a substantial adverse change in the significance of
a historical resource as defined in § 15064.5?
b) Cause a substantial adverse change in the significance of
an archaeological resource pursuant to § 15064.5?
c) Directly or indirectly destroy a unique paleontological
resource or site or unique geologic feature?
d) Disturb any human remains, including those interred
outside of formal cemeteries?
VI. GEOLOGY AND SOILS: - Would the project:
a) Expose people or structures to potential substantial
adverse effects, including the risk of loss, injury, or death
involving:
Less Than
Significant
Potentially With Less Than
Significant Mitigation Significant
Impact Incorporation Impact No Impact
1:1 F-1 R 0
1:1 F-1 1:1 E
F-1 1:1 F-1 0
F-1 F-1 1:1 0
El
0
F-1
E]
F-1 F-1 1:1 0
F-1
E]
i) Rupture of a known earthquake fault, as delineated on the
most recent Alquist-Priolo Earthquake Fault Zoning Map
issued by the State Geologist for the area or based on other
substantial evidence of a known fault? Refer to Division of
Mines and Geology Special Publication 42.
ii) Strong seismic ground shaking?
iii) Seismic -related ground failure, including liquefaction?
iv) Landslides?
b) Result in substantial soil erosion or the loss of topsoil?
c) Be located on a geologic unit or soil that is unstable, or
that would become unstable as a result of the project, and
potentially result in on- or off-site landslide, lateral spreading
subsidence, liquefaction or collapse?
d) Be located on expansive soil, as defined in Table 18-1-B
of the Uniform Building Code (2001), creating substantial
risks to life or property?
e) Have soils incapable of adequately supporting the use of
septic tanks or alternative waste water disposal systems where
sewers are not available for the disposal of waste water?
VII. HAZARDS AND HAZARDOUS MATERIALS:
Would the project:
a) Create a significant hazard to the public or the
environment through the routine transport, use, or disposal of
hazardous materials?
b) Create a significant hazard to the public or the
environment through reasonably foreseeable upset and
accident conditions involving the release of hazardous
materials into the environment?
c) Emit hazardous emissions or handle hazardous or acutely
hazardous materials, substances, or waste within one-quarter
mile of an existing or proposed school?
d) Be located on a site which is included on a list of
hazardous materials sites compiled pursuant to Government
Code Section 65962.5 and, as a result, would it create a
significant hazard to the public or the environment?
e) For a project located within an airport land use plan or,
where such a plan has not been adopted, within two miles of a
public airport or public use airport, would the project result in
a safety hazard for people residing or working in the project
area?
f) For a project within the vicinity of a private airstrip,
would the project result in a safety hazard for people residing
or working in the project area?
Less Than
Significant
Potentially With Less Than
Significant Mitigation Significant
Impact Incorporation Impact No Impact
El
O
❑
0
D
O
�
❑
g) Impair implementation of or physically interfere with an
adopted emergency response plan or emergency evacuation
plan?
h) Expose people or structures to a significant risk of loss,
injury or death involving wildland fires, including where
wildlands are adjacent to urbanized areas or where residences
are intermixed with wildlands?
VIII. HYDROLOGY AND WATER QUALITY: — Would
the project:
a) Violate any water quality standards or waste discharge
requirements?
b) Substantially deplete groundwater supplies or interfere
substantially with groundwater recharge such that there would
be a net deficit in aquifer volume or a lowering of the local
groundwater table level (e.g., the production rate of pre-
existing nearby wells would drop to a level which would not
support existing land uses or planned uses for which permits
have been granted)?
c) Substantially alter the existing drainage pattern of the site
or area, including through the alteration of the course of a
stream or river, in a manner which would result in substantial
erosion or siltation on- or off-site?
d) Substantially alter the existing drainage pattern of the site
or area, including through the alteration of the course of a
stream or river, or substantially increase the rate or amount of
surface runoff in a manner, which would result in flooding on -
or off-site?
e) Create or contribute runoff water which would exceed the
capacity of existing or planned stormwater drainage systems
or provide substantial additional sources of polluted runoff?
f) Otherwise substantially degrade water quality?
g) Place housing within a 100 -year flood hazard area as
mapped on a federal Flood Hazard Boundary or Flood
Insurance Rate Map or other flood hazard delineation map?
h) Place within a 100 -year flood hazard area structures
which would impede or redirect flood flows?
i) Expose people or structures to a significant risk of loss,
injury or death involving flooding as a result of the failure of a
levee or dam?
j) Inundation by seiche, tsunami, or mudflow?
k) Potentially impact stormwater runoff from construction
activities?
1:1 F� 1:1 0
F-1 1:1 El
Less Than
F1
Significant
Potentially
With
Less Than
Significant
Mitigation
Significant
Impact
Incorporation
Impact No Impact
a
a
1:1 0
1:1 F� 1:1 0
F-1 1:1 El
11 0
El
F1
r-1
n
El
El
Z
El
r-1
Z
11 0
1) Potentially impact stormwater runoff from post -
construction activities?
m) Result in a potential for discharge of stormwater
pollutants from areas of material storage, vehicle or equipment
fueling, vehicle or equipment maintenance (including
washing), waste handling, hazardous materials handling or
storage, delivery areas, loading docks or other outdoor work
areas?
n) Result in a potential for discharge of stormwater to affect
the beneficial uses of the receiving waters?
o) Create the potential for significant changes in the flow
velocity or volume of stormwater runoff to cause
environmental harm?
p) Create significant increases in erosion of the project site
or surrounding areas?
IX. LAND USE AND PLANNING — Would the project:
a) Physically divide an established community?
b) Conflict with any applicable land use plan, policy, or
regulation of an agency with jurisdiction over the project
(including, but not limited to the general plan, specific plan,
local coastal program, or zoning ordinance) adopted for the
purpose of avoiding or mitigating an environmental effect?
c) Conflict with any applicable habitat conservation plan or
natural community conservation plan?
X. MINERAL RESOURCES — Would the project:
a) Result in the loss of availability of a known mineral
resource that would be of value to the region and the residents
of the state?
b) Result in the loss of availability of a locally important
mineral resource recovery site delineated on a local general
plan, specific plan or other land use plan?
XI. NOISE —
Would the project result in:
a) Exposure of persons to or generation of noise levels in
excess of standards established in the local general plan or
noise ordinance, or applicable standards of other agencies?
b) Exposure of persons to or generation of excessive
groundborne vibration or groundborne noise levels?
1:1 r-1 11 0
1:1 1:1 E] 0
Less Than
Significant
El
Potentially
With
Less Than
Significant
Mitigation
Significant
Impact
Incorporation
Impact No Impact
❑
❑
® ❑
1:1 r-1 11 0
1:1 1:1 E] 0
El
0
1:1 r-1 11 0
1:1 1:1 E] 0
c) A substantial permanent increase in ambient noise levels
in the project vicinity above levels existing without the
project?
d) A substantial temporary or periodic increase in ambient
noise levels in the project vicinity above levels existing
without the project?
e) For a project located within an airport land use plan or,
where such a plan has not been adopted, within two miles of a
public airport or public use airport, would the project expose
people residing or working in the project area to excessive
noise levels?
f) For a project within the vicinity of a private airstrip,
would the project expose people residing or working in the
project area to excess noise levels?
XII.POPULATION AND HOUSING — Would the project:
a) Induce substantial population growth in an area, either
directly (for example, by proposing new homes and
businesses) or indirectly (for example, through extension of
roads or other infrastructure)?
b) Displace substantial numbers of existing housing,
necessitating the construction of replacement housing
elsewhere?
c) Displace substantial numbers of people, necessitating the
construction of replacement housing elsewhere?
XIII. PUBLIC SERVICES
a) Would the project result in substantial adverse physical
impacts associated with the provision of new or physically
altered governmental facilities, need for new or physically
altered governmental facilities, the construction of which
could cause significant environmental impacts, in order to
maintain acceptable service ratios, response times or other
performance objectives for any of the public services:
Fire protection?
Police protection?
Schools?
Parks?
Other public facilities?
F-1 F-1 El 0
Less Than
z
r-1
Significant
z
F�
Potentially
With
Less Than
El
Significant
Mitigation
Significant
11
Impact
Incorporation
Impact
No Impact
❑
❑
®
❑
F-1 F-1 El 0
El
z
r-1
El
z
F�
0
z
El
z
11
z
11
XIV. RECREATION
a) Would the project increase the use of existing
neighborhood and regional parks or other recreational
facilities such that substantial physical deterioration of the
facility would occur or be accelerated?
b) Does the project include recreational facilities or require
the construction or expansion of recreational facilities which
might have an adverse physical effect on the environment?
XV. TRANSPORTATION/TRAFFIC — Would the project:
a) Cause an increase in traffic which is substantial in relation
to the existing traffic load and capacity of the street system
(i.e. result in a substantial increase in either the number of
vehicle trips, the volume to capacity ratio on roads, or
congestion at intersections)?
b) Exceed, either individually or cumulatively, a level of
service standard established by the county congestion
management agency for designated roads or highways?
c) Result in a change in air traffic patterns, including either
an increase in traffic levels or a change in location that results
in substantial safety risks?
d) Substantially increase hazards due to a design feature (e.g.
sharp curves or dangerous intersections) or incompatible uses
(e.g., farm equipment)?
e) Result in inadequate emergency access?
f) Result in inadequate parking capacity?
g) Conflict with adopted policies, plans, or programs
supporting alternative transportation (e.g., bus turnouts,
bicycle racks)?
XVI. UTILITIES AND SERVICE SYSTEMS --
Would the project:
a) Exceed wastewater treatment requirements of the
applicable Regional Water Quality Control Board?
b) Require or result in the construction of new water or
wastewater treatment facilities or expansion of existing
facilities, the construction of which could cause significant
environmental effects?
c) Require or result in the construction of new storm water
drainage facilities or expansion of existing facilities, the
construction of which could cause significant environmental
effects?
L ess Than
Significant
Potentially With Less Than
Significant Mitigation Significant
Impact Incorporation Impact No Impact
R
R
0
1:1
F1
El
0
1:1
1:1
0
1:1
n
1:1 El F-1 0
F� 1:1 r-] 0
d) Have sufficient water supplies available to serve the
project from existing entitlements and resources, or are new or
expanded entitlements needed?
e) Result in a determination by the wastewater treatment
provider which serves or may serve the project that it has
adequate capacity to serve the project's projected demand in
addition to the provider's existing commitments?
f) Be served by a landfill with sufficient permitted capacity
to accommodate the project's solid waste disposal needs?
g) Comply with federal, state, and local statutes and
regulations related to solid waste?
XVII. MANDATORY FINDINGS OF SIGNIFICANCE
a) Does the project have the potential to degrade the quality
of the environment, substantially reduce the habitat of a fish or
wildlife species, cause a fish or wildlife population to drop
below self-sustaining levels, threaten to eliminate a plant or
animal community, reduce the number or restrict the range of
a rare or endangered plant or animal or eliminate important
examples of the major periods of California history or
prehistory?
b) Does the project have impacts that are individually
limited, but cumulatively considerable? ("Cumulatively
considerable" means that the incremental effects of a project
are considerable when viewed in connection with the effects
of past projects, the effects of other current projects, and the
effects of probable future projects)?
c) Does the project have environmental effects, which will
cause substantial adverse effects on human beings, either
directly or indirectly?
S. Cdd'MlNOO'AW Hill Condos` Rod Hill Townhorncs- uiitial study doc
E] F-1 F� E
Less Than
Sign lficaii t
Potentially
With
Less Thafi
Significant
Mitigation
Significant
Impact
Incorporation
Impact No hnpact
o
a
o
E] F-1 F� E
EVALUATION OF ENVIRONMENTAL IMPACTS
TENTATIVE TRACT MAP 17080
DESIGN REVIEW 06-11
RED HILL TOWN HOMES
BACKGROUND
The property is located within the Multiple Family Residential (R-3) zoning district and High
Density Residential land use designation. The site is surrounded by commercial uses on the south
and east, an office building and residential uses on the north, and a residential neighborhood on
the west. The proposed site includes two parcels that are currently developed with two apartment
complexes including 57 units known as Whispering Woods and Tustin Terrace Apartments. The
Whispering Woods site is 1.87 acres and contains 27 units with two story buildings, and the Tustin
Terrace site is 2.14 acres and includes 30 one story apartments. All existing units at the site are
proposed to be demolished. To redevelop the site with 75 condominium units, a tentative tract map
and a design review application need to be approved for subdivision of the land and the site and
building designs. This analysis evaluates the environmental impacts of the proposed project for 75
units in comparison with the existing 57 unit apartment complex.
The site is designed to include seven 4-plex buildings, seven 5-plex buildings and two 6-plex
buildings designed as town homes with garage access through alleys. One main entrance is provided
to the site from Red Hill Avenue, and the buildings are proposed parallel to Walnut Avenue. A pool
and recreation area are provided across from the main entry. The proposed condominiums are three
stories with the exception of the units along the residential properties on the west that are designed
with two stories and a loft. The units include two bedrooms and a loft or three bedrooms and range
in size from 1,637 square feet to 1,997 square feet.
I. AESTHETICS
Items az & b — No Impact:
The subject property is not located on a scenic vista. The property is a 4 -acre parcel
currently developed with two story and one story apartment buildings and is surrounded
by developed parcels. Significant landscaping is provided along Red Hill Avenue and
Walnut Avenue, most of which will be preserved until future road widening projects.
Additional trees and landscaping would be provided with emphasis at the corner and
project entry. The proposed project would not disturb any trees, rock outcroppings, or
historical buildings, and the site is not located on a State scenic highway.
Item c & d — Less than Significant Impact:
The project would involve construction of new three story residential buildings and
would change the visual character of the area. The existing apartments were developed in
the 1960s and appear as dated architecture; therefore, redevelopment of the site would
enhance the visual characteristics of the area with new and contemporary structures and
new landscaping. Since the site is adjacent to a residential neighborhood on the west,
separated with a narrow buffer, the applicant has placed the buildings ten feet from the
property line which is a five foot increase from the minimum side yard setback. Although
the project proposes three story structures to replace existing one story and two story
Red Hill Town Homes
TTM 17080
DR 06-011
Page 2
structures, the proposed buildings have been designed to be sensitive to the existing
neighboring residences. Specifically, units along the residential property line have been
designed at two stories with a loft that are five feet lower in height than other proposed
units on the site. To provide a green screen, significant landscaping in the form of up-
right trees is proposed on the west and north along the residential and commercial
properties. In addition, no balconies will be located on the west and the window openings
are smaller in size and carefully placed to minimize intrusion of privacy on the adjacent
existing residential properties. A shade and shadow study was provided comparing shade
and shadow effects on the adjacent properties with existing conditions and proposed
development during December at 9:00 a.m. and 12:00 a.m. when the longest shadows are
experienced (Exhibit 3). The study reflects the proposed height increase and new
landscaping along the westerly property line. Since the scope of the project meets the
City's multiple family zoning standards and additional measures to mitigate height and
aesthetic impacts associated with the new development has been incorporated, the project
is not expected to result in significant aesthetic impacts. With the proposed setback,
staggered building height, and design considerations, visual and shade impacts to the
adjacent properties will be reduced to a level of insignificance.
The project is designed to adhere to all of the City's development standards with respect
to setbacks, height, parking standards and landscaping guidelines and the City's Private
Street Improvement Standards.
The proposed condominium complex would generate new light sources with the
installation of new exterior lighting for streets, alleys, landscape areas, patios, and
parking areas. However, the new sources of light would not adversely affect day- or
night-time views in the area since the number of lights would be compatible with a
typical residential project and would be required to comply with the City's security code
standards. In addition, all lights would be required to be arranged so that no direct rays
would shine onto adjacent properties.
Mitigation Measures/Monitoring Required: Compliance with existing rules and regulations
is not mitigation under CEQA. Consequently, no mitigation is required.
Sources: Submitted Plans
Tustin City Code Section 8103(w)15
Private Street Standards
Tustin Security Ordinance
Submitted Plans
Field Inspection
II. AGRICULTURAL RESOURCES
Items a, b & c -- No Impact:
The project site is currently improved with residential buildings and surrounded by other
developed residential, commercial, and office buildings. The proposed project will have
no impacts on any farmland, nor will it conflict with existing zoning for agricultural use, or
Red Hill Town Homes
TTM 17080
DR 06-011
Page 3
a Williamson Act contract. The proposed project will not result in the conversion of
farmland to a non-agricultural use.
Mitigation Measures/Monitoring Required: None Required
Sources: Tustin General Plan
Field Inspection
Submitted Plans
III. AIR QUALITY
Items a, b, c, d & e — Less Than Significant Impact:
The project will temporarily increase the amount of short-term emissions to the area due
to the proposed demolition, grading, and construction activities at the property. Since the
site is relatively flat, only minor grading will .be required. Redevelopment of the site
would result in 18 additional residential units that is well below the thresholds of
significance established by Tables 6-2 (operation thresholds) and 6-3 (construction
thresholds) of the Air Quality Management District's CEQA Air Quality Handbook,
which notes that construction of fewer than 297 condominium units is not considered a
significant impact. In addition, cumulative construction within the area does not exceed
the established thresholds. Less than significant short-term emissions associated with
demolition, grading, construction, and operation of the proposed project will comply with
the regulations of the South Coast Air Quality Management District and the City of
Tustin Grading Manual, which include requirements for dust control. As such, the
proposed project will not create a significant impact related to air quality.
Mitigation Measures/Monitoring Required: Compliance with existing rules and
regulations is not mitigation under CEQA. Consequently, no mitigation is required
Sources: South Coast Air Quality Management District Rules &Regulations
Air Quality Management District's CEQA Air Quality Handbook
City of Tustin Grading Manual
Project Application
Field Inspection
IV. BIOLOGICAL RESOURCES
Items a, b, c, d, e & f - No Impact.
The project site is currently improved with residential buildings and surrounded by other
developed residential, commercial, and office buildings. The site is not inhabited by any
sensitive species of animals and would have no impacts on animal populations, diversity
of species, or migratory patterns. No wetlands exist within the project site. No impacts to
any unique, rare, or endangered species of plant or animal life identified in local or regional
plans, policies, or regulations by the California Department of Fish and Game or U.S. Fish
and Wildlife Service would occur as a result of this project.
Red Hill Town Homes
TTM 17080
DR 06-011
Page 4
Mitigation Measures/Monitoring Required: None Required
Sources: Field Inspection
Submitted Plans
Tustin General Plan
V. CULTURAL RESOURCES
Items a — No Impact:
The project site is currently improved with residential buildings built in the 1960s and
surrounded by other developed residential, commercial, and office buildings. The
property is not located in an area where any cultural or historic resources have been
identified on the site.
Mitigation Measures/Monitoring Required: None
Items b, c & d - Less Than Significant with Mitigation Incorporation
The proposed project is redevelopment of an existing residential site and not located in an
area with undisturbed land. However, as a standard grading condition of approval, if
buried resources are found during grading within the project area, a qualified archaeologist
would need to assess the resource and recommend appropriate mitigation. The Native
American viewpoint would be considered during this process. With the mitigation
measures listed below, potential impacts to archeological resources would be reduced to
less than significant.
Mitigation Measures/Monitoring Required:
• If buried resources are found during grading within the project area, a qualified
archaeologist would need to assess the site significance and perform the appropriate
mitigation. The Native American viewpoint shall be considered during this process.
This could include testing or data recovery. Native American consultation shall also
be initiated during this process.
Sources: Submitted Plans
Tustin General Plan
VI. GEOLOGY & SOILS
Items a -ii, a -iii, & b — Less Than Significant Impact:
The proposed buildings will be located within an area of the City that is known to contain
expansive soils which may subject people or structures to strong seismic ground shaking
and seismic -related ground failure including liquefaction. However, a soils report is
required to be submitted prior to issuance of building permits per the 2001 California
Red Hill Town Homes
TTM 17080
DR 06-011
Page 5
Building Code to demonstrate compliance with Chapter 18, which requires proper
excavation and fills for buildings, structures, foundations, and retaining structures, and
appropriate construction techniques to ensure seismic stability in sites depending on their
soils or geological concerns. No significant impact is anticipated since the project must
comply with the 2001 Uniform Building Code related to Chapter 18.
Mitigation Measures/Monitoring Required: Compliance with existing rules and
regulations is not mitigation under CEQA. Consequently, no mitigation is required
Sources: Tustin General Plan
Tustin Grading Manual
2001 California Building Code Chapter 16 and 18
Project Application
Field Evaluation
Items a -i, a -iv, c, d, & e — No Impact:
The project site is not located within an area identified as a fault zone on the Alquist-
Priolo Earthquake Fault Zoning Map. However, a soils report is required to be submitted
prior to issuance of building permits per the 2001 California Building Code to
demonstrate compliance with Chapter 18, which requires proper excavation and fills for
buildings, structures, foundations, and retaining structures, and appropriate construction
techniques to ensure seismic stability in sites depending on their soils or geological
concerns. The project will be required to be engineered to withstand unstable soils,
possible landslide, lateral spreading, subsidence, or collapse as they relate to the this
specific site. Since all new buildings in the City are required to operate on the existing
sewer system, the use of septic tanks or alternative wastewater disposal systems will not
be necessary.
Mitigation Measures/Monitoring Required: Compliance with existing rules and
regulations is not mitigation under CEQA. Consequently, no mitigation is required
Sources: Tustin General Plan
Tustin City Code
2001 California Building Code Chapter 16 and 18
California Seismic Hazard Zone Map, Tustin Quadrangle, January 17, 2001
Project Application
Field Evaluation
VII. HAZARDS & HAZARDOUS MATERIALS
Items a, b, c, d, e, f, % and h — No Impact:
The proposed project involves construction of 75 condominium units. No storage or
transport of hazardous materials are anticipated from the proposed residential
development. The project would not result in exposure to hazardous substances other
than the possibility of household hazardous waste which residents could properly dispose
Red Hill Town Homes
TTM 17080
DR 06-011
Page 6
of at approved County drop-off locations. A residential project is not anticipated to store
or emit hazardous materials which could create a hazard to the adjacent properties,
school, or the general public if released into the environment. The scope and location of
the project has no potential to interfere with an adopted emergency response plan or
emergency evacuation plan. The site is in an urbanized area and has no potential to
expose people or structures to a significant risk due to wild land fires. All grading and
construction is subject to compliance with all applicable Uniform Building and Fire
Codes. As such, the project is not anticipated to result in any significant hazards.
Mitigation Measures/Monitoring Required: None Required
Sources: Submitted Plans
Tustin General Plan
Approved Fire Master Plan
Mitigation Measures/Monitoring Required: None Required
VIII. HYDROLOGY & WATER QUALITY
Items a, b, f, , h, i, j, and p — No Impact:
The project site is relatively flat, and the proposed project will continue to maintain a
relatively flat site with improved site drainage and additional landscaping. A significant
amount of stormwater received on-site will percolate into the soil where landscaping is
provided and remaining stormwater will be conveyed through a fossil filter prior to
entering a City stormdrain. City stromwater infrastructure is currently available to
accommodate storm water from the project. The applicant must provide a drainage and
hydrology report to the City and demonstrate that the private storm water drainage
system will be able to handle the capacity of any storm water directed into the system.
Best Management Practices are required to be implemented for construction activity to
deter water from flowing off-site. Best Management Practices will also be implemented
to ensure that, once the project is constructed, storm water leaving the site will be filtered
prior to entering the storm drain. As such, the project will not violate any water quality
standards or waste discharge requirements or degrade water quality in the area.
The project by nature would not substantially deplete groundwater supplies or interfere
with groundwater recharge such that there would be a net deficit in aquifer volume or a
lowering of the local groundwater table level. The project is located within Zone X
(areas of 0.2 percent annual chance flood), as mapped on a Flood Insurance Rate Map.
Accordingly, the project will be designed and graded with an appropriate drainage system
to avoid any potential flood hazards. The project site will not expose people or structures
to a significant risk of loss, injury, or death as a result of the failure of a levee or dam, or
by inundation by seiche, tsunami, or mudflow. Nor would the project increase significant
erosion at the project site or surrounding areas.
Mitigation Measures/Monitoring Required: Compliance with existing rules and
regulations isnot mitigation under CEQA. Consequently, no mitigation is required.
Red Hill Town Homes
"TTM 17080
DR 06-011
Page 7
Sources: Field Verification
Submitted Plans
Tustin City Code 4900 et al
Federal Flood Insurance Rate Map 0605900281 H, February 18, 2004
Items c, d, e, k,1, m, n & o — Less Than Significant Impact:
The project site is relatively flat, and the proposed project will continue to maintain a
relatively flat site with improved site drainage, including drive aisles, curbs and gutters,
and additional landscaping. With new construction, there is the potential to impact
stormwater runoff from construction and post -construction activities with stormwater
pollutants from landscaped areas and trash enclosures. There is also the potential for the
discharge of stormwater that could affect the beneficial uses of the receiving waters and
changes in the flow velocity or volume. of storm water runoff. However, the project is
required to comply with the City's Water Quality Ordinance and most recently adopted
NPDES permit (Santa Ana Regional Water Quality Control Board (RWQCB) Order R8-
2002-0010), thus reducing any potential impacts to a level of insignificance. Together,
these regulations minimize water pollution by regulating point sources that discharge
pollutants into local waters. As such, the project will not violate any water quality
standards or waste discharge requirements or degrade water quality in the area.
Mitigation Measures: Compliance with existing rules and regulations is not mitigation
under CEQA. Consequently, no mitigation is required
Compliance with existing rules and regulations is not mitigation under CEQA.
Consequently, no mitigation is required
Sources: Field Verification
Submitted Plans
Tustin City Code Section 4900 et al
Ix. LAND USE PLANNING
Items a, b & c — No Impact:
The property is designated by the General Plan Land Use Map as High Density
Residential and located within the Multiple Family Residential (R-3) zoning district. The
proposed residential density of 19 du/acres is consistent with the applicable land use and
zoning regulations.
If approved, the proposed project would increase the percentage of ownership housing
consistent with Goal 3 of the City's Housing Element, the project is accessible through
the City's current street system, and the project could be supported with existing
transportation and public facilities. The proposed project would not divide an established
community since it includes construction on an existing site that is already improved with
multiple -family residences. The proposed project is not located in a habitat conservation
Red Hill Town Homes
TTM 17080
DR 06-011
Page 8
plan or natural community conservation plan. The proposed project would not conflict
with any applicable conservation plan.
Mitigation Measures: None Required.
Sources: Submitted Plans
Tustin General Plan
Tustin Zoning Code
Tustin Zoning Map
X. MINERAL RESOURCES
Items a & b — No Impact:
The proposed project is not located on a mineral resource recovery site. The construction
of a condominium project on a lot which is improved with existing apartment buildings
will not result in the loss of availability of a known mineral resource.
Mitigation Measures/Monitoring Required: None Required
Sources: Submitted Plans
Tustin General Plan
XI. NOISE
Item a — Less Than Significant with Mitigation Incorporation
The project site is located at the northwest corner of 'walnut Avenue and Red Hill
Avenue, and therefore is exposed to significant traffic related noise. The City's General
Plan recognizes that residents adjacent to major and secondary arterials are typically
exposed to a CNEL over 65 dB. Table N-2 of the Tustin Noise Element identifies
potential conflicts between the land uses and the noise environment. Per Table N-2, most
of the project site falls within Zone A through Zone B with the exception of units along
Red Hill Avenue and Walnut Avenue which fall under Zone C. Zone A requires no
mitigation measures for noise while Zone B requires minor soundproofing as needed.
The City's noise ordinance requires a maximum 45 dB value for interior noise and 65 dB
for exterior noise. An acoustical study was submitted by the project proponent with
recommendations for exterior noise barriers for balconies along Walnut Avenue and Red
Hill Avenue and upgraded windows and doors to be incorporated in the building design
(Exhibit 1). The noise study indicates an existing 70.2 dB reading along the southeasterly
building line and 68.7 dB along the southwesterly building line, which concludes that the
buildings along Red Hill Avenue and Walnut Avenue must provide an A -weighted noise
reduction value of at least 26.1 dB to achieve a maximum interior 45 dB value.
Red Hill Town Homes
TTM 17080
DR 06-011
Page 9
The noise reduction technique recommended by the acoustical analysis would be
implemented and required as a condition of approval. With the mitigation measures
listed below, potential noise impact would be reduced to less than significant.
Mitigation Measures/Monitoring Required:
• Roof ceiling construction shall be roofing on %2 inch plywood. Batt insulation
shall be provided in joist spaces and the interior ceiling shall be finished with one
layer of 5/8 inch gypsum board.
• All exterior walls shall be 2 x 4 studs at 16 inches on center with batt insulation
between studs. Exterior walls shall be plaster with 5/8 inch gypsum board on the
interior.
• All southeast and southwest facing windows and glass doors shall be glazed with
STC 32 glazing with either '/4 inch laminated glass or dual pane assembly with %2
inch air space. In either case, a test report must be provided at the time of
installation to ensure compliance with the minimum requirements. The report
shall be prepared in an independent, accredited testing laboratory in accordance
with ASTM E-90.
• All entry doors shall be 1-3/4 inch solid core door with weather stripping seals on
the sides and top. No glazing shall be permitted for the entry doors.
• Since meeting the minimum levels of interior noise standard would require closed
windows and doors, the structures shall be equipped with ventilation or an air-
conditioning system to provide a habitable interior environment.
• Balconies six feet in depth along Walnut Avenue and first units along Red Hill
Avenue shall be designed with 42 inch high solid railings designed compatible
with the proposed architecture.
Sources: Submitted Plans
Tustin City Code 4611 et al
Tustin General Plan
Acoustical Study (Exhibit 1)
Items b, c & d— Less Than Significant Impact:
Although the grading and construction of the site may result in typical temporary
construction noise impacts, the Tustin Noise Ordinance only allows construction
activities to occur during the daytime on Monday through Saturday. The proposed
project will not create excessive ground vibrations, nor will it create a permanent increase
in the existing ambient noise levels beyond the City's established standards.
Mitigation Measures/Monitoring Required: Compliance with existing rules and
regulations is not mitigation under CEQA. Consequently, no mitigation is required.
Sources: Submitted Plans
Tustin City Code Section 4611 et al
Tustin General Plan
Red Hill Town Homes
TTM 17080
DR 06-011
Page 10
Item e & f — No Impact:
The site is not located within an airport land use plan or within two (2) miles of a public
or private airport airstrip. The proposed project is three stories in height consistent with
the City's maximum height limit and similar to other structures in the vicinity.
Mitigation Measures/Monitoring Required: None Required
Sources: Submitted Plans
Tustin General Plan
Irvine Industrial Planned Community District Regulations
XII. POPULATION & HOUSING
Items a, b, and c — No Impact:
The project involves the proposed construction of a condominium project on a site that is
currently improved with apartment complexes including 57 units known as Whispering
Woods and Tustin Terrace Apartments. The proposed project would remove and replace the
existing 57 units and 18 additional units (total 75 units) that would not result in significant
population growth in the area.
The existing apartment units are rented at market rate (not considered as affordable units)
and the existing residents are on a month-to-month lease. While there will be
displacement of existing residents as a result of the proposed project, the displacement
would not be substantial nor necessitate the construction of replacement housing
elsewhere since the impact could be absorbed by the local rental market. The project is
privately financed and no public funds are involved that would trigger relocation pursuant
to state law. However, the applicant has submitted a Tenant Leasing and Relocation Plan
that indicates that a minimum 120 -day notice will be provided prior to vacation of the
property, tenants would be on a month-to-month lease basis and the last month's rent
would be waived, which should provide the tenants with adequate time and monetary
incentives to relocate.
Mitigation Measures/Monitoring Required: None Required
Sources: Submitted Plans
Tustin General Plan
XIII. PUBLIC SERVICES
Item a — Less Than Significant Impact.
The proposed project is in an existing urbanized area where fire and police protection are
currently provided. while police patrols to the area may be needed from time to time to
ensure safety, no new additional police protection would be required as a result of the
proposed project. The Police Department has recommended mitigation measures to
Red Hill Town Homes
TTM 17080
DR 06-011
Page 11
reinforce safety and effectively patrol the area, which will be included as conditions of
approval. The project would utilize existing infrastructure and is not anticipated to
increase the need for new streets, public services, or infrastructure.
The proposed project is located within Tustin Unified School District (TUSD). The
proposed 18 additional units are not anticipated to have a significant rise in the number of
students served by local schools. The TUSD will receive its statutory school impact fees
per Senate Bill 50 from the residential development. As a condition of approval for the
project, the developer will be required to pay applicable school fees prior to issuance of
the building permit.
Mitigation Measures/Monitoring Required:
• The pool access gates need to be equipped with a knox box for emergency access.
• Landscaping should be designed with surveillance opportunities for residents and
police personnel in patrol vehicles.
• Security devices such as double locking deadbolts, strike plates, with 1-1/2 inch
screws and pin locks on windows and sliders shall be installed minimizing the
potential for criminals to access the units.
Sources: Submitted Plans
Tustin City Code
XIV. RECREATION
Items a & b — No Impact:
The project would include a private community pool recreation area to benefit the
residents of the project. However, since the size of the recreation area does not comply
with the minimum criteria for parkland dedication, the project would be conditioned to
pay in lieu fees for parkland dedication in accordance with Section 9331 of the Tustin
City Code. The developer has indicated that they will pay in lieu fees to comply with
Section 9331 of the Tustin City Code.
While the residents of the project may use existing City parks, the increased use of these
parks would not be such that substantial deterioration of the facility would occur or be
accelerated, nor does the project propose recreational facilities that would have an
adverse physical effect on the environment.
Mitigation Measures/Monitoring Required:
• Prior to issuance of a building permit, the applicant shall pay park land in lieu fees
based on Tustin City Code Section 933 Ld.3
Sources: Submitted Plans
Tustin. City Code
Red Hill Town Homes
TTM 17080
DR 06-011
Page 12
XV. TR.ANSPORTATION/TRAFFIC
Items a — Less Than Significant Impact with Mitigation Incorporation:
A traffic study was submitted and reviewed by the City's Engineering Division (Exhibit
2). The study concluded that the proposed project is expected to generate approximately
718 daily trips, which in comparison with the existing development, would be an increase
of 342 daily trips. This is a relatively significant increase in comparison with the
previously existing land use.
The more detailed (than daily trip comparisons) peak hour intersection analyses,
however, for future conditions with the Project show that no significant traffic impacts
would occur as a result of the Project. In addition, build -out (post -year 2020) evaluations
were included in the study. For these long range projections, the intersection of Red Hill/
Walnut is shown to have over capacity operations (if the current intersection geometry is
maintained), but the Project does not cause any significant traffic impacts, as defined by
City of Tustin policies. In addition, there are improvement projects anticipated to be
implemented at this intersection, to maintain acceptable operations for long range future
conditions.
Access to/from the -site is provided at Red Hill Avenue which will be open to both
northbound and -south bound traffic. The traffic analysis also considered on-site
circulation and determined that the 25 foot wide access on Red Hill Avenue is adequate
to allow for one outbound lane and one inbound lane. For conditions at the completion of
the Project, the access is shown to maintain acceptable operations. Under the build -out
(post -year 2020) scenario, the left turn egress from the Project site would result in
significant Project impacts. A project condition of approval may require prohibiting this
movement under "longer range" conditions, as necessary, to maintain acceptable
operations at the Project driveway.
Mitigation Measures/Monitoring Required: Access to and from the site to Red
Hill Avenue should be available with completion of the project. The left turn egress from
the project site may be prohibited in the future if determined necessary y y b the City's
Traffic Engineer.
Sources: Submitted Plans
Tustin City Code
Traffic Impact Analysis (Exhibit 2)
Items b, c, d, e,, --f, and g -- No Impact:
The project will not exceed, either individually or cumulatively, a level of service
standard established by the county congestion management agency for designated roads
or highways. The proposed project will not induce substantial population or growth,
result in changes to air traffic patterns, or conflict with adopted policies, plans, or programs
supporting alternative transportation such as bus turnouts or bicycle racks. The project
Red Hill Town Homes
TTM 17080
DR 06-011
Page 13
includes sufficient parking on-site to comply with current parking requirements for the
proposed use. As such, no impacts to parking are anticipated.
Mitigation Measures/Monitoring Required: None Required
Sources: Submitted Plans
Tustin City Code
XVI. UTILITIES & SERVICE SYSTEMS
Items a, b, c, d, e, f &,g — No Impact:
The proposed project will not exceed the requirements of the applicable Regional Water
Quality Control Board or require or result in the construction of new water or wastewater
treatment facilities. The proposed project will utilize the existing sewer and storm drain
systems and thus will not require construction of a new storm water drainage facility or solid
waste facility. The project proponent would be required to submit a hydrology report to
ensure proper grading, drainage, and connection of planned sewer systems. The project will
be served by the City's existing trash hauler contract, thus will not require a new trash
hauler. Adequate water supply from existing resources will be available to serve the
proposed project.
Mitigation Measures/Monitoring Required: Compliance with existing rules and regulations
is not mitigation under CEQA. Consequently, no mitigation is required.
Sources: Submitted Plans
Tustin City Code
Tustin General Plan
XVII. MANDATORY FINDINGS OF SIGNIFICANCE
Items a, b & c — No Impact.
The site is located in the multiple family residential (R-3) zoning district and currently
improved with 57 apartment units. The project includes redevelopment of the site with 75
condominium units. The proposed project design, construction, and operation will
comply with applicable City codes and regulations. The project, by nature of its location
and as designed, does not have the potential to: degrade the quality of the environment;
reduce the habitat of fish or wildlife species; cause a fish or wildlife population to drop
below self-sustaining levels; threaten to eliminate a plant or animal community; reduce
the number or restrict the range of a rare or endangered plant or animal; or, eliminate
important examples of the major periods of California history or prehistory. The project
does not have the potential to achieve short-term environmental goals to the disadvantage
of the long-term. It does not have impacts that are individually limited but cumulatively
considerable or that would cause substantial adverse impacts on human beings.
Red Hill Town Homes
TTM 17080
DR 06-011
Page 14
Sources: Submitted Plans
Tustin General Plan
S:`Cdd'\.MINOU\Red Hill Condos\ND analysis-doc
Exhibi
Acoustical Analysis
Davy
Associates, Inc.
Consultants in Acoustics
2627 Manhattan Beach Blvd., Suite 212 • Redondo Beach, CA 90278-1604 • Tel: 310-643-5161 • Fax: 310-643-5364 • Email:DavyAssocgaol.com
JN2006-44B
ACOUSTICAL ANALYSIS
Redhill Avenue & Walnut Avenue
Tustin, California
FOR
Southwind Realty Group, LLC
Irvine, California
October, 2006
1.0 Introduction
At the direction of Southwind Realty Group, LLC, Davy & Associates, Inc. has
completed an acoustical analysis of the Redhill Avenue & Walnut Avenue project in
Tustin, California.
The California Administrative Code (Title 24) as enforced by the City of Tustin specifies
maximum allowable interior noise levels of CNEL 45 for all habitable spaces
in residential buildings where exterior noise from transportation sources exceeds
CNEL 60.
Section 2.0 of this report contains the results of measurements and calculations of the
future exterior noise environment at the site to determine compliance with these
requirements.
Section 3.0 of this report contains recommendations for complying with the
City of Tustin interior noise level requirements.
Section 4.0 of this report contains the requirements of the State Building Code
concerning ventilation.
2.0 Exterior and Future Acoustical Environment
Environmental noise levels were monitored at the site in Tustin, California on
April 6, 2006 between the hours of 3:00 p.m. and 5:00 p.m. The location of the site is
shown in Figure 1. Noise measurements were made at the southeast and southwest
building line.
Noise levels at the site are dominated by traffic on Red Hill Avenue to the southeast
and by traffic on Walnut Avenue to the southwest. No other significant sources of noise
g
were noted during the site visit.
Environmental noise levels were measured with a precision integrating LD 820 sound
level meter that had been calibrated with a B&K 4230 Acoustical Calibrator immediately
prior to use. The sound level meter measures and displays the equivalent noise level
(LEQ), as well as the maximum and the minimum noise levels during the measurement
period. A copy of the analysis of the acoustical data is attached to this report.
Figure 1. Site Location
2
The data thus collected were analyzed to determine the CNEL level at the
measurement location. The CNEL value was determined by measuring the equivalent
noise level (LEQ) directly, and then calculating the equivalent noise level for each of the
other 23 hours in the day.' This CNEL approach has been utilized extensively. The
accuracy of this procedure has been established with automatic 24-hour measurements
at the same location. The procedure has always been within acceptable accuracy
limits. The results of the monitoring and calculations are summarized below in Table 1.
Table 1
Measured Ambient Noise Levels in dB
Location Peak Hour LE Q CNEL
SE Building Line 69.2 dB 70.2 dB
SW Building Line 67.7 68.7
Section 3501.(c) of the State Building Code states the following:
Worst-case noise levels either existing or future, shall be used as the basis for
determining compliance with this Section. Future noise levels shall be predicted
for period of at least 10 years from the time of building permit application.
CALTRANS, Division of Traffic Operations publishes an annual traffic volume book that
contains previous traffic trends. The 2000 traffic volumes on the California State
Highway System Book (the latest edition available) lists an average annual increase
of 2.2% per year in annual traffic volumes for the years 1994 through 1999. Assuming
that this annual growth of 2.2% would hold for this site, it was projected that traffic
i 1
volumes would increase by a factor 1.24 by the year 2016. This traffic volume increase
over the next 10 years would result in a 0.9 dB traffic noise increase. Therefore, the
projected future year noise level is summarized in Table 2.
Table 2
Exterior 2016 CNEL Value at the Site in dB
Location CNEL
SE Building Line 71.1 dB
SW Building Line 69.6
See, for example, "Insulation of Buildings Against Highway Noise," Bruce Davy and Steven Skale,
Federal Highway Administration FHWA-TS-77-202.
3
With an exterior noise level of CNEL 71.1, the building must provide an A -weighted
noise reduction value of at least 26.1 dB to achieve an interior CNEL 45 value.
Standard construction consisting of 2x4 studs with R-11 insulation, exterior stucco,
interior gypboard, and standard glazing provides a minimum A -weighted noise reduction
of 20 dB.
If all southeast and southwest facing perimeter windows and glass doors are glazed
with STC 32 glazing, the noise reduction of the buildings will be a minimum of 30 dB.
This means that with the use of standard construction and STC 32 glazing in all
southeast and southwest facing perimeter windows andg lass doors, interior noise
levels should not exceed CNEL 45. Therefore, the Building will comply with the
California Noise Insulation Standards as enforced by the City of Tustin.
STC 32 glazing can be provided with either 1/4" laminated glass or a dual pane
assembly with a 1/2" airspace. In either case, the glazing supplier should submit a test
report documenting the STC 32 rating. The test report should be prepared in an
independent, accredited testing laboratory in accordance with ASTM E-90.
3.0 Construction Recommendations
3.1 Roof ceiling construction will be roofing on 1/2" plywood. Batt insulation will be
installed in joist spaces. The ceilings will be one layer of 5/8" gypboard nailed
direct.
3.2 All exterior walls will be 2x4 studs 16" o.c. with Batt insulation in the studs aces.
Exteriors will be exterior plaster or stucco. The interiors will be 5/8" gypboard.
3.3 All southeast and southwest facing perimeter windows and glass doors will be
glazed with STC 32 glazing. STC 32 glazing can be provided with either 1/4"
laminated glass or a dual pane assembly with a 1/2" airspace. In either case, the
glazing supplier should submit a test report documenting the STC 32 rating. The
test report should be prepared in an independent, accredited testing laboratory in
accordance with ASTM E-90.
3.4 All other windows and glass doors may be standard glazing.
3.5 All entry doors should be 1-3/4" solid core doors with weather stripping seals on
PP 9
the sides and top. Glazing in entry doors should not be accepted.
4
4.0 Ventilation Requirements
The California Noise Insulation Standards (Title 24) states the following paragraph
concerning ventilation:
"If interior allowable noise levels are met by requiring that windows be
unopenable or closed, the design for the structure must also specify a ventilation
or air-conditioning system to provide a habitable interior environment. The
ventilation system must not compromise the dwelling unit or guest room noise
reduction."
With windows open, typical noise reduction values will be in the 12 d6 range. This
means that a ventilation system must be provided for all habitable rooms. This can
normally be supplied with an FAU (forced air unit) with a summer switch. Outside air
intake must be in compliance with the Uniform Building Code.
5.0 Exterior Living Area Requirements
There will be balconies on the second floors of the buildings.
The City of Tustin has established criteria for exterior living space. Noise Levels in
exterior living space cannot exceed CNEL 65. To determine compliance with this
requirement, an analysis was completed for the balconies facing SW towards Walnut
Avenue and the balconies facing SE towards Red Hili Avenue.
The balconies in buildings 7 and 8 face Walnut Avenue. It was assumed that the
balconies would have solid railings consisting either of glass, plexiglass, wood or
stucco. A railing height of 42 was assumed for this analysis. This 42" railing will be
required for all 6 balconies in buildings 7 and 8.
The first row of units closest to Red Hill Avenue in units 1-6 and building
�� .. g 16 will also
require 42 high solid balcony railings. The balconies that are furthest away from Red
. y
Hill Avenue in these buildings will not require solid railings.
There are no requirements for solid railings for the balconies in buildings 9-15
5
The results of this analysis for buildings facing Walnut Avenue and buildings facing
Red Hill Avenue are summarized in Table 4.
Table 4
Calculated CNEL Values in dB
For The 2nd Floor Balconies.
Orientation Bldg, CNEL
SW 7&8 62.7 dB
SE 1-6 & 16 60.7 dB
Based on this analysis, the four exterior living spaces will comply with the requirements
of the City of Tustin.
P
Bruce A. Davy, P.
I. N. C. E. Board Certified
Davy & Associates, Inc.
a
SITE MONITORING NOISE ANALYSIS
JN2006-44B
PROJECT:
TUSTIN TOWNHOMES
LOCATION:
SOUTHEAST BUILDING LINE
TEST DATE:
APRIL 6, 2006
START TIME:
3:00 P.M.
END TIME:
4:00 P.M.
EQUIPMENT USED:
LD 820 SLM
1/2" RANDOM INCIDENCE MIC
WINDSCREEN
B&K 4230 CALIBRATOR
TRIPOD
WIND SPEED INDICATOR
MICRONTA THERMOMETER/HYGROMETER
TEMPERATURE:
660f
RELATIVE HUMIDITY:
60%
WIND:
0-2 mph
LEQ: 69.2
L90: 58.8
LMAX 90.1
L50: 64.3
LMIN.- 55.1
L25: 68.3
CNEL: 70.2
L8: 72.6
LDN: 70.2
L2: 76.8
Ll: 79.4
DAVY
& ASSOCIATES, INC.
Consultants in Acoustics
SITE MONITORING NOISE ANALYSIS
JN2006-44B
PROJECT:
LOCATION:
TEST DATE:
START TIME:
END TIME:
EQUIPMENT USED:
TEMPERATURE:
RELATIVE HUMIDITY:
WIND:
LEQ:
67.7
LMAX:
80.4
LMIN:
49.9
CNEL
68.7
LDN:
67.7
TUSTIN TOWNHOMES
SOUTHWEST BUILDING LINE
APRIL 6, 2006
400 P.M.
5:00 P.M.
LD 820 SLM
1/2" RANDOM INCIDENCE MIC
WINDSCREEN
B&K 4230 CALIBRATOR
TRIPOD
WIND SPEED INDICATOR
MICRONTA THERMOMETER/HYGROMETER
650f
60%
0-2 mph
L90:
L50:
L25:
1-8:
L2:
L1•
53.4
60.1
67.6
73.0
76.5
77.8
DA VY
& ASSOCIATES, INC.
Consultants in Acoustics
Exhibit 2
Traffic Analysis
Traffic Study for a
Residential Project
41
in the City of Tustin
December 2006
uEiVCD
G'=C 18 2006
y
Prepared for:
Southwind Realty Group, LLC
Centerpoint
19722 MacArthur Boulevard, Suite 240
Irvine, CA 92612
Prepared by:
hlWPAV Katz, Okitsu & Associates
b,,.,.AA Traffic Engineers and Transportation Planners
17852 E. Seventeenth Street, Suite 102
Tustin, California 92780-2412
714/573-0317 Phone
714/573-9534 Fax
Project No: JA6539
aPAPV r Katz Okitsu & Associates
AFA Planning and Engineering
17852 E. Seventeenth St.
December 15 2006
'
Suite 102
Tustin, CA
92780-2142
James Magstadt
-' 714.573.0317
Southwind Realty Group, LLC
fax: 714.573-9534
Centerpoint
koaoc@katzokitsu.com
19722 MacArthur Boulevard, Suite 240
www.katzokitsu.com
Irvine, CA 92612
Subject: Traffic Study for a Residential Project in the City of Tustin
Dear Mr. Magstadt:
Katz, Okitsu & Associates is pleased to present this revised traffic study report for a
proposed residential project in the City of Tustin. The project, known as "Red Hill
Townhomes", would be located along Red Hill Avenue north of Walnut Avenue and
consists of 75 condominiums on a 3.86 -acre site.
The traffic study addresses access and circulation issues, potential traffic impacts of
the project, and possible mitigation measures. The study has been prepared to meet
the traffic study requirements of the City of Tustin for the analysis of traffic impacts
associated with the proposed development.
The report is being submitted to you for review and forwarding to the City of Tustin.
Y Please contact our office if you have any questions or comments about the report, or if
you need additional information to complete your submittal. If there are any
comments that require response or revisions, please notify our office as soon as
Los Angeles possible for prompt revision.
323.260.4703
f fax: 323.260.4705 It has been a pleasure to prepare this study for Southwind Realty and the City of
Tustin.
z
Son Diego
619.683.2933 Sincerely,
fax: 619.683.7982
San Bernardino
909.890.9693 Rock Miller, P.E.
fax: 909.890.9694 Principal
1. INTRODUCTION......................................................................................................................... i
2. PROJECT STUDY METHODOLOGY..........................................................................................4
STUDYTIMEFRAMES.................................................................................................................................4
PROJECTSTUDY AREA..............................................................................................................................4
ANALYSISMETHODOLOGIES.....................................................................................................................4
INTERSECTION CAPACITY ANALYSIS........................................................................................................5
TRAFFICCOUNT DATA..............................................................................................................................5
FUTURETRAFFIC VOLUMES......................................................................................................................6
STANDARDSOF SIGNIFICANCE..................................................................................................................6
3. EXISTING CONDITIONS.............................................................................................................7
EXISTING CIRCULATION NETWORK..........................................................................................................7
PEAK HOUR INTERSECTION LEVEL OF SERVICE.............................................................................
PEDESTRIANTRAFFIC..............................................................................................................................11
4. FUTURE TRAFFIC CONDITIONS WITHOUT PROJECT.......................................................12
FUTURETRAFFIC GROWTH.....................................................................................................................12
FUTURE INTERSECTION CONFIGURATION...............................................................................................12
PEAK HOUR INTERSECTION LEVEL OF SERVICE — FUTURE NEAR TERM................................................12
5. BUILDOUT TRAFFIC CONDITIONS WITHOUT PROJECT..................................................15
FUTURETRAFFIC GROWTH.....................................................................................................................15
FUTURE INTERSECTION CONFIGURATION............................................................................................... 15
PEAK HOUR INTERSECTION LEVEL OF SERVICE — BUILDOUT.................................................................15
6. PROJECT RELATED TRAFFIC...................................................................................................19
PROJECTTRIP GENERATION....................................................................................................................19
PROJECTOJ CT TRAFFIC....................................................................................................................................19
7. FUTURE TRAFFIC CONDITIONS WITH PROJECT.. ............................................................... 25
PEAK HOUR INTERSECTION LEVEL OF SERVICE.....................................................................................25
8. BUILDOUT TRAFFIC CONDITIONS WITH PROJECT ....................................................0....0.28
PEAK HOUR INTERSECTION LEVEL OF SERVICE.....................................................................................28
9. DETERMINATION OF SIGNIFICANT IMPACT...................................................................... 31
NEAR-TERM FUTURE (2008) ........................................ 0 .............................. o ........................... o ............... 31..........................................................31
BUILDOUT(POST-2020)..........................................................................................................................32
Katz, Okitsu & Associates Cit of Tustin
Traffic Engineers and Transportation Planners y
i Red HilllWalnut Residential Project Traffic Study
8. CIRCULATION AND ACCESS................................................................................................... 33
ACCESSROADS AND DRIVEWAYS...........................................................................................................33
PARKINGDISTRIBUTION..........................................................................................................................35
9. MITIGATION AND RECOMMENDATIONS...........................................................................36
10. CONCLUSIONS...................................................................................................................... 37
Katz, Okitsu & Associates City of Tustin
Traffic Engineers and Transportation Planners
ii Red Hill/Walnut Residential Project Traffic Study
FIGURE1 - PROJECT LOCATION..................................................................................................................... 2
IGURE2 - PROPOSED SITE PLAN................................................................................................................... 3
FIGURE 3 - EXISTING INTERSECTION GEOMETRY.......................................................................................... 8
FIGURE 4 - EXISTING TRAFFIC VOLUMES, AM PEAK HOUR......................................................................... 9
FIGURE 5 - EXISTING TRAFFIC VOLUMES, PM PEAK HOUR.................................................................... 0.0. 10
FIGURE 6 - FUTURE TRAFFIC VOLUMES WITHOUT PROJECT, AM PEAK HOUR..........................0...... 0........ 13
FIGURE 7 - FUTURE TRAFFIC VOLUMES WITHOUT PROJECT, PM PEAK HOUR. . ............... 00 ......... 0 ............. 0 14
FIGURE 8 - BUILDOUT INTERSECTION GEOMETRY...................................................................................... 16
FIGURE 9 - BUILDOUT TRAFFIC VOLUMES WITHOUT PROJECT, AM PEAK HOUR.....................................0 17
FIGURE 10 - BUILDOUT TRAFFIC VOLUMES WITHOUT PROJECT, PM PEAK HOUR. 0 ................. 0..osoo ......... 0. 18
FIGURE 11 -PROJECT TRIP DISTRIBUTION.................................................................................................. 20
FIGURE 12 — PROJECT TRIPS, AM PEAK HOUR............................................................................................ 22
FIGURE 13 - PROJECT TRIPS, PM PEAK HOUR............................................................................................ 23
FIGURE 14 - FUTURE TRAFFIC VOLUMES WITH PROJECT, AM PEAK HOUR ............................................... 26
FIGURE 15 - FUTURE TRAFFIC VOLUMES WITH PROJECT, PM PEAK HOUR ............................................... 27
FIGURE 16 - BUILDOUT TRAFFIC VOLUMES WITH PROJECT, AM PEAK HOUR ........................................... 29
FIGURE 17 - BUILDOUT TRAFFIC VOLUMES WITH PROJECT, PM PEAK HOUR ........................................... 30
TABLE 1 - LEVELS OF SERVICE FOR INTERSECTIONS..................................................................................... 5
TABLE 2 - PEAK HOUR INTERSECTION CONDITIONS, EXISTING CONDITIONS ............................................. 11
TABLE 3 - PEAK HOUR INTERSECTION CONDITIONS, FUTURE WITHOUT PROJECT ..................................... 12
TABLE 4 - PEAK HOUR INTERSECTION CONDITIONS, BUILDOUT WITHOUT PROJECT ................................. 15
TABLE 5 - TRIP GENERATION RATES........................................................................................................... 21
TABLE 6 - PROJECT TRAFFIC GENERATION ............................. ..... .................................... .......:.................... 21
TABLE 7 - PEAK HOUR INTERSECTION CONDITIONS, FUTURE WITH PROJECT .......... ............e...............*see . 25
TABLE 8 - PEAK HOUR INTERSECTION CONDITIONS, BUILDOUT WITH PROJECT ....................................... 28
TABLE 9 - LEVEL OF SERVICE ANALYSIS /DETERMINATION OF IMPACTS, FUTURE CONDITIONS ............... 31
TABLE 10 - LEVEL OF SERVICE ANALYSIS /DETERMINATION OF IMPACTS, BUILDOUT CONDITIONS ......... 32
TABLE 11 - CITY PARKING CODE REQUIREMENTS FOR THE PROPOSED PROJECT ...................................... 35
Appendix A — Existing Traffic Counts
Appendix B — Intersection Level of Service Worksheets
Appendix C — Intersection Level of Service Concepts
Appendix D — Project Site Plan
Katz, Okitsu & Associates Cit of Tustin
Traffic Engineers and Transportation Planners y
iii Red Hill/Walnut Residential Protect Traffic Study
The subject of this traffic impact study is a proposed residential project known as 'Red Hill
Townhomes", consisting of a 75 -unit townhome/condominium complex in the City of Tustin.
The proposed project is located on Red Hill Avenue north of Walnut Avenue. The developer of
the proposed project is Southwind Realty Group of Irvine, California. The project location is
shown in Figure 1 and the proposed site plan is shown in Figure 2
The project site is currently occupied by two apartment complexes: a 30 -unit complex known as
"Whispering Woods" and a 27 -unit complex known as 'The Terrace".
The City is requesting a trip generation and distribution analysis to show the difference in trips
from the site due to the proposed development, an intersection traffic analysis for the intersection
of Red Hill Avenue and Walnut Avenue, and an analysis of the on-site circulation and access to
Red Hill Avenue. The study also documents parking distribution within the project site. The
analysis is intended to meet the requirements of the City of Tustin.
Katz, Okitsu & Associates City of Tustin
Traffic Engineers and Transportation Planners
1 Red Hill/Walnut Residential Project Traffic Study
N
Not to Scale
"Katz, G kitsu & Associates City of Tustin Figure 1
Air Planning and Engineering Red Hill / Walnut Residential Project TIS Vicinity Map
LEGEND
Project Location
0
Study Intersection
School
-
Major Street
Minor Street
-+-+-
Railroad
N
Not to Scale
"Katz, G kitsu & Associates City of Tustin Figure 1
Air Planning and Engineering Red Hill / Walnut Residential Project TIS Vicinity Map
•
•' *r �•
FW*wW!W
t1M1 W r'7M�11 lldr� y� �y� y�
wM i w� wY wY wY wY i wY Raw , .o
7 a
This chapter documents the methodologies and assumptions used to conduct the analysis for the
proposed project. This section contains the following background information:
• Study timeframes
• Study area description
• Capacity analysis methodologies
Study Timeframes
This report presents an analysis of the intersection operating conditions during the morning and
evening peak hours during the following anticipated timeframes:
• Existing Conditions (Year 2006)
• Future Year 2008
• Buildout (Post -2020)
Project Study Area
The study area was determined through consultation with City of Tustin staff. The study area
consists of the following:
• Red Hill Avenue at Walnut Avenue
Analysis Methodologies
ethodologies
This section presents a brief overview of traffic analysis methodologies and concepts used in this
study. Street system operating conditions are typically described in terms of "level of service."
Level of service is a report -card scale used to indicate the quality of traffic flow on roadway
segments and at intersections. Level of service (LOS) ranges from LOS A (free flow, little
congestion) to LOS F (forced flow, extreme congestion). Amore detailed description of the
concepts described in this section is provided in Appendix C of this document.
The local jurisdictions within the project area, including the City of Tustin, have determined that
Level of Service D is the minimum acceptable level of service for peak hour operation. Any
roadway segment operating at Level E or F is considered to be operating deficiently. An impact is
deemed significant when the level of service is E or F and the project causes an increase in V/C or
delay over the defined threshold. For further information on these significance thresholds see
Appendix C.
Katz, Okitsu & Associates City of Tustin
Traffic Engineers and Transportation Planners
4 Red Hill/Walnut Residential Project Traffic Study
Project Study Methodology
Intersection Capacity Analysis
The analysis of peak hour intersection conditions was conducted using the TRAFFIX software
program developed by Dowling Associates. The following peak periods were selected for analysis:
• Weekday AM (peak hour between 7:00 AM and 9:00 AM)
• Weekday PM (peak hour between 4:00 PM and 6:00 PM)
Traffic conditions in Southern California are often evaluated during peak hours at intersections
using a methodology known as the Intersection Capacity Utilization (ICU) technique. This is the
preferred analysis method for the City of Tustin. This analysis method is widely accepted and
essentially measures the amount of traffic signal "green" time required for the intersection. It is a
significant variation from the HCM method; however it produces results that are generally
similar. The City of Tustin generally requests that this method be used in the City, so all
signalized intersections were analyzed based on this method. Table 1 shows the relationship
between Level of Service and the ICU Method volume/capacity criteria for signalized
intersections, and Level of Service and delay for unsignalized intersections.
Table 1
Levels of Service for Intersections
Level of Service
Signalized Intersection
Volume/Capacity
Ratio
Unsignalized
Intersection Control
Delay'
A
0.00-0.60
0-10
B
0.61-0.70
10-15
C
0.71-0.80
15-25
D
0.81-0.90
25-35
E
0.9171.00
35-50
F
1.00 and up
50 or more
Note 1: Average delay in seconds/vehicle
Traffic Count Data
Existing daily and peak hour traffic volumes were supplied by Traffic Data Services of Santa Ana,
California in March, 2006. All traffic count data used in this study is compiled in Appendix A of
this report.
Katz, Okitsu & Associates City of Tustin
Traffic engineers and Transportation Planners
5 Red Hill/Walnut Residential Project Traffic Study
Project Study Methodology
Future Traffic Volumes
Peak hour traffic volumes for Red Hill Avenue and Walnut Avenue under future near. term
conditions were forecast based on a 1% annual growth rate from existing conditions. Peak hour
volumes for buildout (Post -2020) conditions were based on traffic forecasts prepared for the
Tustin MCAS Tustin Legacy Study, when these volumes were higher than existing plus an annual
growth factor. When the existing volumes plus an annual growth factor were higher than the
MCAS forecasts, the existing plus growth factor volumes were used per City direction. The
Tustin MCAS Legacy traffic forecasts were provided by the City of Tustin. Project trips were
added to the background base for each scenario to determine the relative impact of the project.
Standards of Significance
The City of Tustin has determined that Level of Service D is the minimum acceptable level of
4
-fi service during peak hours at intersections. Any roadway segment operating at Level of Service E
or F is considered to be operating deficiently. An impact is deemed significant when the level of
p g Y g
service is E or F and the project causes an increase in the Volume/Capacity ratio of .01 or more
over the defined threshold. For further information on these significance thresholds see
Appendix C.
Katz, Okitsu & Associates City of Tustin
Traffic Engineers and Transportation Planners
6 Red Hill/Walnut Residential Project Traffic Study
This section documents the existing conditions in the study area, including local land uses,
roadway geometry, and driveway locations. The discussion presented here is limited to specific
roadways in the project vicinity. The project location is on Red Hill Avenue north of Walnut
Avenue in the City of Tustin.
Existing Circulation Network
Streets in the project vicinity which could be affected by the proposed project include Red Hill
Avenue and Walnut Avenue. The existing roadway circulation network was shown previously in
Figures 1 and 2. Existing intersection geometry is shown in Figure 3.
Red Hill Avenue is a 4 -lane street on a northeast -southwest alignment located immediately to the
east of and adjacent to the project site. The City has designated Red Hill Avenue as a north -south
roadway. The street has a signalized intersection with Walnut Avenue. The speed limit on Red
Hill Avenue is 35 mph. The intersection has left -turn pockets on all approaches. The existing
signal phasing is protected/permissive for the east and west approaches (Walnut Avenue), and
protected for the north and south approaches (Red Hill Avenue). Land use along the street is
residential north of Walnut Avenue, with single- family homes located on the east side of the
street and apartments located on the west side of the street. A neighborhood
commercial/shopping center is located on the west side of the street south of Walnut Avenue.
Elementary and middle schools are located approximately 1/4 mile south of the project site and 'A
mile north of the project site. The traffic volume on the street is 23,800 vehicles per day.
Walnut Avenue is a 4 -lane divided arterial on a northwest -southeast alignment located immediately
r to the south of and adjacent to the project site. The City has designated Walnut Avenue as an
east -west roadway. The street has a painted median with left -turn pockets, and a signalized
,4 intersection with Red Hill Avenue. The speed limit on Walnut Avenue is 35 mph in the project
vicinity. Land use along the street is residential on the north side of the street and
commercial/retail on the south side of the street west of Red Hill. East of Red Hill land use is
residential. The traffic volume on the street is 16,700 vehicles per day.
Regional circulation is provided by the I-5 Freeway approximately 1/2 mile to the north and the SR -
55 Freeway approximately % mile to the west of the project site.
Peak Hour Intersection Level of Service
Figure 4 illustrates the existing peak hour traffic volumes during the AM peak hour, while Figure 5
illustrates the existing peak hour traffic volumes during the PM peak hour. Based on these
Katz, Okitsu & Associates City of Tustin
Traffic Engineers and Transportation Planners
7 Red Hill/Walnut Residential Project Traffic Study
LEGEND
Project Location
Study Intersection
School
Major Street
Minor Street
N
Railroad
Signalized Intersection
—� Lane Geometry
Not to Scale
Katz, Okitsu & Associates City of Tustin Figure 3
Planning and Engineering Red Hill / Walnut Residential Project TIS Existing Geometries
N
Not to Scale
40FKatz, Okitsu & Associates City of Tustin Figure 5
Planning and Engineering Red Hill / Walnut Residential Project TIS Existing Traffic Volumes, PM Peak Hour
LEGEND
Project Location
•
Study Intersection
School
---
Major Street
Minor Street
-}---E-
Railroad
XX 1
Turning Movement Volume
N
Not to Scale
40FKatz, Okitsu & Associates City of Tustin Figure 5
Planning and Engineering Red Hill / Walnut Residential Project TIS Existing Traffic Volumes, PM Peak Hour
Existing Conditions
existing traffic volumes, level of service analyses were conducted for the study intersection. The
results of these analyses are summarized in Table 2 for the existing conditions. As shown in the
table, the intersection currently operates at Level of Service D or better under existing conditions.
Table 2
Peak Hour Intersection Conditions
Existing Conditions, Year 2006
Intersection
AM Peak Hour I PM Peak Hour
Volume/
Level Of
Volume/
Level Of
Capacity
Service
Capacity
Service
Red Hill Avenue &Walnut Avenue .804
D
.684
B
Pedestrian Traffic
Significant pedestrian traffic at the Red Hill/Walnut intersection was observed, both during the
peak hours and before and after school, particularly on the west leg of the intersection (Walnut).
Pedestrian volumes were moderate, with about 20 pedestrians per hour crossing Red Hill and 30
per hour crossing Walnut during the AM peak hour, and about 45 per hour crossing Red Hill and
60 per hour crossing Walnut during the PM peak hour. During the afternoon school peak hour
(2:00 PM to 3:00 PM) there were about 30 pedestrians per hour crossing Red Hill and about 75 per
hour crossing Walnut. The majority of the pedestrians crossing Walnut in the afternoon peak
hour were school children crossing on the west leg.
Katz, Okitsu & Associates City of Tustin
Traffic Engineers and Transportation Planners
� 1 Red Hill/Walnut Residential Project Traffic Study
This section documents the future without project traffic conditions in the study area with
ambient growth added. The year 2008 was selected for analysis based on study requirements.
The project is scheduled for completion before the end of the year 2008.
Future Traffic Growth
Peak hour traffic volumes for the Red Hill Avenue/Walnut Avenue intersection under near-term
future (Year 2008) conditions were forecast based on a 1% per year growth factor.
Future Intersection Configuration
The traffic signal at Red Hill/Walnut will soon be converted from the current PPLT operation to
protected left -turn operation for eastbound and westbound Walnut Avenue. The lane
configuration of the intersection will also be changed, restriping westbound Walnut to provide
dual left -turn lanes. These changes to lane geometry and signal phasing have been incorporated
into the analyses of future intersection conditions.
Peak Hour Intersection Level of Service — Future Near Term
To simulate the near-term growth conditions for the year 2008, the peak hour volumes in Figures
4 and 5 were increased by a factor of 1% per year for two years. Figures 6 and 7 illustrate the
resulting AM and PM peak hour volumes, respectively.
Table 3 illustrates the future without project intersection level of service conditions. As shown in
the table, the intersection is expected to operate at Level of Service B or better under the future
without project condition for the year 2008.
Table 3
Peak Hour Intersection Conditions
Future Without Project Conditions, Year 2008
Katz, Okitsu & Associates City of Tustin
Traffic Engineers and Transportation Planners
12 Red Hill/Walnut Residential Project Traffic Study
Katz, Okitsu & Associates City of Tustin
Planning and Engineering Red Hill / Walnut Residential Project TIS
N
Not to Scale
Figure 6
Future Traffic Volumes Without Project, AM
LEGEND
Project Location
•
Study Intersection
School
—
Major Street
Minor Street
—H --t-
Railroad
Turning Movement Volume
Katz, Okitsu & Associates City of Tustin
Planning and Engineering Red Hill / Walnut Residential Project TIS
N
Not to Scale
Figure 6
Future Traffic Volumes Without Project, AM
Katz, 4 kitsu & Associates City of Tustin
Planning and Engineering Red Hill / Walnut Residential Project TIS
N
Not to Scale
Figure 7
Future Traffic Volumes Without Project, PM
LEGEND
Project Location
•
Study Intersection
School
---
Major Street
Minor Street
+-+-
Railroad
XX 1
Turning Movement Volume
Katz, 4 kitsu & Associates City of Tustin
Planning and Engineering Red Hill / Walnut Residential Project TIS
N
Not to Scale
Figure 7
Future Traffic Volumes Without Project, PM
This section documents the buildout without project traffic conditions in the study area. Post
2020 was selected for analysis based on information provided by the City from the MCAS Tustin
Legacy study.
Future Traffic Growth
Peak hour traffic volumes for the Red Hill Avenue/Walnut Avenue intersection under buildout
(Post -2020) conditions were forecast based on information from the MCAS Tustin Legacy study
and existing volumes plus a growth factor. The Legacy Study takes into account certain planned
roadway improvements to be completed by Year 2020. These improvements are included in all
Buildout scenario analyses. Post -2020 designated lanes are illustrated in Figure 8.
Future Intersection Configuration
The traffic signal at Red Hill/Walnut will soon be converted from the current PPLT operation to
protected left -turn operation for eastbound and westbound Walnut Avenue. The lane
configuration of the intersection will also be changed, restriping westbound Walnut to provide
dual left -turn lanes. Red Hill Avenue is planned to have a buildout configuration of 3 through
lanes in each direction. These changes to lane geometry and signal phasing have been
incorporated into the analyses of buildout intersection conditions.
.T
Peak Hour Intersection Level of Service — Buildout
Buildout traffic volume forecasts for the Post -2020 conditions were provided by the City of Tustin
from the MCAS Tustin Legacy study. Existing volumes plus a growth factor were used when
higher than the Legacy Study forecasts. Figures 9 and 10 illustrate the resulting AM and PM peak
hour volumes, respectively. Table 4 illustrates the buildout without project intersection level of
service conditions. As shown in the table, the intersection is expected to operate at Level -of
Service E in the AM peak hour and Level of Service F in the PM peak hour under the buildout
t
without project condition.
Table 4
i
Peak Hour Intersection Conditions
Buildout Without Project Conditions, Post 2020
Katz, Okitsu & Associates City of Tustin
Traffic Engineers and Transportation Planners
15 Red Hill/Walnut Residential Project Traffic Study
■
Project Location
Study Intersection
School
_
Major Street
Minor Street
Railroad
Signalized Intersection
J6
Stop Sign
-.0'
Lane Geometry
N
Not to Scale
Katz, Okitsu & Associates City of Tustin Figure 8
Planning and Engineering Red Hill / Walnut Residential Project TIS Buildout Geometries
N
Not to Scale
Katz, Okitsu & Associates City of Tustin Figure 9
Planning and Engineering Red Hill / Walnut Residential Project TIS Buildout Traffic Volumes Without Project, AM
LEGEND
Project Location
•
Study Intersection
School
---
Major Street
Minor Street
-+—t-
Railroad
X
Turning Movement Volume
N
Not to Scale
Katz, Okitsu & Associates City of Tustin Figure 9
Planning and Engineering Red Hill / Walnut Residential Project TIS Buildout Traffic Volumes Without Project, AM
Katz, 4kitsu & Associates City of Tustin
Planning and Engineering Red Hill / Walnut Residential Project TIS
N
Not to Scale
Figure 10
Buildout Traffic Volumes Without Project, PM
LEGEND
Project Location
0
Study Intersection
School
Major Street
-
Minor Street
-�—+-
Railroad
XX
Turning Movement Volume
Katz, 4kitsu & Associates City of Tustin
Planning and Engineering Red Hill / Walnut Residential Project TIS
N
Not to Scale
Figure 10
Buildout Traffic Volumes Without Project, PM
The proposed project consists of 75 townhome/condominium units. This residential development
is expected to generate additional traffic volumes as documented below.
Project Trip Generation
Trip generation is a measure or forecast of the number of trips that begin or end at the project site.
All or part of these trips will result in traffic increases on the streets where they occur. Traffic
generated is a function of the extent and type of development proposed for the site.
Trip generation is generally equal to the traffic volume expected at project driveways. The trip
generation rates are equivalent to the number of trips that start or end (in and out) at the project
site, and are specific by land use for a given time period (i.e. AM peak hour). Trip generation rates
are expressed as a function of a given characteristic of the land use area (i.e. floor area, site area,
number of employees, or seating capacity). The rates are based on regression analysis, and are
derived from field observations from as many sources as possible. At each site, trips in and out of
the site are counted, trip rate modifiers are identified and regression analysis is used to derive a
"best fit" for a particular land use. An equation is developed which calculate an average trip
generation rate for the specific land use.
Project Traffic
The trip generation for the proposed project consisting of 75 townhome/condominiums is shown
in Table 5. The project trips summarized in these tables are based on trip generation rates
provided by ITE Trip Generation, 7h Edition with consideration of comparable trip generation
rates for similar uses in this region. This report is widely used in Southern California and
indicates the probable traffic generation rates for various land uses based on studies of existing
developments in comparable settings. City staff directed Katz, Okitsu & Associates to use single-
family detached housing trip generation rates for the proposed project due to the size of the
proposed units. Figure 11 illustrates the expected trip distribution for these project trips.
Katz, Okitsu & Associates City of Tustin
Traffic Engineers and Transportation Planners
19 Red Hill/Walnut Residential Project Traffic Study
LEGEND
.
Project Location
Study Intersection
i
School
Major Street
—
Minor Street
�—�-
Railroad
44FKatz, Okitsu & Associates City of Tustin
Planning and Engineering I Red Hill / Walnut Residential Project TIS
N
Not to Scale
Figure 11
Project Trip Distribution
Project Related Traffic
Table 5
Trip Generation Rates
Land Use
AM Peak Hour
PM Peak Hour
Units
Daily
Total
In
Out
Total
In
Out
• .1� � '. .,: .. ..
. vc. .' -.. s ... ..r.'r.:. .... �'., ...t 4r,.: ♦ .. .<F ✓i :. r.. ..-..
:..4I.,
r.:�. ..Y'. ... ...: r, Ly� S -.. 1 ♦.n.<. _. T $...... :... ....
...5 .33 .. :... .:.'b . .. ., .r. ._. ,v �. ..'. .. 7-: ,, ... •�j Y3C r'A .,., .._, .- w
., C:.:: y.:, z'i -.w moi.: ,,.
.. ... .- .Yv.; .:_: x. J143n, �... 4 .} -.`d. 4a'... ...- ,.., :..q.;
: '..,F n.•
.. F'-� w "" ..;- .�. F...
,3 -
� -'. �. ( i. �(tt,'�•.M(.py.�,
"9::.. 1tr.:: �i% ?A'
.:. ,.,; R; y.,.•�.. ._ .,::. > _.:a. ,. :. : ./^r... 9'... :
-s•. sir �
,q �.. _�«: Fi
Low -Rise Apartments
DU
6.59 0.46 0.10 0.36 0.58
0.38 0.20
ITE Code 221
Single -Family Detached Housing'
DU
9.57
0.75
0.19
0.56
1.01
0.64
0.37
ITE Code 210
Note i s bt u u rate used for townhomes per City direction.
Existing Land Use Traffic
57 apartment units currently occupy the project site. These apartment units will be demolished
upon approval of the proposed project. The trip generation currently associated with the project
site is also shown on Table 6. Figures 12 and 13 show the added trips expected as a result of the
project less the existing use trips.
Table 6
Project Traffic Generation
Note 1: SFDU rate used for townhomes per direction from the City.
As shown in Table 6, the proposed project is expected to generate approximately 718 daily trips.
Of this amount, 56 are expected to be in the AM peak hour, including 14 trips entering and 42
trips exiting the site. There are expected to be 76 trips during the PM peak hour, including 48
trips entering and 28 trips exiting the site.
Katz, Okitsu & Associates City of Tustin
Traffic Engineers and Transportation Planners
21 Red Hill/Walnut Residential Project Traffic Study
Katz, Okitsu & Associates City of Tustin
Planning and Engineering Red Hill / Walnut Residential Project TIS
N
Not to Scale
Figure 12
Project Trips, AM Peak Hour
LEGEND
Project Location
•
Study Intersection
School
----
Major Street
Minor Street
—�--+-
Railroad
XXZ
Turning Movement Volume
Katz, Okitsu & Associates City of Tustin
Planning and Engineering Red Hill / Walnut Residential Project TIS
N
Not to Scale
Figure 12
Project Trips, AM Peak Hour
N
Not to Scale
Katz, Okitsu & Associates City of Tustin Figure 13
Planning and Engineering Red Hill / Walnut Residential Project TIS Project Trips, PM Peak Hour
LEGEND
Project Location
•
Study Intersection
School
Major Street
Minor Street
-+—+-
Railroad
XXZ
Turning Movement Volume
N
Not to Scale
Katz, Okitsu & Associates City of Tustin Figure 13
Planning and Engineering Red Hill / Walnut Residential Project TIS Project Trips, PM Peak Hour
Project Related Traffic
The project will have 718 vehicles per day going in and out onto Red Hill Avenue. This is an
increase of 342 vehicles per day above the existing land use. The resulting "NET Project Vehicle
Trips" are shown in Table 6. Adding 342 vehicles per day to a street that is currently serving
23,800 vehicles per day (Red Hill Avenue) is less than a 1.5% increase. This additional traffic will
have little impact on Red Hill Avenue.
Katz, Okitsu & Associates City of Tustin
Traffic Engineers and Transportation Planners
24 Red Hill/Walnut Residential Project Traffic Study
This section documents the near-term future traffic conditions with the addition of project -
related traffic to the surrounding street system. It evaluates near term traffic conditions in the
study area with ambient growth (1% per year) and the proposed project added. The proposed
project completion date of 2008 was selected for analysis to be conservative.
Peak Hour Intersection Level of Service
Table 7 summarizes the results of the level of service analyses for this scenario. As shown in the
table, the intersection of Red Hill at Walnut continues to operate at Level of Service B or better
with the addition of project -related traffic. Figures 14 and 15 illustrate the resulting AM and PM
peak hour volumes, respectively.
Table 7
Peak Hour Intersection Conditions
Future With Project Conditions, Year 2008
Note 1: Seconds per vehicle average
Note 2: Delay is for poorest movement (left -turn from project driveway)
Katz, Okitsu & Associates City of Tustin
Traffic Engineers and Transportation Planners
25 Red Hill/walnut Residential Project Traffic Study
N
Not to Scale
Katz, Q kitsu & Associates City of Tustin Figure 14
Planning and Engineering Red Hill / Walnut Residential Project TIS Future Traffic Volumes With Project, AM
LEGEND
Project Location
•
Study Intersection
i
School
—
Major Street
Minor Street
-f—+-
Railroad
Turning Movement Volume
N
Not to Scale
Katz, Q kitsu & Associates City of Tustin Figure 14
Planning and Engineering Red Hill / Walnut Residential Project TIS Future Traffic Volumes With Project, AM
Katz, Okitsu & Associates City of Tustin
Planning and Engineering Red Hill / Walnut Residential Project TIS
N
Not to Scale
Figure 15
Future Traffic Volumes With Project, PM
LEGEND
Project Location
r Study Intersection
School
- Major Street
Minor Street
-t--t- Railroad
Turning Movement Volume
Katz, Okitsu & Associates City of Tustin
Planning and Engineering Red Hill / Walnut Residential Project TIS
N
Not to Scale
Figure 15
Future Traffic Volumes With Project, PM
This section documents the buildout traffic conditions with the addition of project -related traffic
to the surrounding street system. It evaluates buildout traffic conditions in the study area with
traffic from the proposed project added. Buildout Post -2020 was selected for analysis based on
information received from the City for the MCAS Tustin Legacy study.
Peak Hour Intersection Level of Service
Table 7 summarizes the results of the level of service analyses for this scenario. As shown in the
table, the intersection of Red Hill at Walnut continues to operate at Level of Service E in the AM
peak hour and Level of Service F in the PM peak hour with the addition of project -related traffic.
Figures 16 and 17 illustrate the resulting AM and PM peak hour volumes, respectively.
Table 8
Peak Hour Intersection Conditions
Buildout With Project Conditions, Post 2020
Note 1: Seconds per vehicle average
Note 2: Delay is for poorest movement (left -turn from project driveway)
Katz, Okitsu & Associates City of Tustin
Traffic Engineers and Transportation Planners
28 Red Hill/Walnut Residential Project Traffic Study
Katz, Okitsu & AssociatesBCity of Tustin
Planning and Engineering Red Hill / Walnut Residential Project TIS
N
Not to Scale
Figure 16
Buildout Traffic Volumes With Project, AM
LEGEND
Project Location
0 Study Intersection
School
-- Major Street
Minor Street
-+-2 Railroad
Turning Movement Volume
Katz, Okitsu & AssociatesBCity of Tustin
Planning and Engineering Red Hill / Walnut Residential Project TIS
N
Not to Scale
Figure 16
Buildout Traffic Volumes With Project, AM
410FKatz, Okitsu & Associates City of Tustin
Planning and Engineering Red Hill / Walnut Residential Project TIS
N
Not to Scale
Figure 17
Buildout Traffic Volumes With Project, PM
LEGEND
Project Location
•
Study Intersection
School
Major Street
---
Minor Street
-+—i
Railroad
Turning Movement Volume
410FKatz, Okitsu & Associates City of Tustin
Planning and Engineering Red Hill / Walnut Residential Project TIS
N
Not to Scale
Figure 17
Buildout Traffic Volumes With Project, PM
Traffic impacts are identified if the proposed project will result in a significant change in traffic
conditions on a roadway or intersection. A significant impact is normally defined when project
related traffic would cause level of service to deteriorate to below the minimum acceptable level
by a measurable amount. Impacts may also be significant if the location is already below the
minimum acceptable level and project related traffic causes a further decline.
The City of Tustin has identified Level of Service D as the minimum allowable service level during
peak hours at signalized intersections in the City. Most arriving traffic will clear the intersection
on the first allowable green cycle under this level of service. Any roadway segment operating at
Level of Service E or F is considered to be operating deficiently. An impact is deemed significant
when level of service is E or F and the project causes an increase in the V/C ratio of 0.01 or more
over the defined threshold. Mitigation measures should be considered when traffic conditions are
forecast to decline to poorer levels of service.
Near -Term Future (2008)
The level of service analyses for the Near -Term Future (Year 2008) study scenarios determined
that level of service will remain at Level B or better under both the "Future Without Project" and
"Future With Project" scenarios. The project will not create a significant impact at the study
intersections in the Future scenarios. Table 9 provides a comparison of the levels of service and
volume/capacity ratios of all study scenarios for the Future condition. Traffic impacts created by
the project can be evaluated by comparing the "Future Without Project" condition to the "Future
With Project" condition.
Table 9
Level of Service Analysis /Determination of Impacts
for Future Conditions
Note: LOS = Level of Service; V/C = Volume/Capacity; Delay = Seconds per vehicle average, poorest movement
Katz, Okitsu & Associates City of Tustin
Traffic Engineers and Transportation Planners
31 Red Hill/walnut Residential Project Traffic Study
Determination of Significant Impact
Buildout (Post -2020)
The level of service analyses for the Buildout (Post 2020) study scenarios determined that level of
service will be at Level E in the AM peak hour and Level F in the PM peak hour under both the
"Buildout Without Project" and "Buildout With Project" scenarios. Although the intersection will
be operating at Level F under the buildout scenario, the project will not create a significant
3
impact at the study intersection. The project driveway will operate at Level of Service F under
buildout conditions.
y
The poor level of service at the project driveway is due to a relatively small number of vehicles
turning left from the driveway onto Red Hill. This condition can be tolerated or it can be
improved by prohibiting left turns from the project onto Red Hill, requiring right turns only.
{ Traffic conditions at the project driveway under buildout conditions may be adequate due to the
F: p l Y Y q
effect of platooning traffic from the nearby signalized intersection at Red Hill/Walnut. However
the City may want to consider mitigating the condition in the future by prohibiting the left turn
from the project driveway onto Red Hill.
Table 10 provides a comparison of the levels of service and volume/capacity ratios of all study
scenarios for the Buildout condition. Traffic impacts created by the project can be evaluated by
comparing the "Buildout Without Project" condition to the "Buildout With Project" condition.
Table 10
Level of Service Analysis /Determination of Impacts
for Buildout Conditions
Note: LOS = Level of Service; V/C = Volume/Capacity; Delay = Seconds per vehicle average, poorest movement
Katz, Okitsu & Associates City of Tustin
Traffic Engineers and Transportation Planners
32 Red HilllWalnut Residential Project Traffic Study
Buildout
Buildout
Intersection
Existing
Without
With
Increase/
Significant
Decrease
Impact
Proj ect
Project
ed Hill Ave. & Walnut Ave., AM Pk Hr
D / .804
E / .959
E / .961
.002
No
Red Hill Ave. &Walnut Ave., PM Pk Hr
B / .684
F / 1.030
F / 1.038
.008
No
ject Driveway, AM Peak Hour
rro
N/A
N/A
F / 709.3
N/A
Yes
ject Driveway, PM Peak Hour
N/A
N/A
F / 87.4
N/A
Yes
Note: LOS = Level of Service; V/C = Volume/Capacity; Delay = Seconds per vehicle average, poorest movement
Katz, Okitsu & Associates City of Tustin
Traffic Engineers and Transportation Planners
32 Red HilllWalnut Residential Project Traffic Study
Access Roads and Driveways
The project is proposed to access Red Hill Avenue at one location near the north end of the project
site. This is the only site access for project entry. Currently the apartment complexes on the site
access Red Hill Avenue near the center of the project site and Walnut Avenue near the west
boundary of the project site. There will be no entry gates regulating access to this project. The
project site pian with existing street dimensions and recommended turn pocket configuration is
presented in Appendix D of this report.
The designated site access on Red Hill Avenue will be accessible to both northbound and
southbound traffic on Red Hill. Analysis indicates that there is sufficient distance between the
project driveway and Walnut Avenue to allow both the existing southbound left -turn pocket at
Redhill/Walnut as well as a northbound left -turn pocket at the project entrance. A southbound
left -turn pocket on Red Hill of 160 feet in length will be adequate to accommodate all traffic
expected to make this move during the peak hours under buildout conditions. This includes left -
turn traffic from the project.
A northbound left -turn pocket of 80 feet in length at the project driveway will be adequate to
accommodate project traffic during the peak hours. Allowing for a 90 -foot southbound transition
and a 90 -foot northbound transition for the turn pockets the total length required would be 420
feet. The distance available on Red Hill Avenue between the project driveway centerline and the
crosswalk limit line at Walnut Avenue is 450 feet. There is therefore more than adequate distance
available to accommodate both turn pockets.
The turn pockets can be separated from opposing traffic lanes with a painted median, and can be
;x
configured "back to back" to maximize turn pocket vehicle storage capacity. The proposed turn
pockets with street dimensions are shown on the site plan in Appendix D of this report.
The proposed driveway has sight distance to comply with the Caltrans 7.5 second sight distance
criteria for a roadway speed of 40 mph or higher. The proposed Red Hill Avenue access roadway is
about 450 feet from the Red Hill/Walnut intersection and has sight distance over 600 feet to the
north and 500 feet to the south.
Near-term future expected traffic volumes at Redhill/Walnut indicate that an eastbound left -turn
pocket storage length of 140 feet will be adequate to accommodate expected traffic volumes in the
near term, including project traffic. Buildout (post -2020) traffic volumes indicate however that
increased capacity for the eastbound left movement will be required. If projected buildout
Katz, Okitsu & Associates City of Tustin
Traffic Engineers and Transportation Planners
33 Red Hill/Walnut Residential Project Traffic Study
On -Site Circulation and Access
volumes occur, split -phase signal timing could be installed to accommodate the increase in traffic
volumes, allowing left turns from the adjacent through lane.
It should be noted that this signal will soon be converted from the current PPLT operation to
protected left- turn operation for eastbound and westbound Walnut Avenue at Red Hill Avenue.
The lane configuration of the intersection will also be changed, restriping westbound Walnut to
provide dual left -turn lanes.
The project site plan was reviewed for internal circulation. The site access roadway to Red Hill
Avenue is 25 feet in width. This is adequate to allow for one outbound lane and one inbound
lane. Parking must be prohibited on the north side of this roadway. The south side of the
roadway has parking "cutouts" that allow for 3 visitor parking spaces on the south side while
maintaining the 25 -foot roadway width for the traffic lanes. Parking should be prohibited on all
other 25 -foot width project streets. Concern over "dead end" drive aisles has been addressed
through a Waste Management Plan documented in the Design Review package.
Maximum outbound project traffic volume is expected to be 42 vehicles in the AM peak hour.
Approximately 40%, or 17 of these vehicles are expected to turn left from the project driveway.
This is only one vehicle every 3.5 minutes. The low expected volume of left turns indicates that a
separate left -turn pocket will not be required at the project entrance in the near-term future.
Level of service is indicated as Level D or better for the project entrance in the near-term future
with one inbound and one outbound lane and STOP sign control.
Projected traffic volumes under buildout conditions (from the MCAS Tustin Legacy study)
indicate Level of Service F for the project driveway with one inbound and one outbound lane. The
level of service reported is for a relatively small number of vehicles turning left from the driveway
onto Red Hill. The AM and PM peak conditions at this intersection are expected to be adequate
due to the effect of platooning traffic from the nearby signalized intersection at Red Hill/Walnut.
The condition can be mitigated in the future by prohibiting the left tum from the project
driveway onto Red Hill.
The interior street running roughly parallel with Red Hill Avenue is 36 feet in width, and is
therefore adequate for vehicles to pass each other and to allow for curbside parking on both sides
of the street. Parking should be prohibited on all other project streets except the south side of the
project entry roadway, as noted above. This restriction will allow adequate space for vehicles to
pass each other and emergency vehicle access.
ADA access is provided from the public right-of-way at the site's Red Hill Avenue entry to all of
the development's accessible units as well as the pool area. Curb ramps will be provided
Katz, Okitsu & Associates City of Tustin
Traffic Engineers and Transportation Planners
34 Red Hill/Walnut Residential Project Traffic Study
On -Site Circulation and Access
throughout the development per City of Tustin Standard Drawings. Two handicap parking stalls
are also provide near the development's private pool area. An ADA accessible path will also be
provided into the community from the Walnut Avenue pedestrian entry.
Parking Distribution
The City of Tustin has established parking space requirements for the multi -family residential
land use category (Tustin Municipal Code Chapter 9224 P -D, Section G-7). The requirements
vary by number of units, and are shown for the proposed project in Table 11.
Table 11 — City Parking Code Requirements for the Proposed Project
Red Hill Townhomes Project
Residential Units
City Requirement
Project Requirement
Resident Spaces
2 Spaces per Unit
150 Spaces
Visitor Spaces
1 Space per 4 Units
19 Spaces
Total Project
75 Units
169 Spaces
As shown in the table, the parking code requirement for the proposed project is a minimum of
two assigned covered parking spaces per unit, plus one visitor parking space for every 4 residential
units (Ord. No. 573, Sec. 2; Ord. No. 906, Sec. 2, 2-21-84).
The project provides 150 resident and 27 visitor parking spaces. The project parking supply is
therefore adequate for the use per City code. All parking stalls are accessible, and all parking areas
comply with accepted design standards for stall and aisle width. Parking is distributed relatively
evenly throughout the project.
Katz, Okitsu & Associates City of Tustin
Traffic Engineers and Transportation Planners
35 Red Hill/Walnut Residential Project Traffic Study
Mitigation measures are required if approval .and construction of the project will result in or
significantly increase unacceptable traffic conditions. They are also appropriate if cumulative
traffic conditions will result in an unsatisfactory level of service and the proposed development
contributes to these conditions significantly. Although the intersection of Red Hill Avenue and
Walnut Avenue will operate at an unacceptable level of service under Buildout (Post 2020)
conditions, the project does not significantly contribute to these conditions.
The poor level of service at the project driveway under buildout conditions can be mitigated by
prohibiting the left turn from the project driveway onto Red Hill. Traffic exiting the project to
travel north on Red Hill would be required to make a U-turn at Walnut or use an alternate route.
Katz, Okitsu & Associates City of Tustin
Traffic Engineers and TransPortrrrioa Planners
36 Red Hill/walnut Residential Project Traffic Study
The subject of this traffic study is a proposed residential project known as "Red Hill Townhomes",
consisting of a 75 -unit condominium/townhome complex in the City of Tustin. The proposed
project is located on Red Hill Avenue north of Walnut Avenue.
The City requested a trip generation analysis to show the difference in trips from the site due to
the proposed development, a level of service analysis for one study intersection, an analysis of on-
site circulation, and an analysis of access to Red Hill Avenue and Walnut Avenue. The
intersection studied was Red Hill Avenue and Walnut Avenue.
The results of the trip generation analysis showed that the project is expected to generate
approximately 718 daily trips. Of this amount, 56 are expected to be in the AM peak hour,
including 14 trips entering and 42 trips exiting the site. There are expected to be 76 trips during
the PM peak hour, including 48 trips entering and 28 trips exiting the site.
The analysis showed that the existing apartment complex on the site currently generates 376 daily
trips, including 26 trips in the AM peak hour and 33 trips in the PM peak hour. These are the
existing use "trip credits".
The net daily trips from the proposed project are the project -generated trips less the existing use
"trip credits". The net daily trips due to the proposed project less the existing use trip credit are
therefore 342 daily trips, including 30 trips in the AM peak hour and 43 trips in the PM peak hour.
These are the traffic volume increases on Red Hill Avenue and Walnut Avenue that can be
expected as a result of the project.
i 9f
The level of service analyses for the near-term future year (2008) conditions showed that the
study intersection will operate at Level of Service B or better (good), including project trips,
during both the AM and PM peak hours. The analysis for buildout (post -2020) conditions showed
that the study intersection will operate at Level of Service F (fail) during the AM and PM peak
hours. The project does not significantly contribute to this condition however.
The on-site circulation analysis showed that traffic conditions should be adequate and the
entrance/exit on Red Hill should provide adequate width for one outbound and one inbound lane.
Level of service is indicated as Level D or better for the project entrance in the near-term future
with one inbound and one outbound lane and STOP sign control.
Katz, Okitsu & Associates City of Tustin
Traffic Engineers and Transportation Planners
37 Red Hill/,Walnut Residential Project Traffic Study
Conclusions
Expected future traffic volumes at Walnut Avenue and Red Hill Avenue indicate that the
southbound left -turn pocket storage length required to accommodate the expected queue of
vehicles turning left from southbound Red Hill Avenue onto eastbound Walnut Avenue is 160
feet. The recommended northbound left -turn pocket storage length at the project driveway is 80
feet. Expected near-term future (2008) volumes indicate that aleft -turn pocket length of 140 feet
will be required for eastbound Walnut Avenue to northbound Red Hill Avenue. Buildout (post
2020) traffic volumes indicate that increased capacity for the eastbound left movement will be
required. If projected buildout volumes occur, split -phase signal timing could be installed to
accommodate the increase in traffic volumes, allowing left turns from the adjacent through lane.
The designated site access on Red Hill Avenue will be accessible to both northbound and
southbound traffic on Red Hill. Analysis indicates that there is sufficient distance between the
M project driveway and Walnut Avenue to allow both the existing southbound left -turn pocket at
A Redhill/Walnut as well as a northbound left -turn pocket at the project entrance. Traffic
conditions at the project driveway in the near-term future are adequate with this configuration.
Buildout conditions however indicate a poor level of service for traffic turning left onto Red Hill
from the project driveway with this configuration. This condition can be mitigated by
prohibiting the left turn from the project driveway onto Red Hill.
The traffic impact study for the proposed project will be submitted to the City of Tustin, who
will review the plan for compliance with applicable City standards. We anticipate that any minor
internal circulation issues will be addressed in conjunction with this review. Katz, Okitsu &
Associates recommends that the City find that the traffic impacts of the project have no adverse
effect on the surrounding street system for the future year.
Katz, Okitsu & Associates City of Tustin
Traffic Engineers and Transportation Planners
38 Red Hill/Walnut Residential Project Traffic Study
Appendix A
Existing Traffic Counts
Katz, Okitsu & Associates City of Tustin
Traffic Engineers and Transportation Planners
Red Hill/Walnut Residential Project Traffic Study
TRAFFIC DATA SERVICES, INC.
•###i#i####r#####r##!###t#w#r#rrtrrrt###r##r##rrr#w#rrrrr#r##ftt#w#rr##r###tw##rr#r##wr####r#r#rri#OC#rro###OD9r#r1
LOCATION - RED NILL-BTM WALNUT/NISSON
VOLUMES FOR •
TUESDAY 1/31/06
TIME
AM tr##tr#####r*##rr###i#r###
###rt#ir#*###tt##wr###rtri#PM
#rrr#r*t#######
rti##wtr##
*######r##!t#t##rf,t##tr#t###t##rr##rww#tttki##r##t#t#irfr#rt#t#w##r#trrr#t#irrt##rtrr###wr##ttr##wr#r#t##r#r#tr###t####
NO S8 TOTAL
TIME N9
S8
TOTAL
12:00
12:15
— 12:15
- 12:30*
23
20
16
39
12:00
- 12:15
209
172
381
12:30
- 12:45
1T
18
10
38
12:15
- 12:30
189
190
379
12:45
1:00
9 69
9 53
27
18 122
12:30
- 12:45
180
196
376
i
12:45
- 1:00
206 784
193 751
399 1535
1:00
1:15
1:15
- 1:30
12
10
7
19
1 •
. 00
1.15
186
197
383
1:30
- 1:45
14
10
9
20
1:15
. 1:30
183
191
374
1:45
2:00
8 44
5 31
23
13 75
1:30
- 1:45
164
197
361
1:45
- 2:00
216 749
159 744
375 1493
2:00
2:15
- 2:15
- 2:30
9
8
8
17
2:00
• 2:15
184
171 1
355
2:30
• 2:45
9
5
5
13
2:15
- 2:30
202
192
394
2:45
- 3:00
2 28
4 22
14
6 50
2:30
- 2:45
224
190
414
2:45
- 3:00
294 904
174 727
468 1631
p
3:00
3:15
. 3:15
- 3:30
7
7
10
17
3:00
- 3:15
232
1 T3
405
_
3:30
3: GS
12
7
6
14
18
3:15
- 3:30
278
188
466
3:45
- 4:00
7 33
9 32
16 65
3:30
3:45
— 3:45
- 4:00
257
286 1053
155
158 674
412
444 1727
4:00
4:15
— 4:15
- 4:30
10
12
13
23
4:00
- 4:15
278
182
460
4:30
- 4:45
10
15
18
27
4:15
- 4.30
267
160
427
4:45
- 5:00
16 48
31 77
28
47 125
4:30
4:45
- 4:45
- 5:00
308
318 1171
150
458
184 676
502 1847
5:00
5:15
- 5:15
5:30
18
28
30
48
5:00
-5. - 15
324
184
508
5:30
— 5:45
30
36
63
64
93
5:15
- 5:30
334
184
518
5:45
- 6:00•
48 124
101 230
149 354
5:30
5:45
- 5:45
- 6:00
296
288 1242
184
21 2 761+
480
500 2006
6:00 -
6:15 -
6:15
6:30
56
SS
116
172
6:00
• 6:15
320
168
488
6:30 -
6:45 —
6:45
7:00
81
112
143
167
224
6:15
6:30 -
6:30
6:45
292
286
176
160
468
446
88 280
206 577
294 857
6:45 -
7:00
230 1128
150 654
380 1782
7:00 -
7:15 -
7:15
7:30
112
142
238
350
7:00 -
7:15
196
1 22
318
`
7:30
7:45
191
280
323
422
514
7:15 -
7:30
158
121
279
7:45 •
8:00
180 625
379 1220
559 184 S
7• _
•30
7:45 -
7.45
8:00
156
124 634
119
275
104 466
228 1100
8:00 -
8:15
8:15
8:30
166
138
327
493
8:00 -
8:15
119
�
209
a
8:30 -
8:45
126
276
263
414
389
8:15 -
8:30
93
88
181
8:45 -
9:00
142 572
248 1114
390 1686
8:30 -
8:45 -
8:45
9:00
84
74 370
94
178
87 359
161 729
9:00 -
9:15 -
9:15
9:30
136
120
241
377
9:00
9:15
71
94
165
9:30 -
9:45
122
196
1 81
316
303
9:1 S
9:30
74
60
134
9:45 -
10:00
114 492
190 808
304 1300
9:30
9:.45 —
9:45
10:00
56
54 255
TZ
128
i
64 290
118 545
10:00 -
10:15
10:15
10:30
120
131
176
296
10:0010:1
5
53
56
109
10:30 -
10:45
114
132
158
263
10 :15 —
10:30
G2
60
102
10:45 -
11:00
126 4 91
136 602
272
262 1093
10:30
10:45
10:45
11:00
36
26
34
70
157
40 190
66 347
11:00 -
11:15
11:1 S
11:30*
158
154
144
302_
11:00
11:1 S
3G
32
66309
11:30 -
11:45
169
155
170
339
11:15 -
11:30
22
31
53
11:45 - 12:00.
r#w#####i#####w###r####i+�r#i#Ri##Ai#4i#i�c#!r#iA*+4#t####*Ai#«*A#it!#t�►rIAA*##tit#rA'###t4###O#twrr
192 673
157 626
349 1299
11:30 -
11:45 -
11:45
12:00
27
26
53
12 101
36
36 208
TOTALS
3,479
5,392
8,871
8 554
6,396
14,950
ADT' S
##*#*'tr###4i##i##t#t###iti##rt##r#rt###ri*tr#ir#i#i##i#r#fii#tMi##rrt#rt##fir##tti##tri
12,033
11,788
23,821
TRAFFIC DATA SERVICES, INC. LOCATION CODE C1519.147
T
LOCATION WALNUT-8TN RED
HILL/NEWPORT
VOLUMES FOR - TUESDAY 11/22/05
•ri�iwirrrr�r#irfi#11tArr#rrriii
AM tilt+*irrirrri#rtri+#rr*rfr
rAiirr##*itrrriii
PM r#itrr###r#ir##t##•i+Rf##s
tr#r#r#rr�#ir#4ir#rrrrrrr#rtr###i,t*Rr#ri.gtr►r#r*#gyri*r+w#i,�+trrr#r4trrr�rr,►4rrrritrRr#rft.rr##.#i#r#rr#.itf�ri#tisrri�*frr#
TIME
EP we TOTAL .TIME E8 N8 TOTAL
12:00
12:15
- 12:15
12:30
11
14
25
12:00 - 12:15
120
148
268
12:30
- 12:45
6
8
10
1 6
16
12:15 - 12:30
134
118
252
12:45
1:00
10 35
10 40
14
20 75
12:30 • 12:45
145
100
45
21
12:45 - 1:00
1 33 532
Itd 494
261 1026
1:00
1:15
- 1:15
1:30
9
4
5
14
1:00 - 1:15
118
105
223
1:30
- 1:45
7
12
6
16
1:15 - 1:30
130
110
240
1:45
- 2:00
3 23
9 32
13
12 55
1:30 - 1:45
153
110
263
1:45 - 2:00
139 540
111 4360
25 976
2:00
2:15
- 2:15
- 2:30
6
1
3
9
2:00 2:1S•
114
132
246
2:30
- .2:45
3
3
3
4
2:15 - 2:30
128
128
256
2:45
- 3:00
10 20
2 11
6
12 31
2:30 - 2:45
129
154
283
2:45 - 3:00
100 471
148 562
248 1033
3:00
- 3:15
3
5
8
3:15
• 3:30
4
9
3:00 - 3:15
111
168
279
3:30
- 3:45
7
3
13
3.15 - 3:30
98
149
.247
3:45
- 4:00
16 30
2 19
10
18 49
3:30 - 3:45
3:45 • 4:00
104
128 441
180
205 702
284
333 1143
4.00
4:15
- 4:15
- 4;30
12
15
3
15
4:00 - 4:15
110
218
328
4:30
- 4:45
15
4
8
19
4:15 - 4:30
116.
226
342
4:45
- 5:00
28 TO
11 26
23
39 96
4:30 - 4:45
4:45 - 5:00
120
134 480
259
270 97304
379
4 1453
5:00-
5;15
- 5:15
- 5:30
26
33
11
37
-
5:00 5:15
126
269
395
5:30
- 5:45
75
12
17
45
5:15 - 5:30
148
280
428
5:45
- 6:00
81 215
24 64
92
105 279
5:30 - 5:45
5:45 - 6.:00
176
168 618
270
258 1077
446
426 1695
6:00
6:15
- 6:15
6:30
76
94
28
34
104
6:00 - 6:15
138
282
420
6:30 -
6:45
140
42
128
182
6:15 - 6:30
6:30 - 6:45
138
234
372
6:45 -
7:00
183 493
66 170
249 663
6:45 - 7:00
137
210
1
347
93 S O6
1 918
28592
285 1424
7:00 -
7:15 -
7:15
7:30
174
206
78
252
7:00 - 7:15
96
16 2
258
7:30 -
7:45
240
120
112
326
352
7:15 - 7:30
106
128
234
7:45 -
8:00
254 874
142 452
396 1326
7:30 - 7:45
7:45 - 8:00
80
96 378
112
85 487
192
181 865
8:00
8:1570
8:15
8:30
192
174
128
3208:00
- 8:15
72
142
8:30 -
8:45
153
110
100
284
253
8:15 - 8:30
66
70
136
8:45
9:00
128 6�4T
82 420
210 1067
8:30 • 8:45
8:45 - 9;00
64
Sp 250
�
53 255
124
103 SOS
t
9:00 -
9:15 -
9:15
9:30
87
92
57
144
9:00 - 9:15
59
58
117
9:30 -
9:45
90
82
�
174
156
9:15 - 9.30-
56
S4
110
9:45 -
10:00
90 359
TO 275
160 634
9:30 - 9:45
9:45 - 10:00
41
38 194
49
90
r,
26 187
64 381
10:00 -
10:15
10-15
10:30
86
63
85
171
10:00 - 10:15
36
53
89
.
10:30 -
10:45
82
77
59
140
10:15 10:30
32
42
74
10:45
11:00
8S 316
82 303
141
167 619
10:30 - 10:45
10:45 11:00
23
36
S9
32 123
46 177
78 300
11:00 -
11:15 -
11:15
11:30
80
86
68
148
11:00 • 11:15
19
32
S 1
11:30
11:45
104
120
13$
206
242
11:15 • 11:30
12
28
40
11:45 -
l•rr++�#4A*,r#�►rr�rt##girt#f##rr#rrr�rr�Rt+ttrrr�Mit*i#rrrrrRr##Airtrri*rtr�#r00ri�
12:00
111 381
123 449
234 830
11:30 • 11:45
1 •
13
8 52
25
38
#i
# r#t�##fir*##lrrriAtlwrirr,rtr#�irr#fr*r
13 98
21 150
TOTALS
30463
201261
5,724
40585
6j366
10,951
ADT' S
•rr#rrf•irrsrfrrr#*rrrrr+rr#rrri#viiri##rrrt•irrri#ririr#i#rrr#r♦it�iii#�trrwi#f
16,675
r+rit8t0#881627
rrrrr*#it
##i
TRAFFIC DATA 3 RVICES, INC
SUMMARY OF VEHIC" TURNING MOVEMENTS
N/S ST: RED HILL. AVE
61W ST: WALNUT AVE
CITY: TUSTIN
FILENAME: 0361601
DATE: 3/1 WN
DAY: WEDNESDAY
a ,e
5
NORTHBOUND
EASTe4 NO
WEsTao 1ND
BEGINS
NL
HT
NR
SL
ST
SR
EL
ET
ER
WL
WT
Wk
Tam
LANES,
1
3
0
1
2
0
1
2
0
1
2
0
52
7.00 A1111
10
67
43
23
189
11
18
81
45
60
55
26
928
15 AM
21
129
55
25
262
8
35
109
78
74
92
27
915
30 AM
14
80
34
19
240
9
25
66
72
50
72
18
698
45 AM
53
104
32
31
261
18
31
107
77
67
107
16
904
8:Q0 ASA
21
92
33
16
206
17
38
113
99
111
165
37
948
15 AM
9
84
31
10
152
7
11
55
44
53
40
19
515
30 AM
14
80
35
22
188
13
10
51
53
69
70
30
635
46 Alin
26
59
21
11
241
13
19
47
56
71
75
28
567
a ,e
5
■ . •• ; 0.91
PW HOUR BEOW AT:
71!5 AM
VOLUMES
109
405
154
9�
960
52
129
394
3216
302 43d
98
3465
FILENAME:
0361601P
DATE:
3123108
DAY:
THURSDAY
PERIOD
NORTHOOLM
NL
NT
NR
SOUTHBO
ST
W
EASTBOUND
Et,
ET
ER
WESTBOUND
WL WT
WR
Taal
4:00 PM
57
260
35
19
20
39
70
24
75 195
37
970
Is Phil
50
194
38
26
.139
97
16
26
83
20
55 141
18
765
i
30 PM
83
217
35
50
100
21
27
57
28
72 187
'160
38
815
45 PM
47
242
38
26
97
21
32
85
21
64
29
862
5.•00 PM
68
Z 78
38
30
88
22
. 28
98
22
66 181
39
958
16 PM
65
272
48
33
140
33
29
102
33
56 170
32
1013
30 Pik
60
238
46
32
112
31
32
107
27
73 198
40
996
t
45 Phil
55
276
39
33
131
24
29
91
21
55 150
33
937
k
PHF: 0.96
PEM HOUR BEGpVS AT:
1700 PM
VOLLNi S •
248
1064
171
128
471
110
118
398
103
250 699
144
3904
7f1A /7AA 1% 'nkTT 4 'C'1AC VTVR "%TJJVVT A7A7T%0*T / `TVJ OT' TT AAA's is.47inn
�f
,t
j28
•
valml
Post -2020 RM9 LltUutive 1
1
IN PK'
mm
PK P!C
am
LANES
L jj5
WXM
VOL
We
VOL
V/c
JBL
1
1700
60
.04*
150
.69
E
3
5100
150
.04
1900
.43*
IBR
0
0
120
.07
280
SBL
SIL
2
3400
40
.01
10
.00
2T
3
5100
2220
.49*
780
.17
MR
0
0
280
70
80
BBL
IML
1
1700
160
.09
390
.23*
BBT
2
3400
390
.17*
280
.09
ZBR
0
0
200
30
30
WDL
VBL
1
1700
200
•3.22
370
.22
VBT
2
3400
470
.14
710
.21*
in
1
1700
20
.01
70
.04
C1eeY`tx IAtvai
.05*
.05*
.0p
.05*
TOT'1L CIPICI'!'Y mtT Tial .87 .92
Post -2020 Regie ,i tative 3-
1
9 PSC
mm
FN PSC
am
LANES
CRACITY
CAPACITY
vm
v/c
VOL
V/C
HBL
1
1700
50
.03*
150
.09
DT
3
5100
160
.05
1950
.45*
OR
0
0
120
.07
320
SBL
s,
2
3400
40
.01
20
.01*
SOT
3
5100
2330
.51*
870
.19
SOR
0
0
270
70
90
BBL
EDL
1
1700
140
.08
410
.24*
EBT
2
3400
460
.21*
280
.09
EBR
0
0
260
30
30
WDL
EL
1
1700
190
.11*
370
.22
NBT
2
3400
490
.14
670
.20*
NBR
1
1700
20
.01
70
.04
Clearance Interial
.05*
.05*
.0p
.05*
TOTAL CBPICIff DTILIU1101 .91 .95
post -2020 Reese lltaude ve 2
1
m F
pw PK MUR
LANES
CRACITY
VOL
v/C
VOL
V/C
m
1
1700
50
.03*
130
.08
OT
3
5100
150
.04
1970
.45*
w
0
0
140
.08
320
SBL
2
3400
30
.01
10
.00
SBT
3
5100
2300
.50*
850
.18
Sm
0
0
260
70
BBL
1
1700
130
.08
400
.24*
$Sf
2
3400
410
.19*
290
.09
EpR
0
0
220
30
WDL
1
1700
170
.10*
390
.23
w
2
'3400
470
.14
660
.19*
NSR
1
1700
20
.01
90
.05
Clomc a lataval
.05*
.0p
'rOT 1f CAPUM i LIUTIM .87 .93
TRAFFIC DATA SERVICES, INC.
(714) 541-2228
PEDESTRIAN COUNT
N/S ST: RED HILL AVE
ENV ST: WALNUT AVE
CITY: TUSTIN
FILENAME: 03616P1A
DATE: 3/15/06
DAY: WEDNESDAY
Time CROSSED AT CORNER CROSSED MIDBLOCK
Period
Beginning N -LEG S -LEG E -LEG W =LEG N -LEG S -LEG E -LEG W -LEG TOTAL
6:00 AM
:15 AM
:30 AM
:45 AM
7:00 AM
2
10
2
1
15
:15 AM
3
1
0
14
18
:30 AM
0
1
1
6
8
:45 AM
0
5
5
2
12
8:00 AM
1
1
1
5
8
:15 AM
1
3
5
8
17
:30 AM
1
6
6
2
15
:45 AM
2
4
3
7
16
9:00 AM
:15 AM
:30 AM
:45 AM
10:00 AM
:15 AM
:30 AM
:45 AM
11:00 AM
:15 AM
:30 AM
:45 AM
12:00 PM
:15 PM
:30 PM
:45 PM
COMMENTS:
TRAFFIC DATA SERVICES, INC.
(714) 541-2228
PEDESTRIAN COUNT
N/S ST: RED HILL AVE
E/W ST: WALNUT AVE
CITY: TUSTIN
FILENAME: 03616P1 M
DATE: 3/15/06
DAY: WEDNESDAY
Time CROSSED AT CORNER CROSSED MIDBLOCK
Period
Beginning N -LEG S -LEG E -LEG W -LEG N -LEG S -LEG E -LEG W -LEG TOTAL
9:00 AM
:15 AM
:30 AM
:45 AM
10:00 AM
:15 AM
:30 AM
:45 AM
11:00 AM
:15 AM
:30 AM
:45 AM
12:00 PM
:15 PM
:30 PM
:45 PM
1:00 PM
1
5
3
17
26
:15 PM
1
3
0
5
9
:30 PM
2
4
1
11
18
:45 PM
2
4
0
2
8
2:00 PM
2
5
2
5
14
:15 PM
4
2
1
18
25
:30 PM
5
1
4
24
34
:45 PM
4
8
7
14
33
3:00 PM
7
3
8
10
28
:15 PM
3
8
6
4
21
:30 PM
:45 PM
COMMENTS:
TRAFFIC DATA SERVICES, INC.
(714) 541-2228
PEDESTRIAN COUNT
N/S ST: RED HILL AVE
ENV ST: WALNUT AVE
CITY: TUSTIN
FILENAME: 03616P1 P
DATE: 3/15/06
DAY: WEDNESDAY
Time CROSSED AT CORNER CROSSED MIDBLOCK
Period
Beginning N -LEG S -LEG E -LEG W -LEG N -LEG S -LEG E -LEG W -LEG TOTAL
12:00 PM
:15 PM
:30 PM
:45 PM
1:00 PM
:15 PM
:30 PM
:45 PM
2:00 PM
:15 PM
:30 PM
:45 PM
3:00 PM
:15 PM
:30 PM
:45 PM
4:00 PM
4
10
9
14
37
:15 PM
9
4
2
13
28
:30 PM
5
4
4
6
19
:45 PM
4
4
8
2
18
5:00 PM
1
7
13
6
27
:15 PM
3
0
1
5
9
:30 PM
3
3
2
9
17
:45 PM
2
1
3
3
9
6:00 PM
:15 PM
:30 PM
:45 PM
COMMENTS:
Appendix B
Intersection Level of Service Worksheets
Katz, Okitsu & Associates City of Tustin
Traffic Engineers and Transportation Planners
Red Hill/Walnut Residential Project Traffic Study
Existing AM
------------------------------------------------------------------------------
--Thu Mar 30, 2006 14:35:22 Page 1-1
JA6539 - 75 -Unit Residential Project TIS
JA6539
City Of Tustin
--------------------------------------------------------------------------------
Existing AM
Scenario;
Scenario Report
Existing AM
Command:
Existing AM
Volume:
Existing AM
Geometry:
Existing
Impact Fee:
Default Impact Fee
Trip Generation:
AM
Trip Distribution:
ALL
Paths-
Default Paths
Routes:
Default Routes
Configuration:
Existing AM
Traffix 7.7.1115 (C) 2004 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA
Existing AM
--------------------------------------------------------------------------------
Thu Mar 30, 2006 14:35:22
Page 2-1
JA6539
- 75 -Unit Residential Project TIS
City of Tustin
------------------------------------------------------------------------
Existing AM
Turning movement Report
AN
Volume Northbound
Southbound Eastbound
Westbound
Total
Type Left Thru Right
Left Thru Right Left Thru Right
Left Thru Right
Volume
#1 Red Hill & Walnut
Base 109 405 154
Added 0 0
91 969 52 129 394 326
302 436
98
3465
0
Total 109 405 154
0 0 0 0 0 0
91 969 52 129 394 326
0 0
302 436
0
98
0
3465
#2 Driveway on Red Hill
Base 0 0 0
0 0 0 0 0 0
0 0
0
0
Added 0 0 .0
0 0 0 0 0 0
0 0
0
0
Total 0 0 0
0 0 0 0 0 0
0 0
0
0
#3 Driveway on Walnut
Base 0 0 0
0 0 0 0 0 0
0 0
0
0
Added 0 0 0
0 0 0 0 0 0
0 0
0
0
Total 0 0 0
0 0 0 0 0 0
0 0
0
0
Traffix 7.7.1115 (c) 2004 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA
Existing AM Thu Mar 30, 3006 14:35:22
--------------------------------------------------------------------------------
Page 3-1
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Existing AM
--------------------------------------------------------------------------------
Intersection Volume Report
Base Volume Alternative
--------------------------------------------------------------------------------
Northbound Southbound Eastbound
Node Intersection L -- T -- R L -- T -- R L T R
Westbound
L T
1 Red Hill & Wa 109 405 154 91 969 52 129 394 326
302 436 98
Traffix 7.7.1115 (c) 2004 Dowling Assoc. Licensed to KATZ oKITSU, TUSTIN, CA
Existing AN Thu Mar 30, 2006 14:35:22 Page 4-1
--------------------------------------------------------------------------------
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Existing AM
-
-------------------------------------------------------------------------------
Impact Analysis Report
Level Of Service
Intersection Base Future Change
Del/ V/ Del/ V/ in
LOS Veh C LOS Veh C
1 Red Hill & walnut D xxxxx 0.804 D xxxxx 0.804 + 0.000 V/C
TraffiX 7.7-1115 (c) 2004 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA
Existing AM Thu Mar 30, 2006 14:35:22 Page 5-1
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Existing AM
--------------------------------------------------------------------
Level Of Service Computation Report
ICU 1(Loss as Cycle Length ?k) Method (Base Volume Alternative)
Intersection #1 Red Hill & Walnut
*r**##*#*##rr*#twr#rrr#t#wrw#trt#wwwrr*###*#w*wrr#w*#t##r#wr*r#wrww#*wr#♦#t#wr#*
Cycle (sac): 100 Critical Vol./Cap. (X): 0.804
Loss Time (sec): 5 (Y+R . 4 sec) Average Delay (sec/veh): XXXxxx
Optimal Cycle: 53 Level Of Service: D
#tw**w*#*ttt4wwttt+#r#r*tr*#*#t#r**#trr#t#A#ttt#r*#r###•#t*##r#w tt#rw###rwww#***
Street Name: Red Hill Ave Walnut Ave
Approach: North Bound South Bound East Bound West Bound
Movement: L - T- R L - T- R L- T R L- T - R
------------ I ---------------11---------------11---------------
Control: Protected �� - -
Protected Protected Protected
Rights: Include Include include Include
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
Lanes: 1 0 2 1 0 1 0 1 1 0 1 0 1 1 0 1 0 1 1 0
VolumeModule: --------------- 11 --------------11---------------11--- ------
Base Vol: 109 405 154 91 969 52 129 394 326 302 436 98
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bae: 109 405 154 91 969 52 129 394 326 302 436 98
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 109 405 154 91 969 52 129 394 326 303 436 98
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol. 109 405 154 91 969 52 129 394 326 302 436 98
PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLP Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 109 405 154 91 969 52 129 394 326 302 436 98
Saturation Flow -Module:-----I1--------------- 11 -------------- --------------
Sat/Lane: 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700
Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lanes: 1.00 2.17 0.83 1.00 1.90 0.10 1.00 1.09 0.91 1.00 1.63 0.37
Final Sat.: 1700 3695 1405 1700 3227 173 1700 1861 1539 1700 2776 624
- --------------- --------------- ---------------
Capacity Analysis Module:
�
Vol/Sat: 0.06 0.11 0.11 0.05 0.30 0.30 0.08 0.21 0.21 0.18 0.16 0.16
Crit Moves: tw## r*#* ww#r #t #t
Traffix 7.7.1115 (c) 2004 Dowling ASSOC. Licensed to KATZ OKITSU, TUSTIN, CA
Existing PM Thu Mar 30 2006 14:35:46 Page 1-1
--------------------------------------------------------------------------------
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Existing PM
--------------------------------------------------------------------------
Scenario Report
Scenario: Existing PM
Command: Existing PM
Volume: Existing PM
Geometry: Existing
Impact Fee: Default Impact Fee
Trip Generation: PM
Trip Distribution: ALL
Paths: Default Paths
Routes: Default Routes
Configuration: Existing PM
Traffix 7.7.1115 (c) 2004 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA
Existing PM Thu Mar 30, 2006 14:35:46 Page 2-1
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Existing PM
--------------------------------------------------------------------------------
Turning Movement Report
PM
Volume Northbound Southbound Eastbound westbound Total
Type Left Thru Right Left Thru Right Left Thru Right Left Thru Right Volume
#1 Red Hill i Walnut
Base 248 1064 171 128 471 110 118 398 103 250 699 144 3904
Added 0 0 0 0 0 0 0 0 0 0 0 0 0
Total 248 1064 171 128 471 110 118 398 103 250 699 144 3904
#2 Driveway on Red Hill
Base 0 0 0 0 0 0 0 0 0 0 0 0 0
Added 0 0 0 0 0 0 0 0 0 0 0 0 0
Total 0 0 0 0 0 0 0 0 0 0 0 0 0
#3 Driveway on Walnut
Base 0 0 0 0 0 0 0 0 0 0 0 0 0
Added 0 0 0 0 0 0 0 0 0 0 0 0 0
Total 0 0 0 0 0 0 0 0 0 0 0 0 0
Traffix 7.7.1115 (c) 2004 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA
Existing PM Thu Mar 30, 2006 14:35:46 Page 3-1
--------------------------------------------------------------------------------
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Existing PM
--------------------------------------------------------------------------------
Intersection Volume Report
Base Volume Alternative
--------------------------------------------------------------------------------
Northbound Southbound Eastbound Westbound
Node Intersection L -- T -- R L -- T -- R L -- T -- R L T R
I Red Hill & Wa 248 1064 171 128 471 110 118 398 103 250 699 144
Traffix 7.7.1115 (C) 2004 Dowling Assoc. Licensed to KATZ O=TSu, TUSTIN, CA
Existing PM Thu Mar 30, 2006 14:35:46 Page 4-1
------------------------------------ w -------------------------------------------
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Existing PM
--------------------------------------------------------------------------------
Impact Analysis Report
Level Of Service
Intersection Base Future Change
Del/ V/ Del/ V/ in
LOS Veh C LOS Veh C
# 1 Red Hill & Walnut B xxxxx 0.684 B xxxxx 0.684 + 0.000 V/C
Traffix 7.7.1115 (c) 2004 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA
Existing PM Thu Mar 30, 2006 14:35:46 Page 5-1
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Existing PM
------------------------------------------------------------------
Level Of Service Computation Report
ICU 1(Loss as Cycle Length 4) Method (Base Volume Alternative)
rrxx*x#r*tw#rxttxAlttxlAxt*ttt*txttt!#xtxt*x*tttrxrltAtrs*t♦#ttAAt1*tArt#ttttttr
Intersection #1 Red Hill & Walnut
tx4lxt!***tAx!*txlAttAltlxlAA*ltrrtxr#txr*lrrtrittttxt#!!At*trtxr##tt tx*xrttA#x!
Cycle (sec): 100 Critical Vol./Cap. (X): 0.684
Loss Time (sec): 5 (Y+R - 4 sec) Average Delay (sec/veh): xxxxxx
Optimal Cycle: 36 Level Of Service: B
*r#trttr##tAltr#wttrxxtttxtxx!#xrt!#rlrrtxxx#rr*rt#t*txxrtx#ttxxfrrxxrittxtr#i#r
Street Name: Red Hill Ave walnut Ave
Approach: North Bound South Bound East Bound West Bound
Movement: L - T - R L - T- R L - T- R L - T- R
Control.:--- I_'-ProtectedProtected
- _II --------------- 11---------------11---------------I
Protected Protected
Rights: Include Include Include Include
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
Lanes: 1 0 2 1 0 1 0 1 1 0 1 0 1 1 0 1 0 1 1 0
Volume Module--------------- II --------------- II --------------- II ---------------
j
Base Vol: 248 1064 171 128 471 110 118 398 103 250 699 144
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bae: 248 1064 171 128 471 110 118 398 103 250 699 144
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 248 1064 171 128 471 110 118 398 103 250 699 144
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 248 1064 171 128 471 110 118 398 103 250 699 144
PCS Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLP Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 248 1064 171 128 471 110 118 398 103 250 699 144
Saturation Flow -Module:----- II -------------- ---------------II------ -------)
Sat/Lane: 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700
Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1,00 1.00 1.00 1.00 1.00
Lanes: 1.00 2.58 0.42 1.00 1.62 0.38 1.00 1.59 0.41 1.00 1.66 0.34
Final Sat.: 1700 4394 706 1700 2756 644 1700 2701 699 1700 2819 581
Capacity Analysis Module;
--- II---------------II---------------�I--------------
Vol/Sat: 0.15 0.24 0.24 0.08 0.17 0.17 0.07 0.15 0.15 0.15 0.25 0.25
Crit Moves: xxA* lxAr AtA! AAAA
•tttx**x*A*w+*A+►rArtx*tt#xrt*txxr*txxttt*x*xt#ttAlxxlrtAxArtAt*tAAAAAA*AA##A*tAt
Traffix 7.7.1115 (c) 2004 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA
Existing Plus AM Fri Dec 15, 2006 14:36:28 Page 1-1
----------------------------------------------------------------------------
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Existing Plus Reuse Alternative 1 Without Project
-----------------------------------------------------------
Scenario Report
Scenario: Existing Plus AM
Command: Existing Plus AM
Volume: Existing AM
Geometry: Nearterm
Impact Fee: Default Impact Fee
Trip Generation: AM
Trip Distribution: ALL
Paths: Default Paths
Routes: Default Routes
Configuration: Existing Plus AM
Existing Plus AM Fri Dec 15, 2006 14:36:28 Page 2-1
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Existing Plus Reese Alternative 1 Without Project
--------------------------------------------------------------------------------
Turning Movement Report
AM
Volume Northbound Southbound Eastbound Westbound Total
Type Left Thru Right Left Thru Right Left Thru Right Left Thru Right Volume
#1 Red Hill & Walnut
Base 111 413 157 93 988 53 132 402 333 308 445 100 3534
Added 0 0 0 0 0 0 0 0 0 0 0 0 0
Total 111 413 157 93 988 53 132 402 333 308 445 100 3534
#2 Driveway on Red Hill
Base 0 0 0 0 0 0 0 0 0 0 0 0 0
Added 0 0 0 0 0 0 0 0 0 0 0 0 0
Total 0 0 0 0 0 0 0 0 0 0 0 0 0
#3 Driveway on Walnut
Base 0 0 0 0 0 0 0 0 0 0 0 0 0
Added 0 0 0 0 0 0 0 0 0 0 0 0 0
Total 0 0 0 0 0 0 0 0 0 0 0 0 0
Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA
Existing Plus AM Fri Dec 15, 2006 14:36:28 Page 3-1
--------------------------------------------------------------------------------
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Existing Plus Reuse Alternative I Without Project
--------------------------------------------------------------------------------
Intersection Volume Report
Base Volume Alternative
--------------------------------------------------------------------------------
Northbound Southbound Eastbound Westbound
Node Intersection L -- T -- R L -- T -- R L -- T -- R L T R
1 Red Hill & Wa 111 413 157 93 988 53 132 402 333 308 445 100
2 Driveway on R 0 0 0 0 0 0 0 0 0 0 0 0
3 Drivewa"Y on W 0 0 0 0 0 0 0 0 0 0 0 0
Existing Plus AM Fri Dec 15, 2006 14:36:28 Page 4-1
--------------------------------------------------------------------------------
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Existing Plus Reuse Alternative 1 Without Project
--------------------------------------------------------------------------------
Impact Analysis Report
Level Of Service
Intersection Base Future Change
Del/ V/ Del/ V/ in
LOS Veh C LOS Veh C
# 1 Red Hill & Walnut B xxxxx 0.678 B xxxxx 0.678 + 0.000 V/C
# 2 Driveway on Red Hill 0.0 0.000 0.0 0.000 + 0.000 D/V
# 3 Driveway on Walnut 0.0 0.000 0.0 0.000 + 0.000 D/V
Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA Traffix 7.8-0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA
J
Existing Plus AM Fri Dec 15, 2006 14:36t28 Page 5-1
--------------------------------------------------------------------------------
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Existing Plus Reuse Alternative I Without Project
-
-------------------------------------------------------------------------
------
Threshold Report (Base Alternative)
Threshold Criteria [Ops LOS >- *][Plan LOS >- *1
[Delay >= 60.000][V/C >. 1.000]
Intersection Movement LOS Delay V/C
Existing Plus AM Fri Dec 15, 2006 14:36:28 Page 6-1
--------------------------------------------------------------------------------
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Existing Plus Reuse Alternative 1 Without Project
--------------------------------------------------------------------------------
Threshold Report (Future Alternative)
Threshold Criteria [Ops LOS >- *)[Plan LOS >-
[Delay >= 60.000)[V/C >- 1.000]
Intersection Movement LOS Delay V/C
Traffix 7.8.0715 (c) 2006 Dowling ASSOC. Licensed to KATZ OKITSU, TUSTIN, CA Traffix 7.8.0715 (C) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA
Existing Plus AM Fri Dec 15, 2006 14:36:28 Page 7-1
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Existing Plus Reuse Alternative 1 Without Project
----------------------------------------------------------------------------
Level Of Service Computation Report
ICU 1(Loss as Cycle Length %) Method (Base Volume Alternative)
Intersection #1 Red Hill & Walnut
Cycle (sec): 100 Critical Vol./Cap.(X): 0.678
Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx
Optimal Cycle: 71 Level Of Service: B
Street Name: Red Hill Ave Walnut Ave
Approach: North Bound South Bound East Bound West Bound
Movement: L - T - R L - T - R L - T - R L - T - R
Control: Protected
------------
) --Protected _ II ---------------
+1 ---------------
Protected i1--'_____---..-..
Protected
Rights: Include Include Include Include
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
Lanes: 1 0 2 1 0 1 0 1 1 0 1 0 1 1 0 2 0 1 1 0
Volume -Module ---------------11-------------- 11----- -------- 11 ---------------
Base Vol: 109 405 154 91 969 52 129 394 326 302 436 98
Growth Adj: 1.02 1.02 1.02 1.02 1.02 1.02 1.021.02 1.02 1.02 1.02 1.02
Initial Bse: 111 413 157 93 988 53 132 402 333 308 445 100
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 111 413 157 93 988 53 132 402 333 308 445 100
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 111 413 157 93 988 53 132 402 333 308 445 100
PCF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 111 413 157 93 988 53 132 402 333 308 445 100
---------------
I) -------------- --------------- --------------
Saturation Flow Module: )
Sat/Lane: 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700
Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lanes: 1.00 2.17 0.83 1.00 1.90 0.10 1.00 1.09 0.91 2.00 1.63 0.37
Final Sat.: 1700 3695 1405 1700 3227 173 1700 1861 1539 3400 2776 - 624
--- --------------- --------------- _-,.--------___-
Capacity Analysis Module: )
Vol/Sat: 0.07 0.11 0.11 0.05 0.31 0.31 0.08 0.22 0.22 0.09 0.16 0.16
Crit Moves: **** «««« **** ****
Existing Plus AM Fri Dec 15, 2006 14:36:28 Page 8-1
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Existing Plus Reuse Alternative 1 Without Project
Level Of Service Computation Report
ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative)
Intersection #1 Red Hill & Walnut
Cycle (sec): 100 Critical Vol./Cap.(X): 0.678
Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx
Optimal Cycle: 71 Level Of Service: B
Street Name: Red Hill Ave Walnut Ave
Approach: North Bound South Bound Fast Bound West Bound
Movement: L - T - R L - T - R L - T - R L - T - R
------------ I ---------------11---------------11---------------11---------------
Control: Protected Protected Protected Protected
Rights: Include Include Include Include
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
Lanes: 1 0 2 1 0 1 0 1 1 0 1 0 1 1 0 2 0 1 1 0
----------- ---------------11 -------------- --------------- ---------------
volume Module:
Base Vol: 109 405 154 91 969 52 129 394 326 302 436 98
Growth Adj: 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02
Initial Bse: 111 413 157 93 988 53 132 402 333 308 445 100
Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0
PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0
Initial Fut: 111 413 157 93 988 53 132 402 333 308 445 100
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 111 413 157 93 988 53 132 402 333 308 445 100
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 111 413 157 93 988 53 132 402 333 308 445 100
PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 111 413 157 93 988 53 132 402 333 308 445 100
--- "---------------II---------------+I---------------
Saturation Flow Module: I
Sat/Lane: 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700
Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lanes: 1.00 2.17 0.83 1.00 1.90 0.10 1.00 1.09 0.91 2.00 1.63 0.37
Final Sat.: 1700 3695 1405 1700 3227 173 1700 1861 1539 3400 2776 624
----- I --------------- --------------- --------------- -------------
Capacity Analysis Module:
Vol/Sat: 0.07 0.11 0.11 0.05 0.31 0.31 0.08 0.22 0.22 0.09 0.16 0.16
Crit Moves: **** **** «««* «***
Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA
Existing Plus AM Fri Dec 15, 2006 14:36:28 Page 9-1
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Existing Plus Reuse Alternative 1 Without Project
----------------------------------------------------
Level Of Service Computation Report
2000 HCM Unsignalized Method (Base Volume Alternative)
t***t:***,t***,t«*�*,t***«****t**�,ter*#***,ts,t***+r�*re***w*�*,t**w��t******s►*tri►*.w*�*
Intersection #2 Driveway on Red Hill
#:****,r**,r*rrw***,r*,c***t*,r*+r,r**********t**�********�r***rs�•.�**�****�*+rte*t�,r*r�*,t
Average Delay (sec/veh): 0.0 Worst Case Level Of Service: I 0.0]
*#***�,ttrr,►�*******,trrw*�►*rr**,�,r**wt*,r*******�*,rw***�*w+►*�*,►*#***+►w�«**,t+t,r,r*+r,►w*,rt,r
Approach: North Bound South Bound East Bound West Bound
Movement: L - T - R L - T - R L - T - R L - T - R
Control. -I - --
Stop Sign Stop Sign -I' Uncontrolled -11 Uncontrolled
Rights: Include Include Include Include
Lanes: 0 0 2 0 0 0 0 1 1 0 0 0 0 0 1 0 0 0 0 0
--------------+--------------- ��---------------��-------------
Volume Modules�
Base Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Growth Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Initial Bse: 0 0 0 0 0 0 0 0 0 0 0 0
User Adj: 0.00 0.00 0.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
PHF Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
PHF Volume: 0 0 0 0 0 0 0 0 0 0 0 0
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Final Vol.: 0 0 0 0 0 0 0 0 0 0 0 0
------------ --------------- --------------- --------------- ---------------�
Critical Gap Module:
Critical Gp: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
FollowUpTim: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
------------ ------------�'-------------- --------------- ---------------
Capacity Module: ,
Cnflict Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Potent Cap.: 0 0 0 0 0 0 0 0 0 0 0 0
Move Cap.: 1 1 1 1 1 1 1 1 1 1 1 1
Volume/Cap: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
----- ---------------
- I' --------------- II ---------------
Level OfService Module: �
2Way95thQ: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Control Del: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
LOS by Move:
Movement: LT - LTR - RT LT - LTR'- RT LT - LTR - RT LT - LTR - RT
Shared Cap.: 0 0 0 0 0 0 0 0 0 0 0 0
SharedQueue: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Shrd ConDel: 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Shared LOS:
ApproachDel: 0.0 0.0 0.0 0.0
ApproachLOS:
,t*****wt+t�*t*,r***�**,ter*,t**,r**rt+►**,t***����r*rt,rrr*�,t*,t**t*,rw*rt*�r*+e,t**�,t*+t,t*rt*,r*****
Note: Queue reported is the number of cars per lane.
rtr�.*.r*rtrrrtrttrrtr►,r,r**�**w***.*.***s**ww��:�r*+►w.,rr.,►�*,w**+t+�*,�***w,�,►*rr*r**,rw,r
Existing Plus AM Fri Dec 15, 2006 14:36:28 Page 10-1
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Existing Plus Reuse Alternative 1 Without Project
--------------------------------------------------------------------------------
Level Of Service Computation Report
2000 HCM Unsignalized Method (Future Volume Alternative)
***�,t,rtrt***,rt*,tw*,tw,r�*�t****�rr,t+tt*rt+t,►,ter**,t+trr�*.*�r*+ts**,a***t*****,r*rwt**,tww*�r�t*,r#
Intersection #2 Driveway on Red Hill
Average Delay (sec/veh): 0.0 Worst Case Level Of Service: C 0.01
Approach: North Bound South Bound East Bound West Bound
Movement; L - T R L - T - R L - T - R L - T - R
-------
Control: ' Stop Sign Stop Sign II Uncontrolled Uncontrolled,
Rights: Include Include Include Include
Lanes: 0 0 2 0 0 0 0 1 1 0 0 0 0 0 1 0 0 0 0 0
--------------��-------------- ��--------------- ��--------------
volume Module: )
Base Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Growth Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Initial Bse: 0 0 0 0 0 0 0 0 0 0 0 0
Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0
PasserByvol: 0 0 0 0 0 0 0 0 0 0 0 0
Initial Fut: 0 0 0 0 0 0 0 0 0 0 0 0
User Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
PHF Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
PHF Volume: 0 0 0 0 0 0 0 0 0 0 0 0
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Final Vol.: 0 0 0 0 0 0 0 0 0 0 0 0
Critical Gap Module:
Critical Gp: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
FollowUpTim: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
----------- --------------- 11 --------------- ---------------
Capacity Modules�
Cnflict Vols 0 0 0 0 0 0 0 0 0 0 0 0
Potent Cap.: 0 0 0 0 0 0 0 0 0 0 0 0
Move Cap.: 1 1 1 1 1 1 1 1 1 1 1 1
Volume/Cap: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
___�I--------------- ��--------------- ��---------------
Level Of service Module:�
2Way95thQ: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Control Del: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
LOS by Move:
Movement: IT - LTR - RT LT - LTR - RT LT - LTR - RT LT - LTR - RT
Shared Cap.: 0 0 0 0 0 0 0 0 0 0 0 0
SharedQueue: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Shrd ConDel: 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Shared LOS:
ApproachDel: 0..0 0.0 0.0 0.0
ApproachLOS:
Note: Queue reported is the number of cars per lane.
Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA
Existing Plus AM Fri Dec 15, 2006 14:36:28 Page 11-1
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Existing Plus Reuse Alternative 1 Without Project
--------------------------------------------------------
Level Of Service Computation Report
2000 HCM Unsignalized Method (Base Volume Alternative)
Intersection #3 Driveway on Walnut
Average Delay (sec/veh): 0.0 Worst Case Level of Service: [ 0.01
Approach: North Bound South Bound Bast Bound West Bound
Movement: L - T - R L - T - R L - T - R L - T - R
------------ --------------- --------------- --------------- ---------------
Control:
-------------Control: Stop Sign Stop Sign UncontrolledUncontrolled
Rights: Include Include Include Include
Lanes: 0 0 0 0 0 1 0 0 0 1 1 0 2 0 0 0 0 1 1 0
-------------- --------------- --------------- ---------------
Volume Module:�
Base Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Growth Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Initial Bse: 0 0 0 0 0 0 0 0 0 0 0 0
User Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
PHF Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
PHF Volume: 0 0 0 0 0 0 0 0 0 0 0 0
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Final Vol.: 0 0 0 0 0 0 0 0 0 0 0 0
------------ --------------- --------------- --------------- ---------------(
Critical Gap Module:
Critical Gp: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
FollowUpTim: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
--------------- ---------------II---------------I�---------------
Capacity Module=I
Cnflict Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Potent Cap.s 0 0 0 0 0 0 0 0 0 0 0 0
Move Cap.: 1 1 1 1 1 1 1 1 1 1 1 1
Volume/Cap: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
-----��----___.._____-------------------------------Level of service Module;�
2Way95thQ: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Control Del: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
LOS by Move:
Movement: LT - LTR - RT LT - LTR - RT LT - LTR - RT LT - LTR - RT
Shared Cap.: 0 0 0 0 0 0 0 0 0 0 0 0
SharedQueue: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Shrd ConDels 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Shared LOS:
ApproachDel: 0.0 0.0 0.0 0.0
ApproachLOS:
Note: Queue reported is the number of cars per lane.
Existing Plus AM Fri Dec 15, 2006 14:36:28 Page 12-1
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Existing Plus Reuse Alternative 1 Without Project
--------------------------------------------------------------------------------
Level Of Service Computation Report
2000 HCH Unsignalized Method (Future Volume Alternative)
Intersection #3 Driveway on Walnut
Average Delay (sec/veh): 0.0 Worst Case Level Of Service: ( 0.01
Approach: North Bound South Bound East Bound West Bound
Movement: L - T - R L - T - R L - T - R L - T - R
--
Control: I Stop Sign Il Stop Sign II Uncontrolled - -I) Uncontrolled
'
ed
Rights: Include Include Include Include
Lanes: 0 0 0 0 0 1 0 0 0 1 1 0 2 0 0 0 0 1 1 0
--------------------------- -----------------------------------------
Volume Module: �
Base Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Growth Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Initial Bse: 0 0 0 0 0 0 0 0 0 0 0 0
Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0
PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0
Initial Fut: 0 0 0 0 0 0 0 0 0 0 0 0
User Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
PHF Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
PHF Volume: 0 0 0 0 0 0 0 0 0 0 0 0
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Final Vol.: 0 0 0 0 0 0 0 0 0 0 0 0
Critical Gap Module:
Critical Cps 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
FollowUpTim;0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
.f
--_----_---�--------------- --------------- --------------- ---------------
Capacity Module:
Cnflict Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Potent Cap.: 0 0 0 0 0 0 0 0 0 0 0 0
Move Cap.: 1 1 1 1 1 1 1 1 1 1 1 1
Volume/Cap: 0.00 0.00 Q.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
--- ---------------
-II-------------- II ------
Level Of Service Module: I
2Way95thQ: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Control Del: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
LOS by Move:
Movement: LT - LTR - RT LT - LTR - RT LT - LTR - RT LT - LTR - RT
Shared Cap.: 0 0 0 0 0 0 0 0 0 0 0 0
SharedQueue: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Shrd ConDel: 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Shared LOS:
ApproachDel: 0.0 0.0 0.0 0.0
ApproachLOS:
Note: Queue reported is the number of cars per lane.
Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA
Existing Plus AM Fri Dec 15, 2006 14:36:28 Page 13-1
-
-----------------------------------------------------------------------------
--
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Existing Plus Reuse Alternative 1 Without Project
-
---------------------------------------------------------------
------------
----
Base Queue Report (cars)
--------------------------------------------------------------------------------
Northbound Southbound Eastbound Westbound
Node Intersection L -- T -- R L -- T -- R L -- T R L T R
#2 [2Way95thQ1, 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
#3 E2Way95thQ]: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Existing Plus AM Fri Dec 15, 2006 14:36:28 Page 14-1
--------------------------------------------------------------------------------
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Existing Plus Reuse Alternative 1 Without Project
--------------------------------------------------------------------------------
Future Queue Report (cars)
--------------------------------------------------------------------------------
Northbound Southbound Eastbound Westbound
Node Intersection L -- T -- R L -- T -- R L -- T -- R L -- T -- R
#2 [2Way95thQJt 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
#3 [2Way95thQJ: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Traffix 7.8.0715 (c) 2006 Dowling ASSOC. Licensed to KATZ OKITSU, TUSTIN, CA Traffix 7.8-071S (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA
Existing Plus PM
Fri Dec 15, 2006 14:36:22 Page 1-1
- -----------------------------------------------------
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Existing Plus Reuse Alternative 1 without Project
--------------------------------------------------------
Scenario Report
Scenario:
Existing Plus PM
Command:
Existing Plus PM
Volume:
Existing PM
Geometry:
Nearterm
Impact Fee:
Default Impact Fee
Trip Generation:
PM
Trip Distribution:
ALL
Paths:
Default Paths
Routes:
Default Routes
Configuration:
Existing Plus PM
Existing Plus PM Fri Dec 15, 2006 14:36:22 Page 2-1
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Existing Plus Reuse Alternative 1 Without Project
--------------------------------------------------------------------------------
Turning Movement Report
PM
Volume Northbound Southbound Eastbound Westbound Total
Type Left Thru Right Left Thru Right Left Thru Right Left Thru Right Volume
#1 Red Hill & Walnut
Base 253 1085 174 131 480 112 120 406 105 255 713 147 3982
Added 0 0 0 0 0 0 0 0 0 0 0 0 0
Total 253 1085 174 131 480 112 120 406 105 255 713 147 3982
#2 Driveway on Red Hill
Base 0 0 0 0 0 0 0 0 0 0 0 0 0
Added 0 0 0 0 0 0 0 0 0 0 0 0 0
Total 0 0 0 0 0 0 0 0 0 0 0 0 0
#3 Driveway on Walnut
Base 0 0 0 0 0 0 0 0 0 0 0 0 0
Added 0 0 0 0 0 0 0 0 0 0 0 0 0
Total 0 0 0 0 0 0 0 0 0 0 0 0 0
Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA
Existing Plus PM Fri Dec 15, 2006 14:36:22 Page 3-1
--------------------------------------------------------------------------------
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Existing Plus Reuse Alternative 1 Without Project
-
------------------------------------------------------------------------------
-
Intersection Volume Report
Base Volume Alternative
--------------------------------------------------------------------------------
Northbound Southbound Eastbound Westbound
Node Intersection L -- T -- R L -- T -- R L -- T R L T R
1 Red Hill & Wa 253 1085 174 131 480 112 120 406 105 255 713 147
2 Driveway on R 0 0 0 0 0 0 0 0 0 0 0 0
3 Driveway on W 0 0 0 0 0 0 0 0 0 0 0 0
TraffiX 7.8.0715 (c) 2006 Dowling ASSOC. Licensed to KATZ OXITSU, TUSTIN, CA
4
Existing Plus Pm Fri Dec 15, 2006 14:36:22 Page 4-1
--------------------------------------------------------------------------------
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Existing Plus Reuse Alternative 1 without Project
--------------------------------------------------------------------------------
Impact Analysis Report
Level Of Service
Intersection Base Future Change
Del/ V/ Del/ V/ in
LOS Veh C LOS Veh C
# 1 Red Hill & Walnut B xxxxx 0.648 B xxxxx 0.648 + 0.000 V/C
# 2 Driveway on Red Hill 0.0 0.000 0.0 0.000 + 0.000 D/V
# 3 Driveway on Walnut 0.0 0.000 0.0 0.000 + 0.000 D/V
Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA
Existing Plus Pm Fri Dec 15, 2006 14:36:22 Page 5-1
--------------------------------------------------------------------------------
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Existing Plus Reuse Alternative 1 Without Project
---------------------------------------------------------------------------------
Threshold Report (Base Alternative)
Threshold Criteria [OPB LOS >- *][Plan LOS >- *]
[Delay >= 60.000] [V/C >- 1.000]
Intersection Movement LOS Delay V/C
Existing Plus PM Fri Dec 15, 2006 14;36;22 Page 6-1
--------------------------------------------------------------------------------
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Existing Plus Reuse Alternative 1 Without Project
--------------------------------------------------------------------------------
Threshold Report (Future Alternative)
Threshold Criteria [Ops LOS >- *][Plan LOS >- *]
[Delay >- 60.000][V/C >- 1.000]
Intersection Movement LOS Delay V/C
Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA
Existing Plus PM Fri Dec 15, 2006 14:36:22 Page 7-1
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
----------------Existing-Plus-Reuse-Alternative-l-Without-Project---------------
Level Of Service Computation Report
ICU 1(Loss as Cycle Length t) Method (Base Volume Alternative)
Intersection #1 Red Hill & Walnut
Cycle (sec): 100 Critical Vol./Cap.(X): 0.648
Loss Time (sec): 0 (Y+R-4 .0 sec) Average Delay (sec/veh) : xxxxxx
Optimal Cycle: 65 Level Of Service: B
Street Name: Red Hill Ave Walnut Ave
Approach: North Bound South Bound East Bound West Bound
Movement: L - T - R L - T - R L - T - R L - T - R
Control: --I --------------11 --------------11---------------1(------------ --�
Protected Protected Protected Protected
Rights: Include Include Include Include
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
Lanes: 1 0 2 1 0 1 0 1 1 0 1 0 1 1 0 2 0 1 1 0
------------
VolumeModule: --------------( ---------------11-------------- 11--------------�
Base Vol: 248 1064 171 128 471 110 118 398 103 250 699 144
Growth Adj: 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02
Initial Bse: 253 1085 174 131 480 112 120 406 105 255 713 147
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 253 1085 174 131 480 112 120 406 105 255 713 147
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 253 1085 174 131 480 112 120 406 105 255 713 147
PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 253 1085 174 131 480 112 120 406 105 255 713 147
Saturation Flow Module, -----I' --------------- '(--------------- 11 ---------------
�
Sat/Lane: 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700
Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lanes: 1.00 2.58 0.42 1.00 1.62 0.38 1.00 1.59 0.41 2.00 1.66 0.34
Final Sat.: 1700 4394 706 1700 2756 644 1700 2701 699 3400 2819 581
---------------------------��---------------�1--------------- -------------
-
Capacity Analysis Module: ��- �
Vol/Sat: 0.15 0.25 0.25 0.08 0.17 0.17 0.07 0.15 0.15 0.08 0.25 0.25
Crit Moves: **** **** «*«* ***«
Existing Plus PM Fri Dec 15, 2006 14:36:22 Page 8-1
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
----------------Existing-Plus-Reuse-Alternative-l-Without-Project---------------
Level Of Service Computation Report
ICU 1(Loss as Cycle Length 40 Method (Future Volume Alternative)
Intersection #1 Red Hill & Walnut
Cycle (sec): 100 Critical Vol./Cap.(X): 0.648
Lass Time (sec): 0 (Y+R-4.0 sec) Average Delay (sec/veh): xxxxxx
Optimal Cycle: 65 Level Of Service: B
Street Names Red Hill Ave Walnut Ave
Approach: North Bound South Bound Fast Bound West Bound
Movement: L - T R L - T - R L - T - R L - T - R
:protectedProtectedProtected Protected
----�--- --1�------I�------�� - ---
Control I
Rights: Include Include Include Include
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
Lanes: 1 0 2 1 0 1 0 1 1 0 1 0 1 1 0 2 0 1 1 0
--------------)---------------��---------------��---------------
Volume Module, )
Base Vol: 248 1064 171 128 471 110 118 398 103 250 699 144
Growth Adj: 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02
Initial Bse: 253 1085 174 131 480 112 120 406 105 255 713 147
Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0
PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0
Initial Fut: 253 1085 174 131 480 112 120 406 105 255 713 147
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 253 1085 174 131 480 112 120 406 105 255 713 147
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 253 1085 174 131 480 112 120 406 105 255 713 147
PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 253 1085 174 131 480 112 120 406 105 255 713 147
------------ I - ----- --------------- 11 --------------- 11---------------�
Saturation Flow Module:
Sat/Lane: 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700
Adjustment: 1.00 1.0o 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lanes: 1.00 2.58 0.42 1.00 1.62 0.38 1.00 1.59 0.41 2.00 1.66 0.34
Final Sat.: 1700 4394 706 1700 2756 644 1700 2701 699 3400 2819 581
Capacity Analysis Module:__- --------------- '1 --------------- 1I ---------------
I
Vol/Sat: 0.15 0.25 0.25 0.08 0.17 0.17 0.07 0.15 0.15 0.08 0.25 0.25
Crit Moves: **** **** «**« «***
Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA
Existing Plus PM Fri Dec 15, 2006 14:36:23 Page 9-1
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Existing Plus Reuse Alternative 1 Without Project
-------------------------
Level Of Service Computation Report
2000 HCM Unsignalized Method (Base Volume Alternative)
Intersection #2 Driveway on Red Hill
«*rr#,r,►**��t**,►**,r**,rr***rr**w+r**tr**rte*******t**,►w�+►R,►**�****,�*#*rr****:*rr***�►,t:*r*
Average Delay (sec/veh): 0.0 Worst Case Level Of Service: [ 0.01
****,rt***,r*,r*.*,r��*w,r*t*,rte,r*�r�r,e**,r**�,r**.***w.*�,tsr►***,►,�**t**w*e,r*w*�*,r**�:***+►
Approach: North Bound South Bound East Bound West Bound
Movement: L - T - R L - T - R L T - R L - T - R
Control: ---- + ---Stop Sign --11 - StopSign--1) Uncontrolled -11 ---------------
Uncontrolled
Rights: Include Include Include Include
Lanes: 0 0 2 0 0 0 0 1 1 0 0 0 0 0 1 0 0 0 0 0
VolumeModule. --------------11 ------------- II ---------------11 --------------I
Base Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Growth Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
initial Brae: 0 0 0 0 0 0 0 0 0 0 0 0
User Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
PHF Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 *0.00 0.00 0.00
PHF Volume: 0 0 0 0 0 0 0 0 0 0 0 0
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Final Vol.: 0 0 0 0 0 0 0 0 0 0 0 0
lModule:--------11---------------11-------------- II --------------
Critical GapI
Critical Gp: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
FollowUpTim: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Capacity-Module:------------II---------------11---------------11---------------I
Cnflict Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Potent Cap.: 0 0 0 0 0 0 0 0 0 0 0 0
Move Cap.: 1 1 1 1 1 1 1 1 1 1 1 1
Volume/Cap: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
- II---------------II---------------11 ---------------
Level Of Service Module:I
2Way95thQ: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Control Del: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
LOS by Move:
Movement: LT - LTR - RT LT - LTR - RT LT - LTR - RT LT - LTR - RT
Shared Cap.: 0 0 0 0 0 0 0 0 0 0 0 0
SharedQueue: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Shrd ConDel: 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Shared LOS:
ApproachDel: 0.0 0.0 0.0 0.0
ApproachLOS:
Note: Queue reported is the number of cars per lane.
**,►**r�,r,r*rr*rr,�*+rrr*wrr********t****rt***,r#****,r**,r*+ew*�
Existing Plus PM Fri Dec 15, 2006 14:36:23 Page 10-1
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Existing Plus Reuse Alternative 1 Without Project
--------------------------------------------------------------------------------
Level Of Service Computation Report
2000 HCM Unsignalized Method (Future Volume Alternative)
*,r,t*,r**�►�,�,r*w**rr**,r+►**�:*,w*�**,t.*r#*rr*w*,r***+a*#*+r�r**s,t*,r***+t*w,r,r*rrrr.*,e***,r#,►,r**,r
Intersection #2 Driveway on Red Hill
rr**rr,est*�+t*s**�*w,►��*��rt*�r***+k�*�****,r*«t*�t*«�*t*t***,rrt****rtt***�t*,t ,r******rr,r•,r**+r
Average Delay (sec/veh): 0.0 Worst Case Level Of Service: ( 0.01
Approach: North Bound South Bound East Bound West Bound
Movement: L - T - R L - T - R L - T - R L - T - R
------------I---------------II---------------II---------------II---------------I
Control: Stop Sign Stop Sign Uncontrolled Uncontrolled
Rights: Include Include Include Include
Lanes: 0 0 2 0 0 0 0 1 1 0 0 0 0 0 1 0 0 0 0 0
---------------II---------------II---------------II---------------
Volume Module=I
Base Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Growth Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Initial Bae: 0 0 0 0 0 0 0 0 0 0 0 0
Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0
PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0
Initial Fut: 0 0 0 0 0 0 0 0 0 0 0 0
User Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
PHF Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
PHF Volume: 0 0 0 0 0 0 0 0 0 0 0 0
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Final Vol.: 0 0 0 0 0 0 0 0 0 0 0 0
Critical Gap Module:
Critical Gps 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
FollowUpTim: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
------------I-------------II---------------II---------------II---------------I
Capacity Module:
Cnf l i ct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Potent Cap.: 0 0 0 0 0 0 0 0 0 0 0 0
Move Cap.: 1 1 1 1 1 1 1 1 1 1 1 1
Volume/Cap: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
-- = --------- I -------II---------------II---------------II---------------I
Level Of Service Module:
2Way95thQ: 0.0 0.0 0.0 0_.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Control Del: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
LOS by Move:
Movement: LT - LTR - RT LT - LTR - RT LT - LTR - RT LT - LTR - RT
Shared Cap.: 0 0 0 0 0 0 0 0 0 0 0 0
SharedQueue: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Shrd ConDela 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Shared LOS:
ApproachDel: 0.0 0.0 0.0 0.0
ApproachLOS:
r*,►,r,r**rr***,r**k**+rw*�.*�,�**.***w.*w.,r*:,r,►,r**�stw**re*�******rr+r*�,►*#*.:***,►*w*sr►**
Note: Queue reported is the number of cars per lane.
Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA
.+..wrv►...�.,,�,� ky � .:: �rmi�'f +per .. .. ,.
Existing Plus PM Fri Dec 15, 2006 14:36:23 Page 11-1
JA6539 - 75 -Unit Residential Project TSS
City of Tustin
Existing Plus Reuse Alternative 1 without Project
-
Level Of Service Computation Report - -
1994 HCM Unsignalized Method (Base Volume Alternative)
*+r*w*,r**�*****�****�*rr***,e*+w*****,r�*r►*�***+t**+r*«+t�******,t*�w*t****,��**�******,r«t
Intersection #3 Driveway on Walnut
*.*,r.t***f�*w*+►*�**t*tr***,t***rr,r***,e�*+t�,r*tt,r****rt***,��#**�**�****��*rt******�*w**�
Average Delay (sec/veh): 0.0 Worst Case Level Of Service:
w,►,rt�rw*w�***�+t*�***w**,r,t***+r*,�*�r*,r***,r*,e*w*wt*«r�,r,�w***rt*,r*,rte*r+r�*rr�+rw.,►,rrr**w�►*•*
Approach: North Bound South Bound East Bound West Bound
Movement: L - T - R L - T - R L - T - R L - T - R
------------------- ---------------11= -------------- ---------------
Control: �
Stop Sign Stop Sign Uncontrolled Uncontrolled
Rights: Include Include Include Include
Lanes: 0 0 0 0 0 1 0 0 0 1 1 0 2 0 0 0 0 1 1 0
-------------- --------------- --------------- --------------
Volume Modulesj
Base Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Growth Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Initial Bse: 0 0 0 0 0 0 0 0 0 0 0 0
User Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0.0 0.00 0.00 0.00 0.00
PHF Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
PHF Volume: 0 0 0 0 0 0 0 0 0 0 0 0
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Final Vol.: 0 0 0 0 0 0 0 0 0 0 0 0
------11 --------------- 41--------------- ��-------------
Adjusted volume Module:�
Grade: Oar 0& 0% 0t
* Cycle/Cars: xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx
% Truck/Comb: xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx
PCE Adj: 0.00 0.00 0:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Cycl/Car PCE: xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx
Trck/Cmb PCE: xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx
Adj Vol.: 0 0 0 0 0 0 0 0 0 0 0 0
lModule:------- ��--------------- ��--------------- ��---------------
Critical Gap�
MoveUp Time: 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Crit Gp Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Critical Gp: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
----------------------------------------- --------------
Capacity Module: ,
Cnflict Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Potent Cap.: 0 0 0 0 0 0 0 0 0 0 0 0
Adj Cap: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.001.00 1.00
Move Cap.: 1 1 1 1 1 1 1 1 1 1 1 1
--- 'I - II---------------" ---------------
Level Of service Module. )
Control Dei: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
LOS by Moves
Movements LT - LTR - RT LT - LTR - RT LT - LTR - RT LT - LTR - RT
Shared Cap.: 0 0 0 0 0 0 0 0 0 0 0 0
Shrd ConDel: 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Shared LOS:
ApproachDel: 0.0 0.0 0.0 0.0
Existing Plus PM Fri Dec 15, 2006 14:36:23 Page 11-2
--------------------------------------------------------------------------------
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Existing Plus Reuse Alternative 1 Without Project
--------------------------------------------------------------------------------
Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA
Existing Plus PM Fri Dec 15, 2006 14:36:23 Page 12-1
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Existing Plus Reuse Alternative 1 Without Project
-----------------------------------------
Level Of Service Computation Report
1994 RCM Unsignalized Method (Future Volume Alternative)
Intersection #3 Driveway on Walnut
******#***w****w**www*w*ww*w***www*******,rw�e*w**,t**wwwww**+►**+r**,r*w******ww,r*w*w
Average Delay (sec/veh)z 0.0 Worst Case Leve, Of Service.
Approach: North Bound South Bound East Bound West Bound
Movement: L - T - R L - T - R L - T - R L - T - R
Control:---- ------ + - �)---------------�)---------------��---------------�
Stop Sign Stop Sign Uncontrolled Uncontrolled
Rights: Include Include Include Include
Lanes: 0 0 0 0 0 1 0 0 0 1 1 0 2 0 0 0 0 1 1 0
---------------�J---------------��--------------- �)---------------
Volume Module:)
Base Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Growth Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Initial Bse: 0 0 0 0 0 0 0 0 0 0 0 0
Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0
PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0
Initial Fut: 0 0 0 0 0 0 0 0 0 0 0 0
User Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
PHF Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
PHP Volume: 0 0 0 0 0 0 0 0 0 0 0 0
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Final Vol.: 0 0 0 0 0 0 0 0 0 0 0 0
Adjusted Volume Module:
Grade: 0V, 0P,
of, pP,
t Cycle/Cars: xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx
$ Truck/Comb: xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx
PCE Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Cycl/Car PCE: xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx
Trck/Cmb PCE: xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx
Adj Vol.: 0 0 0 0 0 0 0 0 0 0 0 0
Critical Gap Module:
MoveUp Time: 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Critical Gp: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Capacity -Module:------------ -------------- ----------------------------
Cnflict Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Potent Cap.: 0 0 0 0 0 0 0 0 0 0 0 0
Adj Cap: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Move Cap.: 1 1 1 1 1 1 1 1 1 1 1 1
w --I) --------------- --------------- ---------------
Level OfService Module. '
Control Del: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
LOS by Move:
Movement: LT - LTR - RT LT - LTR - RT LT - LTR - RT LT - LTR - RT
Shared Cap.: 0 0 0 0 0 0 0 0 0 0 0 0
Shrd ConDel: 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Shared LOS:
ApproachDel: 0.0 0.0 0.0 0.0
Existing Plus PM Fri Dec 15, 2006 14:36:23 Page 12-2
-------------------------------------------------------------------------------
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Existing Plus Reuse Alternative 1 Without Project
*w*ww****ww***www*wwwwwww***www**w********w*w**w***ww*ww***wwwwwww***w*w**w*****
Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA
Existing Plus PM Fri Dec 15, 2006 14:36,23 Page 13-1
--------------------------------------------------------------------------------
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Existing Plus Reuse Alternative I Without Project
-
----------------------------------------------------------------------
---------
Base Queue Report (cars)
--------------------------------------------------------------------------------
Northbound Southbound Eastbound Westbound
Node Intersection L -- T -- R L -- T -- R L T R L T R
#2 [2Way95thQ): 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Existing Plus PM Fri Dec 15, 2006 14:36:23 Page 14-1
--------------------------------------------------------------------------------
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Existing Plus Reuse Alternative 1 Without Project
--------------------------------------------------------------------------------
Future Queue Report (cars)
--------------------------------------------------------------------------------
Northbound Southbound Eastbound Westbound
Node Intersection L -- T -- R L -- T -- R L -- T -- R L -- T -- R
#2 [2Way95thQ]; 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA
rAn
Existing Plus AM Fri Dec 15, 2006 11:20:17 Page 1-1
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Existing Plus Reuse Alternative 1 With Project
--------------------------------------------------------------------------------
Scenario Report
Scenario:
Existing Plus AM
Command:
Existing Plus AM
Volume:
Existing AM
Geometry:
Nearterm
Impact Fee:
Default Impact Fee
Trip Generation:
AM
Trip Distribution:
ALL
Paths
Default Paths
Routes:
Default Routes
Configuration:
Existing Plus AM
Existing Plus AM Fri Dec 15, 2006 11:20:17 Page 2-1
--------------------------------------------------------------------------------
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Existing Plus Reuse Alternative 1 With Project
--------------------------------------------------------------------------------
Trip Generation Report
Forecast for AM
Zone Rate Rate Trips Trips Total * Of
# Subzone Amount Units In Out In Out Trips Total
------------------------------------- ------ ------ ----- ----- ----- -----
1 81 -Unit Resi 1.00 Townhomes 8.00 22.00 8 22 30 100.0
Zone 1 Subtotal ............................. 8 22 30 100.0
--------------------------------------------------------------------------------
TOTAL.................................................. 8 22 30 100.0
Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA
Existing Plus AM Fri Dec 15 2006 11:20:17
---------------------------------------------------------------------page-3-1---
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Existing Plus Reuse Alternative 1 With Project
Trip Distribution Report- - - - - - - -
Percent Of Trips Townhouses
To Gates
1 2 4 5 6
Zone----- ----- ----- ----- -----
1 15.0 15.0 5.0 10.0 55.0
Existing Plus AM Fri Dec 15, 2006 11:20:17 Page 4-1
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Existing Plus Reuse Alternative 1 With Project
--------------------------------------------------------------------------------
Turning Movement Report
AM
Volume Northbound Southbound Eastbound Westbound Total
Type Left Thru Right Left. Thru Right Left Thru Right Left Thru Right Volume
#1 Red Hill & Walnut
Base 111 413 157 93 988 53 132 402 333 308 445 100 3534
Added 1 0 0 5 2 2 4 1 1 0 1 0 17
Total 112 413 157 98 990 55 136 403 334 308 446 100 3551
#2 Driveway on Red Hill
Base 0 0 0 0 0 0 0 0 0 0 0 0 0
Added 2 4 0 0 0 3 9 0 9 0 0 0 27
Total 2 4 0 0 0 3 9 0 9 0 0 0 27
#3 Driveway on Walnut
Base 0 0 0 0 0 0 0 0 0 0 0 0 0
Added 0 0 0 4 0 0 0 2 0 0 2 2 10
Total 0 0 0 4 0 0 0 2 0 0 2 2 10
Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA
Existing Plus AN Fri Dec 15, 2006 11:20:17 Page 5-1
--------------------------------------------------------------------------------
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Existing Plus Reuse Alternative 1 With Project
--------------------------------------------------------------------------------
Intersection Volume Report
Base Volume Alternative
--------------------------------------------------------------------------------
Northbound Southbound Eastbound Westbound
Node Intersection L -- T -- R L -- T -- R L -- T -- R L -- T -- R
1 Red Hill & Wa 111 413 157 93 988 53 132 402 333 308 445 100
2 Driveway on R 0 0 0 0 0 0 0 0 0 0 0 0
3 Driveway on W 0 0 0 0 0 0 0 0 0 0 0 0
k -AgAV-
Existing Plus AM Fri Dec 15, 2006 11:20:17 Page 6-1
--------------------------------------------------------------------------------
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Existing Plus Reuse Alternative 1 With Project
--------------------------------------------------------------------------------
Intersection Volume Report
Future Volume Alternative
--------------------------------------------------------------------------------
Northbound Southbound Eastbound Westbound
Node Intersection L -- T -- R L -- T -- R L -- T -- R L -- T -- R
1 Red Hill & Wa 112 413 157 98 990 55 136 403 334 308 446 100
2 Driveway on R 2 4 0 0 0 3 9 0 9 0 0 0
3 Driveway on W 0 0 0 4 0 0 0 2 0 0 2 2
Traffix 7.8.0715 (C) 2006 Dowling ASSOC. Licensed to KATZ OKITSU, TUSTIN, CA Traffix 7.8-0715 (C) 2006 Dowling ASSOC. Licensed to KATZ OKITSU, TUSTIN, CA
Existing Plus AM Fri Dec 15, 2006 11:20:17 Page 7-1
--------------------------------------------------------------------------------
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Existing Plus Reuse Alternative 1 With Project
--------------------------------------------------------------------------------
Impact Analysis Report
Level Of Service
Intersection Base Future Change
Del/ V/ Del/ V/ in
LOS Veh C LOS Veh C
# 1 Red Hill & Walnut B xxxxx 0.678 B xxxxx 0.681 + 0.002 V/C
# 2 Driveway on Red Hill 0.0 0.000 A 9.0 0.000 + 9.040 D/V
# 3 Driveway on Walnut 0.0 0.000 A 8.5 0.000 + 8.534 D/V
Existing Plus AM Fri Dec 15, 2006 11:20:17 Page 8-1
--------------------------------------------------------------------------------
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Existing Plus Reuse Alternative 1 With Project
--------------------------------------------------------------------------------
Threshold Report (Base Alternative)
Threshold Criteria [Ops LOS >- *][Plan LOS >- *]
[Delay >- 60.000] [V/C >= 1.000]
Intersection Movement LOS Delay V/C
Traffix 7.8.0715 (C) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA
Existing Plus AM Fri Dec 15, 2006.11:20:17 Page 9-1
--------------------------------------------------------------------------------
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Existing Plus Reuse Alternative 1 With Project
--------------------------------------
--
Threshold Report (Future Alternative)
Threshold Criteria [Ops LOS >_ *][Plan LOS >= *]
[Delay >= 60.000] [V/C >- 1.000]
Intersection Movement LOS Delay V/C
Existing Plus AM Fri Dec 15, 2006 11:20:17 Page 10-1
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Existing Plus Reuse Alternative 1 With Project
--------------------------------------------------------------------------------
Level Of Service Computation Report
ICU 1(Loss as Cycle Length %) Method (Base Volume Alternative)
Intersection #1 Red Hill & Walnut
Cycle (sec): 100 Critical Vol./Cap.(X): 0.678
Loss Time (sec): 0 (Y+R=4.0 sec) Average Delay (sec/veh): xxxxxx
Optimal Cycle: 71 Level Of Service: B
Street Name: Red Hill Ave Walnut Ave
Approach: North Sound South Bound East Bound West Bound
Movement: L - T - R L - T - R L - T - R L - T - R
---------------------------11---------------11---------------11---------------
Control: Protected Protected Protected Protected
Rights: Include Include Include Include
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
Lanes 1 0 2 1 0 1 0 1 1 0 1 0 1 1 0 2 0 1 1 0
------------ 1-------------- 11---------------11---------------11---------------1
Volume Module:
Base Vol: 109 405 154 91 969 52 129 394 326 302 436 98
Growth Adj: 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02
Initial Bse: 111 413 157 93 988 53 132 402 333 308 445 100
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 111 413 157 93 988 53 132 402 333 308 445 100
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 111 413 157 93 988 53 132 402 333 308 445 100
PCF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 111 413 157 93 988 53 132 402 333 308 445 100
Saturation Flow
-11 --------------11---------------11 --------------1
o Module:
Sat/Lane: 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700
Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lanes: 1.00 2.17 0.83 1.00 1.90 0.10 1.00 1.09 0.91 2.00 1.63 0.37
Final Sat.: 1700 3695 1405 1700 3227 173 1700 1861 1539 3400 2776 624
-----11 --------------11 --------------11 --------------
Capacity Analysis Module: 1
Vol/Sat: 0.07 0.11 0.11 0.05 0.31 0.31 0.08 0.22 0.22 0.09 0.16 0.16
Crit Moves:
r►,►+t*,t***trrr*,t**wwrr*�,►***rr*tr**,r*t***w*,►***w*****+t*,►,t*,t*******,t*,►*,r*******.t*,►,r***,r*
Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA
�•.u;'!�.a a rya, �. ''
y
GR- _
Existing Plus AM Fri Dec 15, 2006 11:20:17 Page 11-1
JA6539 - 75 -Unit Residential Project TIB
City of Tustin
Existing Plus Reuse Alternative 1 With Project
--- - --------------------------------------------------------------------
Level Of Service Computation Report
ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative)
Intersection #1 Red Hill & Walnut
Cycle (sec): 100 Critical Vol./Cap.(X): 0.681
Lass Time (sec): 0 (Y+R-4 .0 sec) Average Delay (sec/veh) : xDnocxx
Optimal Cycle: 71 Level Of Service: B
Street Name: Red Hill Ave Walnut Ave
Approach: North Bound South Bound East Bound West Bound
Movement: L - T - R L - T - R L - T - R L - T - R
------------I---------------11---------------II---------------11---------------1
Control: Protected Protected Protected Protected
Rights; Include Include Include Include
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
Lanes: 1 0 2 1 0 1 0 1 1 0 1 0 1 1 0 2 0 1 1 0
--------------11---------------11---------------11--------------
Volume Module:i
Base Vol: 109 405 154 91 969 52 129 394 326 302 436 98
Growth Adj; 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02
Initial Bse: 111 413 157 93 988 53 132 402 333 308 445 100
Added Vol; 1 0 0 5 2 2 4 1 1 0 1 0
PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0
Initial Fut: 112 413 157 98 990 55 136 403 334 308 446 100
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 112 413 157 98 990 55 136 403 334 308 446 100
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 112 413 157 98 990 55 136 403 334 308 446 100
PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 112 413 157 98 990 55 136 403 334 308 446 100
------II --------------- 11 ---------------II---------------
Saturation Flow Module: )
Sat/Lane: 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700
Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lanes: 1.00 2.17 0.83 1.00 1.89 0.11 1.00 1.09 0.91 2.00 1.63 0.37
Final Sat.: 1700 3695 1405 1700 3221 179 1700 1860 1540 3400 2777 623
-Anal Analysis Module: ---II - II--------------- II ---------------
Capacity Y I
Vol/Sat: 0.07 0.11 0.11 0.06 0.31 0.31 0.08 0.22 0.22 0.09 0.16 0.16
Crit Moves: **** *«*« «*«« ««««
Existing Plus AM Fri Dec 15, 2006 11:20:17 Page 12-1
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Existing Plus Reuse Alternative 1 With Project
--------------------------------------------------------------------------------
Level Of Service Computation Report
2000 HCM Unsignalized Method (Base Volume Alternative)
Intersection #2 Driveway on Red Hill
««««««««««««««+M«tri««««««�«««•««*««««««««««*««««««««*«««««««««««*««««««**«**«««««
Average Delay (sec/veh): 0.0 Worst Case Level Of Service: [ 0.01
Approach: North Bound South Bound East Bound West Bound
Movement: L - T - R L - T - R L - T - R L - T - R
------------ --------------II--------------11-------------- II ---------------I
Control: Stop Sign Stop Sign Uncontrolled Uncontrolled
Rights: Include Include Include Include
Lanes: 0 1 1 0 0 0 0 1 1 0 0 0 1! 0 0 0 0 0 0 0
---------------11--------------11---------------II---------------
Volume Module=I
Base Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Growth Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Initial Doe: 0 0 0 0 0 0 0 0 0 0 0 0
User Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
PHF Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
PHF Volume: 0 0 0 0 0 0 0 0 0 0 0 0
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Final Vol.: 0 0 0 0 0 0 0 0 0 0 0 0
------------ --------------- ll---------------II---------------II --------------
CriticalGapI
Critical Gp: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
FollowUpTim: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
------------1---------------I1---------------11---------------II---------------1
Capacity Module:
Cnflict Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Potent Cap.; 0 0 0 0 0 0 0 0 0 0 0 0
Move Cap.: 1 1 1 1 1 1 1 1 1 1 1 1
Volume/Cap2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
------------I---------------11---------------11---------------11---------------I
Level Of Service Module:
2Way95thQ: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Control Del: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
LOS by Move:
Movement: LT - LTR - RT LT - LTR - RT LT - LTR - RT LT - LTR - RT
Shared Cap.: 0 0 0 0 0 0 0 0 0 0 0 0
SharedQueue: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Shrd ConDel: 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Shared LOS:
ApproachDel: 0.0 0.0 0.0 0.0
ApproachLOS:
Note: Queue reported is the number of cars per lane.
Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA
Existing Plus AM Fri Dec 15, 2006 11:2.0:17 Page 13-1
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Existing Plus Reuse Alternative 1 With Project
------ ----------------------------------------------------------------------
Level Of Service Computation Report
2000 HCM Unsignalized Method (Future Volume Alternative)
Intersection #2 Driveway on Red Hill
Average Delay (sec/veh): 6.0 Worst Case Level Of Service: A[ 9.01
Approach: North Bound South Bound East Bound West Bound
Movement: L - T - R L - T - R L - T - R L - T - R
- -- ---------------
- -
Control: ( Stop Sign {I Stop Sign -'{ Uncontrolled{)Uncontrolled-
e
Rights: Include Include Include Include
Lanes: 0 1 1 0 0 0 0 1 1 0 0 0 1! 0 0 0 0 0 0 0
---------------{{---------------{{--------------- --------------
Volume Module: {
Base Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Growth Adj: 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02
Initial Bse: 0 0 0 0 0 0 0 0 0 0 0 0
Added Vol: 2 4 0 0 0 3 9 0 9 0 0 0
PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0
Initial Fut: 2 4 0 0 0 3 9 0 9 0 0 0
User Adj: 1.00 1.00. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 2 4 0 0 0 3 9 0 9 0 0 0
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Final Vol.: 2 4 0 0 0 3 9 0 9 0 0 0
Critical Gap Module:
Critical Gp: 7.1 6.5 xxxxx xxxxx xxxx 6.2 4.1 xxxx xxxxx xxxxx xxxx xxxxx
FollowUpTim: 3.5 4.0 xxxxx xxxxx xxxx 3.3 2.2 xxxx xxxxx xxxxx xxxx xxxxx
--acity Module=------------{{--------------- {{--------------- {)---------------
{
P
Cnflict Vol: 23 23 xxxxx xxxx xxxx 0 0 xxxx xxxxx xxxx xxxx xxxxx
Potent Cap.: 995 875 xxxxx xxxx xxxx 900 900 xxxx xxxxx xxxx xxxx xxxxx
Move Cap.: 984 866 xxxxx xxxx xxxx 900 900 xxxx xxxxx xxxx xxxx xxxxx
Volume/Cap: 0.00 0.00 xxxx xxxx xxxx 0.00 0.01 xxxx xxxx xxxx xxxx xxxx
------------{--------------- --------------- --------------- ---------------
Level Of Service Module:
2Way95thQ: xxxx 0.0 xxxxx xxxx xxxx xxxxx 0.0 xxxx xxxxx xxxx xxxx xxxxx
Control Del:xxxxx 9.2 xxxxx xxxxx xxxx xxxxx 9.0 xxxx xxxxx xxxxx xxxx xxxxx
LOS by Move: * A * « « « A * * * «
Movement: LT - LTR - RT LT - LTR - RT IT - LTR - RT IT - LTR - RT
Shared Cap.: 921 xxxx xxxxx xxxx xxxx 900 xxxx xxxx xxxxx xxxx xxxx xxxxx
SharedQueue: 0.0 xxxx xxxxx xxxxx xxxx 0.0 xxxxx xxxx xxxxx xxxxx xxxx xxxxx
Shrd ConDel: 8.9 xxxx xxxxx xxxxx xxxx 9.0 xxxxx xxxx xxxxx xxxxx xxxx xxxxx
Shared LOS: A * * « * A
ApproachDel: 9.0 9.0 xxxxxx xxxxxx
ApproachLOS: A A « «
Notes Queue reported is the number of cars per lane.
Existing Plus AM Fri Dec 15, 2006 11:20:17 Page 14-1
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Existing Plus Reuse Alternative 1 With Project
--------------------------------------------------------------------------------
Level Of Service Computation Report
2000 HCM Unsignalized Method (Base Volume Alternative)
Intersection #3 Driveway on Walnut
Average Delay (sec/veh): 0.0 Worst Case Level Of Service: [ 0.01
Approach: North Bound South Bound East Bound West Bound
Movement: L - T - R L - T - R L - T R L - T - R
------------ ---------------{{---------------{1--------------- ---------------{
Control: Stop Sign Stop Sign Uncontrolled Uncontrolled
Rights: Include Include Include Include
Lanes: 0 0' 0 0 0 1 0 0 0 1 1 0 2 0 0 0 0 1 1 0
---------------------------{{---------------{--------------- ---------------
Volume Module:�
Base Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Growth Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Initial Bse: 0 0 0 0 0 0 0 0 0 0 0 0
User Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
PHP Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
PHF Volume: 0 0 0 0 0 0 0 0 0 0 0 0
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Final Vol.: 0 0 0 0 0 0 0 0 0 0 0 0
------------{---------------{ --------------- --------------- ---------------{
Critical Gap Module:
Critical Gp: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
FollowUpTim: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
--------------------------- {--------------- {{---------------
Capacity Module: {
Cnflict Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Potent Cap.: 0 0 0 0 0 0 0 0 0 0. 0 0
Move Cap.: 1 1 1 1 1 1 1 1 1 1 1 1
Volume/Cap: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
------------ {---------------{--------------- {--------------- ---------------{
Level Of Service Module:
2Way95thQ: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Control Del: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
LOS by Moves
Movement: LT - LTR - RT LT - LTR - RT LT - LTR - RT LT - LTR - RT
Shared Cap.: 0 0 0 0 0 0 0 0 0 0 0 0
SharedQueue: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Shrd ConDel: 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Shared LOS:
ApproachDel: 0.0 0.0 0.0 0.0
ApproachLOS:
Note: Queue reported is the number of cars per lane.
Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA
Existing Plus AM Fri Dec 15, 2006 11:20:17 Page 15-1
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Existing Plus Reuse Alternative 1 With Project
--------------------------------------------------
Level Of Service Computation Report
2000 HCM Unsignalized Method (Future Volume Alternative)
Intersection #3 Driveway on Walnut
Average Delay (sec/veh): 3.4 Worst Case Level Of Service: A[ 8.51
Approach: North Bound South Bound East Bound West Bound
Movement: L - T - R L - T - R L - T - R L - T - R
Control: StopSignStop Sign Uncontrolled
--- I '-----ii------'�---------------
-li---------------
Uncontrolled
Rights: Include Include Include Include
Lanes: 0 0 0 0 0 1 0 0 0 1 1 0 2 0 0 0 0 1 1 0
------------ --------------- --------------- --------------- ---------------�
Volume Module:
Base Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Growth Adj: 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02
Initial See: 0 0 0 0 0 0 0 0 0 0 0 0
Added Vol: 0 0 0 4 0 0 0 2 0 0 2 2
PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0
Initial Fut: 0 0 0 4 0 0 0 2 0 0 2 2
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 0 0 0 4 0 0 0 2 0 0 2 2
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Final Vol.: 0 0 0 4 0 0 0 2 0 0 2 2
Critical Gap Module:
Critical Gp:xxxxx xxxx xxxxx 6.8 xxxx xxxxx xxxxx xxxx xxxxx xxxxx xxxx xxxxx
FollowUpTim:xxxxx xxxx xxxxx 3.5 xxxx xxxxx xxxxx xxxx xxxxx xxxxx xxxx xxxxx
Capacity
---------Module:--- --------------- ---------------1j--------------
Cnflict Vol: xxxx xxxx xxxxx 4 xxxx xxxxx xxxx xxxx xxxxx xxxx xxxx xxxxx
Potent Cap.: xxxx xxxx xxxxx 1023 xxxx xxxxx xxxx xxxx xxxxx xxxx xxxx xxxxx
Move Cap.: xxxx xxxx xxxxx 1023 xxxx xxxxx xxxx xxxx xxxxx xxxx xxxx xxxxx
Volume/Cap: xxxx xxxx xxxx 0.00 xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx
- - O ------------- (I --------------- +1------------ -
Level OfService Modules )
2Way95thQ: xxxx xxxx xxxxx 0.0 xxxx xxxxx xxxx xxxx xxxxx xxxx xxxx xxxxx
Control Del:xxxxx xxxx xxxxx 8.5 xxxx xxxxx xxxxx xxxx xxxxx xxxxx xxxx xxxxx
LOS by Move: * * * A
Movement: LT - LTR - RT LT - LTR - RT LT - LTR - RT LT - LTR - RT
Shared Cap.: xxxx xxxx xxxxx xxxx xxxx xxxxx xxxx xxxx xxxxx xxxx xxxx xxxxx
SharedQueue:xxxxx xxxx xxxxx xxxxx xxxx xxxxx xxxxx xxxx xxxxx xxxxx xxxx xxxxx
Shrd ConDel:xxxxx xxxx xxxxx xxxxx xxxx xxxxx xxxxx xxxx xxxxx xxxxx xxxx xxxxx
Shared LOS: * *
ApproachDel: xxxxxx 8.5 xxxxxx
""""`
PP : ,A
A roachLOS* * *
Note: Queue reported is the number of cars per lane.
y
Existing Plus AM Fri Dec 15, 2006 11:20:17 Page 16-1
--------------------------------------------------------------------------------
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Existing Plus Reuse Alternative 1 With Project
--------------------------------------------------------------------------------
Base Queue Report (cars)
-----------------------I--------------------------------------------------------
Northbound Southbound Eastbound Westbound
Node Intersection L -- T -- R L -- T -- R L -- T -- R L -- T -- R
#2 [2Way95thQ]: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
#3 [2Way95thQ): 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA
Existing Plus AM Fri Dec 15, 2006 11:20t17 Page 17-1
--------------------------------------------------------------------------------
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Existing Plus Reuse Alternative 1 With Project
--------------------------------------------------------------------------------
Future Queue Report (cars)
--------------------------------------------------------------------------------
Northbound Southbound Eastbound Westbound
Node Intersection L -- T -- R L -- T -- R L -- T -- R L -- T -- R
#2 [2Way95thQ]: 0.0 0.0 xxxx xxxx 0.0 0.0 0.0 xxxx xxxx xxxx xxxx xxxx
#3 [2Way95thQ]1 XXXX XXXX xxxx 0.0 xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx
Traffix 7.8-0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA
Existing Plus PM
--------------------------------------------------------------------------------
Fri Dec 15, 2006 11:20;10 Page 1-1
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Existing Plus Reuse Alternative 1 With Project
--------------------------------------------------------------------------------
Scenario Report
Scenario:
Existing Plus PM
Command.
Existing Plus PM
Volume:
Existing PM
Geometry:
Nearterm,
Impact Fee:
Default Impact Fee
Trip Generation:
PM
Trip Distribution:
ALL
Paths:.
Default Paths
Routes:
Default Routes
Configuration;
Existing Plus PM
Existing Plus PM Fri Dec 15, 2006 11:20t10 Page 2-1
--------------------------------------------------------------------------------
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Existing Plus Reuse Alternative 1 With Project
--------------------------------------------------------------------------------
Trip Generation Report
Forecast for PM
Zone Rate Rate Trips Trips Total % Of
# Subzone Amount Units In Out In Out Trips Total
---- ------------ ------- -------------- ------ ------ ---- ----- -----
1 81 -Unit Resi 1.00 Townhomes 26.00 17.00 26 17 43 100.0
Zone I Subtotal ............................. 26 17 43 100.0
--------------------------------------------------------------------------------
TOTAL.................................................. 26 17 43 100.0
Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA
Existing Plus PM Fri Dec 15, 2006 11:20:10 Page 3-1
--------------------------------------------------------------------------------
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Existing Plus Reuse Alternative 1 With Project
--------------------------------------------------------------------------------
Trip Distribution Report
Percent Of Trips Townhouses
To Gates
1 2 4 5 6
Zone----- ----- ----- ----- -----
1 15.0 15.0 5.0 10.0 55.0
Existing Plus PM Fri Dec 15, 2006 11:20:10 Page 4-1
JA6539 75 -Unit Residential Project TIS
City of Tustin
Existing Plus Reuse Alternative 1 with Project
--------------------------------------------------------------------------------
Turning Movement Report
PM
Volume Northbound Southbound Eastbound Westbound Total
Type Left Thru Right Left Thru Right Left Thru Right Left Thru Right Volume
#1 Red Hill & Walnut
Base 253 1085 174 131 480 112 120 406 105 255 713 147 3982
Added 4 0 0 4 2 2 8 1 1 0 4 0 26
Total 257 1085 174 135 482 114 128 407 106 255 717 147 4008
#2 Driveway on Red Hill
Base 0 0 0 0 0 0 0 0 0 0 0 0 0
Added 7 3 0 0 0 11 7 0 7 0 0 0 35
Total 7 3 0 0 0 11 7 0 7 0 0 0 35
#3 Driveway on Walnut
Base 0 0 0 0 0 0 0 0 0 0 0 0 0
Added 0 0 0 3 0 0 0 7 0 0 2 8 20
Total 0 0 0 3 0 0 0 7 0 0 2 8 20
Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA
Existing Plus m" mu Dec xs' 200zz.uo.zo nage 5'1
----------------------------------------
a=«53n ' 75 -Unit Residential Project TIS
City "eTustin
Existing Plus Reuse Alternative IWith Project
—_--_—_--___—____—___—______—__—___---___
znt°rsecniVolume Report
Base Volume Alternative
_— _—_----- ''-_-_''--_—'__-_______—_'__'__'_—_—_
m"=thbo"=u Southbound Eastbound w*°c^"u
Node Intersection L -- r ' n L '- T --u L — r — m L — z — a
1 Rem ,ulz ° =" .u53 1085 1m o1 ^oo 112 120 ^oo 105 vns 713 zor
u o=�e°= on R u o o o o o o o o o o o
x o=m°°ay on w u o o o o o o o o o o o
Existing Plus m^ Fri Dec ,5' 200 11:20.10 Page 6-1
________________________________________
aA6o , - 75 -Unit Residential Project TIS
City ",Tustin
Existing Plus Reuse Alternative 1With Project
__'--___—_____—_____'____--'_—'_'---- ---
Inm°=°m`^ Volume Report
Future Volume Alternative
'- '-'---''-''''--'--'-'------'' ------'----'-- '''-'' -- - --''-- ' '' -
Node Intersection ���hb°�u �a�t�o""u ��st�""«a �w«pt^"=an
z Rem Hill a m" uor 1085 o^ zso 482 114 zxo ^o, zoo unu rzv z^,
2 Driveway =~a , s o o o 11 r o , o u u
3 Driveway on w o o o x o o o , u o o o
Traffix`'«'0715 (c) 2006 Dowling ASSOC. Licensed to KATZ OKITSU, TUSTIN, CA TraffiX`'»'0715(c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA
Existing Plus PM Fri Dec 15, 2006 11:20:10 Page 7-1
-- -----------------------------------------------------
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Existing Plus Reuse Alternative 1 With Project
--------------------------------------------------------------------------------
Impact Analysis Report
Level Of Service
Intersection Base Future Change
Del/ V/ Del/ V/ in
LOS Veh C LOS Veh C
# 1 Red Hill & walnut B xxxxx 0.648 B xxxxx 0.656 + 0.008 V/C
# 2 Driveway on Red Hill 0.0 0.000 A 9.0 0.000 + 9.049 D/V
# 3 Driveway on Walnut 0.0 0.000 A 0.6 0.000 + 0.000 D/V
Existing Plus PM Fri Dec 15, 2006 11:20:10 Page 8-1
--------------------------------------------------------------------------------
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Existing Plus Reuse Alternative 1 With Project
--------------------------------------------------------------------------------
Threshold Report (Base Alternative)
Threshold Criteria (Ops LOS >- *][Plan LOS >-
[Delay >- 60.000] [V/C >- 1.000]
Intersection Movement LOS Delay V/C
Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA
Existing Plus PM Fri Dec 15, 2006 11:20:10 Page 9-1
--------------------------------------------------------------------------------
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Existing Plus Reuse Alternative 1 With Project
------------------------------------------------------------------
Threshold Report (Future Alternative)
Threshold Criteria [Ops LOS >- *)[Plan LOS >= *)
[Delay >- 60.000)[V/C >- 1.000)
Intersection Movement LOS Delay V/C
Existing Plus PM Fri Dec 15, 2006 11:20:10 Page 10-1
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Existing Plus Reuse Alternative 1 With Project
--------------------------------------------------------------------------------
Level Of Service Computation Report
ICU 1(Loss as Cycle Length %) Method (Base Volume Alternative)
Intersection #1 Red Hill & Walnut
Cycle (sec): 100 Critical Vol./Cap.(X): 0.648
Loss Time (sec): 0 (Y+R-4.0 sec) Average Delay (sec/veh): xxxxxx
Optimal Cycle: 65 Level Of Service: 8
Street Name: Red Hill Ave Walnut Ave
Approach: North Bound South Bound East Bound West Bound
Movement: L - T - R L - T - R L - T - R L - T - R
------------ I ------------- 11--------------- ---------------11--------------
Control: Protected Protected Protected Protected
Rights: Include Include Include Include
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
Lanes: 1 0 2 1 0 1 0 1 1 0 1 0 1 1 0 2 0 1 1 0
----------- I --------------- 11 -----------------------------11--------------
Volume Module:
Base Vol: 248 1064 171 128 471 110 118 398 103 250 699 144
Growth Adj: 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02
Initial Bse: 253 1085 174 131 480 112 120 406 105 255 713 147
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 253 1085 174 131 480 112 120 406 105 255 713 147
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 253 1085 174 131 480 112 120 406 105 255 713 147
PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 253 1085 174 131 480 112 120 406 105 255 713 147
------------ --------------- ---------------,--------------- --------------
Saturation Flow Module:
Sat/Lane: 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700
Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lanes: 1.00 2.58 0.42 1.00 1.62 0.38 1.00 1.59 0.41 2.00 1.66 0.34
Final Sat.3 1700 4394 706 1700 2756 644 1700 2701 699 3400 2819 581
----------- -------------- --------------- --------------- ---------------�
Capacity Analysis Module:
Vol/Sat: 0.15 0.25 0.25 0.08 0.17 0.17 0.07 0.15 0.15 0.08 0.25 0.25
Crit Moves: «««« ««*« «**« *««*
Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA
,�.�+*-"r►'�-ter �.,
Existing Plus PM Fri Dec 15, 2006 11:20:10 Page 11-1
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Existing Plus Reuse Alternative 1 With Project
--------------------------------------------------------------------------------
Level Of Service Computation Report
ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative)
Intersection #1 Red Hill & Walnut
Cycle (sec): 100 Critical Vol./Cap.(X): 0.656
Loss Time (sec): 0 (Y+R-4.0 sec) Average Delay (sec/veh): Xxxxxx
Optimal Cycle: 66 Level Of Service: B
Street Name: Red Hill Ave Walnut Ave
Approach: North Bound South Bound East Bound West Bound
Movement: L - T - R L - T - R L - T R L - T - R
------------ I --------------- 11 --------------- 11 --------------- 11---------------�
Control: Protected Protected Protected Protected
Rights: Include Include Include Include
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
Lanes: 1 0 2 1 0 1 0 1 1 0 1 0 1 1 0 2 0 1 1 0
- -------------- -------------------------------------------
VolumeModule�
Base Vol: 248 1064 171 128 471 110 118 398 103 250 699 144
Growth Adj: 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02
Initial Bse: 253 1085 174 131 480 112 120 406 105 255 713 147
Added Vol: 4 0 0 4 2 2 8 1 1 0 4 0
PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0
Initial Fut: 257 1085 174 135 482 114 128 407 106 255 717 147
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 257 1085 174 135 482 114 128 407 106 255 717 147
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 257 1085 174 135 482 114 128 407 106 255 717 147
PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 257 1085 174 135 482 114 128 407 106 255 717 147
Saturation Flow Module: -- --------------- 11
--------------- I' ---------------
Sat/Lane: 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700
Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lanes: 1.00 2.58 0.42 1.00 1.62 0.38 1.00 1.59 0.41 2.00 1.66 0.34
Final Sat.: 1700 4394 706 1700 2749 651 1700 2697 703 3400 282.2 578
---II---------------I) --------------- II ---------------
Capacity Analysis Module;�
Vol/Sat: 0.15 0.25 0.25 0.08 0.18 0.18 0.08 0.15 0.15 0.08 0.25 0.25
Crit Moves: **** **** ««*« «««*
Existing Plus PM Fri Dec 15, 2006 11:20:10 Page 12-1
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Existing Plus Reuse Alternative 1 With Project
Level Of Service Computation Report
2000 HCM Unsignalized Method (Base Volume Alternative)
Intersection #2 Driveway on Red Hill
Average Delay (sec/veh): 0.0 Worst Case Level Of Service: [ 0.01
Approach: North Bound South Bound East Bound West Bound
Movement: L - T - R L - T - R L - T - R L - T - R
------------ ------------------------------------------- --------------�
Control: Stop Sign Stop Sign Uncontrolled Uncontrolled
Rights: Include Include Include Include
Lanes: 0 1 1 0 0 0 0 1 1 0 0 0 11 0 0 0 0 0 0 0
------------ --------------- --------------- --------------- ---------------�
Volume Module:
Base Vol; 0 0 0 0 0 0 0 0 0 0 0 0
Growth Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Initial Bse: 0 0 0 0 0 0 0 0 0 0 0 0
User Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
PHF Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
PHF Volume: 0 0 0 0 0 0 0 0 0 0 0 0
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Final Vol.: 0 0 0 0 0 0 0 0 0 0 0 0
--------------------------- --------------- --------------- ---------------
Critical GapModule:)
Critical Gp: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
FollowUpTim: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
------------ --------------- --------------- ---------------
Capacity Module:�
Cnflict Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Potent Cap.: 0 0 0 0 0 0 0 0 0 0 0 0
Move Cap.: 1 1 1 1 1 1 1 1 1 1 1 1
Volume/Capi 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
---- II --------------- ll--------------- ��---------------
Level Of Service Module �
2Way95thQ: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Control Dei: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
LOS by Move:
Movement: LT - LTR - RT LT - LTR - RT IT - LTR - RT LT - LTR - RT
Shared Cap.: 0 0 0 0 0 0 0 0 0 0 0 0
SharedQueue: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Shrd ConDel: 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Shared LOS:
ApproachDel: 0.0 0.0 0.0 0.0
ApproachLOS:
Note: Queue reported is the number of cars per lane.
Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA
,mac --;AP.
V
Existing Plus PM Fri Dec 15, 2006 11:20:10 Page 13-1
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Existing Plus Reuse Alternative 1 With Project
---------------------------------------------------------------
Level Of Service Computation Report
2000 HCM Unsignalized Method (Future Volume Alternative)
Intersection #2 Driveway on Red Hill
Average Delay (sec/veh): 7.2 Worst Case Level Of Service: At 9.01
Approach: North Bound South Bound East Bound West Bound
Movement: L - T - R L - T - R L - T - R L - T - R
-------------- --------------- --------------- ---------------
ControlsStop
�
Sign Stop Sign Uncontrolled Uncontrolled
Rights: Include Include Include Include
Lanes s 0 1 1 0 0 0 0 1 1 0 0 0 1! 0 0 0 0 0 0 0
------------------------------ ��--------- ��---------------
Volume Module,1
Base Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Growth Adj: 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02
Initial Bse: 0 0 0 0 0 0 0 0 0 0 0 0
Added Vol: 7 3 0 0 0 11 7 0 7 0 0 0
PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0
Initial Fut: 7 3 0 0 0 11 7 0 7 0 0 0
User Adjs 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHP Volume: 7 3 0 0 0 it 7 0 7 0 0 0
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Final Vol.: 7 3 0 0 0 11 7 0 7 0 0 0
Critical Gap Module:
Critical Gp: 7.1 6.5 xxxxx xxxxx xxxx 6.2 4.1 xxxx xxxxx xxxxx xxxx xxxxx
FollowUpTim: 3.5 4.0 xxxxx xxxxx xxxx 3.3 2.2 xxxx xxxxx xxxxx xxxx xxxxx
------------ --------------- --------------- --------------- ---------------
Capacity
----------- -Capacity Module:
Cnflict Vols 18 18 xxxxx xxxx xxxx 0 0 xxxx xxxxx xxxx xxxx xxxxx
Potent Cap.: 1002 881 xxxxx xxxx xxxx 900 900 xxxx xxxxx xxxx xxxx xxxxx
Move Cap.: 984 874 xxxxx xxxx xxxx 900 900 xxxx xxxxx xxxx xxxx xxxxx
Volume/Caps 0.01 0.00 xxxx xxxx xxxx 0.01 0.01 xxxx xxxx xxxx xxxx xxxx
---------------
-} _II --------------- ��---------------�,____-_______-_-
Level Of Service Modules �
2Way95thQs xxxx 0.0 xxxxx xxxx xxxx xxxxx 0.0 xxxx xxxxx xxxx xxxx xxxxx
Control Del:xxxxx 9.1 xxxxx xxxxx xxxx xxxxx 9.0 xxxx xxxxx xxxxx xxxx xxxxx
LOS by Move: * A * * « « A « « « * w
Movements LT - LTR - RT LT - LTR - RT LT - LTR - RT LT - LTR - RT
Shared Cap.: 963 xxxx xxxxx xxxx xxxx 900 xxxx xxxx xxxxx xxxx xxxx xxxxx
SharedQueue: 0.0 xxxx xxxxx xxxxx xxxx 0.0 xxxxx xxxx xxxxx xxxxx xxxx xxxxx
Shrd ConDel: 8.8 xxxx xxxxx xxxxx xxxx 9.0 xxxxx xxxx xxxxx xxxxx xxxx xxxxx
Shared LOS: A * * * « A
ApproachDel: 8.8 9.0 xxxxxx xxxxXX
ApproachLOS: A A * w
Notes Queue reported is the number of cars per lane.
Existing Plus PM Fri Dec 15, 2006 11:20:10 Page 14-1
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Existing Plus Reuse Alternative 1 With Project
--------------------------------------------------------------------------------
Level Of Service Computation Report
1994 HCM Unsignalized Method (Base Volume Alternative)
Intersection #3 Driveway on Walnut
Average Delay (sec/veh)s 0.0 Worst Case Level Of Service:
Approach: North Bound South Bound East Bound West Bound
Movements L - T - R L - T - R L - T - R L - T - R
------------ --------------- --------------- --------------- ---------------)
Control: Stop Sign Stop Sign Uncontrolled Uncontrolled
Rights: Include Include Include Include
Lanes: 0 0 0 0 0 1 0 0 0 1 1 0 2 0 0 0 0 1 1 0
VolumeModule:------------- -------------- --------------- ---------------�
Base Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Growth Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Initial Bse: 0 0 0 0 0 0 0 0 0 0 0 0
User Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
PHF Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
PHF Volume: 0 0 0 0 0 0 0 0 0 0 0 0
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Final Vol.s 0 0 0 0 0 0 0 0 0 0 0 0
------------ I --------------- ---------------11-------------- ---------------)
Adjusted Volume Module:
Grade: 04 0% 0% 0$
% Cycle/Cars: xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx
% Truck/Comb: xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx
PCE Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Cycl/Car PCE: xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx
Trck/Cmb PCE; xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx
Adj Vol.: 0 0 0 0 0 0 0 0 0 0 0 0
-(------- --------------- --------------- ---------------
Critical Ga )
P Module;
MoveUp Time: 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Crit Gp Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Critical Gp: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
--------------- -------------- --------------- ---------------
Capacity Module: �
Cnflict Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Potent Cap s 0 0 0 0 0 0 0 0 0 0 0 0
Adj Cap: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Move Cap.: 1 1 1 1 1 1 1 1 1 1 1 1
----��---------------�'-------------- ��---------------
Level of service Module:�
Control Del: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
LOS by Move:
Movement: LT - LTR - RT LT - LTR - RT LT - LTR - RT LT - LTR - RT
Shared Cap.: 0 0 0 0 0 0 0 0 0 0 0 0
Shrd ConDel: 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Shared LOS:
ApproachDel: 0.0 0.0 0.0 0.0
Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA Traffix 7.8.071.5 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA
Existing Plus PM Fri Dec 15, 2006 11:20:10 Page 14-2
--------------------------------------------------------------------------------
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Existing Plus Reuse Alternative 1 With Project
-----------------------------------------------------------------------------
Existing Plus PM Fri Dec 15, 2006 11:20:10 Page 15-1
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Existing Plus Reuse Alternative 1 With Project
--------------------------------------------------------------------------------
Level Of Service Computation Report
1994 HCM Unsignalized Method (Future Volume Alternative)
Intersection #3 Driveway on Walnut
Average Delay (sec/veh)z 0.6 Worst Case Level Of Service: A
Approach: North Bound South Bound East Bound West Bound
Movement: L - T - R L - T - R L - T - R L - T - R
------------ --------------- --------------- --------------- ---------------�
Controls Stop Sign Stop Sign Uncontrolled Uncontrolled
Rights: Include Include Include Include
Lanes: 0 0 0 0 0 1 0 0 0 1 1 0 2 0 0 0 0 1 1 0
--------------------------- --------------- --------------- ---------------)
Volume Module:
Base Volo 0 0 0 0 0 0 0 0 0 0 0 0
Growth Adj: 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02
Initial Bses 0 0 0 0 0 0 0 0 0 0 0 0
Added Vol: 0 0 0 3 0 0 0 7 0 0 2 8
PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0
Initial Fut: 0 0 0 3 0 0 0 7 0 0 2 8
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 0 0 0 3 0 0 0 7 0 0 2 8
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Final Vol.: 0 0 0 3 0 0 0 7 0 0 2 8
Adjusted Volume Module:
Grade: Oi 0 J 0% 0%
$ Cycle/Cars: xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx
* Truck/Comb: xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx
PCS Adj: 1.10 1.10 1.10 1.10 1.10 1.10 1.10 1.00 1.00 1.10 1.00 1.00
Cycl/Car PCH: xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx
Trck/Cmb PCS: xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx
Adj Vol.: 0 0 0 3 0 0 0 7 0 0 2 8
Critical Gap Module:
MoveUp Time:xxxxx xxxx xxxxx 3.4 xxxx xxxxx xxxxx xxxx xxxxx xxxxx xxxx xxxxx
Critical Gp:xxxxx xxxx xxxxx 7.0 xxxx xxxxx xxxxx xxxx xxxxx xxxxx xxxx xxxxx
------------I --------------- ---------------11--------------- ---------------+
Capacity Module:
Cnflict Vol: xxxx xxxx xxxxx 13 xxxx xxxxx xxxx xxxx xxxxx xxxx xxxx xxxxx
Potent Cap.: xxxx xxxx xxxxx 1039 xxxx xxxxx xxxx xxxx xxxxx xxxx xxxx xxxxx
Adj Cap: xxxx xxxx xxxxx 1.00 xxxx xxxxx xxxx xxxx xxxxx xxxx xxxx xxxxx
Move Cap.: xxxx xxxx xxxxx 1039 xxxx xxxxx xxxx xxxx xxxxx xxxx xxxx xxxxx
------------I --------------- ---------------11 --------------- ---------------�
Level Of Service Module:
Control Del:xxxxx xxxx xxxxx 3.5 xxxx xxxxx xxxxx xxxx xxxxx xxxxx xxxx xxxxx
LOS by Move: * * * A
Movement: LT - LTR - RT LT - LTR - RT LT - LTR - RT LT - LTR - RT
Shared Cap.s xxxx xxxx xxxxx xxxx xxxx xxxxx xxxx xxxx xxxxx xxxx xxxx xxxxx
Shrd ConDel:xxxxx xxxx xxxxx xxxxx xxxx xxxxx xxxxx xxxx xxxxx xxxxx xxxx xxxxx
Shared LOS: * *
ApproachDel: xxxxxx 3.5 0.0 0.0
Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA Traff ix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA
OWN,
Existing Plus PM Fri Dec 15, 2006 11:20:10 Page 15-2
--------------------------------------------------------------------------------
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Existing Plus Reuse Alternative 1 With Project
--------------------------------------------------------------------------------
Existing Plus PM Fri Dec 15, 2006 11:20:11 Page 16-1
--------------------------------------------------------------------------------
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Existing Plus Reuse Alternative 1 With Project
--------------------------------------------------------------------------------
Base Queue Report (cars)
--------------------------------------------------------------------------------
Northbound Southbound Eastbound Westbound
Node Intersection L -- T -- R L -- T -- R L -- T -- R L -- T -- R
#2 [2Way95thQ] s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Traffix 7.8-0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA
Existing Plus PM Fri Dec 15, 2006 11:20:11 Page 17-1
--------------------------------------------------------------------------------
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Existing Plus Reuse Alternative 1 With Project
--------------------------------------------------------------------------------
Future Queue Report (cars)
--------------------------------------------------------------------------------
Northbound Southbound Eastbound Westbound
Node Intersection L -- T -- R L -- T -- R L -- T -- R L T R
#2 12Way95thQ): 0.0 0.0 xxxx xxxx 0.0 0.0 0.0 xxxx xxxx xxxx xxxx xxxx
Traffix 7.8-0715 (c) 2006 Dowling Assoc- Licensed to KATZ OKITSU, TUSTIN, CA
Post 2020 AM Alternative 1 Fri Dec 15, 2006 11:26:22 Page 1-1
Post 2020 AM Alternative 1 Fri Dec 15, 2006 11:26:22 Page 2-1
--------------------------------------------------------------------------------
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Post 2020 AM Alternative 1 With Project
--------------------------------------------------------------------------------
Trip Generation Report
Forecast for AM
Zone Rate Rate Trips Trips Total % Of
# Subzone Amount Units In Out In Out Trips Total
1 81 -Unit Resi 1.00 Townhomes 8.00 22.00 8 22 30 100.0
Zone 1 Subtotal 8 22 30 100.0
--------------------------------------------------------------------------------
TOTAL................................................. 8 22 30 100.0
Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Post 2020 AM Alternative 1 With Project
--------------------------------------------
Scenario Report
Scenarios
Post 2020 AM Alternative 1
Command:
Post 2020 AM Alternative 1
Volume:
Post 2020 AM Alternative 1
Geometry:
Future
Impact Fee:
Default Impact Fee
Trip Generation:
AM
Trip Distribution:
ALL
Paths:
Default Paths
Routes:
Default Routes
Configuration:
Post 2020 AM Alternative 1
Post 2020 AM Alternative 1 Fri Dec 15, 2006 11:26:22 Page 2-1
--------------------------------------------------------------------------------
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Post 2020 AM Alternative 1 With Project
--------------------------------------------------------------------------------
Trip Generation Report
Forecast for AM
Zone Rate Rate Trips Trips Total % Of
# Subzone Amount Units In Out In Out Trips Total
1 81 -Unit Resi 1.00 Townhomes 8.00 22.00 8 22 30 100.0
Zone 1 Subtotal 8 22 30 100.0
--------------------------------------------------------------------------------
TOTAL................................................. 8 22 30 100.0
Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA
Post 2020 AM Alternative 1 Fri Dec 15, 2006 11:26:22 Page 3-1
----------------------------------------------------------------------------
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Post 2020 AM Alternative 1 With Project
-
Trip Distribution Report -
Percent Of Trips Townhouses
To Gates
1 2 4 5 6
Zone ----- ----- ----- ----- -----
1 15.0 15.0 5.0 10.0 55.0
Post 2020 AM Alternative 1 Fri Dec 15, 2006 11:26:22 Page 4-1
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Post 2020 AM Alternative 1 With Project
--------------------------------------------------------------------------------
Turning Movement Report
AM
Volume Northbound Southbound Eastbound Westbound Total
Type Left Thru Right Left Thru Right Left Thru Right heft Thru Right Volume
#1 Red Hill & Walnut
Base 125 466 177 105 2220 280 160 453 375 347 501 113 5322
Added 1 0 0 5 2 2 4 1 1 0 1 0 17
Total 126 466 177 110 2222 282 164 454 376 347 502 113 5339
#2 Driveway on Red Hill
Base 0 0 0 0 0 0 0 0 0 0 0 0 0
Added 2 4 0 0 0 3 9 0 9 0 0 0 27
Total 2 4 0 0 0 3 9 0 9 0 0 0 27
#3 Driveway on Walnut
Base 0 0 0 0 0 0 0 0 0 0 0 0 0
Added 0 0 0 4 0 0 0 2 0 0 2 2 10
Total 0 0 0 4 0 0 0 2 0 0 2 2 10
Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA
Post 2020 AM Alternative 1 Fri Dec 15, 2006 11:26:23 Page 5-1
--------------------------------------------------------------------------------
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Post 2020 AM Alternative 1 with Project
--------------------------------------------------------------------------------
Intersection Volume Report
Base Volume Alternative
--------------------------------------------------------------------------------
Northbound Southbound Eastbound Westbound
Node Intersection L -- T -- R L -- T -- R L -- T -- R L T R
1 Red Hill & Wa 125 466 -177 105 2220 280 160 453 375 347 501 113
2 Driveway on R 0 0 0 0 0 0 0 0 0 0 0 0
3 Driveway on W 0 0 0 0 0 0 0 0 0 0 0 0
Post 2020 AM Alternative 1 Fri Dec 15, 2006 11:26:23 Page 6-1
--------------------------------------------------------------------------------
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Post 2020 AM Alternative 1 With Project
--------------------------------------------------------------------------------
Intersection Volume Report
Future Volume Alternative
--------------------------------------------------------------------------------
Northbound Southbound Eastbound Westbound
Node Intersection L -- T -- R L -- T -- R L -- T -- R L -- T -- R
1 Red Hill & Wa 126 466 177 110 2222 282 164 454 376 347 502 113
2 Driveway on R 2 4 0 0 0 3 9 0 9 0 0 0
3 Driveway on W 0 0 0 4 0 0 0 2 0 0 2 2
Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA
Post 2020 AM Alternative 1 Fri Dec 15, 2006 11:26:23 Page 7-1
--------------------------------------------------------------------------------
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Post 2020 AM Alternative 1 With Project
--------------------------------------------------------------------------------
Impact Analysis Report
Level Of Service
Intersection Base Future Change
Del/ V/ Del/ V/ in
LOS Veh C LOS Veh C
# 1 Red Hill & Walnut E xxxxx 0.959 E xxxxx 0.961 + 0.002 V/C
# 2 Driveway on Red Hill 0.0 0.000 A 9.0 0.000 + 9.040 D/V
# 3 Driveway on Walnut 0.0 0.000 A 8.5 0.000 + 8.534 D/V
Post 2020 AM Alternative 1 Fri Dec 15, 2006 11:26:23 Page 8-1
--------------------------------------------------------------------------------
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Post 2020 AM Alternative 1 With Project
--------------------------------------------------------------------------------
Threshold Report (Base Alternative)
Threshold Criteria [Ops LOS >- *)[Plan LOS >- *1
(Delay >. 60.0001 [V/C >= 1.0001
Intersection Movement LOS Delay V/C
Traffix 7.8-0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA
Post 2020 AM Alternative 1 Fri Dec 15, 2006 11:26:23 Page 9-1
--------------------------------------------------------------------------------
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Post 2020 AM Alternative 1 With Project
--
Threshold Report (Future Alternative)
Threshold Criteria [Ops LOS >= *][Plan LOS >- *]
[Delay >- 60.000][V/C >- 1.000]
Intersection Movement LOS Delay V/C
Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA
Post 2020 AM Alternative 1 Fri Dec 15, 2006 11:26:23 Page 10-1
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Post 2020 AM Alternative 1 With Project
Level Of Service Computation Report
ICU 1(Loss as Cycle Length %) Method (Base Volume Alternative)
Intersection #1 Red Hill & Walnut
Cycle (sec): 100 Critical Vol./Cap.(X): 0.959
Loss Time (sec): 5 (Y+R-4.0 sec) Average Delay (see/veh): xxxxxx
Optimal Cycle: 143 Level Of Service: E
Street Name: Red Hili Ave Walnut Ave
Approach: North Bound South Bound East Bound West Bound
Movement: L - T - R L - T - R L - T - R L - T - R
Control: ----I-- Protected---Ij---Protected Protected --------- II -------------- 1
Protected
Rights: Include Include Include Include
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
Lanes: 1 0 2 1 0 1 0 2 1 0 1 0 1 1 0 2 0 2 0 1
-------------- --------------- -------------- 11---------------
Volume Module:�
Base Vol: 125 466 177 105 2220 280 160 453 375 347 501 113
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse3 125 466 177 105 2220 280 160 453 375 347 501 113
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 125 466 177 105 2220 280 160 453 375 347 501 113
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 125 466 177 105 2220 280 160 453 375 347 501 113
PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 125 466 177 105 2220 280 160 453 375 347 501 113
------------ --------------- --------------- --------------- ---------------�
Saturation Flow Module:
Sat/Lane: 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700
Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lanes: 1.00 2.17 0.83 1.00 2.66 0.34 1.00 1.09 0.91 2.00 2.00 1.00
Final Sat.: 1700 3696 1404 1700 4529 571 1700 1860 1540 3400 3400 1700
�I-------------- --------------- ---------------
Capacity Analysis Module: �
Vol/Sat: 0.07 0.13 0.13 0.06 0.49 0.49 0.09 0.24 0.24 0.10 0.15 0.07
Crit Moves: **** **** **** ****
Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA
Post 2020 AM Alternative 1 Fri Dec 15, 2006 11:26:23 Page 11-1
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Post 2020 AM Alternative 1 With Project
-------------------------------------------------
Level Of Service Computation Report
ICU 1(Loss as Cycle Length U Method (Future Volume Alternative)
Intersection #1 Red Hill & Walnut
Cycle (sec): 100 Critical Vol./Cap.(X): 0.961
Loss Time (sec): 5 (X+Ra4.0 sec) Average Delay (sec/veh): xxxxxx
Optimal Cycle: 147 Level Of Service: E
Street Name: Red Hill Ave Walnut Ave
Approach: North Bound South Bound East Bound West Bound
Movement: L - T - R L - T - R L - T - R L - T - R
------------I---------------11---------------11---------------11---------------I
Control: Protected Protected Protected Protected
Rights: Include Include Include Include
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
Lanes: 1 0 2 1 0 1 0 2 1 0 1 0 1 1 0 2 0 2 0 1
------------I---------------II---------------11---------------11---------------1
Volume Module:
Base Vol: 125 466 177 105 2220 280 160 453 375 347 501 113
Growth Adj: 1.00 1.00 1.0o 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 125 466 177 105 2220 280 160 453 375 347 501 113
Added Vol: 1 0 0 5 2 2 4 1 1 0 1 0
PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0
Initial Fut: 126 466 177 110 2222 282 164 454 376 347 502 113
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 126 466 177 110 2222 282 164 454 376 347 502 113
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 126 466 177 110 2222 282 164 454 376 347 502 113
PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLP Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1..00 1.00 1.00 1.00
Final Vol.: 126 466 177 110 2222 282 164 454 376 347 502 113
-----11--------------- 11 ---------------II ---------------
Saturation Flow Module:I
Sat/Lane: 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700
Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lanes: 1.00 2.17 0.83 1.00 2.66 0.34 1.00 1.09 0.91 2.00 2.00 1.00
Final Sat-: 1700 3696 1404 1700 4526 574 1700 1860 1540 3400 3400 1700
---------------
-_11----_-'--------I1---------------il ---------------
Capacity AnalysisModule.I
Vol/Sat: 0.07 0.13 0.13 0.06 0.49 0.49 0.10 0.24 0.24 0.10 0.15 0.07
Crit Moves: *### #*** **** ##*#
Post 2020 AM Alternative 1 Fri Dec 15, 2006 11:26:23 Page 12-1
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Post 2020 AM Alternative 1 With Project
--------------------------------------------------------------------------------
Level Of Service Computation Report
2000 HCM Unsignalized Method (Base Volume Alternative)
Intersection #2 Driveway on Red Hill
Average Delay (sec/veh): 0.0 Worst Case Level Of Service: [ 0.01
######*#####################################*######################*############
Approach: North Bound South Bound East Bound West Bound
Movement: L - T - R L - T - R L - T - R L - T - R
------------1---------------11---------------II---------------II---------------1
Control: Stop Sign Stop Sign Uncontrolled Uncontrolled
Rights: Include Include Include Include
Lanes: 0 1 2 0 0 0 0 2 1 0 0 0 1! 0 0 0 0 0 0 0
--------------- 11 --------------- -------------- II --------------
Volume Module: 1
Base Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Growth Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Initial Bse: 0 0 0 0 0 0 0 0 0 0 0 0
User Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
PHF Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
PHF Volume: 0 0 0 0 0 0 0 0 0 0 0 0
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Final Vol.: 0 0 0 0 0 0 0 0 0 0 0 0
l--------11---------------11---------------Ii---------------
Critical GapModule:I
Critical Gp: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
FollowUpTim: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
-i---------------11---------------11---------------11---------------I
Capacity Module:
Cnflict Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Potent Cap.: 0 0 0 0 0 0 0 0 0 0 0 0
Move Cap.: 1 1 1 1 1 1 1 1 1 1 1 1
Volume/Capt 0.00 0.00 0.00 o.0o 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
------------ I --------I1---------------11---------------Ii---------------I
Level Of Service Module:
2Way95thQ: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Control Del: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
LOS by Move:
Movement: LT - LTR - RT LT - LTR - RT LT - LTR - RT LT - LTR - RT
Shared Cap.: 0 0 0 0 0 0 0 0 0 0 0 0
SharedQueue: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Shrd ConDel: 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Shared LOS:
ApproachDel: 0.0 0.0 0.0 0.0
ApproachLOS:
Note: Queue reported is the number of cars per lane.
Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA
Post 2020 AM Alternative 1 Fri Dec 15, 2006 11:26:23 Page 13-1
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Post 2020 AM Alternative 1 With Project
- -
Level Of Service Computation Report
2000 HCM Unsignalized Method (Future Volume Alternative)
Intersection #2 Driveway on Red Hill
Average Delay (sec/veh): 6.0 Worst Case Level Of Service: A[ 9.01
rr,r**�*�r*******wtrrw***w******�r**�***,rwrr********r►***,t,r**,r****t*****i►**************
Approach: North Bound South Bound East Bound West Bound
Movement: L - T - R L - T - R L - T - R L - T - R
------------I---------------II---------------IL---------------II---------------I
Control: Stop Sign Stop Sign Uncontrolled Uncontrolled
Rights: Include Include Include Include
Lanes: 0 1 2 0 0 0 0 2 1 0 0 0 1! 0 0 0 0 0 0 0
---------------11---------------II---------------II---------------
Volume Module:I
Base Vols 0 0 0 0 0 0 0 0 0 0 0 0
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bae: 0 0 0 0 0 0 0 0 0 0 0 0
Added Vol: 2 4 0 0 0 3 9 0 9 0 0 0
PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0
Initial Fut: 2 4 0 0 0 3 9 0 9 0 0 0
User Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 2 4 0 0 0 3 9 0 9 0 0 0
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Final Vol.: 2 4 0 0 0 3 9 0 9 0 0 0
Critical Gap Module:
Critical Gp: 7.1 6.5 xxxxx xxxxx xxxx 6.2 4.1 xxxx xxxxx xxxxx xxxx xxxxx
FollowUpTim: 3.5 4.0 xxxxx xxxxx xxxx 3.3 2.2 xxxx xxxxx xxxxx xxxx xxxxx
Capacity -Module: ------------II-------------- 11--------------I)--------------i
Cnflict Vol: 23 23 xxxxx xxxx xxxx 0 0 xxxx xxxxx xxxx xxxx xxxxx
Potent Cap.: 995 875 xxxxx xxxx xxxx 900 900 xxxx xxxxx xxxx xxxx xxxxx
Move Cap.: 984 866 xxxxx xxxx xxxx 900 900 xxxx xxxxx xxxx xxxx xxxxx
Volume/Cap: 0.00 0.00 xxxx xxxx xxxx 0.00 0.01 xxxx xxxx xxxx xxxx xxxx
--- II---------------II---------------II---------------
Level Of Service Module: I
2Way95thQ: xxxx 0.0 xxxxx xxxx xxxx xxxxx 0.0 xxxx xxxxx xxxx xxxx xxxxx
Control Del:xxxxx 9.2 xxxxx xxxxx xxxx xxxxx 9.0 xxxx xxxxx xxxxx xxxx xxxxx
LOS by Moves * A. * * * * A
Movement: LT - LTR - RT LT - LTR - RT LT - LTR - RT LT - LTR - RT
Shared Cap.: 933 xxxx xxxxx xxxx xxxx 900 xxxx xxxx xxxxx xxxx xxxx xxxxx
SharedQueue: 0.0 xxxx xxxxx xxxxx xxxx 0.0 xxxxx xxxx xxxxx xxxxx xxxx xxxxx
Shrd ConDel: 8.9 xxxx xxxxx xxxxx xxxx 9.0 xxxxx xxxx xxxxx xxxxx xxxx xxxxx
Shared LOS: A * * * * A
ApproachDel: 9.0 9.0 xxxxxx xxxxxx
ApproachLOS: A A
Notes Queue reported is the number of cars per lane.
Post 2020 AM Alternative 1 Fri Dec 15, 2006 11:26:23 Page 14-1
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Post 2020 AM Alternative 1 With Project
Level Of Service Computation Report
2000 HCM Unsignalized Method (Base Volume Alternative)
Intersection #3 Driveway on Walnut
Average Delay (sec/veh): 0.0 Worst Case Level Of Service: [ 0.01
Approach: North Bound South Bound East Bound West Bound
Movement: L T - R L - T - R L - T - R L - T - R
------------I---------------11---------------II---------------II---------------I
Control: Stop Sign Stop Sign Uncontrolled Uncontrolled
Rights Include Include Include Include
Lanes: 0 0 0 0 0 1 0 0 0 1 1 0 2 0 0 0 0 1 1 0
---------------------------1i--------------11--------------II---------------
Volume Module:I
Base Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Growth Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Initial Bse: 0 0 0 0 0 0 0 0 0 0 0 0
User Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
PHF Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
PHF Volume: 0 0 0 0 0 0 0 0 0 0 0 0
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Final Vol.: 0 0 0 0 0 0 0 0 0 0 0 0
-l------- II ---------------11 --------------11 --------------
CriticalGapModule:I
Critical Gp: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
FollowUpTim: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Capacity Module:---------------
odule:----------- 11--------------- II--------------- II---------------
I
Cnflict Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Potent Cap.: 0 0 0 0 0 0 0 0 0 0 0 0
Move Cap.: 1 1 1 1 1 1 1 1 1 1 1 1
Volume/Cap: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
------------ I -----II---------------II---------------11---------------I
Level Of Service Module:
2Way95thQ: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Control Del: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
LOS by Move:
Movements LT - LTR - RT LT - LTR - RT LT - LTR - RT LT - LTR - RT
Shared Cap.: 0 0 0 0 0 0 0 0 0 0 0 0
SharedQueue: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Shrd ConDel: 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Shared LOS:
ApproachDel: 0.0 0.0 0.0 0.0
ApproachLOS:
Note: Queue reported is the number of cars per lane.
Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA
Post 2020 AM Alternative 1 Tue Dec 12, 2006 15:39:02 Page 13-1
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Post 2020 AM Alternative 1 With Project
-------------------------------------------------------
Level Of Service Computation Report
2000 HCM Unsignalized Method (Future Volume Alternative)
Intersection #2 Driveway on Red Hill
Average Delay (sec/veh): 8.8 Worst Case Level Of Service: F[709.3]
Approach: North Bound South Bound East Bound West Bound
Movement; L - T - R L - T - R L - T R L - T - R
------------ --------------- --------------- --------------- ---------------+
Control: Uncontrolled Uncontrolled Stop Sign Stop Sign
Rights: Include Include Include Include
Lanes: 1 0 1 1 0 1 0 1 1 0 0 0 1! 0 0 0 0 1 0 0
-------------- --------------- --------------- ---------------
Volume Module:�
Base Vol: 3 739 0 0 2605 3 8 0 12 0 0 0
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 3 739 0 0 2605 3 8 0 12 0 0 0
Added Vol: 5 0 0 0 0 3 9 0 13 0 0 0
PasserByvol: 0 0 0 0 0 0 0 0 0 0 0 0
Initial Fut: 8 739 0 0 2605 6 17 0 25 0 0 0
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 8 739 0 0 2605 6 17 0 25 0 0 0
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Final Vol.: 8 739 0 0 2605 6 17 0 25 0 0 0
Critical Gap Module:
Critical Gp: 4.1 xxxx xxxxx xxxxx xxxx xxxxx 6.8 xxxx 6.9 xxxxx xxxx xxxxx
FollowUpTim: 2.2 xxxx xxxxx xxxxx xxxx xxxxx 3.5 xxxx 3.3 xxxxx xxxx xxxxx
Capacity Module:
--------------- 11--------------- ---------------11 ---------------
Cnflict Vol: 2611 xxxx xxxxx xxxx xxxx xxxxx 2994 xxxx 1306 xxxx xxxx xxxxx
Potent Cap.: 167 xxxx xxxxx xxxx xxxx xxxxx 11 xxxx 153 xxxx xxxx xxxxx
Move Cap.: 167 xxxx xxxxx xxxx xxxx xxxxx 11 xxxx 153 xxxx xxxx xxxxx
Volume/Cap: 0.05 xxxx xxxx xxxx xxxx xxxx 1.59 xxxx 0.16 xxxx xxxx xxxx
Level Of Service Module: ----1'---------------I) --------------- 11 ---------------
2Way95thQ: 0.1 xxxx xxxxx xxxx xxxx xxxxx xxxx xxxx xxxxx xxxx xxxx xxxxx
Control Del: 27.6 xxxx xxxxx xxxxx xxxx xxxxx xxxxx xxxx xxxxx xxxxx xxxx xxxxx
LOS by Move: D +►
Movement: LT - LTR - RT LT - LTR - RT IT - LTR RT IT - LTR - RT
Shared Cap.: xxxx xxxx xxxxx xxxx xxxx xxxxx xxxx 24 xxxxx xxxx xxxx xxxxx
SharedQueue:xxxxx xxxx xxxxx xxxxx xxxx xxxxx xxxxx 5.3 xxxxx xxxxx xxxx xxxxx
Shrd ConDel:xxxxx xxxx xxxxx xxxxx xxxx xxxxx xxxxx 709 xxxxx xxxxx xxxx xxxxx
Shared LOS: * * * * * * * F
ApproachDel: xxxxxx xxxxxx 709.3 xxxxxx
ApproachLOS: * * F
Note: Queue reported is the number of cars per lane.
Post 2020 AM Alternative 1 Tue Dec 12, 2006 15:39:02 Page 14-1
--------------------------------------------------------------------------------
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Post 2020 AM Alternative 1 With Project
--------------------------------------------------------------------------------
Base Queue Report (cars)
--------------------------------------------------------------------------------
Northbound Southbound Eastbound Westbound
Node Intersection L -- T -- R L -- T -- R L -- T -- R L -- T -- R
#2 [2Way95thQ]: 0.1 K.)= xxxx xxxx xxxx xxxx 2.4 2.4 2.4 xxxx xxxx xxxx
Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA
.M":Y^.ww.• .� iia:.: � �;. � ,�_ ., ... �..� F+:�..n• ,etn
Post 2020 AM Alternative 1 Fri Dec 15, 2006 11:26:23 Page 17-1
--------------------------------------------------------------------------------
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Post 2020 AM Alternative 1 With Project
--------------------------------------------------------------------------------
Future Queue Report (cars)
--------------------------------------------------------------------------------
Northbound Southbound Eastbound Westbound
Node Intersection L -- T -- R L -- T -- R L -- T -- R L -- T -- R
#2 [2Way95thQ]: 0.0 0.0 xxxx xxxx 0.0 0.0 0.0 xxxx xxxx xxxx xxxx xxxx
#3 [2Way95thQ]: xxxx xxxx xxxx 0.0 xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx
Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA
Post 2020 PM Alternative 1 Fri Dec 15, 2006 11:26:55 Page 1-1
Traff ix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA
Post 2020 PM Alternative 1 Fri Dec 15, 2006 11:26:55 Page 2-1
--------------------------------------------------------------------------------
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Post 2020 PM Alternative 1 With Project
--------------------------------------------------------------------------------
Trip Generation Report
Forecast for PM
Zone Rate Rate Trips Trips Total % Of
# Subzone Amount Units In Out In Out Trips Total
1 81 -Unit Resi 1.00 Townhomes 26.00 17.00 26 17 43 100.0
Zone 1 Subtotal ............................. 26 17 43 100.0
--------------------------------------------------------------------------------
TOTAL.................................................. 26 17 43 100.0
Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Post 2020 PM Alternative 1 With Project
-
Scenario Report
Scenario:
Post 2020 PM Alternative 1
Command:
Post 2020 PM Alternative 1
Volume:
Post 2020 PM Alternative 1
Geometry:
Future
Impact Fee:
Default Impact Fee
Trip Generation:
PM
Trip Distribution:
ALL
Paths:
Default Paths
Routes:
Default Routes
Configuration:
Post 2020 PM Alternative 1
Traff ix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA
Post 2020 PM Alternative 1 Fri Dec 15, 2006 11:26:55 Page 2-1
--------------------------------------------------------------------------------
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Post 2020 PM Alternative 1 With Project
--------------------------------------------------------------------------------
Trip Generation Report
Forecast for PM
Zone Rate Rate Trips Trips Total % Of
# Subzone Amount Units In Out In Out Trips Total
1 81 -Unit Resi 1.00 Townhomes 26.00 17.00 26 17 43 100.0
Zone 1 Subtotal ............................. 26 17 43 100.0
--------------------------------------------------------------------------------
TOTAL.................................................. 26 17 43 100.0
Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA
Post 2020 PM Alternative 1 Fri Dec 15, 2006 11:26x55 Page 3-1
--------------------------------------------------------------------------------
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Post 2020 PM Alternative 1 With Project
--------------------------------------------------------
Trip Distribution Report
Percent Of Trips Townhouses
To Gates
1 2 4 5 6
Zone ----- ----- ----- ----- -----
1 15.0 15.0 5.0 10.0 55.0
%11
Post 2020 PM Alternative 1 Fri Dec 15, 2006 11:26:55 Page 4-1
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Post 2020 PM Alternative 1 With Project
--------------------------------------------------------------------------------
Turning Movement Report
PM
Volume Northbound Southbound Eastbound westbound Total
Type Left Thru Right Left Thru Right Left Thru Right Left Thru Right Volume
#1 Red Hill & Walnut
Base 285 1900 280 147 780 126 390 458 118 370 804 166 5824
Added 4 0 0 4 2 2 8 1 1 0 4 0 26
Total 289 1900 280 151 782 128 398 459 119 370 808 166 5850
#2 Driveway on Red Hill
Base 0 0 0 0 0 0 0 0 0 0 0 0 0
Added 7 3 0 0 0 11 7 0 7 0 0 0 35
Total 7 3 0 0 0 11 7 0 7 0 0 0 35
#3 Driveway on Walnut
Base 0 0 0 0 0 0 0 0 0 0 0 0 0
Added 0 0 0 3 0 0 0 7 0 0 2 8 20
Total 0 0 0 3 0 0 0 7 0 0 2 8 20
Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA
Post 202PM Alternative x Fri Dec 15, 2006 zz,o,s
____-______________�____�_�___________
Page 5-1
uA6539'75-n"it Residential Project TIS
City of Tustin
Post ummmmAlternative 1With Project
—__—_--______—__—_______--___—__—____--_
znter"ecti" v"u=e Report
Base Volume Alternative
__--_—___—_—____________—_______—_____—_
mo=th^""=u Southbound Eastbound Westbound
Node Intersection L—x—x L—z—u u—r—o L —T —n
1 Rem ,uzz & m" 285 1900 uno »ur roo 126 ,»o ^mo 118 370 oo^ 166
o o=iv~=, on n o o u o u o o o o o o o
xDriveway =nw o o o o u o o o o u o u
vQsc 2mmnwAlternative zFri Dec 15, 000v 11.26.55 Page 6-1
--__—__--____—___—_—____—_—__--__—___—_—
aAoS3o ' 75 -Un^ Residential Project TIS
City of Tustin
Post umm PM Alternative zWith Project
________________________________________
znter"ec,io=v"u"me Report
Future volume Alternative
_____—___---____--____—____--_—____—_--_
m*=th^ou"^ Southbound Eastbound Westbound
Node Intersection L—x —u L— c --x L — z — x L — c — x
1 Red Hill a w" uaw 1900 ono zsz 782 128 398 ^s, 119 »ro 000 mo
2 Driveway on x ' x o o o 11 , o , o o o
a Driveway on v o o o 3 o o o r o o 2 u
Traffixr'«'0715m:006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA Traffixm.0715 (c) 2006 Dowling Assoc. Licensed mKATZ OKITSU, TUSTIN, CA
Post 2020 PM Alternative 1 Fri Dec 15, 2006 11:26:55 Page 7-1
--------------------------------------------------------------------------------
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Post 2020 PM Alternative 1 With Project
--------------------------------------------------------------------------------
Impact Analysis Report
Level Of Service
Intersection Base Future Change
Del/ V/ Del/ V/ in
LOS Veh C LOS Veh C
# 1 Red Hill & Walnut F xxxxx 1.030 F xxxxx 1.038 + 0.008 V/C
# 2 Driveway on Red Hill 0.0 0.000 A 9.0 0.000 + 9.049 D/V
# 3 Driveway on Walnut 0.0 0.000 A 8.6 0.000 + 8.557 D/V
Post 2020 PM Alternative 1 Fri Dec 15, 2006 11:26:55 Page 8-1
--------------------------------------------------------------------------------
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Post 2020 PM Alternative 1 With Project
--- ----------------------------------------------------------------------------
Threshold Report (Base Alternative)
Threshold Criteria [Ops LOS >- *][Plan LOS >. *1
(Delay >- 60.000] [V/C >- 1.000)
Intersection Movement LOS Delay V/C
# 1 Red Hill & Walnut NB TH XXXXXX 1.031
# .1 Red Hill & Walnut NB RT XXXXXX 1.031
# 1 Red Hill & Walnut EB LT XXXXXX 1.031
# 1 Red Hill & Walnut SB LT XXXXXX 1.031
# 1 Red Hill & Walnut WB TH XXXXXX 1.031
Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA
Post 2020 PM Alternative 1
--------------------------------------------------------------------------------
Fri Dec 15, 2006 11:26:55
Page 9-1
JA6539 -
75 -Unit Residential Project TIS
City of Tustin
Post 2020 PM Alternative 1 With Project
---------------------------------------------------------
Threshold Report (Future Alternative)
Threshold Criteria [Ops LOS
>- *][Plan LOS >= *]
[Delay >-
60.000] [V/C >= 1.000]
Intersection
Movement
LOS Delay V/C
# 1 Red Hill
& Walnut
NB TH
XXXXXX 1.040
# 1 Red Hill
& Walnut
NB RT
XXXXXX 1.040
# 1 Red Hill
& Walnut
EB LT
XXXXXX 1.040
# 1 Red Hill
& Walnut
SB LT
XXXXXX 1.040
# 1 Red Hill
& Walnut
WB TH
XXXXXX 1.040
Post 2020 PM Alternative 1 Fri Dec 15, 2006 11:26:55 Page 10-1
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Post 2020 PM Alternative 1 With Project
--------------------------------------------------------------------------------
Level Of Service Computation Report
ICU 1(Loss as Cycle Length C Method (Base Volume Alternative)
Intersection #1 Red Hill & Walnut
Cycle (sec): 100 Critical Vol./Cap-(X): 1.030
Loss Time (sec): 5 (Y+R-4.0 sec) Average Delay (sec/veh): xxxxxx
Optimal Cycle: 180 Level Of Service: F
Street Name: Red Hill Ave Walnut Ave
Approach: North Bound South Bound East Bound West Bound
Movement: L - T - R L - T - R L - T - R L - T - R
----------- ( --------------- ((--------------- ((--------------- ((--------------(
Control: Protected Protected Protected Protected
Rights: Include Include Include Include
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
Lanes: 1 0 2 1 0 1 0 2 1 0 1 0 1 1 0 2 0 2 0 1
------------ i ---------------( ---------------((--------------- ---------------i
Volume Modules
Base Vol: 285 1900 280 147 780 126 390 458 118 370 804 166
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 285 1900 280 147 780 126 390 458 118 370 804 166
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volumes 285 1900 280 147 780 126 390 458 118 370 804 166
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 285 1900 280 147 780 126 390 458 118 370 804 166
PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.s 285 1900 280 147 780 126 390 458 118 370 804 166
-Fl----- ((--------------- ((--------------- ((_-----------T--
Saturation owModule: I
Sat/Lane: 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700
Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lanes: 1.00 2.61 0.39 1.00 2.58 0.42 1.00 1.59 0.41 2.00 2.00 1.00
Final Sat.: 1700 4445 655 1700 4391 709 1700 2703 697 3400 3400 1700
------------------ ---------------
((---------------
Capacity Analysis Module: (
Vol/Sat: 0.17 0.43 0.43 0.09 0.18 0.18 0.23 0.17 0.17 0.11 0.24 0.10
Crit Moves: **** **** **** ****
Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA
Post 2020 PM Alternative 1 Fri Dec 15, 2006 11:26:55 Page 11-1
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Post 2020 PM Alternative 1 With Project
--------------------------------------------------------------------
Level Of Service Computation Report
ICU 1(Loss as Cycle Length %) Method (Future Volume Alternative)
Intersection #1 Red Hill & Walnut
Cycle (sec): 100 Critical Vol./Cap.(X): 1.038
Loss Time (sec): 5 (Y+R-4.0 sec) Average Delay (sec/veh): xxxxxx
Optimal Cycle: 180 Level Of Service: F
*#*wwrwww,trrw****,rww*w**err***w****w,e*w,rtw**,t,twwwww*,r*tw*rww,r,�ww****,rww*t,t*rr,t**,r,►,r
Street Name: Red Hill Ave Walnut Ave
Approach: North Bound South Bound East Bound West Bound
Movement: L - T - R L - T - R L - T - R L - T - R
------------ I --------------- 11 - 11--------------- ---------------�
Control: Protected Protected Protected Protected
Rights: Include Include Include Include
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
Lanes: 1 0 2 1 0 1 0 2 1 0 1 0 1 1 0 2 0 2 0 1
------------ I --------------- --------------- ---------------11--------------�
Volume Module:
Base Vol: 285 1900 280 147 780 126 390 458 118 370 804 166
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 285 1900 280 147 780 126 390 458 118 370 804 166
Added Vol: 4 0 0 4 2 2 8 1 1 0 4 0
PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0
Initial Fut: 289 1900 280 151 782 128 398 459 119 370 808 166
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 289 1900 280 151 782 128 398 459 119 370 808 166
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 289 1900 280 151 782 128 398 459 119 370 808 166
PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLP Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Final Vol.: 289 1900 280 151 782 128 398 459 119 370 808 166
------------I---------------11--------------- --------------- ii - --------------
Saturation Flow Module:
1
Sat/Lane: 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700
Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lanes: 1.00 2.61 0.39 1.00 2.58 0.42 1-00'1-59 0.41 ,2.00 2.00 1.00
Final Sat.: 1700 4445 655 1700 4383 717 1700 2700 700 3400 3400 1700
Capacity -Analysis Module. --- 1j--------------- --------------- 11 ---------------
�
Vol/Sat: 0.17 0.43 0.43 0.09 0.18 0.18 0.23 0.17 0.17 0.11 0.24 0.10
Crit Moves:
*wwr�ww*,r*wwww*rrtwwwrt*t*,r*w**w,►*,twwww**,t*wwwww*rww,►*wwwrtwwt,tw,rw**twwwww,t***,r *,t rt ,t
Post 2020 PM Alternative 1 Fri Dec 15, 2006 11:26:55 Page 12-1
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Post 2020 PM Alternative 1 With Project
--------------------------------------------------------------------------------
Level Of Service Computation Report
2000 HCM Unsignalized Method (Base Volume Alternative)
Intersection #2 Driveway on Red Hill
Average Delay (sec/vch): 0.0 Worst Case Level Of Service: ( 0.01
*w*****,t*.r.,►e*:***w�w�t**w*,e**•��***"�,►*********w:*.r**.�****+�,r**,r*,r*r****,►****www
Approach: North Bound South Bound East Bound West Bound
Movement: L - T - R L - T - R L - T - R L - T - R
------------ --------------- --------------- --------------- ---------------�
Control: Stop Sign Stop Sign Uncontrolled Uncontrolled
Rights: include Include Include Include
Lanes: 0 1 2 0 0 0 0 2 1 0 0 0* 1 t 0 0 0 0 0 0 0
------------ --------------- --------------- --------------- ---------------�
Volume Module:
Base Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Growth Adj: 0.00 Q.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Initial Bse: 0 0 0 0 0 0 0 0 0 0 0 0
User Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
PHF Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
PHP Volume: 0 0 0 0 0 0 0 0 0 0 0 0
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Final Vol: 0 0 0 0 0 0 0 0 0 0 0 0
------------ --------------- --------------- --------------- ---------------)
Critical Gap Module:
Critical Gp: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
FollowUpTim: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
----------- --------------- -------------- --------------- ---------------�
Capacity Module:
Cnflict Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Potent Cap.: 0 0 0 0 0 0 0 0 0 0 0 0
Move Cap.: 1 1 1 1 1 1 1 1 1 1 1 1
Volume/Cap: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
--o----- --------------- ��--------------- --------------- ---------------
Lev�
elf Service Module:
2Way95thQ: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Control Del: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
LOS by Move:
Movement: LT - LTR - RT LT - LTR - RT LT - LTR - RT LT - LTR - RT
Shared Cap.: 0 0 0 0 0 0 0 0 0 0 0 0
SharedQueue: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Shrd ConDel: 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Shared LOS:
ApproachDel: 0.0 0.0 0.0 0.0
ApproachLOS:
**�w,rwr►**�***wwwsw*w*wt**t*,t**,rww**w*w*,rww*w,t*www,rw*******�rrw***ww**�ww�e***wt**w
Note: Queue reported is the number of cars per lane.
**,t#w**rr**,r#*w�►lrww*ww,trkrr�r**w*****war*rrwwww,tww*�etw*wsw�rw�r,►*ww*ww,r**wwwwwww*w,rwt*w#
Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA
Post 2020 PM Alternative 1 Fri Dec 15, 2006 11:26:55 Page 13-1
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Post 2020 PM Alternative 1 With Project
-
Level Of Service Computation Report
2000 HCM Unsignalized Method (Future Volume Alternative)
Intersection #2 Driveway on Red Hill
Average Delay (sec/veh): 7.2 Worst Case Level Of Service: A[ 9.0]
Approach: North Bound South Bound East Bound West Bound
Movements L - T - R L - T - R L - T - R L - T - R
------------ --------------- --------------- --------------- ---------------+
Control: Stop Sign Stop Sign Uncontrolled Uncontrolled
Rights: Include Include Include Include
Lanes: 0 1 2 0 0 0 0 2 1 0 0 0 1! 0 0 0 0 0 0 0
-------------- --------------- --------------- --------------
Volume Module:�
Base Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 0 0 0 0 0 0 0 0 0 0 0 0
Added Vol: 7 3 0 0 0 it 7 0 7 0 0 0
PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0
Initial Fut: 7 3 0 0 0 11 7 0 7 0 0 0
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 7 3 0 0 0 it 7 0 7 0 0 0
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Final Vol.: 7 3 0 0 0 11 7 0 7 0 0 0
Critical Gap Module:
Critical Gp: 7.1 6.5 xxxxx xxxxx xxxx 6.2 4.1 xxxx xxxxx xxxxx xxxx xxxxx
FollowUpTim: 3.5 4.0 xxxxx xxxxx xxxx 3.3 2.2 xxxx xxxxx xxxxx xxxx xxxxx
- Modulez------------��-------------- ��---------------1)--------------
Capacity �
Cnflict Vol: 18 18 xxxxx xxxx xxxx 0 0 xxxx xxxxx xxxx xxxx xxxxx
Potent Cap.: 1002 881 xxxxx xxxx xxxx 900 900 xxxx xxxxx xxxx xxxx xxxxx
Move Cap.: 984 874 xxxxx xxxx xxxx 900 900 xxxx xxxxx xxxx xxxx xxxxx
Volume/Cap: 0.01 0.00 xxxx xxxx xxxx 0.01 0.01 xxxx xxxx xxxx xxxx xxxx
Level Of Service -Module:---- ---------------
----- II ---------------1) ------------- I
2Way95thQ: xxxx 0.0 xxxxx xxxx xxxx xxxxx 0.0 xxxx xxxx xxxx xxxxx
Control Del:xxxxx 9.1 xxxxx xxxxx xxxx xxxxx 9.0 xxxx xxxxx xxxxx xxxx xxxxx
LOS by Move: * A * * « « A * « * « «
Movements LT - LTR - RT LT - LTR - RT LT - LTR - RT IT - LTR - RT
Shared Cap.: 969 xxxx xxxxx xxxx xxxx 900 xxxx xxxx xxxxx xxxx xxxx xxxxx
SharedQueue: 0.0 xxxx xxxxx xxxxx xxxx 0.0 xxxxx xxxx xxxxx xxxxx xxxx xxxxx
Shrd ConDel: 8.7 xxxx xxxxx xxxxx xxxx 9.0 xxxxx xxxx xxxxx xxxxx xxxx xxxxx
Shared LOS: A * * * « A
ApproachDel: 8.8 9.0 xxxxxx xxxxxx
ApproachLOS: A A «. «
Note: Queue reported is the number of cars per lane.
Post 2020 PM Alternative 1 Fri Dec 15, 2006 11:26:55 Page 14-1
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Post 2020 PM Alternative 1 With Project
--------------------------------------------------------------------------------
Level Of Service Computation Report
2000 RCM Unsignalized Method (Base Volume Alternative)
Intersection #3 Driveway on Walnut
Average Delay (sec/veh)s 0.0 Worst Case Level Of Service: [ 0.01
Approach: North Bound South Bound East Bound West Bound
Movement: L - T - R L - T - R L - T - R L - T - R
------------ --------------- --------------- --------------- ---------------
Control:
--------- -Control: Stop Sign Stop Sign Uncontrolled Uncontrolled
Rights: Include Include Include Include
Lanes: 0 0 0 0 0 1 0 0 0 1 1 0 2 0 0 0 0 1 1 0
------------ --------------- --------------- --------------- --------------
Volume Module:
Baine Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Growth Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Initial Bse: 0 0 0 0 0 0 0 0 0 0 0 0
User Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
PHF Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
PHF Volume: 0 0 0 0 0 0 0 0 0 0 0 0
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Final Vol.: 0 0 0 0 0 0 0 0 0 0 0 0
------------ --------------- --------------- --------------- ---------------�
Critical Gap Module:
Critical Gp: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
FollowUpTim: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
------------ ---------------+ --------------- --------------- ---------------�
Capacity Module:
Cnflict Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Potent Cap.: 0 0 0 0 0 0 0 0 0 0 0 0
Move Cap.: 1 1 1 1 1 1 1 1 1 1 1 1
Volume/Cap: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
----------------��--------------- ��--------------- ��--------------
Level Of Se�
r ice Module:
2Way95thQ: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Control Del: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
LOS by Move:
Movement: LT - LTR - RT LT - LTR - RT LT - LTR - RT LT - LTR - RT
Shared Cap.: 0 0 0 0 0 0 0 0 0 0 0 0
SharedQueue: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Shrd ConDel: 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Shared LOSS
ApproachDels 0.0 0.0 0.0 0.0
ApproachLOS:
Note: Queue reported is the number of cars per lane.
Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA
Post 2020 PM Alternative 1 Tue Dec 12, 2006 15:40x55 Page 13-1
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Post 2020 PM Alternative 1 With Project
- - - -
Level Of Service Computation Report
2000 HCM Unsignalized Method (Future Volume Alternative)
Intersection #2 Driveway on Red Hill
Average Delay (sec/veh): 0.8 Worst Case Level Of Service: F[ 87.41
Approach: North Bound South Bound East Bound West Bound
Movement: L - T - R L - T - R L - T - R L - T - R
------------ ---------------+--------------- --------------- ---------------�
Control: Uncontrolled Uncontrolled Stop Sign Stop Sign
Rights: Include Include Include Include
Lanes: 1 0 1 1 0 1 0 1 1 0 0 0 11 0 0 0 0 1 0 0
-------------- --------------- ---------------j(--------------
Volume Module: j
Base Vol: 13 2456 0 0 1053 9 4 0 7 0 0 0
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 13 2456 0 0 1053 9 4 0 7 0 0 0
Added Vol: 15 0 0 0 0 11 7 0 10 0 0 0
PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0
Initial Fut: 28 2456 0 0 1053 20 11 0 17 0 0 0
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 28 2456 0 0 1053 20 11 0 17 0 0 0
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Final Vol.: 28 2456 0 0 1053 20 11 0 17 0 0 0
Critical Gap Module:
Critical Gp: 4.1 xxxx xxxxx xxxxx xxxx xxxxx 6.8 xxxx 6.9 xxxxx xxxx xxxxx
FollowUpTim: 2.2 xxxx xxxxx xxxxx xxxx xxxxx 3.5 xxxx 3,3 xxxxx xxxx xxxxx
Capacity Module. ----------- -------------- --------- 11--- ---------
Cnflict Vol: 1073 xxxx xxxxx xxxx xxxx xxxxx 2347 xxxx 537 xxxx xxxx xxxxx
Potent Cap.: 657 xxxx xxxxx xxxx xxxx xxxxx 31 xxxx 494 xxxx xxxx xxxxx
Move Cap.: 657 xxxx xxxxx xxxx xxxx xxxxx 30 xxxx 494 xxxx xxxx xxxxx
Volume/Cap: 0.04 xxxx xxxx xxxx xxxx xxxx 0.37 xxxx 0.03 xxxx xxxx xxxx
Level -Of Service
-----------��--------------- ��--------------- 11 ---------------
�
Module:
2Way95thQ: 0.1 xxxx xxxxx xxxx xxxx xxxxx xxxx xxxx xxxxx xxxx xxxx xxxxx
Control Del: 10.7 xxxx xxxxx xxxxx xxxx xxxxx xxxxx xxxx xxxxx xxxxx xxxx xxxxx
LOS by Move: B * * « * « «
Movement: LT - LTR - RT LT - LTR - RT LT - LTR - RT LT - LTR - RT
Shared Cap.: xxxx xxxx xxxxx xxxx xxxx xxxxx xxxx 70 xxxxx xxxx xxxx xxxxx
SharedQueue:xxxxx xxxx xxxxx xxxxx xxxx xxxxx xxxxx 1.5 xxxxx xxxxx xxxx xxxxx
Shrd ConDel:xxxxx xxxx xxxxx xxxxx xxxx xxxxx xxxxx 87.4 xxxxx xxxxx xxxx xxxxx
Shared LOS: * * * * « ,► * F
ApproachDel: xxxxxx xxxxxx 87.4 xxxxxx
ApproachLOS: * * F
Note: Queue reported is the number of cars per lane.
Post 2020 PM Alternative 1 Tue Dec 12, 2006 15:40:56 Page 14-1
--------------------------------------------------------------------------------
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Post 2020 PM Alternative 1 With Project
--------------------------------------------------------------------------------
Base Queue Report (cars)
------------------------------------------------------------------
Northbound Southbound Eastbound westbound
Node Intersection L- T -- R L -- T -- R L -- T -- R L -- T -- R
#2 [2Way95thQ]: 0.1 xxxx xxxx xxxx xxxx xxxx 0.5 0.5 0.5 xxxx xxxx xxxx
Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA
Post 2020 PM Alternative 1 Fri Dec 15, 2006 11:26:55 Page 17-1
--------------------------------------------------------------------------------
JA6539 - 75 -Unit Residential Project TIS
City of Tustin
Post 2020 PM Alternative 1 With Project
--------------------------------------------------------------------------------
Future Queue Report (cars)
--------------------------------------------------------------------------------
Northbound Southbound Eastbound Westbound
Node Intersection L -- T -- R L -- T -- R L T R L T R
#2 [2Way95thQ]: 0.0 0.0 xxxx xxxx 0.0 0.0 0.0 xxxx xxxx xxxx xxxx xxxx
#3 [2Way95thQ1t XXXX XXXX XXXX 0.0 XXXX XXXX XX= XXXX X2= XXXX XXXX XXXX
Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA
THRESHOLDS OF SIGNIFICANCE
A project will normally have a significant adverse impact on traffic and circulation if it results in any of
the following conditions:
• An increase in traffic that is substantial in relation to the existing traffic load and capacity of the
street system (i.e., results in a substantial increase in either the number of the vehicle trips, the
volume to capacity ratio on roads, or congestion at intersections); or,
• An increase in the level of service standard established by the Orange County Transportation
Authority for designated roads or highways.
• An increase in the number of the peak hour trips over and above a residential project in
conformance with the General Plan land use designation.
To understand how well a roadway or intersection is handling traffic, several concepts have been devised.
The first. is a qualitative p
q tative measure, referred to as Level of Service, which evaluates a roadways operation
based on observations. A LOS "A" is an optimal traffic condition, while a LOS 'T" represents service
congestion. A second, more quantitative measure, referred to as Volume to Capacity Ratio(V/Q, is the
ratio of an intersection's or roadway's traffic volumes to its design capacity. The relationship between the
LOS and V/C Ratio are summarized below in Table C-1.
TABLE C-1
DEFINITIONS OF LEVEL OF SERVICE
Level of service Definitions
LCIS
ICU Range (V/C
Ratio)
Description
A
Less than 0.60
Free Mowing traffic conditions, no congestion.
B
0.60 to less than 0.70
Generally free from congestion. All vehicles may clear signal
in a single cycle.
C
0.70 to less than 0.80
light congestion with occasional back-ups at critical
approaches.
D
0.80 to less than 0.90
Congestion at critical approaches.
E
0.90 to less than 1.0
Moderate to severe congestion during peak period.
F
1.00 or greater
Severe congestion.
Source: Blodgett/Baylosis Associates, 2000
Katz, Okitsu & Associates City of Tustin
Traffic Engineers and Transportation Planners
Red Hilt/walnut Residential Project Traffic Study
DEFINITIONS OF LEVEL OF SERVICE
FOR SIGNALIZED INTERSECTIONS
LEVEL OF SERVICE DEFINITIONS FOR SIGNALIZED INTERSECTIONS
(Source: City of Los Angeles Trac Studies Policies and Procedures, November 1993)
Level of Volume/Capacity
Service Ratio Definition
A 0.000 - 0.600 EXCELLENT. No vehicle waits longer than one
Red light and no approach phase is fully used.
B 0.601- 0.700 VERY GOOD. An occasional approach phase is
fully utilized; many drivers begin to feel somewhat
restricted within groups of vehicles.
C 0.701— 0.800
GOOD. Occasionally, drivers may have to wait
through more than one red light; backups may
develop behind turning vehicles.
D 0.801— 0.900
FAIR. Delays may be substantial during portions
of the rush hours, but enough lower volume periods
occur to permit clearing of developing lines,
preventing excessive backups.
E 0.901-1.00
POOR. Represents the most vehicles that
intersection approaches can accommodate; may be
long lines of waiting vehicles through several
signal cycles.
F Greater than 1.000
FAILURE. Backups from nearby intersections
or on cross streets may restrict or prevent
movement of vehicles out of the intersection
approaches. Tremendous delays with continuously
increasing queue lengths.
Katz, Okitsu & Associates
City of Tustin
Traffic Engineers and Transportation Planners
Red Hil/lWalnut Residential Project Traffic Study
w
Z)
Z
4
H
Z
J
Q
�►,,two WNW
2V
r !
a RED HILL AVENUE
l
V
3
Katz, Okitsu & Associates
'ffixistin9 Conbitions
°-. 09.07.2006
Conceptual Site Pian witlj Revised Townbomes
B,eb Hit[ Tow nbomes
Tustin, California
0 30 120
15 60
0 KTGY CROUP, INC.
AROMITNCTURN PLANNING
1 7 I T C 0 a L L a 0 v T M
Inv Ina. CALIFORNIA 92.14
1"91 ael.tlsa FAX 404w" vvt-8111141
O am* ALL R�f171 Il�wiio
Ui
D
Q
D
1
I
1
!
•
h
,
i k
,
s
I
,M,a, 'tie , j . .. J.__...— .,d ` �-.:» _... y� `-� � y ♦ + A x, ( �� a y
,+ � I ' �'.. ...} } . Y' ! ..y... f P V' ....t ♦ t i F �s 'M1'�, k•hMt.. _ � ._ / � t ! � i '
,
,
! , F
{
I: 4 t I.. � _ �...._..-•--d..«.._... _ _..; � .,_.�,--1_. _._. �, ! _._._ � i- _;7.._... _.� t� �j , .._.. . _ .,� r ... i»" - q." i
y'
,
J i
r
f
► '
+s d,
.i �� s • � il, t ! # y w.� I: z Y t I � 1: f 1.: i! � �.. � � t•. ..._ .� ....+ r
ti t I
• 1
r
a i
-1
i 4 I
1
t
I�
7
, .y. ..:'.:. r -tir ..tiy ...t. ... _.. — ::i'.,,;,,^�. _.._..�_r.."rl..,.. _ .. . _ s i �,i. �;.� _..,... , �._ .. . � '^ L ..•„i..w.._ ... .._ .r •i+v;:xec�x+di'71..6E��7A'` y"� '• 1
f
,
s
t
L
a
U
.4
a
3
. Katz, Okitsu & Associates
sA ternative I
-9 09.07.2006
Conceptual Site Pian witb Reviseb Townomes
Reb Hit[ T o w n o im e s
Tustin, California
0 30 120
15 60
0 KTG#Y GROUP, INC.
ARCNITRCTYRE PLANNING
1 7 9 ITC L N T N
I RV I M 9. CALIFORNIA 8 9 0 1 4
IRA01 001.111108 FAX IRAN 091-9100
61000 ALL RIOIB11 LYRA
Exhibit 3
Shade and Shadow Study
D
SunCal - Red Hill, LLC
KTGY NO. 20051061 .00
Existing Shadow - December 21 st -12:00 PM
S(aDow StuDN
ReaHiN Town Homes
Tustin, California
0
KTGY GROUP. ."C..
A me M I If a C I Una F L As." 4 a*
A 7 0 9 8 #4 0 T C H 9 L L 6 0 6 r
a L
tv"I awl-21*0 F^z t"Of OW 10 0
to I* OM ALL
FEN
0
SunCal - Red Hill, LLC
KTGY NO. 20051061.00
Existing Shadow - December 21 st - 9:00 AM
sbabow RON
RebHiff Town Homes
Tustin California
11
-„ KTGY GROUP, INC.
ryy, A R C N I T[ C T Y a t r L A N N I N 0
Y 1 T C M 9. L L • a w T M
if VINE. C AL 110001 ♦ •lI
•east u! -alis /A• INA► •�!-A!�•
F
SunCal - Red Hill, LLC
KTGY NO. 20051061.00
Proposed Shadow - December 21 st -12:00 PM
sbabow stubN
Reb HiN Town Homes
Tustin, California
0
KTGY GROCJP, 1Nc.
•w CNa?9CfYww FLA NNI/Ia
IA 1'� T7w•2 MI TC//[LL 0OL TN
w vlrs. C.LI/ OAN14 0!111
�+ 10444 wit -Vila •411 IMs, wwl•wlww
'C w00w ALL �w wwwrllnw
W
El 1:1 1171
71
SunCal - Red Hill, LLC
KTGY NO. 20051061.00
Proposed Shadow - December 21 st - 9:00 AM
Shadow stubN
ReaHill Town Homes
Tustin, California
0
KTGY GROUP, IMC.
A 1I C NI T[C t JR[ P AMM 11,{
+,•}= 1Tii! ft TC 11[ LL iOU
F0w
fy MS. GAL I[1 A •a4i•
ii+1f •+•alai "Ax
4i40, 001-0104
IG aoao Ati wr+ls la>.wvle
W
Exhibit 4
OCTA Comment Letter and City Response
MAR -07-2007 17:02 OCTA 2FL PLANNING 7145605794 P.02i02
m
OCTA
APPILIATED AGENCIES
Orange Counry
Trangit 01atitt
Locai Traneportatiirt
Authority
SCrwde Authority fir
Freeway EmCTencics
Consolidated Transportation
SOMee Agency
Congestoi Management
Agency
SMfieo Authority for
Abandoned Vehicing
March 7, 2007
Mingo Ashabl, Associate Planner
Community Development Department
City of Tustin
300 Centennial Way
Tustin, California 92780
Subject: initial study for the Red Hill Town Homes
Dear Ms. Ashabi:
The grange County Transportation Authority (OCTA) has reviewed
the above mentioned document, The following comment is provided
for your consideration.
Transit
OCTA currently his two bus routes, Route 66 on Walnut Avenue and
Route 71 on Red Hill Avenue, that run adjacent to the proposed
project. Although OCTA does not currently have a stop in the project
limits, it is recommended that a bus turnout be placed on the north
side of Walnut Avenue, northwest of -the intersection of Walnut
Avenue and Red Hill Avenue. If a bus turnout were to be placed at
this intersection, OCTA would relocate the existing stop on the
opposing side of Red Hill Avenue to the new location which would
serve the surrounding area more efficiently.
If you have any questions regarding this transmittal please e contact
me atocta.nat. If (714) 560-5683 or via e-mail at clarwood
� you have
specific questions related to Stops ,and Zones design, tease
P contact
Bill Ba �
tory at (714) 56ow5912 or via e-mail at bbator octa. net.
Sincerely,
Charles Larwood
Section Manager, Corridor Studies
C: Bili Batory, OCTA
550 South Mai p OMW �Qur'11y TA8nWr1-4ftM AWhaiiy
Stne�t / a ft 14184 / Qipr gs / 041ilbrnia 92863-1584 / 1714) 560-00M (6F82)
TOTAL P.02
March 8, 2007
OCTA
550 South Main Street
P.O. Box 14184
Orange, CA 92863-1584
Attn: Charles Larwood
SUBJECT: COMMENT FOR RED HILL TOWN HOMES INITIAL STUDY
Dear Mr. Larwood,
Thank you for your comment received on March 7, 2007, regarding a recommended bus
turnout on the north side of Walnut Avenue, northwest of the Walnut Avenue and Red
Hill Avenue intersection.
As noted in the public notice, the proposed condominium project is scheduled for public
hearings at the March 13, 2007, Planning Commission meeting, and March 20, 2007,
City Council meeting. The project proposes the redevelopment of an existing apartment
complex with new condominium units by a private entity. Staff is recommending a ten
foot wide dedication along Red Hill Avenue and Walnut Avenue for future roadway
widening. While the Red Hill Avenue widening would be considered in the near future,
the Walnut Avenue widening would require land acquisition and a long range plan. When
the plans for these widening projects move forward, we will be preparing additional
environmental documents and consider your recommendation for a bus turnout.
At this time, no public roadway construction would be required due to the scope of the
project.
Please contact me at 714/573-3126, if you have any questions.
Sincerely,
Minoo Ashabi
Associate Planner
cc: Elizabeth Binsack
Dana Ogdon
Terry Lutz
Katy Lee
S:1Cdd\MINOO\Red Hill Condos\OCTA response.doc
Exhibit B of Resolution No. 07-3
Mitigation Monitoring Report
Mitigation Monitoring Report
Exhibit B of Resolution No. 07-31
Tentative Tract Map 17080
Noise:
• Roof ceiling construction shall be roofing on 1/2 inch plywood. Batt insulation
shall be provided in joist spaces and the interior ceiling shall be finished with one
layer of 5/8 inch gypsum board.
• All exterior walls shall be 2 x 4 studs at 16 inches on center with batt insulation
between studs. Exterior walls shall be plaster with 5/8 inch gypsum board on the
interior.
• All southeast and southwest facing windows and glass doors shall be glazed with
STC 32 glazing with either 1/4 inch laminated glass or dual pane assembly with 1/2
inch air space. In either case, a test report must be provided at the time of
installation to ensure compliance with the minimum requirements. The report
shall be prepared in an independent, accredited testing laboratory in accordance
with ASTM E-90.
• All entry doors shall be 1-3/4 inch solid core door with weather stripping seals on
the sides and top. No glazing shall be permitted for the entry doors.
• Since meeting the minimum levels of interior noise standard would require closed
windows and doors, the structures shall be equipped with ventilation or an air-
conditioning system to provide a habitable interior environment.
• Balconies six feet in depth along Walnut Avenue and first units along Red Hill
Avenue shall be designed with 42 inch high solid railings designed compatible
with the proposed architecture.
Public Services:
• The pool access gates need to be equipped with a knox box for emergency access.
• Landscaping should be designed with surveillance opportunities for residents and
police personnel in patrol vehicles.
• Security devices such as double locking deadbolts, strike plates, with 1-1/2 inch
screws and pin locks on windows and sliders shall be installed minimizing the
potential for criminals to access the units.
Traffic:
• Access - to and from the site to Red Hill Avenue should be available with
completion of the project. The left turn egress from the project site may be
prohibited in the future if determined necessary by the City's Traffic Engineer.
ATTACHMENT F
Resolution No. 07-32
RESOLUTION NO. 07-32
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
TUSTIN APPROVING TENTATIVE TRACT 17080 TO MERGE
TWO EXISTING PARCELS CONTAINING 57 APARTMENT
UNITS INTO ONE 4 -ACRE PARCEL FOR DEVELOPMENT OF A
75 UNIT CONDOMINIUM PROJECT LOCATED AT 14421 TO
14471 RED HILL AVENUE
The City Council of the City of Tustin does hereby resolve as follows:
I. The City council finds and determines as follows:
A. That a proper application for Tentative Tract Map 17080 was submitted
by Sun -Cal Red Hill LLC requesting approval to merge two parcels into
one 4 -acre parcel for development of a 75 -unit condominium complex on
properties located at 14421 to 14471 Red Hill Avenue;
B. That a public hearing was duly called, noticed, and held for said map on
March 13, 20071 by the Planning Commission and on March 20, 2007 by
the City Council;
C. That the proposed subdivision is in conformance with the Tustin General
Plan land use designation of High Density Residential (HDR) and
Multiple Family Residential (R-3) zoning district in that these designations
provide for the development of residential condominium units;
D. As conditioned, the map would be in conformance with the State
Subdivision Map Act and Tustin City Code Section 9323 (Subdivision
Code);
E. That the Public Works Department has reviewed the tentative map and
determined that it is technically correct;
F. That the site is physically suitable for the proposed density and type of
development;
G. That the design of the subdivision or the types of improvements
proposed are not likely to cause serious public health problems;
H. The proposed subdivision is not located within a 100 -year flood plain
according to the Federal Emergency Management Agency map for the
area dated February 18, 2004;
I. That development of the site will require the developer to dedicate in
fee title property to the City of Tustin including a 10 -foot side dedication
in fee along Red Hill Avenue and 10 -foot side dedication in fee along
Walnut Avenue for future roadway widening.
Resolution No. 07-32
Tentative Tract Map 17080
March 20, 2007
Page 2
J. The project includes dedication in fee along a portion of Red Hill
Avenue and Walnut Avenue to revise ownership of an existing street
with 33 foot wide highway easement as depicted on Tentative Tract
Map 17080.
K. That the Building Official has considered and approved deviations to
the Private Improvement Standard to allow turning radii of less than 25
feet for private drives accessing private garages;
L. That the parcel map or the proposed improvements are not likely to
cause substantial environmental damage or substantially and avoidably
injure fish or wildlife in their habitat;
M. That the City Council adopted Resolution No. 07-31 adopting the Final
Mitigated Negative Declaration prepared for the project, in compliance
with Sections 15072 and 15105 of the State CEQA Guidelines;
II. The City Council hereby approves Tentative Tract Map 17080 to merge two
existing parcels into one 4 -acre parcel for development of a 75 -unit
condominium project located at 14421 to 14471 Red Hill Avenue, subject to the
conditions contained in Exhibit A attached hereto.
PASSED AND ADOPTED at a regular meeting of the Tustin City Council held on the
20th day of March, 2007.
DOUG DAVERT
MAYOR
PAMELA STOKER
CITY CLERK
Resolution No. 07-32
Tentative Tract Map 17080
March 20, 2007
Page 3
STATE OF CALIFORNIA )
COUNTY OF ORANGE ) SS
CIN OF TUSTIN )
I, Pamela Stoker, City Clerk and ex -officio Clerk of the City Council of the City of
Tustin, California, do hereby certify that the whole number of the members of the City
Council of the City of Tustin is five; that the above and foregoing Resolution No. 07-32
was duly passed and adopted at a regular meeting of the Tustin City Council, held on
the 20th day of March, 2007, by the following vote:
COUNCILMEMBER AYES:
COUNCILMEMBER NOES:
COUNCILMEMBER ABSTAINED:
COUNCILMEMBER ABSENT:
PAMELA STOKER
CITY CLERK
GENERAL
(1)
(1)
(1)
(1)
EXHIBIT A
RESOLUTION NO. 07-32
TENTATIVE TRACT MAP 17080
CONDITIONS OF APPROVAL
1.1 The proposed project shall substantially conform with the submitted
improvement plans on file, and the Tentative Tract Map 17080, dated March
207 2007, on file with the Community Development Department, except as
herein modified, or as modified by the Director of Community Development in
accordance with this Exhibit. The Director of Community Development may
also approve minor modifications to plans during plan check if such
modifications are to be consistent with the provisions of the Tustin City Code
and other applicable codes.
1.2 Approval of Tentative Tract Map 17080 is contingent upon the applicant
returning to the Community Development Department a notarized
"Agreement to Conditions Imposed" form and the property owner signing and
recording with the County Clerk -Recorder a notarized "Notice of Discretionary
Permit Approval and Conditions of Approval" form. The forms shall be
established by the Director of Community Development, and evidence of
recordation shall be provided to the Community Development Department.
1.3 As a condition of approval of Tentative Tract Map 17080, the applicant shall
agree, at its sole cost and expense, to defend, indemnify, and hold harmless
the City, its officers, employees, agents, and consultants, from any claim,
action, or proceeding brought by a third -party against the City, its officers,
agents, and employees, which seeks to attack, set aside, challenge, void, or
annul an approval of the City Council, the Planning Commission, or any other
decision-making body, including staff, concerning this project. The City
agrees to promptly notify the applicant of any such claim or action filed
against the City and to fully cooperate in the defense of any such action. The
City may, at its sole cost and expense, elect to participate in defense of any
such action under this condition.
1.4 Within twenty-four (24) months from tentative map approval, the subdivider
shall record with appropriate agencies a final map prepared in accordance
with subdivision requirements of the Tustin Municipal Code, the State
Subdivision Map Act, and applicable conditions contained herein unless an
extension is granted pursuant to Section 9323 of the Tustin Municipal Code.
Time extensions may be considered if a written request is received by the
Community Development Department within thirty (30) days prior to
expiration.
SOURCE CODES
(1) STANDARD CONDITION (5)
(2) CEQA MITIGATION (6)
(3) UNIFORM BUILDING CODE/S (7)
(4) DESIGN REVIEW
*** EXCEPTION
RESPONSIBLE AGENCY REQUIREMENT
LANDSCAPING GUIDELINES
PC/CC POLICY
Exhibit A
Resolution No. 07-32
TTM 17080
Page 2
(1) 1.5 The subdivider shall
Subdivision Map Act,
regulations.
conform to all applicable requirements of the State
the City's Subdivision Ordinance, and the City's zoning
(1) 1.6 Prior to final map approval by the City Council, the subdivider shall execute
a hold -harmless agreement and provide a Certificate of Insurance pursuant
to Section 9325 of the Tustin City Code.
(1) 1.7 Prior to final map approval, the subdivider shall submit:
A. A current title report;. and,
B. A duplicate mylar of the Final Map, or 81/2 inch by 11 inch
transparency of each map sheet prior to final map approval and "as
built" grading, landscape, and improvement plans prior to Certificate
of Acceptance.
1.8 Prior to recordation of the final map, the existing SCE easement shall be
quitclaimed to the subdivider.
PUBLIC WORKS DEPARTMENT
(1) 2.1 Dedication in Fee Title of 10 feet additional street right-of-way along Red
Hill Avenue and Walnut Avenue plus the appropriate corner cut-off shall be
required for future street widening.
(1) 2.2 Dedication in fee along a portion of Red Hill Avenue and Walnut Avenue to
revise ownership of an existing street with 33 foot wide highway easement
as depicted on Tentative Tract Map 17080.
(1) 2.3 A statement shall be placed on the Final Map indicating that at the time
Red Hill Avenue and/or Walnut Avenue is widened, a 10 foot temporary
construction easement shall be granted to the City of Tustin beyond the
public right-of-way to accommodate construction. Any damage to the
existing improvements within the construction easement caused solely by
the City's construction shall be restored to its original condition at the City's
expense. Such temporary construction easement shall be granted at no
cost to the City. The right of entry (temporary construction easement) shall
terminate on the date that the notice of completion is recorded at the
orange County Recorder's office.
(1) 2.4 Prior to issuance of building permit or approval of final map, whichever
occurs first, the applicant shall be required to enter into a Landscape
Maintenance Agreement with the City of Tustin for parkway improvements
with public right-of-way along Red Hill Avenue and Walnut Avenue. The
applicant shall submit the Landscape Maintenance Agreement to the Public
Works Department for review and approval.
Exhibit A
Resolution No. 07-32
TTM 17080
Page 3
(1) 2.5 The subdivider shall satisfy grant in fee, dedication and/or reservation
requirements as applicable, including but not limited to dedication of all
required street and flood control right-of-way easements, vehicular access
rights, sewer easements, and water easements defined and approved as to
specific locations by the City Engineer and other agencies.
(1) 2.6 Subdivider's execution of a subdivision and monumentation agreement and
furnishing the improvement and monumentation bonds as required by the
City Engineer prior to recordation of the final map.
(1) 2.7 Preparation and recordation of a final subdivision map shall be required.
(1) 2.8 Prior to approval of Final Map or issuance of any Building Permit, whichever
occurs first, the applicant shall obtain a new address from the Engineering
Division.
(1) 2.9 In addition to the normal full size plan submittal process, all final development
plans including, but not limited to: tract maps, parcel maps, right-of-way
maps, records of survey, public works improvements, private infrastructure
improvements, final grading plans, and site plans are also required to be
submitted to the Public Works Department/Engineering Division in computer
aided design and drafting (CADD) format. The standard file format is
AutoCAD Release 2004 having the extension DWG. Likewise, layering and
linetype conventions are AutoCAD -based (latest version available upon
request from the Engineering Division). In order to interchangeably utilize the
data contained in the infrastructure mapping system, CADD drawings must
be in AutoCAD "DWG" format (i.e., produced using AutoCAD or AutoCAD
compatible CADD software). The most current version of AutoCAD is
Release 2004. Drawings created in AutoCAD Release 2004 are compatible
and acceptable.
The CADD files shall be submitted to the City at the time the plans are
approved and updated CADD files reflecting the "as built" conditions shall be
submitted once all construction has been completed. The subdivision bonds
will not be released until the "as built" CADD files have been submitted.
COVENANTS, CONDITIONS, AND RESTRICTIONS (CC&Rs)
(1) 3.1 All organizational documents for the project including any covenants,
conditions, and restrictions (CC&Rs) shall be submitted to and approved by
the Community Development Department and the City Attorney's Office.
Costs for such review shall be borne by the subdivider. The approved
CC&Rs shall be recorded with County Recorder's Office at the same time as
recordation of the final map. A copy of the final documents shall be
submitted to the Community Development Department after recordation.
Exhibit A
Resolution No. 07-32
TTM 17080
Page 4
No dwelling unit in the development shall be sold or a Certificate of
Occupancy issued, unless a homeowners association has been legally
formed with the right to assess all these properties which are jointly owned or
benefited to operate and maintain all other mutually available features of the
development including, but not limited to, open space, amenities,
landscaping, slope maintenance/landscaping, private streets, and utilities. No
dwelling unit shall be sold unless all approved and required open space,
amenities, landscaping, or other improvements, or approved phases thereof,
have been completed or completion is assured by a development agreement
or financing guarantee method approved by the City. The CC&Rs shall
include, but not be limited to, the following provisions:
A. The City shall be included as a party to the CC&Rs for enforcement
purposes of those CC&R provisions in which the City has interest as
reflected in the following provisions. However, the City shall not be
obligated to enforce the CC&Rs.
B. The requirement that association bylaws be established.
C. Provisions for effective establishment, operation, management, use,
repair, and maintenance of all common areas and facilities including
recreational buildings and amenities, landscaped areas and lots,
walls and fences, private roadways (i.e., walks, sidewalks, trails),
parkland facilities and bikeways, and open space areas.
D. Membership in the homeowners association shall be inseparable
from ownership in individual units.
E. Architectural controls shall be provided and may include, but not be
limited to, provisions regulating exterior finishes, roof materials,
fences and walls, accessory structures such as patios, sunshades,
trellises, gazebos, awnings, exterior mechanical equipment,
television and radio antenna, consistent with the Tustin City Code.
F. Maintenance standards shall be provided for applicable items listed
in Section C above in CC&Rs. Examples of maintenance standards
are shown below.
1. All common area landscaping and private areas visible from
any public way shall be properly maintained such that they
are evenly cut, evenly edged, free of bare or brown spots,
debris, and weeds. All trees and shrubs shall be trimmed so
they do not impede vehicular or pedestrian traffic. Trees shall
be pruned so they do not intrude into neighboring properties
and shall be maintained so they do not have droppings or
create other nuisances to neighboring properties. All trees
Exhibit A
Resolution No. 07-32
TTM 17080
Page 5
shall also be root pruned to eliminate exposed surface roots
and damage to sidewalks, driveways, and structures.
2. All private roadways, sidewalks, and open space areas shall
be maintained so that they are safe for users. Significant
pavement cracks, pavement distress, excessive slab
settlement, abrupt vertical variations, and debris on travel
ways should be removed or repaired promptly.
3. Common areas shall be maintained in such a manner as to
avoid the reasonable determination of a duly authorized
official of the City that a public nuisance has been created by
the absence of adequate maintenance such as to be
detrimental to public health, safety, or general welfare.
G. Homeowners association approval of exterior improvements
requiring a building permit shall be obtained prior to requesting a
building permit from the City of Tustin Community Development
Department. All plans for exterior improvements shall conform to
requirements set forth by the City and the CC&Rs.
H. Private open space areas within the common area shall be
illustrated on a "Private Open Space Exhibit" and shall be made part
of the CC&Rs and shall specify those portions of the common open
space area that are allocated for private use and public use and
access rights in perpetuity. The CC&Rs shall include a separate 8Y2
inch by 11 inch dimensioned site plan for each unit that is allocated
private open space.
I. The approved site plan showing the dedication areas and provisions
for maintenance of these areas by the Homeowners Association.
J The approved "Site/Parking Plan Exhibit" and "Waste Management
Plan Exhibit" shall be made part of the CC&Rs and shall be enforced
by the homeowners association. In addition to the exhibit, provisions
regarding parking shall be included in the CC&Rs, including the
following:
1. All units are required to maintain a two -car garage.
2. A minimum of 27 unassigned guest parking spaces shall be
permanently maintained in locations shown on the
"Site/Parking Exhibit."
3. Residents shall not store or park any non -motorized vehicles,
trailers or motorized vehicles that exceed 7 feet high, 7 feet
wide, and 19 feet long in any parking space, driveway, or
Exhibit A
Resolution No. 07-32
TTM 17080
Page 6
private street area except for the purpose of loading,
unloading, making deliveries or emergency repairs except that
the homeowners association may adopt rules and regulations
to authorize exceptions.
4. Residents shall park vehicles in garage spaces. Storage of
personal items may occur in the garages only to the extent
that vehicles may still be parked within the required garage
spaces.
5. The homeowners association shall be responsible for
monitoring and enforcing all parking and traffic regulations on
private streets. The proposed CC&Rs shall include provisions
requiring the association to develop and adopt an
enforcement program for parking and traffic regulations within
the development which may include measures for fire access
and enforcement by a private security company.
K. Provisions for enforcing the "Waste Management Plan" to minimize
backing into private streets. Residents are required to store their
trash and recycling carts within the area designated within the
garage. Prior to collection day, the residents need to move the carts
to an area immediately outside their garage, where a Homeowner
Association Employee will be in charge of relocating them to the
designated parking stalls that are marked and designated
accordingly. The carts shall be placed in the common drives no
earlier than noon on the day before scheduled collections and
removed within twelve (12) hours of collection.
L. Maintenance of lettered and numbered Lots A and B containing
dedication areas, common areas, streets, alleys, paseos, etc., shall
be by the homeowners association.
M. Television and radio antennas shall be installed in accordance with
the requirements of the Tustin City Code.
N. All utility services serving the site with the exception of the 66 KV
power lines shall be installed and maintained underground.
0. The homeowners association shall be required to file the names,
addresses, and telephone numbers of at least one member of the
homeowners association Board and, where applicable, a manager of
the project before January 1st of each year with the City of Tustin
Community Development Department for the purpose of contacting
the association in the case of emergency or in those cases where
the City has an interest in CC&R violations.
Exhibit A
Resolution No. 07-32
TTM 17080
Page 7
P. The homeowners association shall be responsible for establishing
and following procedures for providing access to public utilities for
maintenance of their facilities within the project area, subject to
those agencies' approval.
Q. No amendment to alter, modify, terminate, or change the
homeowners association's obligation to maintain the common areas
and the project perimeter wall or other CC&R provisions in which the
City has an interest, as noted above, or to alter, modify, terminate, or
change the City's right to enforce maintenance of the common areas
and maintenance of the project perimeter wall, shall be permitted
without the prior written approval of the City of Tustin Community
Development Department.
R. No delivery and -or moving trucks larger than 40 feet shall be
permitted on the private drives of the condominium projects with less
than 25 foot radius turns.
S. Balconies along Walnut Avenue shall be provided with a solid stucco
barrier. The balconies shall be used for open space. Storage of any
item visible from the public right-of-way with the exception of live
potted plants is prohibited.
T. Access to and from the site to Red Hill Avenue should be available
with completion of the project. The left turn egress from the project
site may be prohibited in the future if determined necessary by the
City's Traffic Engineer.
HOMEBUYER NOTIFICATION
(1) 4.1 Prior to recordation of the final map, the subdivider shall submit to the
Community Development Department for review and approval a
homebuyer notification document that includes the notifications listed
below. The notification document shall be signed by each homebuyer prior
to final inspection and occupancy, and a copy of the signed notification
shall be provided to the Community Development Department prior to final
inspection and/or issuance of each Certificate of Occupancy.
A. A notice for roadway noise from Red Hill Avenue and Walnut
Avenue that may impact the subdivision.
B. A notice, to be reviewed by the City of Tustin and the Tustin Unified
School District, regarding the location of existing and proposed
elementary, middle, and high schools which will serve the
subdivision (text and map).
Exhibit A
Resolution No. 07-32
TTM 17080
Page 8
C. A notice regarding units that are adjacent to aboveground utilities or
structures (such as light standards and fire hydrants) identifying the
type of structure and their locations.
D. A notice indicating that any use of a residence for a business shall
be subject to the City's Home Occupation Ordinance and may
require zoning clearance and a business license.
E. A notice explaining the easements, facilities, amenities, and
dedications that will be provided on lettered lots and indicating all on-
site streets, alleys, paseos, and common areas are to be maintained
by the homeowners association.
F. A notice, to be approved by the City Attorney, indicating that neither
the site, nor the project nor any part thereof any street or sidewalk,
alleyway, or paseo thereon shall be privately gated, provided
however that any swimming pool and/or spa facility within the
common area and any indoor common area improvements, including
any clubhouse and bathrooms, may be gated or locked and made
available solely to residents of the project and their guests.
G. A notice stating trash bins shall be placed in designated areas as
shown on the approved "Waste Management Exhibit" no earlier than
noon on the day before scheduled collections and removed within
twelve (12) hours of collection.
H. A notice indicating that surrounding properties may be developed in
accordance with City ordinances in a manner which may partially or
totally obstruct views from the owner's unit and that the City of Tustin
makes no claim, warranty, or guarantee that views from any unit will
be preserved as development of surrounding properties occurs.
1. A notice explaining and providing a copy of a "Private Open Space
Exhibit" and separate 8Y2 inch by 11 inch dimensioned site plan for
each unit that is allocated private open space within the common
area.
J. A notice explaining and providing a copy of the approved
"Site/Parking Exhibit" and related CC&R provisions.
K. A notice explaining the phasing of construction within the subdivision
and that activity may be disruptive.
L. The developer shall notify all homebuyers that future
Assessment/Maintenance Districts may affect the property.
Exhibit A
Resolution No. 07-32
TTM 17080
Page 9
M. Access to and from the site to Red Hill Avenue should be available
with completion of the project. The left turn egress from the project
site may be prohibited in the future if determined necessary by the
City's Traffic Engineer.
N. A notice stating that on -street parking currently available along Red
Hill Avenue and Walnut Avenue would be restricted in the near
future and upon construction of the project.
O. A notice about the location and upgrade of units that are required to
be constructed with sound attenuation per submitted acoustical
report.
FEES
(1) 5.1 Prior to issuance of the first building permit, the subdivider shall submit in -
lieu parkland dedication fees in an amount and form as required by the
Director of the Parks and Recreation Department.
(1) 5.2 The applicant shall submit all fees required by the City and other agencies
as identified in Resolution No. 4054.
(1) 5.3 The applicant shall reimburse the City of Tustin for the actual cost incurred
to the City by the City Attorney for review of the CC&Rs and homebuyer