Loading...
HomeMy WebLinkAbout09 NOC/WATER MAIN REPL PROJ CIP #6154 03-20-07 AGENDA REPORT Agenda Item Reviewed: City Manager Finance Director 9 MEETING DATE: MARCH 20,2007 TO: WilliAM A. HUSTON, CITY MANAGER FROM: PUBLIC WORKS DEPARTMENT/ENGINEERING DIVISION SUBJECT: ACCEPTANCE OF PUBLIC IMPROVEMENTS AND AUTHORIZATION TO FilE THE NOTICE OF COMPLETION FOR THE LIANE LANE, VALHALLA DRIVE, AND HIGHVIEW DRIVE WATER MAIN REPLACEMENT PROJECT (CIP NO. 6154) SUMMARY Construction of the Liane Lane, Valhalla Drive and Highview Drive Water Main Replacement Project (CIP No. 6154) has been completed to the satisfaction of the City Engineer and is now ready for City Council acceptance. RECOMMENDATION It is recommended that the City Council adopt Resolution No. 07 -27 accepting the Liane Lane, Valhalla Drive, and Highview Drive Water Main Replacement Project (CIP No. 6154) and authorize the recordation of the Notice of Completion, and direct the City Clerk to: 1. Release the labor and Materials Bond not sooner than thirty-five (35) days after the date of recordation of the Notice of Completion; and 2. Release the Faithful Performance Bond not sooner than one year after the date of recordation of the Notice of Completion. Assuming no claims or stop payment notices are filed, it is further recommended that thirty- five (35) days after the date of recordation of the Notice of Completion, the City Council authorize payment of the final 100/0 retention in the amount of $51,760.48 to West Valley Construction Company, Inc. The total final construction contract cost for the project is $517,604.79 FISCAL IMPACT The final construction contract cost for the Liane Lane, Valhalla Drive and Highview Drive Water Main Replacement Project (CIP No. 6154) is $517,604.79.The project was funded by the City's Water Capital Improvement Program (CIP No. 6154) budget. Acceptance of Public Improvements and Authorization to File the Notice of Completion for the Liane Lane, Valhalla Drive, and Highview Drive Water Main Replacement Project (CIP No. 6154), March 20, 2007 Page 2 Project construction, along with design and construction management, has increased the City's infrastructure assets by $677,791. The increased infrastructure valuation will be added to the City's infrastructure inventory as required by Statement 34 of the Governmental ,Accounting Standards Board (GASB 34). Detailed cost information is shown on the attached GASB 34 Infrastructure Inventory Valuation Forms. BACKGROUND AND DISCUSSION The construction of the Liane Lane, Valhalla Drive and Highview Drive Water Main Replacement Project (CIP No. 6154) was completed on November 1,2006. This project is part of the City's Water Capital Improvement Programs scheduled upgrade and replacement of the water mains as recommended in the City's 2000 Water Master Plan. A total of 2620 feet of new eight-inch class 200 PVC pipe was installed to replace existing undersized six-inch lines. As a result of this project, 10 new fire hydrants were installed to improve fire protection for Liane Lane, Valhalla Drive and HighviewDrive residents in this remote portion of the City's water distribution system. All of the work for this project has been completed to the satisfaction of the City Engineer and is now ready for City Council acceptance. ~~ / lit- Tim D. Serlet Director of Public Works/City Engineer " Attachments: Resolution No. 07-27 Location Exhibit GASB 34 Infrastructure Inventory Valuation Form S:\City Councilltems\2007 Councilltems\NOC Liane Lane WM Repl Project (CIP 6154) & Reso 07-27.doc RESOLUTION NO. 07-27 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUSTIN, CALIFORNIA, ACCEPTING THE WORKS OF IMPROVEMENT AND AUTHORIZING THE RECORDATION OF THE NOTICE OF COMPLETION FOR THE CONSTRUCTION OF THE LIANE LANE, VALHALLA DRIVE, AND HIGHVIEW DRIVE WATER MAIN REPLACEMENT PROJECT (CIP NO. 6154) WHEREAS, West Valley Construction Company, Inc., having a contract with the City of Tustin to construct the hereinafter described public works and improvement; and WHEREAS, the City Engineer has duly certified to the construction and completion of said public improvement hereinafter mentioned in a manner satisfactory to the City Council of the City of Tustin; and WHEREAS, the City Council finds that said contractor has completed said public improvement hereinafter more particularly described in accordance with the provisions of the contract documents and the Notice of Completion, and acceptance of said public works and i'mprovement should be 'filed and payment of the balance due said contract authorized in accordance with the contract documents; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Tustin that said public works and improvement is found to be complete, and the same is hereby accepted. Said public works and improvement is more particularly described as follows: Liane Lane, Valhalla Drive and Highview Drive Water Main Replacement Project (CIP No. 6154) BE IT FURTHER RESOLVED that the City Engineer of the City of Tustin is hereby authorized to execute and file a Notice of Completion for the acceptance of said public works and improvement described herein as required by law. PASSED AND ADOPTED at a regular meeting of the City Council of the City of Tustin held on the 20th Day of March 2007. Lou Bone, Mayor ATTEST: City Clerk ~ Z J- CJ) ::::> J- LL o ~ o ~o ~ o THILL BOULElI YARD ~ -;r / / ;1 / / I ! / / i .I /~/ !/~/ /#1 /ir' -~/ / / I I i en .....Z 00 W..... -,< 00 0:0 Q.....J ~ ~ <0 0 Z 0.. () '-' t- Z W ~ W () < ...J 0.. W a: Z < ~ a: ~ ~ W > a: 0 ~ W ~ C J: 0 Z < W > a: 0 :3 ...J < J: ...J ~ W z :3 w z < ...J 0' W ~ ::E ~ t < or Z ~ t- o ~ () g W ~ ...., ~ 0 0:j a: ~ 0.. CITY OF TUSTIN GASB 34 INFRASTRUCTURE INVENTORY VALUATION FORM Department: Public Works Prepared by: Victor Saoredo Date Prepared: March 13. 2007 Division: Water Services Phone/Extension: 714/573-3380 Description of the Asset: Liane Lane. Valhalla Drive. and Hiohview Drive Water Main Replacement Proiect (CIP No. 6154) Date: D Acquired C8J Constructed D Removed: November 30,2006 Basis of Valuation: (Please check one) C8J Actual Cost (should include design, construction mgmt, fees, transportation, etc.) D Estimated Cost If Estimated Cost, describe the method used: Quantity: Description Asphalt Concrete Pavement Asphalt Concrete Slurry Seal AC Surface Course Type III C-3 AC Surface Course Type III 82 Install 8-inch PVC CL200 - Pipeline 8-inch resilient Wedge Gate Valve Install new 1-inch service Install new fire hydrant SUBTOTAL TOTAL Source of Document /Information: Actual Contract Cost Quantitv Total Amount 22,825 SF 75,969 SF 262 TN 460 TN 2620 LF 7 EA 36 EA 10 EA $120,600 $122,750 $45,900 $61,500 $175,500 $40,500 $70,500 $40.541 $677,791 $677,791 Total Valuation Amount $677,791