Loading...
HomeMy WebLinkAbout06 AWARD CONTRACT FOR RED HILL AVE WIDENING & MEDIAN IMPROVEMENTS PROJECT CIP NOS. 70197, 70226 & 70227• Agenda Item 6 AGENDA REPORT Reviewed: City Manager Finance DiM MEETING DATE: JUNE 20, 2017 TO: JEFFREY C. PARKER, CITY MANAGER FROM: DOUGLAS S. STACK, DIRECTOR OF PUBLIC WORKS/CITY ENGINEER SUBJECT: AWARD CONTRACT FOR THE RED HILL AVENUE WIDENING AND MEDIAN IMPROVEMENTS PROJECT FROM BARRANCA PARKWAY TO EDINGER AVENUE, CIP NOS. 70197, 70226 & 70227 SUMMARY Staff is recommending that the City Council award the construction contract for the Red Hill Avenue Widening and Median Improvements Project from Barranca Parkway to Edinger Avenue, CIP Nos. 70197, 70226 & 70227 to the lowest responsive / responsible bidder, All American Asphalt. RECOMMENDATION It is recommended that the City Council award the construction contract for Red Hill Avenue Widening and Median Improvements Project from Barranca Parkway to Edinger Avenue, CIP Nos. 70197, 70226 & 70227 to the lowest responsive/responsible bidder, All American Asphalt, in the amount of $ 7,285,766.00 and authorize the Mayor and the City Clerk to execute the contract documents on behalf of the City. FISCAL IMPACT Sufficient funds in the amount of $9,400,000 have been budgeted for this project in the FY 2016/17 Capital Improvement Program budget. The total estimated expenditure for the construction of this project is $7,919,833. The City received grant funds in the amount of $6,000,000 for the project through Measure M2 Regional Capacity Program (RCP). Other funding sources include Legacy Backbone Infrastructure Fees, MCAS 2010 Tax Allocation Bonds and Community Facilities District 14-1. Project expenditures include: • Construction Contract........................:..........................................$ 7,285,766.00 • Geotechnical Engineering and Materials Testing ...........................$ 120,362.00 • Construction Management and Inspection ...................................$ 401,105.00 • Construction Engineering/Support................................................$ 112,600.00 • Estimated Expenditures.............................................................$ 7,919,833.00 It is recommended that the remaining budgetary appropriation be set aside as project contingency for potential unforeseen conditions that may arise necessary to complete the work within the approved project scope and budget. Award Contract for Red Hill Avenue Widening & Median Improvements June 20, 2017 Page 2 CORRELATION TO THE STRATEGIC PLAN The construction of Red Hill Avenue Widening and Median Improvements Project from Barranca Parkway to Edinger Avenue contributes to the fulfillment of the City's Strategic Plan Goal A: Economic and Neighborhood Development. Specifically, the project implementation of Strategy 1, which among other items, is to develop critical phases of Tustin Legacy. DISCUSSION AND BACKGROUND Red Hill Avenue is designated as a major arterial roadway on the Orange County Master Plan of Arterial Highways (MPAH) and is currently six lanes with a striped median. The PM peak hour on northbound Red Hill Avenue experiences particularly heavy congestion. The project will widen the northbound side to implement a fourth through lane and install a raised median to reduce driveway cross traffic movement on Red Hill Avenue from Dyer Road/Barranca Parkway to Edinger Avenue, thereby improving traffic flow and enhancing safety. Construction components will include roadway widening and median installation, Class II bike lane, underground utility, street lighting, intersection improvements, traffic signal modifications, drainage systems and environmentally sustainable catch basins with low impact development bio treatment, curb and gutter, sidewalk construction, signing and striping and median landscaping featuring drought tolerant plants. The City Council adopted Resolution No. 17-03 approving the plans and specifications and authorized and directed the City Clerk to advertise for Project bids on March 21, 2017. The Project was advertised and the bids were opened on May 2, 2017 and evaluated. Six (6) bids were received by the noticed deadline and are summarized as follows: • All American Asphalt.....................................................................$ 7,285,766.00 • R. J. Noble, Co..............................................................................$ 7,672,094.55 • Los Angeles Engineering, Inc ........................................................$ 7,903,500.00 • Beador Construction Co., Inc .........................................................$ 8,141,300.00 • GMC Engineering, Inc...................................................................$ 8,264,774.65 • USS Cal Builders...........................................................................$ 8,507,974.10 Stack, P.E. Public Works/City Engineer Attachment(s): Location Map S:ICity Coundl Items12017 Council Ilems106-20-20171Award Contract -Red Hill Avenue Widening & Median Improvements (70197, 70206 & 70227)Wward of Contract for Red Hill Avenue Widening & Median Improvements (70197, 70226 & 70227).docx LOCATION MAP Red Hill Ave Widening and Median Improvements between Barranca Pkwy and Edinger Ave I` g, v TUSTIN RANCH d USTIN LEGACY a NO SCALE � ASN PROJECT LOCATION O� Red Hill Avenue Widening and Median Improvements between Barranca Parkway and Edinger Avenue (CIP Nos. Fly` A 70197, 70226 & 70227) �� AW- q, F F �y PROJECT LOCATION � e 1 RAN(w _ FILE: Red Hill Widening &Median Improvements.dwg