Loading...
HomeMy WebLinkAbout07 APPROVE AMENDMENT NO. 3 TO COOPERATIVE AGREEMENT NO. D02-119 WITH ORANGE COUNTY FLOOD CONTROL DISTRICTAGENDA R fi' MEETING DATE: JULY 5, 2017 TO: JEFFREY C. PARKER, CITY MANAGER Agenda Item 7 Reviewed: City Manager Finance Director—, FROM: DOUGLAS S. STACK, DIRECTOR OF PUBLIC WORKS/CITY ENGINEER SUBJECT: APPROVE AMENDMENT NO. 3 TO COOPERATIVE AGREEMENT NO. D02- 119 WITH THE ORANGE COUNTY FLOOD CONTROL DISTRICT INCREASING THE RESIDENTIAL UNIT LIMIT FOR THE CONSTRUCTION OF THE PETER'S CANYON CHANNEL FLOOD CONTROL IMPROVEMENTS SUMMARY Cooperative Agreement D02-119 dated March 11, 2003 as amended established terms and conditions under which certain Peter's Canyon Channel Flood Control Improvements would be scheduled, engineered, financed, constructed, operated, and maintained. Amendment No. 3 to Cooperative Agreement D02-119 increases the residential certificate of occupancy limit of 1,200 units, established in the 2nd amendment to the agreement with the Orange County Flood Control District (OCFCD) and the County of Orange, by an additional 200 units to 1,400 units. Prior to that limit being reached, the Peter's Canyon Channel Improvements are required to be awarded and construction commenced. RECOMMENDATION It is recommended that the City Council approve Amendment No. 3 to Cooperative Agreement No. D02-119 with the Orange County Flood Control District and the County of Orange and authorize the Mayor and City Clerk to execute the agreement on behalf of the City. FISCAL IMPACT Benefits associated with the proposed action include: 1. Negotiations with CalAtlantic Group, Inc. regarding residential development on Lot 19 of TR 17404 can now proceed unencumbered by the cap on residential certificates of occupancy. 2. Outflow of cash for the Peter's Canyon Channel Improvements will be delayed by several months. 3. Construction of the Peter's Canyon Channel Improvements can be started in the spring instead of late summer thereby ensuring more dry weather work time. CORRELATION TO THE STRATEGIC PLAN This agreement contributes to the fulfillment of three goals in the City's Strategic Plan. First is contribution to the fulfillment of the City's Strategic Plan Goal A: Economic and Neighborhood Development; specifically the project implementation of Strategy #1 which, among other items, is to develop critical phases of Tustin Legacy. Secondly is implementation of Goal B, Strategy #3 to ensure public safety and protection of assets through continuous maintenance and improvement of public facilities. Lastly the agreement also addresses Goal D, Strategy #2 by working collaboratively with agencies to address issues of mutual interest and concern. Approve Amendment to OCFCD Cooperative Agreement No. D02-119 July 5, 2017 Page 2 DISCUSSION AND BACKGROUND Amendment No. 3 to Cooperative Agreement No. D02-119 has been prepared to amend Section 5.3.3.4 of the original agreement to require a contract for construction of Peter's Canyon Channel Improvements be awarded and construction commenced prior to the issuance of certificates of use and occupancy for the 1,401st residential unit in Tustin Legacy. This represents an increase from the prior limit of 1,201 residential units. The limit of certificates of use and occupancy on no more than 270 acres of land remains unchanged. The major reason for the increase to the certificates of use and occupancy limit is to allow for the negotiations with CalAtlantic Group, Inc. regarding residential development on Lot 19 of TR 17404 to proceed unencumbered by the cap on residential certificates of occupancies. It also provides the City with flexibility to start the Peter's Canyon Channel Improvements at a more appropriate time. The City Attorney has reviewed and approved as to form Amendment No. 3 to Cooperative Agreement No. D02-119. Oougfa Stack, P.E. Dire&oV Public Works/City Engineer Attachment 1: Cooperative Agreement No, D02-119 Attachment 2: Amendment No. 1 to Cooperative Agreement No. D02-119 Attachment 3: Amendment No. 2 to Cooperative Agreement No. D02-119 Attachment 4: Proposed Amendment No. 3 to Cooperative Agreement No. D02-119 SACity Cound I1ems12017 Cauncil lt-107-05-20171Flood Conlml Agreement PCCIApproval of Coop Agml #C,02-119-3 w County Rev3.docx ATTACHMENT 1 Cooperative Agreement No. D02-119 %RIGINAL CLERK Off' THE BOARD ORANGE COUNTY Barranca Channel (F09) — Armstrong Avenue Crossing and Armstrong Avenue Storm Drain, Peters Canyon Channel (F06) and Peters Canyon Bikeway Cooperative Agreement 11 M.` V between City of Tustin and Orange County Flood Control District and The County of Orange (03(03!03) • PROJECT: Barranca Channel (F09) — Armstrong Avenue AGREEMENT NO. D02.119 Crossing and Armstrong Avenue'St6rrii Drain, Peters Canyon Channel (1706) and Peters Canyon Bikeway TABLE OF CONTENTS SECTION PAGE NO 1. Purpose................................................................................. 3 2. Description of Channel Improvements ............................................ 4 3. Project Coordination.................................................................. 4 4. Term....................................................................................... 5 5. CITY'S Responsibilities............................................................... 5 6. DISTRICT'S Responsibilities........................................................ 13 7. Encroachment Permits............................................................... 14 8. Conflict with Existing Public and/or Private Utilities ........................... 15 9. Notices................................................................................... 15 10. Federal and/or State Funding ...................................................... 16 11. Termination............................................................................. 16 12. Indemnification......................................................................... 16 13. Hazardous or Toxic Materials...................................................... 17 14. Independent Contractor Status .................................................... 18 15. Successors and Assigns............................................................ 18 16. Waiver of Rights....................................................................... 19 17. Severability............................................................................. 19 18. Attorney Fees/Costs................................................................. 19 19. Exhibits ................................. ........................................... I..... 19 20. Waiver and Interpretation........................................................... 19 21. Authority ................................................................................. 20 22. Amendment(s)......................................................................... 20 23. Entire Agreement...................................................................... 20 24. Governing Law and Venue........................................................... 20 CitySignature Page................................................................... 21 District Signature Page................................................................ 22 EXHIBITS EXHIBIT A Location Map (03103103) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 Project; Barranca Channel (FOOArmstrong Avenue Crossing Agreement No. D02-119 and Armstrong Avenue Storm Drain, Peters Canyon Channel (F06) and Peters Canyon Bikeway JOINT COOPERATIVE AGREEMENT j This AGREEMENT is made and entered into this til k4day of , 2003, BY and AMONG AND AND The City of Tustin, a municipal corporation, hereinafter referred to as "CITY," The Orange County Flood Control District, a body and politic, hereinafter referred to as "DISTRICT," The County of Orange, a body corporate and politic, hereinafter referred to as "COUNTY," Which are sometimes individually referred to as "PARTY," or collectively as "PARTIES." RECITALS WHEREAS, the CITY has prepared a MCAS Tustin Reuse Plan/Specific Plan ("Reuse/Specific Plan") and Is in the process of preparing and implementing redevelopment pians for those portions of the Reuse/Specific Plan project area located within the CITY'S incorporated boundaries, hereinafter referred to as "TUSTIN LEGACY;" and WHEREAS, in accordance with the provisions of the National Environmental Policy Act ("NEPA") of 1969, as amended, and the California Environmental Quality Act ("CEQA"), the Department of the Navy and the CITY, have completed a Final Joint Environmental Impact Statement/Final Environmental Impact Report, hereinafter referred to as "FEIS/FEIR," for the disposal and reuse of the TUSTIN LEGACY. The CITY certified the FEIS/FEIR as complete on January 16, 2001, A Record of Decision ("NEPA ROD") regarding the disposal of property at TUSTIN LEGACY was issued by the Department of the Navy on March 2, 2001; and WHEREAS, the FEIS/FEIR identifies certain implementation measures to be required by the CITY as conditions for individual projects to support planned development within the TUSTIN LEGACY, and the provision of infrastructure (including but not limited to storm drains, regional channels, and retention basins, flood plain mitigation, regional bikeway, etc.) necessary to support the planned development of the reuse plan area constructed; and WHEREAS, the FEIS/FEIR includes implementation measures that specify that drainage studies shall be MMM. Barranca channel.Mar3 Page 1 (03103103) it 2 3 4 5 6 7 8 9 10 11 12 13 14 j 15 16 17 18 19 20 21 22 23 24 25 26 Project: Barranca Channel (FOVArmstrong Avenue Crossing r Agreement No. D02.119 and Armstrong Avenue Storm Drain, Peters Canyon Channel (FO6) and Peters Canyon Bikeway prepared to justify diversions; to demonstrate that "the proposed drainage patterns would not result in increased 100 -year peak discharges within and downstream of the project limits and would not worsen existing drainage conditions at storm drains, culverts, and other street crossings including regional flood control facilities;" to propose appropriate mitigation for any increased runoff causing a worsened condition of any existing facilities within or downstream of the project limits; and to include implementation of appropriate interim or ultimate flood control infrastructure construction; and WHEREAS, a large portion of the TUSTIN LEGACY drains to DISTRICT'S Barranca Channel (F09) which is adjacent to the southerly boundary of the TUSTIN LEGACY, and Peters Canyon Channel (F06) traverses the easterly portion of the TUSTIN LEGACY; and WHEREAS, the Santa Ana -Santa Fe Channel (F10) is an existing earthen and rock -lined channel and is located along the northerly and northeasterly portion of the TUSTIN LEGACY, and subsequently drains into Peters Canyon Channel; and WHEREAS, Barranca Channel and Peters Canyon Channel pass through both the Cities of Tustin and Irvine, and the Santa Ana -Santa Fe Channel passes through the City of Tustin , and all are currently deficient in their ability to convey their 100 -year design discharges; and WHEREAS, the CITY desires to obtain DISTRICT approval for Valencia/Armstrong Avenue roadway and infrastructure improvements prior to its sale of any property at TUSTIN LEGACY to developers, and has applied for an encroachment permit from DISTRICT requesting permission to reconstruct the Armstrong Avenue crossing of Barranca Channel and to construct a new storm drain entry into Barranca Channel for the Armstrong Avenue Storm Drain (the proposed improvements shall hereinafter be referred to as "BARRANCA CHANNEL IMPROVEMENTS"); and WHEREAS, CITY also desires to obtain DISTRICT's authorization for the CITY to proceed with subdivision map approval and grading for new development on Parcels 33 and 34 as shown on the Reuse/Specific Plan prior to completion of comprehensive drainage studies for TUSTIN LEGACY and to defer construction of Peters Canyon Channel improvements along the side and immediately adjacent to proposed development on Parcels 33 and 34 ("PETERS CANYON CHANNEL IMPROVEMENTS"), until completion of drainage studies and completion of MMM, Barranca channel,Mar3 Page 2 (03103103) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 Project: Barranca Channel (F*Armstrong Avenue Crossing Agreement No. D02-119 and Armstrong Avenue Storm Drain, Peters Canyon Channel (F06) and Peters Canyon Bikeway engineering design and financing of ultimate Peters Canyon Channel improvements; and WHEREAS, COUNTY desires to implement its Master -Planned Peters Canyon Regional Riding and Hiking Trail as part of the PETERS CANYON CHANNEL IMPROVEMENTS; and WHEREAS, if COUNTY exercises its right to participate in PETERS CANYON CHANNEL IMPROVEMENTS, COUNTY would be responsible for the cost to design and construct its Peters Canyon Regional Riding and Hiking Trail; and WHEREAS, CITY desires to proceed with the BARRANCA CHANNEL IMPROVEMENTS, prior to completion of the drainage studies required by the FEIS/FEIR for the TUSTIN LEGACY; and WHEREAS, the BARRANCA CHANNEL IMPROVEMENTS and the PETERS CANYON CHANNEL IMPROVEMENTS shall hereinafter collectively be referred to as "CHANNEL IMPROVEMENTS;" and WHEREAS, it is understood and agreed that any future improvements to the Santa Ana -Santa Fe Channel and any improvements to the remaining portion of Peters Canyon Channel adjacent to the TUSTIN LEGACY, will be addressed in a separate agreement; and WHEREAS, the FEIS/FEIR includes implementation measures that specify "interim flood control facilities may be considered for approval provided such facilities meet DISTRICT requirements;" and WHEREAS, this AGREEMENT is needed to address issues that would otherwise have been addressed in the drainage studies required by the FEIS/FEIR; and WHEREAS, it is mutually agreed and in the public's interest that DISTRICT, COUNTY and CITY cooperate In the planning, design, construction, operation and maintenance of certain Improvements for protection from the effects of floods, and is therefore beneficial for the DISTRICT, COUNTY and CITY to outline each agency's respective responsibilities. NOW, THEREFORE THE PARTIES MUTUALLY AGREE AS FOLLOWS: SECTION 1. PURPOSE The purpose of this AGREEMENT is to establish the terms and conditions under which the CHANNEL IMPROVEMENTS, will be scheduled, engineered, financed, constructed, operated and maintained. HMM. Barranca channel.Mar3 Page 3 (03103103) 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 1 20 21 22 23 24 25 26 Project; Barranca Channel (FArmstrong Avenue Crossing Agreement No. D02.119 and Armstrong Avenue Storm Drain, Peters Canyon Channel (F06) and Peters Canyon Bikeway SECTION 2. DESCRIPTION OF CHANNEL IMPROVEMENTS 2.1. BARRANCA CHANNEL IMPROVEMENTS shall consist of the reconstruction of the Armstrong Avenue crossing of Barranca Channel and construction of a new storm drain entry for the Armstrong Avenue Storm Drain Into Barranca Channel. 2.2. PETERS CANYON CHANNEL IMPROVEMENTS shall consist of improvements parallel to the west side of Parcels 33 and 34 as shown on the Reuse/Specific Plan located within the City of Tustin, and within the limits of the existing Peters Canyon Channel right-of-way including an adjacent 40 foot proposed right-of-way currently owned by the Department of the Navy to the west of Parcel 33 and 34, and reserved for flood control purposes. It is further agreed by all PARTIES that COUNTY reserves the right to request that the CITY or its assignees Include in the design and construction of the Peters Canyon Channel (F06), COUNTY's Master -Planned Regional Riding and Hiking Trail at full COUNTY expense for design and construction, 2.3. All CHANNEL IMPROVEMENTS shall conform to plans and specifications, hereinafter referred to as "BARRANCA CHANNEL PLANS and PETERS CANYON CHANNEL PLANS," respectively. BARRANCA CHANNEL PLANS have been prepared by CITY and submitted to DISTRICT for approval and PETERS CANYON CHANNEL PLANS will be submitted by CITY or its assignee to DISTRICT and COUNTY for review and approval. 2.4. All CHANNEL IMPROVEMENTS are located within CITY, and the site(s) of the CHANNEL IMPROVEMENTS are more specifically illustrated on Exhibit A, entitled "LOCATION MAP," attached hereto and by this reference, made a part hereof. SECTION 3. PROJECT COORDINATION 3.1. CITY'S Director of Public Works, or authorized designee, hereinafter referred to as "CONSTRUCTION MANAGER," shall be CITY'S representative in all matters pertaining to this AGREEMENT. 3.2. DISTRICT'S Director of the Public Facilities and Resources Department (PFRD), or an HMM. Barranca channel.Mar3 Page 4 (03!03/03) 1 2 3 4 5 6 7 8 9 10 11 12 13' 14 15' 16 17 16 19 20 21 22 23 24 25 26 Project; Barranca Channel (FOPArmstrong Avenue Crossing is Agreement No. D02-119 and Armstrong Avenue Storm Drain, Peters Canyon Channel (F06) and Peters Canyon Bikeway authorized designee, hereinafter referred to as "DIRECTOR," shall be, DISTRICT'S representative in all matters pertaining to this AGREEMENT. SECTION 4. TERM 4.1. The term of this AGREEMENT shall commence upon execution by CITY and DISTRICT'S Board of Supervisors, and shall terminate, with the exception of Sections 5.2. and 5.3.3.4. below, upon completion and acceptance of all CHANNEL IMPROVEMENTS by DIRECTOR in writing, based on the determination that the CHANNEL IMPROVEMENTS have been satisfactorily completed per the approved BARRANCA CHANNEL PLANS and the PETERS CANYON CHANNEL PLANS, except as noted in Section 4.2, below. 4.2. Those sections of this AGREEMENT that pertain to legal, policy and/or administrative matters including the sections discussing "Indemnification," "Hazardous or Toxic Materials," "Successors and Assigns," "Attorney's Fees/Costs" and "Governing Law and Venue," (Sections numbered 12, 13, 15, 18 and 24 respectively), shall succeed the termination date initiated by DIRECTOR'S written concurrence, as specified in Section 4.1, above. SECTION 5. Cn Y'S RESPONSIBILITIES 5.1. BARRANCA CHANNEL IMPROVEMENTS HMM. Barranca channel,Mar3 5.1.1. Design and Construction. Design and construct the BARRANCA CHANNEL IMPROVEMENTS at no cost to DISTRICT. Construction shall not begin until receiving the necessary encroachment permit(s) through PFRD/Public Works/Engineering & Permit Services/County Property Permits, and paying all required permit application and construction inspection fees. The BARRANCA CHANNEL IMPROVEMENTS are being designed to convey the 100 -year design discharge for Barranca Channel with the assumption that the future Barranca Channel will be a fully enclosed boxed channel. However, should the Barranca Channel between Redhill Avenue and the Barranca Parkway crossing be constructed in the future, different than the CITY'S assumption of a fully enclosed Page 5 (03/03!03) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 Project: Barranca Channel (FOormstrong Avenue Crossing Agreement No. D02.119 and Armstrong Avenue Storm Drain, Peters Canyon Channel (F06) and Peters Canyon Bikeway boxed channel, and the determination made that the BARRANCA CHANNEL IMPROVEMENTS are hydraulically deficient and incompatible with approved future Improvements of Barranca Channel, the CITY shall be responsible for reconstruction or modification of the BARRANCA CHANNEL IMPROVEMENTS at its sole cost. The CITY may assign design and construction responsibilities and costs for BARRANCA CHANNEL IMPROVEMENTS to a private development entity or other public entity other than the CITY, at its discretion. No such assignment by CITY shall operate to release the CITY from any of its obligations under this Agreement without the prior written approval of DISTRICT, which approval DISTRICT may withhold or grant in the exercise of its sole discretion. The CITY, its representatives or assignees shall be responsible to: 5.1.1.1. Administer and obtain all government agency approvals for said BARRANCA CHANNEL IMPROVEMENTS, Including, but not limited to the selection of contractors, management of contractors' work, administration of contractors for compliance with the requirements of all applicable local building codes and other regulations. 5.1.1.2. Obtain prior to construction date, DISTRICT'S advance written approval of any regulatory permits, Including but not limited to permits from the U. S. Army Corps of Engineers (COE) and California State Department of Fish and Game (CSDF&G) or other agencies, which obligate the DISTRICT with special maintenance requirements. 5.1.1.3. Appoint a representative to function as CITY'S resident engineer, to coordinate all aspects of construction of BARRANCA CHANNEL IMPROVEMENTS with DISTRICT. 5.1.1.4. Provide all necessary preliminary engineering, identification and location of utilities, and construction engineering services for BARRANCA CHANNEL HMM. Barranca channel.Mar3 Page 6 (03!03/03) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 Project: Barranca Channel (FAf Armstrong Avenue Crossing Agreement No. 002.119 and Armstrong Avenue Storm Drain, Peters Canyon Channel (F06) and Peters Canyon Blkeway IMPROVEMENTS, at no cost to DISTRICT. 5.1.1.5. Construct BARRANCA CHANNEL IMPROVEMENTS in accordance with approved plans and specifications, in conformance with all terms and conditions of the approved encroachment permit(s), and to the written satisfaction of DISTRICT. 5.2. HMM. Barranca channel.Mar3 5.1.1.6. Provide DISTRICT, its agents, employees and invitees, with access to BARRANCA CHANNEL IMPROVEMENT areas, to perform their responsibilities pursuant to this AGREEMENT. 5.1.1.7. Obtain DISTRICT'S advance written approval of proposed changes to approved BARRANCA CHANNEL PLANS, prior to implementing such changes. 5.1.1.8. Furnish one (1) set of mylar copies of the approved "As -Built" construction drawings for the BARRANCA CHANNEL IMPROVEMENTS to DISTRICT. 5.1.2. Right -of -Way. Plans for BARRANCA CHANNEL IMPROVEMENTS currently do not necessitate any additional right-of-way dedication to the DISTRICT given that all BARRANCA CHANNEL IMPROVEMENTS are proposed within the existing Barranca Channel right-of-way easement. In the event of any unforeseen additional right-of-way needs, the CITY or its assignees shall at no cost to the DISTRICT, dedicate, or Cause the dedication of additional right-of-way necessary for the BARRANCA CHANNEL improvements to the DISTRICT In a form meeting the written approval of the DISTRICT. 5.1.3. Hazardous Material Assessments. Obtain, or through conditions of development approval cause others to obtain, DISTRICTS approval of a Hazardous Materials Assessment of any additional TUSTIN LEGACY right-of-way that is to be conveyed to DISTRICT, prior to DISTRICT'S acceptance of such right-of-way. FUTURE BARRANCA CHANNEL IMPROVEMENTS Page 7 (03103/03) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 Project; Barranca Channel (FOILtrong Avenue Crossing Agreement No. 002-119 and Armstrong Avenue Storm Drain, Peters Canyon Channel (1206) and Peters Canyon Bikeway 5.2.1. Barranca Channel Reconstruction Responsibilities. Following the completion of BARRANCA CHANNEL IMPROVEMENTS, the CITY agrees to correct at no cost to DISTRICT, any portion of the BARRANCA CHANNEL IMPROVEMENTS found in the future, to be deficient in or incompatible with providing a 100 -year level of protection due to inconsistencies between the CITY'S design assumptions made in HMM, Barranca channel.Mar3 constructing future improvements, and more detailed drainage studies that are compteted regarding any future improvements to the Barranca Channel (between Redhill Avenue and the Barranca Parkway crossing), DISTRICT'S review and written approval of any subsequent efforts to correct such a deficiency, shall be obtained via the permit application process through the PFRD/Public Works/Engineering & Permit Services/County Property Permits. Any proposed reconstruction of the BARRANCA CHANNEL IMPROVEMENTS as part of the future improvement may be done in coordination with the ultimate improvements of the Barranca Channel. Nothing shall preclude the CITY from assigning this obligation to another public or private entity other than the COUNTY or DISTRICT. No such assignment by CITY shall operate to release the CITY from any of its obligations under this Agreement without the prior written approval of DISTRICT, which approval DISTRICT may withhold or grant in the exercise of its sole discretion. 5.2.2. Design and Construction of Ultimate Barranca Channel Improvements. Design and construct ultimate Barranca Channel improvements between Redhill Avenue and the Barranca Parkway crossing, at no cost to DISTRICT, either through the City of Tustin, Tustin Community Redevelopment Agency or conditions of development approval within the TUSTIN LEGACY after receiving DISTRICT'S written approval for any proposed improvements and any regulatory permits, including but not limited to permits from the COE and CSDF&G or other Page 8 (03!03103) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 Project; Barranca Channel (F#Armstrong Avenue Crossing Agreement No. D02-119 and Armstrong Avenue Storm Drain, Peters Canyon Channel (F06) and Peters Canyon Bikeway agencies, which obligate the DISTRICT with special maintenance requirements, provided however that the CITY shall not be responsible for any construction of ultimate Barranca Channel improvements necessary for any Barranca Parkway roadway widening that is proposed by the City of Irvine and/or the City of Santa Ana. 5.2.3. Right-of-way for Ultimate Barranca Channel Improvements. In the event that additional right-of-way is needed to accommodate future ultimate Barranca Channel improvements, the CITY or its assignees shall at no cost to the DISTRICT, dedicate, or cause the dedication of such additional tight -of -way to the DISTRICT in a form meeting the written approval of the DIRECTOR. 5.3 PETERS CANYON CHANNEL IMPROVEMENTS HMM. Sarranca channel.Mor3 5.3.1 Design and Construction. Design and construct PETERS CANYON CHANNEL IMPROVEMENTS and improvements for the Peters Canyon Bikeway, a regional Class I "paved off-road bikeway" adjacent to Parcels 33 and 34, at no cost to DISTRICT, either through the City of Tustin, Tustin Community Redevelopment Agency or conditions of development approval within TUSTIN LEGACY. COUNTY reserves the right to request CITY to include design and construction of a regional riding and hiking trail at COUNTY's full expense in CITY project. Construction shall not begin until receiving the necessary encroachment permit(s) through PPRD/Public Works/Engineering and Permit Services/County Property Permits, and paying all required permit application and construction inspection fees. PETERS CANYON CHANNEL IMPROVEMENTS shall be designed to convey the 100 year design discharge for Peters Canyon Channel with the assumption that the design and construction will be located within the right-of-way limits defined in Section 2.2. However, in conjunction with the assumed right-of-way limits, the CITY agrees that it will be responsible for any reconstruction, modification or added Page 9 (03103103) 1 z 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 Project: Barranca Channel (FO90rmstrong Avenue Crossing S Agreement No. D02-119 and Armstrong Avenue Stonn Drain, Peters Canyon Channel (FO6) and Peters Canyon Bikeway construction costs, including but not limited to mitigation costs, that may be necessary to accommodate PETERS CANYON CHANNEL IMPROVEMENTS HMM. Barranca channel.Mar3 within the defined right-of-way limits, at its sole cost, in order to ensure that ultimate PETERS CANYON CHANNEL IMPROVEMENTS at TUSTIN LEGACY are capable of conveying the 100 year design discharge for Peters Canyon Channel. The CITY may assign design and construction responsibilities and the cost of PETERS CANYON CHANNEL IMPROVEMENTS to a private development entity or other public entity other than the CITY at is discretion. No such assignment by CITY shall operate to release the CITY from any of its obligations under this Agreement without the prior written approval of DISTRICT, which approval DISTRICT may withhold or grant In the exercise of its sole discretion. The CITY, its representatives or assignees shall be responsible to: 5.3.1.1 Administer and obtain all government agency approvals for said PETERS CANYON CHANNEL IMPROVEMENTS including, but not limited to the selection of contractors, management of contractors work, administration of contractors for compliance with the requirements of all applicable local building codes and other regulations. 5.3.1.2 Obtain, prior to construction date DISTRICT's advance written approval of any regulatory permits, including but not limited to permits from the COE and CSDF&G or other agencies, which obligate the DISTRICT to special maintenance requirements. 5.3.1.3 Appoint a representative to function as CITY's resident engineer, to coordinate all aspects of construction of PETERS CANYON CHANNEL IMPROVEMENTS with DISTRICT. 5.3.1.4 Provide all necessary preliminary engineering, identification and location of utilities, and construction engineering services for PETERS CANYON Page 10 (03/03103) 2 3 4 5 6 rA 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 Project: Barranca Channel (F#rmstrong Avenue Crossing Agreement No. D02-1119 and Armstrong Avenue Storm Drain, Peters Canyon Channel (FOB) and Peters Canyon Bikeway CHANNEL IMPROVEMENTS at no cost to DISTRICT, 5.3.1.5 Construct PETERS CANYON CHANNEL IMPROVEMENTS in accordance with approved plans and specifications, in conformance with all terms and conditions of the approved encroachment permit(s) and to written satisfaction of DISTRICT. 5.3.1.6 Provide DISTRICT, its agents, employees and invitees, with access to PETERS CANYON CHANNEL IMPROVEMENT areas, to perform their responsibilities pursuant to this AGREEMENT. 5.3.1.7 Obtain DISTRICTs advance written approval of proposed changes to approved PETERS CANYON CHANNEL IMPROVEMENTS PLANS, prior to Implementing such changes. 5.3.1.8 Furnish one (1) set of mylar copies of the approved "As-Bulit" construction drawings for the PETERS CANYON CHANNEL IMPROVEMENTS to DISTRICT, HMM. Barranca channel.Mar3 5.3.2 Right of Way. Where needed and at no cost to DISTRICT, dedicate, or cause the dedication of any additional right-of-way beyond DISTRICT'S existing easements and not exceeding the limits defined in Section 2.2. for PETERS CANYON CHANNEL IMPROVEMENTS to the DISTRICT in a form meeting the written approval of the DISTRICT. 5.3.3 Timing. The design and construction of PETERS CANYON CHANNEL IMPROVEMENTS would proceed upon completion of the following: 5.3.3.1 Completion of a drainage study for TUSTIN LEGACY as described in Section 5.4. below, 5.3.3.2 Transfer of the 40 feet of additional proposed right-of-way for Peters Canyon Channel from the Department of the Navy to the CITY or DISTRICT. Page 11 (03103/03) Project; Barranca Channel (F09ormstrong Avenue Crossing • Agreement No. D02-119 and Armstrong Avenue Storm Drain, Peters Canyon Channel (F06) and Peters Canyon Bikeway 1 5.3.3.3 Commitment that it will include PETERS CANYON CHANNEL 2 IMPROVEMENTS adjacent to Parcel 33 and 34 in the first phase of any 3 CITY established community facilities district or assessment district. 4 5.3.3.4. Excepting Parcels 33 or 34, CITY agrees that it will not issue grading or 5 building permits for any new development at TUSTIN LEGACY until 6 completion of the drainage study required in Section 5.4., and until a more 7 detailed design, construction and financing implementation agreement for 8 ultimate Peters Canyon Channel improvements not adjacent to Parcel 33 9 and 34 is entered into between the DISTRICT and CITY. 10 5.3.4. Drainage Studies. Per the FEIS/FEIR, CITY will require the developer of Parcels 11 33 and 34 to submit to and receive approval of a localized drainage study including 12 diversions (Le., off-site areas that drain onto and/or through each parcel), with 13 justification and appropriate mitigation for any proposed diversion so that proposed 14 drainage from Parcels 33 and 34 would not result in a significant adverse impact on 15 the Peters Canyon Channel pending future completion of PETERS CANYON 16 CHANNEL IMPROVEMENTS. 17 5.4. Runoff Management Plan/Engineering Study: 18 5.4.1. Excepting Parcels 33 and 34, prior to any grading for any new development at 19 TUSTIN LEGACY, prepare a drainage study or Runoff Management 20 Plan/Engineering Study, hereinafter referred to as "RMP/ES," for TUSTIN LEGACY 21 that will demonstrate that proposed diversions of flow or changes to existing 22 drainage patterns will not result in (i) increasing 100 -year peak discharges and (ii) 23 worsening existing conditions of any storm drains, culverts, DISTRICT facilities, 24 and street crossings; propose appropriate mitigation for worsened existing 25 conditions within or downstream of TUSTIN LEGACY; and identify the ultimate 26 Barranca Channel improvements and ultimate Peters Canyon Channel HW Barranca channei.Mar3 Page 12 (03103103) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 Project: Barranca Channel (FOrmstrong Avenue Crossing Agreement No. D02.119 and Armstrong Avenue Storm Drain, Peters Canyon Channel (FO6) and Peters Canyon Bikeway Improvements adjacent to the TUSTIN LEGACY taking all regulatory permit conditions from 'the COI: , the CSDF&G, or others into consideration, including mitigation measures, method of funding, construction phasing, and implementation triggering events and responsibilities. The RMP/ES shall also include an analysis of water quality impacts; best management practices (BMPs); TUSTIN LEGACY reuse effects on total maximum daily loads (TMDLs) that have been identified for the watershed, including but not limited to nutrients, sediment, etc.; and necessary mitigation measures. 5.4.2. With the exception of Parcels 33 and 34, the RMP/ES shall be submitted to and approved by the DISTRICT'S Chief Engineer of PFRD, or an authorized designee, hereinafter referred to as "CHIEF ENGINEER," prior to any grading for any new development at TUSTIN LEGACY. SECTION 6. DISTRICT'S RESPONSIBILITIES 6.1. ALL CHANNEL IMPROVEMENTS HMM. Barranca channel.Mar3 6.1.1. Permit Review. DISTRICT shall review and approve plans for all CHANNEL IMPROVEMENTS submitted by the CITY, its representatives or assigns via the permit application process and, if determined at the sole and absolute discretion of DIRECTOR, to be satisfactory and in conformance with DISTRICT practices, standards and criteria, provide encroachment permit approval. 6.1.2. Construction Inspection. DISTRICT shall assign a qualified PFRD Construction Division Inspector or representative to all CHANNEL IMPROVEMENTS, whose function shall be to verify that construction of all CHANNEL IMPROVEMENTS within DISTRICT'S rights-of-way is accomplished in a good, workman -like manner and in accordance with the approved plans for all CHANNEL IMPROVEMENTS. The decisions of DISTRICTS representative shall prevail on all work within, or affecting DISTRICTS right-of-way. Page 13 (03103/03) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 Project: Barranca Channel (F091Wnstrong Avenue Crossing Agreement No. D02-119 and Armstrong Avenue Storm Drain, Peters Canyon Channel (F06) and Peters Canyon Bikeway 6.1.3. Maintenance and Operation. DISTRICT shall own and operate at DISTRICT'S cost the CITY (or its assignee) -constructed channel portions of the all CHANNEL IMPROVEMENTS, upon written concurrence by DIRECTOR that the Improvements have been satisfactorily completed per the approved respective plans or future plans and specifications (approved in writing by DISTRICT), and any additional necessary rights-of-way for the CHANNEL IMPROVEMENTS have been dedicated and accepted by DISTRICT. 6.2. PETERS CANYON CHANNEL IMPROVEMENTS ONLY 6.2.1. Right-of-way. DISTRICT agrees that right-of-way limits defined in Section 2.2 are acceptable to DISTRICT based on the fact that CITY acknowledges and agrees that it will be solely responsible for ensuring that the design and construction of the PETERS CANYON CHANNEL IMPROVEMENTS satisfactorily convey; 100 year storm flows; satisfy the terms of permits issued by COE and CDF&G; and meets all DISTRICT standards 6.2.2. Entitlements of Parcels 33 and 34. DISTRICT agrees that CITY may entitle final subdivision maps for Parcels 33 and 34 and that this AGREEMENT will ensure the requirement for the CITY, its representatives or assigns to identify, construct and finance certain subsequent flood control facilities 6.2.3. Review CITY'S RMP/ES. DISTRICT'S CHIEF ENGINEER or appointed designee shall review CITY'S drainage plan or RMP/ES for the TUSTIN LEGACY at no cost to CITY and approve RMPIES without undue delay when found acceptable to DISTRICT. SECTION 7. ENCROACHMENT PERMITS Encroachment permits from the PFRD/County Property Permits which authorize CITY to commence work on property which Iles within DISTRICT rights-of-way, or which affects DISTRICT facilities are required and shall be obtained by CITY prior to commencing any construction. HW Barranca channel.Mar3 Page 14 (03103103) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 1 22 23 24 25 26 Project: Barranca Channel (FArmstrong Avenue Crossing Agreement No. D02-119 and Armstrong Avenue Storm Drain, Peters Canyon Channel (F06) and Peters Canyon Bikeway SECTION 8. CONFLICT WITH EXISTING PUBLIC AND/OR PRIVATE UTILITIES If any existing public and/or private utilities conflict with construction of CHANNEL IMPROVEMENTS or violate DISTRICT'S encroachment policy, CITY shall, at no cost to DISTRICT, make all necessary arrangements with the owners of such utilities for their protection, relocation or removal in accordance with the policy and procedure for those utilities located within the limits of work providing for the improvements to DISTRICT rights-of-way. SECTION 9. NOTICES 9.1. Notices or other communications which may be required or provided under the terms of this AGREEMENT shall be given as follows: CITY: Director Public Works Department City of Tustin 300 Centennial Way Tustin, CA 92780 Phone (714) 573-3150 Facsimile No. (714) 734-8991 and Assistant City Manager City of Tustin 300 Centennial Way Tustin, CA 92780 Phone (714)573-3107 Facsimile No. (714) 838-1602 DISTRICT/COUNTY: Director 9.2. HMM. Barranca channel.Mar3 Public Facilities and Resources Department (PFRD) County of Orange P. 0. Box 4048 Santa Ana, CA 92702-4048 Phone (714) 834-5302 Facsimile No. (714) 834-2395 All notices shall be In writing and deemed effective when delivered in person or deposited In' the United States mail, first class, postage prepaid and addressed as above. Notwithstanding the above, PARTIES may also provide notices by facsimile transmittal, and any such notice so given shall be deemed to have been given upon receipt during normal business hours or, in the event of receipt after business hours, on the following Page 15 (03103103) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 Project: Barranca Channel (F0k—trong Avenue Crossing Agreement NO. 002-119 and Armstrong Avenue Storm Drain, Peters Canyon Channel (F06) and Peters Canyon Bikeway business day, Any notices, correspondence, reports and/or statements authorized or required by this AGREEMENT, addressed in any other fashion shall be deemed not given. 9.3. The PARTIES hereto may change the address to which notices are to be sent by giving notice of such change to the other PARTY. SECTION 10. FEDERAL AND/OR STATE FUNDING Should any portion of CHANNEL IMPROVEMENTS be financed with federal funds or state gas tax funds, all applicable laws, regulations and policies relating to the use of such funds shall apply, notwithstanding other provisions of this AGREEMENT. SECTION 11. TERMINATION 11.1. In the event that CITY Is unable to proceed with CHANNEL_ IMPROVEMENTS in accordance with the terms and conditions described in this AGREEMENT, CITY may terminate this AGREEMENT with or without cause, upon delivery of thirty (30) days written notice to DISTRICT. CITY shall, however, remain responsible for payment of its share of the design and construction costs and expenses incurred for CHANNEL IMPROVEMENTS prior to effective date of termination and those CHANNEL IMPROVEMENT -related costs Incurred by DISTRICT for which CITY is otherwise responsible to pay DISTRICT under the terms of this AGREEMENT. 11.2. Notice of Termination shall be in writing and shall state the date upon which such termination is effective. Notice shall be served as provided in Section 9, (NOTICES), above. SECTION 12. INDEMNIFICATION 12.1. CITY hereby agrees to indemnify, defend (with counsel approved in writing by DISTRICT/COUNTY), and hold harmless DISTRICT and the COUNTY, their elected and HMM. Barranca channel.Mar3 appointed officials, officers, employees, agents (including its contractors and subcontractors), licensees, and representatives (collectively, the "DISTRICT/COUNTY INDEMNITEES"), and each of them, and its and their property from all loss, liability, Page 16 (03/03/03) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 Project, Barranca Channel (F09®rmstrong Avenue Crossing Agreement No. D02.119 and Armstrong Avenue Storm Drain, Peters Canyon Channel (F06) and Peters Canyon Bikeway damages, claims, costs and expenses (including attorneys' fees and court costs) arising out of, based :upon or relating to a breach of the AGREEMENT by CITY or the willful misconduct or negligent acts or omissions of CITY or the CITY INDEMNITEES (as defined in Section 12.2 below) in connection with this AGREEMENT; provided, however, that nothing contained in this subsection shall operate to relieve DISTRICT/COUNTY or DISTRICT/COUNTY INDEMNITEES from any loss, liability, damages, claims, costs, or expenses to the extent determined by a court of competent jurisdiction to have been proximately caused by the willful misconduct or negligent acts or omissions of DISTRICT/COUNTY or DISTRICT/COUNTY INDEMNITEES, or any of them. Payment shall not be a condition precedent to recovery under the foregoing indemnity. 12.2. DISTRICT/COUNTY hereby agree to indemnify, defend (with counsel approved in writing by CITY), release and hold harmless CITY, its elected and appointed officials, officers, employees, agents (including their contractors and subcontractors), licensees, and representatives (collectively, the "CITY INDEMNITEES"), and each of them, and its and their property from all loss, liability, damages, claims, costs and expenses (Including attorneys' fees and court costs) arising out of, based upon or relating to a breach of this AGREEMENT by DISTRICT/COUNTY or the willful misconduct or negligent acts or omissions of DISTRICT/COUNTY or DISTRICT/COUNTY INDEMNITEES In connection with this AGREEMENT; provided, however, that nothing contained in this subsection shall operate to relieve CITY or CITY INDEMNITEES from any loss, liability, damages, claims, costs, or expenses to the extent determined by a court of competent jurisdiction to have been proximately caused by the willful misconduct or negligent acts or omissions of CITY or CITY INDEMNITEES, or any of them. Payment shall not be a condition precedent to recovery under the foregoing Indemnity. SECTION 13. HAZARDOUS OR TOXIC MATERIALS Nothing in this AGREEMENT is intended nor shall anything in this AGREEMENT be construed to HMM. Barranca channel,Mar3 Page 17 (03/03103) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 Project: Barranca Channel (F09strong Avenue Crossing Agreement No. D02-119 and Armstrong Avenue Storm Drain, Peters Canyon Channel (F06) and Peters Canyon Bikeway transfer to DISTRICT or COUNTY or their successors or assigns or to relieve CITY or its successors or assigns or predecessors in title of any responsibility or liability CITY or its successors or assigns or predecessors in title now has, has had or comes to have with respect to human health or the environment, Including but not limited to responsibility or liability relating to hazardous or toxic substances or materials (as such terms as those used In this sentence are defined by statute,' ordinance, case law, governmental regulations or other provision of the law). Furthermore, DISTRICT may exercise its right under law to bring action, if necessary, to recover clean-up costs and penalties paid, if any, from CITY or any others who are ultimately determined by a court of competent jurisdiction and/or a federal, state or local regulatory or administrative governmental agency or body having jurisdiction, to have responsibility for said hazardous or toxic substances or materials upon, within, or under the real property interests transferred pursuant to this AGREEMENT. Notwithstanding the foregoing, CITY shall be and remain liable for any hazardous or toxic substances or materials which become located, because of CITY'S construction activities, upon, within, or under the real property interests described in this AGREEMENT. Notwithstanding the foregoing, DISTRICT shall be and remain liable for any hazardous or toxic substances or materials which become located, because of DISTRICT'S operations, upon, within, or under the real property Interests transferred pursuant to this AGREEMENT. SECTION 14. INDEPENDENT CONTRACTOR STATUS This AGREEMENT is by and among CITY, DISTRICT and COUNTY, and is not intended and shall not be construed so as to create the relationship of agent, servant, employee, partnership, joint venture or association, as between CITY, DISTRICT and COUNTY. SECTION 15. SUCCESSORS AND ASSIGNS DISTRICT/COUNTY acknowledge CITY's stated intention to assign its obligations under this AGREEMENT to a future developer(s) at TUSTIN LEGACY. No such assignment by CITY shall operate to release the CITY from any of its obligations under this AGREEMENT without the prior written approval of DISTRICT/COUNTY, which approval DISTRICT/COUNTY may withhold or grant HMM. Barranca channel.Mar3 Page 18 (03103103) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 Project: Sarranca Channel (F09Qnstrong Avenue Crossing Agreement No. D02.119 and Armstrong Avenue Storm Drain, Peters Canyon Channel (F06) and Peters Canyon Bikeway in the exercise of its sole discretion. This AGREEMENT shall be binding on the successors and assigns of the PARTIES hereto, and shall not be assigned by any PARTY without the written consent of the other PARTY, which consent shall not be unreasonably withheld. Failure to obtain all PARTIES' required written approval of any proposed transfer or assignment will render this AGREEMENT terminated, as specified in Section 11 (TERMINATION), above. SECTION 16. WAIVER OF RIGHTS The failure by the CITY, DISTRICT or COUNTY to insist upon strict performance of any of the terms, covenants or conditions of this AGREEMENT shall not be deemed a waiver of any right or remedy that CITY, DISTRICT or COUNTY may have, and shall not be deemed a waiver of the right to require strict performance of all the terms, covenants and conditions of this AGREEMENT thereafter, nor a waiver of any remedy for the subsequent breach or default of any term, covenant or condition of this AGREEMENT. SECTION 17. SEVERABILITY If any part of this AGREEMENT is held, determined or adjudicated to be illegal, void or unenforceable by a court of competent jurisdiction, the remainder of this AGREEMENT shall be given effect to the fullest extent reasonably possible, SECTION 18. ATTORNEY FEESICOSTS Should litigation be necessary to enforce any terms or provisions of this AGREEMENT, then each PARTY shall bear its own litigation and collection expenses, witness fees, court costs and attorney's fees. SECTION 19. EXHIBITS This AGREEMENT incorporates by this reference, the following exhibit, which is attached hereto and incorporated herein: 19.1. Exhibit A — Location Map SECTION 20. WAIVER AND INTERPRETATION Titles or captions contained herein are inserted as a matter of convenience and for reference, and HMM. Barranca channel.Mar3 Page 19 (03103/03) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 Project; Barranca Channel (F09�rmstrong Avenue Crossing Agreement No. D02.119 and Armstrong Avenue Storm Drain, Peters Canyon Channel (F06) and Peters Canyon Bikeway In no way define, limit, extend, or describe the scope of this AGREEMENT or any provisions hereof. No provision in this AGREEMENT is to be interpreted for or against a PARTY because that PARTY or its legal representative drafted such provision. SECTION 21. AUTHORITY The PARTIES to this AGREEMENT represent and warrant that this AGREEMENT has been duly authorized and executed and constitutes the legally binding obligation of their respective organization or entity, enforceable in accordance with its terms, SECTION 22. AMENDMENT(S) It is mutually understood and agreed that no addition to, alteration of, or variation of the terms of this AGREEMENT, nor any oral understanding or agreement not incorporated herein, shall be valid unless made in writing and signed and approved by all necessary PARTIES. SECTION 23. ENTIRE AGREEMENT This document sets forth the entire AGREEMENT between CITY, DISTRICT and COUNTY, and may be modified only by further written amendment between the PARTIES hereto, in accordance with Section 22 (AMENDMENTS), above, SECTION 24. GOVERNING LAW AND VENUE The PARTIES hereto agree that this AGREEMENT has been negotiated and executed in the State of California and shall be governed by and construed under the laws of California, in the event of any legal action to enforce or interpret this AGREEMENT, the sole and exclusive venue shall be a court of competent jurisdiction located in Orange County, California, and the PARTIES hereto agree to and do hereby submit to the jurisdiction of such court, notwithstanding Code of Civil Procedure Section 394. Furthermore, the PARTIES hereto specifically agree to waive any and all rights to request that an action be transferred for trial to another county. HMM, Barranca channel.Mar3 Page 20 (03/03103) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 Project; Barranca Channel (F09) — Armstrong Avenue Crossing Agreement No. D02-119 and Armstrong Avenue Storm Drain and Peters Canyon Channel (FOS) IN WITNESS WHEREOF, each PARTY hereto has executed this AGREEMENT by its duly authorized representatives as of the date set forth above. r CITY OF TUSTIN, a municipal corporation of the State of California BY; William A. Huston City Manager ATTEST: Of )mL" al l 03 Pamela Stoker Date City Clerk APPROVED AS TO FORM: A !4' W� f� - c —ff P 3 Lois e y Date — City Attorney IN WITNESS WHEREOF, each signatory hereto agrees, on behalf of the City of Tustin, to all changes included in Agreement D02-119 approved by the Board of Supervisors of the Orange Flood Control District and the County of Orange on March 11, 2003. HMM. Sarranca channel.Feb 7 CITY OF TUSTIN, a municipal corporation of the State of California Page 1.1 (02111/03) BY: William A. Huston City Manager ATTEST: 7274i , fid , sARAL? Marsha Miller Date Interim City Clerk APPROV AS TO FORM: 9. 3 Lois Jeffr pate City Attorney Page 1.1 (02111/03) 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 1 23 24 25 26 Project: Sarrance Channel (FO9*—Mtrong Avenue Crossing is Agreement NO. D02-119 and Armstrong Avenue Storm Drain, Peters Canyon Channel (FO6) and Peters Canyon Bikeway IN WITNESS WHEREOF, each PARTY hereto has executed this AGREEMENT by its duly authorized representatives as of the date set forth above. DATE: 3- i%-03 DATE: 5- 1'7-03 SIGNED AND CERTIFIED THAT A COPY OF THIS DOCUMENT HAS BEEN DELIVERED TO THE CHAIR OF THE BOARD /v Oariene'J. gloom Clerk of the Board of Supervisors of the Orange County Flood Control District of Orange County, California and the County of Orange Attachment: Exhibit A - Location Map HMM. Barrance channel,Mar3 ORANGE COUNTY FLOOD CONTROL DISTRICT, a body corporate and politic BY: inttN�l�j Chair of the Board of Supervisors of the Orange County Flood Control District of Orange County, California COUNTY OF ORANGE, a body corporate and politic BY: 1— Chair of the Board of Supervisors APPROVED AS TO FORM: 211111" to COUNTY COUNSEL / Page 22 Date (03/03103) I ORANGE COUNTY PUBLIC FACILITIES &RESOURCES DEPT. I LOCATION MAP FLOOD CONTROL DIVISION PROJECT : BARRANCA CHL. (F09) & PETERS CANYON CHL, (F06) I SCALE : 1"-200' jAgmt. D02-119 ORANGE COUNTY BOARD OF SUPERVISORS Acting as the Board of Supervisors and Orange County Flood Control District 1011cift March 11, 2003 Submittine Aeencx/DW-tment: Board of Supervisors and Orange County Blood Control District Approve agreement D02-119 with of Tustin for construction purposes of the former Marine Corps Air Station - District 3 The following is action taken by the Board of Supervisors: APPROVED AS RECOMMENDED N OTHERE3 Unanimous O (1) SMITH: Y (2) SILVA: X (3) CAMPBELL: Y (4) NORBY: Y (S) WILSON: Y Vote Key: Y= Yes; N=No; A Abstain; X=Excused; B. 0. =Board Order Documents accompanying this matter: O Resolution(s) O Ordinances(s) 0 Contract(s) Item No. 20 Special Notes: Copies sent to: CEO PFRD: Herb Nakasone Auditor I certify that the foregoing is a true and correct copy of the Minute Order adopted by the Board of Supervisors, Acting as the Board of Supervisors and Orange County Flood Control District, Orange County, State of California. DARLENE J. BLOOM, Clerk of the Board Deputy ATTACHMENT 2 Amendment No. 1 to Cooperative Agreement No. D02-119 •Y ` Project: Barranea Chana 9}Armstrong .,, Seement No. D02-119-1 Crossing and Armstrong Storm Drain, Peters Canyon Channel (F06) and Peters Canyon AMENDMENT NO.1 TO JOINT COOPERATIVE AGREEMENT THIS AMENDMENT NO, 1 TO the JOINT COOPERATIVE AGREEMENT is made and entered into THIS Ahday of ,tAtjc 2004, BY and AMONG 0 0 The City of Tustin, a municipal corporation, hereinafter referred to as the "City", The Orange County Flood Control District, a body Corporate and politic, hereinafter referred to as "District" The County of Orange, a body corporate and politic, Hereinafter referred to as "County" Which are sometimes individually referred to as "PARTY" or collectively as "PARTIES". WHEREAS, on March 11, 2003 the JOINT COOPERATIVE AGREEMENT No. D02- 119 (the "Agreement") was entered into among the PARTIES; and WHEREAS, Section 22 of the Agreement identified that any amendments to the Agreement would require approval in writing signed by all necessary PARTIES. WHEREAS, CITY desires to obtain DISTRICT'S authorization for the CITY to proceed with issuance of grading and building permits at Tustin Legacy for certain new development prior to completion of comprehensive drainage studies for Tustin Legacy and to defer construction of Peters Canyon Channel Improvements adjacent to Parcels 33, 34, and 35 within the CITY of Tustin (the "PETERS CANYON CHANNEL IMPROVEMENTS"), until completion of drainage studies and completion of engineering design and financing of the PETERS CANYON CHANNEL IMPROVEMENTS (for purposes of this amendment the PETERS CANYON CHANNEL IMPROVEMENTS and ultimate PETERS CANYON CHANNEL IMPROVEMENTS, as described in the Agreement, are one and the same); and WHEREAS, the PARTIES have determined the need for Amendment No. I to the Agreement to reflect the revised anticipated time necessary for completion of engineering design cost estimates of the PETERS CANYON CHANNEL IMPROVEMENTS, and the need for such improvements to be more specifically tied to the timing and financing of future development on those portions of the Tustin Legacy project within the Master 185730,76 -1- 6.1.04 Project: Barranca Channe 9} -Armstrong $eement No. D02-119-1 Crossing and Armstrong Storm Drain, Peters Canyon Channel (FO6) and Peters Canyon Developer Footprint as shown on Exhibit B, attached hereto and incorporated herein by reference; and WHEREAS, DISTRICT acknowledges that the financing implementation agreement for PETERS CANYON CHANNEL IMPROVEMENTS will take more time to accomplish, and therefore it is unlikely that such improvements will be constructed prior to the construction of certain new development at Tustin Legacy; and WHEREAS CITY acknowledges the need to take necessary steps to ensure that new development constructed before completion of PETERS CANYON CHANNEL IMPROVEMENTS is protected by means of interim alternative flood protection and to ensure that runoff from such new development will not adversely impact the Peters Canyon Channel; NOW THEREFORE THE PARTIES MUTUALLY AGREE AS FOLLOWS: SECTION 1. Section 2.2 of the Agreement is amended to read as follows: "2.2. PETERS CANYON CHANNEL IMPROVEMENTS shall consist of improvements adjacent to Parcels 33, 34, and 35 as shown on the Reuse/Specific Plan located within the City of Tustin and within the limits of the existing Peters Canyon Channel right-of-way including the adjacent approximate 40 foot proposed right-of-way currently owned by the Department of the Navy to the west of Parcels 33, 34, and 35, and reserved for flood control purposes. It is further agreed by all PARTIES that COUNTY reserves the right to request that the CITY or its assignees include in the design and construction of the Peters Canyon Channel (FO6), County's Master Planned Regional Riding and Hiking Trail in full County expense for design and construction." SECTION 2. Section 5.3.1 of the Agreement is amended to read as follows: "5.3.1 Design and Construction. Design and construct PETERS CANYON CHANNEL IMPROVEMENTS and improvements for the Peters Canyon Bikeway, a regional Class I "paved off-road bikeway", adjacent to Parcels 33, 34, and 35 within the City, at no cost to DISTRICT, either through the City of Tustin, a financing district or conditions of development approval within Tustin Legacy. COUNTY reserves the right to request CITY to include design and construction of regional riding and hiking trail at COUNTY'S full expense in City project. Construction shall not begin until receiving the necessary encroachment permit(s) through RDMD/Public Works/Engineering and Permit Services/County Property Permits, and paying all required permit application and construction inspection fees. PETERS CANYON CHANNEL IMPROVEMENTS shall be designed to convey the 100 year design discharge for Peters Canyon Channel with the assumption that the design and construction will be located within the right-of-way limits defined in Section 2,2. However, in conjunction with the assumed right-of-way limits, the CITY agrees that it will be responsible for any reconstruction, modification or added construction costs, including, but not limited to, mitigation costs, that may be necessary 165730,76 .2- 6.1.04 Project: Barranca Chano )-Armstrong 9eement No. D02-114-1 Crossing and Armstrong Storm Drain, Peters Canyon Channel (Z~O6) and Peters Canyon to accommodate PETERS CANYON CHANNEL IMPROVEMENTS within the defined right-of-way limits, at its sole cost, in order to ensure that the PETERS CANYON CHANNEL IMPROVEMENTS at TUSTIN LEGACY are capable of conveying the 100 year design discharge for Peters Canyon Channel, The CITY may assign design and construction responsibilities and the cost of PETERS CANYON CHANNEL IMPROVEMENTS to a private development entity or other public entity other than the City at its discretion. No such assignment by CITY shall operate to release the CITY from any of its obligations under this Agreement without the prior written approval of DISTRICT, which approval DISTRICT may withhold or grant in the exercise of its sole discretion. The CITY, its representatives or assignees shall be responsible to:" SECTION 3. Section 5.3.3.3 of the Agreement is amended to read as follows: "Section 5.3.3.3 Commitment that it will include PETERS CANYON CHANNEL IMPROVEMENTS in a future CITY established community facilities district or assessment district that includes property locations within that portion of the Peters Canyon Channel Drainage area located west of the Peters Canyon Channel and within the Master Developer Footprint as shown on Exhibit B." SECTION 4. Section 5.3.3.4 of the Agreement is amended to read as follows: "Section 5.3.3.4 The CITY shall ensure that construction of the PETERS CANYON CHANNEL IMPROVEMENTS (excluding any PETERS CANYON CHANNEL IMPROVEMENTS which are obligations of the COUNTY pursuant to Section 2.2 of the Agreement) is completed at no cost to the DISTRICT or to the COUNTY. A contract for PETERS CANYON CHANNEL IMPROVEMENTS shall have been awarded for and construction commenced prior to the issuance of certificates of use and occupancy for the 1001st residential unit or certificates of use and occupancy on more than 270 acres of land within the Master Developer Footprint of the New Development, whichever occurs first. Once construction of PETERS CANYON CHANNEL IMPROVEMENTS commences, the City shall make every effort to ensure Developer's completion of PETERS CANYON CHANNEL IMPROVEMENTS within fifteen months after award of contract. "New Development" includes all land at Tustin Legacy that drains to Peters Canyon Channel, as shown on Exhibit B. SECTION 5. Section 5.3.4 of the Agreement is amended to read as follows: "Section 5.3.4 Drainage Studies and Erosion Control. Per the EIS/EIR, CITY will require the developers of New Development to submit and receive approval of a localized drainage study including diversions (i.e. off-site areas or on-site areas that drain into and/or through each development site), with justification and appropriate mitigation for any proposed diversion so that proposed drainage and run-off would not result in a significant adverse impact on the Peters Canyon Channel pending future completion of PETERS CANYON CHANNEL IMPROVEMENTS. Until PETERS CANYON 183730.76 .3- 6. t .04 } Project: Barranca Channef9}Armstrong Seement No. D02-119-1 } Crossing and Armstrong Storm Drain, Peters Canyon Channel (F06) and Peters Canyon CHANNEL IMPROVEMENTS are completed, CITY, its representatives or assignees shall be responsible to: 5.3.4.1 Ensure that proposed new development has interim alternative flood protection measures in place. 5.3.4.2 For development on Parcel 35, verify the adequacy of the Valencia Storm Channel (F06SO2), which runs in Moffett Drive along the northerly edge of Parcel 35 to ensure its ability to convey the 100 -year discharges from its tributary areas. 5.3.4.2 Provide erosion protection along Peters Canyon Channel within the approximate 40 foot proposed right-of-way currently owned by the Department of the Navy as described in Section 2.2." SECTION 6. Section 6.2.2 of the Agreement is amended to read as follows: Section 6.2.2. Entitlements for New Development. DISTRICT agrees that CITY may entitle final subdivision maps and issue grading and building permits for New Development subject to all requirements and limitations contained in this Agreement and that this Agreement will ensure the requirement for the CITY, its representatives or assigns to identify, construct and finance subsequent flood control facilities." SECTION 7. Section 19 of the Agreement is amended to add Subsection 19.2 to read as follows: "19.2 Exhibit B (2004) - Master Developer Footprint (includes Tributary Areas to Peters Canyon and Barranca Channels SECTION 8. All references in the Agreement to the County's Public Facilities and Resources Department (PFRD) are changed to the County's Resources and Development Management Department (RDMD). SECTION 9. To the extent permitted by law, and until such time as the PETERS CANYON CHANNEL IMPROVEMENTS are substantially completed, the CITY shall require developers of New Development (Excepting Parcels 33 and 34), including but not limited to the Master Developer, to indemnify and defend COUNTY and DISTRICT against any claims, loss, liability or damages arising from damage to property or injury to persons resulting from flooding and/or erosion within the New Development . In requiring said indemnification, CITY shall ensure that developers have adequate assets in existence until completion of PETERS CANYON CHANNEL IMPROVEMENTS. These defense and indemnity obligations do not extend to any loss, liability, or damages established by a court of competent jurisdiction to be caused by COUNTY's or 185730.76 .4. 6.1.04 Project! Barraate ChannO'09)-Armstrong 1kreement No. D02-1194 Crossing and Armstrong Storm Drain, Peters Canyon Channel (Fo6) and Peters Canyon DISTRICT's negligence or willful misconduct in the design or maintenance of existing flood control improvements in the Peters Canyon Channel, provided the failure to improve PETERS CANYON CHANNEL adjacent to Parcels 33, 34 and 35 will not constitute negligence or willful misconduct on the part of the DISTRICT or COUNTY. SECTION 10. All other provisions contained in the Agreement not expressly modified by this Amendment remain unchanged and in full force and effect. IN WITNESS WHEREOF, each PARTY hereto has executed this Amendment No. l by its duly authorized representatives as of the date set forth above. CITY OF TUSTIN, a municipal corporation of the State of California BY: William A. Huston City Manager ATTEST: BY:�;r l��.i • �bf - • DCity Clerk ate AS TO FORM: Lois Jet re ate City Attorney 165790,16 .5. 6.1.04 I t Project: Barranca Chan 09}Armstrong Crossing and Armstrong Storm Drain, Peters Canyon Channel (F06) and Peters Canyon DATE: L- a DATE: � - SIGNED AND CERTIFIED THAT A COPY OF THIS DOCUMENT HAS BEEN DELIVERED TO THE CHAIR OF THE BOARD 04reement No. D02-119-1 ORANGE COUNTY FLOOD CONTROL DISTRICT, a body corporate and politic BY: IYIIwtAI.. Chair of the Board of Supervisors of the Orange County Flood Control District of Orange County, California COUNTY OF ORANGE, a body corporate and politic BY: `k"l r...► A�wln4i-ilj,-t- Ddriene J. Blov Clerk of the Board of Supervisors of the Orange County Flood Control District of Orange County, California and the County of Orange Chair of the Board of Supervisors APPROVED AS TO FORM: COUNTY COUNSEL BY: / _... 4 Attachment: Exhibit B (2004) - Master Developer Footprint 185730.76 .6- 6.1.04 ATTACHMENT 3 Amendment No. 2 to Cooperative Agreement No. D02-119 ` Project; Barranca Channel (F09) - Armstrong Amendment No.2 to Agreement 002-119 ' Prossing, Armstrong Storm Drain, Peters Canyon Channel (F06), and Peters Canyon Bikeway Amendment No. 2 to Cooperative Agreement D02-119 This Amendment No. 2 to Cooperative Agreement D02-119, hereinafter referred to as 'AMENDMENT NO. 2," is entered into and effective as of LLffik-of A?gil. , 2015, by and among AND ORANGE COUNTY FLOOD CONTROL DISTRICT, a body corporate and politic in the State of California, hereinafter referred to as "DISTRICT," COUNTY OF ORANGE, a political subdivision of the State of Califomia, hereinafter referred to as "COUNTY," CITY OF TUSTIN, a municipal corporation, hereinafter referred to as "CITY," which are sometimes individually referred to as "PARTY," or collectively as "PARTIES." RECITALS WHEREAS, DISTRICT, COUNTY and CITY entered into that certain Joint Cooperative Agreement (1302-119) dated March 11, 2003, hereinafter referred to as the "Agreement," which established that the CITY would be responsible for constructing infrastructure to support the future development of the former Marine Corps Air Station Base (also known as the "Tustin Legacy"). The Agreement required the CITY, among other things, to design and construct segments of the Peters Canyon Channel immediately adjacent to Tustin Legacy to satisfactorily convey 100 year storm flows ('PETERS CANYON CHANNEL IMPROVEMENTS"). The Agreement also required the CITY to establish how its infrastructure obligations under the Agreement would be scheduled, 107146.1 Page 1 of 7 Project: Barranca Channel (1708) - Armstrong Amendment No.2 to Agreement D02-119 ' Crossing, Armstrong Storm Drain, Peters Canyon Channel (F06), and Peters Canyon Bikeway engineered, financed, operated and maintained; WHEREAS, on June 8, 2004 the PARTIES entered into that certain Amendment No. 1 to Joint Cooperative Agreement ("Amendment No. 1") which revised the Agreement to tie completion of the PETERS CANYON CHANNEL IMPROVEMENTS to the future development of Tustin Legacy, specifically requiring the CITY to commence construction on the PETERS CANYON CHANNEL IMPROVEMENTS prior to its issuance of certificates of use and occupancy for the 1001st residential unit, or on more than 270 acres of the land which drains into Peters Canyon Channel, whichever occurs first; WHEREAS, the CITY has approved construction of residential units within Tustin Legacy making issuance of certificate of occupancy for more than 1001 residential units imminent, which would trigger CITY's requirement to commence construction on the PETERS CANYON CHANNEL IMPROVEMENTS; WHEREAS, construction of the PETERS CANYON CHANNEL IMPROVEMENTS in accordance with the Agreement, as amended, would interfere with the time -sensitive Peters Canyon Channel Pipeline water quality project work ("Pipeline Project") in the same vicinity. A delay in the Pipeline Project schedule may jeopardize the OCTA Measure M2 Tier 2 environmental grant funding it has been awarded, and greatly increase its overall Project costs due to necessary coordination; and, WHEREAS, the PARTIES mutually desire to further amend the Agreement to defer construction of PETERS CANYON CHANNEL IMPROVEMENTS in accordance with the terms herein to accommodate the construction of the Pipeline Project. 107146,1 Page 2 of 7 Project: Barranca Channel (F09) - Armstrong Amendment No.2 to Agreement D02-119 ' Crossing, Armstrong Storm Drain, Peters Canyon Channel (F06), and Peters Canyon Bikeway NOW, THEREFORE the PARTIES hereto agree as follows: 1. RECITALS The provisions, definitions, and statements of intentions set forth in the recitals above are incorporated into this AMENDMENT NO. 2. 2, DEFINITIONS All capitalized terms used and not otherwise defined in this AMENDMENT NO. 2, but defined in the Agreement, as amended by Amendment No. 1, shall have the meanings set forth in the Agreement, as amended. 3. REVISIONS a) Subsection 5.3.3.4 is deleted in its entirety and hereby substituted with the following: 5.3.3.4 The CITY shall ensure that construction of the PETERS CANYON CHANNEL IMPROVEMENTS (excluding any PETERS CANYON CHANNEL IMPROVEMENTS which are obligations of the COUNTY pursuant to Section 2.2 of the Agreement) is completed at no cost to the DISTRICT or to the COUNTY. A contract for PETERS CANYON CHANNEL IMPROVEMENTS shall have been awarded for and construction commenced prior to the issuance of certificates of use and occupancy for the 1201s1 residential unit or certificates of use and occupancy on more than 270 acres of land within the Master Developer Footprint of the New Development, whichever occurs first. Once construction of PETERS CANYON CHANNEL IMPROVEMENTS commences, the CITY shall make every effort to ensure Developer's completion of PETERS CANYON CHANNEL IMPROVEMENTS within fifteen months after award of the contract. "New Development" includes all land at Tustin Legacy that drains to Peters Canyon Channel, as shown on Exhibit B. 107146.1 Page 3 of 7 Project: Barranca Channel (F09) - Armstrong Amendment No,2 to Agreement D02-119 grossing, Armstrong Storm Drain, Peters Canyon Channel (F06), and Peters Canyon Blkeway b) All references in the Agreement, as amended, to Public Facilities and Resources Department (PFRD) and/or Resources and Development Management Department (RDMD) are changed to OC Public Works (OCPW). 4. AUTHORITY The PARTIES to this AMENDMENT NO, 2 represent and warrant that this AMENDMENT has been duly authorized and executed and constitutes the legally binding obligation of their respective organization or entity, enforceable in accordance with its terms, 5. NO OTHER CHANGES; RATIFICATION Except as expressly set forth in this AMENDMENT NO, 2, each and all of the terms, conditions and covenants in the Agreement as amended by Amendment No.1 shall remain unchanged and in full force and effect, and are hereby ratified by the Parties, 6. COUNTERPARTS This AMENDMENT NO. 2 may be executed in counterparts, each of which shall be deemed an original, but all of which together shall constitute one and the same document. H // 107146.1 Page 4 of 7 Project: Barrance Channel (F09) - Armstrong Amendment No.2 to Agreement D02-119 Crossing, Armstrong Storm Drain, Peters Canyon Channel (F06), and Peters Canyon Bikeway IN WITNESS WHEREOF, each PARTY hereto has executed this AMENDMENT NO. 2 by its duly authorized representatives as of the date set forth above. Date: 4-- (1-1 S Date: APPROVED AS TO FORM: Office of the County Counsel Orange County, California By: Date ORANGE COUNTY FLOOD CONTROL DISTRICT a body corporatep9d politic , M Cha Supervisors SIGNED AND CERTIFIED THAT A COPY OF THIS AGREEMENT HAS BEEN DELIVERED TO THE CHAIR OF THE BOARD PER G. C. Sec 25103, Reso 79-1535 Attest: U /�Z' CleWof the Board of Supervisors Orange County, California Page 5 of 7 2182015 Project: Barranca Channel (F09) - Armstrong Crossing, Armstrong Storm Drain, Peters Canyon Channel (F06), and Peters Canyon Bikeway Date: u" - (4,1 S Date: w 114 —f 5 APPROVED AS TO FORM: Office of the County Counsel Orange County, California By: Dat Amendment No.2 to Agreement D02-119 COUNTY OF ORANGE a political subdivi�,4n of State of California Ch Supervisors SIGNED AND CERTIFIED THAT A COPY OF THIS AGREEMENT HAS BEEN DELIVERED TO THE CHAIR OF THE BOARD PER G. C. Sec 25103, Reso 79-1535 Attest: R i y Cle of the Board of Supervisors Orange County, California Page 6 of 7 2182015 Project: Barranca Channel (F09) - Armstrong Crossing, Armstrong Stone Drain, Peters Canyon Channel (F06), and Peters Canyon Bikeway Date: Y—Jd &. — Date: g% , l 5— APPROVED AS TO FORM: City Aftomey Page 7 of 7 Amendment No.2 to Agreement D02-119 CITY OF TUSTIN, a municipal corporation BY: Mayor, City of Tustin BY: RECEIVED :)MAY(CPubhcWorks 2 7 2015 Integrity, Accountability, service, Trust TUSTIN POBLIC WORKS DEPT. Shane L Silsby, Director May 26, 2015 Ken Nishikawa Deputy Director of Public Works/Engineering City of Tustin Public Works Department 300 Centennial Way Tustin, CA 92708 RE: Peters Canyon Channel (F06) Amendment No. 2 to Cooperative Agreement D02-119 Dear Mr, Nishikawa: Enclosed is a fully, executed original of the above referenced Amendment No. 2 and a copy of its supporting Orange County Board of Supervisors' Minute Order, Item No. 13 dated April 14, 2015. Each is provided for the City of Tustin's files. Please contact me at 714-667-9690 with any questions or concerns about this correspondence. Sincerely, Catherine Lapid Flood Agreements Flood Program Support cc: Kevin Onuma, P.E., Deputy Director, OC Infrastructure Programs Mehdi Sobhani, P.E., Manager, OC Infrastructure Programs/ Flood Program Support 5;\Flood Program\Correspondence\2015\Peters Canyon D02-119-2 orignal to City of Tustln.doc 300 N, Flower Street, Santa Ana, CA 92703 P.O. Box 4048, Santa Ana, CA 92702-4048 www.ocpublicwo*s.com 714.667, 8800 1 Info@ OCPW.ocgov,com ATTACHMENT 4 Proposed Amendment No. 3 to Cooperative Agreement No. D02-119 Project: Barranca Channel (F09) - Armstrong Crossing, Armstrong Storm Drain, Peters Canyon Channel (F06), and Peters Canyon Bikeway Amendment No.3 to Agreement D02-119 Amendment No. 3 to Cooperative Agreement D02-119 This AMENDMENT NO. 3 to Cooperative Agreement D02-119, hereinafter referred to as "AMENDMENT NO. 3," is entered into and effective as of of , 2017, by and among AND AND ORANGE COUNTY FLOOD CONTROL DISTRICT, a body corporate and politic in the State of California, hereinafter referred to as "DISTRICT," COUNTY OF ORANGE, a political subdivision of the State of California, hereinafter referred to as "COUNTY," CITY OF TUSTIN, a municipal corporation, hereinafter referred to as "CITY," which are sometimes individually referred to as "PARTY," or collectively as "PARTIES." RECITALS WHEREAS, DISTRICT, COUNTY and CITY entered into that certain Cooperative Agreement (D02-119) dated March 11, 2003, hereinafter referred to as the "AGREEMENT," which established that the CITY would be responsible for constructing infrastructure to support the future development of the former Marine Corps Air Station Base (also known as the "TUSTIN LEGACY"). The AGREEMENT required the CITY, among other things, to design and construct segments of the Peters Canyon Channel immediately adjacent to TUSTIN LEGACY to satisfactorily convey 100 year storm flows ("PETERS CANYON CHANNEL IMPROVEMENTS"). The AGREEMENT also required the CITY to establish how its infrastructure obligations under the AGREEMENT would be Page 1 of 6 Project; Barranca Channel (F09) - Armstrong Amendment No.3 to Agreement D02-119 Crossing, Armstrong Storm Drain, Peters Canyon Channel (F06), and Peters Canyon Bikeway scheduled, engineered, financed, operated and maintained; WHEREAS, on June 8, 2004 the PARTIES entered into that certain Amendment No. 1 to Cooperative Agreement ("AMENDMENT NO. 1") which revised the AGREEMENT to tie completion of the PETERS CANYON CHANNEL IMPROVEMENTS to the future development of TUSTIN LEGACY, specifically requiring the CITY to commence construction on the PETERS CANYON CHANNEL IMPROVEMENTS prior to its issuance of certificates of use and occupancy for the 1001st residential unit, or on more than 270 acres of the land which drains into Peters Canyon Channel, whichever occurs first; WHEREAS, on April 14, 2015 the PARTIES entered into that certain Amendment No. 2 to Cooperative Agreement ("AMENDMENT NO. 2") which further revised the AGREEMENT to require the CITY to commence construction on the PETERS CANYON CHANNEL IMPROVEMENTS prior to its issuance of certificates of use and occupancy for the 1201st residential unit, an increase in 200 units, or on more than 270 acres of the land which drains into Peters Canyon Channel, whichever occurs first; WHEREAS, the CITY requests the AGREEMENT be amended to delay commencement of the PETERS CANYON CHANNEL IMPROVEMENTS construction to accommodate additional action required of the City for regulatory permit compliance; WHEREAS, the PARTIES mutually desire to further amend the AGREEMENT to defer construction of PETERS CANYON CHANNEL IMPROVEMENTS in accordance with the terms herein. Page 2 of 6 Project: Barranca Channel (F09) - Armstrong Amendment No.3 to Agreement D02-119 Crossing, Armstrong Storm Drain, Peters Canyon Channel (F06), and Peters Canyon Bikeway NOW, THEREFORE the PARTIES hereto agree as follows: 1. RECITALS The provisions, definitions, and statements of intentions set forth in the recitals above are incorporated into this AMENDMENT NO. 3. 2. DEFINITIONS All capitalized terms used and not otherwise defined in this AMENDMENT NO. 3, but defined in the AGREEMENT, as amended by AMENDMENT NO. 1 and AMENDMENT NO. 2, shall have the meanings set forth in the AGREEMENT, as amended. 3. REVISIONS a) Subsection 5.3.3.4 is deleted in its entirety and hereby substituted with the following: 5.3.3.4 The CITY shall ensure that construction of the PETERS CANYON CHANNEL IMPROVEMENTS (excluding any PETERS CANYON CHANNEL IMPROVEMENTS which are obligations of the COUNTY pursuant to Section 2.2 of the AGREEMENT) is completed at no cost to the DISTRICT or to the COUNTY. A contract for PETERS CANYON CHANNEL IMPROVEMENTS shall have been awarded for and construction commenced prior to the issuance of certificates of use and occupancy for the 1401 sc residential unit or certificates of use and occupancy on more than 270 acres of land within the Master Developer Footprint of the New Development, whichever occurs first. Once construction of PETERS CANYON CHANNEL IMPROVEMENTS commences, the CITY shall make every effort to ensure Developer's completion of PETERS CANYON CHANNEL IMPROVEMENTS within fifteen months after award of the contract. "New Development" includes all land at TUSTIN LEGACY that drains to Peters Canyon Channel, as shown on Exhibit B. Page 3 of 6 Project: Barranca Channel (F09) - Armstrong Amendment No.3 to Agreement D02-119 Crossing, Armstrong Storm Drain, Peters Canyon Channel (F06), and Peters Canyon Bikeway 4. AUTHORITY The PARTIES to this AMENDMENT NO. 3 represent and warrant that this AMENDMENT has been duly authorized and executed and constitutes the legally binding obligation of their respective organization or entity, enforceable in accordance with its terms. 5. NO OTHER CHANGES; RATIFICATION Except as expressly set forth in this AMENDMENT NO. 3, each and all of the terms, conditions and covenants in the AGREEMENT as amended by AMENDMENT NO.1 and AMENDMENT NO. 2 shall remain unchanged and in full force and effect, and are hereby ratified by the Parties. 6. COUNTERPARTS This AMENDMENT NO. 3 may be executed in counterparts, each of which shall be deemed an original, but all of which together shall constitute one and the same document. H H Page 4 of 6 Project: Barranca Channel (F09) - Armstrong Amendment No.3 to Agreement D02-119 Crossing, Armstrong Storm Drain, Peters Canyon Channel (F06), and Peters Canyon Bikeway IN WITNESS WHEREOF, each PARTY hereto has executed this AMENDMENT NO. 3 by its duly authorized representatives as of the date set forth above. Date: Date: APPROVED AS TO FORM: Office of the County Counsel Orange County, California Deputy Date: ORANGE COUNTY FLOOD CONTROL DISTRICT a body corporate and politic By, Shane L. Silsby Director of OC Public Works Pursuant to Minute Order dated April 14, 2015 COUNTY OF ORANGE a political subdivision of State of California By Shane L. Silsby Director of OC Public Works Pursuant to Minute Order dated April 14, 2015 Page 5 of 6 Project: Barranca Channel (F09) - Armstrong Amendment No.3 to Agreement D02-119 Crossing, Armstrong Storm Drain, Peters Canyon Channel (F06), and Peters Canyon Bikeway Date: Date: APPROVED AS TO FORM: w City Attorney Page 6 of 6 CITY OF TUSTIN, a municipal corporation BY: Mayor, City of Tustin City Clerk