SUMMARY
In order to maintain eligibility for the Measure M Growth Management Program, the City is
required to annually submit a compliance package to the Orange County Transportation
Authority (aCTA). For Fiscal Year 2004-2005, that package includes: (1) an updated Seven-
Year Capital Improvement Program, (2) a Master Plan of Arterial Highways Consistency
Resolution, and (3) a Maintenance of Effort Certification.
RECOMM ENDA TION
In order to maintain eligibility for the Measure M Growth Management Program (GMP), it is
recommended that the City Council take the following actions in compliance with the Measure
M GMP requirements:
A.
Adopt the attached draft Measure M Growth Management Program Seven-Year
Capital Improvement Program (Fiscal Year 2004-2005 through Fiscal Year 2010-
2011 ).
B.
Adopt Resolution No. 04-56 concerning the City's Circulation Element for Master
Plan of Arterial Highways consistency.
C.
Authorize the Director of Public Works/City Engineer to submit the City of Tustin's
Measure M GMP eligibility package, including certification of the City's Maintenance
of Effort (MaE), to the Orange County Transportation Authority.
FISCAL IMPACT
Compliance with Measure M requirements will ensure continued City eligibility for the Measure
M Local Turnback Program and the Measure M Competitive Programs.
BACKGROUND
In November 1990, the voters of Orange County approved Measure M, the revised Traffic
Improvement and Growth Management Program (GMP), which established a one-half (1/2)
cent sales tax over a twenty-year period for local and regional transportation improvements
City of Tustin Measure M Growth Management Program Annual Compliance, Fiscal Year
2004-2005
June 21, 2004
Page 2
throughout Orange County. In order to receive revenue from these programs for facility
improvements, the City of Tustin and other Orange County cities must continue to meet certain
requirements.
Tustin's Measure M eligibility package for Fiscal Year 2003-2004 was approved by OCTA last
year. In order to maintain eligibility for these programs, the City is required to submit the
following items for the Fiscal Year 2004-2005 compliance submittal:
Seven-Year Capital Improvement Program (CIP)
The draft CIP is a seven-year projection of specific projects upon which Measure M funds
may be expended. Adoption of the seven-year CIP is a requirement of the Measure M
GMP. Included in the plan are projects that could be submitted to OCTA during future
Measure M calls for projects. The proposed CIP is currently in draft form until the formal
adoption of the City's seven-year Capital Improvement Program as part of the Fiscal Year
2004-2005 budget process. The finalized seven-year CIP will be forwarded to OCTA when
the budget has been adopted by the City Council.
Master Plan of Arterial Highways (MPAH) Consistency
The City of Tustin is required to affirm, by a City Council resolution, that no unilateral
reduction in through lanes has been made on any MPAH arterial on the City's circulation
element. The City has completed studies for the amendment of the MPAH to reclassify EI
Camino Real, between First Street and Newport Avenue, and submitted those studies to
aCTA. The City is currently processing a General Plan Circulation Element Amendment to
reclassify EI Camino Real between First Street and Newport Avenue. Upon adoption, the
resolution will be submitted to aCTA.
Maintenance of Effort (MOE)
A Maintenance of Effort Reporting Form, with a statement certifying that the City will meet
its MaE expenditure in accordance with Measure M requirements for Fiscal Year 2004-
2005, must be submitted with a copy of the City's draft budget sections showing these
expenditures. Upon authorization, the certification of the MOE will be executed by the
Director of Public Works/City Engineer and submitted to aCTA.
City of Tustin Measure M Growth Management Program Annual Compliance, Fiscal Year
2004-2005
June 21, 2004
Page 3
Compliance with the Measure M GMP requirements will ensure the City's continued eligibility
for the various Measure M funding programs.
C7;;1)~
Tim D. Serlet
Director of Public Works/City Engineer
~p ,/({~
Dana R. Kasdan
Engineering Services Manager
Attachments: Resolution No. 04-56
Draft Seven-Year CIP (aCTA Format)
RESOLUTION NO. 04-56
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUSTIN,
CALIFORNIA CONCERNING THE STATUS OF THE CIRCULATION ELEMENT
FOR THE CITY OF TUSTIN
WHEREAS, the City of Tustin desires to maintain and improve the streets within its
jurisdiction, including those arterials contained in the Master Plan of Arterial Highways
(MPAH); and
WHEREAS, the City of Tustin has endorsed a definition of and a process for
determining consistency of the City's Arterial Highway Plan with the MPAH; and
WHEREAS, the City has adopted a General Plan Circulation Element which does not
preclude implementation of the MPAH within its jurisdiction; and
WHEREAS, the City has completed studies for the amendment of the MPAH to
reclassify EI Camino Real, between First Street and Newport Avenue, and submitted
those studies to OCT A, and the City is currently processing a General Plan Circulation
Element Amendment to reclassify EI Camino Real between First Street and Newport
Avenue; and
WHEREAS, the City is required to adopt a resolution every even-numbered year
informing the Orange County Transportation Authority (aCTA) that the City's General
Plan Circulation Element is in conformance with the County's Master Plan of Arterial
Highways and whether any changes to any arterial highways of said Circulation Element
have been adopted by the City during Fiscal Years 2002-2003 and 2003-2004; and
WHEREAS, the City is required to send annually to the OCT A all recommended
changes to the City Circulation Element and the County's Master Plan of Arterial
Highways for the purpose of re-qualifying for participation in the Measure M Combined
Transportation Funding Programs.
NOW, THEREFORE, BE IT RESOLVED that the City of Tustin does hereby inform
the aCTA that:
a)
The arterial highway portion of the Circulation Element of the City is in
conformance with the County's Master Plan of Arterial Highways.
b)
The City attests that no unilateral reduction in through lanes has been made on
any MPAH arterials during Fiscal Years 2002-2003 and 2003-2004.
c)
The City has adopted a uniform setback ordinance providing for the
preservation of rights-of-way consistent with the MPAH arterial highway
classification.
Resolution 04-56
June 21, 2004
Page 2
d)
The City has adopted provisions for the limitation of access to arterial highways
in order to protect the integrity of the system.
PASSED AND ADOPTED at a regular meeting of the City Council of the City of Tustin
held on the 21 st day of June 2004.
Tony Kawashima, Mayor
ATTEST:
City Clerk
08-Jun-O4
1
Agency: Tustin
Project Number: ilia
Project Name: Altadena Drive/Pasadena Avenue Pedes:rian
Enhancements (4063)
Project Limits/Loc: At the intersection of Altadena Drive and Pasadena
Avenue
Type Of Work: Other
Additional TOW: other
Project Description: Installation of in-pavement lighted clOsswalk and curb
bump outs
Project Cost:
C
E
$0
Agency:
Project Number:
Project Name:
Project Limits/Loc :
Type Of Work :
Additional TOW:
Project Description:
Tustin
ilia
Annual Major Maintenance Program (700 I)
Various Locations within City Limit
Road Maintenance
rehabilitation of roadway
Annual routine rehabilitation of street pavement at
various locations throughout the City, including crack
sealing, skin patching, AC resurfacing, traffic loops and
striping
Measure M Growth Management Program
Congestion Management Program
Seven Year Capital Improvement Program (Sorted by Nune)
Fiscal Years 2004/2005 throug'¡ 20 10/20 II
DRAFT
Caltrans Safe Route to Scrnol Program Grant
100%
$0
$0
$0
$0
$0
114,000
5,000
$119,000
114,000
5,000
$119,000
100%
$630,000
$630,000
Project Cost:
C
E
04/05
525,000
105,000
$630,000
05/06
0
0
$0
Measure M:
Yes
06/07
0
0
$0
07/08
0
0
$0
08/09
0
0
$0
09/10
0
0
$0
10/11
0
0
$0
525,000
105,000
$630,000
525,000
105,000
$630,000
08-Jun-O4
2
Agency: Tustin
Project Number: n/a
Project Name: Irvine Boulevard and Newport Averne Intersection
Enhancement (7118)
Irvine Boulevard and Newport A verne Intersection
Intersection
add through and left turn lanes to inttrsection
Widening and realignment to include dual left turn lanes
and three through lanes on all approacht:'>o Traffic signal
modifications. Rehabilitation and resurfacing AC
pavement.
Agency:
Project Number:
Project Name:
Project Limits/Loc :
Type Of Work:
Additional TOW:
Project Description:
Project Cost:
Project Limits/Loc :
Type Of Work:
Additional TOW:
Project Description:
Project Cost:
Measure M: Yes
Measure M Growth Management Program
Congestion Management Program
Seven Year Capital Improvement Program (Sorted by Name)
Fiscal Years 2004/2005 throug12010/201 I
DRAFT
Tustin
ilia
Edinger Avenue Widening (7147)
Between SR-55 and 1400' East of Red Hill Avenue
Road Widening
add 2 lanes to existing roadway in proþct limits
Widen to major arterial highway smart street standards
with dual left turn lanes and exclusiw right hand turn
lanes. Resurface AC pavement. Construct inlets, curb &
gutter, raised median, sidewalks, signals, street lights
and traffic striping.
Santa Ana-Tustin Transportation system Improvement
Authorithy
SSP 51% 3,677,585
Other 5% 370,198
SAD 2% 108,000
100% $7,197,241
3,677,585
370,198
108,000
$7,197,241
City of Santa Ana Smart Street Reimbursement
Developer Bond
04/05 05/06
C I 6,827,043 I 0
R 370,198 0
$7,197,241 $0 $0 $0
6,827,043
370,198
$7,197,241
6,827,043
-
370,198
$7,197,241
$0 $0 $0
1,786,981 1,786,981
910,150 910,150
420,879 420,879
831,741 831,741
$3,949,751 $3,949,751
Gas Tax
IIP
MPAH
Tumback
45%
23%
11%
21%
100%
04/05
05/06
06/07
07/08
08/09
09/10
1O1ll
C 3,169,150 0 0 0 0 0 0 3,169,150 3,169,150
E 31,981 0 0 0 0 0 0 31,981 31,981
R 748,620 0 0 0 0 0 0 748,620 748,620
$3,949,751
$0
$0
$0
$0
$0
$0
$3,949,751
$3,949,751
08-Jun-O4
3
Agency: Tustin
Project Number: n/a
Project Name: Newport Avenue at El Camino Real Mcdify/Upgrade
Traffic Signal (4064)
Newport Avenue at El Camino Real
Traffic Signals
replace and upgrade traffic signals and equipment
Project Description: Modification and upgrade of existing traffic signal and
equipment, including the addition oflefttum phasing
Project LimitslLoc :
Type Of Work:
Additional TOW:
Measure M Growth Management Program
Congestion Management Program
Seven Year Capital Improvement Program (Sorted by Nlme)
Fiscal Years 2004/2005 through 20 I 0/20 II
DRAFT
100%
$150,000
Project Cost:
04/05 05/06 06/07 07/08 08/09 09/10 10/11
I C I 150,000 0 I 0 I 0 I 0 I 0 I 0 I 150,000 I 150,000
$150,000 $0 $0 $0 $0 $0 $0 $150,000 $150,000
Agency:
Project Number:
Project Name:
Project LimitslLoc :
Type Of Work:
Additional TOW:
Project Description:
Tustin
Newport Avenue Extension (7131)
From current terminus to Edinger Avenue
New Facility
new 6 lane roadway between project linits
Extension of Newport Avenue from CUlfent terminus,
south of Edinger Avenue including therailroad
underpass and the widening ofNewX>rt Avenue from
Tustin Grove Drive to Myrtle Avenu:. Includes
realignment of flood control channel.
Tustin Community Redevelopment Agency-South
Central
Tumback
Other
Unfunded
199,997
4,200,000
19,800,000
$30,620,487
215,731
4,530,426
21,357,722
$33,029,487
Future Measure "M" Application
Uncertain Funding
1%
14%
65%
100%
04/05
05/06
06/07
07/08
09/10
10/11
C 0 0 0 21,000,000 0 0 0 21,000,000 22,953,000
E 509,549 0 0 0 0 0 0 509,549 509,549
R 110,938 3,000,000 6,000,000 0 0 0 0 9,110,938 9,566,938
Project Cost:
$620,487
$3,000,000
Measure M: Yes
08/09
$6,000,000
$21,000,000
$0
$0
$30,620,487
$33,029,487
$0
08-Jun-O4
4
Agency: Tustin
Project Number: 00-TUST-RIP-3190
Project Name: Newport Avenue/SR-55 Northbound Ramp
Reconfiguration (7130)
Newport Avenue / SR-55 Northbound RarqJ
Interchange
reconfigure the interchange between street and freeway
to eliminate traffic conflicts
Project Description: Relocation of existing ramps, construction of new
ramps, construction of Newport between Edinger and
Valencia. Realignment of Del Amo be1ween Edinger
Project LimitsILoc :
Type Of Work :
Additional TOW:
Measure M Growth Management Program
Congestion Management Program
Seven Year Capital Improvement Program (Sorted by Nlme)
Fiscal Years 2004/2005 through 2010/2011
DRAFT
CDBG 6% 689,302
General 3% 318,000
RIP 57% 6,965,986
Tumback 11% 1,368,022
Developer 17% 2,014,252
Other 7% 846,124
100% $12,201,686
689,302
318,000
6,965,986
1,368,022
2,014,252
846,124
Water Capitallmproverœnt Program
Bonds/Payments
Tustin Community Redevelopment Agency-South
Central
$12,201,686
04/05
05/06
09/10
10/11
Project Cost:
06/07
08/09
C 11,041,838 0 0 0 0 0 0 11,041,838 11,041,838
E 66,999 0 0 0 0 0 0 66,999 66,999
R 1,092,849 0 0 0 0 0 0 1,092,849 1,092,849
$12,201,686
$0
Agency: Tustin
Project Number: n/a
Project Name: Old Town Tustin Commercial District Sign Program
(4065)
Old Town Tustin
Other
other
Project Description: Entry signs and directional signs for Old Town Tustin
Project LimitsILoc :
Type Of Work:
Additional TOW:
07/08
$0 $0 $0 $0 $0 $12,201,686 $12,201,686
.
100% $80,000 $80,000
Project Cost:
04/05 05/06 06/07 07/08 08/09 09/10 10/11
C I 80,000 0 I 0 I 0 I 0 I 0 0 I 80,000 I 80,000 I
$80,000 $0 $0 $0 $0 $0 $0 $80,000 $80,000
Measure M:
Yes
08-Jun-O4
5
Agency:
Project Number:
Project Name:
Project LimitslLoc :
Type Of Work :
Additional TOW:
Project Description:
Tustin
00- TUST -RST -2020
Red Hill Avenue Grade Separation (7175)
Red Hill Avenue at aCTA / SCRRARailway / Edinger
Avenue
Intersection
separate streets through an over or undeTJBSs (grade
separation) ofthe roadways
Grade separation of Red HillÆdinger, Red Hill/Santa
Ana-Santa Fe Channel, and Red Hill/OCT A-S::RRA
Measure M Growth Management Program
Congestion Management Program
Seven Year Capital Improvement Program (Sorted by Nlme)
Fiscal Years 200412005 through 2010/2011
¡-"~V' r:-,'~ J!f" r ~
U~~J-\~'"S I
liP 6%
Tumback 0%
Unfunded 91%
100%
1,400,000
107,920
23,100,000
$25,305,000
1,517,084
116,946
25,031,892
$27,421,300
99-TUST-GMA-1193, 00-TUST-GMA-3189 & 03-
TUST-GMA-1222
Uncertain Funding
Project Cost:
10/11
04/05
05/06
06/07
07/08
08/09
09/10
C 0 0 0 22,100,000 0 0 0 22,100,000 24,155,300
E 530,000 1,575,000 100,000 0 0 0 0 2,205,000 2,205,000
R 0 0 1,000,000 0 0 0 0 1,000,000 1,061,000
Agency:
Project Number:
Project Name:
Project LimitslLoc :
Type Of Work:
Additional TOW:
Project Description:
$530,000
$1,575,000
$1,100,000
$22,100,000
$0 $0
250,000 250,000
406,800 406,800
257,600 257,600
994,503 994,503
41,012 41,012
$1,949,915 $1,949,915
$0
$25,305,000
$27,421,300
Tustin
nla
Red Hill Avenue Widening at the 1-5 (7133)
Between EI Camino Real and Nisson Road (at the 1-5
Freeway)
Road Widening
add 2 lanes to existing roadway in proj:ct limits
Widening to major arterial highway !tandards including
3 through lanes and bicycle lanes in beth directions,
Right turn only lanes onto the freeway mnps, dual left
turn lanes from northbound Red Hill Avenue to
westbound EI Camino Real,
Gas Tax 13%
General 21%
RIP 13%
Turnback 51%
Other 2%
100%
CIP
Santa Ana-Tustin Transportation System Improvements
Project Cost:
Measure M: Yes
C
E
04/05
1,928,912
21,003
-
$1,949,915
05/06
0
0
$0
06/07
0
0
$0
07/08
0
0
$0
08/09
0
0
$0
09/10
0
0
$0
IO/ll
0 1,928,912 1,928,912
0 21,003 21,003
$0 $1,949,915 $1,949,915
08-Jun-O4
Measure M Growth Management Program
Congestion Management Program
Seven Year Capital Improvement Program (Sorted by Nlme)
Fiscal Years 2004/2005 through 2010/2011
6
. . '; ~ "":<)S
"'.. ,,'" I
.:. lie'.;,;,,:,"::!i
.;) .. .... ¡¡¡
Agency: Tustin
Project Number: n/a Gas Tax 3% 572,029 605,927
Project Name: Tustin Ranch Road Extension (7100) General 0% 95,699 101,370 ICIP
Project Limits/Loc: Between Walnut Avenue and ValenciaNorth Loop Road MPAH 12% 2,500,000 2,648,147 Future Measure "M" Application
Type Of Work: New Facility Developer 10% 2,195,000 2,325,073
Additional TOW: new 6 lane roadway between project lirrits Unfunded 75% 16,305,000 17,271,212 IUncertain Funding
Project Description: Construction of 6-lane major arterial induding bridges 100% $21,667,728 $22,951,728
over Santa Fe Channel, SCRRAlOCTARailway &
Edinger. Edinger Ave improvements induding on/off
ramps, Tustin Ranch Rd improvements south of Edinger
to link with on-off ramps at Valencia N. Loop Rd.
""-"_._~"-
Project Cost:
04/05 05/06 06/07 07/08 08/09 09/10 10/11
$567,728 $100,000 $21,000,000 $0 $0 $0 $0 $21,667,728 $22,951,728
Agency: Tustin
Project Number: n/a
Project Name: Walnut Avenue Rehabilitation (7178)
Project LimitslLoc: Between Red Hill Avenue and Browling Avenue 100% $720,395
Type Of Work: Road Maintenance
Additional TOW: rehabilitation of roadway
Project Description: Removal and deeplift AC repair of œteriorated areas;
repair of damaged sidewalk and curb and gutter, crack
sealing, cold planing, AC resurfacing traffic loops,
_m~ning and traffic striping,
Project Cost:
04/05 05/06 06/07 07/08 08/09 09/10 10/11
C 700,000 0 0 0 0 0 0 700,000 700,000
E 20,395 0 0 0 0 0 0 20,395 20,395
$720,395 $0 $0 $0 $0 $0 $0 $720,395 $720,395
Total for Tustin $30,491,643 $31,296,000 $29,965,005 $45,137,000 $3,572,000 $5,145,000 $9,500,000 $155,106,648 $164,968,188
C 0 0 21,000,000 0 0 0 0 21,000,000 22,281,000
E 537,728 0 0 0 0 0 0 537,728 537,728
R 30,000 100,000 0 0 0 0 0 130,000 133,000
Measure M: Yes
08-Jun-O4
Measure M Growth Management Program
Congestion Management Program
Seven Year Capital Improvement Program (Sorted by Nlme)
Fiscal Years 2004/2005 through 2010/2011
1
~¡'
¡\...l..:"'.,:"r
.f="';~ ~ Ii
Agency:
Project Number:
Project Name:
Project Limits/Loc :
Tustin
n/a
Edinger Avenue Beautification
Between east of Red Hill Avenue and west of Jamboree
Road
Aesthetics
landscaping of roadway
North parkway and median island landscaping along
portion of Edinger Avenue.
100%
$1,174,600
Type Of Work :
Additional TOW:
Project Description:
Project Cost:
04/05 05/06 06/07 07/08 08/09 09/10 10/11
COO 0 0 0 0 900,000 900,000 1,074,600
E 0 0 0 0 0 100,000 0 100,000 100,000
$0 $0 $0 $0 $0 $100,000 $900,000 $1,000,000 $1,174,600
Agency: Tustin
Project Number: General 9% 800,000 936,893 CIP
Project Name: EI Camino Real Widening (7116) Other 9% 800,000 936,893 Future Measure "M" Application
Project Limits/Loc: Between Red Hill Avenue and 400' east ofBrowning Unfunded 82% 7,360,000 8,619,414 Uncertain Funding
Avenue
T OfW k R d W.d . 100% $8,960,000 $10,493,200
ype or: oa I enmg
Additional TOW: add 4 lanes to existing roadway in proj:ct limits
Project Description: Widen east leg ofEI Camino Real &Red Hill Avenue
intersection. Street widening to four lane secondary
arterial highway standards. Reconstruction & resurface
of AC pavement and signalization of8 Camino Real &
Browning Avenue.
mm-
Project Cost:
04/05 05/06 06/07 07/08 08/09 09/10 10/11
C 0 0 0 0 800,000 0 7,000,000 7,800,000 9,258,800
E 0 0 120,000 0 0 240,000 0 360,000 360,000
R 0 0 0 800,000 0 0 0 800,000 874,400
$0
$0
$120,000
$800,000
$800,000
$240,000
$7,000,000
$8,960,000
$10,493,200
Measure M: No
08-Jun-O4
2
Agency:
Project Number:
Project Name:
nla
Irvine Boulevard at Prospect Avenue MaliJy/Upgrade
Traffic Signal (4052)
Irvine Boulevard at Prospect Avenue
Traffic Signals
replace and upgrade traffic signals and equipment
Installation ofleft-tum phasing for north-south Prospect
Avenue at Irvine Boulevard
Project Limits/Loc :
Type Of Work :
Additional TOW:
Project Description:
Measure M Growth Management Program
Congestion Management Program
Seven Year Capital Improvement Program (Sorted by Nune)
Fiscal Years 2004/2005 through 2010/2011
DRAFT
100%
$212,000
$237,200
Project Cost:
C
E
04/05
0
0
$0
05/06
0
0
$0
Agency: Tustin
Project Number: nla
Project Name: Irvine Boulevard Rehabilitation
Project Limits/Loc: Between Ranchwood Road and Jamboree Road
Type Of Work: Road Maintenance
Additional TOW: rehabilitation of roadway
Project Description: Removal and deep lift repair of pavement failure areas,
repair curb and gutter, cold plane, crack seal,AC
resurfacing, traffic loops and traffic striping.
06/07
0
0
$0
07/08
0
12,000
$12,000
08/09
200,000
0
$200,000
09/1 0
0
0
$0
10/11
0 200,000 225,200
0 12,000 12,000
$0 $212,000 $237,200
06/07
0
0
$0
100%
$793,580
Project Cost:
C
E
04/05
0
0
$0
05/06
0
0
$0
Measure M: No
07/08 08/09 09/10 10/11
0 0 620,000 0 620,000 718,580
0 75,000 0 0 75,000 75,000
$0 $75,000 $620,000 $0 $695,000 $793,580
08-Jun-O4
3
Agency: Tustin
Project Number: nla
Project Name: Irvine Boulevard Rehabilitation
Project LimitslLoc: Between Prospect Avenue and Holt Avenue
Type Of Work: Road Maintenance
Additional TOW: rehabilitation of roadway
Project Description: Removal and deep lift repair of pavement failure areas,
repair curb and gutter, cold plane, crack seal,AC
resurfacing, traffic loops and traffic striping.
Measure M Growth Management Program
Congestion Management Program
Seven Year Capital Improvement Program (Sorted by Nlme)
Fiscal Years 2004/2005 through 2010/2011
RAFT
100%
$620,000
$711,425
Project Cost:
C
E
04/05
0
0
$0
05/06
0
0
$0
Agency:
Project Number:
Project Name:
Project LimitslLoc :
Tustin
nla
Jamboree Road Median Barrier Installati:m (7162)
Between Barranca Parkway and OCTA/SCRRA Bridge
north of Edinger Avenue
Safety
Install guard rails, curbs or other safe1¥ barriers along
road
Construction of guard rails / safety ban-iers along the
median
Type Of Work:
Additional TOW:
Project Description:
06/07
0
0
$0
07/08 08/09 09/10 10/11
0 0 575,000 0 575,000 666,425
0 45,000 0 0 45,000 45,000
$0 $45,000 $575,000 $0 $620,000 $711,425
Gas Tax
Other
State TSM
43%
17%
40%
317,807
129,200
300,000
$747,007
317,807
129,200
300,000
$747,007
City ofIrvine
Hazard Elimination System Grant
100%
Project Cost:
04/05 05/06 06/07 07/08 08/09 09/10 10/11
I C I 747,007 I 0 I 0 I 0 I 0 I 0 I 0 I 747,007 I 747,007 I
$747,007 $0 $0 $0 $0 $0 $0 $747,007 $747,007
Measure M: No
08-Jun-O4
Measure M Growth Management Program
Congestion Management Program
Seven Year Capital Improvement Program (Sorted by Nlme)
Fiscal Years 2004/2005 throug12010/2011
4
L.£'
/", ~"c: "~'"
¿'~¿~i' i
Agency: Tustin
Project Number: ilia
Project Name: Jamboree Road Rehabilitation 100% $750,000 $792,090
Project LimitsILoc: Between Irvine Boulevard and Peters Ca~on Wash
Bridge
Type Of Work: Road Maintenance
Additional TOW: rehabilitation of roadway
Project Description: Removal and deep lift repairs of AC pavement failure
areas, cold plane, AC resurfacing, trailiic loops and
_,~~~~ing.
Project Cost:
04/05 05/06 06/07 07/08 08/09 09/10 10/11
C 0 0 690,000 0 0 0 0 690,000 732,090
E 0 60,000 0 0 0 0 0 60,000 60,000
$0 $60,000 $690,000 $0 $0 $0 $0 $750,000 $792,090
Agency: Tustin
Project Number: ilia
Project Name: Jamboree Road Rehabilitation 100% $780,000 $823,310
Project LimitsILoc: Between Peters Canyon Wash Bridge and Portola
Parkway
Type Of Work: Road Maintenance
Additional TOW: rehabilitation of roadway
Project Description: Removal and deep lift repairs of AC pavement failure
areas, cold plane, AC resurfacing, traffic loops and
-~.
Project Cost:
04/05 05/06 06/07 07/08 08/09 09/10 10/11
C 0 0 710,000 0 0 0 0 710,000 753,310
E 0 70,000 0 0 0 0 0 70,000 70,000
$0 $70,000 $710,000 $0 $0 $0 $0 $780,000 $823,310
Measure M: No
08-Jun-O4
Measure M Growth Management Program
Congestion Management Program
Seven Year Capital Improvement Program (Sorted by Nune)
Fiscal Years 2004/2005 through 20 I 0/20 I I
5
~r~.\j. ~¡ F""-.L,'. i
~¡f~
FT
Agency:
Project Number:
Project Name:
Project LimitslLoc :
Tustin
nla
Jamboree Road Rehabilitation
Between Portola Parkway and 1350 feet north of Tustin
Ranch Road
Road Maintenance
rehabilitation of roadway
Removal and deep lift repairs of AC pavement failure
areas, cold plane, AC resurfacing, traffic loops and
traffic striping.
100%
$672,080
Type Of Work :
Additional TOW:
Project Description:
Project Cost:
04/05 05/06 06/07 07/08 08/09 09/10 10/11
C 0 0 0 560,000 0 0 0 560,000 612,080
E 0 0 60,000 0 0 0 0 60,000 60,000
$0 $0 $60,000 $560,000 $0 $0 $0 $620,000 $672,080
Agency: Tustin
Project Number: nla
Project Name: Jamboree Road Rehabilitation 100% $1,250,000 $1,473,100
Project LimitsILoc: Between 2750 feet north of Tustin Ranch Road and
north City limits
Type Of Work: Road Maintenance
Additional TOW: rehabilitation of roadway
Project Description: Removal and deep lift repairs of AC pavement failure
areas, cold plane, AC resurfacing, traffic loops and
~~~~~~
Project Cost:
04/05 05/06 06/07 07/08 08/09 09/10 10/11
C 0 0 0 0 0 0 1,150,000 1,150,000 1,373,100
E 0 0 0 0 0 100,000 0 100,000 100,000
$0 $0 $0 $0 $0 $100,000 $1,150,000 $1,250,000 $1,473,100
Measure M: No
08-Jun-O4
Measure M Growth Management Program
Congestion Management Program
Seven Year Capital Improvement Program (Sorted by Nime)
Fiscal Years 2004/2005 through 2010/2011
6
r"\:ì!'
brI if\.
r-'
i-I
Agency: Tustin
Project Number: n/a
Project Name: Main Street at Williams Street Modify'Upgrade Traffic
Signal
Main Street at Williams Street
Traffic Signals
replace and upgrade traffic signals and equipment
Project Description: Modification and upgrade of existing traffic signal and
equipment at Main Street and Williams S1reet.
100%
$226,415
Project Limits/Loc :
Type Of Work :
Additional TOW:
Project Cost:
04/05 05/06 06/07 07/08 08/09 09/10 10/11
C 0 0 0 0 0 185,000 0 185,000 214,415
E 0 0 0 0 12,000 0 0 12,000 12,000
$0 $0 $0 $0 $12,000 $185,000 $0 $197,000 $226,415
Agency: Tustin
Project Number:
Project Name: 100% $530,000 $617,300
Project LimitsILoc :
Type Of Work :
Additional TOW:
Project Description:
Project Cost:
04/05 05/06 06/07 07/08 08/09 09/10
C 0 0 0 0 0 0 450,000 450,000 537,300
E 0 0 0 0 30,000 50,000 0 80,000 80,000
$0 $0 $0 $0 $30,000 $50,000 $450,000 $530,000 $617,300
Measure M: No
08-Jun-O4
7
Agency:
Project Number:
Project Name:
Project LimitslLoc :
Type Of Work:
Additional TOW:
Project Description:
Measure M Growth Management Program
Congestion Management Program
Seven Year Capital Improvement Program (Sorted by Nune)
Fiscal Years 2004/2005 through 2010/2011
';;-1 ff"'~
f/:;<, K','II ¡a
.¡}øJ~ i II
04/05 05/06 06/07 07/08 08/09 09/10
C I 0 350,000 I 0 I 0 I 0 I 0
E 20,000 0 0 0 0 0
$20,000 $350,000 $0 $0 $0 $0
Agency: Tustin
Project Number: n/a CDBG 70% 384,612
Project Name: Prospect Avenue Improvements (7177) General 23% 125,388
Project LimitslLoc: Between Main Street and Third Street Other 7% 40,000
Type Of Work: Road Widening 100% $550,000
Additional TOW: widen width of existing traffic lanes
Project Description: Improvements to the west side of Prmpect Avenue
including half street reconstruction, remOie and replace
sidewalk, curb and gutter, install street lights and
bollards, landscaping, decorative pavtment and storm
~~rovements.
Project Cost:
04/05 05/06 06/07 07/08 08/09 09/10
C I 495,000 0 I 0 I 0 I 0 I 0
E 55,000 0 0 0 0 0
$550,000 $0 $0 $0 $0 $0
Project Cost:
Tustin
n/a
Newport Avenue Rehabilitation (7165)
Between Sycamore Avenue and McFadœn Avenue
Road Maintenance
rehabilitation of roadway
Street rehabilitation & resurfacing including; repair and
grinding of existing pavement, crack seal, AC
resurfacing, traffic loops, traffic signing and traffic
striping.
100%
384,612
125,388
40,000
$550,000
10/11
0 I 350,000 I 360,500
0 20,000 20,000
$0 $370,000 $380,500
Water Capital Improverœnt Fund
Tustin Lighting District
10/11
0
0
$0
495,000
55,000
$550,000
495,000
55,000
$550,000
Measure M: No
08-Jun-O4
Measure M Growth Management Program
Congestion Management Program
Seven Year Capital Improvement Program (Sorted by Nime)
Fiscal Years 2004/2005 throug:l2010/201l
8
:,%;, f-tk'1r
!, ~" ";,¡a !:â
~..~~ I
Agency: Tustin
Project Number: ilia
Project Name: Red Hill Avenue at Bell Avenue New Traffc Signal 100% $240,000
Installation
Project Limits/Loc: Red Hì\l Avenue at Bell Avenue
Type Of Work: Traffic Signals
Additional TOW: replace and upgrade traffic signals and equipment
Project Description: Installation of new traffic signal and safety lighting at
Red Hill Avenue and Bell Avenue.
Project Cost:
04/05 05/06 06/07 07/08 08/09 09/10 10/11
C 0 0 0 225,000 0 0 0 225,000 245,925
E 0 0 15,000 0 0 0 0 15,000 15,000
$0 $0 $15,000 $225,000 $0 $0 $0 $240,000 $260,925
Agency: Tustin
Project Number: ilia
Project Name: Red Hì\l Avenue at Service Road Modfy / Upgrade 100%
Traffic Signal (4055)
Project Limits/Loc: Red Hill Avenue at Service Road
Type Of Work: Traffic Signals
Additional TOW: replace and upgrade traffic signals and equipment
Project Description: Modification and upgrade of existing traffic signal and
equipment at Red Hì1l Avenue and Service Road.
Project Cost:
04/05 05/06 06/07 07/08 08/09 09/10 10/11
C 0 0 200,000 0 0 0 0 200,000 212,200
E 0 10,000 0 0 0 0 0 10,000 10,000
$0 $10,000 $200,000 $0 $0 $0 $0 $210,000 $222,200
Measure M: No
08-Jun-O4
Measure M Growth Management Program
Congestion Management Program
Seven Year Capital Improvement Program (Sorted by Nime)
Fiscal Years 2004/2005 through 20101201 I
9
1"
Agency:
Project Number:
Project Name:
Project LimitslLoc :
Type Of Work :
Additional TOW:
Project Description:
Tustin
100%
$290,000
Red Hill Avenue Widening
Between Melvin Way and 200 feet 9Jutherly
Road Widening
widen width of existing traffic lanes
Widening on easterly side of Red Hil. Sawcut &
removal of edge of pavement & pavement failure areas.
Clearing grubbing & excavation of native material.
Const. of curb & gutter, drive aprons & sidewalk, deep-
lift AC repair, AC resurfacing.
Project Cost:
04/05
05/06
06/07
07/08
08/09
09/10
10111
C 0 0 0 0 0 150,000 0 150,000 173,850
E 0 0 20,000 40,000 0 0 0 60,000 60,000
R 0 0 0 0 80,000 0 0 80,000 90,080
$0 $0 $20,000 $40,000 $80,000 $150,000 $0 $290,000 $323,930
Agency: Tustin
Project Number: n/a Other 50,000 56,340 Tustin Community Redevelopment Agency-South
Project Name: Red Hill Avenue Widening Central
Project LimitslLoc: Between Edinger Avenue and ValenciaAvenue Unfunded 1,800,000 2,028,260 Uncertain Funding
Type Of Work: Road Widening 100% $1,850,000 $2,084,600
Additional TOW: add 2 lanes to existing roadway in proj;:ct limits
Project Description: Widening of right-of-way to 6-lane full maj:>r arterial
standards. This project adds bicycle lanes, raised
median and landscaping, turn lanes at intersections and
modifications to existing traffic.
Project Cost:
04/05 05/06 06/07 07/08 08/09 09/10 10111
C 0 0 0 0 0 1,000,000 0 1,000,000 1,159,000
E 0 0 0 250,000 0 0 0 250,000 250,000
R 0 0 0 0 600,000 0 0 600,000 675,600
$0
$0
$0
$250,000
$600,000
$1,000,000
$0
$1,850,000
$2,084,600
Measure M: No
08-Jun-O4
Measure M Growth Management Program
Congestion Management Program
Seven Year Capital Improvement Program (Sorted by Nlme)
Fiscal Years 2004/2005 through 20 I 0/20 I I
10
~,'Äi
r;¡
~
Agency:
Project Number:
Project Name:
Project Limits/Loc :
Type Of Work :
Additional TOW:
Project Description:
Tustin
nla
Tustin Ranch Road Rehabilitation
Between 1-5 and Bryan Avenue
Road Maintenance
rehabilitation of roadway
Removal and deep-lift repair of pavement failure areas,
cold plane, AC resurfacing, traffic loops ani traffic
striping.
100%
$565,000
Project Cost:
04/05 05/06 06/07 07/08 08/09 09/10 10/11
C 0 500,000 0 0 0 0 0 500,000 515,000
E 50,000 0 0 0 0 0 0 50,000 50,000
$50,000 $500,000 $0 $0 $0 $0 $0 $550,000 $565,000
Agency: Tustin
Project Number: nla
Project Name: Tustin Ranch Road Rehabilitation 100%
Project Limits/Loc: Between Walnut Avenue and 1-5
Type Of Work: Road Maintenance
Additional TOW: rehabilitation of roadway
Project Description: Removal and deep lift repairs of AC pavement failure
areas, cold plane, AC resurfacing, traffic loops and
-~.
Project Cost:
04/05 05/06 06/07 07/08 08/09 09/10 10/11
C 0 0 0 0 580,000 0 0 580,000 653,080
E 0 0 0 50,000 0 0 0 50,000 50,000
$0 $0 $0 $50,000 $580,000 $0 $0 $630,000 $703,080
Measure M: No
08-Jun-O4
11
Agency: Tustin
Project Number: n/a
Project Name: Valencia Avenue Widening
Project Limits/Loc: Between Newport Avenue Extension and Red Hill
Avenue.
Type Of Work: Road Widening
Additional TOW: add 2 lanes to existing roadway in proj:ct limits
Project Description: Widening to 4-lane roadway with mtrlian. Ineludes
improvements at ValencialRed Hill neluding NB and
SB dual left-turn lanes, SB right-turn lane.
Modification oftrafÎic signals at ValencialRed Hill and
ValencialNewport.
Measure M Growth Management Program
Congestion Management Program
Seven Year Capital Improvement Program (Sorted by Name)
Fiscal Years 2004/2005 through 2010/2011
100%
1,712,500
$3,425,000
Tustin Community Redevelopment Agency South
Central
Future Measure "M" Application
1,953,888
$3,907,775
04/05
05/06
06/07
07/08
08/09
10/11
C 0 0 0 0 0 2,125,000 0 2,125,000 2,462,875
E 0 0 50,000 100,000 0 0 0 150,000 150,000
R 0 0 0 0 1,150,000 0 0 1,150,000 1,294,900
Project Cost:
$0
$0
Agency: Tustin
Project Number: n/a
Project Name: Valencia North Loop Road and Annstrong Avenue
(7139)
Within MCAS-Tustin
New Facility
new 6 lane roadway between project linits
Project Description: Construction of roads, ineluding selecttrl utilities for
Valencia North Loop Road from Red Hil Avenue to
Tustin Ranch Road extension. Inch.rles West Connector
Road, Landsdowne Road, and Anmtrong Avenue.
Project Limits/Loc :
Type Of Work :
Additional TOW:
09/10
$50,000
$100,000 $1,150,000 $2,125,000 $0 $3,425,000 $3,907,775
1% 150,000 154,429
0% 30,875 31,787
1% 227,558 234,278 CIP
98% 25,631,005 26,387,874 Uncertain Funding
100% $26,039,438 $26,808,368
Gas Tax
CDBG
General
Unfunded
Project Cost:
04/05 05/06 06/07 07/08 08/09 09/10 lOll 1
C 339,000 25,631,000 0 0 0 0 0 25,970,000 26,738,930
E 69,433 0 5 0 0 0 0 69,438 69,438
$408,433 $25,631,000 $5 $0 $0 $0 $0 $26,039,438 $26,808,368
Total for Tustin $30,491,643 $31,296,000 $29,965,005 $45,137,000 $3,572,000 $5,145,000 $9,500,000 $155,106,648 $164,968,188
Measure M: No