HomeMy WebLinkAboutPACIFIC ST 515 06/25/1992Gly Y •
Community Development Department
June 25, 1992
Mr. John Sauer
515 Pacific Street
Tustin, CA 92680
City Of Tustin
15222 Del Amo Avenue
Tustin, CA 92680
(714) 544-8890
FAX (714) 832-0825
SUBJECT: CERTIFICATE OF APPROPRIATENESS FOR A PROPOSED DECK TO BE
CONSTRUCTED AT THE REAR OF THE RESIDENTIAL STRUCTURE AT
515 PACIFIC STREET
Dear Mr. Sauer:
i
In accordance with Ordinance No. 1001 which was adopted June 20,
1988 by the Tustin City Council, the Community Development Director
has the authority to approve, approve with conditions or deny
Certification of Appropriateness for improvements requiring a City
building permit for property located within a Cultural Resource
District.
The following findings are required before a Certificate of
Appropriateness is issued:
a. The proposed work conforms to the Municipal Code and design
standards which may be established from time to time by the
Cultural Resources Committee.
b. The proposed work does not adversely affect the character of
the District or Designated Cultural Resources within the
District.
C. The proposed work is harmonious with existing surroundings.
The extent of harmony shall be evaluated in terms of
appropriateness of materials, scale, size, height, placement
and use of a new building or structure in relationship to
existing buildings and structures and the surrounding setting.
The Community Development Director has reviewed the proposed deck
to be constructed at the above-mentioned address and has determined
that the proposed deck is in conformance with the above
requirements. The proposed new deck material is consistent with
existing conditions, will be added at the rear of the structure,
will not be visible from the public right-of-way, is not
structurally integrated into the historic fabric of the existing,
Certificate of Appropriateness
515 Pacific Street
June 25, 1992
Page 2
and is an appropriate addition at the rear of the subject single
family dwelling.
The proposed deck is hereby approved subject to the following
condition:
Prior to the start of any roofing work, the applicant shall
obtain a building permit and pay all applicable plan check and
permit fees.
Should you have any questions regarding this matter please feel
free to contact me at (714) 544-8890, extension 273.
Sincerely,
Christine A. Shingleton
Assistant City Manager
00-1
Becky Stone
Assistant Planner