HomeMy WebLinkAboutC ST 140 10/05/1993r
•
sus
Community Development Department
City of Tustin
300 Centennial Way
October 5, 1993 Tustin, CA 92680
Director
(714)573-3106
Planning & Zoning Info.
CERTIFICATE OF APPROPRIATENESS
(714) 573-3140
140 C STREET
RE -ROOFING OF A RESIDENTIAL STRUCTURE
Building
(714) 573-3131
(714)573-3132
Housing
In accordance with Ordinance No. 1001 which was adopted
(714) 573-3117
June 20, 1988 by the Tustin City Council, the Community
Code Enforcement
Development Director has the authority to approve,
(714) 573-3134
approve with conditions or deny Certification of
Appropriateness for improvements requiring a City
Business License
(714) 573-3144
building permit for property located within a Cultural
Resource District.
Inspection Requests
(714)573-3141
The following findings are required before a Certificate
Graffiti Hot Line
of Appropriateness is issued:
(714) 573-3111
a. The proposed work conforms to the Municipal Code
FAX Machine
and design standards which may be established from
(714) 573-3113
time to time by the Cultural Resources Committee.
b. The proposed work does not adversely affect the
character of the District or Designated Cultural
Resources within the District.
C. The proposed work is harmonious with existing
surroundings. The extent of harmony shall be
evaluated in terms of appropriateness of materials,
scale, size, height, placement and use of a new
building or structure in relationship to existing
buildings and structures and the surrounding
setting.
O
Certificate of Appropriateness
140 C Street
Re -roofing of a Residential Structure
October 5, 1993
Page 2
The Community Development Department has reviewed the proposed re-
roofing plans for a residential structure and has determined that
the proposal is in conformance with the above requirements. The
proposed roofing material is similar in.appearance to the existing
material and is appropriate for the subject building. The proposed
work is hereby approved, subject to the following conditions:
1. Prior to the start of any roofing work, the
applicant shall obtain a building permit and
pay all applicable plan check and permit fees.
2. Any replacement or repair of an existing feature of the
roof (ie. facia, gutters, downspout, roof vents,
chimneys) shall match the existing materials, finish and
colors of the existing structure.
CAS:SJP:140CST.coa