HomeMy WebLinkAboutMAIN ST W 425 09/28/1993sY
Community Development Department
September 28, 1993
City of Tustin
300 Centennial Way
Tustin, CA 92680
Director
Mr. Noel Picardal (714) 573-3106
425 West Main Street Planning & Zoning Info.
Tustin, California 92680 (714) 573-3140
Building
SUBJECT: CERTIFICATE OF APPROPRIATENESS FOR THE (714) 573-3131
(714)573-3132
REPLACEMENT OF GARAGE SIDING, THE ADDITION OF A CARPORT,
AND A ROOM ADDITION AT THE REAR OF THE RESIDENTIAL Housing
STRUCTURE AT 425 WEST MAIN STREET. (714) 573-3117
Code Enforcement
(714)573-3134
Dear Mr. Picardal:
Business License
In accordance with Ordinance No. 1001 which was adopted (714) 573-3144
June 20, 1988 by the Tustin City Council, the Community Inspection Requests
Development Director has the authority to approve, (714) 573-3141
approve with conditions or deny Certification of Graffiti Hot Line
Appropriateness for improvements requiring a City (714) 573-3111
building permit for property located within a Cultural
Resource District. FAX Machine
(714)573-3113
The following findings are required before a Certificate
of Appropriateness is issued:
a. The proposed work conforms to the Municipal Code
and design standards which may be established from
time to time by the Cultural Resources Committee.
b. The proposed work does not adversely affect the
character of the District or Designated Cultural
Resources within the District.
C. The proposed work is harmonious with existing
surroundings. The extent of harmony shall be
evaluated in terms of appropriateness of materials,
scale, size, height, placement and use of a new
building or structure in relationship to existing
buildings and structures and the surrounding
setting.
•
Certificate of Appropriateness
425 West Main Street
Page 2
The Community Development Department has reviewed the proposal to
replace the garage siding, construct a carport, and construct an
addition to the rear of the structure at the above mentioned
address and has determined that the proposed work is in conformance,
with the above requirements. The proposed work is hereby approved
subject to the following conditions:
1. All new materials and finishes shall match the.existing
materials and finishes of the existing structure on the
site.
2. All new construction shall be painted to match existing
structures on the site.
Should you have any questions or concerns related to this matter,
please do not hesitate to contact me at (714) 573-3127.
Sincerely,
5 �� Z- 4 ���
Becky C. Stone
Assistant Planner
CAS:BS:br:425main.coa