HomeMy WebLinkAboutB ST S 515 07/24/1995Go'Ty"'�
� ' Community Development Department
July 24, 1995
City of Tustin
300 Centennial Way
Tustin, CA 92680
b. The proposed work does not adversely affect the
character of the District or Designated Cultural
Resources within the District.
C. The. proposed work is harmonious with existing
surroundings. The extent of harmony shall be
evaluated in terms of appropriateness of materials,
scale, size, height, placement and use of a new
building or structure in relationship to existing
buildings and structures and the surrounding
setting.
Director
(714)573-3106
Planning
& Zoning Info.
(714) 573-3140
CERTIFICATE OF APPROPRIATENESS
515 SOUTH 11B11 STREET
Building
(714)573-3131
RE -ROOFING OF A NONCONTRIBUTING RESIDENTIAL GARAGE
(714) 573-3132
Housing
In accordance with Ordinance No. 1001 which was adopted
(714) 573-3117
June 20, 1988 by the Tustin City Council, the Community
Code Enforcement
Development Director has the authority to approve,
(714) 573-3134
approve with conditions or deny Certification of
Appropriateness for improvements requiring a City
Business License
(714) 573-3144
building permit for property located within a Cultural
Resource District.
Inspection Requests
(714)573-3141
The following findings are required before a .Certificate
Graffiti Hot Line
of Appropriateness is issued:
(714) 573-3111
a. The proposed work conforms to the Municipal Code
FAX Machine
and design standards which may be established from
(714) 573-3113
time to time by the Cultural Resources Committee.
b. The proposed work does not adversely affect the
character of the District or Designated Cultural
Resources within the District.
C. The. proposed work is harmonious with existing
surroundings. The extent of harmony shall be
evaluated in terms of appropriateness of materials,
scale, size, height, placement and use of a new
building or structure in relationship to existing
buildings and structures and the surrounding
setting.
Certificate of
515 South "B"
July 24, 1995
Page 2
Appropriateness
Street
The Community Development Director has reviewed the re -roofing
proposal for the flat roof of the subject residential garage and
has determined that the proposal is in conformance with the above
requirements. The proposed rock/built-up roofing material is
similar in appearance to the existing material and is appropriate
for the subject garage building. Furthermore, the garage is at the
rear of the subject property and is not visible from the public
right-of-way. The proposed work is hereby approved, subject to the
following conditions:
1. Prior to the start of any roofing work, the applicant
shall obtain a building permit and pay all applicable
plan check and permit fees.
2. Any replacement or repair of an existing feature of the
roof (ie. facia, gutters, downspout, roof vents,
chimneys) shall match the existing materials, finish and
colors of the existing structure.
Christine A. P4ingleton
Assistant Cit Manager
CAS:sr:515SOB.COA