HomeMy WebLinkAboutPASADENA AVE 270 09/29/1995Community p p Development Department
September 29, 1995
City of Tustin
CERTIFICATE OF APPROPRIATENESS
270 PASADENA AVENUE
RE -ROOFING OF A NON-CONTRIBUTING RESIDENTIAL STRUCTURE
300 Centennial Way
Tustin, CA 92680
In accordance with Ordinance No. 1001 which was adopted
June 20, 1988 by the Tustin City Council, the Community
Development Director has the authority to approve,
approve with conditions or deny Certification of
Appropriateness for improvements requiring a City
building permit for property located within the Cultural
Resource District.
The following findings are required before a Certificate
of Appropriateness is issued:
a. The proposed work conforms to the Municipal Code
and design standards which may be established from
time to time by the Cultural Resources Committee.
b. The proposed work does not adversely affect the
character of the District or Designated Cultural
Resources within the District.
C. The proposed work is harmonious with existing
surroundings. The extent of harmony shall be
evaluated in terms of appropriateness of materials,
scale, size, height, placement and use of a new
building or structure in relationship to existing
buildings and structures and the surrounding
setting.
Director
(714)573-3106
Planning & Zoning Info.
(714)573-3140
Building
(714)573-3131
(714)573-3132
Housing
(714)573-3117
Code Enforcement
(714)573-3134
Business License
(714)573-3144
Inspection Requests
(714) 573-3141
Graffiti Hot Line
(714)573-3111
FAX Machine
(714)573-3113
0 1 •
Certificate of Appropriateness
270 Pasadena Avenue
September 29, 1995
The Community Development Department has reviewed the proposed re-
roofing plans for the non-contributing residential structure at 270
Pasadena and has determined that the proposal is in conformance
with the above requirements. The proposed tan Class A composition
shingle roofing material is similar to the previously used
composition roofing material and is appropriate for the subject
building. The proposed work is hereby approved, subject to the
following conditions:
1. Prior to the start of any roofing work, the applicant
shall obtain a building permit and pay all applicable
plan check and permit fees.
2. Any replacement or repair of an existing feature of the
roof (i.e. facia, gutters, downspout, roof vents,
chimneys) shall match the existing materials, finish and
colors of the existing structure.
Christine A. S gleton
Assistant City Manager
KS:270pasa.ltr