HomeMy WebLinkAboutPACIFIC ST S 185 01/16/1996G�rCY �
Community Development Department,
City of Tustin
January 16, 1996
300 Centennial Way
Tustin, CA 92680
Director
(714)573-3106
CERTIFICATE OF APPROPRIATENESS Planning & Zoning Info.
(714) 573-3140
185 SOUTH . PACIFIC . STREET
RE -ROOFING OF A NON-CONTRIBUTING RESIDENTIAL STRUCTURE
Building
(714)573-3131
(714)573-3132
In accordance with Ordinance No. 1001 which was adopted
Housing
June 20, 1988 by the Tustin City Council, the Community
(714) 573-3117
Development Director has the authority to approve,
approve with conditions or den Certification of
PP y
Code Enforcement
(714) 573-3134
Appropriateness for improvements requiring a City
building permit for property located within the Cultural
Business License
Resource District.
(714) 573-3144
The following findings are required before a Certificate
Inspection Requests
(714)573-3141
of Appropriateness is issued:
Graffiti Hot Line
a. The proposed work conforms to the Municipal Code
(714)573-3111
and design standards which may be established from
FAX Machine
time to time by the Cultural Resources Committee.
(714)573-3113
b. The proposed work does not adversely affect the
character of the District or Designated Cultural
Resources within the District.
C. The proposed work is harmonious with existing
surroundings. The extent of harmony shall be
evaluated in terms of appropriateness .of materials,
scale, size, height, placement and use of a new
building or structure in relationship to existing
buildings and structures and the surrounding
setting.
Certificate of Appropriateness
185 South Pacific Street
January 16, 1996
The Community Development Department has reviewed the proposed re-
roofing plans for the non-contributing residential structure at 185
South Pacific Street and has determined that the proposal is in
conformance with the above requirements. The proposed 50 year
minimum Class B fiber cement roofing material (Maxitile) is
appropriate for the subject non-contributing building. The
proposed work is hereby, approved, subject to the following
conditions:
1. Prior to the start of any roofing work, the applicant
shall obtain a building permit and pay all applicable
plan check and -permit fees.
2. Any replacement or repair of an existing feature of the
roof (i.e. facia, gutters, -downspout, roof vents,
chimneys) shall match the existing materials, finish and
colors ofthe existing structure.
644_ _ , 4�
Christine A. Shingleton
Assistant City Manager
SR:180spaci.coa