HomeMy WebLinkAboutEL CAMINO REAL 180 02/27/1997GMTV O
vs�(� Community Development Department
February 27, 1997
CERTIFICATE OF APPROPRIATENESS
180 EL CAMINO REAL
DETACHED ENTRY STRUCTURE
City of Tustin
300 Centennial Way
Tustin, CA 92780
(714) 573-3100
In accordance with Ordinance No. 1001 which was adopted June 20,
1988 by the Tustin City Council, the Community Development Director
has the authority to approve, approve with conditions or deny
Certification of Appropriateness for improvements requiring a City
building permit for property located within a Cultural Resource
District.
The following findings are required before a Certificate of
Appropriateness is issued:
a. The proposed work conforms to the Municipal Code and
design standards which may be established from time to
time by the Cultural Resources Committee.
b. The proposed work does not adversely affect the character
of the District or Designated Cultural Resources within
the District.
C. The proposed work is harmonious with existing
surroundings. The extent of harmony shall be evaluated
in terms of appropriateness of materials, scale, size,
height, placement and use of a new building or structure
in relationship to existing buildings and structures and
the surrounding setting.
Certificate of Appropriateness
180 E1 Camino Real
February 27, 1997
The Community Development Department has reviewed the proposed
plans for a detached entry structure in conjunction with a
restaurant and tea house use and has determined that the proposal
is in conformance with the above requirements. The proposed
design, materials and colors are similar in appearance to the
elements included on the, exterior elevations of the existing
structure and is appropriate for the subject building. The
proposed work is hereby approved, subject to the following
conditions:
1. Prior to.the start of any construction, the applicant
shall obtain a building permit and pay all applicable
plan check and permit fees.
2. The stucco color and wooden support posts shall be
painted to match the color and texture of the main
structure.
3. A separate sign permit shall be submitted for review and
approval of the Community Development Department.
Elizabeth A. Binsack
Community Development Director
EAB:SJP:180ELCam.COA