HomeMy WebLinkAboutMAIN ST W 345 01/15/1999CJ® O101,
Community Development Department
- City .of Tustin
January 15, 1999 300 Centennial Way
Tustin, CA 92780
CERTIFICATE OF APPROPRIATENESS (714) 573-3100
345 West Main Street
PARTIAL REROOF OF AN EXISTING HOUSE
In accordance with Ordinance No. 1001 which was adopted June 20, 1988 by the Tustin City Council, the
Community Development Director has the authority to approve, approve with conditions or deny Certificates of
Appropriateness for improvements requiring a City building permit for property located within a Cultural
Resource District. The proposed project includes:
1. The removal of a composition shingle roof and replacement with like materials on the detached
garage and original portion of an existing house; and,
2. The tear off and replacement of a built up flat roof section on the same house.
The structure is a "C" rated Dutch Colonial Revival structure per the Tustin Historical Resources Survey.
The Community Development Department finds and determines as follows:
A. The proposed work conforms to the Municipal Code and any applicable design standards in that in
accordance with TCC Section 8103(m) the proposed roof is a minimum Class B roof covering
assembly. It actually is a Class A roof covering assembly.
B. The proposed work does not adversely affect the character of the District or Designated Cultural
Resources within the District in that the proposed roof replaces a dilapidated roof with one of the same
style, appropriate for a Dutch Colonial Revival structure.
C. The proposed work is harmonious with existing surroundings in that the new roof is consistent with the
style of the existing roof, and the structure "C" rated Dutch Colonial Revival structure.
The proposed work is hereby approved, subject to the following conditions:
Prior to the start of any work, the applicant shall obtain a building permit and pay all applicable plan
check and permit fees.
2. Any replacement or repair of any existing features surrounding the roof shall match the existing
materials, finish and colors of the existing structure.
Elizabeth A. Binsac
Community Development Director
B E 345wesUnaincoa. doc