HomeMy WebLinkAboutEL CAMINO REAL 300 10/07/20040 0
Community Development Department
October 7, 2004 City of Tustin
300 Centennial Way
CERTIFICATE OF APPROPRIATENESS Tustin, CA 92780
300 El Camino Real 714.573.3100
REROOF OF A NON -RATED CONTRIBUTING STRUCTURE
In accordance with Ordinance .No. 1001 which was adopted June 20, 1988, by the Tustin City Council, the
Community Development Director has the authority to approve, approve with conditions, or deny Certificates
of Appropriateness for improvements requiring a City building permit for property located within a Cultural
Resource District. The proposed project includes the installation of a GAF Built -Up "A" rated base sheet
roofing with a 10 year rating. As the building is not included with the Tustin Historical Survey, the
structure is considered a non -rated contributing structure.
The Community Development Department finds and determines as follows:
A. The proposed work conforms to the Municipal Code and any applicable design standards in that in
accordance with TCC Section 8103 (m) the proposed roof is a class A covering assembly.
• B. The proposed work does not adversely affect the character of the District or Designated Cultural
Resources within the District in that the proposed reroof installation is necessary to ensure the continued
protection and inteirity of the commercial structure In the commercial building's staggered upper roof,
_g� pP
the reroof will consist of one (1) laver base sheet overlaid with three 3) layers of Ply 41 sheeting _ g and
flood coated with asphalt mixed with rock For the building's lower roof, the existini roof will be
entirely removed and reroofed with one laver base sheet overlaid with three layers of Ply 4 plysheeting
and flood coated with asphalt mixed with rock
C. The proposed work is harmonious with existing surroundings in that the proposed reroof is consistent
with the existing built-up roofing and appropriate for the style of the building.
The proposed work is hereby approved, subject to the following conditions:
1. Prior to the start of any work, the applicant shall obtain a building permit and pay all applicable plan
check and permit fees.
2. Any replacement or repair of any existing features surrounding the roof shall match the existing
materials, finish, and colors of the existing structure.
3. Vent pipes and stacks that protrude through the roof shall match the color of the roof material.
C'
Elizabeth A. Binsack
Community Development Director
S:\Cdd\Reuben\C of A\300 EI Camino Realt.doc