HomeMy WebLinkAboutMAIN ST W 340 04/14/2005• i
SOT �is.��� Community Development Department
Cott' ®f Tustn
300 Centennial Way
Tustin, CA 92780
APRIL 14, 2005 714.573.3100
CERTIFICATE OF APPROPRIATENESS
340 W. MAIN STREET
REPLACEMENT OF AN EXTERIOR CIRCUIT BOARD ON A "B" RATED CRAFTSMAN STYLE
RESIDENTIAL STRUCTURE
In accordance with Ordinance No. 1001 which was adopted June 20, 1988, by the Tustin City Council, the
Community Development Director has the authority to approve, approve with conditions, or deny
Certificates of Appropriateness for improvements requiring a City building permit for property located
within a Cultural Resource District. The proposed project involves the replacement of a 40 amp electrical
circuit panel located in a rear yard which is not visible from the public right-of-way. No other external
changes are proposed.
The Community Development Department finds and determines as follows:
A. The proposed work conforms to the Municipal Code and any applicable design standards in that
the replacement of a circuit board would not change the building's architecture. Moreover, the
work performed shall be required to adhere to the City of Tustin's Building Code requirements.
B. The proposed work does not adversely affect the character of the District or Designated Cultural
Resources within the District in that the installation of a 40 amp electrical circuit panel will replace
the existing exterior circuit panel on the rear elevation of an existing single family dwelling.
C. The proposed replacement of a circuit board is not expected to detract or conflict with the external
architecture of the building or existing surrounding uses.
The proposed work is hereby approved, subject to the following conditions:
Prior to the start of any work, the applicant shall obtain a building permit and pay all applicable plan
check and permit fees for replacement of an existing electrical circuit panel with a new 40 amp
electrical circuit panel.
2. Any replacement or repair of any existing features shall match the existing materials, finish, and
colors of the existing exterior structure.
Elizabeth A. Binsack
Community Development Director
S:\Cdd\Chad\C ofA\Main 340.doc
0 0
Al,
A r