HomeMy WebLinkAboutC ST S 305 10/04/11i
REROOF AREA INDICATED WITH LIGHT SHADING
WITH CLASS "A" 3 -TAB SHINGLES
25 YEAR "ROYAL SOVEREIGN'
IN "SLATE" BY GAF/ELK ICC ESR -1475
DECK FAIR
REMOVE AND REPLACE ROTTEN DECK ELEMENTS
AND LEAD LADEN FINISH MATERIALS WITH IN KIND
REPLACEIvENT&
." J- WSW
(iron Runny Deve�opnWW oepa byagg
A$ft a: 3° s S • "C " S—r ¢cer
Ptapa..a wmk __ ge- R oo F 9-6TwFN t> -- c ac
E=�1 c��y-r5 L At^ --A A 1--k
iteQ11oawua r«a Wish"
_a11M ID N 103
a arm. t�,e.e in m. cw;
yft )qw.tZa�icR
f%a A
a► *oau am MAN oftw" Mo. taw. enConmMawq parwopmwy Daowna at but
•ne a�xnn« opt:
Tti txaoaa d wont eon,. ""COW Coa.Ona 000* 1y0 dallp
etas wft it t eaeta.
4Y
TIN WWO-awork do- -wkwa*eon "«Mr.w►ofN.ar t«
Du*m tea Cu@aal palmuop "W„ ft dW&ta.
Th. wovoa.a MRMk s taMmwaow MAS+ .WV aa.u.* pa et tamr of
.ppraw�atw�es. d , mMala..lst. A.kp+t. triarn.nt. ana.aa ae a nw
tnAtdup w °'n1Wa! N to nWp to aa0 !, b19aFl0, ow Mumma" etta .
.vrourWrq wAeirq. -
Daft
PeTCO. �'�.43
NORTH SITE PLAN
NOT TO SCALE
dc
LL
PUL
cc
Loix
Q
M
`b
lr=,l
PROFESSIONAL SEAL
4cf/p,to
ooh T p4 ?011
svl , � �(ppNj�NT
jvjSj6N
SITE PLAN
FIE NAME 1} -47 -site
MLESTONESt
REVISIONS:
A .
RE -ROOFING PERMIT APPLICATION
QUESTIONNAIRE
PLEASE ANSWER THE FOLLOWING QUESTIONS
JOB ADDRESS: ..Y1 5 SC�(J '1 G �t• -
1. Does this application constitute any change in type
of material from existing construction?
2. Indicate type of existing roofing material
3. Answer the following questions (for new roof)
Via
a. Type of material S►ng O h Dow r,
b. Manufacturers name and mode C r
c. Testing approval agency name and approval number I (ICBG report #)
d. Weight of material per square foot BE VCXiF160
2.2• 16r./* Very' e�+
4. New roofing material to be installed as follows: (check one)
a. Over existing roofing material
b. Installing new underlay material
I f answer to "a" is yes, proceed to following questions.
5. Is the additional weight on roof structure more than 4psf? (assuming existing material is 3pfs
or less such as wood shakes, shingles and composition shingles)
6. Is a new built up roofing material to be applied over existing roofing in a commercial building?
7. If the answer to question No. 5 or 6 is yes, then provide the following:
/c,,, /v r a s
a. A drawing which shows roof slope and the framing of all rafters and roof support members.
b. Size, span, and location of all supporting roof rafters and shear walls.
c. Engineering calculations justifying the structure for additional weight.
d. Drawing and calculations signed by California Registered Civil Engineer, Structural Engineer or Architect.
YES _ NOY
t
YES XNO _
YES—NO—
YES
ES _ NO _
YES_NO'L'K
YES_NO
NOTE: 1. Effective January 1, 2010, reroofing of flat roof greater that 2000 sq/ft or more than 50% of
the total roof area, shall comply with the cool roof requirements of the State of California
Title 24 Energy Efficiency Standards.- Initial -------
2. All new roofing material shall be class B or better per City of Tustin Ordinance number
8103 ft Except in high fire hazard zone as determined by Orange County Fire Authority
and Planning Division where a minimum Class A is required. Initial ------;�
Submitted by:
Signature:
ro / FoX
Date:
Plan (tKecicVl Date rev 03/25/10