HomeMy WebLinkAbout12 AUTHORIZE ADVERTISEMENT FOR BIDS FOR THE CONSTRUCTION OF TUSTIN LIBRARY RESTORATION PROJECT CIP 10080Agenda 4 AGENDA REPORT Ree eid: 12 v City Manager Finance Director MEETING DATE: DECEMBER 19, 2017 TO: JEFFREY C. PARKER, CITY MANAGER FROM: DOUGLAS S. STACK, DIRECTOR OF PUBLIC WORKS \ CITY ENGINEER SUBJECT: AUTHORIZE ADVERTISEMENT FOR BIDS FOR THE CONSTRUCTION OF TUSTIN LIBRARY RESTORATION PROJECT (CIP No. 10080) SUMMARY On March 31, 2017, the County of Orange discovered a water leak at the Tustin Library. Preliminary abatement occurred following the discovery and extensive repairs are needed. The bid documents are complete for the Tustin Library Restoration Project, CIP No. 10080, and the project is ready to be advertised accordingly. Bid documents consist of the original plans and specifications approved by the City Council prior to construction of the library and the damage assessment report completed by Young and Associates, the City's insurance carrier claim adjustor's building damage assessment consultant. RECOMMENDATION It is recommended that the City Council approve the bid documents, authorize the advertisement for construction of the Tustin Library Restoration Project CIP No. 10080, and authorize the City Clerk to advertise to receive bids. FISCAL IMPACT A budget appropriation of $225,000 was set aside as a preliminary measure for restoration efforts in the Fiscal Year 2017-2018 Capital Improvement Program. Pursuant to the damage assessment, the scope of work and estimate is based on returning the premises to its pre -loss condition utilizing materials of like -kind and quality. The preliminary estimate of probable cost to repair the damage is $1,116,129.00. Full cost recovery is expected through the City's insurance coverage. The estimate includes overhead and profit, the use of prevailing wages for all tradesmen, and coordination, on-site supervision and general conditions. Once bids are received, a revised budget appropriation will be prepared for Council authorization and award. CORRELATION TO THE STRATEGIC PLAN The recommended actions contribute to the fulfillment of the City's Strategic Plan Goal B, Public Safety and Protection of Assets. BACKGROUND On April 21, 2009, the City Council approved a long-term lease agreement with the County of Orange for the Tustin Library. Since the execution of the Tustin Library Lease on May 19, 2009, the County of Orange has been responsible for the operations and maintenance of the Tustin Library. On April 6, 2010, the City completed construction of the 31,500 square foot facility. The single story building is founded on a slab on grade with a large portion of the slab depressed 18" and covered with a steel raised accessible floor. The utilities for the facility are routed below the carpeted raised Tustin Library Restoration Project December 19, 2017 Page 2 floor of the library providing heating and cooling through locally controlled variable air volume (VAV) boxes with ductwork and registers at the floor. Much of the electrical and control wiring are located below the raised floor. On March 31, 2017, a leak was discovered by the County of Orange that originated from the water supply for the Heating Ventilation and Air Conditioning system under the raised floor. The County utilized an existing contract with COIT to assist in the initial response. Over the course of approximately eight (8) weeks, COIT removed an estimated 125,000 gallons of water, repaired the pipe and remediated the standing water. During the County's abatement efforts, City staff contacted the City's insurance carrier (California Insurance Pool Authority) and they immediately assigned an adjuster to assist with the analysis. On May 25, 2017, the insurance adjuster contacted a building damage assessment consultant, Young & Associates, to determine the extent of the damage to the facility. On September 19, 2017, the City received the damage assessment report from the insurance adjuster and their team. The City retained LPA, Inc. to assist with the review and establishment of bid documents for the repairs. The scope of work includes, but is not limited to, the removal of the carpet and raised floor panels to access the repair areas, replacement of some raised floor pedestals, replacement of various electrical/electronic components, control wiring to the VAV boxes, replacing flex ducting, replacing piping insulation, and extensive cleaning. City Staff and LPA have completed their review of the project, a bid package has been prepared, and the project is ready to bid. The tentative schedule for construction of the project is as follows: Authorization to Advertise for Bids..................................................................12/19/2017 First Legal Advertisement...............................................................................01/04/2018 Second Legal Advertisement..........................................................................01/11/2018 BidOpening...................................................................................................02/06/2018 Award of Contract...........................................................................................02/20/2018 Start Construction..........................................................................................03/05/2018 Complete Construction...................................................................................06/05/2018 It is recommended that the City Council authorize the advertisement for the Tustin Library Restoration Project CIP No. 10080, and authorize the City Clerk to advertise to receive bids. Stack, P.E. Public Works/City Engineer SACity Council Items\2017 Council Item s\ 12-19-201 7\Authorization to Bid Library Renovation\Authorization to Bid the Library Renovations Project DSS.docx