Loading...
HomeMy WebLinkAbout09 ADOPT RESOLUTION NO. 18-07 - ACCEPT IMPROVEMENTS FOR THE DETENTION BASIN LANDCAPING & WATER QUALITY INSTALLATION (CIP 50038 & 20077)• Agenda Item 9 6 AGENDA REPORT Reviewed: City Manager Finance Director MEETING DATE: FEBRUARY 6, 2018 TO: JEFFREY C. PARKER, CITY MANAGER FROM: DOUGLAS S. STACK, DIRECTOR OF PUBLIC WORKS/CITY ENGINEER SUBJECT: ADOPT RESOLUTION NO. 18-07 TO ACCEPT IMPROVEMENTS FOR THE DETENTION BASIN LANDSCAPING AND WATER QUALITY INSTALLATION (CIP NO. 50038) AND TUSTIN LEGACY LINEAR PARK IMPROVEMENTS (CIP NO. 20077) SEGMENT 1 AND 2 CONSTRUCTION PROJECT AND AUTHORIZE THE CITY ENGINEER TO FILE A NOTICE OF COMPLETION SUMMARY Construction of the Detention Basin Landscaping and Water Quality Installation (CIP No. 50038) and Tustin Legacy Linear Park Improvements (CIP No. 20077) Segment 1 and 2 Construction Project has been completed to the satisfaction of the City Engineer and is now ready for City Council acceptance. RECOMMENDATION It is recommended that the City Council take the following actions: Adopt Resolution No. 18-07 accepting the construction of the Detention Basin Landscaping and Water Quality Installation (CIP No. 50038) and Tustin Legacy Linear Park Improvements (CIP No. 20077) Segment 1 and 2 Construction Project; and 2. Authorize the City Engineer to execute and file the Notice of Completion with the Orange County Recorder's Office. FISCAL IMPACT The final construction cost for the Detention Basin Landscaping and Water Quality Installation (CIP No. 50038) and Tustin Legacy Linear Park Improvements (CIP No. 20077) Segment 1 and 2 Construction Project is $5,137,001.79, including authorized contract change orders in the amount of $647,521.76. Two notable changes during the course of construction included a change in the utility electrical power point of connection for the monument signage pursuant to Southern California Edison and the installation of 90 feet of 48" reinforced concrete storm drain pipe and headwall outlet structure to the basin, originally included within the Red Hill Widening Project. The cost for these two modifications were $176,080 and $189,017, respectively. Sufficient funds were budgeted and appropriated in the Capital Improvement Program. The project is partially funded by the OCTA Measure M2 Environmental Cleanup Program Grant, in the amount of $824,687.50 and the City is required to provide a match amount of $444,062.50. CORRELATION TO THE STRATEGIC PLAN The Detention Basin Landscaping and Water Quality Installation and Tustin Legacy Linear Park Improvements contribute to the fulfillment of the City's Strategic Plan Goal A: Economic and Notice of Completion for Detention Basin and Linear Park Landscaping February 6, 2018 Page 2 Neighborhood Development. Specifically, the project implementation of Strategy 1, which among other items, is to develop critical phases of Tustin Legacy. DISCUSSION The detention basin project consists of landscaping, irrigation and water quality installation and Segments 1 and 2 of the linear passive park in and around the detention basin consists of general clearing and grubbing, grading, construction of trails and amphitheater, lighting, park amenities, landscape improvements and Tustin Legacy monument sign installation at the corner of Barranca Parkway and Red Hill Avenue. Construction of the project is deemed complete to the satisfaction of the City Engineer and is now ready for City Council acceptance. Segments 3 and 4 of the linear park from the detention basin to Armstrong Avenue including the parking area landscape and park improvements will be constructed at a later date in conjunction with the Flight Development project. Lincoln Properties is developing Phase 1 of Flight at Tustin Legacy, a 400,000 -square -foot creative office campus which invites collaborative, non-traditional workspaces. Flight will feature several amenities, including a market food hall with chef -driven food and beverage concepts, a 6,000 -square -foot conference center for meeting and special events, and direct access to Tustin Legacy Park creating a dynamic indoor/outdoor environment. /L Douglas 7. Stack, P.E. Dict r f Public Works/City Engineer Attachment(s): 1. Resolution No. 18-07 2. Location Map S:Zty Council te- 018 Council Ito-M-06-201MOC -Detention Basin (CIP 50038) & Linear Park (CIP 20077) LandscapinglNOC Detention Basin (CIP 50038) & Linear Park (CIP 20077) Landscaping.ri ATTACHMENT Resolution No. 18-07 RESOLUTION NO. 18-07 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUSTIN, CALIFORNIA, ACCEPTING THE WORKS OF IMPROVEMENT AND AUTHORIZING THE RECORDATION OF THE NOTICE OF COMPLETION FOR THE DETENTION BASIN LANDSCAPING AND WATER QUALITY INSTALLATION (CIP NO. 50038) AND TUSTIN LEGACY LINEAR PARK IMPROVEMENTS (CIP NO. 20077) SEGMENT 1 AND 2 CONSTRUCTION PROJECT WHEREAS, KASA Construction, Inc., having a contract with the City of Tustin to construct the hereinafter described public works and improvement; and WHEREAS, the City Engineer has duly certified to the construction and completion of said public improvement hereinafter mentioned in a manner satisfactory to the City Council of the City of Tustin; and WHEREAS, the City Council finds that said contractor has completed said public improvement hereinafter more particularly described in accordance with the provisions of the contract documents and the Notice of Completion, and acceptance of said public works and improvement should be filed and payment of the balance due said contract authorized in accordance with the contract documents; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Tustin that said public works and improvement is found to be complete, and the same is hereby accepted. Said public works and improvement is more particularly described as follows: Detention Basin Landscaping and Water Quality Installation (CIP No. 50038) and Tustin Legacy Linear Park Improvements (CIP No. 20077) Construction Project BE IT FURTHER RESOLVED that the City Engineer of the City of Tustin is hereby authorized to execute and file a Notice of Completion for the acceptance of said public works and improvement described herein as required by law. PASSED AND ADOPTED at a regular meeting of the City Council of the City of Tustin held on the 6t" day of February, 2018. Elwyn A. Murray, Mayor ATTEST: ERICA N. RABE City Clerk STATE OF CALIFORNIA ) COUNTY OF ORANGE ) SS CITY OF TUSTIN ) I, ERICA N. RABE, City Clerk and ex -officio Clerk of the City Council of the City of Tustin, California, do hereby certify that the whole number of the members of the City Council is five; that the above and foregoing Resolution No. 18-07 was duly and regularly passed and adopted at a regular meeting of the City Council held on the 6t" day of February, 2018 by the following vote: COUNCILMEMBER AYES: COUNCILMEMBER NOES: COUNCILMEMBER ABSTAINED: COUNCILMEMBER ABSENT: ERICA N. RABE, City Clerk ATTACHMENT 2 Location Map LOCATION MAP Tustin Legacy Linear Park Grading Project from Barranca Pkwy/Red Hill Ave to Armstrong Ave TUSTIN LEGACY TUSTIN RANCH f PROJECT LOCATION Tustin Legacy Linear Park Grading Project from Barranca Parkway / Red Hill Avenue to Armstrong Avenue (CIP No. 20077) FILE: Tustin Legacy Linear Park Grading Project.dwg AGF PROJECT i n�n-rinnl NO SCALE