Loading...
HomeMy WebLinkAbout01 DRAFT RED HILL AVENUE SPECIFIC PLAN - PRESENTATION OF FINAL DRAFT PLAN (COMMUNITY WORKSHOP #3)Agenda Item Reviewed: AGENDA REPORT City Manager ' Finance Director ,..,N/A MEETING DATE: FEBRUARY 20, 2018 TO: JEFFREY C. PARKER, CITY MANAGER FROM: COMMUNITY DEVELOPMENT DEPARTMENT SUBJECT: DRAFT RED HILL AVENUE SPECIFIC PLAN — PRESENTATION OF FINAL DRAFT PLAN (COMMUNITY WORKSHOP #3) BACKGROUND & DISCUSSION: In March 2016, the City embarked upon the process of developing a Specific Plan for Red Hill Avenue with the goal of promoting revitalization within the existing commercial district. Since project initiation, the City has held two (2) community workshops where the public was invited to participate and the overall "vision" and goals and objectives were developed for the area. The "vision" created from this input was refined through subsequent meetings and discussions between Kimley-Horn & Associates and City staff, and was used as the basis for the preparation and completion of a Draft Specific Plan and Draft Environmental Impact Report for the project area. The proposed Red Hill Avenue Specific Plan project area includes approximately 36 acres of land adjacent to Red Hill Avenue and includes the portion of Red Hill Avenue bordered by Bryan Avenue to the north and Walnut Avenue to the south, bisected by Interstate 5 (1-5) (Attachment 1). The Draft Red Hill Avenue Specific Plan calls for a greater mix of uses within the Specific Plan area. The Specific Plan uses will introduce residential uses to the area and increase pedestrian -oriented retail and commercial uses. In keeping with the aspirations of the community, greater emphasis will be placed on the pedestrian and bicyclist, in addition to the needs of the automobile and public transit, in allocating the use of the space within the public rights-of-way. A greater variety of activities along the street is encouraged through the development of either horizontal or vertical mixed -uses that reinforce pedestrian orientation. Overall, the Plan area includes approximately 296,446 square feet of existing non- residential uses (primarily commercial) and 21 dwelling units. The Specific Plan's Draft Program Environmental Impact Report (EIR) evaluates an additional 500 dwelling units and an additional 325,000 square feet of non-residential uses as a threshold of development intensity within the Specific Plan area. The total development in the Specific Plan area anticipated with the build out potential of the Specific Plan in addition February 20, 2018 Draft Red Hill Avenue Specific Plan Page 2 to the existing development is 521 dwelling units and 621,446 of non-residential development. Upon approval, the Draft Red Hill Avenue Specific Plan will become the regulatory planning document that sets forth the vision with goals and objectives to achieve that vision, as well as development standards and design criteria that will become the basis for future development in the area. The Executive Summary contained within Chapter 1 the Specific Plan highlights the overall objective of the Plan and is attached for your reference as Attachment 2. In addition to the release of the Draft Specific Plan, the Draft Program EIR, analyzing the potential impacts of the Specific Plan project, was released for public review on February 1, 2018. The required 45 -day public review period for the Draft EIR will conclude on March 19, 2018. Once all the comments have been compiled and responses prepared, they will be incorporated in the Final Program EIR. Public hearing(s) for the Final Specific Plan and Final Program EIR are anticipated to take place before the Planning Commission and City Council in April and May 2018, respectively. At the workshop, the following topics will be discussed: • Specific Plan Process • Specific Plan Overview o Vision o Land Use o Development Regulations o Design Criteria o Public Improvements • Pending Red Hill Avenue Mixed Use Project • Environmental Clearance • Public Outreach • Next Steps Public notification for the Community Workshop included an individual mailing of public notices to approximately 3,100 individuals which included property owners and occupants within the project area and within a 500 -foot radius surrounding the area. A Notice of Availability for the Draft Environmental Impact Report was also included in the mailing. In addition, the Business Industry Association (BIA) and local and regional stakeholders were also notified and the City posted the same information on the City's website and at City Hall. February 20, 2018 Draft Red Hill Avenue Specific Plan Page 2 Erica H. Demko icz, AIC Senior Planner Attachment(s): Elizabeth A. Binsack Community Development Director 1. Exhibit 2 — Specific Plan Area Map 2. Red Hill Avenue Specific Plan Executive Summary & Introduction ATTACHMENT 1 Exhibit 2 — Specific Plan Area Map Project Boundary EXHIBIT 2: Specific Plan Area Red Hill Avenue Specific Plan HIGH M �s SCH 0 240 480 mmmmm== Feet ATTACHMENT 2 Red Hill Avenue Specific Plan Executive Summary & Introduction RED HILL AVENUE TUSTIN �� � ■Rru REDHIL' UESPECIFIC PLAN SPECIFIC PLAN� 1. Executive Summary and Introduction 1.1 Executive Summary The Red Hill Avenue Specific Plan (RHASP) focuses on the commercial area north and south of the existing Interstate 5 freeway in the City of Tustin. The Specific Plan area is comprised of approximately 36 acres of land (approximately 52 acres including road right -of way) adjacent to Red Hill Avenue, a northeast - to southwest -trending arterial roadway located near the geographical center of the City. Red Hill Avenue is primarily a vehicular corridor developed with a mixture of retail stores and restaurants within traditional shopping centers that are not meeting their full potential to serve the community. The RHASP calls for a greater mix of uses within the Specific Plan area. In keeping with the aspirations of the community, greater emphasis will be placed on the pedestrian and bicyclist, in addition to the needs of the automobile and public transit, in allocating the use of space within the public rights-of-way. Adding residential uses and increasing pedestrian -oriented retail and commercial uses will help create a more dynamic, eclectic, and attractive place for both residents and visitors. A greater variety of activities along the street is encouraged through the development of either horizontal or vertical mixed -uses that reinforce pedestrian orientation. This regulatory planning document sets forth a vision with goals and objectives to achieve that vision, as well as development standards and design criteria that will become the basis for future development. 1.2 Overview 1.2.1 Location and Setting The City of Tustin is in central Orange County, bordered by the Cities of Irvine and Santa Ana to the south and west respectively, the City of Orange and unincorporated County of Orange areas to the north; and on the east by the City of Irvine and unincorporated County of Orange territory as illustrated in Exhibit 1-1, Regional Vicinity Map. The City of Tustin is located approximately two miles north of Orange County's John Wayne Airport and is transected by two major regional freeways: Interstate 5 (1-5) and State Route 55 (SR -55). The RHASP area is located in central Tustin, east of Old Town, and southwest of the Tustin Ranch development. Exhibit 1-2, Specific Plan Area, illustrates the Specific Plan area, which is comprised of approximately 36 acres of land (approximately 52 acres including road right -of way). The Specific Plan area includes properties on both sides of Red Hill Avenue, a northeast- to southwest -trending arterial roadway, and is bisected by the 1-5 Freeway. It extends along Red Hill Avenue to Bryan Avenue to the northeast, and generally Walnut Avenue to the southwest. Chapter 1 • Introduction January 2078 • Draft • 1-1 iTUSTIN RED HILL AVENUE .4130 RFD HIUE SPECIFIC PLAN SPECIFICFIC PLAN SANTA ANA v Project TUSTIN Location v to Q e Santa Ana Zoo 0 San Diego Source: Google Map; 2017 NORTHWOOD IRVINE Exhibit 1-1 Regional Vicinity Map 7-2 • Draft • January 2078 Chapter 7 • Introduction RED HILLAVENUE SPECIFIC PLAN Project Boundary TUSTIN 7�..�,.�., RED HILLAVENUE SPECIFIC PLAN 0 240 480 Feet Exhibit 1-2 Specific Plan Area Chapter 7 • Introduction January 2078 • Draft • 7-3 :4.9 RED HILL AVENUE =' 1! F�. ti RED IFIC PLA UE SPECIFIC PLAN SPECIFIC PLAN 1.3 Historical Context Red Hill Avenue is named after a relatively well-known Tustin historical landmark—a hill only 347 feet high and 1,000 feet long with rust -colored outcroppings. American Indians called it "katuktu," meaning "signifying hill of prominence or place of refuge" because of a legend that told of people gathering at the hill to weather an epic flood. By the time European settlement began, Mexicans had given the hill its present name, Cerro Colorado, or Red Hill. The new settlers recognized the reason for the hill's reddish hue: cinnabar, the ore that yields mercury. Several attempts were made to mine the ore, but the hill produced too little profit to continue. The surrounding area took its name from the hill, as did Red Hill Avenue itself. Agricultural uses also defined the character of this area of Tustin, with citrus and avocado groves in the area providing produce to large citrus association packing houses within the City. 1.4 Planning Context 1.4.1 Existing Conditions Today, Red Hill Avenue is a major arterial roadway in Tustin, oriented northeast to southwest through the City. The Specific Plan area, which generally extends from Bryan Avenue to the northeast and Walnut Avenue to the southwest, generally contains a mix of low intensity commercial, retail, and office uses in an auto -oriented setting. See more detail on existing land uses in the paragraphs below. Detailed existing conditions for the Specific Plan area can be found in Appendix A: Existing Conditions Report. Tustin's Agricultural Past Historic Agricultural Uses "Red Hill" 7-4 • Draft • January 2078 Chapter 7 • Introduction RED HILL AVENUE TUSTIN SPECIFIC PLAN EDHILL�a"� REDHIFIC PLA UE SPECIFIC PLAN Within the Specific Plan area, Red Hill Avenue is a six -lane divided roadway with three travel lanes in each direction and a center two-way left -turn lane. A raised, landscaped median is present in the segment south of Bryan Avenue. The existing street parkways include sidewalks, with some portions containing landscaping and trees. Interstate 5 bisects the Specific Plan area creating a natural divide between the northern and southern portions of the Specific Plan area. Existing zoning within the Specific Plan area consists of commercial and office zones: Retail Commercial (CI), Central Commercial (C2), General Commercial (CG) and Professional (PR). Existing uses include commercial retail, shopping centers, professional offices, residential, motel, and an institutional use. Many buildings are outdated, experiencing deferred maintenance, and are in need of renovation. There are also vacant parcels within the Specific Plan area. Exhibit 1-3, Existing Land Use, illustrates the on -the -ground land uses. Commercial and retail uses are spread throughout the Specific Plan area. There are currently non -conforming uses along Nissan Road with multi -family residential uses located on parcels zoned for commercial uses, two single- family homes north of Mitchell Avenue on parcels zoned for professional office uses, and self -storage uses on EI Camino Real. Detailed information on existing zoning in the Specific Plan area can be found in Appendix A: Existing Conditions Report. Land uses adjacent to the study area north of Interstate 5 are characterized by high density residential uses, Pine Tree Park at the intersection of Red Hill and Bryan Avenues, and Tustin High School to the west of the Specific Plan area. Land uses adjacent to the study area south of Interstate 5 are characterized by a mixture of low-, medium-, and high-density residential uses and Frontier Park to the west of the Specific Plan area. The Specific Plan area presently contains approximately 270,618 square feet of commercial uses, 12,633 square feet of office uses, 1 1,946 square feet of an institutional use, 3.65 acres of vacant property, and 21 dwelling units. Public transportation and pedestrian/ADA facilities in the Specific Plan area Chapter I • Introduction January2018 • Draft • 7-5 LEGEND RED HILL AVENUE TUSTIN REDHILL ��UESPECIFIC PLAN SPECIFIC PLAN A. Demographics and Employment In 2015, there was a population of 80,796 residents and approximately 26,400 households living in the City of Tustin. From 2010 to 2015, the City's population increased by 8.2 percent. By comparison, the population of Orange County increased by 3.8 percent from 2010 to 2015. Average household size in Tustin was 3.04 persons per household in 2015 (Kosmont, 2017). Per the California Employment Development Department, the unemployment rate in Tustin for April 2016 was 3.6 percent, which is lower than the County's unemployment rate of 3.9 percent. The top job categories within the City include retail trade; professional, scientific, and technical services; and hotel accommodation and food services. According to the most recent U.S. Census Economic Study published in 2013, most City of Tustin residents (94%) work outside of the City. Approximately six percent (6%) of the working population who live in Tustin also work in the City. Detailed demographic and employment data for Tustin can be found in Appendix B: Kosmont, Tustin Red Hill Retail Plan. B. Market Demand A market demand analysis was conducted for the Specific Plan area to evaluate the potential for future development opportunities. The analysis found that retail vacancy and retail lease rates in Tustin are slightly higher than the overall Orange County market average. Retail sales per capita for the City (---$29,500) (Kosmont, 2017) is above average compared to other nearby regions and within Orange County. Higher performing sales categories include those in heavy commercial, such as, building materials, auto dealers and supplies, and gasoline stations, in addition to general merchandise stores, sporting goods, electronic stores, food and beverage stores, and restaurants. Lower performing retail categories include health and personal care, miscellaneous store retailers, and non -store retailers. Overall retail sales in Tustin are higher than retail spending potential based on households and average household income, suggesting that, overall, the City is likely capturing a significant portion of Tustin resident retail purchases and additional retail spending by residents of other cities and unincorporated areas. Certain categories, however, are exhibiting a retail sales leakage, including: health and personal care stores, miscellaneous store retailers, grocery stores, gasoline stations, and non -store retailers. A detailed market analysis for Tustin can be found in Appendix B: Kosmont, Tustin Red Hill Retail Plan. C. Circulation System Roadways. The Specific Plan area roadways are illustrated by General Plan designation in Exhibit 1-4, Existing Roadways. These roadways consist of Red Hill Avenue, which is oriented in a northeast to southwest direction; and six roadways that cross Red Hill Avenue: Bryan Avenue, San Juan Street, EI Camino Real, Nisson Road, Mitchell Avenue, and Walnut Avenue. The intersections of each of these streets within the Specific Plan are signalized. Interstate 5 bisects the Specific Plan area adjacent to the intersection of Red Hill Avenue/Nisson Road and Red Hill Avenue/EI Camino Real. Northbound and southbound on- and off -ramps are present in a diamond style interchange configuration. Parking is currently prohibited along Red Hill Avenue except along the frontage of Pine Tree Park. There are painted medians on Red Hill Avenue throughout the Specific Plan area, and a raised, landscaped median between Bryan Avenue and Lance Drive. More detail on the existing roadways is provided in the Circulation Plan (see Chapter 3, Development Plan). Chapter 7 • Introduction January2078 • Draft • 7-7 LEGEND PMMA _ NRED HILLAVENUE .117, EDHIUESPECIFIC PLAN SPECIFIC PLAN� Chapter 7 • Introduction Exhibit 1-5 Public Transportation Facilities January2078 • Draft • 7-9 Peo)ett Boundary Sus Route 71 (OCTA) Bus Stop With Sign Only � Sus Stop With Sheltef Bus Stop vAth Bench Chapter 7 • Introduction Exhibit 1-5 Public Transportation Facilities January2078 • Draft • 7-9 A.,,, ff RED HILL AVENUE: ? " .1•�.r ,I RED IUE SPECIFIC PLA N SPECCIFICFIC PLAN Transit. The Orange County Transportation Authority (OCTA) operates local public transit services throughout Orange County, including the City of Tustin and through the Specific Plan area. Route 71 currently serves the Specific Plan area, as shown in Exhibit 1-5, Public Transportation Facilities. Route 71 operates between Newport Beach and Yorba Linda, traveling along Red Hill Avenue, EI Camino Real, Newport Avenue, and First Street in Tustin. Service is provided daily with an approximate headway (measurement of time between vehicles in a transit system) of 50 minutes during the weekdays and 60 minutes during the weekends and holidays. Within the Specific Plan area, bus stops are provided on Red Hill in limited locations (see Exhibit 1-5, Public Transportation Facilities). Bikeways and Pedestrian Facilities. Within the Specific Plan area, the only existing bike lane is a Class II bike lane (a striped, on -street bike lane adjacent to the travel lane) on Red Hill Avenue (in both directions), between EI Camino Real and Nisson Road. Red Hill Avenue is a designated Class II bikeway between Irvine Boulevard and 1-5 and a potential Class II bikeway between 1-5 and First Street as shown in the City's Master Bikeway Plan. Existing pedestrian facilities within the Specific Plan area include sidewalks along all roadways and crosswalks across the signalized intersections. There are no unsignalized crosswalks across Red Hill Avenue within the Specific Plan area. A few restaurants along EI Camino Real provide dedicated and landscaped pedestrian walkways from the sidewalk to the building. D. Urban Design Streetscape. Overall the Specific Plan area is lacking in streetscape. The east side of Red Hill Avenue, north of San Juan Street, is landscaped with grass, plants, and trees adjacent to multi -family residential buildings. The west side of Red Hill Avenue, north of San Juan Street, consists of residential frontages and driveways, with minimal trees. The west side of Red Hill Avenue between San Juan Street and EI Camino Real, directly adjacent to an existing vacant parcel, is landscaped with street trees; south of the vacant parcel there is limited landscaping, with several palm trees and grass in the parkway area. The east side of Red Hill Avenue between San Juan Street and EI Camino Real does not have continuous streetscape. The large surface parking lot, located within Red Hill Plaza on the east side of Red Hill Avenue, north of the 1-5, contains sparse trees and landscaping. Red Hill Avenue, south of the 1-5, is landscaped around the perimeter of surface parking lots from 1-5 to Mitchell Ave. The east and west sides of Red Hill Avenue from Mitchell Avenue to Walnut Avenue are a mixture of single- and multi -family residential uses and do not have continuous streetscape treatments. The west side of Red Hill Avenue south of Walnut Avenue to the southern boundary of the property area has evenly spaced street trees. A landscaped median is present south of Walnut Avenue (outside of the Specific Plan area). The Specific Plan area lacks unified street furniture or other "placemaking" enhancements such as benches, lighting, bicycle racks, planters, pavement markings, etc. There are two existing bus shelters on the west side of Red Hill Avenue, south of the 1-5; and two wayfinding signs located on the west side of Red Hill Avenue, north of EI Camino Real, and at the OCTA bus stop on EI Camino Real indicating the direction of Old Town Tustin. Generally, the Specific Plan area does not have a cohesive streetscape character and is often defined by large open areas of surface parking lots. Images on the following page illustrate the overall character of the Specific Plan area. I -10 • Draft • January 2018 Chapter I • Introduction RED HILL AVENUE TUSTIN SPECIFIC PLAN RED IUE SPECCIFFILIC PLA Existing Character Chapter 7 • Introduction Large parking lots separating buildings and sidewalks. Many parking lots do not have consistent parking treatments or landscaping. Landscape treatments along sidewalks are inconsistent. Sidewalks do not provide adequate buffers between pedestrians and vehicles. Varying sidewalk widths and lack of unified treatments are prevalent. Primary existing land uses consist of older and outdated retail/commercial buildings and centers. January 2078 • Draft • 1-77 TvsTIN RED HILL AVENUE h. `�tr�. urea SPECIFIC PLAN RED C LL AVENUE SPEC FIC PLAN y� 1.5 Purpose and Intent of the Specific Plan 1.5.1 Purpose The RHASP provides planning regulations that connect General Plan policies with project -level development within the Specific Plan area. The purpose of the Specific Plan is to guide future change, promote high quality development, and implement the community's vision for the area. The Specific Plan provides long and short-term goals and objectives, a land use plan, regulatory standards, design criteria, and administration and implementation programs to carry out the vision of the Specific Plan area. 1.5.2 Vision Summary The RHASP is envisioned to result in a distinctive, vibrant and thriving district with enlivened and interconnected commercial, office, and residential uses. The mixed uses represent an evolution of land uses that respond to the changing marketplace. The area will support multi -modal transportation practices and activate key areas where residents, visitors, or employees can safely and efficiently walk, ride a bike, catch a bus, or drive a car. The area will engage the surrounding neighborhoods at key locations and reflect the small-town spirit of Tustin. Over time, the influx of retail, restaurants, services and new residents will enhance the economic and social vitality of the area and establish the RHASP area as a unique district with its own character. The streets and public spaces will be enhanced through landscaping and street furniture and framed by quality architecture expressed in a variety of building styles. The Specific Plan will incorporate the following elements as part of this Vision: • Sense of place; • Compatible land uses in an integrated mixed-use environment; • High quality architecture; • High quality businesses, and • Improved public streetscape. The vision for the Specific Plan area is more fully described and illustrated in Chapter 2, Vsion, Goals, and Objectives. 1.5.3 Specific Plan Goals Overall goals for the RHASP, as further delineated in Chapter 2, Vsion, Goals, and Objectives, are as follows: Goal 1 — Enhance streetscape, landscape, and public amenities throughout the Specific Plan area. 1- 72 • Draft • January 2078 Chapter I • Introduction RED HILL AVENUE TUSTIN ....f SPECIFIC PLAN HILL � ' } RED PLA UE SPECIFIC PLAN Goal 2 - Improve visual and functional connections and linkages between Red Hill Avenue, surrounding residential neighborhoods, adjacent public and institutional uses, and Interstate 5. Goal 3 - Balance flexible and diverse land uses that foster economic development opportunities and support housing opportunities. Land use in the project area will maximize residential opportunities along with neighborhood -serving retail and commercial uses. Goal 4 - Streamline processes to support future development in the Specific Plan area. Goal 5 - Improve pedestrian and bicycle accessibility and vehicular circulation to minimize potential conflicts between different users and improve mobility throughout the Specific Plan area and connectivity with the greater community. Goal 6 - Implement parking standards that reflect verifiable demand and consider future land uses in the area. Goal 7 - Coordinate existing and future development with infrastructure capacity. Goal 8 - Ensure development within the Specific Plan area is sensitive to and compatible with surrounding land uses. 1.6 Authority and Scope 1.6.1 Statutory Authority The RHASP is established through the authority granted to the City of Tustin by California Government Code, Title 7, Division 1, Chapter 3, Article 8, Sections 65450 through 65457 (Specific Plans). As expressed in California law, a Specific Plan may be adopted either by ordinance or by resolution. This allows jurisdictions to choose whether their specific plan will be policy driven (adopted by resolution) or regulatory in nature (adopted by ordinance). The RHASP will be adopted by Ordinance as a regulatory plan. 1.6.2 Relationship to General Plan Specific Plan - a tool for the systematic implementation of the General P/an. It effectively establishes a link between implementing policies of the General Plan and the individual development proposals in a defined area. The current City of Tustin General Plan was updated in 2013. A specific plan may not be adopted or amended unless the proposed plan or amendment is consistent with the General Plan, pursuant to Government Code Section 65454. The RHASP was adopted in conjunction with an amendment to the General Plan to make the two documents consistent. The RHASP's regulations and criteria comply with the directives of the Tustin General Plan's policies and programs as amended. Chapter I • Introduction January 2078 • Draft • 7- 73 TUSTIN RED HILL AVENUE h. .� e RED I UE SPECIFIC PLAN SPECCIFICFIC PLAN 1.6.3 Relationship to Zoning Code Upon its adoption, the RHASP will become the zoning for all properties within the Specific Plan area, replacing the existing zoning. Government Code Section 65455 requires that the adoption or amendment of a zoning ordinance be consistent with any applicable specific plan covering the some area. The provisions contained in the RHASP constitute the primary land use and development standards for the Specific Plan area. These regulations are applied in addition to the provisions set forth in the Tustin City Code (TCC). Where the Specific Plan is silent, the provisions of the TCC shall prevail. 1.7 Specific Plan Organization The RHASP is organized into the following Chapters: • Chapter 1: Introduction — This chapter provides a general introduction to the Specific Plan, including the purpose and intent of the plan, historical background, an overview of existing conditions, and scope and authority of the Specific Plan. • Chapter 2: Vision, Goals, and Objectives — This chapter provides the policy foundation for the Specific Plan and includes the community vision, policy framework, and goals and objectives. • Chapter3: Development Plan—This chapter provides specific land use, circulation, urban design, and infrastructure plans. • Chapter 4: Land Use and Development Standards — This chapter identifies the allowed land uses and the development standards for parcels in the Specific Plan area. • Chapter 5: Design Criteria—This chapter provides design regulations and guidance for all private properties in the Specific Plan area, including criteria for site planning, building design, and signage. • Chapter6: Implementation and Administration —This chapter discusses the administrative process and procedures required for review and permitting of land use and development activity within the Specific Plan area as well as development incentives and funding mechanisms. • Appendices: The Appendices provide background materials related to the Specific Plan. 1.8 User's Guide The RHASP is designed to meet the needs of many users, including property owners, merchants, architects, designers, building contractors, City staff, future residents, investors, developers, and other interested persons in the community. Each of these interests plays a role in the future development of the Specific Plan area. 1-74 • Draft • January 2078 Chapter 7 • Introduction RED HILL AVENUE TUSTIN c c�LF-671511 SPECIFIC PLAN RED SPECCIFICIFIC PLAN To most effectively use the Specific Plan, the following process is recommended: Step 1: Review Chapter 1 to gain an understanding of the study area, including history and an overview of existing conditions. • Step 2: Review Chapter 2 to gain an understanding of the vision and guiding principles for this Specific Plan. • Step 3: Property owners that are interested in developing/intensifying property or those interested in starting a new business or expanding/enhancing an existing business in the Specific Plan area should review Chapters 4, Land Use and Development5tandardsand 5, Design Criteria, to gain an understanding of the development standards and design criteria for their property. • Step 4: Review Chapter 3, Development Plan, to gain an understanding of the land use, circulation, urban design, and infrastructure plans that will guide the potential buildout of the Specific Plan area. • Step 5: Review Chapter 6, Implementation and Administration, to gain an understanding of the implementation procedures and administration of this Specific Plan. • Step 6: Schedule a meeting with the City of Tustin Community Development Department to review concepts, determine project processes and requirements, identify other agencies that may need to be contacted, and discuss potential issues, solutions, and approaches. It is highly recommended that interested property/business owners, developers, and investors contact the City to discuss project proposals before committing large amounts of time and financial resources for plans and drawings. 1.9 California Environmental Quality Act Compliance The RHASP has been prepared in conjunction with a Program -level Environmental Impact Report (EIR), which identifies potential impacts resulting from the proposed development and establishes, standard conditions and mitigation measures that reduce them to a less than significant level, where feasible. Colifomia Environmental Quality Act (CEQA) — a California statute passed in 7970 to institute a statewide policy of environmental protection As the lead agency, the City of Tustin will implement a monitoring program for the approved standards and mitigation measures. To assist in this monitoring effort, a Mitigation Monitoring Program has been developed by the City as part of environmental findings which will be included in the Final Specific Plan approved by the Tustin City Council. The Mitigation Monitoring Program shall be included as an Appendix to this Specific Plan. Chapter 7 • Introduction January 2078 • Draft • 7- 75 :49 RED HILL AVENUE ' Au, RED IUE SPECIFIC PLAN SPECCIFICFIC PLAN The RHASP EIR will serve as the primary environmental document for future development undertaken within the Specific Plan area. The EIR is anticipated to be the definitive environmental document for project implementation within the Specific Plan area, including serving as a Program EIR for purposes of backbone infrastructure improvements. Future development projects that require discretionary review will be examined against the analysis prepared for the EIR to determine if additional environmental documentation must be prepared. Developments that do not require additional discretionary review will not be subject to additional environmental documentation. However, a project applicant will be required to submit documentation substantiating the finding that said development is allowed and in conformance with the Specific Plan, and the potential environmental effects are within the parameters and timeframe analyzed within the Specific Plan EIR. Future development projects proposed within the Specific Plan area may be required to prepare their own environmental documentation pursuant to State law. However, subsequent site-specific projects may use the "tiering" concept, as provided by § 15385 of the State CEQA Guidelines. The tiering concept is a process by which the City of Tustin, as lead agency, can adopt the programmatic EIR focusing on the "big picture," and can then use streamlined CEQA review for subsequent individual development projects in the Specific Plan area. This streamlined CEQA review may be used for each site-specific future development so long as the project is consistent with the findings of the EIR, the mitigation measures described in the EIR, and the City's General Plan and Zoning Ordinance. This tiering concept allows the City to address the broad environmental issues detailed in the EIR during the planning stages of the Specific Plan. Future site-specific development projects will be evaluated on a project -specific basis, and may be excused from repeating the broad environmental analysis examined in the comprehensive, programmatic EIR for the entire Specific Plan area. 7-76 • Draft • January 2078 Chapter 1 • Introduction