HomeMy WebLinkAboutCC RES 18-29RESOLUTION NO 18-29
RESOLUTION ADOPTING A LIST OF PROJECTS FOR
FISCAL YEAR 2018-19 FUNDED BY SB 1: THE ROAD
REPAIR AND ACCOUNTABILITY ACT OF 2017
WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017
(Chapter 5, Statutes of 2017) was passed by the Legislature and Signed into law by the
Governor in April 2017 in order to address the significant multi -modal transportation
funding shortfalls statewide; and
WHEREAS, SB 1 includes accountability and transparency provisions that will
ensure the residents of the City are aware of the projects proposed for funding in our
community and which projects have been completed each fiscal year; and
WHEREAS, the City must adopt a list of all projects proposed to receive funding
from the Road Maintenance and Rehabilitation Account (RMRA), created by SB 1 by
resolution, which must include a description and the location of each proposed project, a
proposed schedule for the project's completion, and the estimated useful life of the
improvement; and
WHEREAS, the City will receive estimated revenues of $469,783 in RMRA funding
in Fiscal Year 2017-18 and $1,367,873 in Fiscal Year 2018-19 from SB 1; and
WHEREAS, this is the second year in which the City is receiving SB 1 funding and
will enable the City to continue essential road maintenance and rehabilitation projects that
would not have otherwise been possible without SB 1; and
WHEREAS, the City used a Pavement Management Plan (PMP) and Capital
Improvement Program to develop the SB 1 project list to ensure revenues are being used
on the most high-priority and cost-effective projects that meet priorities for transportation
investment; and
WHEREAS, the City's PMP has been developed to assist City personnel by
providing current data on the City's street network and to develop cost-effective
maintenance strategies to maintain a desirable level of pavement performance on a
network scale, while optimizing the expenditure of limited fiscal resources; and
WHEREAS, the City's weighted pavement condition index (PCI) for the entire
network is 87.1; and
WHEREAS, system sustainability can only be achieved through proactive
scheduling and the implementation of cost-efficient pavement applications; and
Resolution No. 18-29
Page 1 of 3
WHEREAS, restoring roads before they fail reduces construction costs and
successive years of collecting pavement condition data has shown that it is far more
economical to preserve roads than to delay repairs; and
WHEREAS, the SB 1 project list and overall investment in our local streets and
roads infrastructure with a focus on basic maintenance and safety, investing in complete
streets infrastructure, and using cutting-edge technology, materials and practices, will have
significant positive co -benefits statewide.
NOW, THEREFORE, BE IT RESOLVED that the Fiscal Year 2018-19 list of projects
planned to be funded with Road Maintenance and Rehabilitation Account revenues
includes those listed on the attached Exhibit A.
PASSED AND ADOPTED at a regular meeting of the City Council of the City of Tustin
held on the 17th day of April 2018.
ATTEST -
ERICA N. RABE,
City Clerk
Resolution No. 18-29
Page 2 of 3
STATE OF CALIFORNIA )
COUNTY OF ORANGE ) SS
CITY OF TUSTIN
I, Erica N. Rabe, City Clerk and ex -officio Clerk of the City Council of the City of Tustin,
California, do hereby certify that the whole number of the members of the City Council of
the City of Tustin is five; that the above and foregoing Resolution No. 18-29 was duly
passed and adopted at a regular meeting of the Tustin City Council, held on the 17th day
of April 2018, by the following vote:
COUNCILMEMBER AYES: Murray, Gomez, Puckett, Bernstein, Clark (5)
COUNCILMEMBER NOES: (0)
COUNCILMEMBER ABSTAINED: (0)
COUNCILMEMBER ABSENT: (0)
ERICA N. RABE,
City Clerk
Resolution No. 18-29
Page 3 of 3
P=11 •ri
Pape 1 of 2
loratien
Est
Est
Est
Eat3lMGd
Coroplelfon
CompWon
Lffe Mb
llN mm
Pro Con
Coo
18R+2019-271
Pp001 -
Rwd Mdraengnco
NW4)ortAvmn
Rep-almo rfscs 0.63 miss d road, kmkx*V bcWtmd rmoval and
Syamors
oams
=019
20
30
naMrr anM
t RehabikNfon
RehoMMon
inspair of asphalt oonaabs pevoffw t faiva arcs, repair of akW*W r and
Avenue b
curb i 0ratar, reconstuctlon of curb ramps to be ADA oompiont cold
Nrterelate 5
Vim sakdbg atplrlt, oarr*ucdon of asphok oorraate overlay, tatltc
Froommy
gig" dol dor bops. and talkOVk+0.
tdlM#:2019-271
PP002
Rood Mabgrarrce
NewportAvenue
Repovokewrhos 0.80_mko otmed, bduft baMzed mrrovai and
haerdme 5
oemis
031301#
20
30
vada and
&RohobMtWon
RehdAtOw
repair ofosphatmoaft povernentIblurewow repatcfskkaalkand
Fwawayto
Curb & Ruder, mmotudbn ofcurb ramps b be ADA eomphM Cud
Hut Avenue
plana eAft esphut mWtucbm of aspI ltoorrcrsI overlay. taffc
signal debcbrMops, and tafR .btbp.
of
X119
LBRQM O-271
PPOM
Road MaNrterwnce
BmwnkV Avenue
RepavMnsrrface o.Ob mics of road M&d ng Imefted rernovu and
8 canrkro
0W2019
06r2m
20
30
;Temlft RehobOtaton
Ral '1- t5,
repair ofsephafconcrete, pavementfob" won, repokofaklowskand
Red tokvk»
curb l putior, reconshud(on of curb ramps b be ADA cumpiarrt Cold
Bhrd.
pW* odsllg asphalt, Conskt+eaen of aptWtconcrete overlay, Laft
sWA9 d*%clor bops, andta8k sirlpkrM.
at
1#►1#
201#-6271
PPO04
Rood Mainiorronce
Red HM Avenue
Repevelroerrfsoe 0.24 mics of road, kwki*g licabod rarnoval and
San Juan SL
062020
0312021
20
30
Ylair
A ANnbi kerion
RehobWAGOn
rapeir of p' N conorms povernaM fiirre anmm. repair of eidewo k and
to Brim Ave.
Curb l yvrer, mcorrah"on -curb ramps kr beADA oompMartt cdd
It
pkrn ods" asphak o0netuodon of aephsk Dorset& overlay, talllc
deMcbr bops tafic atripkg, and median aoonobu08on to
WVII@n the r wW"jnd Wiwn podmt of Drysn Ave.
LSW=11.SY71
PRODS
Road Maintenance
Red HM Avenue
Repwelreairfaoe 0.47 m1m of road, krdudinp locefted rerrrovu and
Wsk"Avv, In
OWOM20
03/2021
30:
RehabOolon
RNrbiNf.YOrr
repairofaepheN=Mrs* povernentfskreares%,repair ofsMewalkand
kderswo5
*A & 9 Mer reeoeuarucdon ofourb ro10 be ADA compManL Cud
Freeway
.plane eldflkg ae;' - constucdon of asphalt concrWe overlay, tuft
i0rnol detsdor loops• and Aa[MMG sbipkg.
Pape 1 of 2
OW-eftdV1M
-M 4vl
PPOOG
Road htakasn.nea
E&W Awmra
RapararraauMm 0.23 mase of toad, bckrdtnp basad fwmwd and
Jonborme
0D12020
0612021
20
30
rafi� aNf
t MbabUtWm
RokadaMatlon
repoir of aaplalt amm is pw msnt takes wags, repair of s-I 1 1, mW
'Rad lo
curb i 9 AMr, a000ewMweffm of anb nwW Ike b* ADAoowgft. c W
Harvard Ave.
plmosxkftmphmkcorAwucdmatsaplak conorak svarlay, talae
'
sigW dotecbrloops, and trWe skipinp.
'UWMTWI
7
PAW Mokftnarres
Jarrftm Road
Rapaw/rawxfico 1.6 malas of rood, kWu*V bcofted rarnmmi and
SMAWa
09441021
06/2022
20
30
Twob Md
tRMabO Mm
RslabWAGw
atsaphok- era lapw4wmtfaknmem rep* ofsidswakand
Parkwaylo
owb i pAMr, roemwoucOm of arab romps b be ADA coreipMM cold
SCRRA
vlora wdatlnp aaphok. oaatuotton of - phslt cvnaaa owday, taft
Ro kosd
daaaor bops, and trafao stipkap.
1Mf1!
fY-5271
Pp40t1
Tmftcoe"
ParkoanMrLora
kNhtlotlonofnow tafUes(pnalsandequo ant
ParkosMsr
OMIS
1=16
is
25
Tuorw and
Dadoos
and eqm
Lara l arum
AvwRn Ttaf c
Avwwa
toarsackon
ftv sf
I
FF-
Taft Cor"
lanedovmo Road
kab Mw of naw kafMc sVu k sad equipmea
LwwdwAm
0312018
1=19
Is
25
44AAdMGdr and
owdoom
s" Vabndo
Rased /
Awrruo Tuft
VM@ndaAv4L
Inlarascborl
Pape 2 of 2