HomeMy WebLinkAboutZA ACTION AGENDA r ,
paTnpagos auoN
SJiSIHTd�H oI'ISfld
( 'NOIIDV 3lvulydsS uO3 UVC[NHrIVD
INdSNOO aHs WONJ GHAONEE UO/GMV aaSSMSIa
HS Os SWHJi OI3IOHds LsftnZ9sx DiaEnd -do davis
'-d0l d,LSINIWdV DNINOZ ZH,L Ssagm NOIJ,OW 3HL .NO
JNIlOA RHI 30 dWls alll OZ -dOI-dd Swdsl dSHH.L dO
NOISSnOSIa dlVHVddS ON Sg rIrIIM d2IHHL 'NOIIOW
ENO Ag CFl3VNd . HH 'I`IIM aNrd SNIJn0H ad2idaISNOO
SHV UVCINagVD ZN3SHO0 2idaNfl CISISIrI S2idJJVN TIV) =HKQNarlvo MNESMOO
SOTS-ELS (IiTL) ZK 22UV HHDaS
ONICM0DRU 2iOIVdISINIWCIV SNINOZ SHZ ZO'dJNOO
asvagd 'SNOIS'daOWWOaOv 'IKIOdds auinoau im dI
ClUO032i SHZ E03 SSHU(IC[i '
CIXV S VN 'Irma M07, RIMS SSVSrld '2iOIV- J.SINIWaK
JNINOZ dH,I, SSd2Iaciv OCL luvis nOX NdHM 'Hgavl
S ,-daX dddS SHL NO (IHIVOOrl SWUO3 aHZ dO ENO
MO ggId dSVSgd 'UHIIKW F,NV NO 2 OlV'd SINIWaFI
ONINOZ SHL SSEdGC V OZ - HSIM f1O.?� dI
(MPT rCg pazTzoqqn-e ssaTun sula-4z apuab.e
-.;;o uaNL-q aq uL-o uo-rgae OH) .zoq,2.zgszuzam
uipV
FuiuoZ atj-4 -To uoigozpsTanC _ . agg
Iaa Cgns aqq uyggTm pug Ppuab� atgq uo qou
suialT Au-e buTpaPbaz zo -ezqszuzuipV buzuoZ auk
ssaappa Apul oTlgnd auq 30 saz qulaui amzq sztIq qv
( -Iepuabe auq uo
IOU stuagi .jog uosaad aad sagnuTw E oq pagYiuTq) :SN HDKOO oiriand
aaubzsaa a0gL' jSTUTtupV bu-ruoZ
`Umoag 5[DT-d :'I'IvO `I'IOH
tuooH aoua.zaguoO
-4uawI.zL-daa IuatudoTaAaa AITunwwoO •to•a T E: 0 T HEQHO OZ ZZTdO
9661 'T JL7aC'
�Hxs�sr+i H�zn��H
SNOlsov HOIVHZSINIwa'd SNIKOZ
KQHSJTd Ho I SOFI
d
Zoning Administrator Action Agenda
July 1, 1996
Page 2
REGULAR BUSINESS:
1. Desicrn Review 96-023
APPLICANT: C.E.T
ATT: CHRISTIAN FAULK
13701 SOUTH ALMA AVENUE
GARDENA, CA. 90249
LANDOWNER: ATLANTIC RICHFIELD COMPANY
ATT: HUBER WILSON
P.O.BOX 2435
LOS ANGELES, CA. 90051
LOCATION: 14231 RED HILL AVENUE
ZONING: RETAIL COMMERCIAL (100 C--1 10, 000)
ENVIRONMENTAL THIS PROJECT HAS BEEN DETERMINED TO BE
STATUS: CATEGORICALLY EXEMPT (SECTION 15301, CLASS 1)
PURSUANT TO THE CALIFORNIA ENVIRONMENTAL QUALITY
ACT
REQUEST: INSTALLATION OF SOIL REMEDIATION EQUIPMENT
Recommendation - That the Zoning Administrator approve Design '
Review 96--023 by approving Zoning Administrator Action 96-007
subject to the conditions attached as Exhibit A, as submitted or
revised.
Presentation: Rosa Ceja, Assistant Planner
The Administrator asked if the applicant had any comments.
Christian Faulk, representing the applicant, corrected the wording
on page two of the staff report, stating that the filtered exhaust
from the therma catalytic oxidation does not go into the soil but
is .released into the atmosphere and that it is not an air sparging
system but only therma catalytic oxidation. He also commented that
the proposed fence would be chain link but questioned the
requirement of a solid metal gate. Concerning the muffled
equipment as discussed on page 3 of the staff report, he stated
that if any complaints ensued, acoustical paneling would be used
but is not proposed at this time. Concerning Exhibit A, Condition
1. 6, he asked if the language could be changed to reflect that the
permit shall" be valid from the date finaled instead of from the
date of issue.
:r
Zoning Administrator Action Agenda
July 1, 1996
Page 3
The Administrator stated that this was standard condition language
and that time frames were routinely extended when required and that
he was reluctant to change the language of this condition.
Christian Faulk stated that he wished to see the condition read
from date finaled because ARCO is a large company, and when his
consulting services are completed they will have to continue the
process and he wanted ARCO to have sufficient time to complete it.
Dan Fox, Senior Planner, stated it would be better to change
Condition 1. 6 to read 1130 months" instead of 1124 months" since the
condition is tied to the approval process and would meet the
applicant ' s needs.
The Administrator agreed to this language change.
Christian Faulk referring to Condition 2 . 1 (D) , asked if it would
be necessary to obtain clearances from both the Orange County
Health Care Agency (OCHCA) -and the California Water Quality Board
since the OCHCA takes care of the water issue.
The Administrator stated that the condition also contained the
words, as necessary, and that clearances from both agencies would
not be necessary if a letter was obtained stating that OCHCA had
the proper authority to take care of the water issue.
Christian Faulk asked if Condition 3 .3 could read "painted to match
the color of the building" instead of a neutral grey. He stated
that ARCO typically purchased vapor units that were blue. He
further stated that if the San Juan site was conditioned to read,
"neutral grey" and it was painted blue he would see that ARCO
complies with the original condition for that site.
The Director asked if any calls had been received from the general
public concerning this project .
Rosa Cela, Assistant Planner, stated there had been no - calls.
The Director approved Design Review 96-023 by adopting Zoning
Administrator Action 96-007 revised as follows. Condition 1.6 to
read, "All equipment related to the vapor extraction process shall
be removed within thirty days of completion of the extraction and
treatment process. This permit shall be valid for a period off
time not to exceed 30 months from the date that building permits
are issued. An extension may be granted by the Zoning
Administrator should the extraction process require additional
i
Zoning Administrator Action Agenda
July 1, 1996
Page 4
time. Said extension request shall be made to the Community
Development Department at least 30 days prior to the expiration of
the terms of this Design Review. " Condition 3 .1 shall read, "The
remediation enclosure shall include a chain link gate with slats.
The entire enclosure shall be painted to match that of the existing
adjacent mini mart building. "
ADJOURNMENT:
The Administrator adjourned the meeting at 10:47 a.m.
The date of the next regular meeting of the Zoning Administrator
will be set as items are scheduled for action.