Loading...
HomeMy WebLinkAbout10-ATTACHMENT 1VIA CERTIFIED MAIL, RETURN RECEIPT REQUESTED Marcus Ohno, Chief Operating Officer Ohno Construction Company 16396 Boyle Avenue Fontana, CA 92337 Subject: Veterans Sports Park at Tustin Legacy Park Improvements Project, CIP No, 20043: LA Engineering, Inc.'s Bid Notice of Staffs Recommendation to Deny Bid Protest Dear Mr. Ohno, The City of Tustin ("City") has received your letter dated September 19, 2018 protesting Los Angeles Engineering, Inc,'s ("LAE") bid related to . the Veterans Sports Park at Tustin Legacy Park Improvements Project, CIP No. 20048, The following are our findings regarding the reasons for the protest listed in your letter: 1. LAE listed an unregistered and non -responsible subcontractor (Hydrology), Response: LAE has requested that the City allow LAE to substitute California Waters in place of Hydrology Group, Inc., as authorized by Public Contract Code section 4107(a)(8), which request has been approved, 2. LAE listed multiple subcontractors that are not permitted to install specified products, 'a. Spectra -Turf cannot install or supply the specified Play. Bound product because it is not a certified installer. Response: The playground specifications (LD -5.4) specify the following "Play Bound Poured -In -Place W/ Aliphatic Urethane Extreme 10 Binder "or equal" Surface Base Mat and Wearing Course." Public Contract Code Section 3400 prohibits agencies from calling for a designated material or product, by brand name unless the specification includes the words "or equal." LAE submitted a rubber surfacing comparison sheet, a test report, specifications, and submittal documents for Spectra Pour that meets or exceeds the Play Bound product, Spectra Pour is an "or equal" product to the Play Bound product in compliance with the project specifications. b. Hydrology cannot install or supply the specified Vortex system because it is not a certified installer, Response: Notwithstanding the fact that Hydrology has now been replaced by California Waters, the project specifications do not require the installer of the Vortex system to be a certified installer. Page I oft 300 Centennial Way, Tustin, CA 92780 6 P: (714) 573-3150 F: (714) 734-8991 • www.tustinca.org c. SprinTurf cannot supply or install the specified Synthetic Turf product or an equal. Response: SprinTurf is one of the City's pre -approved turf providers in accordance with Specification Section 02880-2.1 "Acceptable Turf Providers." As noted above, Public Contract Code section 3400 requires that an agency allow products "equal" to those called for in the specifications, SprinTurf meets or exceeds the specifications for the synthetic turfsystem. 3. LAE, bid is non-responsive because it did not use the correct notary form as required by the bid documents, Response: Public entities have discretion to waive inconsequential deviations from public bid specifications. A deviation is inconsequential if it neither gives the bidder' an unfair competitive advantage nor otherwise defeats the goal of preventing corruption in the public contracting process. (Ghilotti' Construction Co. v City of Richmond (1996) 45 Cal.AppAth 897; 899) The use of a different; legally recognized notary form is considered to be an inconsequential deviation. 4.'LAE did not include the required submittal for the Shade Canopies that was required with the bid. Response: Public Contract Code Section 4104(a)(1) provides that an entity taking bids for a. public works project shall state in the specifications that bidders shall list subcontractors who are to perform work in excess of 0.5% of the total bid,: While the specifications provide that bid submittals are to include submittals for a fabric tension structure, the bid documents, in compliance with Public Contract Code Section 4104(a)(1), provide that bidderss are to list each subcontractor who will perform work in an amount in excess of 0,5% of the total bid. With their response, LAE submitted a bid from USA Shade & Fabric Structures totaling approximately 0.3% of LAE's total bid, Accordingly, it was permissible for LAE not to include a bid for the fabric tension structures with its bid submittals, 5. Summary of LAE non -responsiveness material advantage.. Response: As noted above, the City finds LAE as the lowest responsive and responsible bidder. In conclusion, City staff finds the bid protest to be without merit and will recommend that the Tustin City Council on November 20 deny the protest and award the contract to LAS: Sincerely, S. Stack, P. E. of Public Works/City Engineer c: Aaron O'Brien, Los Angeles Engineering Ken Nishikawa, Deputy Director of Public Works David E. Kendig; Esq., City Attorney Page 2 of 2 CERTIFIED RECEIPT •. Provided) Co r"q IU.. .. ... _ M ca postage` ru 0ortitied Fee 4 M Return Receipt Fee" (Endorsement Required) postmark Here Restricted Delivery Fee (Endorsement Required) fu Cr Total postage & Fees ru ru. sen 7o Marcus 0hna wQhn �onuctog� ;ireet,ApC Aio; �- °IBoy1e A�ienue Gty Sfare z(P+4 Fontana, CA .. .. 92337 r PS Form :00 August00. SeeReverse , Instructions