Loading...
HomeMy WebLinkAbout06 AWARD CONTRACT FOR THE FY 2018-19 ROADWAY REHABILITATION & SIDEWALK REPAIR PROJECT, CIP NO. 70018AGENDA R r! MEETING DATE: JUNE 18, 2019 TO: MATTHEW S. WEST, CITY MANAGER Agenda Item 6 Reviewed: City Manager Finance Director FROM: DOUGLAS S. STACK, DIRECTOR OF PUBLIC WORKS/CITY ENGINEER SUBJECT: AWARD CONTRACT FOR THE FISCAL YEAR 2018-19 ROADWAY REHABILITATION AND SIDEWALK REPAIR PROJECT, CIP NO. 70018 SUMMARY Staff is requesting the City Council award a construction contract to the lowest responsive/responsible bidder for the Fiscal Year (FY) 2018-19 Roadway Rehabilitation and Sidewalk Repair Project, CIP No. 70018. RECOMMENDATION It is recommended that the City Council award a construction contract to the lowest responsive/responsible bidder, Onyx Paving Company Inc in the amount of $1,637,000.00, for the FY 2018-19 Roadway Rehabilitation and Sidewalk Repair Project, CIP No. 70018 and authorize the Mayor and the City Clerk to execute the contract documents on behalf of the City. FISCAL IMPACT Sufficient funds in the amount of $1,800,000 have been budgeted and appropriated in the Fiscal Year 2018-2019 Capital Improvement Program Budget. CIP No. 70018 is part of the City's ongoing Maintenance of Effort (MOE) obligation to maintain eligibility for Renewed Measure M (M2) funding. Funding is provided through a combination of General Fund (Fund 200), Measure M2 Fair Share (Fund 139), and Gas Tax (Fund 130). CORRELATION TO THE STRATEGIC PLAN Rehabilitation of roadways and repair of sidewalks contribute to the fulfillment of the City's Strategic Plan Goal B: Public Safety and Protection of Assets. Specifically, the project implements Strategy #1, which among other items, is to ensure continuous maintenance and improvement of public facilities. DISCUSSION The Roadway Rehabilitation and Sidewalk Repair Project, CIP No. 70018 for Fiscal Year 2018-19 includes asphalt concrete pavement repair, asphalt concrete overlay, slurry sealing, and traffic striping on various streets within Zone 7 of the City's Pavement Management Program. The City is divided into seven pavement management zones with one zone targeted each year for pavement maintenance. Through a rolling seven year cycle, this program is intended to maintain the integrity of City streets. The current phase, Zone 7 (attached map), generally bounded by Edinger Avenue to the north, Tustin Ranch Road to the east, Barranca Parkway/Warner Avenue to the south, and Costa Mesa Freeway (SR -55) to the west. The project also includes citywide sidewalk repair which focuses on removal and replacement of damaged sidewalk at numerous locations throughout the City based on an annual field survey conducted by the Engineering Division. The Engineer's Estimate is $1,500,000. FY 2017-18 Roadway Rehabilitation and Sidewalk Repair Project, CIP No. 70017 June19, 2018 Page 2 Formal bids were publicly opened on May 21, 2019 and reviewed by Public Works. Eight (8) bids were received and are summarized below by order of least dollar amount: • Onyx Paving Company, Inc............................................................ $ 1,637,000.00 • Hardy & Harper, Inc........................................................................ $ 1,662,000.00 • R.J. Noble Company...................................................................... $ 1,672,573.10 • Sequel Contractors, Inc.................................................................. $ 1,733,024.72 • Palp, Inc. dba Excel Paving............................................................ $ 1,769,626.07 • All American Asphalt...................................................................... $ 1,847,777.00 • EBS General Engineering, Inc ........................................................ $ 1,977,474.85 • Aramexx Group, Inc....................................................................... $ 2,402,560.55 Staff has reviewed the references and the State Contractor's License for Onyx Paving Company, Inc. and has determined that they are appropriate for the subject project. It is recommended that the City Council award the construction contract to the lowest responsive/responsible bidder, Onyx Paving Company, Inc. for the FY 2018-19 Roadway Rehabilitation and Sidewalk Repair Project, CIP No. 70018 and authorize the Mayor and the City Clerk to execute the contract documents on behalf of the City. (Stack, P.E. Public Works/City Engineer Attachment: Location Map S:\City Council Items\2019 Council Item s\06-1 8-2 01 9\Awa rd of Contract for Rdway Rehab (CIP 70018)\Award of Contract for Rdwy Rehab (CIP 70018).docx J A M B O R E E R D BRYAN AVE WALNUT AVE W. MAIN ST N E W P O R T A V P I O N E E R R D EDINGER AVE R E D H I L L A V E Y O R B A S T EL CAMINO REAL E. FIRST ST NISSON RD MITCHELL AV SAN JUAN ST IRVINE BLVD BARRANCA PKWY DOW AV H O L T A V E SIXTH ST P R O S P E C T A V E B R O W N I N G A V E M Y F O R D R D McFADDEN AVE B S T BELL AV F R A N K L I N A V P A R K A V VALENCIA AV SYCAMORE AVE W I L L I A M S S T T O W N S H I P D R P A S A D E N A A V MOFFETT AV N . Y O R B A S T A S T HERITAGE WY R A I N T R E E R D A L L E N G A L Y S T SEVENTEENTH ST A R M S T R O N G A V R O B I N S O N D R WARREN AV THIRD ST C S T MICHELLE DR C H E R R Y W O O D L N A L D E R L N WASS ST T U S T I N R A N C H R D U T T D R C H A M B E R S R D AM A GA N S ET W Y S E V E R Y N S R D M A R S H A L L L N R E D H I L L A V L A C O LI N A D R EDINGER AV VA N D E N B E R G L N ROANOKE AV KELLER DR WARNER AVE M A L E N A D R P A C I F I C S T O L W Y N D R L O R E T T A D R E. MAIN ST O R A N G E S T R A W L I N G S W Y A C A C I A D R E FIR ST ST C O R T I N A BROOKSHIRE AV H A N N A F O R D D R H A R V A R D A V E L A M B E R T C A R F A X A V MILLER DR LANCE DR SECOND ST P O R T O L A P K W Y P O R T A L P L A Z A D R W H E E L E R P L FIG TREE DR LAGIER WY D O R A L F A I R M O N T W Y C A R R O L L W Y B R U N S D R C E N T E N N I A L W Y D E L A M O A V P R E B L E D R C O M A N C H E A L B E E A V E N . P R O S P E C T A V E COCO PALM DR SANTA FE DR MARKS DR MELVIN WY F O X C R O F T R D INDUSTRIAL DR GARLAND AV C R O M W E L L D R W O O D L A W N A V K ALU A L N M AU NA LO A R D D A V I S D R OLD IRVINE BLVD B R I D G E P O R T R D D I A M O N D H E A D D R ANDREWS ST P I O N E E R W Y TUSTIN GROVE DR C A L I F O R N I A S T S U N N I N G D A L E D R N E W M A N A V COPPERFIELD DR W I L L A R D A V C H A N D L E R D R MEAR LN SLEEPER AVE HOXIE DR COX R A L E I G H P L FIESTA WY B U R N H A M D R P A R K VIE W W Y BRYAN AVE C S T EDINGER AVE J A M B O R E E R D B R O W N I N G A V E N E W P O R T A V B S T IRVINE BLVD D E L A M O A V J A M B O R E E R D VALENCIA AV E. FIRST ST J A M B O R E E R D M Y F O R D R D IRVINE BLVD R E D H I L L A V E J A M B O R E E R D W. MAIN ST P A R K A V N E W P O R T A V N E W P O R T A V J A M B O R E E R D VALENCIA AV IRVINE BLVD B S TNISSON RD N E W P O R T A V LANCE DR City of Tustin, CACitywide Zones Legend Zone 1 2 3 4 5 6 7 Centerline City of Tustin, CA Citywide Zones Map ArcGIS 10.1 Bucknam & AssociatesJuly 2013 Source: City of Tustin AutoCAD DwgCreated in ArcGIS 10.1 using ArcMap