HomeMy WebLinkAbout05 APPROVE THE ANNUAL MEASURE M2 ELIGIBILTY SUBMITTAL PACKAGE, FY 2019-2020• nda AGENDA REPORT Reee eld: 5 City Manager Finance Director MEETING DATE: JUNE 18, 2019 TO: MATTHEW S. WEST, CITY MANAGER FROM: DOUGLAS S. STACK, DIRECTOR OF PUBLIC WORKS/CITY ENGINEER SUBJECT: APPROVE THE ANNUAL MEASURE M2 ELIGIBILITY SUBMITTAL PACKAGE, FISCAL YEAR 2019-2020 SUMMARY In order to maintain eligibility for funding under the Orange County Measure M2 Program, the City is required to annually submit a compliance package to the Orange County Transportation Authority (OCTA). RECOMMENDATION It is recommended that the City Council take the following actions: 1. Adopt the attached Measure M2 Seven -Year Capital Improvement Program (Fiscal Year 2019-2020 through Fiscal Year 2025-2026); 2. Approve Resolution 19-26 informing the OCTA that there have been no changes to the City's Circulation Element of the General Plan and that it is consistent with the Master Plan of Arterial Highways and that the City concurs with the Mitigation Fee Program for new development; 3. Approve Resolution 19-27 informing the OCTA that the City updated a Pavement Management Program that is in conformance with the OCTA format; and 4. Authorize the Director of Public Works/City Engineer to submit the City of Tustin's Measure M2 eligibility package to the Orange County Transportation Authority. FISCAL IMPACT The City has successfully secured Comprehensive Transportation Funding Program (CTFP) competitive funds under the current Measure M2 Program and met required match funding contributions towards various projects over the years. The City's annual local jurisdiction apportionment, known as "Fair Share" under Measure M2, is estimated at $1.62M for Fiscal Year 2019-2020. From the beginning of Measure M in 1991 and Renewed Measure M2 in 2006, the City has received nearing $53.3M in competitive CTFP, with $23.6M of that amount in the last eight years, for such projects as Tustin Ranch Road Extension, Warner Avenue Extension, Tier 1/II Environmental Water Quality and Red Hill Avenue Widening and Raised Median Improvements. CORRELATION TO THE STRATEGIC PLAN Maintaining eligibility for funding under Measure M2 and use of that funding to improve transportation infrastructure contributes to the fulfillment of the City's Strategic Plan Goal B: Public Annual Measure M2 Eligibility Submittal June 18, 2019 Page 2 Safety and Protection of Assets. Specifically, the project implements Strategy #1, which among other items, is to ensure continuous maintenance and improvement of public facilities. BACKGROUND AND DISCUSSION Since the inception of Measure M in 1991, the City has submitted annual documentation to the OCTA in order to maintain eligibility for competitive and Local Fair Share (LFS) funding: In November 2006, the voters of Orange County approved Renewed Measure M (M2), a 30 -year extension of the original 20 -year Measure M program which had established a one-half (1/2) cent sales tax for local and regional transportation improvements throughout Orange County. The Measure M2 program provides for a new slate of projects and planned programs. These include improvements to the Orange County freeway system and road network, expansion of the Metrolink system, more transit services for seniors and the disabled, funding for the cleanup of roadway storm water runoff, and funding for local traffic signal synchronization programs. LFS and CTFP funds have enabled the City to undertake significant capital projects that improve the transportation and circulation system in Tustin. This year's eligibility package includes the following documentation • The City's Measure M2 Seven -Year Capital Improvement Program (CIP), Orange County Transportation Authority (OCTA) format, for Fiscal Year 2019-2020 through Fiscal Year 2025-2026 (Attachment "A"). • A copy of the City's Capital Improvement Program (CIP) Budget sections (Attachment "B"), beginning with FY 2019-20, as it relates to Measure M2 funding. • City Resolutions 19-26 and 19-27 (Attachment "C") for the Circulation Element, Mitigation Fee Program and Pavement Management Program. • Maintenance of Effort (MOE) Report Form (Attachment "D"), plus a statement certifying that the City of Tustin has budgeted and will meet its MOE requirement for Fiscal Year 2019-20. The City of Tustin's General Fund — CIP Account (Fund Number 200), will fund all projects listed under the Maintenance of Effort (MOE) Documentation. • A copy of the City's annual roadway and public infrastructure maintenance program 70018 Exhibit (Attachment "E") • Arterial Highway Plan of City's Circulation Element (Attachment "F") • Measure M Eligibility Checklist for Fiscal Year 2019-20 (Attachment "G") • Congestion Management Program (CMP) Checklist (Attachment H) • Arterial Highway Mileage Change Report (Attachment "I") • Mitigation Fee Program - the Measure M2 Ordinance requires local agencies to assess traffic impacts of new development and require new development to pay a fair share of necessary transportation improvements attributable to the new development. The City currently has a defined development impact mitigation fee program in place. The components of this program, including an associated nexus study, were previously submitted to the OCTA. The latest Transportation Corridor Agencies (TCA) Major Thoroughfare and Bridge Fee Program included in Attachment "J" satisfies this requirement. Annual Measure M2 Eligibility Submittal June 18, 2019 Page 3 • The City, through its General Plan, considers land use planning strategies that accommodate transit and non -motorized transportation. A letter documenting these strategies is included in Attachment "K". • The Pavement Management Plan (PMP) is a plan to manage the preservation, rehabilitation, and maintenance of paved roads by analyzing pavement life cycles, assessing overall system performance costs, and determining alternative strategies and costs necessary to improve paved roads. The City is required to adopt a Pavement Management Plan every two years that is consistent with the OCTA Measure M2 Ordinance and Countywide Pavement Management Program Guidelines. The Local PMP Plan and certification form certifying conformance with OCTA requirements (Attachment "L") is attached. These items demonstrate to OCTA that Tustin has been and will continue to fulfill its responsibility to implement the requirements of Measure M2. Moreover, compliance with the requirements of Measure M2 will ensure the City's continued eligibility for the various Fair Share and competitive program funds. ,b. 5tacK, H. E. of Public Works/City Engineer Attachment(s): 1. Measure M2 Eligibility Package FY 2019-20 2. Resolution 19-26 3. Resolution 19-27 S:\OCTA\Measure M2 2019-2020\1d Approve Annual M2 Eligibility Submittal for FY 2019-20 Draft CC Rpt.docx ATTACHMENT 1 Measure M2 Eligibility Package FY 2019-20 Department of Public Works Douglas S. Stack, P.E. Director June 7, 2019 Mr. Joe Alcock Section Manager, Measure M - Local Programs Orange County Transportation Authority 600 S. Main St. P.O. Box 14184 Orange, CA 92863-1584 SUBJECT: Renewed Measure M (M2) Program Eligibility Review for Fiscal Year 2019-2020 Dear Mr. Alcock: The City of Tustin is pleased to submit the Renewed Measure M (M2) Program Eligibility Review package for Fiscal Year 2019-20. Included in the submittal are the following: 1. Measure M2 Seven -Year Capital Improvement Program (CIP), Orange County Transportation Authority (OCTA) format, for Fiscal Year 2019-2020 through Fiscal Year 2025-2026 (Attachment "A") 2. A copy of the City's Seven -Year CIP Budget sections (Attachment "B") 3. City Resolutions (Attachment "C") — Concerning the status and update of the Circulation Element, Mitigation Fee Program and Pavement Management program for the Measure M2 Program. 4. Maintenance of Effort (MOE) Report Form (Attachment "D") plus a statement certifying that the City of Tustin has budgeted and will meet its MOE requirement for Fiscal Year 2019-20. The City of Tustin's General Fund, CIP Account (Fund Number 200), will fund all projects listed under the Maintenance of Effort (MOE) Documentation. 5. A copy of the City's annual roadway and public infrastructure maintenance program Exhibit (Attachment "E") 6. Arterial Highway Plan of City's Circulation Element (Attachment "F") 7. Measure M Eligibility Checklist for Fiscal Year 2019-20 (Attachment "G") 8. Congestion Management Program (CMP) Checklist (Attachment "H") 9. Arterial Highway Mileage Change Report (Attachment "I") 300 Centennial Way, Tustin, CA 92780 0 P: (714) 573-3150 0 F: (714) 734-8991 0 www.tustinca.org Renewed Measure M (M2) Program Eligibility Review for Fiscal Year 2019-2020 June 7, 2019 Page 2 10. Mitigation Fee Program - the City currently has a defined development impact mitigation fee program in place. The components of this program, including an associated nexus study, were previously submitted to the OCTA in the compliance package for Fiscal Year 2010-2011. The latest Transportation Corridor Agencies (TCA) Major Thoroughfare and Bridge Fee Program is included in Attachment "J". 11. The City, through its General Plan, considers land use planning strategies that accommodate transit and non -motorized transportation. A letter documenting these strategies is included in Attachment W'. 12. The Local Pavement Management Program (PMP) Plan and PMP Certification Form (Attachment "L"). Please do not hesitate to contact me at 714-573-3172 if you have any questions regarding the City of Tustin's eligibility package. Sincerely, Krys Saldivar Public Works Manager-Traffic/Transportation Attachments: 1. Attachment "A" Seven Year CIP (OCTA format) 2. Attachment "B" Excerpts from City's Seven Year CIP Budget (FY 2019-20) 3. Attachment "C" City Resolutions 4. Attachment "D" Maintenance of Effort Reporting Form 5. Attachment "E" Annual Roadway & Public Infrastructure Maintenance Program Exhibit 6. Attachment "F" Arterial Highway Plan of City's Circulation Element 7. Attachment "G" Measure M Eligibility Checklist 8. Attachment "H" Congestion Management Program (CMP) Checklist 9. Attachment "I" Arterial Highway Mileage Change Report 10. Attachment "J" TGA Major Thoroughfare and Bridge Fee Program Rates 11. Attachment "K" Transit - Non -Motorized Land Use Planning Strategies Letter 12. Attachment "L" Local PMP Plan & PMP Certification Form cc: Douglas S. Stack, P.E., Director of Public Works/City Engineer John A. Buchanan, Director of Finance Ken Nishikawa, P.E., Deputy Director of Public Works/Engineering S:10CTA\Measure M2 2019-202M1a M2 Annual Compliance 2019-2020 Cvr_Ltr Divider Shts.docx CITY OF TUSTIN TUSTIN iL �TREES C F- HISTORY BUILDING OUR FUTURE HONORING OUR PAST MEASURE M2 ELIGIBILITY PACKAGE FY 2019-20 City of Tustin A. Seven Year CIP (OCTA Format) B. Excerpts from City's Seven Year CIP Budget (FY 2019-20) C. City Resolutions D. Maintenance of Effort Reporting Form E. Annual Roadway & Public Infrastructure Maintenance Program Exhibit F. Arterial Highway Plan of City's Circulation Element G. Measure M Eligibility Checklist Congestion Arterial Highway Mileage•Report TCA Major • • • _ and Bridge Fee Program Rates IC. Transit - Non -Motorized Land Use Planning -Strategies Letter L. PMP Certification & Local PMP Plan Attachment "A" Seven -Year CIP (®CTA Format) 6/7/2019 Agency: Tustin Project Name: Annual Roadway and Public Infrastructure .. _. Maintenance Proaram 2019-20 170018 - MOEI Project Limits: Citywide various locations Project Number: N/A Type of Work (TOW): Road Maintenance TOW Description: Rehabilitation of roadway Project Description: Annual maintenance of roadways, public alleys, and .....v::k.:'.i ..., $125,000 $125,000� public infrastructure at various citywide locations, $0 including pavement rehabilitation measures such as $0 crack sealing, slurry seal, AC overlay, sidewalk $0 repairs, signing and striping. [Zone 7] Measure M Seven Year Capital Improvement Program (Sorted by Project Name) Fiscal Years 2019/2020 through 2025/2026 �spROJECz. "k FUND NAME,�,.�,;,,,",�PERCENT,r„?#�.v_,ESTIMATED:GOST�,_TED.COST Gas Tax 11.26 $300,000 $300,000 $250k New funds, -$50k CO from prior yrs General Fund - 60.04 $1,600,000 $1,600;000 GF-CtP includes -$50k Carry Over from pric yr M2 LFS 28.71 $765,000 $765,000 $510k in new funds, -$255k CO from prior yr $2,665,000 $2,665,000 :`t' d ,t ,'.:,. .'r ,�:,,x ,.� ,y 6 3 ,".. .,': .xx.+^:ar .. r t .* i. a ` .. >:':', ., x.. x;,]j Z` +.....�,,.... s.. ,...� x .s-.d.v...;G. ,a ^.. s x . 'n 21 /22 f ... , , , P M , .. v m. s, ProiectPhase X22/23 , 23/24N � 24/25 � �` , 25/�: �;rEstimated<Cost�-�*� �'rP,roiectedsCost� ,_., .,_ . .., __ .. _. _......... �- f� Annual Roadway and Public Infrastructure .. _. �.x sa:.f., ... .>. , .A__.r E.k _; ti•..u...,....�.u. Wsi ,.,. ,�z t>. S.. E $125,000 $0 $0� $0 $0 .. ..,,e., ....�,..5...*b. $0 $0 .....v::k.:'.i ..., $125,000 $125,000� R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $2,540,000 $0 $0 $0 $0 $0 $0 $2,540,000 $2,540,000 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,665,000 $0 $0 $0 $0 $0 $0 $2,665,000 $ 2,665,000 Agency: Tustin Project Name: Annual Roadway and Public Infrastructure ,ProiecYPhase. ,,.. . �cc�* � r ;,.Estimated;Cost� >. F :' �z � r�'�z ,a �r�«� � , , , �,. .{'' s'' ".. L d^� '"'4 4 ..f x _t "'"�" S _ *,,,3 "��3 . .. .. .. .... .. ... W_.✓...,.. _... .... ,.. !. a, �_x sl.«...u.�.cd'aW.> ",.......�w..,..,..a,,.« ,,,..`,„ua. �...m'r...,EEL:.� ., n ..x,.d..,�s.. .t..0. a.} W...a 9..t.uv4.dvw:s....._ ,3z2.. ,ie.,._...wE*^"1a.r. '�'w�.*.�.r�."�'.�.ta".,.} .^.t.ma., ,w.tit...,.wd �..._ u,�. ........ < Maintenance Proaram 2020-21 r700191 Project Limits: Citywide various locations Project Number: N/A Type of work (TOW): Road Maintenance TOW Description: Rehabilitation of roadway Project Description: City wide maintenance of roadways, public alleys $0 and public infrastructure including pavement $0 $0 rehabilitation, sidewalk repairs, signing and striping; $0 maintain and update City's PMP and transportation $2,465,000 project grants. [Zone 11 EUNDN�i4ME„,,, _,t.: _ "� %PERCENT �,, , M,•ESTIMATEI]COST z ;�PROJECTED�GOST,,,�?� NOTES ?„ , ,_� ,_ _, x , �� � �, , ,,,z_ Gas Tax 11.26 $300,000 $300,000 General Fund 60.04 $1,600,000 $1,600,000 M2 LFS 28.71 $765,000 $765,000 $2,665,000 $2,665,000 '.!. . .._ .. .:.. - �, ., .� . F.,r� .;:. r "... .-mow.-„ ., , .�, L't Y ,,w,. � A,.. } i:” .. �,..,.-. W..,�p�;., ,.. � Fy--�"•,,.. 19/20 . ,F20/21 21/22 > .,22/23 �, .z 23/24 24725. � �. 25 � z � ,,.w � .Gv .. 26��z�>t ^ Proiected�Gost �� � ,ProiecYPhase. ,,.. . �cc�* � r ;,.Estimated;Cost� >. F :' �z � r�'�z ,a �r�«� � , , , �,. .{'' s'' ".. L d^� '"'4 4 ..f x _t "'"�" S _ *,,,3 "��3 . .. .. .. .... .. ... W_.✓...,.. _... .... ,.. !. a, �_x sl.«...u.�.cd'aW.> ",.......�w..,..,..a,,.« ,,,..`,„ua. �...m'r...,EEL:.� ., n ..x,.d..,�s.. .t..0. a.} W...a 9..t.uv4.dvw:s....._ ,3z2.. ,ie.,._...wE*^"1a.r. '�'w�.*.�.r�."�'.�.ta".,.} .^.t.ma., ,w.tit...,.wd �..._ u,�. ........ < E $200,000 $0 $0 $0 $0 $0 $0 $200,000 $200,000 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $2,465,000 $0 $0 $0 $0 $0 $0 $2,465,000 $2,465,000 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,665,000 $0 $0 $0 $0 $0 $0 $2,665,000 $ 2,665,000 1 6/7/2019 Measure M 2 Seven Year Capital Improvement Program (Sorted by Project Name) Fiscal Years 2019/2020 through 2025/2026 Agency: Tustin Project Name: Browning Avenue Rehabilitation between EI Camino _... Rd and Irvine Blvd Project Limits: Browning Avenue between EI Camino Real and Irvine Project Number: Boulevard Project Number: N/A Type of Work (TOW): Road Maintenance TOW Description: $0 $0 Project Description: Removal and deep lift repairs of asphalt concrete $100,000 pavement failure areas, cold plane, construction of $0 asphalt concrete resurfacing, traffic loops, and $0 traffic striping. FUND`NAME_�,`,” ,,,PERCENTw,_`_ ESfMATEDDOST _ PR05EC7ED`COSTr NOTES _,�„, SB 100.00 $6D0,000 $630,759 SB1, GF and/or M2 $600,000 $630,759 Prosect Phase 19120 20/21 21/22 22/23 23/24 24/25` �25/P6x' x, Estimafetl Cost Proiectetl i _... .u. _. _.� _. _. Project Limits: Various locations - Citywide Project Number: 18-TUST-ECP-3927 Type of Work (TOW): $0n $0, $100,000 $0 $0 $0 $0� $100,000 $100,000 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $0 $0 $500,000 $0 $0 $0 $0 $500,000 $530,759 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $600,000 $0 $0 $0 $0 $600,000 $ 630,759 Agency: Tustin Project Name: Citywide Installation of Catch Basin BMPs FY2018/19 x Projected Cost f500361 Project Limits: Various locations - Citywide Project Number: 18-TUST-ECP-3927 Type of Work (TOW): Environmental Cleanup - TOW Description: Automatic Retractable Screen and other debris $0 screens or inserts Project Description: Installation of catch basin filters and/or automatic $0 retractable catch basin screens at various citywide $0 $0 locations. Carry over ongoing project. r a e 0 FUND"NA'ME_Ww=�„ rPERCENT,�._�__��ESTIMATED�G�OS7`_,:'PROJECTED.�08`���,NOTES`���„fib > i M2 ECP -1 0.00 $0 $0 M2 -ECP Tier 1 $152,794- in FY 2018/19 [2018 Call] M2 LFS 0.00 $0 $0 City Match FY 2018/19 —$40k $0 $0 .....19/20 . _ 23`,_,.2 .3 /2,x4 � ^.y,:, i`,;'�,s£h24/2.. 5T,.:Ft� ,: , 25/26,;..,; � `�",+ �°�:,,:..✓�' Estimated Costf x Projected Cost , _s ,r .�, � ,r � � � � , ,� ,, E $0 $0 $0 $0 $0 $0 $0 $0 $0 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $0 $0 $0 $0 $0 $0 $0 $0 $0 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 0 6/7/2019 Agency: Tustin Project Name: Citywide Pedestrian Oriented Accessibility Project Limits: Imnrovement Program (CIP 702361 Project Limits: Citywide Project Number: N/A Type of Work (TOW): Pedestrian TOW Description: Reconstruction or rehabilitation of sidewalk Project Description: Reconstruction of pedestrian infrastructure and R installation of equipment to make pedestrian travel $0 thru the City more accessible to persons with $0 $0 $0 disabilities. Measure M Seven Year Capital Improvement Program (Sorted by Project Name) Fiscal Years 2019/2020 through 2025/2026 t UNDNAME H..,,,s ,,, ,,u,PERCENT ESTIMATED°��O8T'PROJECtED.`C�1STj General Fund 100.00 $2,800,000 $3,067,770 GF and/or M2 $2,800,000 $3,067,770 I Ph Praeas 19/20 20/21 21/22 22/2iax 24/25 nt 25/26 23/24 Estmiatetl Cosy Proiectetl Cc Project Limits: , �$0 TBD �$0 4� E $0 $0 $0 $0= $0 $0� $0 Schools First Campus. City to rimburse Schools R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $400,000 $400,000 $400,000 $400,000 $400,000 $400,000 $400,000 $2,800,000 $3,067,770 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $400,000 $400,000 $400,000 $400,000 $400,000 $400,000 $400,000 $2,800,000 $ 3,067,770 Agency: Tustin Project Name: Del Amo / Newport Improvements Project Limits: SR -55 On Ramp and Edinger Avenue Project Number: TBD Type of Work (TOW): Road Maintenance TOW Description: Rehabilitation of roadway Project Description: Roadway Improvements and Maintenance near ..,_. 3IM.�_.� $0 $0 Schools First Campus. City to rimburse Schools $0 First. Gas Tax 100.00 $55,000 $55,000 Gas Tax and/or M2 $55,000 $55,000 .":.,-" , ,c.. ,:s =+v s: x, .. '. .d. .. ;.4 Cw.,. . ,_ ., 2 s ..:., .., ..,:�., x.. , . ....-1Y ....... :, J. ....,a., ., :19/20,,.,, > .,,2Q/21 ,.� „, .21!22,. �N�22/23 r .,, Prosect Phase � .';., ., ..H "a .` _..!y +r: .„r .�., . - # 5.*, .. ,:. n .b.:..,. a +° vkr,.;� tis 7 i , 5 ., „ , -� , �„ .x w n,=,t � ,�'u � , ,_ � sr.., 23/24 24/25, 25/26. Estimated Cost, r < � � � , ,.Proiectetl -IM, E $0 $0 $0 $0 $0 $0 $0 ..,_. 3IM.�_.� $0 $0 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $55,000 $0 $0 $0 $0 $0 $0 $55,000 $55,000 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $55,000 $0 $0 $0 $0 $0 $0 $55,000 $ 55,000 3 6/7/2019 Measure M Seven Year Capital Improvement Program (Sorted by Project Name) Fiscal Years 2019/2020 through 2025/2026 Agency: Tustin Project Name: Edinger Avenue/Irvine Center Drive Traffic Signal Svnchronization Proiect [400881 Project Limits: Edinger Av/Irvine Center Dr between Newport Av in Tustin & Protocol St in Irvine Project Number: 16-I RvN-TSP-3791 Type of work (TOW): Traffic Signals TOW Description: Coordinate signals within project limits Project Description: Traffic studies, install new signal equipment and $0 $0 implement new timing to synchronize signals on $0 Edinger Av/Irvine Center Dr. City contribution of 20% R to Regional TSSP project managed by Irvine. CO $0 project with funding from prior yrs. M2ND.SNAME _ rP 00 DONT„f $33 iM%TED•COST„r PROJE QED COSH MP LFS $144,190- in total including CO from 430 $93,430 Prior yrs M2 TSSP 0.00 $0 $0 Irvine -Lead Agency, $466,592 in TSSP for Tustin Segment Another Agency 0.00 $0 $0 City of Irvine (Lead Agency) - Project Contribution $93,430 $93,430 Prosect Phase 19/20 20/21 21!22 22/23 23/24 24/25 x x 25/26: y Estirriatetl=Cost' PrOiectetl C'©si 3 � atetl . w. e �_ E E $0 $0 $0 $0 $0 $0 $0 $0 .$0_ .Fw. .. _�. R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $0 $0 $0 $0 $0 $0 $0 $0 $0 O&M $93,430 $0 $0 $0 $0 $0 $0 $93,430 $93,430 $0 $93,430 $0 $0 $0 $0 $0 $0 $93,430 $ 93,430 Agency: iustln Project Name: Irvine Boulevard Storm Drain between Holt Avenue and SR -55 (Phase ill Project Limits: Irvine Boulevard from Prospect Avenue to SR -55 Project Number: N/A Type of Work (TOW): Safety TOW Description: Improve roadway drainage Project Description: New storm drain, catch basins and junction structures 7 r Unfunded 100.00 $3,900,000 $4,542,787 Uncertain funding. M2 LFS, GF, Gas Tax, S131 or other funds. $3,900,000 $4,542,787 4 Cot C, 3 � atetl ro ected E $0 $0 $0 $0 $300,000 $0�� $0 $300,000 $300,000 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $0 $0 $0 $0 $0 $1,800,000 $1,800,000 $3,600,000 $4,242,787 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $300,000 $1,800,000 $1,800,000 $3,900,000 $ 4,542,787 4 6/7/2019 Measure M Seven Year Capital Improvement Program (Sorted by Project Name) Fiscal Years 2019/2020 through 2025/2026 Agency: Tustin Project Name: Irvine Boulevard Storm Drain between Holt Avenue to Prosoect Avenue (Phase 1) Project Limits: Irvine Boulevard from Holt Avenue toProspect Avenue Project Number: N/A Type of Work (TOW): Safety TOW Description: Improve roadway drainage Project Description: New storm drain, catch basin and junction structures ESTIM4 ,EU'C __ PROJE"CTED COST NOTES Unfunded 100.00 $3,900,000 $4,356,554 Uncertain funding. M2 LFS, GF, Gas Tax, SBI or other funds $3,900,000 $4,356,554 ProiectPhase 19/20 `20/21 ° 21/22 22/23 23/24 � r24/25� � 25/26 � �� � Eslir'riatetl Costi� Proiected�Cdst� Project Number: N/A Type of Work (TOW): Road Maintenance TOW Description: Rehabilitation of roadway Project Description: Removal and deep lift repairs of AC pavement failure $0 E $0 $0 $0 $300,000 $0 $0 $0 $300,000 $300,000 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $0 $0 $0 $0 $3,600,000 $0 $0 $3,600,000 $4,056,554 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $300,000 $3,600,000 $0 $0 $3,900,000 $ 4,356,554 Agency: Tustin Project Name: Jamboree Road Pavement Rehabilitation between Barranca Pkwv and OCTA/SCRRA Project Limits: Between Barranca Parkway and OCTA/SCRRA Project Number: N/A Type of Work (TOW): Road Maintenance TOW Description: Rehabilitation of roadway Project Description: Removal and deep lift repairs of AC pavement failure $0 areas, cold plane, construction of AC resurfacing, $100,000 traffic loops and traffic striping. 100.00 $1,300,000 $1,452,185 SB1, GF and/or M2 $1,300,000 $1,452,185 5 „ y a.. s.. Estimate Pr-,oiectetl Cost : f"_, E $0 $0 $0 $0 $100,000 $0 $0 $100,000 $100,000 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/1 $0 $0 $0 $0 $1,200,000 $0 $0 $1,200,000 $1,352,185 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,300,000 $0 $0 $1,300,000 $ 1,452,185 5 6/7/2019 Measure M Seven Year Capital Improvement Program (Sorted by Project Name) Fiscal Years 2019/2020 through 2025/2026 Agency: Tustin Project Name: Jamboree Road Widening between Tustin Ranch Rd and North Citv Limits Project Limits Jamboree Road between Tustin_ Ranch Road and North Citv Limits Project Number: N/A Type of Work (TOW): Road Widening TOW Description: Add 2 lanes to existing roadway in project limits Project Description: Widen to 6 -lane major arterial standards, decreasing the existing median width. FUN6AA91 9?PERCENT �� � __ES1zi ED'COST _.'PRO`SECEEDZOS'Ig .. NOTESw. Developer 50.00 $1,400,000 $1,635,369 Developer Contribution for E and C phases Unfunded 50.00 $1,400,000 $1,635,369 Uncertain Funding - Construction Phase $2,800,000 $3,270,737 Proiect'Phase 19%20` '; 20/21 2I/22 22)23 23/24 24%25- 25/26 `; Estimated Cosf` P.rojecfed'C'< Intersection of Lansdowne Road and Valencia M2 LFS prior yr expenditures Avenue Project Number: v A$400,000 Traffic Signals TOW Description: Install new traffic signal and equipment Project Description: Installation of traffic signal at intersection of $0 $400,000 $0 $400,000 expenditures include M2-LFS, SB1 and Developer R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $0 $0 $0 $0 $0 $0 $2,400,000 $2,400,000 $2,870,737 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $400,000 $2,400,000 $2,800,000 $ 3,270,737 Agency: Tustin Project Name: Lansdowne Road and Valencia Avenue Traffic PLus $25k prior yr expenditures Sianal Proiect 1`400901 Project Limits: Intersection of Lansdowne Road and Valencia M2 LFS prior yr expenditures Avenue Project Number: N/A Type of work (TOW): Traffic Signals TOW Description: Install new traffic signal and equipment Project Description: Installation of traffic signal at intersection of $375,000 Lansdowne Road and Valencia Avenue. Prior yr $0 expenditures include M2-LFS, SB1 and Developer $0 fuds. :rsit". '� Developer 20.00 $75,000 $75,000 PLus $25k prior yr expenditures M2 LFS 0.00 $0 $0 M2 LFS prior yr expenditures 3131 80.00 $300,000 $300,000 Plus $10k prior yr expenditures. SBI and/or $0 $0 $0 $0 M2-LFS funds $0 $375,000 $375,000 $0 Project Phase „ 19120 Estimate k Projected Cos �. E $0 $0 $0 $0 $0 $0 $0 $0 $0 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $375,000 $0 $0 $0 $0 $0 $0 $375,000 $375,000 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $375,000 $0 $0 $0 $0 $0 $0 $375,000 $ 375,000 [:9 6/7/2019 Measure ISE 7 Seven Year Capital Improvement Program (Sorted by Project Name) Fiscal Years 2019/2020 through 2025/2026 Agency: Tustin Project Name: Main Street/EI Camino Real Improvements 1`400871 Project Limits: Main St between Newport Ave and "C' St and EI AB2766 Camino Real between Newoort Av and First St Project Number: N/A Type of Work (TOW): Safety TOW Description: Install guard rails, curbs or other safety barriers $454,000 along road Project Description: Main Street improvements including installation of $0 medians, traffic striping, enhanced landscaping and funds widening of sidewalks. CO Project. Project Phase : 19/20 , 20/21 ,`; a $20,000 $0._.;,$0.s.$0 FUND'N'ME._ <.PHRCENT__e.__, .ESTIMATED�COST _PRbJECTED C'OST,__„,NOTES w_}h, ,,, „ _ _� AB2766 0.00 $0 $0 _ Prior Yr PE phase expenditures $198k CDBG 11.58 $454,000 $454,000 Includes Community Dev Block Grant priory $0 $0 $0 $0 funds CMAQ 58.60 $2,297,900 $2,297,900 M2 -Competitive and/or Federal CMAQ fund: M2 LFS 29.82 $1,169,446 $1,169,446 Plus Prior YR M2-LFS exp. of $229,786- $0 $0 $0 $3,921,346 $3,921,346 $0 Project Phase : 19/20 , 20/21 ,`; a $20,000 $0._.;,$0.s.$0 2.1/22 ' 22/23 23/24.: � 24/25 25/26 ' ' Estlm"eted Cost §� , . Prdlected`Cost $0� $0. $0..,$20,000 $20,000, R $0 $0 $0 $0 s0 $0 $0 $0 $0 CA $3,901,346 $0 $0 $0 $0 $0 $0 $3,901,346 $3,901,346 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $3,921,346 $0 $0 $0 $0 $0 $0 $3,921,346 $ 3,921,346 Agency: I Ustln Project Name: Median Landscape Rehabilitation 1`CIP No. 100741 Project Limits: Citywide ARS units - Medians along First St, Newport Pro Av and Irvine Blvd Project Number: 16-TUST-ECP-3858 Type of Work (TOW): Environmental Cleanup TOW Description: Other Project Description: Replace median turf with drought tolerant plant and efficient irrigation. Replace monument signs. Design and improvements along First St, Newport Av and Irvine Blvd, install 24 ARS units citywide. Carry over project with prior yr -funding. M2 ECP -1 0.00 $0 $0 16-TUST-ECP-3858 ECP Tier 1 Grant $2001 CO FY 16/17 Gas Tax 0.00 $0 $0 CO Project with prior yr funds M2 LFS 0.00 $0 $0 CO Project with prior yr funds Other 32.13 $0 $0 FY 18/19 MCAS Land funds $0 $D 066&f Phase, '- 19/20 i :20/21 21/22 22/23 231`24 �� 24/25 t 25/26 � EstlmatetlCos`t Pro : r�� , E $0 $0 $0 $0 $0 $0>.. $0 $0 $0� R - $0 $0 $0 $0 $0 $0 $0 $0 $0 CA $0 $0 $0 $0 $0 $0 $0 $0 $0 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 0 6/7/2019 Measure M Seven Year Capital Improvement Program (Sorted by Project Name) Fiscal Years 2018/2020 through 2025/2026 Agency: Tustin Project Name: Moffet Drive Extension from Park Avenue to east of 2°1/22 Peters Canvon Channel r702241 Project Limits: Moffet Drive from Park Avenue to east of Peters Intersection of Newport Avenue and Schools First _ Canvon Channel Project Number: N/A Type of Work (TOW): New Facility TOW Description: New 2 lane roadway between project limits Project Description: Design and construction of Moffet Dr extension 0 including bridge construction over Peters Canyon $0 Channel. CO project for FY17/18 with funding from $0 prior years and FY18/19 funds. Other 1D0.00 $1,000,000 $1,000,D00 MCAS TAB $1,000,000 $1,000,000 Proieit Phase 19/20 ''20/21 Project Name: 2°1/22 22/23 23!24 4 24/25` 25/26 `` ' Estimated Cosi P.roiectetl°Cost Project Limits: Intersection of Newport Avenue and Schools First } , E $0 $0 $0 TOW Description: Install new traffic signal and equipment $0 0 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $1,000,000 $0 $0 $0 $0 $0 $0 $1,000,000 $1,000,000 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 O&M $1,000,000 $0 $0 $0 $0 $0 $0 $1,000,000 $ 1,000,000 Agency: Tustin Project Name: Newport Avenue / Schools First Traffic Signal _ Proiect Project Limits: Intersection of Newport Avenue and Schools First Camnus Project Number: TBD Type of Work (TOW): Traffic Signals TOW Description: Install new traffic signal and equipment Project Description: Installation of traffic signal at the intersection of $0 Newport Avenue and the Schools First Campus. vy, a FGND NA�111E _n ��< ,,,r ,� PERCENTa,� �3.ESTIMATED'COST,,�.�;PROJfiC�ED COST.'. NOTES__��.�,� 4, .,.�„_; Gas Tax 100.00 $2D0,000 $200,000 Gas Tax and/or M2-LFS fundsf _a� $200,000 $200,000 ProiectrPhase ': � � �� � Estimated Cost. Projected Cos4� , _ s k _ �, , , $0 $0 $0 $0 $0� $0 $0 $0 $0 R $0 $0 $0 $0 $0 $0 $0 $0 - $0 C/I $200,000 $0 $0 $0 $0 $0 $0 $200,000 $200,000 O&M $0 $0 $0 $0 $0 $0 $0 -$0 $0 $200,000 $0 $0 $0 $0 $0 $0 $2001000 $ 200,000 s 6/7/2019 Agency: Tustin Project Name: Newport Avenue Extension, N/O Edinger Avenue - 2:9/22 Phase II (CIP 70131) Project Limits: From current terminus to south of Edinger Avenue Project Number: N/A Type of Work (TOW): New Facility TOW Description: New 6 lane roadway between project limits Project Description: Extension of Newport Avenue from current terminus $0 to south of Edinger Avenue including the railroad $1,000,000 underpass and the widening of Newport Avenue $0 from Tustin Grove Drive to Myrtle Avenue. Includes -$1,000,000 realignment of flood control channel. Measure M Seven Year Capital Improvement Program (Sorted by Project Name) Fiscal Years 2019/2020 through 2025/2026 fUNDNgIVIE Unfunded 100.00 $51,000,000 $60,455,254 Uncertain funding. Prior exp. includes M-Tur backfunds $51,000,000 $60,455,254 Project Tustin 20/21 2:9/22 22%23 23124 24/25 25/26 Estimatetl Cost: Projected Cost Project Limits: Newport Avenue between 1-5 and Holt Avenue n _ N/A Type of Work (TOW): Road Maintenance E $0 $0 $0 $0 $1,000,000 $0 $0 $1,000,0004 -$1,000,000 R $0 $0 $0 $0 $0 $10,000,000 $0 $10,000,000 $11,609,633 C/I $0 $0 $0 $0 $0 $0 $40,000,000 $40,000,000 $47,845,620 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,000,000 $10,000,000 $40,000,000 $51,000,000 $ 60,455,254 Agency: Tustin Project Name: Newport Avenue Rehabilitation between 1-5 and Holt 23!24 r 24!25, 25/26` ' Est mated Cost? •Projected `Cost Avenue iCIP No. 702441 Project Limits: Newport Avenue between 1-5 and Holt Avenue Project Number: N/A Type of Work (TOW): Road Maintenance TOW Description: Rehabilitation of roadway Project Description: Street rehabilitation, R&R of failed AC areas, repair $0 of sidewalk, C&G, ramp reconstruction, cold plane $0 pavement, AC resurfacing, traffic loops and striping. SB1 100.00 $1,150,000 $1,150,000 SB1, GF and/or M2 + CO funds from prior yr $1,150,000 $1,150,000 Rroiect Phase 19/20 20/21 21 /22 22/23 23!24 r 24!25, 25/26` ' Est mated Cost? •Projected `Cost J f , E $50,000 $0 $0 $0 $0 $0 $0 $50,000 $50,000 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $1,100,000 $0 $0 $0 $0 $0 $0 $1,100,000 $1,100,000 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,150,000 $0 $0 $0 $0 $0 $0 $1,150,000 $ 1,150,000 0 6/7/2019 Agency: Tustin Project Name: Newport Avenue Rehabilitation between I-5 Freeway ,22/23 and Svcamore Avenue UP 702451 Project Limits: Newport Av between 1-5 Freeway and Sycamore' $0 Avenue Project Number: N/A Type of Work (TOW): Road Maintenance TOW Description: Rehabilitation of roadway Project Description: R&R of failed AC areas, repair of sidewalk and C&G, C/I ramp reconstruction, cold plane and AC resurfacing, $0 traffic loops and striping Measure M Seven Year Capital Improvement Program (Sorted by Project Name) Fiscal Years 2019/2020 through 2025/2026 FUND NOME, - SB 1 100.04 $850,000 $850,000 SB1, GF and/or M2 + CO funds from prior yr $850,000 $850,000 Project Phase �' < 19/20 ; r;, 20/21 "• 21/22 ,22/23 3. °23%3 E $50,000 $0 $0 $0 $0 R $0 $0 $0 $0 $0 C/I $800,000 $0 $0 $0 $0 O&M $0 $0 $0 $0 $0 $375,000 $850,000 $0 $0 $0 $0 Agency: Tustin Project Name: Parkcenter Lane and Bryan Avenue Traffic Signal 23%2Q Proiect r400911 Project Limits: Intersection of Parkcenter Lane and Bryan Avenue Project Number: N/A Type of Work (TOW): Traffic Signals TOW Description: Install new traffic signal and equipment Project Description: Installation of traffic signal at intersection of $0 Parkcenter Lane and Bryan Avenue. Prior year "$0 expenditures include M2 LFS and SB1 funds. FUND`NAME, , �,,,_' �,, . PERCENT,. ESTiMATED�COST _ P,ROJECTED.COST M2 LFS 0.00 $0 $0 M2-LFS expenditures in prior yrs r SB1 100.00 $375,000 $375,000 S131 and/or M2-LFS funds plus Prior Yr expenditures $375,000 $375,000 Project Phase 19/20 20I21� 21/22 22123 23%2Q 24/25: 25/2 Y 2.�..._,.. E $0 . $0 u$0 _ "$0 $0 r_$0 A.y „ $0 R $0 $0 $0 $0 $0 $0 $0 C/I $375,000 $0 $0 $0 $0 $0 $0 O&M $0 $0 $0 $0 $0 $0 $0 $375,000 $0 $0 $0 $0 $0 $0 Estimated Cos` ,Proiectedv $0 $0 $0 $0 $375,000 $375,000 $0 $0 $375,000 $ 375,000 im 6/7/2019 Measure M Seven Year Capital Improvement Program (Sorted by Project Name) Fiscal Years 2019/2020 through 2025/2026 Agency: Tustin. Project Name: Red Hill Ave Median Imroovements Project Limits: Red Hill Avenue and Bryan Avenue - Project Number: TBD Type of Work (TOW): Road Maintenance TOW Description: Reconstruction of roadway Project Description: Reconstruction of medianson Red Hill Ave and Bryan Ave to lengthen turn pockets and replace aging landscape. Gas Tax 100.00 $200,000 $200,000 Gas Tax and/or M2 $200,000 $200,000 Project Phase 19/20"-' ':- ;20/21 - :21/22 t +. ::22/23 . 232 Project Limits: Red Hill Avenue between Dyer Rd/Barranca Pkwy $0 and Edinaer Avenue Project Number: 16-TUST-ACE-3817 R $0 $0 $0 $0 $0 C/1 $200,000 $0 $0 $0 $0 O&M $0 $0 $0 $0 $0 $0 $200,000 $0 $0 $0 $0 Agency: Tustin Project Name: Red Hill Ave Widening & Raised Medians between 23/24' 24/25 " 25/26 Estimated Cost Barranca Pkwv & Edinaer Ave 1702261 Project Limits: Red Hill Avenue between Dyer Rd/Barranca Pkwy $0 and Edinaer Avenue Project Number: 16-TUST-ACE-3817 Type of work (TOW): Road Widening Tow Description: Add 1 lane to existing roadway in project limits Project Description: Design and construction of N/B widening from 3 to 4 lanes, raised medians, landscaping and irrigation system. [Combined City CIP Projects 70226, 70227 & 701971. CO Project complete - Final report approval and reimbursement of M2 -ACE funds pending. 1/25. 25/26 rt E`stinated`Cost Projected"1 23/24' 24/25 " 25/26 Estimated Cost $0 $0 $0 $0 $0 $0 $200,000 $200,000 $0 $0 $0 $0 $0 $0 $200,000 $ 200,000 �FUNDNAME , _„_� v ,..,,tiPERCENT r,��_ __,,ESTIMATED COSTS _<<PROJECTED�COST, __-NOTES ,,�, _� �'_ t M2 ACE 0.00 $0 $0 $6M CTFP ACE funding "C" Phase in FYI 16/17 General Fund 5.04 $0 $0 CFD 14-1 funds in FY 2018/19 Other 94.96 $0 $0 City match [MCAS Fee in FY 2018/19] $0 $0 Project Phase 19/20. 20/21 21/22 22123 23/24' 24/25 " 25/26 Estimated Cost E $0 $0 $0 $0 $0 $0 $0 $0 $0 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $0 $0 $0 $0 $0 $0 $0 $0 $0 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 0 6/7/2019 Measure M Seven Year Capital Improvement Program (Sorted by Project Name) Fiscal Years 2019/2020 through 2025/2026 Agency: Tustin Project Name: Red Hill Avenue Corridor TSSP Project Limits: Multi agency project - City of Tustin Segment Limits 24/25: from Brvan Ave to Carnegie Ave. Project Number: N/A Type of work (TOW): Traffic Signals TOW Description: Interconnect traffic signals to improve coordination and communication Project Description: Provide timing analysis studies, install new signal equipment and synchronization. Managed by OCTA as lead agency. City of Tustin to provide match for $0 project within it's City limits. New project to be R programmed in FY 20/21. FUND NAME PERCENT_, „n ,ESTIMATED COST,_, -`PROJECTED COSTW _ N07ES. ,., ._ _ Other 15.18 $300,000 $307,421 City match - M2-LFS, SB1 Gas Tax, GF M2 TSSP 81.64 $1,613,352 - $1,653,264 2019 M2 RTSSP Call Primay Implementatioi Funds M2 TSSP 3.17 $62,720 $64,272 2019 M2 RTSSP Call O&M funds $1,976,072 $2,024,957 Project"Phase 19/20 20/21 21/22 22%23 23/24 24/25: 25/26 Estirrated Cos£ Proiectetl`Ci 16-TUST-ACE-3817 Type of Work (TOW): Safety .-Prdiectetl'COst $0 $0 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $0 $1,613,352 $0 $0 $0 $0 $0 $1,613,352 $1,662,237 O&M $0 $362,720 $0 $0 $0 $0 $0 $362,720 $362,720 $0 $0 $1,976,072 $0 $0 $0 $0 $0 $1,976,072 $ 2,024,957 Agency: I ustln Project Name: Red Hill Avenue Median Improvements Between 22/23 23%24` 'V Barranca & N/O Valentia Ave 1701971 Project Limits: From Barranca Avenue to Edinger Avenue Project Number: 16-TUST-ACE-3817 Type of Work (TOW): Safety FUND'tJ AME _, „ u ,_ tPERCENT _ w, , , ,ESTIMATED DOST PRO IECTED•COST ',MOTES_. M2 ACE 0.00 $0 $0 See funding Comb. CIPs 70226, 70227 & _ 70197 General Fund 0.00 $0 $0 See funding Comb. CIPs 70226, 70227 & 70197 $0 $0 TOW Description: Install curb median Project Description: Construct raised median, landscaping & irrigation. [Combined with City CIPs 70226 & 702271- CO Project complete - Final report approval and reimbursement of M2 -ACE grant funds pending - - 12 Proiecf Phase 19!20 •` 20/21 21122 22/23 23%24` 'V 24 25/26 Estimatetl'Cost?' x .-Prdiectetl'COst $0 $0 $0 $0 $0 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $0 $0 $0 $0 $0 $0 $0 $0 $0 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 0 6/7/2019 Measure M 13 Seven Year Capital Improvement Program (Sorted by Project Name) Fiscal Years 2019/2020 through 2025/2026 Agency: Tustin Project Name: Red Hill Avenue Rehabilitation between San Juan St 21/22 22/23 and Brvan Av 1702201 Project Limits: Redhill Avenue between San Juan Street and Bryan ated.Cd's``f Proiected'Cost, i Avenue Project Number: N/A Type of Work (TOW): Road Maintenance TOW Description: Rehabilitation of roadway Project Description: Removal and deep lift repairs of AC pavement failure $0..._ areas, cold plane, construction of AC resurfacing, $50,000 traffic loops and traffic striping. The project also $0 includes median reconstruction to lengthen $0 northbound left turn pocket at Bryan Avenue. FUND:NAME, , _ PERCENT _ .�ESTIMATED`COST �PROJEC.TED COST, NOTES ,;�, w , �y,r x „ SB1 100.00 $400,000 $432,789 SB1, GF and/or M2 $400,000 - $432,789 Project Phase :' 19/20 "' 20/21 21/22 22/23 23/24 r 24/25' 25126 'r ma Esti ted Cost Proiectetl Cdst s ated.Cd's``f Proiected'Cost, i Freewav � �. ... N/A Type of Work (TOW): $0 $0 $50,000 $0 $0 $0 $0..._ $50,000 $50,000 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $0 $0 $0 $350,000 $0 $0 $0 $350,000 $382,789 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $50,000 $350,000 $0 $0 $0 $400,000 $ 432,789 Agency: Tustin Project Name: Red Hill Avenue Rehabilitation between Walnut Av 22/23 and 1-5 Project Limits: Red Hill Avenue between Walnut Avenue and 1-5 ated.Cd's``f Proiected'Cost, i Freewav Project Number: N/A Type of Work (TOW): Road Maintenance TOW Description: Rehabilitation of roadway Project Description: R&R of failed AC areas, repair of sidewalks, C&G, $50,000� ramp reconstruction, cold plane pavement and AC $o resurfacing, traffic loops and striping SB1 100.00 $550,000 $596,841 SB1, GF and/or M2 $550,000 $596,841 "Project Phase _`"'-' 191 0, ` 20/21 29/22 22/23 23/24 r 24125:° 25/26: " n;Estirr ated.Cd's``f Proiected'Cost, i E $0 $0 $50,000 $0 $0 $0 $0 $50,000 $50,000� R $o $0 $0 $0 $0 $0 $0 $0 $0 CA $0 $0 $0 $500,000 $0 $0 $0 $500,000 $546,841 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 . $0 $50,000 $500,000 $0 $0 $0 $550,000 $ 596,841 6/7/2019 Agency: Tustin Project Name: Red Hill Avenue Widening between Barranca Pkwy and Warner Av [702271 Project Limits: Between Warner Avenue and Edinger Avenue Project Number: 16-TUST-ACE-3817 Type of Work (TOW): . Road Widening TOW Description: Add 1 lane to existing roadway in project limits Project Description: Widening on the east side to 8 -lane major arterial standards. Project combined with City CIPs 70226 & 70197. CO Project complete - Final report approval and reimbursement of M2 ACE grant funds pending. Measure M Seven Year Capital Improvement Program (Sorted by Project Name) Fiscal Years 2019/2020 through 2025/2026 FUND'f�AME _u,_ w..l, ,,, PERCENTiM, ESTIMATED�CO'ST _,".a.PROJECTED CAST; ' _NO1ES _ �s .,_ A_ M2 ACE 0.00 $0 $0 See funding Combined City CIPs 70226, 70227 & 70197 General Fund 0.00 $0 $0 See funding Combined City CIPs 70226, 70227 & 70197 $0 $0 14 Proiect Phase 19/20 20!21 21/22 22/23 23/24 24/25; 25/26 Estimated Cosf� a Cost 200° southerly 1701961 Project Limits: Red Hill Avenue from Melvin Way to 200 feet _ Project Number: N/A _ .Projected TOW Description: Widen width of existing traffic lanes $0 $0 $0 $0 $O $D., $O,N.:. $0 u.._ $0 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $0 $0 $0 $0 $0 $0 $0 $0 $0 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 0 Agency: Tustin Project Name: Red Hill Avenue Widening between Melvin Wy and 23/24 200° southerly 1701961 Project Limits: Red Hill Avenue from Melvin Way to 200 feet southerly Project Number: N/A Type of Work (TOW): Road Widening TOW Description: Widen width of existing traffic lanes Project Description: Street widening on the easterly side within the City $0 boundary and drainage improvements FUND NAME t „ „ ,. PERCENT ESTIMATED' COST ,, .,.RROJECTED Unfunded 100.00 $1,100,000 $1,273,009 Uncertain funding $1,100,000 $1,273,009 Proiect Phase 19/20 20/29 21/22 r 22/23 23/24 4/25 2;x, 25/26 Y Esfimated Cost= r Proiedted'"Ci E $0 $0 $0 $0 $0 $200,000 $0 $200,000 $200,000 R $0 $0 $0 $0 $0 $100,000 $0 $100,000 $116,096 C/I $0 $0 $0 $0 $0 $0 $800,000 $800,000 $956,912 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $300,000 $800,000 $1,100,000 $ 1,273,009 6/7/2019 Measure M Seven Year Capital Improvement Program (Sorted by Project Name) Fiscal Years 2019/2020 through 2025/2026 Agency: Tustin Project Name: San Juan Street Storm Drain Improvements Project Limits: San Juan Street from Falmouth Drive to 600' E/O 25/26= Redhill Avenue Project Number: N/A Type of Work (TOW): Safety TOW Description: Improve roadway drainage Project Description: San Juan Street Storm Drain Improvements - $0 Preliminary design studies, hydrology and hydaulic analysis to scope improvements. Unfunded 100.00 $75,000 $75,000 Uncertain funding. M2 LFS, SB1, Gas Tax, GF or other funds $75,000 $75,000 P.roiect Phase : 19/20 20/21 21/22 22/23 23124 x 24/25:' 25/26= ;'-. Estimated Cdst`":t Pioiected _ Project Number: 15 -OCTA -TSP -3786 Type of Work (TOW): Traffic Signals _ .. $0 $0 $0 $0 $Ou,_`$75,000 $0 $0 $•0 $0 $0 $0. $75,000 $75,000. R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $0 $0 $0 $0 $0 $0 $0 $0 $0 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $75,000 $0 $0 $0 $0 $0 $75,000 $ 75,000 Agency: Tustin Project Name: Seventeenth Street Signal Synchronization Project Estimated Cost= [400861 Project Limits: Seventeenth Street in the City of Tustin - OCTA Lead Aaencv Project Number: 15 -OCTA -TSP -3786 Type of Work (TOW): Traffic Signals TOW Description: Interconnect traffic signals to improve coordination and communication Project Description: Design & implement traffic signal coordination along Seventeenth St. including installation of TS controllers and fiber optic interconnect. City contribution of 20% match to OCTA managed project. CO project with funding from prior years. FUND'NAME,.,,,_. _,„a PERCENT�Q,,,,�;ESTIMATED'.�OST,,,,�,„PROJECT�EDCOST�, �„NdTES W, � _, M2 LFS 100.00 $10,000 $10,000 M2 LFS O&M funds Requested in FY 2019/20 M2 TSSP 0.00 $0 $0 M2 TSSP funding managed by OCTA as lea agency $10,000 $10,000 15 Proiect Phase 19/20 20/21 '' 21/22 22/23 �: f 3 x 2 /24 24!25 25/26 Y Estimated Cost= Proiectetl Gbst a� ^ E $0 $0 $0 $0 $0 $0 $0 $0 $0 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/1 $0 $0 $0 $0 $0 $0 $0 $0 $0 O&M $10,000 $0 $0 $0 $0 $0 $0 $10,000 $10,000 $10,000 $0 $0 $0 $0 $0 $0 $10,000 $ 10,000 6/7/2019 Measure M 16 Seven Year Capital Improvement Program (Sorted by Project Name) Fiscal Years 2019/2020 through 2025/2026 Agency: Tustin Project Name: Street Light LED Conversion Project rCIP No. 100791 Project Limits: Citywide Project Number: N/A Type of Work (TOW): Safety TOW Description: Improve lighting of roadway Project Description: Convert Tustin street light system from high pressure $0 $0 sodium to energy efficient LED fixtures. CO project R includes funding from prior years. FUND^NA7NE __,_,, �, „�_PERCSENT`�.w�„_,� ESTIMATED`COST ,.,,,'PROJECT'ED'COST;G,�;NOTES � �* � � _ General Fund 100.00 $30,000 $30,000 CO Project, FY 19/20 $30k in GF and/or - M2_LFS funds $30,000 $30,000 Project Phase 19/20 20/21 Traffic Signal Equipment Upgrades and $0 Reolacements (CIP 40080) Project Limits: Various existing signalized intersections throughout $0 x$0 E $0 $0.. $0 $0 TOW Description: R $0 $0 $0 $0 $0 C/I $30,000 $0 $0 $0 $0 O&M $0 $0 $0 $0 $0 $0 $30,000 $0 $0 $0 $0 Agency: Tustin Project Name: Traffic Signal Equipment Upgrades and $0 Reolacements (CIP 40080) Project Limits: Various existing signalized intersections throughout $0 the Citv. Project Number: N/A Type of Work (TOW): Traffic Signals TOW Description: Replace and upgrade traffic signals and equipment Project Description: Upgrades or replacement of aging traffic signal $0 equipment at various locations throughout the City. FIEND N7\MB„�' _ __k ,,PERCENT_„'ESTIMATED"`COST , k�PROJEC;TED COSTS ;,NOTES'_ _ M2 LFS 100.00 $800,000 $849,971 CO project with additional funds $800,000 $849,971 Project Phase Estimated Cosi Protecteii $0 $0 $0_.: - - $0 $0 $0 $0 $0 $0 $0 $30,000 $30,000 $0 $0 $0 $0 $0 $0 $30,000 $ 30,000 FIEND N7\MB„�' _ __k ,,PERCENT_„'ESTIMATED"`COST , k�PROJEC;TED COSTS ;,NOTES'_ _ M2 LFS 100.00 $800,000 $849,971 CO project with additional funds $800,000 $849,971 Project Phase 19/20 = 20/21 ; 21/22 22/23 3 23/24 24/25 + 2S/2/2 E $0 $0 $0 $0 w$0 $0 $0 R $0 $0 $0 $0 $0 $0 $0 C/I $160,000 $160,000 $160,000 $160,000 $160,000 $0 $0 O&M $0 $0 $0 $0 $0 $0 $0 $160,000 $160,000 $160,000 $160,000 $160,000 $0 $0 Esfimatetl Cost'M - ""ted - $0 $0 $0 $0 $800,000 $849,971 $0 $0 $800,000 $ 849,971 6/7/2019 Measure M Seven Year Capital improvement Program (Sorted by Project Name) Fiscal Years 2019/2020 through 2025/2026 Agency: Tustin Project Name: Tustin Ranch Road/Von Karman Avenue Traffic Tustin Villaoe Wav Drainaoe Improvements Signal Svnchronization Proiect 1`400891 Project Limits: Between Pioneer Road in Tustin and Campus Drive in 100,00 $210,193 Irvine Project Number: 16-IRVN-TSP-3792 Type of Work (TOW): Traffic Signals TOW Description: Coordinate signals within project limits Project Description: Traffic studies, install new signal equipment and Irvine -Lead Agency, $932,180 in TSSP for implement new timing to synchronize signals on $0 Tustin Ranch Rd and Von Karmen Avenue. Regional Tustin Segment TSSP project managed by the City of Irvine. CO 0.00 $0 project including funding from prior years. Project Phase ;19/20 ,;`' 20/21'21'/22 Tustin Villaoe Wav Drainaoe Improvements 22/23 X2312 M2 LFS 100,00 $210,193 $210,193 M2 LFS $302,891- in total including CO from $0 $0 R Prior Yrs M2 TSSP 0.00 $0 $0 Irvine -Lead Agency, $932,180 in TSSP for C/I $0 $0 Tustin Segment Another Agency 0.00 $0 $0 City of Irvine (Lead Agency) - Project $0 $0 $0 Contribution $0 $210,193 $210,193 $0 Project Phase ;19/20 ,;`' 20/21'21'/22 Tustin Villaoe Wav Drainaoe Improvements 22/23 X2312 E $0 $0 $0 $0 $0 R $0 $0 $0 $0 $0 C/I $0 $0 $0 $0 $0 O&M $210,193 $0 $0 $0 $0 $0 $210,193 $0 $0 $0 $0 Agency: Tustin Project Name: Tustin Villaoe Wav Drainaoe Improvements Project Limits: Tustin Village Way north of McFadden Project Number: N/A Type of Work (TOW): Safety TOW Description: improve roadway drainage Project Description: Develop plans to alleviate drainage concerns along $0 Tustin Village Way. 4125`Y 25/26 `'- � aEsbrriated Cost+= Proiecteii l `20/21 21'122 _. ;2312 $0 $0� .''... $0a�$p. E $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $210,193 $210,193 $0 $0 $210,193 $ 210,193 Unfunded 100.00 $75,000 $75,000 Uncertain funding. M2 LFS, GF, Gas Tax, SBI or other funds $75,000 $75,000 Project Phase 19/20 `20/21 21'122 122/23 } ;2312 $0 E $0 $75,000 $0 $0 $0 R $0 $0 $0 $0 $0 C/I $0 $0 $0 $0 $0 O&M $0 $0 $0 $0 s0 $0 $75,000 $0 $0 $0 4/25 25/26 Estimated Cost = Prbie6t6c $0 $0 $75,000 $75,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $75,000 $ 75,000 17 6/7/2019 Measure M Seven Year Capital Improvement Program (Sorted by Project Name) Fiscal Years 2019,2020 through 2025/2026 Agency: Tustin Project Name: Valencia Avenue Widening between Newport Av � '` and Red Hill Av Project Limits: Valencia Avenue between Newport Avenue , Extension and Red Hill Avenue. Project Number: N/A Type of Work (TOW): Road Widening TOW Description: Add 2 lanes to existing roadway in project limits Project Description: Widening to 4 -lane primary arterial roadway with $500,,000 median. Includes improvements at Valencia/Red Hill R including NB and SB dual left -turn lanes, SB $0 right -turn lane. Modification of traffic signals at $0 Valencia/Red Hill and Valencia/Newport. Unfunded 100.00 $5,500,000 $6,410,348 Uncertain Funding $5,500,000 $6,410,348 18 Proiect`Phase 19/20 ;,;': 20/21 21/22 22/23 k ,j 23/24 � 24!25", 25/26 � ` Estimated Cost, �rrProiecfed�Cost � '` Add left turn and right turn lanes to intersection Project Description: _,$0. , left -turn lane and exclusive right -turn lane on EI - E._ $0 $0 $0. $0 $500,000 $0.u° $0 $500,,000 $500,000 R $0 $0 $0 $0 $0 $2,000,000 $0 $2,000,000 $2,321,927 C/I $0 $0 $0 $0 $0 $0 $3,000,000 $3,000,000 $3,588,422 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $500,000 $2,000,000 $3,000,000 $5,500,000 $ 6,410,348 Agency: lustln Project Name: Westbound EI Camino Real at Tustin Ranch Road Imorovements Proiect (702391 Project Limits: EI Camino Real at Tustin Ranch Road Developer 100.00 $2,650,000 $2,650,000 Developer funds by The Irvine Co. $2,650,000 $2,650,000 Project Number: N/A Type of Work (TOW): Intersection TOW Description: Add left turn and right turn lanes to intersection Project Description: Intersection modifications to add second westbound left -turn lane and exclusive right -turn lane on EI - a �... Camino Real at intersection with Tustin Ranch Road. $0 This is CO project with funding from prior years. Project Phase 19/20 20!21:'-. 21/22 22!23 23/24 x24/25.; 25/26 Estiinatetl'Cos ° „sRroiectetl:Cdst .._ a �... E $0 $o $o $0 $0 $0 $0 $0 $0 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $2,650,000 $0 $0 $0 $0 $0 $0 $2,650,000 $2,650,000 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,650,000 $0 $0 $0 $0 $0 $0 $2,650,000 $ 2,650,000 6/7/2019 Measure M 19 Seven Year Capital Improvement Program (Sorted by Project Name) Fiscal Years 2019/2020 through 2025/2026 Agency: Tustin Project Name: Yorba Street Storm Drain from 17th Street to Laurie 22/23 Lane Project Limits: Yorba Street from 17th Street to Laurie Lane Project Number: N/A Type of Work (TOW): Safety TOW Description: Improve roadway drainage Project Description: Develop plans to alleviate drainage concerns. $0 Preliminary design Studies, hydrology and hydraulic $0 analysis to scope Improvements FUND NAME_ _r r Y ,,,,,,_ PERCENT 4 ._ ;ESTIMATED GSOST _ a ., PROJECTED COST;- a„NOTES Unfunded 100.00 $75,000 $75,000 Uncertain funding. M2 LFS, SBI, Gas Tax, GF, or other funds. $75,000 $75,000 Project Phase 19/20 20/21 21/22 22/23 # 23/24 24125 25/26 w Estimatetl Cost; Proiectetl Go`st E $0 $0 $75,000 $0 $0 $0 $0 $75,000 $75,000 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $0 $0 $0 $0 $0 $0 $0 $0 $0 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $75,000 $0 $0 $0 $0 $75,000 $ 75,000 Attachment "B" Excerpts•Budget (2019-20) City Funded Maintenance of Effort (MOE) Expenditures Required by Measure M /Renewed Measure M (M2) TOTAL MOE EXPENDITURES $ 1,404,789 $ 1,456,000 $ 1,456,000 $ 1,600,000 MOE Benchmark Requirement $ 1,455,691 $ 1,455,691 $ 1,455,691 $ 1,455,691 FY 17-18 FY 18-19 FY 18-19 FY 19-20 Actual Current Projected Proposed CIP Project No. Project Description Expenditures Budget Expenditures Budget 70016 Annual Roadway and Public Infi-astructure Maintenance Program $ 1,401,684 70017 Annual Roadway and Public Infi-astructure Maintenance Program $ 3,105 $ 1,456,000 $ 1,456,000 70018 Annual Roadway and Public Infrastructure Maintenance Program $ 1,600,000 TOTAL MOE EXPENDITURES $ 1,404,789 $ 1,456,000 $ 1,456,000 $ 1,600,000 MOE Benchmark Requirement $ 1,455,691 $ 1,455,691 $ 1,455,691 $ 1,455,691 City ®f Tustin Summary of Projects and Funding Sources Transportation Facilities Maintenance FY19-20 FY20-21 FY21-22 FY22-23 FY23-24 FY24-26 Total Request Project Request Planned Planned Planned Planned Plamed &Planned No. 70016 Annual Pavement Maintenance and Public Infrastructure Maintenance Program (MOE) Project Total COMPLETE Annual Pavement Maintenance and Public � e d Infrastructure Maintenance Program (MOE) Project Total COMPLETE 70018 Annual Pavement Maintenance and Public Infrastructure Maintenance Program (MOE) $ 1,150,000 $ $ $ $ $ $ 1,150,000 Fund 139 M2 -FS $ 410,000 $ $ $ $ $ $ 410,000 Fund 130 GT $ 200,000 $ $ $ $ $ $ 200,000 Fund 200 GF-CIP $__1_600,000 $ $ $ $ $ $ 1,600,000 Project Total $ 2,210,000 $ $ $ $ $ $ 2,210,000 70019 Annual Pavement Maintenance and Public $ 850,000 $ $ $ $ $ $ 850,000 Infrastructure Maintenance Program (MOE) Fund 139 M2 -FS $ 710,000 $ $ $ $ $ $ 710,000 Fund 130 GT $ 250,000 $ $ $ $ $ $ 250,000 Fund 200 GF-CIP $ 1,600,000 $ $ $ $ $ $ 1,600,000 Project Total $ 2,560,000 $ $ $ $ $ $ 2,560,000 70244 Newport Avenue Rehabilitation between I-5 Freeway and Bolt Avenue Fund 140 SB 1 $ 1,150,000 $ $ $ $ $ $ 1,150,000 Project Total $ 1,150,000 $ $ $ $ $ $ 1,150,000 70245 Newport Avenue Rehabilitation between I-5 Freeway and Sycamore Avenue Fund 140 SB 1 $ 850,000 $ $ $ $ $ $ 850,000 Project Total $ 850,000 $ $ $ $ $ $ 850,000 TBA Del Amo Avenue and Newport Avenue Improvements Fund 130 GT $ 550,000 $ $ $ $ $ $ 550,000 Project Total $ 550,000 $ $ $ $ $ $ 550,000 TBA Red Hill Median Improvements Fund 130 GT $ 200,000 $ $ $ $ $ $ 200,000 Project Total $ 200,000 $ $ $ $ $ $ 200,000 City of Tustin Summary of Projects and Funding Sources Transportation Facilities Maintenance FY19-20 FY20-21 FY21-22 FY22-23 FY23-24 FY24-26 Total Request Project Request Planned Planned Planned Planned Planned & Planned No. 70236 Citywide Pedestrian Oriented Accessibility Improvement Program 70220 Red Hill Avenue Rehabilitation Between San Juan Street and Bryan Avenue Fund 140 SB 1 $ $ $ 50,000 $ 350,000 $ $ $ 400,000 Project Total $ $ $ 50,000 $ 350,000 $ $ $ 400,000 TBA18 Red Hill Avenue Rehabilitation between Walnut Avenue and I-5 Freeway Fund 140 SB 1 $ $ $ 50,000 $ 500,000 $ $ $ 550,000 Project Total $ $ $ 50,000 $ 500,000 $ $ $ 550,000 TBA Browning Avenue Rehabilitation between El Camino Real and Irvine Boulevard Fund 140 SB 1 $ $ $ 600,000 $ $ $ $ 600,000 Project Total $ $ $ 600,000 $ $ $ $ 600,000 TBA Jamboree Road Rehabilitation between Barranca Parkway and OCTA/SCRRA Fund 140 SB 1 $ $ $ $ $ 1,300,000 $ $ 1,300 000 Project Total $ $ $ $ $ 1,300,000 $ $ 1,300,000 Transportation Facilities Maintenance Total $ 7,920,000 $ 400,000 $ 1,100,000 $ 1,250,000 $ 1,700,000 $ 800,000 $ 13,170,000 Total Uncertain Funding - - - - - - - City of Tustin Summary of Projects and Funding Sources Transportation Facilities Capacity Enhancements FY19-20 Project Request No. 70238 Eastbound EI Camino Real at Jamboree Road Improvement Project Project Total 70242 Transit Circulator Feasibility Study Project Total FY20-21 FY21-22 FY22-23 FY23-24 FY24-26 Total Request Planned Planned Planned Planned Planned & Planned COMPLETE COMPLETE 70239 Westbound EI Camino Real at Tustin Ranch Road Project Total $ 2,6511,000 - $ $ - ,; - $ �2,650,000 70131 Newport Avenue Extension, N/O Edinger Avenue - Phase II Fund 000 OF _$ $ $ $ $ 1,000,000 $ 50,000,000 $ 51,000 000 Project Total $ $ $ $ $ 1,000,000 $ 50,000,000 $ 51,000,000 TBA Valencia Avenue Widening between Newport Avenue and Red Hill Avenue Fund 000 OF $ $ $ $ $ 500,000 $ 5,000,000 $ 5,500,000 Project Total $ $ $ $ $ 500,000 $ 5,000,000 $ 5,500,000 TBA Jamboree Road Widening between Tustin Ranch Road and North City Limits Fund 000 OF $ $ $ $ $ $ 1,400,000 $ 1,400,000 Fund 200 DEV $ $ $ $ $ $ 1,400,000 $ 1,400,000 Project Total $ $ $ $ $ $ 2,800,000 $ 2,800,000 70196 Red Hill Avenue Widening between Melvin Way and 200 feet southerly Fund 000 OF $ $ $ $ $ $ 1,100,000 $ 1,100,000 Project Total $ $ $ $ $ - $ 1,100,000 $ 1,100,000 Transportation Facilities Capacity Enhancement Total $ 2,650,000 $ $ $ $ 1,500,000 $ 58,900,000 $ 63,050,000 Total Uncertain Funding - 1,500,000 57,500,000 59,000,000 City of Tustin Summary of Projects and Funding Sources Tustin Legacy Facilities FY19-20 FY20-21 FY21-22 FY22-23 FY23-24 FY24-26 Total Request Project Request Planned Planned Planned Planned Planned & Planned No. 70201 Armstrong Avenue Extension: Warner Avenue to Barranca Parkway Project Total COMPLETE Armstrong Avenue (formerly Bell Avenue) Project Total COMPLETE 70226 Red Hill Avenue Widening between Barranea Parkway and Warner Avenue Project Total COMPLETE 70227 Red Hill Avenue Widening between Warner Avenue and Edinger Avenue Project Total COMPLETE 70197 Red Hill Avenue Median Improvements between Barranca Parkway and north of Valencia Avenue Project Total COMPLETE 70230 Moffett Drive Extension from Future Legacy Road Extension to Park Avenue Project Total COMPLETE. 70231 Legacy Road (formerly Kensington Park Drive) Extension from Valencia Avenue to Future Moffett Drive Extension Project Total COMPLETE 70229 Flight Way (formerly Aston) Extension between Barranca Parkway and Tustin Legacy Linear Park Project Total COMPLETE City of Tustin Summary of Projects and Funding Sources Tustin Legacy Facilities FY19-20 FY20-21 Project Request Planned No. 70233 Park Avenue Improvements between Tustin Ranch Road and Warner Avenue Project Total FY21-22 FY22-23 FY23-24 FY24-26 Total Request Planned Planned Planned Planned & Planned COMPLETE Fund 132 PDL $ - $ - $ - $ $ $ - $ - Fund 434 CFD 06- $ 246,306 $ $ $ $ $ $ 246,306 Fund 561 MCAS TAB $ 482,913 $ $ $ $ $ $ 482,913 Project Total $ 9,979,219 $ $ $ $ $ $ 9,979,219 50040 Peters Canyon Channel Improvements Fund 187 MCAS Fee $ 9,123,988 $ $ $ $ $ $ 9,123,988 Fund 200 1RWD Reimb $ 100,000 $ $ $ $ $ $ 100,000 Project Total $ 9,223,988 $ $ $ $ $ $ 9,223,988 70224 Moffett Drive Extension from Park Avenue to east of Peters Canyon Channel Fund 561 MCAS TAB $ 1,000,000 $ $ $ $ $ $ 1,000,000 Project Total $ 1,000,000 $ $ $ $ $ $ 1,000,000 20077 Tustin Legacy Linear Park between Barranca Parkway and Armstrong Avenue Fund 187 MCAS Fee $ 2,316,940 $ $ $ $ $ $ 2,316,940 Project Total $ 2,316,940 $ $ $ $ $ $ 2,316,940 10076 South Hangar Renovation - Phase 1 Fund 189 MCAS Land $ 4,318,844 $ $ $ 10,000,000 $ $ $ 14,318,844 Project Total $ 4,318,844 $ $ $ 10,000,000 $ $ $ 14,318,844 70243 Tustin Ranch Road Pedestrian Bridge Fund 187 MCAS Fee $ 365,060 $ $ $ $ 11,000,000 $ $ 11,365,060 Project Total $ 365,060 $ $ $ $ 11,000,000 $ $ 11,365,060 70246 Neighborhood D South Infrastructure Construction - Phase 1 Fund 434 CFD 06-1 $ 2,610,000 $ $ $ $ - $ $ 2,610,000 Fund 437 CFD 07-1 $ 548,000 $ $ $ $ $ $ 548,000 Fund 443 CFD 14-1 $ 9,842,000 $ $ $ $ $ $ 9,842,000 Fund 189 MCAS Land $ 7,750,000 $ $ $ $ $ $ 7,750,000 City of Tustin I I allll; 0-1011li-01 r acllllles FY19-20 FY20-21 FY21-22 FY22-23 FY23-24 FY24-26 Total Request Project Request Planned Planned Planned Planned Planned & Planned No. 70248 Solar Speed Radar Feedback Signs Project Total COMPLETE 40085 Newport Avenue Signal Synchronization Project Total 40080 Traffic Signal Equipment COMPLETE Fund 139 M2 -FS $ 160,000 $ 160,000 $ 160,000 $ 160,000 $ 160,000 $ - $ 800,000 Project Total $ 160,000 $ 160,000 $ 160,000 $ 160,000 $ 160,000 $ $ 800,000 40086 Seventeenth Street Signal Synchronization CDBGy16 $ - $ $ - $ $ $ _ $ _ Fund 139 M2 -FS $ 10,000 $ - $ - $ - $ - $ $ 10,000 Project Total $ 10,000 $ - $ $ - $ - $ $ 10,000 Edinger Avenue / Irvine Center Drive Signal 40088 Synchronization Fund 139 M2 -FS $ 93,430 $ - $ - $ - $ - $ $ 93,430 Project Total $ 93,430 $ $ - $ - $ - $ $ 93,430 Tustin Ranch Road/Von Karman Avenue. Signal 40089 Synchronization Fund 139 M2 -FS $ 210,193 $ - $ $ - $ - $ - $ 210,193 Project Total $ 210,193 $ - $ $ - $ - $ - $ 210,193 40087 Main Street Improvements Fund 139 M2 -FS $ 1,169,446 $ - $ - $ $ - $ - $ 1,169,446 Fund 139 M2 -C $ 2,297,900 $ - $ - $ $ $ - $ 2,297,900 Fund 120 CDBGy16 $ - $ $ - $ $ $ _ $ _ Fund 120 CDBGyl7 $ - $ - $ - $ $ $ $ - Traffic Control Facilities Total $ 5,344,969 $ 160,000 $ 160,000 $ 160,000 $ 160,000 $ - $ 5,984,969 Total Uncertain Funding - - - - - - - FY19-20 FY20-21 FY21-22 FY22-23 FY23-24 FY24-26 Total Request Project Request Planned Planned Planned Planned Planned & Planned No. Fund 120 CDBGyl8 $ 354,000 $ - $ $ - $ - $ - $ 354,000 Fund 120 CDBGyl9 $ 100,000 $ - $ $ - $ - $ - $ 100,000 Project Total $ 3,921,346 $ - $ $ - $ - $ - $ 3,921,346 40091 Parkcenter Lane/Bryan Avenue Traffic Signal Fund 140 SB 1 $ 375,000 $ - $ - $ - $ - $ - $ 375,000 Project Total $ 375,000 $ - $ $ - $ - $ - $ 375,000 40090 Lansdowne RoadNalencia Avenue Traffic Signal Fund 200 DEV $ 75,000 $ - $ $ - $ - $ - $ 75,000 Fund 140 SB I $ 300,000 $_ - $ $ - $ - $ - $ 300,000 Project Total $ 375,000 $ - $ $ $ - $ - $ 375,000 TBD Newport Avenue/Schools First Signal Project Fund 130 GT $ 200,000 $ - $ - $ $ $ $ 200,000 Project Total $ 200,000 $ - $ - $ $ - $ - $ 200,000 Traffic Control Facilities Total $ 5,344,969 $ 160,000 $ 160,000 $ 160,000 $ 160,000 $ - $ 5,984,969 Total Uncertain Funding - - - - - - - City of Tustin Summary of Projects and Funding Sources Flood Control Facilities FY19-20 FY20-21 FY21-22 FY22-23 FY23-24 FY24-26 Total Request Project Request Planned Planned Planned Planned Planned & Planned No. TBA San Juan Street Storm Drain Fund 000 OF TBA Tustin Village Way Storm Drain Fund 000 OF TBA Yorba Street Storm Drain Fund 000 OF TBA Irvine Boulevard Storm Drain Phase. 1 Fund 000 OF TBA Irvine Boulevard Storm Drain Phase 2 Fund 000 OF Flood Control Facilities Total Total Uncertain Funding $ $ 75,000 $ $ $ $ $ 75,000 Project Total $ $ 75,000 $ $ $ $ $ 75,000 $ 75,000 $ $ $ $ $ 75,000 Project Total $ 75,000 $ $ - $ - $ - $ 75,000 $ - $ - $ 75,000 $ $ $ $ 75,000 Project Total $ - $ - $ 75,000 $ $ $ $ 75,000 $ - $ $ $ 300,000 $ 3,600,000 $ $ 3,900,000 Project Total $ - $ $ $ 300,000 $ 3,600,000 $ $ 3,900,000 $$ - $ $ $ 300,000 $ 3,600,000 $ 3,900,000 Project Total $ $ - $ $ $ 300,000 $ 3,600,000 $ 3,900,000 $ $ 150,000 $ 75,000 $ 300,000 $ 3,900,000 $ 3,600,000 $ 8,025,000 150,000 75,000 300,000 3,900,000 3,600,000 8,025,000 City of Tustin FY19-20 FY20-21 FY21-22 FY22-23 FY23-24 FY24-26 Total Request Project Request Planned Planned Planned Planned Planned & Planned No. 10080 Tustin Library Restoration Fund 200 GF-CIP Project Total COMPLETE 10078 Community Center Auditorium Renovation Fund 131 PD Project Total COMPLETE 10082 Temporary Homeless Shelter Project Total COMPLETE 10073 Senior Center Alternate Power Source Project Total COMPLETE 10032 Annual Major Building Maintenance Fund 200 GF-CIP $ 1,445,000 $ $ - $ - $ - $ - $ 1,445,000 Project Total $ 1,445,000 $ - $ - $ - $ - $ - $ 1,445,000 10067 Emergency Operations Center and City Yard Fund 200 GF-CIP $ - $ $ - $ - $ - $ _ $ _ Fund 301 WCF $ 4,298,762 $ - $ - $ - $ - $ - $ 4,298,762 Fund 189 MCAS Land $ 5,000,000 $ - $ - $ - $ - $ - $ 5,000,000 Project Total $ 9,298,762 $ - $ - $ - $ - $ - $ 9,298,762 10069 Civic Center Alternate Power Source City of Tustin FY19-20 FY20-21 FY21-22 FY22-23 FY23-24 FY24-26 Total Request Project Request Planned Planned Planned Planned Planned & Planned No. Fund 184 Equip Repl $ 944,550 $ - $ - $ - $ - $ - $ 944,550 Project Total $ 944,550 $ - $ - $ - $ - $ - $ 944,550 10079 Street Light LED Conversion Project Fund 200 GF-CIP $ 30,000 $ - $ - $ - $ - $ - $ 30,000 Project Total $ 30,000 $ - $ - $ - $ - $ - $ 30,000 10083 Tustin Legacy Annex Renovations Fund 200 GF-CIP $ 114,650 $ - $ - $ - $ - $ - $ 114,650 Fund 132 PDL $ 114,650 $ _ _ - $ - $ - $ - $ - $ 114,650 Project Total $ 229,300 $ - $ - $ - $ - $ - $ 229,300 TBD Stevens Square Parking Structure Improvements Fund 200 GF-CIP $ 100,000 $ - $ - $ - $ - $ - $ 100,000 Project Total $ 100,000 $ - $ - $ - $ - $ - $ 100,000 TBD Parking Lot Resurfacing 15171 Del Amo Fund 200 GF-CIP Total Uncertain Funding $ 125,000 $ - $ - $ - $ - $ - $ 125,000 Project Total $ 125,000 $ - $ - $ - $ - $ - $ 125,000 Attachment "C" RESOLUTION NO. 19-26 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUSTIN CONCERNING THE STATUS AND UPDATE _OF THE CIRCULATION ELEMENT, AND MITIGATION FEE PROGRAM FOR THE MEASURE M (M2) PROGRAM WHEREAS, the City of Tustin desires to maintain and improve the streets within its jurisdiction, including those arterials contained in the Master Plan of Arterial Highways (MPRH) and WHEREAS, the City of Tustin had endorsed a definition of and process for, determining consistency of the City's Traffic Circulation Plan with the MPRH, and WHEREAS, the City has adopted a General Plan Circulation Element which does not preclude implementation of the MPAH within its jurisdiction, and WHEREAS, the City is required to adopt a resolution biennially informing the Orange County Transportation Authority (OCTA) that the City's Circulation Element is in conformance with the MPAH and whether any changes to any arterial highways of said Circulation Element have been adopted by the City during Fiscal Years (FY) 2017-18 and FY 2018-19, and WHEREAS, the City is required to send biennially to the OCTA all recommended changes to the City Circulation Element and the MPAH for the purposes of re -qualifying for participation in the Comprehensive Transportation Funding Programs; WHEREAS, the City is required to adopt a resolution biennially certifying that the City has an existing Mitigation Fee Program that assesses traffic impacts of new development and requires new development to pay a fair share of necessary transportation improvements attributable to the new development; and NOW, THEREFORE, BE IT RESOLVED that the City Council for the City of Tustin, does hereby inform OCTA that: a) The arterial highway portion of the City Circulation Element of the City is in conformance with the MPAH. b) The City attests that no unilateral reduction in through lanes has been made on any MPAH arterials during FY 2017-18 and FY 2018-19. c) The City reaffirms that Council concurs with the existing Mitigation Fee Program. PASSED AND ADOPTED at a regular meeting of the City Council of the City of Tustin held on the 18th day of June 2019. CHARLES E. PUCKETT, Mayor ATTEST: ERICA N. YASUDA City Clerk STATE OF CALIFORNIA ) COUNTY OF ORANGE ) SS CITY OF TUSTIN ) I, Erica N. Yasuda, City Clerk and ex -officio Clerk of the City Council of the City of Tustin, California, do hereby certify that the whole number of the members of the City Council is five; that the above and foregoing Resolution No. 19-26 was duly and regularly passed and adopted at a regular meeting of the City Council held on the 18th day of June, 2019 by the following vote: COUNCILMEMBER AYES: COUNCILMEMBER NOES: COUNCILMEMBER ABSTAINED: COUNCILMEMBER ABSENT: ERICA N. YASUDA, City Clerk RESOLUTION NO. 19-27 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUSTIN CONCERNING THE STATUS AND UPDATE OF THE PAVEMENT MANAGEMENT PLAN FOR THE MEASURE M2 (M2) PROGRAM WHEREAS, the local jurisdiction is required to meet eligibility requirements and submit eligibility verification packages to Orange County Transportation Authority (OCTA) in order to remain eligible to receive M2 funds. WHEREAS, the local jurisdiction is required to adopt and update a Pavement Management Plan (PMP), using the required format, regarding the status of road pavement conditions and implementation of the PMP on a biennial basis; and WHEREAS, the local jurisdiction is required to provide a plan that manages the preservation, rehabilitation, and maintenance of paved roads by analyzing pavement life cycles, assessing overall system performance costs, and determining alternative strategies and costs necessary to improve paved roads. NOW, THEREFORE, BE IT RESOLVED that the City Council for the City of Tustin, does hereby inform OCTA that: a) The PMP is in conformance with the PMP Submittal Template provided in the Countywide Pavement Management Plan Guidelines. b) The City/County hereby adopts a PMP and has provided an updated PMP report, using the required format, to OCTA. c) The Public Works Director, City Engineer or designee is authorized to sign the PMP certification form. PASSED AND ADOPTED at a regular meeting of the City Council of the City of Tustin held on the 18th day of June 2019. CHARLES E. PUCKETT, Mayor ATTEST: ERICA N. YASUDA City Clerk STATE OF CALIFORNIA ) COUNTY OF ORANGE ) SS CITY OF TUSTIN ) I, Erica N. Yasuda, City Clerk and ex -officio Clerk of the City Council of the City of Tustin, California, do hereby certify that the whole number of the members of the City Council is five; that the above and foregoing Resolution No. 19-27 was duly and regularly passed and adopted at a regular meeting of the City Council held on the 18th day of June, 2019 by the following vote: COUNCILMEMBER AYES: COUNCILMEMBER NOES: COUNCILMEMBER ABSTAINED: COUNCILMEMBER ABSENT: ERICA N. YASUDA, City Clerk PPENDIX I OCTA Maintenance of Effort (MOE) Reporting Form Jurisdiction: City of Tustin Type of GENERAL FUND Transportation Expenditures: Please attach supportinq budqet documentation for each line item listed below. MAINTENANCE Total Expenditure Annual Roadway Maintenance and Public Infrastructure Maintenance Program (MOE) CIP No. 70018 - Citywide various locations. [General Fund Budget Amount only and $ 1,600,000.00 includes anticipated $50k in general fund from prior year] Subtotal Maintenance 1,600,000.00 CONSTRUCTION Total Expenditure Subtotal Construction - INDIRECT/OTHER Total Expenditure Subtotal Indirect Other - Total General Fund Transportation Expenditures $ (Less Total MOE Exclusions') MOE Expenditures $ MOE Benchmark Requirement (Shortfall) / Surplus $ 1,600,000.00 - 1,600,000.00 1,455,691.00 144,309.00 Certification: I hereby certify that the City of (MOE) requirement for Fiscal Year Finance Director Signature J Tustin has budgeted and will meet the Maintenance of Effort 2019/20 John A. Buchanan Finance Director (Print Name) 'Funding sources include Measure M, federal, state, redevelopment, and band financing. Date � .� � 0 o � 0 7 7 k k F --q a - � / \ / z 6 - � � . � � & � E \ 0 \ § � k 2 # 2 ct/« ® o c 2 / / \ � t In Attachment "E" Annual Roadway• Public Infrastructure Maintenance Program Exhibit (;ity of "ibstin City Funded Maintenance of Effort (MOE) Expenditures Required by Measure M /Renewed Measure M (M2) MOE Benchmark Requirement $ 1,455,691 $ 1,455,691 $ 1,455,691 $ 1,455,691 FY 17-18 FY 18-19 FY 18-19 FY 19-20 Actual Current Projected Proposed CIP Project No. Project Description Expenditures Budget Expenditures Budget 70016 Annual Roadway and Public Infrastructure Maintenance Program $ 1,401,684 70017 Annual Roadway and Public Infrastructure Maintenance Program $ 3,105 $ 1,456,000 $ 1,456,000 70018 Annual Roadway and Public Infrastructure Maintenance Program $ 1,600,000 TOTAL MOE EXPENDITURES $ 1,404,789 $ 1,456,000 $ 1,456,000 $ 1,600,000 MOE Benchmark Requirement $ 1,455,691 $ 1,455,691 $ 1,455,691 $ 1,455,691 cit, Project Detail Sheet PROJECT CATEGORY Transportation Facilities Maintenance PROJECT NAME Annual Pavement Maintenance 18/19 MOE PROJECT MANAGER LOCATION Joann Wu Pavement - Zone 7 Sidewalk - Citywide DESCRIPTION PROJECT NO. 70018 TOTAL PROJECT COST $ 2,665,000 The City is divided into seven pavement maintenance zones. Every year street rehabilitation occurs in one zone. Through a rolling seven year cycle, this program maintains the integrity of City streets. The City maintains a Pavement Management System (PMS) for all MPAH roadways every two years and all non-MPAH roadways every six years. Funding for construction of this project is as follows: Pavement Rehabilitation ($1,600,000 - GF-CIP), City-wide Street Striping and Markings Program ($255,000 - M2 Fair Share), City-wide Sidewalk Repair Program ($200,000 - M2 Fair Share), Street and Alley Repair Program ($60,000 - M2 Fair Share), City's portion of County rehabilitation of shared roads ($300,000 - Gas Tax), and bridge deck maintenance per annual State recommendations ($250,000 - M2 Fair MAP PHOTO Expenses To FY19-20 FY20-21 FY21-22 FY22-23 FY23-24 FY24-26 Total 6/30/2019* Request Planned Planned Planned Planned Planned Project Cost Funding Source 139 M2 -FS $ 255,000 $ 510,000 $ 765,000 130 GT $ 50,000 $ 250,000 $ 300 000 200 GF-CIP $ 50,000 $ 1,550,000 $ 1,600,000 138 M S - TOTAL $ 355,000 $ 2,310,000 $ $ - $ $ S S 2,665,000 Expenditure Design $ 125,000 $ 125,000 Right -of -Way $ - Constmction $ 230,000 $ 2,310,000 $ 2,540,000 TOTAL $ 355,000 $ 2,310,000 $ - S - S - S S $ 2,665,000 Funding Sources 139 M2 -FS Measure M2 Fair Share 130 GT Gas Tax Fund 200 GF-CIP General Fund - Capital Improvement Projects 138 Measure M Measure M * Estimate FYI 8-19 year-end Attachment "F" I. '�.i(tliA4�`FA A7tky�� � T M. iat d i]4 Q �;YTI: �a n•SC a tiTti is a rFttS'F � - SY s�aaaa� � Ii Pa•'71G i s,g x'xCiC:9G Y L7C r :�€f NORTkC not to scale SOURCE: Austin -Foust Associates, tnc. Gity of Tustin A pp UN JUNE 2018 - ---� '`r x a Corridor vkU nmmn4, diax raxtimotic 0111yx. i.EG r, N to Major (a l.enes) hvtajor (G lanes) mat McKlified 4tajor (6 latm) "o"cq,,vm Primary (4 i.m s) Sccundary (it tar M lanes) mus City Boundary i 0't Planning Area I30ovdary —C'. -.,..r Colltelor Q lanes) -DC- - Divi&d Colleotor (2 lanes) _ Figure - � Attachment "G" APPENDIX OCTA Eligibility Checklist Jurisdiction: City of Tustin Capital Improvement Program (CIP) YES NO 1. Did you submit your draft or adopted Measure M2 (M2) seven-year CIP to OCTA by ® ❑ June 30? ® ❑ 6. a. Did you utilize the required OCTA CIP database? ® ❑ 4. b. Have you included projects required to demonstrate compliance with signal ® ❑ synchronization, pavement maintenance and environmental clean-up commitments? c. Are there any non -transportation related projects included in your M2 CTP? ❑ d. Did you include all projects that are partially, fully, or potentially funded by M2 ® ❑ Net Revenues? e. The City Council/Board of Supervisors approval date* to adopt the final 7 -Year CIP is: 6/18/2019 *Must be prior to July 31 Maintenance of Effort (MOE) YES NO 2. Did you submit the MOE certification form (Appendix I) to OCTA by June 30? ® ❑ a. Did you provide supporting budget documentation? ® ❑ 6. b. Has the MOE Reporting form been signed by the Finance Director or appropriate designee? ® ❑ Pavement Management Program (PMP) YES N/A 3. Are you required to submit a PMP update to OCTA for this eligibility cycle? If you are not required to submit a PMP update, check N/A. Refer to Exhibit 3 for PMP submittal schedule. 10 ❑ a. If yes, did you use the current PMP Submittal Template (Appendix F)? ® ❑ 6. b. If yes, is the PMP consistent with the OCTA Countywide Pavement Management Program? ® ❑ 4. If you answered "N/A" to question 3, did you submit a PMP Update to OCTA through the previous eligibility cycle by June 30? ❑ ❑ Resolution of Master Plan of Arterial Highways (MPAH) Consistency YES NO 5. Did you submit a resolution demonstrating consistency with the MPAH? ® ❑ a. Have you enclosed a figure representing your most current circulation element? ® ❑ 6. If the requirement is not due as part of the current cycle, has there been an update to the circulation element since the last report period? If yes, include a copy of the latest circulation element. ❑ ❑ Local Signal Synchronization Plan (LSSP) YES N/A 7. Did you submit an update to the LSSP as part of the current cycle? ❑ a. Is your LSSP consistent with the Regional Traffic Signal Synchronization Master Plan? M ❑ Eligibility Checklist Time Limits for Use of Net Revenues YES NO 8. Has your jurisdiction complied with the three-year time limit for the use of Net Revenues ® ❑ 11. over the last year per the requirements outlined in the Ordinance? ❑ IK 12. a. If no, has a time extension been requested through the semi-annual review ❑ ❑ process for funds subject to expiration? ® ❑ Supplanting of Developer Commitments YES NO 9. Has your jurisdiction ensured they have not supplanted developer commitments for transportation projects and funding with M2 funds? ® ❑ Mitigation Fee Program (MFP) YES NO 10. Does your jurisdiction currently have a defined development impact MFP in place? ® ❑ 11. Has an update to the MFP occurred since the last reporting period? ❑ IK 12. If yes to 11, has your jurisdiction submitted a copy of the current MFP or City Council/ Board of Supervisors approved policy? ❑ ❑ a. Have you included a copy of your current impact fee schedule; or ® ❑ b. Have you provided OCTA with a copy of your mitigation fee nexus study; or ❑ c. Have you provided OCTA with a copy of your City Council/ Board of Supervisors resolution approving the MFP? ® ❑ Planning Strategies YES NO 13. Does your jurisdiction consider as part of its General Plan, land use planning strategies ® ❑ that accommodate transit and non -motorized transportation? 14. Have you provided a letter identifying land use planning strategies that accommodate ® ❑ transit and non -motorized transportation consideration in the General Plan? Traffic Forums YES NO 15. Did representatives of your jurisdiction participate in the regional traffic forum(s)? M ❑ a. If you answered yes, provide date of attendance: 2/5/2019 Congestion Management Program (CMP) YES NO 16. Has your jurisdiction completed the required CMP checklist? (Appendix C) ® ❑ Krys Saldivar Name (Print) Signature Date Attachment "H" OCTA Jurisdiction: City Of Tustin Congestion Management Program (CMP) CMP Moln�tornng Checklist Leel of Service (LOS) s yy 1 k' CMP Checklist YES NO. N/A 1. Check "Yes" if either of the following apply: ❑ • There are no CMP intersections in your jurisdiction, • Factoring out statutorily -exempt activities', all CMP intersections within your jurisdiction are operating at LOS E (or the baseline level, if worse than E) or better. NOTE: ONLY THOSE AGENCIES THAT CHECKED "NO" FOR QUESTION i NEEDS TO ANSWER THE REMAINING QUESTIONS. 2. If any, please list those intersections that are not operating at the CMP LOS standards. ❑ 3. Will deficient intersections, if any, be improved by mitigation measures to be ❑ ❑ ❑ implemented in the next 18 months or improvements programmed in the first year of any recent funding program (i.e. local jurisdiction CTP, Measure M CIP)? a. If not, has a deficiency plan been developed for each intersection that will be ❑ ❑ ❑ operating below the CMP LOS standards? Additional Comments: 'The following activities are statutorily -exempt from deficiency determinations: interregional travel, traffic generated by the provision of low and very low income housing, construction rehabilitation or maintenance of facilities that impact the system, freeway ramp metering, traffic signal coordination by the state or multi -jurisdictional agencies, traffic generated by high-density residential development within 1/4 mile of a fixed -rail passenger station, traffic generated by mixed-use residential development within 1/4 mile of a fixed -rail passenger station. APPENDIX C OCTA Congestion Management Program (CMP) CMP Monitoring CheckliSt. Deficiency Planst CMP Checklist YES NO N/A 1. Check "Yes" if either of the following apply: Q ❑ • There are no CMP intersections in your jurisdiction. • Factoring out statutorily -exempt activitiesz, all CMP Highway System (CMPHS) intersections within your jurisdiction are operating at LOS E (or the baseline level, if worse than E) or better. NOTE: ONLY THOSE AGENCIES THAT CHECKED "NO" FOR QUESTION 1 NEED TO ANSWER THE REMAINING QUESTIONS. 2. If any, please list those intersections found that are not operating at the CMP LOS standards. ❑ 3. Are there improvements to bring these intersections to the CMP LOS standard scheduled ❑ ❑ ❑ for completion during the next 18 months or programmed in the first year of the CIP? NOTE: ONLY THOSE AGENCIES THAT CHECKED "NO" FOR QUESTION 3 NEED TO ANSWER THE REMAINING QUESTIONS. 4. Has a deficiency plan or a schedule for preparing a deficiency plan been submitted to ❑ ❑ ❑ OCTA? 5. Does the deficiency plan fulfill the following statutory requirements? a. Include an analysis of the causes of the deficiency? ❑ ❑ ❑ b. Include a list of improvements necessary to maintain minimum LOS ❑ ❑ ❑ standards on the CMPHS and the estimated costs of the improvements? c. Include a list of improvements, programs, or actions, and estimates of their ❑ ❑ ❑ costs, which will improve LOS on the CMPHS and improve air quality? i. Do the improvements, programs, or actions meet the criteria established ❑ ❑ . ❑ by South Coast Air Quality Management District (SCAQMD) (see the CMP Preparation Manual)? 2The following activities are statutorily -exempt from deficiency determinations: interregional travel, traffic generated by the provision of low and very low income housing, construction rehabilitation or maintenance of facilities that impact the system, freeway ramp metering, traffic signal coordination by the state or multi -jurisdictional agencies, traffic generated by high-density residential development within 1/4 mile of a fixed -rail passenger station, traffic generated by mixed-use residential development within 1/4 mile of a fixed -rail passenger station. APPENDIX C OCTA Congestion Management Program (CMP) OR CMP Monitoring Checklist Deficiency Ptans (cont )J { CMP Checklist YES NO N/A 6, Are the capital improvements identified in the deficiency plan programmed in your seven-year CTP? ❑ ❑ ❑ 7, Does the deficiency plan include a monitoring program that will ensure its implementation? ❑ ❑ ❑' g. Does the deficiency plan include a process to allow some level of development to proceed pending correction of the deficiency? Q ❑ Q 9. Has necessary inter -jurisdictional coordination occurred? ❑ Q Q. 10. Please describe any innovative programs, if any, included in the deficiency plan: ❑ Additional Comments: OCTA APPENDIX C Congestion Management Program (CMP) CMP Monitoring Checklist: Land Use Coordination CMP Checklist YES NO N/A 1. Have you maintained the CMP traffic impact analysis (TIA) process you selected for the Q ❑ previous CMP? a. If not, have you submitted the revised TIA approach and methodology to OCTA ❑ ❑ ❑ for review and approval? 2. Did any development projects require a CMP TIA during this CMP cycle?3 ❑ ❑� NOTE: ONLY THOSE AGENCIES THAT CHECKED "YES" FOR QUESTION 2 NEED TO ANSWER THE REMAINING QUESTIONS. 3. If so, how many? 4. Please list any CMPHS links & intersections that were projected to not meet the CMP LOS standards (indicate whether any are outside of your jurisdiction). ❑ a. Were mitigation measures and costs identified for each and included in your ❑ ❑ ❑ seven-year CIP? b. If any impacted links & intersections were outside your jurisdiction, did your ❑ ❑ ❑ agency coordinate with other jurisdictions to develop a mitigation strategy? 5. If a local traffic model was/will be used, did you follow the data and modeling ❑ ❑ ❑ consistency requirements as described in the CMP Preparation Manual (available online at http://www.octa.net/pdf/cmpprepmanual.pdf)? Additional Comments: 3Exemptions include: any development generating less than 2,400 daily trips, any development generating less than 1,600 daily trips (if it directly accesses a CMP highway), final tract and parcel maps, issuance of building permits, issuance of certificate of use and occupancy, and minor modifications to approved developments where the location and intensity of project uses have been approved through previous and separate local government actions prior to January 1, 1992. APPENDIX OCTA Congestion Management Program (CMP) CMP monitoring Checklist: Capital Improvement Program (CIP); CMP Checklist YES NO N/A 1, Did you submit a seven-year CIP to OCTA by June 30? ❑ 2, Does the CIP include projects to maintain or improve the performance of the CMPHS (including capacity expansion, safety, maintenance, and rehabilitation)? rol ❑ ❑ 3. Is it consistent with air quality mitigation measures for transportation- related vehicle emissions? ❑ ❑ 4. Was the Web Smart CIP provided by the OCTA used to prepare the CIP? ❑ ❑ Additional Comments: I certify that the information contained in this checklist is true. Krys Saldivar Public Works Manager Name (Print) Title Signature Date Attachment "I" APPENDIX H OCTA Arterial Highway Mileage Change Report Jurisdiction: City of Tustin ®✓ Check here if there are no changes to report Date Date 8 -Lane 6 -Lane 4 -Lane Total Street Name Added DeletedFrom To Centerline Centerline Centerline Centerline ; - Miles Miles Miles Miles Current Impact I Y 'e., Schedule: • Major Thoroughfare I: • Bridge e e Program I e ,. San Joaquin Hills Foothill/Eastern Transportation Transportation Corridor Agency AA91hi, Corridor Agency Transportation Corridor Agencies MAJOR THOROUGHFARE AND BRIDGE FEE PROGRAM FY 2020 RATES EFFECTIVE JULY 1, 2019 — JUNE 30, 2020 SAN JOAQUIN HILLS TRANSPORTATION CORRIDOR AGENCY ZONE A: ZONE B: Single Family $5,740/unit Multi -Family $3,343/unit Non -Residential $7.69/sq. ft. Single Family $4,448/unit Multi -Family $2,595/unit Non -Residential $5.68/sq. ft. FOOTHILL/EASTERN TRANSPORTATION CORRIDOR AGENCY ZONE A: ZONE B: Single Family $5,925/unit Multi -Family $3,460/unit Non -Residential $8.24 sq. ft. Single Family $4,217/unit Multi -Family $2,459/unit Non -Residential $4.77/sq. ft. On July 1 of each year, the fee rate schedule will increase by: San Joaquin Hills TCA 2.667% Foothill/Eastern TCA 2.206% 125 Pacifica, Suite 100, Irvine, CA 92618-3304 • (949) 754-3400 Fax (949) 754-3467 TheTollRoads.com Members: Aliso Viejo • Anaheim • Costa Mesa • County of Orange • Dana Point • Irvine • Laguna Hills . Laguna Niguel • Laguna Woods • Lake Forest Mission Viejo • Newport Beach . Orange • Rancho Santa Margarita . Santa Ana . San Clemente . San Juan Capistrano • Tustin • Yorba Linda Attachment "K" Transit • -,d F -and Use Planning Department of Public Works Douglas S. Stack, P.E. Director June 7, 2019 Mr. Joe Alcock Section Manager III, Measure M Local Programs Orange County Transportation Authority 600 S. Main St., P.O. Box 14184 Orange, CA 92863-1584 Attention: Ms. Kelsey Imler, Transportation Funding Analyst, Associate Subject: City of Tustin's General Plan Consistency Regarding Land Use Strategies Accommodating Transit and Non -Motorized Transportation Dear Mr. Alcock: As part of the Renewed Measure M (M2) Eligibility package, the City of Tustin is pleased to provide our land use strategies, which accommodate transit and non -motorized transportation. The City of Tustin's General Plan incorporates all of the following elements: Land Use, Housing, Conservation/Open Space/Recreation, Noise, Circulation, Public Safety and a locally mandated element, Growth Management. In particular, it is the Circulation Element which incorporates the land use strategies to accommodate transit and non -motorized transportation. The Land Use Element identifies the present and planned land use activity; the general distribution and location of residential and non-residential land uses; and density and building intensity. The Land Use Element constitutes official City policy for the location of various land uses and provides guidance to ensure orderly growth and development. Transit and non - motorized transportation are addressed in this element in a broad manner with expanded detail covered in the subsequent elements. The following is a listing of the applicable Land Use Element goals, which are expanded upon in the Circulation Element: GOAL 1: Provide for a well balanced land use pattern that accommodates existing and future needs for housing, commercial and industrial land, open space and community facilities and services, while maintaining a healthy, diversified economy adequate to provide future City services. GOAL 3: Ensure that new development is compatible with surrounding land uses in the community, the City's circulation network, availability of public facilities, existing development constraints and the City's unique characteristics and resources. GOAL 10: Improve and strengthen the Tustin Old Town/First Street area with a unique pedestrian environment and diverse mix of goods, services, and uses. 300 Centennial Way, Tustin, CA 92780 0 P: (714) 573-3150 • F: (714) 734-8991 0 www.tustinca.org Mr. Joe Alcock Land Use Strategies Accommodating Transit and Non -Motorized Transportation June 7, 2019 Page 2 The Circulation Element guides the development of the City's circulation system by providing adequate capacity for future land uses and provides for a safe, efficient, and adequate circulation system for the City. The Element establishes a hierarchy of transportation routes with specific development standards described for each category of roadway. The following subjects are included in the Circulation Element: streets and highways, transportation corridors, transportation system management, transportation demand management, transit, rapid transit, railroads, paratransit (e.g. carpooling, vanpooling and taxi service), bicycle, pedestrian facilities, commercial, general, and military airports. The following is a listing of the applicable Circulation Element goals and implementation measures: GOAL 1: Provide a system of streets that meets the needs of current and future inhabitants and facilitates the safe and efficient movement of people and goods throughout the City consistent with the City's ability to finance and maintain such a system. GOAL 4: Maximize the efficiency of the circulation system through the use of transportation system management and demand management strategies. GOAL 5: Support development of a public transportation system that provides mobility to all City inhabitants and encourages use of public transportation as an alternative to automobile travel. GOAL 6: Increase the use of non -motorized modes of transportation. Implementation Measures are as follows: • New Development: Require new development to dedicate land and fund improvement of bicycle, pedestrian and equestrian facilities, where deemed necessary to meet public needs arising in conjunction with development. • Bus Service: The City works closely with the Orange County Transportation Authority (OCTA) to provide local and express bus service to the community. The City continued a cooperative effort with designs to enhance access to bus stops that are compliant with the Americans with Disabilities Act (ADA). • Bus Shelters and Bus Bench Program: The City has implemented a bus shelter and bus bench program and installs these facilities as opportunities become available for their implementation. • Bus Turnouts: The City reviews development plans and identifies locations for the installation of bus turnouts on arterial roadways. It also ensures bus turnouts are included where applicable on new roadway construction and widening. The City continues to coordinate the design and implementation of new bus turnout locations at Tustin Legacy with OCTA and the development community. • Regional Hiking and Biking Trail System: The City supports and promotes the safety of pedestrians and bicyclists by complying with uniform standards and practices, including designation of bicycle lanes, off-road bicycle trails, proper signage, and adequate sidewalks, bicycle lanes, and off-road bicycle trail widths. Mr. Joe Alcock Land Use Strategies Accommodating Transit and Non -Motorized Transportation June 7, 2019 Page 3 • Orange County Master Plan of Bikeways: The City supports and coordinates the development and maintenance of bikeways in conjunction with the Orange County .Master Plan of County Bikeways. The City continues to coordinate with OCTA to identify bicycle corridors that enhance regional connectivity within the County such as the Orange County Foothills Bikeways Strategy multi -agency cooperative effort. The City's construction, project to close the gap along the Peters Canyon Channel between the railroad tracks and Warner Avenue has begun with estimated completion by the end of 2019. Construction of the Class I trail on Barranca Parkway between Tustin Ranch Road and Red Hill Avenue has been completed. Construction of Class 11 lanes was recently completed on northbound Red Hill Avenue. • Pedestrian Path between Dow Avenue and Metrolink Station: The pedestrian path connects the industrial business complex near Dow Avenue to the Metrolink Station, which was designed and constructed by the Orange County Transportation Authority. The path features energy saving LED street lighting. GOAL 7: Provide for well-designed and convenient parking facilities, Implementation Measures are as follows: • Parking Facilities: Tustin encourages the efficient use of existing parking facilities, including provisions for shared use of facilities and other provisions to improve the effectiveness of City parking codes and ordinances. Additionally, the City provides for common parking facilities in the Old Town area to provide convenient access to public and private facilities. In cooperation with the City, OCTA constructed a parking structure at the Metrolink Commuter Rail Station to accommodate parking demands as Metrolink service expands. • Development Review and Parking Requirements: The City monitors development to ensure sufficient off-street parking for all land use decisions. I trust this information will be helpful in documenting how the City of Tustin addresses transit and non -motorized transportation through its General Plan. Please feel free to contact me at (714) 573-3172 if you have any questions. Sincerely, Krys Saldivar Public Works Manager—Traffic/Transportation Attachment: City of Tustin — General Plan Excerpts Copy: Douglas S. Stack, Director of Public Works/City Engineer Ken Nishikawa, Deputy Director of Public Works/Engineering S:\OCTA\Measure M2 2019-2020\K Land U seS trategles Letter 2019.docx Il Land Use Element n D balance between the City's revenue generation needs and service provision responsibilities. GOAL 1: Provide for a well balanced land use pattern that accommodates existing and future needs for housing, commercial and industrial land, open space and community facilities and services, while maintaining a healthy, diversified economy adequate to provide future City services. Policy 1.1: Preserve the low-density quality of Tustin's existing single-family neighborhoods while permitting compatible multi -family development to meet regional housing needs where best suited from the standpoint of current development, accessibility, transportation and public facilities. Policy 1.2: Provide for and encourage the development of neighborhood -serving commercial uses in areas of Tustin presently underserved by such uses. Encourage the integration of retail or service commercial uses on the street level of office projects. Policy 13: Facilitate the development of vacant and underutilized freeway parcels -with commercial uses where appropriate and compatible with surrounding uses to capitalize on their freeway access and visibility. Policy 1.4: Consider modification of present City boundaries in unincorporated areas within the City of Tustin's sphere where they are irregular and create inefficiencies. Policy 1.5: Encourage compatible and complementary infill of previously by-passed parcels in areas already predominately developed. Policy 1.6: Ensure an adequate supply of commercial and industrial land within the City of Tustin for potential commercial and industrial expansion and development. Policy 1.7: As part of the City's attraction to business and industry, provide adequate sites to house future employees. CITY OF TUSTIN LAND USE ELEMENT GENERAL PLAN 13 NOVEMBER 20, 2012 Policy 1.8: Provide incentives to encourage lot consolidation and parcel assemblage to provide expanded opportunities for coordinated development and redevelopment. Policy 1.9: Provide development of light industrial and business park uses under strict performance development standards. Encourage industrial and business parks as the preferred method of accommodating industrial growth. Policy 1.10: Ensure that the distribution and intensity of land uses are consistent with the Land Use Plan and classification system. Policy 1.11: Where feasible, increase the amount and network of public and private open space and recreational facilities which will be adequate in size and location to be useable for active or passive recreation as well as for visual relief. Policy 1.12: Evaluate all future annexation proposals within the City's sphere of influence for their potential financial, social and environmental impacts on the City of Tustin. The analysis of financial impacts shall include preparation of a fiscal impact report which provides an analysis of impacts on operating costs and costs associated with needed short and long term capital improvements. Policy 1.13: Preserve the existing low density character of North Tustin single family zoned neighborhoods. GOAL 2: Ensure that future land use decisions are the result of sound and comprehensive planning. Policy 2.1: Consider all General Plan goals and policies, including those in other General Plan elements, in evaluating proposed development projects for General Plan consistency. Policy 2.2: Maintain consistency between the Land Use Element, Zoning Ordinances, and other City ordinances, regulations and standards. Policy 2.3: Endeavor to promote public interest in, and understanding of, the General Plan and regulations relating to it. CITY OF TUSTIN LAND USE ELEMENT GENERAL PLAN 14 NOVEMBER 20,2012 Policy 2.4: Encourage citizen participation in planning and development of land use programs. Policy 2.5: Foster inter -governmental cooperation and coordination in order to maximize the effectiveness of land use policies. Policy 2.6: Maintain consistency with the Airport Environs Land Use Plan (AELUP) for John Wayne Airport in terms of maximum allowable building height, noise levels, safety areas, and other applicable standards. COMPATIBLE AND COMPLEMENTARY DEVELOPMENT Intermixing of different land uses can result in incompatibilities attributable to differences in traffic levels, noise levels, physical scale, and hours of operation. Incompatibility can also occur when the characteristics of a specific land use do not match the physical characteristics of available land (such as intensive development in hillside areas). GOAL 3: Ensure that new development is compatible with surrounding land uses in the community, the City's circulation network, availability of public facilities, existing development constraints and the City's unique characteristics and resources. Policy 3.1: Coordinate and monitor the impact and intensity of land uses in adjacent jurisdictions on Tustin's transportation and circulation systems to provide for the efficient movement of people and goods with the least interference. Policy 3.2: Locate major commercial uses in areas that are easily accessible to major transportation facilities. Policy 3.3: Allow development clustering in hillside areas when this method will better preserve the natural terrain and open character of the City. Policy 3.4: In designing hillside development, give particular attention to maximizing view opportunities, minimizing dangers of geologic and soil hazards, minimizing adverse visual impact on surrounding CITY OF TUSTIN LAND USE ELEMENT GENERAL PLAN 15 NOVEMBER 20, 2012 Policy 9.9: Site buildings and align roadways to maximize public visual exposure to the north -south Peters Canyon ridgeline, the redwood/cedar grove, the knoll and major tree stands. DEVELOPMENT CHARACTER IN OLD TOWN/FIRST STREET AREA The development character of Old Town and the First Street area can be significantly enhanced by greater integration of residential uses and thriving commercial uses and physical renovations to existing buildings and street frontages which promote a pedestrian orientation. GOAL 10: Improve and strengthen the Tustin Old. Town/First Street area with a unique pedestrian environment and diverse mix of goods, services, and uses. Policy 10.1: Improve the Old Town District's identity as the City's historical and architectural focus and its contribution to the City's economic base. Policy 10.2: Review and consider the possible development of residential uses in the Old Town area both as individual residential projects, and integrated above ground floor retail and office uses. Policy 10.3: Encourage outdoor pedestrian spaces, such as courtyards, arcades and open landscaped passages, to be integrated into new development. Encourage high-quality pedestrian -oriented building frontages which open onto these pedestrian spaces and public sidewalks. Policy 10.4: Develop and use signage to promote a district parking concept that emphasizes shared parking facilities. Promote improvements which will upgrade circulation and access in the Old Town District. Policy 10.5: Study the potential expansion of the Cultural Resources Overlay District north of First Street to Irvine Boulevard. CITY OF TUSTIN LAND USE ELEMENT GENERAL PLAN 23 NOVEMBER 20, 2012 Policy 10.6: Encourage the integration of retail or service commercial uses on the street level of office projects through flexibility in site development standards. Policy 10.7: Encourage the consolidation of individual parcels/ consolidated site planning and parking and access along First Street and in Old Town through utilization of development incentives such as reduced parking, height bonus, lot coverage relaxation, allowance for secondary uses, fee waivers, and/or financial assistance in land acquisition and/or infrastructure improvements. Policy 10.8: Encourage rehabilitation of existing facades and signage to comply with First Street Specific Plan guidelines and any future design guidelines for Old Town. Policy 10.9: Allow existing single family residential uses/structures listed within the City's official historic survey to be preserved and used as a residence, or preserved and used as a commercial use consistent with the City's Cultural District Residential Design Guidelines and the Secretary of Interiors Standards for Rehabilitation. The future image of the Pacific Center East area will consist of a more intensive and integrated business park environment. The area's distinct location adjacent to SR 55 creates a significant opportunity to capitalize on its freeway orientation to achieve regional recognition. GOAL 11: Provide for an integrated business park environment in the Pacific Center East Area which both capitalizes on market opportunities and is compatible with adjacent developed land uses. Policy 11.1: Provide a wide range of uses and intensities which meet the City's future needs for mixed land uses and for a variety of facilities and services in, the project area, and which capitalize on visibility and access of freeway interchange locations. Policy 11.2: Create a cohesive architectural image and attractive streetscape through implementation of development standards and design guidelines to unify the area. CITY OF TUSTIN LAND USE ELEMENT GENERAL PLAN 24 NOVEMBER 20, 2012 Circulatioa 4 IIAA x 9 Fail CIRCULATION ELEMENT GOALS AND POLICIES The following goals and policies form the basis for providing a circulation system which adequately serves the development intensity anticipated in the Land Use Element. They are designed to reflect and support the Citywide goals of the General Plan, and acknowledge the changing economic and environmental conditions in the City and surrounding regions. LOCAL THOROUGHFARES AND TRANSPORTATION ROUTES CITY OF TUSTIN GENERALPLAN A well-planned street system provides safe and convenient access to land use development in the City and serves the primary mobility needs of the community. To provide such a system, the Circulation Element includes a planned hierarchy of arterial roadways, each roadway serving a specific function and carrying a portion of the anticipated traffic demands. GOAL 1: Provide a system of streets that meets the needs of current and future inhabitants and facilitates the safe and efficient movement of people and goods throughout the City consistent with the City's ability to finance and maintain such a system. Policy 1.1: Develop and maintain a circulation system that is based upon and is in balance with the Land Use Element of the General Plan. Policy 1.2: Develop and implement circulation system standards for roadway and intersection classifications, right-of-way width, pavement width, design speed, warrant requirements, capacity, maximum grades and associated features such as medians and bicycle lanes or trails that are adjacent or off-road. Policy 1.3: Coordinate roadway improvements with applicable regional, state and federal transportation plans and proposals. Policy 1.4: Develop and implement thresholds and performance standards for acceptable levels of service. 10 CIRCULATION ELEMENT JUNE 17, 2008 Policy 1.5: Develop a program to identify, monitor and make recommendations for improvements to roadways and intersection ' s that are approaching, or have approached, unacceptable levels of service or experiencing higher than expected accident rates. Policy 1.6: Develop and improve the City's transportation network consistent with available funding; scheduling shall be coordinated with land use plans to ensure the orderly extension of facilities and to preserve a free-flowing circulation system. Policy 1.7: Provide for and work with responsible agencies regarding the safe and expeditious transport of hazardous materials. Policy 1.8: Limit driveway access on arterial streets to maintain a desired quality of flow. Policy 1.9: Design local and collector streets to discourage their use as alternate through routes to secondary, primary, and major streets. Policy 1.10: Require that proposals for major new developments include a future traffic impact analysis which identifies measures to mitigate any identified project impacts. Policy 1.11: Encourage new development which facilitates transit services, provides for non -vehicular circulation and minimizes vehicle miles traveled. Policy 1.12: Minimize pedestrian and vehicular conflicts through street design and well -marked pedestrian crossings. Policy 1.13: Minimize effects of transportation noise wherever possible so as to comply with the Noise Element. Policy 1.14: Enhance the important role that streetscapes play in defining the character of the City by expanding street planning and design procedure to include aesthetic and environmental concerns, as well as traffic considerations. Develop a circulation system which highlights environmental amenities and scenic areas. Policy 1.15: Ensure construction of existing roadways to planned widths, as new developments are constructed. CITY OF TUSTIN CIRCULATION ELEMENT GENERAL PLAN 11 1 JUNE 17, 2008 Policy 1.16: Continue to require dedication of right-of-way and construction of required public improvements on streets adjacent to construction projects at the developer's expense. Policy 1.17: Direct existing through traffic from local streets to collector, secondary, and arterials to reduce traffic on local streets., improve neighborhood safety and environmental quality. Policy 1.18: Assist and develop safe school routes in conjunction with the Tustin Unified School District. GOAL 2: Provide for a truck circulation system that provides for the effective transport of commodities while minimizing the negative impacts throughout the City. Policy 2.1: Provide primary truck routes and describe such routes on selected arterial streets to minimize the impacts of truck traffic on residential areas. Policy 2.2: Provide appropriately designed and maintained roadways for the primary truck routes. Policy 2.3: Provide loading areas and accessways that are designed and located so as to avoid conflicts with efficient traffic circulation. Policy 2.4: Consider safety regulations addressing trucks hauling materials within the City. Policy 25: Discourage on -street loading and unloading of commercial and industrial products. INTERCITY AND REGIONAL TRANSPORTATION The Circulation Element is set in a regional context which recognizes the related transportation needs and planning activities of the surrounding County, Region, and State. GOAL 3: Support development of a network of regional transportation facilities which ensure the safe and efficient CITY OF TUSTIN CIRCULATION ELEMENT GENERAL PLAN 12 JUNE 17, 2008 efficiency of the transportation system and reduce vehicular demands, thereby reducing the impacts of future development. GOAL 4: Maximize the efficiency of the circulation system through the use of transportation system management and demand management strategies. Policy 4.1: Implement traffic signal coordination on arterial streets to the maximum extent practical, consistent with financial resources, integrate signal coordination efforts with those of adjacent jurisdictions, and implement other operational measures where possible to maximize the efficiency of the existing circulation system and to minimize delay and congestion. Policy 4.2: Implement intersection capacity improvements where feasible. Policy 4.3: Encourage the implementation of employer Transportation Demand Management (TDM) requirements, which were included in the Southern California Air Quality Management District's Regulation 2202 of the 1997 Air Quality Management Plan and as required by Proposition 111 as part of the Congestion Management Program (CMP) and participate in regional efforts to implement TDM requirements. Policy 4.4: Require that proposals for major new non-residential developments include submission of a TDM plan to the City, including monitoring and enforcement provisions. Policy 4.5: Encourage the development of additional regional public transportation services and support facilities including park-and-ride lots near the SR -55 and I-5 freeways. Policy 4.6: Encourage the promotion of ridesharing through publicity and provision of information to the public. GOAL 5: Support development of a public transportation system that provides mobility to all City inhabitants and encourages use of public transportation as an alternative to automobile travel. Policy 5.1: Support the efforts of the appropriate transportation agencies to provide additional local and express bus service to the CITY OF TUSTIN CIRCULATION ELEMENT GENERAL PLAN 14 JUNE 17, 2008 Tustin community, and to provide park-and-ride lots near the SR -55 and I-5 freeways. Policy 5.2: Require new development to fund transit facilities, such as bus shelters and turn -outs, where deemed necessary to meet public needs arising in conjunction with development. Policy 5.3: Ensure accessibility of public transportation for elderly and disabled persons, consistent with City responsibilities for accessibility. Policy 5.4: Encourage employers to reduce vehicular trips by offering employee incentives, such as subsidized bus passes and vanpool/carpool programs. Policy 5.5: Promote new development that is designed in a manner which facilitates provision or expansion of transit service, and provides non -automobile circulation within the development. Policy 5.6: Encourage developers to work with agencies providing transit service with the objective of maximizing the potential for transit use by residents and/or employees. Policy 5.7: Promote the provision of safe transit stops and shelters. TRANSIT, BICYCLE, PEDESTRIAN AND EQUESTRIAN FACILITIES Non -vehicular modes of travel serve certain mobility needs and also provide recreational opportunities. Where possible, the Element provides for these modes of travel by separate trails, walkways and bike lanes. GOAL 6: Increase the use of non -motorized modes of transportation. Policy 6.1: Promote the safety of pedestrians and bicyclists by adhering to uniform standards and practices, including designation of bicycle lanes, off-road bicycle trails, proper signage, and adequate sidewalk, bicycle lane, and off-road bicycle trail widths. CITY OF TUSTIN CIRCULATION ELEMENT GENERAL PLAN 15 JUNE 17, 2008 Policy 6.2: Maintain existing pedestrian facilities and require new development to provide pedestrian walkways between developments, schools and public facilities. Policy 6.3: Ensure accessibility of pedestrian facilities to the elderly and disabled. Policy 6.4: Support and coordinate the development and maintenance of bikeways in conjunction with. the County of Orange Master Plan of Countywide Bikeways to assure that local bicycle routes will be compatible with routes of neighboring jurisdictions. Policy 6.5: Require the provision of showers and an accessible and secure area for bicycle storage on certain size non-residential developments as required by the City's TDM ordinance. Policy 6.6: Develop programs that encourage the safe utilization of easements and/or rights-of-way along flood control channels, public utility rights-of-way, and street rights-of-way wherever possible for the use of bicycles and/or pedestrian/ equestrian trails. Policy 67: Ensure link -up of trails within the City to the regional trail system. Policy 6.8: Support retrofit installation of sidewalks in industrial districts and Planned Community Business Parks as development occurs. Policy 6.9: Support and coordinate the development and maintenance of bikeways and trails in conjunction with the master plans of the appropriate agencies. Policy 6.10: Encourage safe biking by supporting safety clinics/ courses sponsored by various local and state agencies. Policy 6.11: Consider the provision of unique transportation methods, such as shuttle buses from outlying parking areas, for special events. Policy 6.12: Provide for a non -vehicular circulation system that encourages bicycle transportation and pedestrian circulation. CITY OF TUSTIN CIRCULATION ELEMENT GENERAL PLAN 16 JUNE 17, 2008 PARKING Policy 6.13: Maintain a City of Tustin Bikeway Plan (that complements and is coordinated with the County's Plan as well as neighborhood jurisdictions) which will identify existing and future routes within the City to accommodate such uses. Policy 6.14: Require new development to dedicate land and fund improvement of bicycle, pedestrian and equestrian facilities, where deemed necessary to meet public needs arising in conjunction with development. Adequate and convenient parking facilities are an important part of the transportation amenities provided by a City. The Circulation Element therefore contains policies which ensure the provision of such amenities. GOAL 7: Provide for well-designed and convenient parking facilities. Policy 7.1: Consolidate parking, where appropriate, to eliminate the number of ingress and egress points onto arterials. Policy 7.2: Provide sufficient off-street parking for all land uses. Policy 7.3: Encourage the efficient use of parking facilities, including provisions for shared use of facilities, smaller vehicles and other provisions to improve the effectiveness of City codes and ordinances. Policy 7.4: Reduce use of arterial streets for on -street parking in an effort to maximize traffic flow characteristics of roadways. ALTERNATIVE FINANCING Implementation of the Circulation Element requires an adequate source of funding for the improvements that will be required. The goal and policies which follow emphasize the importance of , this aspect of the Element. CITY OF TUSTIN CIRCULATION ELEMENT GENERAL PLAN 17 JUNE 17, 2008 the Tustin community and to provide Park and Ride lots near the freeways. 0 Require new development to participate in transit amenities, such as bus shelters, turn -outs, landing pads and similar items. 0 Coordinate roadway improvements with transit service so that where applicable, special features, such as bus turn -outs, can be provided in the improvement program. Responsible Agency/Department: Engineering Division, Community Development Funding Source: Developer exactions, Measure "M", Proposition 111 Time Frame: On-going Related Circulation Element Policies: 3.7, 3.8, 4.1-4.6, 5.1-5.7 BICYCLE, PEDESTRIAN AND EQUESTRIAN FACILITIES 11, Alternative Transportation. Modes: These components of the General Plan Circulation Element provide alternative modes of transportation (in the case of bicycle), and recreation -related facilities (in the case of bicycle, pedestrian, and equestrian). Implementing actions are as follows: 0 Provide uniform standards and practices for the safety of pedestrians and bicyclists by providing adequate sidewalks, bicycle lanes, and off-road bicycle trails and requiring dedication and improvement of these facilities where deemed necessary to meet public needs arising as a result of development. 0 Include pedestrian walkway standards as requirements on new development. 0 Coordinate the development and maintenance of bikeways with the work carried out by the County of Orange for the Master Plan of Countywide Bikeways. CITY OF TUSTIN CIRCULATION ELEMENT GENERAL PLAN 53 JUNE 17, 2008 PARKING 0 Encourage City-wide development to participate in transit amenities, such as bus shelters, turn -outs, and similar facilities. Responsible Agency/Department: Community Development, Public Works Funding Source: Developer exactions, Federal and State grants, City General Fund Time Frame: On-going Related Circulation Element Policies: 6.1-6.13 12. Sidewalks in Industrial Areas: Continue to study and implement, if feasible, the creation of an assessment district for sidewalk construction within each industrial area which would spread the cost of said sidewalk construction and administrative district costs over a multi-year payoff period or 10 or 20 years. Responsible Agency/Department: Public Works Department Funding Source: Assessment District Time Frame: 1993/1994 Related Circulation Element Policies: 1.12, 1.16, 6.1, 6.2 and 6.8 13. Parking Ordinance Study: The City shall complete a Parking Ordinance study which will include issues such as guest parking standards, shared use of parking facilities, parking for smaller vehicles and necessary changes to City codes and regulations, Responsible Agency/Department: Community Development Department Funding Source: City General Fund Time Frame: 1993 CITY OF TUSTIN CIRCULATION ELEMENT GENERAL PLAN 54 JUNE 17, 2008 Attachment "L" PMP Certification & Local PMP Plan FINAL REPORT UPDATED CITYWIDE PAVEMENT MANAGEMENT PLAN OC Go 2019-2026 TuSTI N Submitted to: June 7, 2019 Mr. Eric Johnson Principal Engineer CITY OF TUSTIN 300 Centennial Way Tustin, CA 92780 Subject: City of Tustin — OCTA Pavement Management Compliance Report 2019 Dear Eric: As part of the 2019 Update of the Pavement Management Plan (PMP) for the City of Tustin, Bucknam Infrastructure Group, Inc. is pleased to submit the PMP reporting required by the Orange County Transportation Authority (OCTA). This data/report will be submitted to OCTA as part of the City's required biennial PMP prior to June 30, 2019. The information contained in this report was used to develop the recommended improvement program for the pavement network. The report covers the following categories: • Pavement Management Plan Certification • Quality Assurance/ Quality Control (QA/QC) Plan • Pavement Management Data Files (electronic Tustin.e70 file format) • Pavement Management Plan that includes the following: • Average Pavement Conditions For Each Segment in the Network (PCI Report) The Pavement Condition Index report shows the present condition of each street in the pavement network (MPAH and Locals). In addition, the report shows the basic geometry of each street segment. • Seven-year Projected PCI Under Existing Funding Levels This report identifies the projected PCI's based on the local agencies current funding programs. This report details the PCI projects for the entire network, MPAH roadways and Local streets. • Seven-year Plan for Road Maintenance and Rehabilitation (Forecasted Maintenance Report) The Forecasted Maintenance Report projects the street maintenance activities required for the next seven years, broken down to show maintenance levels for all streets. This includes all scheduled projects provided by the City for fiscal years 2019 through 2026. • Alternative Funding Levels OCTA has requested two reports indicating the necessary funding to maintain the City's current weighted average PCI as well as the necessary funding to improve the weighted average PCI by one PCI point over the next seven years. • Backlog by Fiscal Year (re: unfunded restoration, rehabilitation and reconstruction) • Percentage of total network in each of the five condition categories based on centerline mileage • Local Match Reduction Reporting In order to be eligible for Local Match Reduction of 10%, the following must be submitted: o Measurable improvement of paved road conditions during the previous reporting period defined as an overall weighted (by area) average system improvement of one PCI point. o No reduction in the overall weighted (by area) average PCI in the MPAH or local street categories - or— o Have road pavement conditions, for the overall network, during the previous reporting period within the highest twenty (20%) of the scale for road pavement conditions in conformance with OCTA Ordinance No. 3, defined as a PCI of 75 or higher, otherwise defined as in "good condition". These reports will be submitted to the City of Tustin as part of the biennial Pavement Management Plan that is due prior to June 30, 2019. These reports will be packaged in a way that it will be easy for staff to review. All comments received from the City have been incorporated in the reports that follow. All of the City's issues and needs that were brought to our attention are included in the report. It has been a pleasure working with you and the City on updating your Pavement Management Plan. We look forward to the continued success of this project and future teamwork with City staff. Sincerely, Bucknam Infrastructure Group, Inc. Peter J. Bucknam Project Manager Infrastructure Management — GIS Services BUC.<NAM IN=RASTRUCTURE GROUP, INC. 3548 Seagate Way, Suite 230 Oceanside, CA 92056 T. 760.216.6529 F. 760.216.6549 www.bucknam-inc.com City of Tustin, CA Page i 2019 Citywide Pavement Management Plan - OCTA Submittal Final Report - June 7, 2019 AGENCY SUBMITTAL TABLE OF CONTENTS I. Pavement Management Plan Certification.............................................................................. 2 II. Executive Summary................................................................................................................. 3 III. Background (Tustin PMP)........................................................................................................4 IV. Current Pavement Conditions (PCI).........................................................................................7 V. Projected Pavement Conditions (PCI)...................................................................................... 8 VI. Alternative Funding Levels.......................................................................................................9 a. Maintain Existing Average Network PCI................................................................ 9 b. Improve Average Network PCI............................................................................... 9 VII. Current and Projected Backlog by Year of Pavement Maintenance Needs ............................ 9 VIII. Centerline Mileage.................................................................................................................10 IX. Percentage of Network in Each of Five Condition Categories Based on Centerline mileage 10 X. Reduction in M2 Local Match................................................................................................11 XI. Appendix A — Seven -Year Road Maintenance and Rehabilitation Plan Based on Current or Expected Funding Level..............................................................................12 XII. Appendix B —Complete Street Listing Current Conditions....................................................13 XIII. Appendix C — Quality Assurance / Quality Control Plan........................................................14 • Introduction.........................................................................................................14 • Objectives............................................................................................................14 • Structure of QA/QC Plan......................................................................................14 • Condition Survey Procedures...............................................................................15 • Accuracy Required for Data Collection................................................................16 • Random and Systematic Re-Inspections..............................................................16 • PCI Comparison with Past Surveys.......................................................................17 • Inspector Qualifications and Experience.............................................................17 • Safety Procedures................................................................................................ 17 XIV. Appendix D — Pavement Management Data Files............................................................18 XV. Appendix E — GIS Maps — Current Conditions...................................................................19 City of Tustin, CA Page 1 2019 Citywide Pavement Management Plan - OCTA Submittal Final Report -lune 7, 2019 CITY OF TUSTIN PAVEMENT MANAGEMENT PLAN - part of - COUNTYWIDE PAVEMENT MANAGEMENT PLAN GUIDELINES (OCTA Guideline —April 2018) Prepared by: Bucknam Infrastructure Group, Inc. Submitted to OCTA: June 30, 2019 City of Tustin, CA Page 2 2019 Citywide Pavement Management Plan — ®CTA Submittal Final Report — June 7, 2019 I. Pavement Management Plan Certification The City of Tustin, CA certifies that is has a Pavement Management Plan in conformance with the criteria stated in the Orange County Transportation Authority Ordinance No. 3. This ordinance requires that a Pavement Management Plan be in place and maintained to qualify for allocation of revenues generated from renewed Measure M (M2). The plan was developed by Bucknam Infrastructure Group, Inc. using MicroPAVER, a pavement management system conforming to American Society for Testing and Materials (ASTM) Standard D6433- 16, and contains, at a minimum, the following elements: • Inventory of MPAH and Local routes reviewed and updated biennially. The last update of the inventory was completed on March, 2019 for the Arterial (MPAH) and March, 2019 for the Local streets; • Assessment of the pavement condition for all routes in the system, updated biennially. The last field review of the pavement condition was completed in April, 2019; • Percentage of all section of pavement needing: o Preventive Maintenance = 27.0%; o Rehabilitation =14.3%1 o Reconstruction = 0.1% • Budget needs for preventive maintenance, rehabilitation and/or reconstruction of deficient sections of pavement for: o Current biennial period $6,668,800; o Following biennial period $6,652,500 • Funds budgeted or available for Preventive Maintenance, Rehabilitation and/or Reconstruction. o Current biennial period $6,000,000; o Following biennial period $6,000,000 • Backlog by year of unfunded rehabilitation, restoration and reconstruction needs (See page 9); • The Pavement Management Plan is consistent with countywide psvement condition assessment standards as described in the OCTA Countywide Pavement Management Plan Guidelines adopted by the OCTA Board of Directors. *An electronic copy of the Pavement Management Plan (with MicroPAVER or StreetSaver compatible files) has been or will be submitted with the certification statement. A copy of this certification is being provided to the Orange County Transportation Authority. Submitted by: Title City of Tustin Jurisdicti Date City of Tustin, CA Page 3 2019 Citywide Pavement Management Plan - OCTA Submittal Final Report - June 7, 2019 II. EXECUTIVE SUMMARY 2019 UPDATE OF PAVEMENT MANAGEMENT PLAN (PMP) As the City of Tustin's infrastructure continues to mature Public Works priorities such as Local street overlay rehabilitation and proactive Arterial CIP maintenance are key projects to City staff. With the City mostly built -out, wear and tear on the infrastructure will occur at an ever increasing rate. Pavement aging through annual weathering, dynamic and static vehicle loading, and increased usage, compounded with the increased cost of performing maintenance and rehabilitation, add to the yearly operational budget of the pavement network. System sustainability can only be achieved through proactive scheduling and the implementation of cost-efficient pavement applications. In the upcoming years as the City continues to build upon this study through future inspections and maintenance work history, Tustin pavement data will continue to provide reliable data. This will enhance the PMP through detailed Orange County Transportation Authority (OCTA) OC Go funding analysis, City specific budgetary reporting and level of service reporting. The Tustin PMP has been developed to assist City personnel by providing current data on the City's street network and to develop cost-effective maintenance strategies to maintain a desirable level of pavement performance on a network scale, while optimizing the expenditure of limited fiscal resources. The project consisted of analyzing the City's 2017 dataset for quality and usability. In doing this, we were tasked to generate an updated Capital Improvement Program report that identified recommendations and deficiencies in the current operating and maintenance efforts put forth by the City. We surveyed all designated arterial, collector (MPRH) and local routes this past spring to assist the City in being compliant with OCTA — OC Go April 2018 guidelines. Additionally, we updated the City's unique Pavement Management — GIS layer that will continue to assist the City in analyzing pavement conditions and other attribute information through the use of ESRI ArcMap. Bucknam Infrastructure Group reviewed the City's previous maintenance efforts and the current 2019-20 proposed street improvements for pertinent pavement information in order to generate a CIP report that identified recommendations and opportunities for improvement in the current operating and maintenance efforts put forth by the City. The result of these work efforts is this report. City of Tustin, CA Page 4 2019 Citywide Pavement Management Plan - OCTA Submittal Final Report - June 7, 2019 III. BACKGROUND (TUSTIN PMP) In late 1990, voters throughout Orange County approved a %-cent sales tax for transportation improvements known as OC Go, formerly known as Measure M2. Funding for streets and roads are included within the sales tax and are distributed to locals agencies through both formula and a competitive method. In late 2006, the renewal of OC Go was approved by voters that would continue the -cent sales tax for thirty additional years, starting in 2011. The primary of goal of this report is to comply with established guidelines from OCTA to ensure that field data collection and reporting efforts performed by outside consultants or local agency staff are consistent. This is required in order that funding allocations can be reviewed and based on agency comparable pavement conditions. Specifically, our findings and recommendations provide Public Works administrators, managers and field personnel with: * PMP report consistent with OCTA OC Go guidelines * the present condition status of the pavement network (arterial, collector, residential and industrial streets), as a whole and of any grouping or individual component within the City, * a ranked list of all streets, or segments of streets, by condition within the network, * rehabilitation/maintenance needs of each street segment by year,, * an optimized priority maintenance and rehabilitation program based on cost/benefit analysis and various levels of funding; * optimum annual pavement expenditure levels for pavement maintenance for the next seven (7) years, * prediction of the life -cycle performance of the City's pavement network and each individual street section, and * pavement condition data and analysis presented in GIS through ESRI ArcMap Pavement is a dynamic structure where deterioration is constantly occurring; thus the pavement management system needs to be updated on a regular basis to reflect these changes in pavement conditions, pavement maintenance histories, and maintenance strategies based upon budgetary constraints. In our approach to develop the City's forecasted maintenance recommendations we worked with Tustin Public Works/Engineering staff in identifying unit costs for all maintenance practices used on an annual basis. Currently, based upon the City's maintenance practices and their associated unit costs, the total replacement value of the Tustin pavement network is $249,033,400. This value clearly indicates that the City's pavement network is the most valuable and essential asset to Tustin. The City's use of slurry seal, AC Overlay and R&R practices are typically applied at a five year, ten year and 25 year frequency respectively. These, frequencies are typical but the City may see increases in deterioration rates due to environmental, load and high average daily traffic (ADT) volumes. For example, high ADT volumes along one of Tustin's arterial streets will increase deterioration rates for a previously applied AC Overlay compared to a small local street. These deterioration rates are monitored through frequent inspections and functional class deterioration analysis within the City's PMP database. City of Tustin, CA Page 5 2019 Citywide Pavement Management Plan - OCTA Submittal Final Report -June 7, 2019 FINDINGS AND RECOMMENDATIONS Through our assessment of historical maintenance performed within the City and through our discussions with City staff the conditional data found across the network clearly shows that the City has applied strong, preventative maintenance strategies over the past decade. Pavement management involves frequent preventative maintenance; as pavement deteriorates through heavy traffic impacts, weathering and time, preventative maintenances (such as slurry seal, stop gap, etc.) have limited benefits. More aggressive maintenance applications have to be used. Our study has shown that key slurry seal and selective overlay projects will be needed over the next seven years to maintain the network's high level of condition. Currently, the City's two major streets networks (Local & Arterial) hold high weighted PCI values; it is our recommendation that a proactive, common sense overlay program and a continued slurry seal program be scheduled over the next several fiscal years. This will ensure that the citywide weighted PCI will sustain itself and allow for routine slurry seal maintenance to continue. We have found and recommend the following detailed items which should be reviewed and considered for a proactive approach to the future management of the PMP: ARTERIAL / COLLECTOR (MPAH) FINDINGS AND RECOMMENDATIONS The actual workload requirements identified indicate that the Arterial (MPAH) street network is currently in "Good" condition. To maintain this condition, it is critical that preventive maintenance and overlay activities are funded at the levels identified on page 9 to maintain a "Good" network weighted average PCI value. Our MPAH findings for conditional data and recommendations for revenue expenditures are shown below: • The MPAH network has a weighted PCI of 85.4 • The MPAH network consists of 72.8 centerline miles and 17,088,467 SF of pavement; • Currently, 33% of the MPAH network (23.7 centerline miles) qualify for slurry seal/stop gap maintenance; 9% of the Arterial network (6.8 centerline miles) qualify for rehabilitation/reconstruction maintenance; • At a minimum, MPAH maintenance projects should focus on the maintaining the current weighted average PCI between 83 and 85 over the next 7 years; • Develop a proactive fiscal and planned approach to identify MPAH overlay projects based on the deterioration modeling within MicroPAVER; • Appropriate MPAH revenues at an average of $1.92 Million /yr for the term of the seven-year CIP to generate the results identified on page 9 (VI. Alternative Funding Levels (Increase PCI); and • Perform pavement inspections on the MPAH network every two years to build a solid planning model within MicroPAVER to track PCI deterioration; also follows new OCTA guidelines for OC Go. City of Tustin, CA Page 6 2019 Citywide Pavement Management Plan — OCTA Submittal Final Report — June 7, 2019 LOCAL FINDINGS AND RECOMMENDATIONS The actual workload requirements identified indicate that the Local street network is currently in "Good" condition. To maintain this condition, it is critical that preventive maintenance and overlay activities are funded at the levels identified on page 9 to maintain a "Good" network weighted average PCI value. Our Local network findings for conditional data and recommendations for revenue expenditures are shown below: The Local network has a weighted PCI of 85.9; o The City's slurry program over the past 7+ years has made a tremendous impact to the overall weighted Local PCI; o It is recommended that this program continue until all qualifying sections are addressed; o At the completion of the slurry program and defined overlay schedule is recommended for the next seven to ten years (i.e. FY 2023 thru 2030). o The new overlay program should take into consideration the deterioration of previously applied slurry and pavement section(s) age. • The Local network consists of 67.7 centerline miles and 13,542,951 SF of pavement; • Currently, 32.6% of the Local network (21.6 centerline miles) qualifies for slurry seal/stop gap maintenance; 8% of the Local network (5.0 centerline miles) qualify for rehabilitation/reconstruction maintenance; • At a minimum, Local maintenance projects should focus on the maintaining the current weighted average PCI between 83 and 85 over the next 7 years; • Develop a proactive fiscal and planned approach to identify arterial overlay projects based on the deterioration modeling within MicroPAVER; • Appropriate Local revenues at an average of $1.72 Million /yr for the term of the seven-year CIP to generate the results identified on page 9 (VI. Alternative Funding Levels (Increase PCI); and • Perform pavement inspections on the Local network every four years to build a solid planning model within MicroPAVER to track PCI deterioration; also follows new OCTA guidelines for OC Go. City of Tustin, CA Page 7 2019 Citywide Pavement Management Plan — OCTA Submittal Final Report — June 7, 2019 IV. CURRENT PAVEMENT CONDITIONS (PCI) Historical Tustin PCI Trend s (FY 2012-2019) 893 91.0 89.0 87.0 85-0 4 83-0 81,0 80.2 79.0 WethtedPC12012 Weighted PC12013 Weighted PCI 2015 Weighted PCI 2017 Weighted PCI 2019 Arterial -Local -Citywide Very Good 1 ................................... ......................................... (86-100) I .............. 41.8 ............... 39.5 ............ 81.3 .......... ...... 58.7% .... , ............................. Good(75-85) ................................... ......................................... ................. 19-7 ...................... 17.6 .............................. 37.3 ........................................ 2T0% ................................... Fair(60-74) ................................... ......................................... ....................................... 9.1 8-3 ..................................... 17.4 .................. .......... 12.6% Poor .................... .............. (41-59) ........................ - 1.7 ................................... 0.6 ........................................ 2.3 ........................................ 1.7% ................................... Very Poor (0-40) 0.0 0.1 0.1 0.1% Table above depicts section mileage City of Tustin, CA 2019 Citywide Pavement Management Plan - OCTA Submittal Final Report -June 7, 2019 V. PROJECTED PAVEMENT CONDITIONS (PCI) - CURRENT FUNDING Page 8 Current Funding - Projected Pavement Condition (PCI) FY 2019-2026 3500000.00 85.6 3000000.00 2500000-00 2000000.00 1500000.00 1000000.00 500000.00 0.00 87.0 86.0 85.0 84.0 83.0 82.0 81.0 79.9 80.0 79.0 78.0 77.0 2019-20 2020-21 2021-22 2022-23 2023-24 2024-25 2025-26 � Current Funding -me-Entire Network (PCI) SEVEN-YEAR $21.0 MILLION BUDGET - A $21.0 Million/seven-yr budget was generated for the City to demonstrate how its existing Public Works M&R/CIP budget allocation would perform against the current citywide conditions. City Public Works PMP funding is identified through: • General Fund; • SB1; • Measure M2 Fair Share, and • Gas Tax Current PC! 85.6 85.4 85.9 2019-20 .......2020-2.i....... $3,200,000 ..............$ 85.2 .......................84........................... 85.0 .84.1....................... 85.6 ........................84.8....................... ..................................... 2, 800,000.............. :.......................... ....................................... ;................................................................. ................................................................. ;................................................................. 202122 .................................... € $3,000,000 4.................................................................,................................................................. 83.7 83.3 a.................................................................,................................................................. 84.0 2022-23 .....................................:.................:..............................................,................................................................. S3,000,000 82.9 82.5 €................................................................. 83.2 a................................................................. 2023 24 ..............................a € $3,000,000 82.0 ......................, 81.6 .............................................................,............................................................ 82.3 2024-25 .....................................:...................................................................................................................................,.................................................................,................................................................. $3.000,000 81.0 80.6 81.4 2025-26 S3.000.000 79.9 79.5 80.2 Current Funding - Projected Pavement Condition (PCI) FY 2019-2026 3500000.00 85.6 3000000.00 2500000-00 2000000.00 1500000.00 1000000.00 500000.00 0.00 87.0 86.0 85.0 84.0 83.0 82.0 81.0 79.9 80.0 79.0 78.0 77.0 2019-20 2020-21 2021-22 2022-23 2023-24 2024-25 2025-26 � Current Funding -me-Entire Network (PCI) SEVEN-YEAR $21.0 MILLION BUDGET - A $21.0 Million/seven-yr budget was generated for the City to demonstrate how its existing Public Works M&R/CIP budget allocation would perform against the current citywide conditions. City Public Works PMP funding is identified through: • General Fund; • SB1; • Measure M2 Fair Share, and • Gas Tax City of Tustin, CA Page 9 2019 Citywide Pavement Management Plan - OCTA Submittal Final Report -June 7, 2019 VI. ALTERNATIVE FUNDING LEVELS Maintain Existing Average Network PCI Improve Average Network PCI Current PCI 85.6 85A 85A 85.9 2019-20$3,334,000 «.............................................................................................................._........................._.......................................................................................................................... 85.5 85.8 85.3 85.8 .......2020-2.1 .......:.................$ 3,334,800.................................._....._$5: 4.........._.......................................-85 2021-22 _..._..........,._...._.... :Z............................ 85.8........................... ..................................... 2021-22 .... _.............................. $3,325,800 ..............$3,326,7............. .......................85.4....................... 85.5 .......................85.3...................... 85.3 86-0 .......................85.9........................... ....... .............................................................................................................................._........_..........._.................._................................................... : 00 $3,751,800 ..... _.......................................... _.... _......... _..... _....................... 85.8 ._.................. 85.7 ... ...................... _........................................... ,.................................................................. ............................. 2023-24 _.........................................................................................._.............................................................._..................................................................;..........................................._................_.. $3,317,500 85.5 86.2 .............................................. .................57 85-3 85-9 .......2024-25....._. ......... ,x .................;_. 85.3 ..............5................................_............. 3.......................... .. ..........._$5:2.....................................................85.7........................... ...5..7 2025-26 :.........._ 53.335.400 85-5 85-3 85.9 Improve Average Network PCI VII. CURRENT AND PROJECTED BACKLOG BY YEAR OF PAVEMENT MAINTENANCE NEEDS Current Current PCI 85.6 85A 85.9 2019-20':. _................................ $3,334,000 ._.............._.........................._..................._....__.............................................._........................_.............................................. .......................... ............... _......... _..... _..... 85.5 85.3 85.8 2020-21 ............._........._...........,........................................................._.............._........................._........_..................._ ' I $3,334,800 85A 85.2 .................................................................................................................................. 85.8 2021-22 _..._..........,._...._.... $3,325,800 ......................................................._...._......._...._............._._._............._....._...._..._._...........................................................;.........................-................................._.... 85-5 85.3 86-0 2022-23 _................................. € $3,326,700 _........._......................................_.............e_...................._..........................._......._...;_...._......._...._..........................................«................................................................. 85.4 85.3 85.9 2023-24 ............... ................... $3,751,800 ..... _.......................................... _.... _......... _..... _....................... 85.8 ._.................. 85.7 ... ...................... _........................................... ,.................................................................. 86.3 2024-25 ............. $3,989,80] ........_... ......................_...................... .............$ 86.3 86.2 .............................................. .................57 86-8 2025-26 4,455,500 86.8 86.7 3.......................... VII. CURRENT AND PROJECTED BACKLOG BY YEAR OF PAVEMENT MAINTENANCE NEEDS Current $6,424,500 $6,424,500 $6,424,500 2019-20$6,534,900 ..................................................................' $6,488,700 ................................................................. $6,488,700 2020-21:. ......................................................................................................,................................................................................................................................... $6,885,200 $6,751,300 $6,751,300 2021-22 ........................................................................................................................................................................................................................................... $5,175,200 $5,054,100 $5,054,100 2022-23$4,697,600 .............................................................._ . $4,545,700 $4,545,700 2023-24$3,450,000 ................................................................................................... _..................................................................................................................................... $3,311,100 $4,010,400 2024-25$6,727,300 ................................... .................................................................... ,................................................................. $6,600,500 ........................ $6,198,600 .......................................... 2025-26 $9,382,800 $9,261,500 $8,715,500 City of Tustin, CA Page 10 2019 Citywide Pavement Management Plan — OCTA Submittal Final Report —June 7, 2019 DEFERRED MAINTENANCE Delaying repairs on streets where pavement conditions indicate a need generates deferred maintenance or "backlog". Deferred maintenance is work that is postponed to a future budget cycle, or until funds are available. As maintenance is deferred, the opportunity to apply preventive, life extending pavement treatments is forfeited and the ultimate cost of rehabilitation multiplies (i.e. slurry seal costs to overlay costs). By using the City's pavement maintenance applications and their associated unit costs, when a budgetary model is exercised within the PMP software the amount of deferred maintenance is calculated. Based upon the available budget applied to the model, deferred maintenance will increase or decrease. As maintenance is deferred, the opportunity to apply life extending preventive pavement applications is lost and the ultimate cost of rehabilitation multiples. In the case of Tustin, the City's current seven-year budget will continue to increase the amount of deferred maintenance on both the Arterial and Local networks. VIII. CENTERLINE MILEAGE Rank I Ctr Mi. SF Weighted PCl 2019 Arterial 72.817,088,467 85.4 ................................. :................................ ........................................................ ........................................................ Local 67.7 13,542,951 85.9 Citywide 140.5 30,631,418 85.6 IX. PERCENTAGE OF NETWORK IN EACH OF FIVE CONDITION CATEGORIES BASED ON CENTERLINE MILES 42.2 2......................... (86-100) .........._MPAH .......................31.:��..................9,714,904......................_30 .....4, :0%.................a. ..................... Local 26.7% 8,172,480 29.1! 40.9 :............................................................... C�OOd (75-85] MPAH 15.5io .........,.. 0,... 4,749,379 ......................................................................................... 14.1/o i ,.................---17.8 19.9................... :• Local 11.9% 3, 63 2, 409 12.7°� (60-74] ...........MPAH .........................7:1°''..................2,185,806.........................6:4°/0...................a.....................`....:©.................. ...5, _- Local 5.2% 1,589.218 5.9% 8.3 i.........._MPAH (41-59)17 .......................... ..... ....................438.378..........................._1.2%............................. .......................................... Local 0.4% 1 112,706 0.4% 0.6 Q 0 (0 40) ............MPAH ........................_0:0%..................................................................._�:�'.'.................... .................................................. Local 0.1% 36,138 0.1% 0.1 City of Tustin, CA Page 11 2019 Citywide Pavement Management Plan - OCTA Submittal Final Report - June 7, 2019 X. REDUCTION IN M2 LOCAL MATCH A local agency match reduction of 10% of the eligible cost for projects submitted for consideration of funding through the M2 Comprehensive Transportation Funding Programs (CTFP) call for projects is available if the local agency either: a. Shows measurable improvement of paved road conditions during the previous reporting period defined as an overall weighted (by area) average system improvement of one Pavement Condition Index (PCI) point with no reduction in the overall weighted (by area) average PCI in the Master Plan of Arterial Highways (MPAH) or local categories: or b. Have road pavement conditions during the previous reporting period, within the highest 20% of the scale for road pavement conditions in conformance with OCTA Ordinance No. 3, defined as a PCI of 75 or higher, otherwise defined as in "good condition". Road conditions found through our 2019 PMP management study shows that the City is eligible for Local Match Reduction based on the current network weighted PCI of 85.6. Additionally, the City of Tustin has demonstrated with the enclosed budget projection (Section V, page 8) that the City's weighted average PCI (by area) remains above a PCI of 75 after the seven year program. City of Tustin, CA Page 12 2019 Citywide Pavement Management Plan - OCTA Submittal Final Report - June 7, 2019 XI. APPENDIX A - SEVEN YEAR ROAD MAINTENANCE AND REHABILITATION PLAN BASED ON CURRENT OR EXPECTED FUNDING LEVEL City of Tustin, CA Forecasted Maintenance Report - FY 2019-2026 Sorted by FY, Rank, Name (A -Z) Page 1 of 10 -CID a." MPAH/Arterials From _ -TUSTIN TO MP71 Rank Type Lanes, --Zone L W A,ea PCI Maim. Type Total 2019-20 EL CAM REA 1062 EL CAMINO REAL RANCH RD MYFORD RD _ C AC 4 5 1,639 60 98,340 51 ARHM $338,290 2019-20 RED HILAV 1195 RED HILLAVENUE NISSON RD EL CAMINO REAL _SECONDARY MAJOR A MC 4 4 813 46 37,398 70 ARHM $128,649 2019-20 RED HILAV 1196 RED HILLAVENUE ELCAMINO REAL NISSON RD A AC 4 4 813 46 37,398 62 ARHM $128,649 2019-20 RED HILAV 1193 RED HILLAVENUE NISSON RD MITCHELLAV_ _MAJOR MAJOR A AAC 4 4 956 40 38,240 69 ARHM $131,546 2019-20 2019-20 RED HILAV REDHILAV 1194 1192 RED HILLAVENUE REDHILLAVENUE MITCHELLAV WALNUT AV --MITCHELL NISSON RD AV _ MAJOR MAJOR A A AC AC 3 3 4 4 956 1,326 40 40 38,240_ 55,920 82 70 ARHM ARHM $131,546 $192,365 2019-20 RED HILAV 1187 RED HILL AVENUE MITCHELLAV WALNUTAV MAJOR A AC 3 4 1,326 40 53,040 70 ARHM $182,458 2019-20 RED HILAV 1189 RED HILLAVENUE SYCAMORE AV EDINGERAV MAJOR A AC 2 4 1,717 33 60,981 61 ARHM $209,775 2019-20 RED HILAV 1190 RED HILLAVENUE _WALNUT AVE SYCAMORE AVE_ MAJOR _A AC 2 4 1,334 33 46,902 81 ARHM $161,343 $1,604.619 2020-21 RED HILAV 1188 RED HILL AVENUE EDINGER AV SYCAMORE AV MAJOR A AC 3 4 1,717 33 59,541 70 ARHM $204,821 2020-21 RED HILAV 1191 RED HILLAVENUE SYCAMORE AV _ WALNUTAVE MAJOR A AC 3 4 1,334 33 48,342 63 ARHM $166,296 2020-21 RED HIL AV 1197 RED HILL AVENUE EL CAMINO REAL _ SAN JUAN ST MAJOR A AAC 4 3 981 40 39,240 59 ARHM $134,986 2020-21 RED HILAV _ 1198 RED HILLAVENUE _ SAN JUAN ST EL CAMINO REAL A AC 3 3 981 40 39,240 55 ARHM $134,986 2020-21 RED HILAV 1199 RED HILLAVENUE SAN JUAN ST BRYAN AV _MAJOR MAJOR A AAC 2 3 1,316 40 52,040 75 ARHM $179,018 2020-21 RED HILAV 1200 RED HILLAVENUE _ BRYAN AVE SANIUANST MAJOR A AC 2 3 1,316 40 52,040 71 ARHM $179,018 2020-21 RED HILAV 1201 RED HILL AVENUE _ KALUA LN BRYAN LN _ ._PRIMARY A AAC 2 3 806 33 29,478 53 ARHM $101,4 04 2020-21 RED HILAV 1202 RED HILL AVENUE BRYAN AVE KALUA LN _ PRIMARY A AC 2 3 806 33 28,038 67 ARHM $96,451 2020-21 REDHILAV 1203 REDHILLAVENUE MELVIN WY KALUA LN PRIMARY B AAC 3 3 1,062 40 42,480 48 ARHM $146,131 _- $1,343,110 202]-22 JAMBOR RD 1336_ JAMBOREE ROAD TUSTIN RANCH PLAZA IRVINE BLVD MAJOR A AC 4 882 53 46,746 ARHM $165,481 2021-22 JAMBOR RD 1334 JAMBOREE ROAD BRYAN AVE TUSTIN RANCH PLAZA _ _ MAJOR_ A AAC 4 5 1,259 53 66,727 _79 72 ARHM $236,214 2021-22 JAMBOR RD 1335 JAMBOREE ROAD TUSTIN RANCH PLAZA BRYAN AVE MAJOR A AC 4 1,247 53 66,091 76 ARHM $233,962 2021-22 JAMBOR RD 1337 JAMBOREE ROAD IRVINE BLVD TUSTIN RANCH PLAZA _ MAJOR A_ AAC 4 5 889 53 _ 47,117 68 ARHM $166,794 2021-22 PROSPE AV 1154 PROSPECTAVENUE IRVINE BLVD SHERBROOK DR SECONDARY A AAC 4 1 1,411 60 84,660 74 ARHM $299,696 2021-22 SEVENTST 1208 SEVENTEENTH STREET HWY 55 BRIDGE E EDGE YORBA ST SOUTH MAJOR A AC 3 1 468 44 20,592 75 ARHM $72,896 2021-22 SEVENT ST 1209 SEVENTEENTH STREET YORBA ST SOUTH HWY 55 BRIDGE E EDGE MAJOR A AC 3 1 468 44 22,032 69 ARHM $77,993 2021-22 SEVENT ST 1210 SEVENTEENTH STREET YORBA ST SOUTH YORBA ST NORTH MAJOR A AAC 3 1 628 41 X7,188 83 Type II Slurry $13,322 2021-22 WALNUT AV 1304 WALNUTAVENUE BROWNINGAV CHERRYWOOD AVE _ PRIMARY I AC 4 4 1,142 65 81,430 67 ARHM $288,262 _ $1,554,620 2022-23 SYC_AMO AV 1218 SYCAMOREAVENUE PASADENA AVE NEWPORTAV SECONDARY C AC 2 2 455 24 10,920 70 ARHM $39,858 2022-23 SYCAMO AV 1219 SYCAMOREAVENUE NEWPORTAV PASADENA AVE SECONDARY C AC 2 2 466 24 11,184 64 ARHM $40,822 2022-23 WALNUTAV 1259 WALNUTAVENUE NEWPORTAV ATHERTON LN PRIMARY I AC 4 4 1,523 60 91,380 74 ARHM $333,537 2022-23 WALNUT AV 1260 WALNUTAVENUE ATHERTONLN RED HILL AV PRIMARY I AC 4 4 1,123 60 67,380 68 ARHM $245,937 2022-23 WARNER AV 1265 WARNER AVENUE HWY 55 BRIDGE E EDGE PULLMAN ST MAJOR A AC 3 7 815 40 31,385 60 ARHM $114,555 2022-23 WARNER AV 1267 WARNERAVENUE PULLMAN ST RED HILLAV MAJOR A AC 3 7 1,672 32 57,824 75 ARHM $211,058 2022-23 IRVINE BLV 1095 IRVINE BLVD BST PROSPECTAV MAJOR A AC 3 1 1,045 33 37,365 80 ARHM $136,382 2022-23 IRVINE BLV 1096 IRVINE BLVD PROSPECTAV BST MAJOR _ A AC 3 1 1,045 33 37,365 71 ARHM $136,382 2022-23 IRVINE BLV 1112 IRVINE BLVD 108FT E/O ELIZABETH WAY NEWPORTAV MAJOR A AAC 3 3 980 42 48,930 75 ARHM $178,595 2022-23 IRVINE BLV 1113 IRVINE BLVD RED HILL DR 108FT E/O ELIZABETH WAY MAJOR A AAC 3 3 1,667 40 66,680 72 ARHM $243,382 ___ ___ $1,680,507 2023-24 FIRSTST 1022 FIRSTSTREET _ AST HWY SS BRIDGE E EDGE COLLECTOR B AAC 2 2 1,425 32 51,360 79 ARHM $193,114 2025-26 FIRSTST 1021 FIRSTSTREET HWY 55 BRIDGE E EDGE AST COLLECTOR B AAC 2 2 1,430 32 54,400 75 ARHM $204,544 2023-24 FIRST ST 1023 FIRST STREET AST ELCAMINOREAL COLLECTOR B AAC 2 2 1,265 32 49,120 82 ARHM $184,691 2023-24 FIRST ST 1024 FIRST STREET EL CAMINO REAL AST COLLECTOR B AAC 2 2 1,265 32 47,680 80 ARHM $179,277 2023-24 FIRSTST 1025 FIRSTSTREET EL CAMINO REAL_ CENTENNIAL WY COLLECTOR B AAC 2 2 1,480 32 53,120 74 ARHM $199,731 2023-24 IRVINE BLV 1091 IRVINE BLVD HWY 55 BRIDGE E EDGE YORBA ST MAJOR A AC 3 1 489 34 19,506 82 ARHM $73,343 2023-24 IRVINE BLV 1092 IRVINE BLVD YORBAST_ HWY 55 BRI DGEEEDGE MAJOR A AC 3 1 489 33 17,577 78 ARHM $66,090 2023-24 IRVINE BLV 1093 IRVINE BLVD YORBA ST BST MAJOR A AC 3 1 1,340 34 49,880 69 ARHM $187,549 2023-24 IRVINE BLV 1094 IRVINE BLVD BST YORBAST MAJOR A AC 3 1 1,340 33 48,540 74 ARHM $182,510 $1,470,848 2024-25 BRYAN AV 1008 BRYAN AVENUE RED HILL AV FARMINGTON RD SECONDARY C AAC 5 3 1,469 60 88,140 59 ARHM $341,102 2024-25 BRYAN AV_ 1009 BRYAN AVENUE FARMINGTON RD_ BROWNINGAV SECONDARY C AAC 5 3 1,160 60 69,600 57 ARHM $269,352 2024-25 EDINGE AV 1292 EDINGER AVENUE KENSINGTON PARK RD 1273'w/o JAMBOREE PLAZA SMART A AC 3 7 2,437 41 99,917 79 ARHM $386,679 2024-25 McFADD AV 1148 MCFADDEN AVENUE PASADENA AV MYRTLE AV PRIMARY B AC 5 2 355 60 21,300 52 ARHM $82,431 2024-25 MCFADD AV 1149 McFADDEN AVENUE MYRTLE AV NEWPORTAV B AC 5 2 1,259 60 75,540 75 ARHM $292,340 2024-25 NEWPORAV 1168NEWPORT_AVENUE MCFADDEN AV NISSON RD _PRIMARY MAJOR A AC 3 4 1,363 40 50,900 71 ARHM $196,983 $1,568,886 2025-26 NEWPORAV 1158 NEWPORTAVENUE CITY LIMITS 118 FT N/O WINDSOR LN WASS ST PRIMARY B AC 2 1 1,792 40 71,680 84 ARHM $286,003 2025-26 NEWPOR AV 1159 NEWPORTAVENUE WASS ST _ IRVINE BLVD PRIMARY B AAC 3 1 1,110 37 50,165 62 ARHM $200,158 2025-26 NEWPOR AV 1160 NEWPORTAVENUE FIRSTST BRYANAV _ PRIMARY 8 AC 3 2 830 40 32,030 82 ARHM $127,800 2025-26 NEWPOR AV 1176 NEWPORTAVENUE BRYAN AV _ FIRSTAV PRIMARY B AC 3 2 830 40 31,740 79 ARHM $126,643 Page 1 of 10 City of Tustin, CA Forecasted Maintenance Report - FY 2019-2026 Sorted by FY, Rank, Name (A-2) FY 2025-26 2025-26 2025-26 r . NEWPOR AV NEWPOR AV NEWPORAV See IDz 1174 1175 1172 Name 'NEW PORT AVENUE NEWPORT AVENUE NEWPORTAVENUE From SAN JUAN ST BRYAN AV JELCAMINO REAL To (.BRYAN AV SAN JUAN AV SANJUANST MPAH PRIMARY ___.. PRIMARY PRIMARY Rank 8 a B Type ACi. AC AC Lanes 2 2 2 ne •2 2 2 L 1,326 1,326 1,359 W 33 33 33 - Area- 45,198 --- 49,518_ 49,167 PCI 75 81 74 Maint. Type ARHM ARHM ARHM Total $ $180,340 $197,577 $196,176 2025-26 NEWPORAV _1173 NEWPORTAVENUE SANJUANST ELCAMINO REAL PRIMARY B AC 2 2 1,359 33 SLI 74 ARHM $201,922 $1,516,619 Locals 2019-20 ACACIA DR 1502 ACACIA DRIVE AMAGANSET WY _ VILLAGE DR LOCAL E AC 2 1 339 37 12,543 87 Stop Gap $376 2019-20 ACACIA DR 1503 ACACI"D VE VILLAGE D_R NORWOOD PARK PL_ LOCAL _ E AC 2 1 839 37 31,043 78 Type II Slurry $11,796 2019-20 ACACIA DR 1504 ACACIA DRIVE SEND N CUL DE SAC LOCAL E AC 2 1 614 36 26,588 57 AC Overlay $63,811 2019-20 AMAGA WY 1513 AMAGANSET WAY W CUL DE SAC YORBA ST _ LOCAL E AC 2 1 202 33 6,666 89 Stop Gap $200 2019-20 AMAGA WY _ 1514 AMAGANSET WAY YORBAST ACACIA DR LOCAL E AC 2 1 980 37 42,197 87 Stop Gap $1,266 2019-20 AMAGA WY 1515 AMAGANSET WAY ACACIA DR _ PROSPECT AV LOCAL E AC 2 1 1,347 33 44,451 88 Stop Gap $1,334 2019-20 AMAGA WY 5014 AMAGANSET WAY AMAGANSET WAY N CUL DE SAC LOCAL E AC 2 1 112 50 5,600 75 Type II Slurry $2,128 2019-20 AMAGA WY 5015 AMAGANSET WAY AMAGANSET WAY N CUL DE SAC _ LOCAL E AC 2 1 112 50 5,600 75 Type II Slurry $2,128 2019-20 AMAGA WY _ 5016 AMAGANSET WAY AMAGANSET WAY N CUL DE SAC _ LOCAL E _ AC 2 1 112 50 5,600 64 AC Overlay $13,440 2019-20 AMBERW LN 1516 AMBERWICK LANE SHEARBROOK DR CHATHAM DR _ LOCAL E AC 2 1 292 33 9,636 _ 72 Type II Slurry $3,662 2019-20 ANGLIN DR _1522 ANGLIN DRIVE MARSHALL LN ECUL DE SAC LOCAL E_ AC 2 1 138 33 6,759 93 Stop Gap $203 2019-20 2019-20 ANGLIN LN ARBOLA WY 1523 1_526 ANGLIN LANE ARBOLADA WAY _ MALENA DR PROSPECTAV N. PROSPECT AV W END LOCAL LOCAL E E AC AC 2 2 1 7 797 448 33 33 26,301 16,989 76 61 Type II Slurry AC Overlay $9,994 $40,774 2019-20 BST 1542 BSTREET_ IRVINE BLVD WESTBURY LN LOCAL E AC 2 1 639 33 21,087 94 Stop Gap $633 2019-20 BENETA WV _ 1546 BENETA WAV _ PROSPECT AV 150 FT W/O LIVINGSTON ST_ LOCAL E AC 2 1 1,204 37 44,548 78 Type II Slurry $16,928 2019-20 Cl 1548 BERGEN CIRCLE YORBAST WCUL DE SAC LOCAL E AC 2 1 212 33 9,201 91 Stop Gap $276 2019-20 1558 BONNER DRIVE MARSHALLLN ECUL DE SAC _ LOCAL E AC 2 1 163 33 7,584 93 Stop Gap $228 2019-20 R 1559 BONNER DRIVE FAIRMONTWY N.YORBAST LOCAL E AC 2 1 473 37 20,013 71 Type 11 Slurry $7,605 2019-20 R ]CAEROL 1560 BONNER DRIVE N. YORBA ST LORETTA DR _ LOCAL E AC 2 1 502 33 16,566 87 Stop Gap $497 2019-20 1564 BRENT LANE LORETTA DR W CUL DE SAC _ LOCAL E AC 2 1 448 33 17,077 74 Type II Slurry $6,489 2019-20 Y 1568 BROOKLINE WAY _ WESTBURY LN AMAGANSET WY _ LOCAL E AC 2 1 396 33 13,068 72 Type II Slurry $4,966 2019-20 Y 1594 CARROLL WAY SEVENTEENTH ST MEDFORD AV LOCAL E AC 2 1 643 37 23,791 82 Type II Slurry $9,041 2019-20 Y 1595 CARROLL WAY LAURIE LN _ SANTA CLARA AV LOCAL E AC 2 1 1,067 37 39,479 84 Type II Slurry $15,002 2019-20 CHATHA DR 1611 CHATHAMDRIVE GALY ST AMBERWICK LN _ LOCAL E AC 2 1 856 33 28,248 73 Type 11 Slurry $10,734 2019-20 END CEN DR 1661 ENDERLE CENTER DRIVE VANDENBERG LN SEVENTEENTH ST_ LOCAL I AC 2 1 631 62 39,122 66 AC Overlay $93,893 2019-20 EVANST CI 1665 EVANSTON CIRCLE WESTBURY LN N CUL DE SAC _ LOCAL E AC 2 1 244 33 10,257 65 AC Overlay $24,617 2019-20 FAIRMOWY 1666 FAIRMONTWAY SCULDESAC BONNER DR LOCAL E AC 2 1 368 37 18,271_ 81 Type 11 Slurry $6,943 2019-20 FAIRMO WY1667 FAIRMONT WAY _ LAURIE LN _ LAURIE LN LOCAL E AC 2 1 154 37 5,698 87 Stop Gap $171 2019-20 FAIRMO WY 1668 FAIRMONT WAY_ LAURIE LN SANTA CLARA AVE LOCAL E AAC 2 1 1,006 37 37,222 76 Type II Slurry $14,144 2019-20 FIESTAWV 1681 FIESTA WAY PROSPECT AV WCUL DE SAC LOCAL E AC 2 1 446 33 16,923 59 AC Overlay $40,615LIN 2019-20 FT DR 5009 FLINT OR _ S CUL DE SAC SANTA CLARA AVE LOCAL E AC 2 1 212 32 6,784 67 AC Overlay $16,282 2019-20 GAILY ST 1692 GSTREET SHERBROOK DR N CUL DE SAC LOCAL E AC 2 1 1,591 33 54,708 67 AC Overlay $131,299 2019-20 GROVES DR 1702 GROVESITE DRIVE MEDFORD AV N CUL DE SAC LOCAL E AC 2 1 417 33 15,966 84 11 Type Slurry $6,067 2019-20 HEIGHT DR 1710 HEIGHTS DRIVE YORBA ST NCUL DE SAC E AC 2 1 743 37 29,470 88 Stop Gap $884 2019-20 HENSTR CI 1711 HENSTRIDGE CIRCLE MEDFORD AV NCUL DE SAC _LOCAL LOCAL E AC 2 1 224 33 9,597 89 Stop Gap $288 2019-20 IVERNE WY 1719 IVERN ESS WAY WESTBURY LN AMAGANSET WY LOCAL E AC 1 411 33 94 Stop Gap $407 2019-20 JACARA AV 2003 JACARANDA AVENUE ACACIA ST YORBA ST LOCAL E AC _2 1 1 1,023 24 _13,563 24,552 56 AC Overlay $58,925 2019-20 JACARA AV 2004 JACARANDA AVENU E YORBAST ACACIA DR LOCAL E AC 1 1 1,023 24 24,552 63 AC Overlay $58,925 2019-20 LAURIE LN 1742 LAURIE LANE MARSHALL LN FAIRMONTWY LOCAL E AC 2 1 570 37 21,090 91 Stop Gap $633 2019-20 LAURIE LN 1743 LAURIE LANE FAIRMONTWY NYORBA ST - LOCAL E AC 2 1 430 37 15,910 91 Stop Gap $477 2019-20 LAURIE LN 1744 LAURIE LANE ROSALIND DR LORETTA DR LOCAL E AC 2 1 219 33 7,227 85 Type II Slurry $2,746 2019-20 LAURIE LN 1745 LAURIE LANE _ WHEELER PL MALENA DR LOCAL E AC 2 1 300 33 9,900 72 Type 11 Slurry $3,762 2019-20 LAURIN WY 1746 LAURINDA WAY SEVENTEENTH ST N END LOCAL E AC 2 1 958 33 32,029 66 ACOverlay $76,870 2019-20 _ LAURIN WY 1747 LAURINDAWAY _ 317 FT S/O SANTA CLARA AV SANTA CLARA AV LOCAL E AC 2 1 317 33 10,461 86 Stop Gap $314 2019-20 LEAFWO LN 1748 LEAFWOOD LANE NYORBA ST LORETTA DR LOCAL E AC 2 1 477 33 15,741 60 AC Overlay $37,778 2019-20 LIMETR WV 1752 LIMETREE WAV MALENA DR W CUL DE SAC LOCAL E AC 2 1 219 33 9,432 79 Type II Slurry $3,584 2019-20 LINDA LN 1753 LINDA LANE NVORBA ST ROSALIND DR LOCAL E AC 2 1 241 1 33 7,953 76 Type 11 Slurry $3,022 2019-20 LORETT OR 1756 LORETTA DRIVE MEDFORD AV 120 FT N/O BONNER DR LOCAL E AC 2 1 513 33 16,929 81 Type II Slurry $6,433 2019-20 LORETT DR 1757 LOREFTA DRIVE _ 120 FT N/O BONNER DR SANTA CLARA AV LOCAL E AC 2 1 1,290 34 43,860 71 Type II Slurry $16,667 2019-20 LUCERO WY 1758 LUCERO WAY W CUL DE SAC E CUL DE SAC LOCAL E AC 2 1 1,025 33 38,235 62 AC Overlay $91,764 2019-20 MALENA DR 1759 MALENA DRIVE SEVENTEENTH ST LIMETREE WY LOCAL E AC 2 1 460 33 15,180 86 Stop Gap $455 2019-20 MALENA DR 1760 MALENA DRIVE S CUL DE SAC _ LAURIE LN 5 EDGE LOCAL E AC 2 1 716 33 26,102 84 Type 11 Slurry $9,919 2019-20 MALENA DR 1761 MALENA DRIVE LAURIE LN S EDGE _ SANTA CLARA AV LOCAL E AC 2 1 1,129 32 36,128 75 Type 11 Slurry $13,729 2019-20 MARSHA LN 1764 MARSHALL LANE MEDFORD AV BONNER DR LOCAL E AC 2 1 494 37 18,278 93 Stop Gap $548 2019-20 MARSHA LN 1765 MARSHALL LANE LAURIE LN (SANTA CLARA AV LOCAL E AC 2 1 1,076 27 29,052 90 Stop Gap $872 Page 2 of 10 City of Tustin, CA Forecasted Maintenance Report - FY 2019-2026 Sorted by FY, Rank, Name (A -Z) FY 2019-20 BranchlD MARSHA LN Sec ID 1766 Name MARSHALL LANE From ETHELBEE WV To NNLDE SAC MPAH LOCAL Rank E Type AC 0- 2 ne •1 I L 2,205 W 33 Area 76,345 PCI 69 M�int. Type AC Overlay Total $ $183,228 2019-20 MEDFOR AV 1771 MEDFORD AVENUE N YORBA ST _ _ CARROLL WY LOCAL E AC 3 1 625 37 23,125 93 Stop Gap $694 2019-20 MEDFOR AV 1772 MEDFO_RDAVENUE CARROLL WY MARSHALL LN_ LOCAL E AC 2 1 237 37 8,769 95 Stop Gap $263 2019-20 MEDFOR AV 1773 MEDFORD AVENUE W CUL DE SAC 134 FT W/O LORETTA DR LOCAL E AC 2 1 370 33 12,415 89 Stop Gap $372 2019-20 MEDFOR AV 1774 MEDFORD AVENUE 134 FT W/O LORETTA DR _ GROVESITE DR LOCAL E AC 2 1 404 34 13,736 90 Stop Gap $412 2019-20 MILLER DR 1778 MILLER DRIVE BST NORTH PROSPECT AV LOCAL E AC 2 1 989 33 32,637 94 Stop Gap $979 2019-20 MIMOSA LN 1779 MIMOSA LANE VINEWOODAV ROSELEAF AV _ LOCAL E AC 2 1 260 37 9,620 89 Stop Gap $289 2019-20 MIMOSA LN 1780 MIMOSA LANE ROSELEAF AV NCUL DE SAC LOCAL E AC 2 1 258 33 13,961 86 Stop Gap $419 2019-20 MIMOSA LN 1781 _ MIMOSA LANE SCUL DE SAC NORWOOD PARK PL_ LOCAL E_ AC 2 1 118 37 6,345 59 AC Overlay $15,228 2019-20 NOR PAR PL 1807 NORWOOD PARK PLACE W CUL DE SAC YORBAST LOCAL E AC 2 1 195 33 8,640 83 Type II Slurry $3,283 2019-20 NOR PAR PL 1808 NORWOOD PARK PLACE YORBA ST _ ACACIA DR LOCAL E AC 2 1 988 37 36,556 68 AC Overlay $87,734 2019-20 NOR PAR PL 1809 NORWOOD PARK PLACE GALY ST PROSPECT AV LOCAL E AC 2 1 988 33 32,604 89 Stop Gap $978 _2019-20 OU TRE Cl 1810 OLIVE TREE CIRCLE WELLINGTON AV 5 CUL DE SAC LOCAL E AC 2 1 220 33 7,260 70 AC Overlay $17,424 2019-20 ORA TRE LN 1814 ORANGE TREE LANE GALY ST _ PROSPECT AV LOCAL E AC 2 1 988 33 32,604 69 AC Overlay $78,250 2019-20 PACIFI ST 1821 PACIFIC STREET_ ROSELEAF AV N CUL DE SAC _ LOCAL E AC 2 1 242 33 10,553 87 Stop Gap $317 2019-20 PALACE WY 1822 PALACE WAY S CUL DE SAC BONNER DR LOCAL E AC 2 1 341 33 13,820 63 AC Overlay $33,168 2019-20 PALACE WY 1823 PALACE WAY S CUL OE SAC LAURIE LN LOCAL E AC 2 1 131 67 10,852 73 Type II Slurry $4,124 2019-20 PARKER DR 1828 PARKER DRIVE YORBA 5T ACACIA DR LOCAL E AC 2 1 1,062 37 44,324 76 Type II Slurry $16,843 2019-20 PARKER DR 5010 ---N-ARKER PARKER DRIVE PARKER DR N CUL DE SAC LOCAL E AC 2 1 123 50 6,150 90 Stop Gap $185 2019-20 PARKER DR 5011 DRIVE PARKER DR 5 CUL DE SAC _ LOCAL E AC 2 1 123 50 6,150 82 Type II Slurry $2,337 2019-20 PLAZA DR _1852 PLAZA DRIVE IRVINE BLVD NCULDESAC LOCAL E AC 2 1 885 37 35,007 75 Type 11 Slurry $13,303 2019-20 PLAZA WY 1853 PLAZA WAY HOLT AV PLAZA DR LOCAL E AC 2 1 382 37 14,134 86 Stop Gap $424 2019-20 RIDGEC Cl 1870 RIDGECREST CIRCLE ANGLIN LN _ SCUL DE SAC_ LOCAL E AC 2 1 389 33 15,311 77 Type 11 Slurry $5,818 2019-20 RONDEL PL 1874 RONDELPLACE SCUL DE SAC WELLINGTON AV LOCAL E AC 2 1 226 33 9,663 81 Type 11 Slurry $3,672 2019-20 RONDEL PL 1875 RONDEL PLACE WELLINGTON AV N CUL DE SAC LOCAL E AC 2 1 177 33 8,046 88 Stop Gap $241 2019-20 ROSALI DR 1877 ROSALIND DRIVE LAURIE LN LINDA LN LOCAL E AC 2 1 411 33 13,563 79 Type II Slurry $5,154 2019-20 ROSELE AV 1878 ROSELEAFAVENUE WCUL DE SAC YORBAST LOCAL E AC 2 1 217 34 9,614 94 Stop Gap $288 2019-20 ROSELE AV1879 ROSELEAF AVENUE YORBAST MIMOSALN LOCAL E AC 2 1 502 37 18,574 88 Stop Gap $557 2019-20 ROSEWO Cl 1880 ROSEWOOD CIRCLE NORWOOD PARK PL_ SCULDESAC LOCAL E AC 2 1 132 37 6,863 76 Type 11 Slurry $2,608 2019-20 SAN CLA FR 1892 SANTA CLARA (FRONTAGE) AVENUE MARSHALL LN _ FAIRMONT WY LOCAL E AC 2 1 553 27 14,931 95 Stop Gap $448 2019-20 SHADEL DR 1906 SHADEL DRIVE MALENA DR _ _ WCUL DE SAC LOCAL E AC 2 1 195 33 8,640 68 AC Overlay $20,736 2019-20 2019-20 SHASTA WY SHERBR DR 1908 1909 SHASTA WAV _ SHERBROOK DRIVE BENETA WY GALY ST LUCERO WY _ _ _ PROSPECT AV LOCAL LOCAL _ E E AC AC 2 2 1 1 250 1,032 37 33 9,250 34,056 72 60 Type II Slurry AC Overlay $3,515 $81,734 2019-20 TREEHA DR 1936 TREEHAVEN DRIVE _ SEVENTEENTH ST - PRIVATE GATE LOCAL E AC 2 1 227 34 7,718 72 Type II Slurry $2,933 2019-20 2019-20 VANDEN LN VANDEN LN 1946--VANDENBERG 1947 LANE _ VANDENBERG LANE _ YORBA ST _ ENDERLE CENTER DR ENDERLE CENTER DR PROSPECT AV LOCAL LOCAL I I AC AC 2 2 1 1 859 1,407 48 47 41,232 66,129 92 92 Stop Gap Stop Gap $1,237 $1,984 2019-20 VILLAG DR 1951 VILLAGE DRIVE YORBA ST ACACIA DR LOCAL E AC 2 1 1,065 37 51,219 60 AC Overlay $122,926 2019-20 2019-20 2019-20 VILLAG DR VINEW_O_AV WARRENAV 5012 1952 1957 VILLAGE DRIVE VINEWOOD AVENUE WARREN AVENUE VILLAGE DR YORBAST HOLT AV N CUL DE SAC MIMOSA LN 234FT E/O HOLT AV LOCAL LOCAL LOCAL E E E AC AC AC 2 2 2 1 1 1 123 515 234 50 37 37 61150 19,055 8,658 77 88 86 Type II Slurry Stop Gap Stop Gap $2,337 $572 $260 2019-20 WARREN AV 1958 WARREN AVENUE 294FT W/O NEWPORT AV NEWPORT AV LOCAL E AC 2 1 294 32 9,408 97 Stop Gap $282 2019-20 WELLIN AV 1960 WELLINGTON AVENUE GALY ST PROSPECT AV LOCAL E AC 2 1 1,046 33 34,518 77 Type 11 Slurry $13,117 2019-20 WESTBU LN 1961 WESTBURY LANE BST NORTH PROSPECT AV LOCAL E AC 2 1 1,006 33 33,198 91 Stop Gap $996 2019-20 WHEELE PL 1963 WHEELER PLACE SANTA CLARA AV LAURIE LN LOCAL E AC 2 1 1,124 33 37,092 67 AC Overlay $89,021 2019-20 WILLOW LN 1968 WILLOW LANE NORWOOD PARK PL S CUL DE SAC LOCAL E AC 2 1 123 37 61530 71 Type 11 Slurry $2,481 2019-20 WISTE CIR 5013 WISTERIA CIRCLE VILLAGE DR SCUL DE SAC LOCAL E AC 2 1 121 50 6,050 77 Type 11 Slurry $2,299 2019-20 YORBAST 2028 YORBA STREET YORBA 5T 440'5/JACARANDA AVE CDS LOCAL E AC 2 1 110 32 5,700 68 AC Overlay $13,680 2019-20 YORBAST -- 2029 YORBA STREET YORBA ST 200' S/JACARANDA AVE CDS LOCAL E AC 2 1 100 37 5,530 59 AC Overlay $13,272 _ - -_--- - -- $1,798,963 2020-21 ALDER 1506 ALDER LANE_ APPLE TREE DR _ SYCAMOREAV LOCAL E AC 2 4 895 37 33,115 90 Stop Gap $993 2020-21 ALDER 1507 ALDER LANE SYCAMORE AV FIG TREE DR LOCAL E AC 2 4 728 37 26,936 91 Stop Gap $808 2020-21 ALDER 1508 ALDER LANE FIG TREE LN NE CUL DE SAC LOCAL E AC 2 4 438 33 14,454 1 80 Type 11 Slurry $5,637 2020-21 ALMSID DR 1510 ALMSIDE DRIVE _ HAMLET LN KIPLING LN -LOCAL E AC 2 4 189 33 6,105 99 No Action $0 2020-21 AMHERS RD 1517 AMHERST ROAD NW CUL DE SAC SECULDESAC LOCAL E AC 2 4 911 35 36,060 80 Type 11 Slurry $14,063 2020-21 ANA TRE PL 1518 ANA TREE PLACE RAINTREE RD SE CUL DE SAC LOCAL E AC 2 4 374 35 15,190 91 Stop Gap $456 2020-21 APP TRE DR 1524 APPLE TREE DRIVE ALDER LN RAINTREE RD LOCAL E AC 2 4 905 37 33,485 88 Stop Gap $1,005 2020-21 APP TRE DR 1525 APPLE TREE DRIVE RAINTREE RD _ SE CUL DE SAC LOCAL E AC 2 4 354 33 13,782 90 Stop Gap $413 2020-21 ASHBURAV 1529 ASHBURTON AVENUE BRAEBURN RD DEVONSHIRE AV_ LOCAL E AC 2 4 498 37 18,426 85 Type 11 Slurry $7,186 2020-21 ATHERTLN 1530 ATHERTON LANE WALNUTAV LANGDALE LN LOCAL E AC 2 4 103 34 3,252 99 No Action $0 2020-21 ATTBOR PL 1531 ATTBORO PLACE PENNINGTON AV NECULDESAC LOCAL E AC 2 4 423 33 16,164 78 Type 11 Slurry $6,304 2020-21 BASSWO Cl 1543 BASSWOOD CIRCLE RAINTREE RD SECULDESAC LOCAL E AC 2 4 343 33 13,524 85 Type 11 Slurry $5,274 2020-21BERKSH PL 1549 BERKSHIRE PLACE DORCHESTERAV SW CUL DE SAC LOCAL E AC 2 4 403 33 15,504 74 Type II Slurry $6,047 2020-21 BIRCHF DR 1550 BIRCHFIELD DRIVE SILVERBROOK DR SANDBROOK DR LOCAL E AC 2 4 284 33 9,372 78 Type II Slurry $3,655 Page 3 of 20 City of Tustin, CA Forecasted Maintenance Report - FY 2019-2026 Sorted by FY, Rank, Name )A -Z) 2020-21 2020-21 BIRCH -FDR---- BIRCHW PL 1551 1552 BIRCHFIELD DRIVE BIRCHWOOD PLACE SANDBROOK DR SUMMERVILLEAV CUL DE 5AC NE CUL DE SAC - MPAA LOCAL LOCAL Rank E E Type AC AC Lane, 2 2 Zone 4 4 L 287 407 W 33 33 Area 11,571 15,636 PCI 92 71 Maint. Type Stop Gap Type II Slurry Total $347 $6,098 2020-21 2020-21 BIRMIN PL BRAEBU RD 1553 1561 BIRMINGHAM PLACE BRAEBURN ROAD WINDEMERE LN SW CUL DESAC LANGDALE LN_ NECUL DE SAC LOCAL LOCAL E E AC AC 2 2 _ 4 4 380 1,034 33 33 _ 12,408 38,532 99 62 No Action AC Overlay $0 $95,174 2020-21 BRANBU PL 1562 BRANBURRY PLACE SUMMERVILLEAV NE CUL DE SAC LOCAL E AC 2 4 418 33 15,999 90 Stop Gap $480 2020-21 MARC PL 1565 BRIARCLIFF PLACE SUMMERVILLE AV __. NE CUL DE SAC LOCAL E AC 2 4 310 33 12,435 71 Type 11 Slurry $4,850 2020-21 BRIDGERD 1566 BRIDGEPORT ROAD SW CUL DE SAC _ - NE CUL DE SAC LOCAL E AC 2 4 1,032 33 38,466 62 AC Overlay $95,011 2020-21 BROOKSAV 1569 BROOKSHIRE AVENUE GRANDOAKS CIR MUNTON CIR _ LOCAL E AAC 2 4 1,783 37 65,971 94 Stop Gap $1,979 2020-21 BUCKIN PL 1572 BUCKINGHAM PLACE DORCHESTER AV SW CUL DE SAC _ LOCAL E AC 2 4 499 33 18,672 84 Type II Slurry $7,282 2020-21 BURLIN AV 1573 BURLINGAME AVENUE ROANOKEAV HAMPSHIRE RD LOCAL E AC 2 4 225 33 7,425 84 Type 11 Slurry $2,896 2020-21 CAN AV 1585 _ CANTERBURY AVENUE MUNTON CIR KINGSBORO CIR _ LOCAL E ARC 2 4 1,521 37 56,277 94 Stop Gap $1,688 2020-21 CAP COD AV 1586 CAPE COD AVENUE CANTERBURYAV - - HYANNISPORTRD -__ LOCAL E AC 2 4 478 37 17,686 73 Type 11 Slurry $6,898 2020-21 2020-21 CAP TREDR CAP TRE DR 1587 1588 CAPER TREE DRIVE CAPER TREE DRIVE ALDER LN RAINTREE RD RAINTREE RD _ _ _ SE CUL DE SAC _ LOCAL LOCAL E E AC AC 2 2 4 4 902 222 37 33 33,374 9,531 88 86 Stop Gap Slop Gap $1,001 $286 2020-21 CARFAX AV 1589 CARFAXAVENUE MITCHELLAV NISSON RD _ LOCAL E AC 2 4 984 33 32,472 81 Type 11 Slurry $12,664 2020-21 CARFAX DR 1590 CARFAX DRIVE SW CUL DE SAC SYCAMORE AV _ LOCAL E AC 2 4 786 33 26,774 64 AC Overlay $66,132 2020-21 CARFAX DR 1591 CARFAX DRIVE SYCAMORE AV NE CUL DE SAC LOCAL E AC 2 4 1,123 33 39,352 89 Stop Gap $1,181 2020-21 CASTLE AV 1597 CASTLEGATEAVENUE BROOKSHIRE AV PENNINGTON AV LOCAL E AC 2 4 225 36 8,100 87 Stop Gap $243 2020-21 CASTLW AV 1598 CASTLEWOOD AVENUE DORCHESTER AV ROANOKEAV LOCAL E AC 2 4 225 36 8,100 87 Stop Gap $243 2020-21 CEDAR LN_ 1599 CEDAR LANE _ POPLAR DR CHERRYW06D LN _ LOCAL E AC 2 4 273 33 9,433 92 Stop Gap $283 2020-21 CEDARC AV 1600 CEDARCRESTAVENUE CANTERBURYAV FOXCROFTRD LOCAL E AC 2 4 475 37 17,575 76 Type 11 Slurry $6,854 2020-21 CHARLO DR 1604 CHARLOMA DRIVE SYCAMORE AV NE END LOCAL E AC 2 4 643 33 21,219 86 Stop Gap $637 2020-21 CHARLO DR 1605 CHARLOMA DRIVE VEEH DR NISSON RD LOCAL E AC 2 4 810 33 26,730 93 Stop Gap $802 2020-21 CHERRYLN 1612 CHERRYWOOD LANE_ SYCAMORE AV NE CUL DE SAC LOCAL E AC 2 4 353 33 13,854 85 Type 11 Slurry $5,403 2020-21 CH ERRY LN 1613 CHERRYWOOD LANE FIG TREE DR WALNUTAV LOCAL E AC 2 4 477 37 17,649 88 Stop Gap $529 2020-21 CHERRY LN 1614 CHERRYWOOD LANE WALNUTAV MAPLE CT LOCAL E AC 2 4 1,233 36 44,388 84 Type 11 Slurry $17,311 2020-21 CHERRYLN 1615 CHERRYWOOD LANE MAPLE CT RAINTREE RD LOCAL E AC 2 4 1,195 36 43,020 82 Type 11 Slurry $16,778 2020-21 CHESHI PL _ 1616 CHESHIRE PLACE DORCHESTER AV SW CUL DE SAC LOCAL E AC 2 4 503 33 19,695 75 Type 11 Slurry $7,681 2020-21 CLOVEB AV 1618 CLOVERBROOK AV WALNUTAV CULDESAC LOCAL E AC 2 4 1,177 33 41,134 86 Stop Gap $1,234 2020-21 COC PAL DR 1619 COCO PALM DRIVE APPLE TREE DR SE CUL DE SAC _ LOCAL E AC 2 4 1,166 33 40,683 83 Type II Slurry $15,866 2020-21 COPPER DR 1621 COPPERFIELD DRIVE RED HILLAV SANDBROOK DR LOCAL E AC 2 4 856 33 30,722 89 Stop Gap $922 2020-21 COPPER DR 1622 COPPERFIELD DRIVE DEERFIELD AV OXFORD AV LOCAL E AC 2 4 379 33 17,455 90 Stop Gap $524 2020-21 DANBER Cl 1631 DANBERRY CIRCLE HEATHER AV SW CUL DE SAC _ LOCAL E AC 2 4 515 33 20,091 74 Type 11 Slurry $7,835 2020-21 DANBOR RD 1632 DANBOROUGH ROAD _ NANTUCKET PL___-- SW CUL DE SAC LOCAL E AC 2 4 1,063 33 37,284 68 AC Overlay $92,091 2020-21 DARSY Cl 1633 DARSY CIRCLE ROANOKEAV _ NW CUL DE SAC LOCAL E AC 2 4 139 31 6,627 71 Type II Slurry $2,585 2020-21 DARTMO Cl 1634 DARTMOUTH CIRCLE HEATHER AV SW CUL DE SAC LOCAL E AC 2 4 494 33 18,507 88 Stop Gap $555 2020-21 DEBUSK LN 1636 DEBUSK LANE MITCHELLAV WALTER AV LOCAL E AC 2 4 505 33 16,665 85 Type 11 Slurry $6,499 2020-21 DEERFIAV 1637 DEERFIELD AVENUE HEATHER AV ROANOKEAV LOCAL E AC 2 4 225 36 8,100 92 1 Stop Gap $243 2020-21 DEERFIAV 1638 DEERFIELD AVENUE WALNUTAV _ COPPERFIELD OR LOCAL E AC 2 4 488 33 16,104 90 Stop Gap $483 2020-21 DEL AMO AV 1640 DELAMOAVENUE DRATON AV MEARLN LOCAL E AC 2 4 292 33 14,584 80 Type 11 Slurry $5,688 2020-21 DEL AMO AV 1641 DELAMOAVENUE SYCAMORE AV NECULDESAC LOCAL E AC 2 4 580 33 21,433 84 Type 11 Slurry $8,359 2020-21 DEL AMO AV 1642 DELAMOAVENUE SCHERER PL WALNUTAV LOCAL E AC 2 4 425 33 14,025 92 Stop Gap $421 2020-21 DEL AMID AV 1643 DELAMOAVENUE _ MITCHELLAV NISSON RD LOCAL E AC_ 2 4 898 33 29,6_34 78 Type 11 Slurry $11,557 2020-21 DENBIG LN 1645 DENBIGH LANE FORESTERRA LN PENRITH LN LOCAL E AC 2 4 154 33 5,082 99 No Action $0 2020-21 DEVONS AV 1646 DEVONSHIRE AVENUE GRANDOAKS CIR DARSYCIR LOCAL E AAC 2 4 1,566 33 51,678 94 Stop Gap $1,550 2020-21 DORCHE AV 1650 DORCHESTER AVENUE BERKSHIRE PL CHESHIRE PL LOCAL E AC 2 4 511 33 18,644 75 Type II Slurry $7,271 2020-21 DRAYTON AV 1652 DRAYTON AVENUE _ DEL AMO AV CARFAX DR _ LOCAL E AC 2 4 429 33 14,157 70 AC Overlay $34,968 2020-21 ELDER LN 1657 ELDER LANE MORNING GLORY RD RAIN TREE RD LOCAL E AC 2 4 235 33 7,755 91 Stop Gap $233 2020-21 EMERYW RD 1660 EMERYWOOD ROAD SW CUL DE SAC NECULDESAC LOCAL E AC 2 4 1,106 33 40,723 76 Type 11 Slurry $15,882 2020-21 FAL LEA PL 1669 _ FALLEN LEAF PLACE NW CUL DE SAC SE CUL DE SAC LOCAL E AC 24 757 33 29,391 69 AC Overlay $72,596 2020-21 FEATHE RD 1678 FEATHERHILL ROAD _ FALLENLEAF PL NE CUL DE SAC LOCAL E AC 2 4 978 33 34,479 79 Type II Slurry $13,447 2020-21 FERNBR DR 1679 FERNBROOK DRIVE SAN DFIELD PL CULDESAC LOCAL E AC 2 4 491 33 18,496 88 Stop Gap $555 2020-21 FIG TRE DR 1682 FIG TREE DRIVE ALDER LN RAINTREE DR LOCAL E AC 2 4 731 37 27,047 84 Type II Slurry $10,548 2020-21 FIG TRE DR 1683 FIG TREE DRIVE RAINTREE DR SE CUL DE SAC LOCAL E AC 2 4 364 33 14,217 72 Type II Slurry $5,545 2020-21 FOREST LN 1686 FORESTERRA LANE DENBIGH LN GRASSMERE IN LOCAL E AC 2 4 322 33 10,494 99 No Action $0 2020-21 FOXCRO RD1687 FOXCROFT ROAD FALLENLEAF PL NE CUL DE SAC LOCAL E AC 2 4 976 33 34,413 74 Type II Slurry $13,421 2020-21 GLENAR AV 1695 GLENARBOR AVENUE BROOKSHIRE AV SUMMERVILLE AV LOCAL E AC 2 4 225 36 8,100 74 Type 11 Slurry $3,159 2020-21 GRANDO Cl 1696 IGRANDOAKS CIRCLE DEVONSHIRE AV NW CUL DE SAC_ LOCAL E AC 2 4 122 31 6,100 75 Type 11 Slurry $2,379 2020-21 GRASSM LN 1697 IGRASSMERE LANE FORESTERRA LN WINDEMERE LN LOCAL E AC 2 4 380 33 12,540 99 No Action $0 2020-21 GRE MEA AV 1698 IGREEN MEADOW AVENUE NW CUL DE SAC SECULDESAC - LOCAL E AC 2 4 925 33 34,935 83 Type 11 Slurry $13,625 2020-21 GREVALAV 1699 GREEN VALLEY AVENUE MITCHELLAV CULDESAC LOCAL E AC 2 4 534 33 19,915 80 Type 11 Slurry $7,767 2020-21 HAMLET LN 1705 1 HAMLET LANE ALMSIDE DR WALDEN LN LOCAL E AC 2 4 391 33 12,903 99 No Action $0 2020-21 HAMPDE AV 1706 HAMPDEN AVENUE WESTFALL RD DEVONSHIRE AV LOCAL E AC 2 4 502 37 18,574 73 Type 11 Slurry $7,244 Page 4 of 10 City of Tustin, CA Forecasted Maintenance Report - FY 2019-2026 Sorted 6y FY, Rank, Name (A-2) TV 2020-21 2020-21 2020-21 B-6110 HAMPSH RD HEATHE AV HEATHE DR SecID I 1707 1708 1709 Name HAMPSHIRE ROAD HEATHER AVENUE HEATHERFIELD DRIVE From NW CUL DE SAC OANBERRY CIR _ SANDWOODPL To SE CUL DE SAC KIMBERLYCIR MITCHELLAV MPAH LOCAL _LOCAL LOCAL Rank E E E Type AC AC AC Lanes 2 2 2 Zone 4 4 4 L 850 517 502 W 33 33 33 Area 32,460 18,842 16,566 PCI 72 71 72 Maint. Type Type II Slurry Type 11 Slurry Type 11 Slurry Total S $12,659 $7,348 $6,461 2020-21 HID HIL AV 1714 HIDDEN HILLAVENUE ROYAL OAK PL _ BROOKSHIREAV LOCAL E AC 2 4 223 33 7,359 79 Type 11 Slurry $2,870 2020-21 HILLSB PL 1715 HILLSBORO PLACE PENNINGTON AV _ _ NECULDESAC LOCAL E AC 2 4 310 33 13,326 72 Type 11 Slurry $5,197 2020-21 HOLLYH AV 1716 HOLLYHOCKAVENUE GREENMEADOW AV BROOKSHIRE AV_ LOCAL E AC 2 4 224 33 7,392 83 Type II Slurry $2,883 2020-21 HYA FOR RD_ 1717 HYANNIS PORT ROAD NANTUCKET PL SW CUL DE SAC LOCAL E AC 2 4 1,078 33 37,779 74 Type II Slurry $14,734 2020-21 KIMBER CI 1728 KIMBERLY CIRCLE HEATHER AV SW CUL DESAC LOCAL E AC 2 4 390 33 16,515 80 Type 11 Slurry $6,441 2020-21 KINGSB CI _ 1729 KINGSBORO CIRCLE CANTERBURYAV NECULDESAC LOCAL E AC 2 4 114 31 5,852 69 AC Overlay $14,454 2020-21 KINGSTAV 1730 KINGSTON AVENUE ROANOKEAV AMHERST RD LOCAL E AC 2 4 225 33 7,425 78 Type 11 Slurry $2,896 2020-21 KIPUN LN 1732 KIPLING LANE ALMSIDE DR WALDEN IN LOCAL E AC 2 4 391 33 12,903 99 No Action $0 2020-21 LANGDA LN 1740 LANGDALE LANE WILDEVE LN BIRMINGHAM LN LOCAL E AC 2 4 202 33 6,534 99 No Action $0 2020-21 MAPLE CT 1762 MAPLE COURT_ CHERRYWOOD LN NW Cut DE SAC _ LOCAL E AC 2 4 321 33 12,886 77 Type 11 Slurry $5,026 2020.21 _ MEAR LN 1768 MEARLANE DEL AMO AV CARFAX DR LOCAL E AC 2 4 429 33 14,157 84 Type II Slurry $5,521 2020.21 MITCHEAV 1783 MITCHELLAVENUE NEWPORTAV RED HILLAV LOCAL I AC 2 4 2,575 36 _ 92,700 94 Stop Gap $2,781 2020.21 HEAV 1784 MITCHELLAVENUE REDNILLAV BROWNING AV LOCAL I AAC 2 4 2,566 36 92,376 98 No Action $0 2020-21 EL RD FMOR 1786 MORELROAD RAINTREE RD PINEWOODRD LOCAL E AC 2 4 238 33 7,854 88 Stop Gap $236 2020-21 GLO RD 1788 MORNING GLORY ROAD SW CUL DE SAC NE CULDESAC LOCAL E AC 2 4 1,139 33 39,792 85 Type II Slurry $15,519 2020-21 TON CI 1791 MUNTON CIRCLE BROOKSHIRE AV SE CUL DE SAC LOCAL E AC 2 4 113 31 5,821 71 Type II Slurry $2,270 2020-21 NANTUC PL 1802 NANTUCKET PLACE HYANNUS PORT RD NW CUL DE SAC LOCAL E AC 2 4 478 33 19,419 81 Type II Slurry $7,573 2020-21 NEWPORAV 1161 NEWPORTAVENUE 15 NORTH ON RAMP NISSON RD _ LOCAL E AC 3 4 380 40 15,200 83 Type 11 Slurry $5,928 2020-21 NEWPOR AV 1169 NEWPORT AVENUE NISSON RD 15 NORTH ON RAMP LOCAL E AC 3 4 380 40 15,200 66 AC Overlay $37,544 2020-21 NISSON RD 1804 NISSON RD NEWPORT AV RED HILL RD I AAC 2 4 2,689 37 99,493 100 No Action $0 2020-21 NISSON RD 1805 NISSON RD RED HILL AV BROWNINGAV _LOCAL LOCAL I AC 2 4 2,625 36 94,500 94 Stop Gap $2,835 2020-21 OXFORD AV 1816 OXFORD AVENUE ROANOKEAV WALNUTAV LOCAL E AAC 2 4 380 60 22,800 95 Stop Gap $684 2020-21 OXFORD AV 1817 OXFORDAVENUE WALNUTAV _ COPPERFIELD DR LOCAL E AC 2 4 488 33 21,962 91 Stop Gap $659 2020-21 PENNIN AV 1836 PENNINGTON AVENUE HILLSBORO PL ATTBORO PL LOCAL E AC 2 4 511 33 19,743 72 Type 11 Slurry $7,700 2020-21 2020-21 PENRITLN PEP TRE Cl 1837 1838 PENRITH LANE PEPPER TREE CIRCLE BIRMINGHAM PL SYCAMORE AV GRASSMERE LN NECULDESAC LOCAL LOCAL E E AC AC 2 2 4 4 524 458 33 33 17,292 17,500 99 89 No Action Stop Gap $0 $525 2020-21 PEP TRE CI 1839 PEPPER TREE CIRCLE FIG TREE DR NE CUL DE SAC LOCAL E AC 2 4 285 33 11,610 93 Stop Gap $348 2020-21 PINEBR DR 1842 PINEBROOK DRIVE _ BROWNINGAV _ SW CUL DE SAC LOCAL E AC 2 4 534 33 21,355 90 Stop Gap $641 2020-21 PINEBR DR 1843 PINEBROOK DRIVE NISSON RD _ CUL DE SAC LOCAL E AC 2 4 204 33 7,025 61 AC Overlay $17,352 2020-21 PINEWORD 1844 PINEWOOD ROAD SW CUL DE SAC_ NECULDESAC LOCAL E AC 2 4 1,189 36 46,875 80 Type 11 Slurry $18,281 2020-21 POMEGR RD 1854 POMEGRANATE ROAD CHERRYWOOD LN MORINING GLORY RD LOCAL E AC 2 4 228 33 7,524 92 Stop Gap $226 2020-21 POPLAR DR 1855 POPLAR DRIVE CEDAR LN NE CUL DE SAC_ LOCAL E AC 2 4 323 33 14,304 93 Stop Gap $429 2020-21 QUENTDR 1858 QUENT DRIVE MITCHELLAV _ CULDESAC LOCAL E AC 2 4 219 33 9,520 87 Stop Gap $286 2020-21 RAINTR LN 1859 RAINTREE LANE APPLE TREE DR ANA TREE CIR LOCAL E AC 2 4 989 37 36,593 83 Type 11 Slurry $14,271 2020-21 RAINTR LN 1860 RAINTREE LANE ANA TREE CIR WALNUT AV LOCAL E AC 2 4 1,072 36 39,355 94 Stop Gap $1,181 2020-21 RAINTR LN 1861 RAINTREE LANE WALNUT AN DAHLIA DR LOCAL E AC 2 1,35_5 36 48,780 80 Type 11 Slurry $19,024 2020-21 RAINTR LN 1862 RAINTREE LANE DAHLIA DR NW CUL DE SAC LOCAL E AC 2 _4 4 1,626 36 60,572 84 Type II Slurry $23,623 2020-21 RALEIG PL 1863 RALEIGH PLACE MITCHELLAV WALTER AV LOCAL E AC 2 4 519 33 17,127 86 Stop Gap $514 2020-21 REN Cl 1868 REN CIRCLE BROWNINGAV CULDESAC_ LOCAL E AC 2 4 210 33 9,223 92 Stop Gap $277 2020-21 RIDGES PL 1869 RIDGEBORO PLACE PENNINGTON AV NECULDESAC LOCAL E AC 2 4 408 33 15,669 74 Type 11 Slurry $6,111 2020-21 ROANOKAV 1872 ROANOKEAVENUE DARSEY CIR _ KINGSBORO CIR _ LOCAL E AAC 2 4 1,773 37 65,601 94 Stop Gap $1,968 2020-21 ROSALI PL 1876 _ ROSALIE PLACE MITCHELLAV C_UL_DESAC LOCAL E AC 2 4 219 33 9,520 85 Type II Slurry $3,713 2020-21 ROY OAK PL 1881 ROYAL OAK PL NW CUL DE SAC SE CUL DE SAC LOCAL E AC 2 4 872 33 33,186 73 Type II Slurry $12,943 2020-21 SAB TRE Cl 1882 SABLE TREE CIRCLE RAINTREE RD _ SE CUL DE SAC LOCAL E AC 2 4 337 33 13,326 87 Stop Gap $400 2020-21 SANDBR DR 1889 SANDBROOK DRIVE BIRCHFIELD DR COPPERFIELD DR LOCAL E AC 2 4 296 33 9,768 92 Stop Gap $293 2020-21 SANDFI PL 1890 SANDFIELD PLACE BROWNING AV FERNBROOK DR LOCAL E AC 2 4 475 33 15,675 83 Type II Slurry $6,113 2020-21 SANDWO PL 1891 SANDWOOD PLACE HEATHERFIELD DR CLOVERBROOK DR LOCAL E AC 2 4 357 33 11,781 83 Type II Slurry $4,595 2020-21 SCHERE PL 1896 SCHERER PLACE DELAMOAV CARFAX DR _ LOCAL E AC 2 4 313 33 10,329 92 - Stop Gap $310 2020-21 SCHOOL LN 1897 SCHOOL LANE SERVICE RD SYCAMORE AV LOCAL E AC 2 4 947 31 29,357 65 AC Overlay $72,512 2020-21 SERVIC RD 1903 SERVICE ROAD. SCHOOLLN RED HILL AV LOCAL E AC 2 4 1,408 31 43,648 69 AC Overlay $107,811 2020-21 SHADYB DR 1907 SHADYBROOK DRIVE SANDFIELD PL CUL DE SAC LOCAL E AC 2 4 491 33 18,496 89 Stop Gap $555 2020-21 SIL TRE DR 1911 SILK TREE DRIVE ALDER LN SECULDESAC LOCAL- E AC 2 4 1,196 33 41,673 84 Type 11 Slurry $16,252 2020-21 SILVER DR 1913 SILVERBROOK DRIVE WALNUTAV BIRCHFIELD DR LOCAL E AC 2 4 157 33 5,181 71 Type II Slurry_ $2,021 2020-21 SILVER DR 1914 SILVERBROOK DRIVE BIRCHFIELD OR CUL DESAC _ LOCAL E AC 2 4 376 33 14,701 86 Stop Gap $441 2020-21 SNOWBE RD 1919 SNOWBERRY ROAD CHERRYWOOD LN _ NW CUL DE SAC LOCAL E AC 2 4 319 - 33 12,732 _ 93 Stop Gap $382 2020-21 SUMMER AV 1923 SUMMERVILLE AVENUE BRANBURYPL BRIARCLIFF PL LOCAL E AC 2 4 509 33 21,967 75 Type 11 Slurry $8,567 2020-21 SWEETB RD 1924 SWEETBRIAR ROAD CHERRYWOOD LN NW CUL DE SAC - LOCAL E AC 2 4 340 33 13,425 89 Stop Gap $403 2020-21 SYCAMOAV 1222 SYCAMORE AVENUE RED HILL AV DEVONSHIRE AV _ LOCAL C AAC 4 4 676 59 41,324 95 Stop Gap $1,240 2020-21 SYCAMOAV 1223 SYCAMORE AVENUE CANTERBURYAV SE DEAD END LOCAL E AC 2 4 - 634 57 36,138 25 AC Recon $302,475 2020-21 SYCAMO AV 1224 SYCAMORE AVENUE NW DEAD END _ ALDER LN LOCAL E AC 2 4 112 57 5,934 85 Type II Slurry $2,314 Page 5 of 10 City of Tustin, CA Forecasted Maintenance Report - FY 2019-2026 Sorted by FY, Rank, Name (A -Z) ry 2020-21 BrimchlD SVCAMOAV Sec 10 1225 Name SYCAMORE AVENUE From ALDER LN TO PEPPERTREECIR MPAH LOCAL - Rank E AC Lanes�. 2 ,'Zone 4 L 493 W 33 Area 21,439 PCI 89 Maint. Type Stop Gap Tota I $ $643 2020-21 2020-21 TENBY LN TUPELO LN 1925 1937 _ TEN131 LANE TUPELO LANE WALNUT AV WALDEN LN FORASTERRA LN _ _ _ MITCHELLAV _ _ LOCAL LOCAL E E AC AC 2 2 4 4 106 104 33 35 3,248 3,390 99 99 No Action No Action $0 $0 2020-21 UTT OR 1942 UTTDRIVE MITCHELLAV NISSON RD LOCAL E AC 2 4 1,130 37 41,810 77 Type 11 Slurry $16,306 2020-21 2020-21 VEEH DR VEER DR 1948_ 1949 VEEH DRIVE VEEH DRIVE CHARLOMA_DR WOODLAWN AVE WOODLAWN AVE _ UTT DR _ LOCAL LOCAL E E AC AC 2 2 4 4 275 283 33 33 9,075 9,339 91 72 Stop Gap Type 11 Slurry $272 $3,642 2020-21 WALDEN LN 1953 WALDEN LANE HAMLET LN KIPLING LN LOCAL E AC 2 4 189 33 6,237 99 No Action $0 2020-21 WALTER AV 19_56 WALTER AVENUE RALEIGH PL DELAMO AV LOCAL E AC 2 4 516 33 16,896 81 Type 11 Slurry $6,589 2020-21 WESTFA RD 1962 WESTFALL ROAD SW CUL DE SAC NE CUL DE SAC E AC 2 4 1,112 33 41,282 73 Type II Slurry $16,100 2020-21 WILDEV LN 1967 WILDEVE LANE LANGDALE LN ALMSIDEOR _ _ __LOCAL LOCAL E AC 2 4 589 33 19,437 99 No Action $0 2020-21 WINDERLN 1969 WINDERMERE LANE WILDEVE LN GRASSMERE LN _ LOCAL E AC 2 4 742 33 24,486 99 No Ac[ion $0 2020-21 WOODLAM 1974 WOODLAWNAVENUE VEEH DR NISSON RD LOCAL E AC 2 4 790 33 26,070 82 Type 11 Slurry $10,167 2020-21 YOLAND WY 1976_ YOLANDA WAY _ BROWNING AV CUL DE SAC LOCAL E AC 2 4 210 33 9,223 93 Stop Gap $277 $1,650,234 2021-22 AST,N 1500 ASTREET, NORTH FIRSTST IRVINE BLVD LOCAL E AC 2 2 842 30 25,260 91 Stop Gap $758 2021-22 AST,S 1501 ASTREET, SOUTH WMAIN ST THIRDST LOCAL E AC 2 2 328 39 12,792 80 Type 11 Slurry $5,181 2021-22 A ST,S 20 A STREET, SOUTH THIRD ST SECOND ST _ LOCAL E AC 2 2 330 35 11,550 89 Stop Gap $347 2021-22 AST,S 30 ASTREET, SOUTH SECOND ST_ FIRSTST _ LOCAL E AC 2 2 512 37 18,944 72 AC Overlay $48,307 2021-22 ALLIAN AVE 1509 ALLIANCE AVENUE WILLIAMS ST TUSTIN VILLAGE WY LOCAL E AC 2 2 1,058 37 39,146 89 Stop Gap $1,174 2021-22 ALTADE DR 1511 ALTADENA DRIVE W CUL DE SAC PASADENAAV LOCAL_ E AAC 2 2 301 33 9,933 94 Stop Gap $298 2021-22 ALTADE DR 1512 ALTADENA DRIVE PASADENAAV MYRTLE AV LOCAL E AC 2 2 409_ 37 15,133 54 AC Overlay $38,589 2021-22 BST 1535 85TREET MCFADDEN AV _ MITCHELLAV LOCAL E AC 2 2 1,054 37 38,998 95 Stop Gap $1,170 2021-22 BST 1536 BSTREET MITCHELLAV NISSON RD LOCAL E AC 2 2 453 36 16,308 88 Stop Gap $489 2021-22 BST 1537 B STREET _ S CUL OE SAC SIXTH ST LOCAL E AC 2 2 576 38 24,067 79 Type II Slurry $9,747 2021-22 BST 1538 B STREET SIXTH ST MAIN ST _ LOCAL E AC 2 2 696 37 25,752 88 Stop Gap $773 2021-22 BST 1539 BSTREET MAIN ST THIRDST _ LOCAL E AC 2 2 351 44 15,444 95 Stop Gap $463 2021-22 BST 1540 BSTREET THIRDST FIRSTST LOCAL E AC 2 2 908 37 33,596 88 Stop Gap $1,008 2021-22 BST 1541 BSTREET FIRSTST _ IRVINE BLVD _ _ LOCAL _ E AC 2 2 874 37 32,338 86 Type 11 Slurry $13,097 2021-22 BLISS LN 1554 BUSS LANE ALTADENA DR S CUL DE SAC _ LOCAL E AC 2 2 199 33 8,860 78 Type II Slurry $3,588 2021-22 BOLEYN Cl 1555 BOLEYN CIRCLE CARLANN CIR_ N CUL DE SAC LOCAL E AC 2 2 212 33 6,996 95 Stop Gap $210 2021-22 C ST,N 1576 C STREET, NORTH E. FIRSTST N END _ LOCAL E AC 2 2 737 37 27,269 86 Type 11 Slurry $11,044 2021-22 CST,S 1577 CSTREET, SOUTH MITCHELLAV_ NECULDESAC_ LOCAL E AC 2 2 33 9,405 91 Stop Gap $282 2021-22 C ST'S 1578 C STREET, SOUTH _ _ SIXTH ST _ N END LOCAL E AC 2 2 37 13,653 84 Type II Slurry $5,529 2021-22 C ST,5 1579 C STREET, SOUTH _ SEND MAIN ST LOCAL E AC 2 2 37 5,757 90 Stop Gap $173 2021-22 CST,S _1580 CSTREET, SOUTH MAIN ST SECONDST LOCAL E AC 2 2 E71 43 30,745 90 Stop Gap $922 2021-22 C ST'S 1581 C STREET, SOUTH _ SECOND ST FIRSTST _ LOCAL E AAC 2 2 41 22,017 95 Stop Gap $661 2021-22 CALIFO ST 1583 CALIFORNIA STREET MEDALLION AV _ CORLA AV _ _LOCAL E AC 2 2 33 27,945 73 Type 11 Slurry $11,318 2021-22 CALIF05T 1584 CALIFORNIA STREET W. MAIN ST THIRDST LOCAL E AC 2 2 33 10,923 93 Stop Gap $328 2021-22 CARLAN Cl _ 1592 CARLANN CIRCLE BOLEYN CIR PASADENA AV LOCAL E AC 2 2 257 33 94 Stop Gap $329 2021-22 CENTEN WY 1601 CENTENNIAL WAY E. MAIN ST FIRSTST LOCAL I AAC 2 2 1,250 37 _10,955 46,250 90 Stop Gap $1,388 2021-22 CORLA AV 1625 CORLAAVENUE MYRTLE AV EEND LOCAL E AC 2 2 654 33 21,582 95 Stop Gap $647 2021-22 DST 1630 DSTREET _ LOCKWOOD PARK PL ORANGEWOOD LN LOCAL E AC 2 2 285 33 10,746 81 Type 11 Slurry $4,352 2021-22 EL CAM WY _2010 EL CAMINO WAV EL CAMINOREAL SEND _ LOCAL I AC 2 2 448 58 25,984 87 Stop Gap $780 2021-22 FASHIO LN 1677 FASHION LANE FIRSTST _ IRVINE BLVD LOCAL E AC 2 2 1,058 37 38,186 87 Stop Gap $1,146 2021-22 HALL Cl 1704 HALL CIRCLE _ FIRSTST _ NCUL DE SAC _ _ LOCAL E AC 2 2 224 4410,918 93 Stop Gap $328 2021-22 KENYON DR 1727 KENYON DRIVE NEWPORTAV 5 CUL DE SAC LOCAL E AC 2 2 805 33 28,858 85 Type II Slurry $11,687 2021-22 LOC PAR PL 1754 LOCKWOOD PARK PLACE_ DST PROSPECTAV LOCAL E AC 2 2 1 470 33 15,510 95 Stop Gap $465 2021-22 LORELELN 1755 LORELEI LANE WILLIAMSST _ NEND _ LOCAL E_ AC 2 2 352 33 11,616 94 Stop Gap $348 2021-22 MEDALLAV 1769 MEDALLION AVENUE PASADENAAV _ WCUL DE SAC LOCAL E AC 2 2 196 33 8,179 71 AC Overlay $20,856 2021-22 MEDALLAV 1770 MEDALLION AVENUE MYRTLE AV CALIFORNIA ST LOCAL E AC 1 2 2 526 33 19,833 89 Stop Gap $595 2021-22 MITCHEAV 1782 MITCHELLAVENUE BST NEWPORTAV LOCAL I AC 2 2 416 30 12,480 83 Type 11 Slurry $5,054 2021-22 MOU VIE DR 1790 MOUNTAIN VIEW DRIVE W.FIRSTST IRVINE BLVD _ LOCAL E AC 2 2 838 30 25,140 87 Stop Gap $754 2021-22 MYRTLE AV 1798 MYRTLEAVENUE - _ NEWPORT AV MCFADDEN AV LOCAL E AC 2 2 1,188 33 39,204 69 AC Overlay $99,970 2021-22 MYRTLE AV 1799 MYRTLEAVENUE MCFADDEN AV NCUL DE SAC LOCAL E AC 2 2 1,147 32 38,546 73 Type 11 Slurry $15,611 2021-22 MYRTLE AV 1800 MYRTLE AVENUE MAIN ST WEST _ FIRSTSTWEST LOCAL E AC 2 2 1,242 36 44,712 94 Stop Gap $1,341 2021-22 MYRTLE AV _1801 MYRTLE AVENUE FIRSTSTWEST NCUL DE SAC LOCAL E AC 2 2 515 37 21,034 91 Stop Gap $631 2021-22 NISSON RD 1803 NISSON RD PASADENA AV _ BST LOCAL E AC 2 2 1,935 36 69,660 82 Type 11 Slurry $28,212 2021-22 ORANGELN 1815 ORANGEWOOD LANE DST PROSPECt AV LOCAL E AC 2 2 470 33 19,872 81 Type 11 Slurry $8,048 2021-22 PACIFI ST 1818 PACIFIC STREET MEDALLION AV CORLA AV LOCAL E AC 2 2 762 33 25,146 90 Stop Gap $754 2021-22 PACIFI ST 1819 PACIFIC STREET SIXTH ST MAIN ST WEST LOCAL E AC 2 2 692 37 25,604 81 Type 11 Slurry $10,370 2021-22 PACIFIST 1820 PACIFIC STREET MAIN ST WEST FIRSTST LOCAL E AC 2 2 1,268 37 48,356 86 Type 11 Slurry $19,584 2021-22 PASADE AV 1831 PASADENAAVENUE SYCAMORE AV MCFADDENAVE LOCAL I AAC 4 2 1,211 60 72,660 84 Type 11 Slurry $29,427 2021-22 PASADE AV 1832 PASADENAAVENUE _ MCFADDEN AVE _ NISSON RD LOCAL E AC 2 2 1,677 32 53,664 84 Type 11 Slurry $21,734 Page 6 of 10 City of Tustin, CA Forecasted Maintenance Report - FY 2019-2026 Sorted by FY, Rank, Name (A -Z) FY 2W7-22 2021-22 2021-22 2021-22 BranchlD PASADE AV PASADE AV PREBLE DR PROSPE AV PROSPE AV PROSPE AV r- 1833 1834 1856 1150 1151 1152 PASADENA AVENUE PASADENAAVENUE PREBLE DRIVE PROSPECTAVENUE PROSPECTAVENUE PROSPECTAVENUE SOUL DE SAC SECOND ST MAIN ST WEST MAIN ST THIRD ST SECOND ST 'SECOND ST IN CUL DE SAC SECOND ST THIRD ST SECOND ST FIRST ST LOCAL LOCAL LOCAL LOCAL LOCAL LOCAL E E E A A A AC AC AC AC AC AC 2 2 2 2 2 2 2 2 2 2 2 2 L 712 3697 85828 3240 39652 53317 W Area 2 PCI 83 83 77 92 96 88 M39,33179 Maint. Type Type 11 Slurry Type 11 Slurry _ _..2021-22 Type 11 Slurry Stop Gap Stop Gap Stop Gap Total $11,612 $6,264 $15,1182021-22 $243 $440 $784 2021-22 2021-22 SECONDST SECONDST 1898 1899 SECOND STREETPASADENAAV SECOND STREET PACIFICST MYRTLE AV _ BST LOCAL LOCAL E E AC AC 2 2 2 2 3026 1,06331 91 79 Stop Gap Type 11 Slurry $299 $15,929 2021-22 SECONDST 1900 SECOND STREET CST _ ___ EL CAMINOREAL LOCAL E AC 2 2 342 37 12,654 88 Stop Gap $380 2021-22 SECONDST 1901 SECOND STREET _ EL CAMINO REAL _ PROSPECT AV LOCAL E AC 2 2 331 37 12,24788 Stop_Gap $367 2021-22 SECONDST 1902 SECOND STREET PREBLE DR _ CENTENNIAL WY LOCAL E AC 2 2 579 37 28,721 80 Type II Sl-.-rry-T $11,632 2021-22 SIXTH ST 1916 SIXTH STREET W CUL DE SAC PACIFIC 5T LOCAL I AC 2 2 454 37 19,091 92 Stop Gap $573 2021-22 SIXTH ST 1917 SIXTH STREET PACIFIC ST EL CAMINO REAL I AC 2 2 1,664 38 63,232 86 Type Il Slurry $25,609 2021-22 SIXTH ST 1918 SIXTH STREET EL CAMINO REAL NEWPORTAV _LOCAL LOCAL I AC 2 2 1,009 37 37,333 91 Stop Gap $1,120 2021-22 THIRD ST 1926 THIRD STREET_ MYRTLE AV PACIFIC ST LOCAL E AC 2 2 496 36 17,856 73 Type 11 Slurry $7,232 2021-22 THIRD ST 1927 THIRD STREET PACIFIC ST _ _ CALIFORNIA ST LOCAL E AC 2 2 357 42 14,994 78 Type 11 Slurry $6,073 2021-22 THIRD ST 1928 THIRD STREET CALIFORNIAST BST LOCAL E AC 2 2 715 _ 33 23,595_ 79 Type 11 Slurry $9,556 2021-22 THIRD ST 1929 THIRD STREET CST_ EL CAMINO REAL LOCAL E AC 2 2 343 38 13,034 95 Stop Gap $391 2021-22 THIRD ST 1930 THIRD STREET EL CAMINO REAL PROSPECT AV LOCAL E AC 2 2 333 37 12,321 89 Stop Gap $370 2021-22 THIRD ST 1931 THIRD STREET PROSPECT AV PREBLE DR LOCAL E AC 2 2 478 37 17,686 90 Stop Gap $531 2021-22 THIRD ST 1932 THIRD STREET PREBLEDR _ EEND _ LOCAL E AC 2 2 151 37 5,587 95 Stop Gap $168 2021-22 TUS VIL WY 1939 TUSTIN VILLAGE WAY MCFADDEN AV 386 FT N/0 MCFADDEN AV LOCAL I AC 4 2 386 49 18,914 95 Stop Gap $567 2021-22 TUS VIL WY 1940 TUSTIN VILLAGE WAY _ 386 FT N/O MCFADDEN AV ALLIANCE AV LOCAL I AC 2 2 598 33 V9,734 94 Stop Gap $592 2021-22 TUS VIL WY 1941 TUSTIN VILLAGE WAY ALLIANCE AV N END LOCAL I AC 2 2 625 33 20,625 91 Stop Gap $619 2021-22 WHITBYCI 1964 WHITBYCIRCLE PASADENAAV WCUL DE SAC LOCAL E AC2 2 399 33 15,460 92 Stop Gap $464 2021-22 WILLIAST 1269 WILLIAMS STREET MCFADDEN AV ALLIANCE AV LOCAL A AAC 2 2 1,012 37 37,444 95 Stop Gap $1,123 2021-22 WILLIAST 1270 WILLIAMS STREET ALLIANCE AV LORELEI LN LOCAL A AC 2 2 1,668 37 61,716 95 Stop Gap $1,851 2021-22 WILLIAST - 1271 WILLIAMS STREET - LORELEI LN MAIN ST WEST LOCAL A AC 3 2 264 50 13,200 95 Stop Gap $396 $560,170 2022-23 ANDREW ST 1519 ANDREWS STREET NEWPORTAV ESTORO CIR_ LOCAL E AC 2 3 471 33 17,635 51 AC Overlay $46,204 2022-23 ANDREW ST 1520 ANDREWS STREET NW CUL DE SAC OTT DR LOCAL E AC 2 3 724 33 26,248 86 Type 11 Slurry $11,024 2022-23 ANDREW ST 1521 ANDREWS STREET FARMINGTON RD FALMOUTH DR LOCAL E AC 2 3 279 37 12,502 92 Stop Gap $500 2022-23 ARLOUR WY 1527 ARLOURA WAY WOODLAWN AV NW CUL DE SAC LOCAL E AC 2 3 234 33 10,105 78 Type II Slurry $4,244 2022-23 BONITAST 1557 BONITA STREET NEWPORTAV ORANGEST LOCAL E AC 2 3 602 37 22,274 95 Stop Gap $891 2022-23 BRYAN FR 1571 BRYAN (FRONTAGE) AVENUE STONEHENGE DR SE CUL-DE-SAC LOCAL E AAC 2 3 375 25 10,739 83 Type II Slurry $4,510 2022-23 CHARLO DR 1606 CHARLOMA DRIVE SAN JUAN ST N CUL DE SAC LOCAL E AC 2 3 230 33 9,883 90 Stop Gap $395 2022-23 CHARLO DR 1607 CHARLOMA DRIVE ANDREWS ST LANCE DR LOCAL E AC 2 3 431 33 16,697 90 Stop Gap $668 2022-23 CHARLO DR 1608 CHARLOMA DRIVE BRYAN AV KALUA LN LOCAL E AC 2 3 634 33 20,922 92 Stop Gap $837 2022-23 CHARLO DR _1609 CHARLOMA DRIVE FIRSTST MAUNA LOA RD LOCAL E AAC 2 3 256 33 8,448 99 No Action $0 2022-23 CHARLO DR 1610 CHARLOMA DRIVE _ OLWYN DR GARLAND AV LOCAL E AC 2 3 412 33 18,544 85 Type H Slurry $7,788 2022-23 CINDY LN 1617 CINDY LANE BRYAN AV TIKI LN LOCAL E AC 2 3 533 33 20,063 92 Stop Gap $803 2022-23 COR REE RD 1623 CORAL REEF ROAD SW CUL DE SAC _ _ LOCAL E AC 2 3 262 33 10,939 92 Stop Gap $438 2022-23 COR REE RD 1624 CORAL REEF ROAD FIRSTST --FIRSTST MAUNA LOA LOCAL E AAC 2 3 288 33 9,504 99 No Action $0 2022-23 CROMWEDR 1628 CROMWELL DRIVE SAYBROOK LN STONEHENGE DR LOCAL E AC 2 3 756 37 27,972 86 Type 11 Slurry $11,748 2022-23 CROMWE DR 1629 CROMWELL DRIVE STONEHENGE DR NECULDESAC LOCAL E AC 2 3 226 33 9,663 84 Type li Slurry $4,058 2022-23 DEAN ST 1635 DEAN STREET _ LANCE DR _ NE CUL DE SAC LOCAL E AAC 3_ 371 33 14,446 92 Stop Gap $578 2022-23 DEL CER DR 1644 DEL CERRO DRIVE KALUA LN SW CUL DE SAC_ LOCAL E AAC _2 2 3 247 33 10,444 99 No Action $0 2022-23 DIA HEA DR 1647 DIAMOND HEAD DRIVE SW END BRYAN AV_ LOCAL E AAC 2 3 612 33 20,196 85 Type 11 Slurry $8,482 2022-23 DIA HEA DR 1648 DIAMOND HEAD DRIVE BRYAN AV KALUA LOCAL E AAC 2 3 711 33 23,463 99 No Action $0 2022-23 DIA HEA DR 1649 DIAMOND HEAD DRIVE KALUA LANAI WY LOCAL E AAC 2 3 355 33 11,715 99 NO Action $0 2022-23 ELIZAB WY 1658 ELIZABETH WAY _ LETTY LN TIKI LN LOCAL E AC 2 3 419 33 17,714 88 Stop Gap $709 2022-23 ELIZAB WY 1659 ELIZABETH WAY IRVINE BLVD WASS ST LOCAL E AC 2 3 616 31 19,096 88 Stop Gap $764 2022-23 EPPING WY 1662 EPPING WAY LANCE DR NECULDESAC LOCAL E AAC 2 3 430 33 16,340 87 Type II Slurry $6,863 2022-23 EPPING WY 1663 EPPING WAY BRYAN AV NECULDESAC LOCAL E AC 2 3 601 33 19,833 86 Type II Slurry $8,330 2022-23 ESTERO CI 1664 ESTERO CIRCLE ANDREWS ST NECULDESAC LOCAL E AC 2 3 229 33 11,111 83 Type 11 Slurry $4,667 2022-23 FALMOU DR 1670 FALMOUTH DRIVE SW CUL DE SAC ANDREWS ST LOCAL E AC 2 3 468 32 17,238 84 Type II Slurry $7,240 2022-23 FALMOU DR 1671 FALMOUTH DRIVE ANDREWS ST _ LANCE DR LOCAL E AC 2 3 268 37 9,916 85 Type II Slurry $4,165 2022-23 FALMOU DR 1672 FALMOUTH DRIVE LANCE DR NE CUL DE SAC LOCAL E AC 2 3 467 32 15,206 91 Stop Gap $608 F,22022-23 FALMOU PL 1673 FALMOUTH PLACE STONEHENGE DR SW CUL DE SAC LOCAL E AAC 2 3 299 34 12,315 93 Stop Gap $493 022-23 FARMIN RD 1674 FARMINGTON ROAD SAN JUAN ST ANDREWSST LOCAL E AC 2 3 512 37 18,944 89 Stop Gap $758 2022-23 FARMIN RD 1675 FARMINGTON ROAD LANCE DR BRYAN AV LOCAL E AC 2 3 479 37 17,723 87 Type II Slurry $7,444 2022-23 FARMIN RD 1676 FARMINGTON ROAD BRYAN AV STONHENGE DR LOCAL E AAC 2 3 538 37 19,906 87 Type II Slurry $8,361 2022-23 FIELDI DR 1680 FIELDING DRIVE ANDREWS ST NECULDESAC LOCAL E AAC 2 3 178 33 8,167 95 Stop Gap $327 Page 7 of 10 City of Tustin, CA Forecasted Maintenance Report - FY 1019-2026 Sorted by FY, Rank, Name (A -Z) 2022-23 2022-23 .. . FIRST ST FIRST S7 1029 1030 FIRST STREET NEWPORT AV FIRST STREET CHARLOMA DR iCHARLOMA DR REDHILLAV_ MPAH LOCAL LOCAL Rank E E .- AAC AC Lanes 2 2 Zone 3 3 L 1. W Area 4,600 8,700 PCf 96 95 Maint. Type Stop Gap Stop Gap Total $ $3,384 $2,748 2022-23 2022-23 2022-23 GARLAN AV GARLAN AV GRE VALAV 1693 1694 1700 GARLAND AVENUE GARLANDAVENUE GREEN VALLEY AVENUE CHARLOMA DR WOODLAWN AV _ SAN IUAN ST _ 1WOODLAWN AV RED HILLAV _- LANCE DR _ LOCAL LOCAL LOCAL E E E AC AC AC 2 2 2 3 3 3 V33 15,601 24,882 30,525 85 86 78 Type 11 Slurry Type 11 Slurry Type 11 Slurry $6,552 $10,450 $12,821 2022-23 2022-23 GWYNETDR JAN MAR PL 1703 1720 GWYNETHDRIVE JANMARIE PLACE OLWYN DR BROWNINGAV END NW END LOCAL LOCAL E E AC AAC 2 2 3 3 4,290 0,493 88 95 Stop Gap$172 Stop Gap $820 2022-23 KALUA LN 1721 KALUA LANE CHARLOMA DR WHITE SANDS DR LOCAL E AC 2 3 19,998 91 Stop Gap $800 2022-23 KALUA LN 1722 KALUA LANE RED HILLAV DIAMOND HEAD DR_ E AAC 2 3 467 33 15,411 99 NO Action $0 2022-23 KAREN WV 1723 KAREN WAY _ ISIERRAVISTA DR _ lAN MARIE PL _LOCAL LOCAL_ E AAC 2 3 415 33 13,695 94 Stop Gap $548 2022-23 KENT PL 1726 KENT PLACE_ CROMWELL DR_ SE CUL DE SAC LOCAL _ E AAC 2 3 160 33 7,380 99 No Action $0 2022-23 LABURN DR 1733 LABURNUM DRIVE OLWYN DR _ NECULDESAC _ LOCAL E AAC 2 3 356 33 13,812 84 Type II Slurry $5,801 2022-23 2022-23 LANAI WY LANCE DR 1735 _ 1736 LANAI WAY LANCE DRIVE DIAMOND HEAD DR CHIARLOMA DR NW CUL DE SAC _ RED HILLAV LOCAL LOCAL E E AAC AC _ 2 2 3 3 444 1,170 33 33 16,716 40,050 95 92 Stop Gap Stop Gap $669 $1,602 2022-23 LANCE DR 1737 _ LANCE DRIVE _ _ RED HILLAV DIAMOND HEAD DR LOCAL E AAC 2 3 458 33 15,114 90 Stop Gap $605 2022-23 LANCE DR 1738 LANCE DRIVE WOODLAND DR FALMOUTH DR _ LOCAL E AC 2 3 945 37 37,202 83 Type 11 Slurry $15,625 2022-23 LEAR LN 1749 LEAR LANE UTT DR NW CUL DE SAC LOCAL E AAC 2 3 201 33 8,926 90 Stop Gap $357 2022-23 LEAR LN 1750 LEAR LANE WOODLAND DR SE CUL DE SAC _ LOCAL E AAC 2 3 119 34 6,613 81 Type II Slurry $2,777 2022-23 LETN LN 1751 LETTY LANE ELIZABETH WVCINDY LN LOCAL E AC 2 3 397 33 _ 1 15,575 90 Stop Gap $623 2022-23 MAU LOA RD 1767 MAUNA LOA ROAD _ CHARLOMA DR CORAL REEF RD LOCAL E AAC 2 3 959 33 31,647 98 No Action $0 2022-23 MELVIN WY 1775 MELVIN WAV RED HILLAV 165 FT W/O DEAN ST LOCAL E AC 2 3 921 33 30,393 87 Type 11 Slurry $12,765 2022-23 NIXON Cl 1806 NIXON CIRCLE NW CUL-DE-SAC SE CUL-DE-SAC _ LOCAL E AAC 2 3 539 33 22,137 93 1 Stop Gap $885 2022-23 OLWYN DR 1811 OLWYN DRIVE CHARLOMA DR WOODLAWN AV NW EDGE LOCAL E AC 2 3 403 33 19,157 87 Type II Slurry $8,046 2022-23 OLWYN DR 1812 OLWYN DRIVE WOODLAWN AV NW EDGE RED HILLAV LOCAL E AAC 2 3 845 33 27,885 95 Stop Gap $1,115 2022-23 ORANGEST 1813 ORANGE STREET ELCAMINO REAL SAN JUAN ST_ LOCAL E AAC 2 3 1,302 37 48,174 99 NO Ac[ion $0 2022_-23 RED HIL AV 1207 RED HILLAVENUE IRVINE BLVD CITY LIMITS LOCAL B AC 4 3 270 60 16,200 83 Type 11 Slurry $6,804 2022-23 RED MIL CI 1867 RED MILL CIRCLE BROWNING AV NW CUL DE SAC LOCAL E AAC 2 3 217 31 8,902 99 NO Action $D 2022-23 RIV FOR RD 1871 RIVER FORD ROAD NIXON CIR 383 FT E/O NIXON CIR LOCAL E AAC 2 3 383 33 12,639 90 Stop Gap $506 2022-23 SAN IUA ST 1885 SAN JUAN STREET NEWPORTAV REDHILLAV LOCAL I AC 2 3 2,560 36 92,160 89 Stop Gap $3,686 2022-23 SAN JUA ST SAN 1886 SAN JUAN STREET RED HILLAV FARMINGTON RD LOCAL I AC 2 3 1,419 36 51,084 87 Type II Slurry $21,455 2022-23 1887 SAN JUAN STREET FARMINGTON RD BROWNING AV LOCAL I AC 2 3 1,145 36 41,220 88 Stop Gap $1,649 2022-23 SAYBRO LN 1895 SAYBROOK LANE_ CROMWELL DR FARMINGTON RD LOCAL E AC 2 3 332 37 12,284 83 Type 11 Slurry $5,159 2022-23 SIE VIS DR 1910 SIERRAVISTA DRIVE BROWNING AV NW END _ LOCAL E AAC 2 3 642 33 21,186 97 Stop Gap $847 2022-23 SIL BIR DR 1912 SILVER BIRCH OLWYNDR NECULDESAC LOCAL E AAC 2 3 394 33 15,295 92 Stop Gap $612 2022-23 STONEH DR 19221 TONEHENGE DRIVE CROMWELL DR BRYAN AV _ LOCAL E AAC 2 3 1,362 37 50,394 92 Stop Gap $2,016 2022-23 TIKI Cl 1934 TIKI CIRCLE WHITESAND DR NW CUL DE SAC LOCAL E AC 2 3 174 33 8,309 83 Type 11 Slurry $3,490 2022-23 TIKI LN 1935 TIKI LANE _ ELIZABETH WY CINDY LN LOCAL E AC 2 3 456 33 22,346 90 Stop Gap $894 2022-23 TUSEASDR 1938 TUSTIN EAST DRIVE ELCAMINOREAL _ SAN JUAN ST LOCAL E AAC 2 3 1,780 37 65,860 92 Stop Gap $2,634 2022-23 OTT DR 1943 UTT DRIVE SANJUANST LANCE DR LOCAL E AC 2 3 823 34 27,982 93 Stop Gap $1,119 2022-23 OTT DR 1944 UTT DRIVE LANCE DR BRYAN AV LOCAL E AAC 2 3 411 33 13,563 76 Type 11 Slurry $5,696 2022-23 WALNUTST 1955 WALNUTSTREET NEWPORTAV ORANGEST LOCAL E AC 2 3 602 37 22,274 96 Stop Gap $891 2022-23 WASS ST 1959 WASS STREET NEWPORT AV CHARLOMA DR LOCAL E AC 2 3 1,395 33 46,035 75 AC Overlay $120,612 2022-23 7WHI SAN DR 1965 WHITESANDS DRIVE BRYAN AV FI RST ST LOCAL E AC 2 3 776 33 25,608 93 Stop Gap $1,024 2022-23 WOODLA DR 1970 WOODLAND DRIVE LANCE DR BRYAN AV LOCAL E AAC 2 3 487 37 20,899 87 Type 11 Slurry $8,778 2022-23 WOODLA DR 1971 WOODLAND DRIVE BRYAN AV NECUL DESAC LOCAL E AAC 2 3 1,208 35 45,513 99 NO Action $0 2022-23 WOODLA DR 1972 WOODLAND DRIVE MELVIN WY SW CUL DE SAC LOCAL E AAC 2 1 3 475 33 17,880 79 Type II Slurry $7,510 2022-23 WOODLAAV 1975 WOODLAWN AVENUE OLWYN DR _ OLD IRVINE BLVD LOCAL E AAC 2 3 888 33 29,304 92 Stop Gap $1,172 $439,614 2023-24 BENTLE Cl 1547 BENTLEY CIRCLE _ WALNUTAV SW CUL DE SAC LOCAL E AC 2 6 526 40 25,504 91 Type II Slurry $10,967 2023-24 CHAMBERD 1603 CHAMBERS ROAD _ MICHELLE DR FRANKLIN AV LOCAL E AC 2 6 2,596 40 103,840 91 Type 11 Slurry $44,651 2023-24 DOW AV 1651 DOWAVENUE FRANKLIN AV MYFORD RD LOCAL E AC 2 6 3,004 44 134,456 94 Stop Gap $5,378 2023-24 FRANKLAV 1688 FRANKLIN AVENUE DOW AV WALNUTAV LOCAL I AC 2 6 1,452 52 76,944 97 Stop Gap $3,078 2023-24 FRANKLAV 1689 FRANKLIN AVENUE WALNUTAV CHAMBERS RD LOCAL E AC 2 6 305 1 60 18,300 93 Stop Gap $732 2023-24 FRANKLAV 1690 FRANKLIN AVENUE CHAMBERS RD _ MICHELLE DR LOCAL I AC 2 6 2,210 40 88,400 82 Type 11 Slurry $38,012 2023-24 MICHEL DR 1776 MICHELLE DRIVE CHAMBERS DR FRANKLIN AV LOCAL I AC 2 6 604 40 26,560 82 Type 11 Slurry $11,421 2023-24 MICHELDR 1777 MICHELLE DRIVE FRANKLIN AV MYFORD RD LOCAL I AC 4 6 1,278 60 76,680 81 Type 11 Slurry $32,972 2023-24 MOFFETT 5020 MOFFETT DR HARVARD AV SONORAST LOCAL C AC 2 6 714 48 _ 34,272 85 Type 11 Slurry $14,737 2023-24 MYFORD RD 1792 MYFORD ROAD DOW AV WALNUTAV LOCAL E AC 5 6 1,191 70 87,990 90 Type 11 Slurry $37,836 2023-24 MYFORD RD 1793 MYFORD ROAD WALNUTAV MICHELLE DR LOCAL C AC 5 6 2,749 45 123,705 92 Stop Gap $4,948 2023-24 PARK AV 2000 PARKAVE - DISTRICTST TUSTIN RANCH RD LOCAL C AC 4 6 1,304 26 32,292 93 Stop Gap $1,292 2023-24 PARKAV _ 2001 PARKAVE DISTRICTST IWARNERAVE LOCAL C AC 4 6 2,022 26 50,960 96 Stop Gap $2,038 2023-24 PARK AV 2002 PARKAVE IWARNERAVE I DISTRICT ST LOCAL C AC 4 6 1,996 26 50,284 94 Stop Gap $2,011 2023-24 SINCLACI 1915 iSINCLAIRCIRCLE WALNUTAV _ SWCULDESAC LOCAL E AC 2 6 371 40 19,116 79 Typell Slurry $8,220 Page 8 of 10 City of Tustin, CA Forecasted Maintenance Report - FY 2019-2026 Sorted by FY, Rank, Name (A -Z) 2023-24 Branchl!) VICTORY RD Sec ID 2021 Name iVICTORY ROADPARK From AV To TUSTIN RANCH RD MPAH LOCAL Rank C Type AC Lane, 2 Zone 6 L 950 W 29 Area 29,650 PCI 95 Maint. Type Stop Gap Total $ $1,186 2023-24 VICTORY RD 5017 VICTORY ROAD TUSTIN RANCH RD PARK AV LOCAL C AC 2 6 926 28 31,860 95 Stop Gap $1,274 _ $220,754 2024-25 BELL AV 1544 BELL AVENUE RED HILL AV NW CUL DE SAC LOCAL E AAC 2 7 2,406 44 110,140 92 Type 11 Slurry $48,462 2024-25 DELAMOAV 1639 DELAMOAVENUE SW CUL DE SAC VALENCIA AV LOCAL E AC 2 7 372 40 19,592 86 Type 11 Slurry $8,620 2024-25 DEL AMO AV 2012 DELAMOAVENUE EDINGER AVE _ NEWPORTAVE LOCAL C AC 5 7 1,280 74 94,720 86 Type1151urry $41,677 2024-25 GATEWAY Cl 2020 GATEWAYCIR BELL AVE SCOS LOCAL E AC 2 7 589 40 25,910 93 Stop Gap $1,036 2024-25 INDUSTDR 1718 INDUSTRIAL DRIVE RED HILL AV _ WOOD LAWN AV LOCAL E AC 2 7 938 52 48,776 83 Type 11 Slurry $21,461 2024-25 KENS RD _1725 KENSINGTON PARK ROAD VALENCIA AVE EDINGERAVE LOCAL C AC 4 7 1,405 96 134,880 89 Type 11 Slurry $59,347 2024-25 LANDSO RD 1739 LANSDOWNE ROAD VALENCIA AVE NEND LOCAL E AC 2 7 700 33 23,100 93 Stop Gap $924 2024-25 LEGACY RD 5031 LEGACY RD TUSTIN RANCH RD WARNER AV LOCAL E AC 4 7 1,538 50 76,900 94 Stop Gap $3,076 2024-25 MOFFETT 5021 MOFFETT DR SONORA ST END LOCAL C AC 2 7 650 48 31,200 83 Type 11 Slurry $13,728 2024-25 MORGAN Cl 1787 MORGAN CIRCLE MOSHER AV SE CUL DE SAC_ LOCAL E AC 2 7 330 40 15,262 82 Type II Slurry $6,715 2024-25 MOSHER AV 1789 MOSHER AVENUE BELL AV VALENCIA AV LOCAL E AAC 2 7 1,265 40 50,600 96 Stop Gap $2,024 2024-25 PARKAV 1825 PARK AVE TUSTIN RANCH RD DISTRICT ST LOCAL C AC 4 7 1,349 26 33,462 82 Type II Slurry $14,723 2024-25 PARK AV 5030 PARK AVE VICTORY RD WARNERAV LOCAL C AC 2 7 1,586 29 57,920 93 Stop Gap $2,317 2024-25 PARK AV 5032 PARK AVE WARNERAV VICTORY RD _ LOCAL C AC 2 7 1,600 29 56,730 93 Stop Gap $2,269 2024-25 SAN FE DR 1893 SANTA FE DRIVE WOODLAWN AV RED HILLAV LOCAL E AC 2 7 938 52 48,776 84 Type II Slurry $21,461 2024-25 SEVERN RD 1904 SEVERVNS ROAD VALENCIA AVE CHARLESTON ST LOCAL E AC 2 7 1,120 38 42,560 94 Stop Gap $1,702 2024-25 WOODLA AV 1973 WOODLAWNAVENUE -- SANTA FE DR -- INDUSTRIAL DR LOCAL E AC 2 7 - 636 5233,072 87 Type 11 Slurry $14,552 _ $264,096 2025-26 ADAMS DR 1505 ADAMS DRIVE TUSTIN RANCH RD NW CUL DE SAC LOCAL E AC 2 5 671 37 26,806 97 Stop Gap $1,072 2025-26 AUT CEN DR 1532 AUTO CENTER DRIVE TUSTIN RANCH RD SE LUL DE SAC LOCAL E AC 3 5 2,093 56 120,551 88 Type II Slurry $54,248 2025-26 AUTCEN DR 1533 AUTO CENTER DRIVE EL CAMINO REAL AUTO CENTER DR LOCAL E AC 3 5 1,151 56 64,456 92 Stop Gap $2,578 2025-26 AUT CEN DR 1534 AUTO CENTER DRIVE AUTO CENTER DR AUTO CENTER DR LOCAL E AC 2 5 869 56 48,664 94 Stop Gap $1,947 2025-26 BELLEF RD 1545 BELLEFORD ROAD BROWNING AV RANCHWOOD RD LOCAL E AC 2 5 462 36 16,632 92 Stop Gap $665 2025-26 BRAZOS LN 1563 BRAZOS LANE SAN SABA ST SAN SIMON ST LOCAL E AC 2 5 201 33 6,633 100 Stop Gap $265 2025-26 BRISTO LN 1567 BRISTOW LANE COSTELLO DR BRUNS DR LOCAL E AC 2 5 281 37 10,397 97 Stop Gap $416 2025-26 BRUNS DR 1570 BRUNS DRIVE BRISTOW LN BURRIER LN LOCAL E AC 2 5 976 37 36,112 98 Stop Gap $1,444 2025-26 BUR MIL RD 1574 BURNT MILL ROAD _ BROWNINGAV TIBURON WY LOCAL E AC 2 5 731 37 27,047 98 Stop Gap $1,082 2025-26 BURRIE LN 1575 BURRIER LANE COSTELLO DR BRUNS DR LOCAL E AC 2 5 281 37 10,397 98 Stop Gap $416 2025-26 CALAVE Cl 1582 CALAVERA CIRCLE SARATOGA DR _ SE CUL DE SAC LOCAL E AC 2 5 144 37 7,307 96 Stop Gap $292 2025-26 CARRIER 1593 CABRERA SOUNDA CORTINA LOCAL E AC 2 5 367 37 13,579 99 Stop Gap $543 2025-26 CASTEN DR 1596 CASTENEDA DRIVE PIONEER RD COSTELLO DR LOCAL E AC 2 5 165 37 6,105 97 Stop Gap $244 2025-26 CONTES 1620 CONTESSA MARSELINA PALERMO LOCAL E AC 2 5 278 37 10,286 96 Stop Gap $411 2025-26 _ _ CORTIN _ 1626 CORTINA SONBRIA VENTIA LOCAL E AC 2 5 1,054 37 38,998 97 Stop Gap $1,560 2025-26 COSTEL 1627 COSTELLO DRIVE BRISTOW LN BURRIER LN LOCAL E AC 2 5 735 37 27,195 96 Stop Gap $1,088 2025-26 GALLER WY 1691 GALLERY WAY TUSTIN RANCH RD RAWLINGS WY LOCAL E AC 2 5 845 37 31,265 82 Type II Slurry $14,069 2025-26 GREENW DR_ 1701 GREENWAY DRIVE TUSTIN RANCH RD LA COLINA DR LOCAL E AC 2_ 5 1,047 37 38,739 88 Type 11 Slurry $17,433 2025-26 HERITA WY 1712 HERITAGE WAY TUSTIN RANCH RD _ MYFORD RD LOCAL I AC 2 5 1,770 36 63,720 84 Type II Slurry $28,674 2025-26 HERITA WY 1713 HERITAGE WAY MYFORD RD BRYAN AV LOCAL I AC 2 5 1,671 36 60,156 87 Type II Slurry $27,070 2025-26 KELLER DR 1724 KELLER DRIVE ROBINSON DR JAMBOREE RD LOCAL E AC 2 5 1,455 37 53,835 82 Type II Slurry $24,226 2025-26 KINSMA Cl 1731 KINSMAN CIRCLE TUSTIN RANCH RD SE CUL DE SAC LOCAL E AC 2 5 397 37 16,753 93 Stop Gap $670 2025-26 LA COL DR 1142 LA COUNA DRIVE TUSTIN RANCH RD 770 FTN/O TUSTIN RANCH RD LOCAL I AC 1 5 770 15 11,550 97 Stop Gap $462 2025-26 LA COL DR 1143 LA COLINA DRIVE 770 FT N/O TUSTIN RANCH RD TUSTIN RANCH RD LOCAL I AC 1 5 770 15 11,550 96 Stop Gap $462 2025-26 LA COL DR 1144 LA COUNA DRIVE TUSTIN RANCH RD _ GREENWAY DR LOCAL I AC_ 2 5 1,267 37 46,879 91 Type 11 Slurry $21,096 2025-26 LAGIE WY 1734 LAGIER WAV TUSTIN RANCH RD HERITAGE WY LOCAL I AC 2 5 1,055 37 39,035 85 Type 11 Slurry $17,566 2025-26 LARACA ST 1741 LARACA STREET SAN SABA ST SAN SIMON ST LOCAL E AC 2 5 205 33 6,765 100 Stop Gap $271 2025-26 MARSEL 1763 MARSELINA CONTESSA CORTINA LOCAL E AC 2 5 491 37 - 18,167 98 Stop Gap $727 2025-26 MONTER ST 1785 MONTEREY STREET TIBURON WY _ PARKCENTERLN LOCAL E AC 2 5 128 37 4,736 95 Stop Gap $189 2025-26 MYFORD RD 1794 MYFORD ROAD PRIVATE ROAD EL CAMINO REAL LOCAL E AC 2 5 282 60 16,920 73 Type II Slurry $7,614 2025-26 MYFORD RD 1795 MYFORD ROAD EL CAMINO REAL BRYAN AV LOCAL I AC 4 5 803 60 48,180 87 Type II Slurry $21,681 2025-26 MYFORD RD 1796 MYFORD ROAD BRYAN AV _ HERITAGE WY _ LOCAL C AC 5 5 1,062 60 63,720 85 Type II Slurry $28,674 2025-26 MYFORD RD 1797 MYFORD ROAD HERITAGE WY IRVINE BLVD LOCAL C AC 5 5 1,175 60 70,500 84 Type II Slurry $31,725 2025-26 PALERM 1824 PALERMO CONTESSA TUSTIN RANCH RD LOCAL E AC 2 5 605 37 22,080 98 Stop Gap $883 2025-26 PARKCE LN 1826 PARKCENTER LANE EL CAMINO REAL BRYAN AV LOCAL I AC 2 5 1,940 36 69,840 77 Type II Slurry $31,428 2025-26 PARKCE LN 1827 PARKCENTER LANE BRYAN AV TUSTIN RANCH RD _ LOCAL I AC 2 5 1,531 37 56,647 79 Type II Slurry $25,491 2025-26 PARKVI WY 1829 PARKVIEWWAY BROWNINGAV PARKCENTER LN LOCAL E AC 2 5 538 37 19,906 95 Stop Gap $796 2025-26 PATRIO WY 1835 PATRIOT WAY PIONEER RD JAMBOREE RD LOCALI AC 3 5 707 47 33,229 89 Type II Slurry $14,953 2025-26 PET CAN RD 1840 PETERS CANYON ROAD PIONEER RD ORCHARD DR LOCAL E AC 2 5 1,150 37 42,550 92 - Stop Gap $1,702 2025-26 PET CAN RD 1841 PETERS CANYON ROAD ORCHARD DR NW CUL DE SAC LOCAL E AC 2 5 1,135 37 42,495 91 Type 11 slurry $19,123 2025-26 PIONEERD 1845 PIONEER ROAD NW CUL DE SAC _ PIONEER WY LOCAL I AC 2 5 849 47 41,317 87 Type 11 Slurry $18,593 2025-26 PIONEE RD 1846 PIONEER ROAD - PIONEER WY BAXTER LOCAL I AC 3 5 1,586 47 74,542 86 Type 11 Slurry $33,544 Page 9 of 10 City of Tustin, CA Forecasted Maintenance Report - FY2019-2026 Sorted by FY, Rank, Name (A -Z) FY 2025-26 _. _. 2025-26 2025-26 r PIONEE RD PION EE RD PION EE RD S-09 - 1847 ___..__ 1848 1849 Ninn-e-- PIONEER ROAD --__ PIONEER ROAD PIONEER ROAD From BAXTER 1CARLSON CT BRAND DR TO CARLSON CT BRAND DR CASTENEDA DR _ _ MPAH . LOCAL Rank Type AC Lanes 2 •5 1,481 47 69,607 85 Type 11 Slurry $3 1,323 _ LOCAL 1 AC 2 5 1,565 45 70,425 83 Type II Slurry $31,691 LOCAL LOCAL I I AC AC 2 2 5 5 1,123 992 47 47 52,781 46,624 91 92 Type II Slurry Stop Gap $23,751 $1,865 2025-26 2025-26 PIONEE RD PIONEE RD 1850 1851 PIONEER ROAD PIONEER ROAD CASTENEDA DR CARSON DR _ CARSON DR JAMBOREE RD _._ _ _. LOCAL I AC 2 5 1,483 47 69,701 93 Stop Gap $2,788 2025-26 PIONEE WY 2005 PIONEER WAY PIONEER RD _ _ TUSTIN RANCH RD__ _ _ _ LOCAL I AC 2 5 608 32 20,896 89 Type II Slurry $9,403 2025-26 PIONEE WY 2006 PIONEER WAY TUSTIN RANCH RD PIONER RD LOCAL I AC 2 5 608 32 20,896 85 Type II Slurry $9,403 2025-26 2025-26 2025-26 PRESID PL RANCHW RD RAWLIN WY 1857 1864 1865 _ PRESIDIO PLACE RANCHWOOD ROAD RAWLINGSWAY BURNT MILL RD IRVINE BLVD NW CUL DE SAC _ _ VALLEJO DR SW CUL DE SAC TUSTIN RANCH RD _ _ LOCAL LOCAL E E AC AC AC 2 2 2 5 5 5 657 1,078 587 37 33 37 24,309 39,990 23,698 96 88 95 Stop Gap Type 11 Slurry Stop bap $972 $17,996 $948 2025-26 RN WY 1866 RAWLINGS WAY TUSTIN RANCH RD_ GALLERY WY _LOCAL LOCAL _E E AC 2 S 1,317 37 48,729 84 Type II Slurry $21,928 2025-26 ROBINS DR 1873 ROBINSON DR IRVINE BLVD JAMBOREE RD LOCAL E AC 3 5 2,831 46 130,226 89 Type II Slurry $58,602 2025-26 SAN IAC ST_ 1884 SAN 1ACINTO STREET HERITAGE WY SAN SABA ST LOCAL E AC 2 5 106 37 3,922 86 Type 11 Slurry $1,765 2025-26 SAN SAB 5T 1888 SAN SABA STREET LARACA ST SE CUL DE SAC -CDS LOCAL E AC 2 5 794 33 28,407 99 Stop Gap $1,136 2025-26 SAN SIM 1883 SAN SIMON BRAZOS LN NW LOCAL E AC 2 5 713 33 25,779 94 Stop Gap $1,031 2025-26 SARATO DR 1894 SARATOGA DRIVE BURNT MILL RD_ VALLEJO DR LOCAL E AC 2 5 632 37 23,384 96 Stop Gap $935 2025-26 SOUND 1920 SOUNDA CARRERA VENTIA LOCAL E AC 2 5 287 37 10,619 96 Stop Gap $425 2025-26 SO_NBRI 1921 SONBRIA CORTINA NW CUL DE SAC LOCAL E AC 2 5 619 37 24,882 98 Stop Gap $995 2025-26 TIBURO WY 1933 TIBURON WAY BURNTMILLRD _ SONBRIA _ LOCAL E AC 2 1 5 880 37 32,560 97 Stop Gap $1,302 2025-26 VALLEJ DR 1945 VALLEJO DRIVE PRESIDIO PL _ TIBURON WY LOCAL E AC 2 5 755 37 27,935 96 Stop Gap $1,117 2025-26 VENTIA 1950 VENTIA SOLINDA CORTINA LOCAL E AC 2 5 353 37 13,061 84 Type II Slurry $5,877 2025-26 WICKSH LN 1966 WICKSHIRE LANE SW CUL DE SAC NECULDESAC LOCAL E AC 2 5 867 33 33,027 87 Type 11 Slurry $14,862 $697,511 Page 10 of 10 City of Tustin, CA Page 13 2019 Citywide Pavement Management Plan - OCTA Submittal Final Report -June 7, 2019 XII. APPENDIX B -COMPLETE STREET LISTING CURRENT CONDITIONS City of Tustin, CA Pavement Condition Index (PCI) Report - All Streets Sorted by Rank, Name (A -Z) Branchl!) Sec ID Name MPA_H/Arterials _ From To MPAH Rank Type_ i ARMSTRONG 1528 JARMSTRONG AVE WARNER AV VALENCIA ST SECONDARY C AC 4 7 3,049 73 222,577 93 3/12/19 BARRAN PW 1279 BARRANCA PARKWAY (NB ONLY) JAMBOREE RD THE DISTRICT MAJOR A AC 4 6 936 60 56,160 89 3/22/19 BARRAN PW 1280 BARRANCA PARKWAY (NB ONLY) THE DISTRICT TUSTIN RANCH RD MAJOR A AC 4 6 1,646 60 98,760 89 3/22/19 BARRAN PW BARRAN PW 1281 1282 BARRANCA PARKWAY (NS ONLY) BARRANCA PARKWAY (NB ONLY) TUSTIN RANCH RD ';ARMSTRONG ARMSTRONG ASTON MAJOR MAJOR A AC A AC 3 3 1,346 1,487 40 40 53,840 59,480 95 89 3/11/19 3/11/19 BARRAN PW 1283_ BARRANCA PARKWAY (NB ONLY) _ ASTON REDHILLAVE MAJOR A AC 3 1,135 40 45,400 93 3/22/19 BROWNI AV 1004 BROWNING AVENUE BRYAN AV BENT TWIG LN SECONDARY C AC 2 1 5 1,475 60 88,500 81 3/5/19 BROWNI AV 1005 BROWNING AVENUE BENT TWIG LN IRVINE BLVD SECONDARY C AC 2 5 1,174 60 70,440 87 3/5/19 BROWNI AV 1328 BROWNING AVENUE EL CAMINO REAL SAN JUAN ST SECONDARY C AC 4 5 1,125 60 67,500 95 1/18/19 BROWNI AV 1329 BROWNING AVENUE SAN JUAN ST PARKVIEW WY SECONDARY C AC 4 662 60 39,720 94 1/18/19 BROWNI AV 1330 BROWNING AVENUE PARKVIEW WY BRYAN AVE SECONDARY C AC 4 659 60 39,540 95 1/18/19 _BROWNI AV 1331 BROWNING AVENUE WALNUTAVE SANDFIELD PL SECONDARY C AC 4 4 806 60 48,360 95 1/8/19 BROWN] AV 1332 BROWNING AVENUE SANDFIELD PL _ _ REN CIR SECONDARY C AC 2 780 60 46,800 91 1/8/19 BROWNI AV 1333 BROWNING AVENUE REN CIR _ NISSON RD C AC 2 922 60 55,320 92 1/8/19 BRYAN AV 1006 BRYAN AVENUE NEWPORTAV ---,---SECONDARY MAIN ST C AC 5 3 940 60 56,400 93 3/4/19 BRYAN AV 1007 BRYAN AVENUE MAIN ST _ RED HILL AV _-SECONDARY SECONDARY C AC 5 3 1,642 _ 60 98,520 92 3/4/19 BRYAN AV 1008 BRYAN AVENUE RED HILL AV _ _ FARMINGTON RD _ SECONDARY C AAC 5 3 1,469 60 88,140 59 3/22/19 BRYAN AV 1009 BRYAN AVENUE FARMINGTON RD BROWNING AV SECONDARY C AAC 5 3 1,160 60 69,600 57 3/22/19 BRYAN AV _1010 BRYAN AVENUE _ BROWNING AV TUSTIN RANCH RD PRIMARY C AC 2 5 1,875 32 61,440 85 3/4/19 BRYAN AV 1011 BRYAN AVENUE TUSTIN RANCH RD BROWNING AV PRIMARY C AC 2 5 1,875 32 62,880 95 3/4/19 BRYAN AV 1012 BRYAN AVENUE TUSTIN RANCH RD MYFORD RD PRIMARY B AC 2 5 1,709 32 57,568 95 3/4/19 BRYAN AV 1013 BRYAN AVENUE MYFORD RD TUSTIN RANCH RD PRIMARY B AC 2 5 1,709 32 59,008 95 3/4/19 BRYAN AV 1014 BRYAN AVENUE MYFORD RD _ JAMBOREE RD PRIMARY B AC 2 5 1,600 29 50,720 95 3/4/19 BRYAN AV 1015 BRYAN AVENUE JAMBOREE RD MYFORD RD PRIMARY B AC 2 5 1,600 31 52,480 95 3/4/19 EDINGE AV 1045 EDINGER AVENUE RED HILL AVE PARKWAY LOOP SMART A AAC 4 7 457 39 16,623 95 3/8/19 EDINGE AV 1046 EDINGER AVENUE PARKWAY LOOP RED HILL AVE _ SMART A AC 5 7 457 33 15,081 83 3/8/19 EDINGE AV _ 1049 EDINGER AVENUE 1273 FT W/O JAMBOREE PLAZA_ JAMBOREE PLAZA SMART A AC 3 6 1,273 41 55,073 94 3/8/19 EDINGE AV 1050 EDINGER AVENUE------- JAMBOREE PLAZA 1273 FT W/O JAMBOREE PLAZA SMART A AC 3 6 1,273 41 52,193 93 3/8/19 EDINGE AV 1051 EDINGER AVENUE JAMBOREE PLAZA BRIDGE E/JAMBOREE RD SMART A AC 3 6 1,382 41 67,930 88 3/8/19 EDINGE AV 1052 EDINGER AVENUE BRIDGE E/JAMBOREE RD JAMBOREE PLAZA SMART A AC 3 6 1,355 50 69,450 95 3/8/19 EDINGE AV 1053 EDINGER AVENUE BRIDGE E/JAMBOREE RD HARVARD AV SMART A AC 3 6 1,246 41 62,766 99 3/8/19 EDINGE AV 1054 EDINGER AVENUE HARVARD AV BRIDGE E/JAMBOREE RD SMART A AC 3 6 1,230 41 56,750 100 3/8/19 EDINGE AV 1290 EDINGER AVENUE PARKWAY LOOP KENSINGTON PARK RD SMART A AC 3 7 3,840 41 157,440 84 3/8/19 EDINGE AV 1291 EDINGER AVENUE KENSINGTON PARK RD PARK WAY LOOP SMART _ A AC 3 7 3,846 41 157,686 87 3/8/19 EDINGE AV 1292 EDINGER AVENUE KENSINGTON PARK RD 1273' w/o JAMBOREE PLAZA SMART A AC 3 7 2,437 41 99,917 79 3/8/19 EDINGE AV 1293 EDINGER AVENUE 1273' w/o JAMBOREE PLAZA KENSINGTON PARK RD SMART A AC 3 7 2,437 41 99,917 85 3/8/19 EDINGE AV 1294 EDINGER AVENUE RED HILL AVE _ AT&T SMART A AC 3 7 874 41 35,834 84 3/8/19 EDINGE AV 1295 EDINGER AVENUE AT&T RED HILL AVE_ _ SMART A AC 3 3 870 41 35,670 94 3/8/19 EDINGE AV 1296 EDINGER AVENUE AT&T DEL AMO AVE SMART A AC 3 3 848 41 34,768 90 1 3/8/19 EDINGE AV 1297 EDINGER AVENUE DEL AMO AVE AT&T SMART fi A AC 3 7 850 41 34,850 91 3/8/19 EDINGE AV 1298 EDINGER AVENUE DEL AMO AVE NEWPORTAVE SMART A AC 3 7 605 41 24,805 87 3/8/19 EDINGE AV 1299 EDINGER AVENUE NEWPORTAVE_ _ DEL AMO AVE SMART A AC 3 7 599 41 24,559 91 3/8/19 EDINGE AV 1300 EDINGER AVENUE NEWPORTAVE CITY LIMIT SMART A AC 3 7 310 41 12,710 93 3/25/19 EDINGE AV 1301 EDINGER AVENUE CITYLIMIT NEWPORTAVE SMART A AC 3 7 310 41 12,710 94 3/8/19 EL CAM REA, 1055 ELCAMINO REAL FIRST ST MAIN ST COLLECTOR C AAC 2 2 1,300 22 48,100 87 2/25/19 EL CAM REA 1056 EL CAMINO REAL MAIN ST SIXTH ST COLLECTOR C AAC_ 2 2 700 22 26,680 88 2/25/19 EL CAM REA 1057 EL CAMINO REAL_ SIXTH ST NEWPORTAV COLLECTOR C AAC 4 2 921 52 47,892 91 2/25/19 EL CAM REA 1060 EL CAMINO REAL BROWNING AV _ PARK CENTER LN SECONDARY C AC 4 S 1,434 60 86,040 94 3/5/19 EL CAM REA 1061 EL CAMINO REAL PARK CENTER LN TUSTIN RANCH RD SECONDARY C AC 4 5 1,262 60 75,720 95 3/5/19 EL CAM REA 1062 EL CAMINO REAL TUSTIN RANCH RD MYFORD RD SECONDARY C AC 4 5 1,639 60 98,340 51 3/22/19 EL CAM REA 1063 EL CAMINO REAL MYFORD RD JAMBOREE RD SECONDARY B AC 2 5 1,792 23 49,856 87 3/22/19 EL CAM REA 1064 EL CAMINO REAL JAMBOREE RD MYFORD RD SECONDARY B AC 2 5 1,792 23 48,416 90 3/22/19 EL CAM REA 1323 EL CAMINO REAL RED HILL AVE TUSTIN HIGH DRIVEWAY SECONDARY C AC 4 3 964 61 58,804 83 2/27/19 EL CAM REA 1324 EL CAMINO REAL JELCAMINCRIAL TUSTIN HIGH DRIVEWAY ORANGE ST SECONDARY C AC 4 3 1,067 61 65,087 84 3/4/19 EL CAM REA 1325 ORANGEST NEWPORT AVE SECONDARY C AC 4 3 663 61 40,443 87 3/5/19 EL CAM REA 1326 EL CAMINO REAL RED HILL AVE TUSTIN EAST DR SECONDARY C AC 3 3 1,707 36 61,452 81 3/22/19 Page 1 of 15 City of Tustin, CA Pavement Condition Index (PCI) Report - All Streets Sorted by Rank, Name (A -Z) BranchID EL CAM REA Sec ID 1327 Name EL CAMINO REAL From JUSTIN EAST DR ___ To ,BROWNING AVE MPAH SECONDARY Rank C Type AC Lanes 3 , 3 994 36 35,784 80 3/5/19 FIRST ST 1020 FIRST STREET TUSTIN AV _ HWY 55 BRIDGE W EDGE PRIMARY B AC 5 2 162 74 11,988 95_ 2/26/19 FIRST ST 1021 FIRST STREET HWY 55 BRIDGE E EDGE _ _ A ST COLLECTOR B AAC 2 2 1,430 32 54,400 75 2/26/19 FIRST ST 1022 FIRST STREET AST _ _ HWY 55 BRIDGE EEDG_E COLLECTOR B AAC 2 2 1,425 32 51,360 79 2/26/19 FIRST ST 1023 FIRST STREET AST EL CAMINO REAL COLLECTOR B AAC 2 2 1,265 32 49,120 82 2/26/19 FIRST ST 1024 FIRST STREET EL CAMINO REAL A ST COLLECTOR B AAC 2 2 1,265 32 47,680 80 2/26/19 FIRST ST 1025 FIRST STREET EL CAMINO REAL CENTENNIAL WY COLLECTOR B AAC 2 2 1,480 32 53,120 74 2/26/19 FIRST ST 1026 FIRST STREET CENTENNIAL WY EL_CAMINOREAL COLLECTOR B AAC 2 2 1,480 32 54,560 79 2/26/19 FIRSTST 1027 FIRST -STREET CENTENNIAL WY NEWPORTAV COLLECTOR B AAC 2 2 1,275 32 46,560 63 3/25/19 FIRST ST 1028 FIRST STREET NEWPORTAV CENTENNIALWY COLLECTOR B AAC 2 2 1,275 32 46,560 87 2/26/19 HARVAR AV 1079 HARVARDAVENUE OCTA/SCRRA RAILWAY _ IRVINE CENTER DR SECONDARY C AC 3 6 1,336 46 61,456 87 3/8/19 HARVAR AV 1080 HARVARDAVENUE IRVINE CENTER DR_ PASEO WESTPARK PRIMARY B AC 2 6 1,308 30 39,240 92 3/8/19 HARVAR AV 1081 HARVARDAVENUE PASEO WESTPARK 1427 FTS/O PASEO WESTPARK PRIMARY B AC 2 6 1,427 30 42,810 89 3/8/19 HOLT AV 1087 HOLT AVENUE BIGELOW PARK S EDGE 126FT N/O WARREN AV SECONDARY C AC 4 1 534 60 32,040 88 2/21/19 HOLT AV 1088 HOLTAVENUE 126FT N/O WARREN AV LUCERO WY SECONDARY C AC 4 1 662 60 39,720 91 2/21/19 HOLT AV 1089 HOLTAVENUE _ LUCERO WY IRVINE BLVD SECONDARY C AC 4 1 1,360 60 81,600 91 2/21/19 HOLT AV 1090 HOLTAVENUE _ IRVINE BLVD _ NEWPORTAV SECONDARY C AC 4 2 700 60 42,000 78 2/21/19 IRVINE BLV 1091 IRVINE BLVD HWY 55 BRIDGE E EDGE YORBA ST MAJOR A AC 3 1 489 34 19,506 82 2/21/19 IRVINE BLV _1092 IRVINE BLVD YORBA ST _ _ HWY 55 BRIDGE E EDGE MAJOR A AC 3 1 489 33 17,577 78 2/21/19 IRVINE BLV 1093 IRVINE BLVD YORBA ST B ST MAJOR A AC 3 1 1,340 34 49,880 69 _ 2/25/19 IRVINEBLV 1094 IRVINE BLVD BST _ YORBAST MAJOR_ A AC 3 1 1,340 33 48,540 74 _ 2/21/19 IRVINEBLV 1095 IRVINE BLVD BST PROSPECT AV MAJOR A AC 3 1 1,045 33 37,365 80 2/25/19 IRVINE BLV 1096 IRVINE BLVD PROSPECT AV BST MAJOR A AC 3 1 1,045 33 37,365 71 2/21/19 IRVINE BLV 1097 IRVINE BLVD _ FASHION LN _ PROSPECT AVE A AC 3 1 1,609 57,417 88 2/21/19 IRVINE BLV 1098 IRVINE BLVD PROSPECT AVE _ __-MAJOR FASHION LN MAJOR A AC 3 1 1,609 _33 33 55,977 89 2/21/19 IRVINE BLV 1099 IRVINE BLVD FASHION LN HOLT AV MAJOR A AAC 3 1 859 32 30,368 89 2/21/19 IRVINE BLV 1100 IRVINE BLVD HOLTAV FASHION LN MAJOR A AAC 3 1 859 32 31,808 90 2/21/19 IRVINE BLV 1101 IRVINE BLVD_ HOLTAV_ NEWPORTAV MAJOR A AAC 2 1 729 31 25,479 86 2/21/19 IRVINE BLV 1102 IRVINE BLVD NEWPORTAV HOLT AV MAJOR A AAC 2 1 729 41 31,329 84 2/21/19 IRVINE BLV 1103 IRVINE BLVD NEWPORTAV 108FT E/O ELIZABETH WAY MAJOR A AAC 3 3 975 42 40,140 82 2/21/19 IRVINE BLV 1104 IRVINE BLVD 108FT E/O ELIZABETH WAY RED HILL DR MAJOR A AAC 3 3 1,675 40 67,000 87 2/21/19 IRVINE BLV 1105 IRVINE BLVD BROWNING AV RANCHWOOD RD MAJOR A AC 6 5 500 40 20,000 85 3/25/19 IRVINE BLV 1106 IRVINE BLVD RANCHWOOD RD TUSTIN RANCH RD_ MAJOR A AAC 3 5 820 34 32,200 91 3/5/19 IRVINE BLV 1107 IRVINE BLVD TUSTIN RANCH RD _ RANCHWOOD RD MAJOR A AAC 3 5 710 40 31,280 91 3/5/19 IRVINE BLV 1108 IRVINE BLVD TUSTIN RANCH RD ROBINSON DR MAJOR A AAC 3 5 1,527 34 56,238 90 3/5/19 IRVINE BLV 1109 IRVINE BLVD ROBINSON DR TUSTIN RANCH RD MAJOR A AAC 3 5 1,527 41 64,047 91 3/5/19 IRVINE BLV 1110 IRVINE BLVD ROBINSON DR JAMBOREE RD MAJOR A AAC 3 5 1,827 42 81,054 91 3/4/19 IRVINE BLV 1111 IRVINE BLVD JAMBOREE RD _ ROBINSON DR MAJOR A AAC 3 5 1,827 42 78,174 91 3/4/19 IRVINE BLV 1112 IRVINE BLVD 108Ff E/O ELIZABETH WAY NEWPORTAV MAJOR A AAC 3 3 980 42 48,930 75 2/26/19 IRVINE BLV 1113 IRVINE BLVD _ RED HILL DR 108FF E/O ELIZABETH WAY MAJOR A AAC 3 3 1,667 40 66,680 72 3/25/19 JAMBOR RD 1114 JAMBOREE ROAD BARRANCA PKWY CITY LIMIT (1250 FT SE/O WARNER AV) PRINCIPAL A AC 4 6 1,810 71 128,510 80 3/12/19 JAMBOR RD 1115 JAMBOREE ROAD CITY LIMIT (1250 FT SE/O WARNER AV) BARRANCA PKWY PRINCIPAL A AC 4 6 1,810 65 120,530 80 3/12/19 JAMBOR RD 1116 JAMBOREE ROAD CITY LIMIT (920FT NW/O WARNER AV) CITY LIMIT (1160FT NW/O EDINGER AV) MAJOR A AC 4 6 4,990 54 269,460 71 3/22/19 JAMBOR RD 1117 JAMBOREE ROAD CITY LIMIT (1160FT NW/O EDINGER AV) CITY LIMIT (920FT NW/0 WARNER AV) MAJOR A AC 4 6 4,990 54 269,460 62 3/22/19 JAMBOR RD 1118 JAMBOREE ROAD HWY 5 OFFRAMP BRYAN AV MAJOR A AAC 4 5 1,937 54 108,918 83 1/15/19 JAMBOR RD 1119 JAMBOREE ROAD BRYAN AV HWY 5 NB OFFRAMP MAJOR A AAC 4 5 1,937 54 108,918 84 1/15/19 JAMBOR RD 1122 JAMBOREE ROAD IRVINE BLVD ROBINSON DR_ MAJOR A AAC 3 5 1,916 41 79,996 78 1/15/19 JAMBOR RD 1123 JAMBOREE ROAD ROBINSON DR _ IRVINE BLVD MAJOR A AAC 3 5 1,916 40 79,520 85 3/5/19 JAMBOR RD 1124 JAMBOREE ROAD ROBINSON DR DR MAJOR A AAC 3 5 1,499 41 62,899 84 3/22/19 JAMBOR RD 1125 JAMBOREE ROAD TREVINO DR _TREVINO ROBINSON DR MAJOR A AAC 3 5 1,499 40 61,400 93 1/15/19 JAMBOR RD 1126 JAMBOREE ROAD TREVINO DR CHAMPION WY MAJOR A AAC 3 5 1,928 41 80,488 86 1/15/19 JAMBOR RD 1127 JAMBOREE ROAD_ CHAMPION WY TREVINO DR MAJOR A AAC 3 5 1,928 41 80,488 94 1/15/19 JAMBOR RD 1128 JAMBOREE ROAD CHAMPION WY PORTOLA PKWY MAJOR A AAC 3 5 1,580 41 66,220 82 1/15/19 JAMBOR RD 1129 JAMBOREE ROAD _ PORTOLA PKWY CHAMPION WY MAJOR A AAC 3 5 1,580 41 66,220 80 1/15/19 JAMBOR RD 1130 JAMBOREE ROAD PORTOLA PKWY TUSTIN RANCH RD MAJOR A AAC 3 5 1,758 40 71,760 94 1/15/19 JAMBOR RD 1131 JAMBOREE ROAD TUSTIN RANCH RD PORTOLA PKWY MAJOR A AAC 3 5 1,758 40 71,760 95 1/15/19 JAMBOR RD 1132 JAMBOREE ROAD ITUSTIN RANCH RD 3347 F'f S/O PATRIOT WY ! MAJOR A AAC 2 5 1,329 32 42,528 91 1/15/19 Page 2 of 15 City of Tustin, CA Pavement Condition Index (PCI) Report - All Streets Sorted by Rank, Name (A -Z) BranchlD JAMBOR RD Sec ID 1133 Name _JAMBOREE ROAD From 3347 FT S/O PATRIOT WY To TUSTIN RANCH RD MPAH MAIOR Rank A Type Lanes Zone S L 1,329 W 32 Area 45,408 PCI 86 Insp. Date 1/15/19 JAMBOR RD 1134 JAMBOREE ROAD 3347 FT S/O PATRIOT WY 1909 FT S/O PATRIOT WY MAJOR A 51,438 32 46,016 94 1/15/19 JAMBORRD 1135 JAMBOREE ROAD 1909 FT S/O PATRIOT WY 3347 FT 5/0 PATRIOT WY MAIOR A 5 1,438 32 46,016 94 1/15/19 JAMBOR RD 1136 JAMBOREE ROAD 1909 FT S/O PATRIOT WY PATRIOT WY MAIOR A 4AA 5 1,909 32 62,528 95 1/15/19 JAMBOR RD 1137 JAMBOREE ROAD PATRIOT WY 1909 FT S/O PATRIOT WY MAJOR A 5 1,909 32 61,088 82 1/15/19 JAMBOR RD 1138 JAMBOREE ROAD PATRIOT WY PIONEER RD _ MAIOR A 5 3,344 32 108,448_ 87 1/15/19 JAMBOR RD 1139 JAMBOREE ROAO PIONEER RD _ PATRIOT WY MAJOR A 5 3,344 32 107,008 95 1/15/19 JAMBOR RD 1140 JAMBOREE ROAD - _PIONEER RD _ N TUSTIN CL MAJOR A AC 2 5 1,915 32 61,280 95 1/15/19 JAMBOR RD 1141 JAMBOREE ROAD N TUSTIN CL PIONEER RD MAJOR A AC 2 5 1,982 32 63,424 95 1/15/19 JAMBOR RD JAMBOR RD 1334 1335 JAMBOREE ROAD JAMBOREE ROAD BRYAN AVE TUSTIN RANCH PLAZA_ TUSTIN RANCH PLAZA BRYAN AVE MAJOR MAIOR A A AAC AC 4 - 4 5 1,259 1,247 53 53 66,727 66,091 72 76 3/22/19 2/21/19 JAMBOR RD 1336_ JAMBOREE ROAD _ ---TUSTIN RANCH PLAZA IRVINE BLVD MAJOR A AC 4 882 53 46,746 79 1/15/19 JAMBOR RD 1337_ JAMBOREE ROAD _ IRVINE BLVD TUSTIN RANCH PLAZA MAJOR A AAC 4 5 889 53 47,117 68 3/22/19 MAIN 5T 1031 MAIN ST ELK LN E EDGE WILLIAMSST _ COLLECTOR B AC 3 2 1,283 60 76,980 88 2/27/19 MAIN ST 1032 MAIN ST WILLIAMS ST STONE GLASS COLLECTOR B AAC 1 2 1,105 18 19,890 1 95 2/27/19 MAIN 5T 1033 MAIN ST STONE GLASS WILLIAMSSTCOLLECTOR B AC 1 2 1,105 17 18,785 95 2/27/19 MAIN ST 1034MAIN ST _ STONE GLASS _ HWY 55 BRIDGE W EDGE COLLECTOR B AAC 3 2 396 40 17,280 93 2/27/19 _MAIN ST 1035 MAIN ST HWY 55 BRIDGE E EDGE PACIFIC AV WEST COLLECTOR B AC 3 2 1,121 56 62,776 88 2/27/19 MAIN ST 1036_ MAIN ST PACIFIC AV WEST AST _ COLLECTOR BAC 3 2 741 50 37,050 94 2/27/19 MAIN ST 1037 MAIN 5T _ A ST C ST COLLECTOR B AC 3 2 729 52 37,908 94 2/27/19 MAIN ST 1038 MAIN ST C ST _ EL CAMINO REAL COLLECTOR B AC 3 2 378 52 19,656 91 2/25/19 MAIN ST 1039 MAIN ST EL CAMINO REAL _ PROSPECT AV _ COLLECTOR B AC 3 2 369 52 19,188 79 2/25/19 MAIN ST 1040MAIN ST _ PROSPECT AV PREBLE DR COLLECTOR B AC 3 2 517 62 32,054 86 2/25/19 MAIN ST 1041 MAIN ST _ PREBLE DR NEWPORT AVCOLLECTOR B AC S 2 787 70 _ 55,090 88 2/25/19 MAIN ST 1042 MAIN ST NEWPORTAV BRYAN AV SECONDARY B AC 4 _ 3 1,197 60 71,820 90 3/4/19 McFADDAV 1000 McFADDEN AVENUE HWY 55 BRIDGE E EDGE PASADENA AV PRIMARY B AC 5 2 445 60 26,700 95 3/25/19 McFADDAV 1145 McFADDEN AVENUE MANTLE LN _ _ WILLIAMSST PRIMARY B AC 5 2 932 60 55,920 1 95 2/27/19 McFADDAV 1146 McFADDEN AVENUE WILLIAMSST VILLAGE WY PRIMARY AC 5 2 1,08360 64,980 93 2/27/19 McFADDAV 1147 MCFADDEN AVENUE VILLAGE WY HWY 55 BRIDGE W EDGE PRIMARY _B B AC 5 2 462 65 30,030 95 2/27/19 McFADDAV 1148 McFADDEN AVENUE PASADENA AV MYRTLE AV PRIMARY B AC 5 2 355 60 21,300 52 3/25/19 MCFADD AV 1149 McFADDEN AVENUE MYRTLE AV NEWPOR_TAV PRIMARY B AC 5 2 11259 60 75,540 75 3/25/19 NEWPORAV 1158 NEWPORTAVENUE- CITY LIMITS 118 FT N/O WINDSOR LN_ WASS ST PRIMARY B AC 2 1 1,792 40 71,680 84 2/21/19 NEWPORAV 1159NEWPORTAVENUE WASS ST IRVINE BLVD PRIMARY B AAC 3 1 1,110 37 50,165 _ 62 3/25/19 NEWPORAV 1160 NEWPORTAVENUE FIRST ST BRYAN AV PRIMARY B AC 3 2 830 40 32,030 82 2/27/19 NEWPORAV _1162 NEWPORTAVENUE NISSON RD MCFADDEN AVE MAJOR A AC 3 4 1,360 40 52,000 73 2/25/19 NEWPORAV 1163 NEWPORTAVENUE MCFADDEN AV WALNUTAV MAJOR A AAC 3 4 562 40 22,480 79 2/25/19 NEWPOR AV 1164 NEWPORTAVENUE WALNUTAV SYCAMORE AV MAJOR A AAC 3 4 1,387 40 55,480 75 2/25/19 NEWPORAV 1165 INEWPORTAVENUE SW CUL DE SAC_ SYCAMORE AV MAJOR E AC 3 4 1,193 79 96,189 70 2/25/19 NEWPOR AV 1166 NEWPORTAVENUE SYCAMORE AV WALNUT AV MAJOR A AAC 3 4 1,360 40 56,000 85 2/25/19 NEWPORAV 1167 NEWPORT AVENUE WALNUTAV MCFADDEN AV MAJOR A AAC 3 1 4 620 40 24,800 89 3/25/19 NEWPORAV 1168 NEWPORTAVENUE MCFADDEN AV NISSON RD _ MAJOR A AC 3 4 1,363 40 50,900 71 2/25/19 NEWPORAV 1170 NEWPORTAVENUE 15 NORTH ON RAMP EL CAMINO REAL PRIMARY A AAC 2 3 320 33 10,560 54 3/22/19 NEWPORAV 1171 NEWPORTAVENUE EL CAMINO REAL 15 NORTH ON RAMP PRIMARY A .AAC 3 3 320 33 10,560 66 2/27/19 NEWPORAV 1172 NEWPORTAVENUE ELCAMINOREAL_ SANJUANST PRIMARY B AC 2 2 1,359 33 49,167 74 3/22/19 NEWPORAV 1173 NEWPORTAVENUE SAN JUAN ST EL CAMINO REAL PRIMARY B AC 2 2 1,359 33 50,607 74 2/27/19 NEWPORAV 1174 NEWPORTAVENUE SAN JUAN ST BRYAN AV PRIMARY B 'AC 2 2 1,326 33 45,198 75 2/27/19 NEWPORAV 1175 NEWPORTAVENUE BRYAN AV SAN JUAN AV PRIMARY B AC 2 2 1,326 33 49,518 81 2/27/19 NEWPORAV 1176 NEWPORTAVENUE BRYAN AV FIRST AV PRIMARY B AC 3 2 830 40 31,740 79 2/27/19 NEWPOR AV _ 1177 NEWPORTAVENUE FIRST ST IRVINE BLVD PRIMARY B .AAC 2 2 1,338 32 45,696 85 2/26/19 NEWPORAV 1178 NEWPORT AVENUE IRVINE BLVD FIRST -ST _ _ PRIMARY 8 AAC 2 2 1,338 32 48,576 79 2/26/19 NEWPORAV 1179 NEWPORT AVENUE IRVINE BLVD WASS ST PRIMARY 8 AAC 3 1 1,071 37 42,600 80 3/25/19 NEWPOR AV 1180 NEWPORTAVENUE _ WASS ST _ CITY LIMITS 118 FT N/0 WINDSOR LN PRIMARY B AC 2 1 1,800 40 72,000 83 2/25/19 NEWPORAV 1181 NEWPORTAVENUE VALENCIA AVE DEL AMO AVEMAJOR A AC - 6 4 1,027 85 87,295 85 3/8/19 NEWPORAV 1182 NEWPORTAVENUE _ DEL AMO AVE EDINGER AVE MAJOR A AC 6 4 1,243 101 125,543 89 3/8/19 OL IR BLVD 2011 OLD IRVINE BOULEVARD NEWPORTAV _ _ IRVINE BLVD SECONDARY C AAC 4 3 698 60 41,880 88 2/25/19 PORTOL PKY 1183 PORTOLA PARKWAY TUSTIN RANCH RD JAMBOREE RD PRIMARY B AC 2 5 1,372 32 46,784 99 1/18/19 PORTOL PKY 1184 PORT OLA PARKWAY _ JAMBOREE RD TUSTIN RANCH RD PRIMARY B AC 2 5 1,372 32 46,784 98 1/18/19 Page 3 of 15 City of Tustin, CA Pavement Condition Index (PCI) Report - All Streets Sorted by Rank, Name (A -Z) BranchID PROSPE AV Sec ID 1153 Name PROSPECT AVENUE From FIRST ST To IRVINE BLVD MPAH SECONDARY '_ Rank A Type AC Lanes 4 • ne 2 L 963 W 53 Area 51,039 PCI 88 Insp. Date 2/25/19 PROSPE AV 1154 PROSPECT AVENUE IRVINE BLVD _ SHERBROOK DR _ SECONDARY A AAC 4 1 1,411 60 84,660 74 2/21/19 PROSPE AV 1155 PROSPECT AVENUE SHERBROOK DR _ BIGELOW PARK SECONDARY A AAC 4 1 1,206 60 72,360 84 2/21/19 PROSPE AV 1156 PROSPECT AVENUE _ BIGELOW PARK _ - _ SEVENTEENTH ST SECONDARY A AAC 4 1 1,488 60 89,280 85 2/21/19 PROSPE AV 1157 PROSPECT AVENUE SEVENTEENTH ST 165 FT N/0 ANGLIN LN SECONDARY A AC 3 1 1,277 60 76,620 83 2/26/19 RED HIL AV 1187 RED HILL AVENUE MITCHELLAV WALNUT AV A AC 3 4 1,326 40 53,040 70 1/9/19 RED HIL AV 1188 RED HILL AVENUE EDINGER AV SYCAMORE AV _MAJOR MAJOR A AC 3 4 1,717 33 59,541 70 1/9/19 RED HIL AV 1189 _ RED HILL AVENUE SYCAMOREAV EDINGER AV MAJOR A AC 2 4 1,717 33 60,981 61 3/8/19 RED HIL AV 1190 RED HILL AVENUE WALNUT AVE SYCAMORE AVE MAJOR A AC 2 4 1,334 33 46,902 81 3/8/19 RED HIL AV 1191 RED HILL AVENUE SYCAMORE AV WALNUTAVE MAJOR A AC 3 4 1,334 33 48,342 63 3/22/19 RED HIL AV 1192 RED HILL AVENUE WALNUT AV_ _ MITCHELL AV MAJOR A AC 3 4 1,326 40 55,920 70 1/9/19 RED HIL AV 1193 RED HILL AVENUE NISSON RD MITCHELL AV MAJOR A AAC 4 4 956 40 38,240 69 3/8/19 RED HIL AV 1194 RED HILL AVENUE MITCHELLAV NISSON RD MAJOR A AC 3 4 956 40 38,240 82 3/22/19 RED HILAV 1195 RED HILLAVENUE NISSON RD EL CAMINO REAL MAJOR A AAC 4 4 813 46 37,398 70 3/8/19 RED HILAV 1196 RED HILLAVENUE EL CAMINO REAL NISSON RD MAJOR A AC 4 4 813 46 37,398 62 3/22/19 RED HILAV 1197 RED HILL AVENUE EL CAMINO REAL SAN JUAN ST MAJOR A AAC 4 3 981 40 39,240 59 3/4/19 RED HILAV 1198 RED HILLAVENUE SAN JUAN ST EL CAMINO REAL MAJOR A AC 3 3 981 40 39,240 55 3/22/19 RED HILAV 1199 RED H I LL AVEN U E SAN JUAN ST BRYAN AV MAJOR A AAC 2 3 1,316 40 52,040 75 3/4/19 RED HIL AV 1200 RED HILLAVENUE _ BRYAN AVE SAN JUAN ST MAJOR A AC 2 3 1,316 40 52,040 71 3/22/19 RED HIL AV 1201 RED HILL AVENUE KALUA LN BRYAN LN PRIMARY A AAC 2 3 806 33 29,478 53 3/22/19 RED HIL AV 1202 RED HILL AVENUE BRYAN AVE _ KALUA LN PRIMARY A AC 2 3 806 33 28,038 67 3/4/19 RED HIL AV 1203 RED HILLAVENUE MELVIN WY KALUA LN PRIMARY B AAC 3 3 1,062 40 42,480 48 3/22/19 RED HIL AV _ 1204 RED HILL AVENUE _ KALUA LN MELVIN WY PRIMARY B AC 2 _ 3 1,062 40 42,480 82 3/4/19 RED HIL AV 1205 RED HILLAVENUE IRVINE BLVD _ MELVIN WY PRIMARY B AAC 3 3 794 33 26,202 81 3/4/19 RED HIL AV 1206 RED HILL AVENUE MELVIN WY IRVINE BLVD PRIMARY B AC 2 3 794 33 26,202 79 3/4/19 RED HIL AV RED HIL AV RED HIL AV RED HILAV 1284 1285 1286 1287 RED HILLAVENUE RED HILLAVENUE RED HILLAVENUE RED HILLAVENUE BARRANCA PKWV CARNEGIEAVE WARNER AVE BELL AVE_ CARNEGIEAVE WARNER AVE BELL AVE VALENCIAAVE MAJOR MAJOR MAJOR MAJOR A A A A AC AC AC AC 4 4 4 4 3 7 1,325 1,330 1,320 1,320 52 64 52 52 76,030 91,190 76,383 80,656 99 97 99 99 3/8/19 3/8/19 3/8/19 3/8/19 RED HIL AV 1288 RED HILL AVENUE VALENCIA AV INDUSTRIAL MAJOR A AC 4 7 1,480 45 74,817 100 1/9/19 RED HIL AV RED HIL AV RED HIL AV 1289 2022 2023 RED HILLAVENUE RED HILLAVENUE RED HILLAVENUE INDUSTRIAL EDINGER AVE INDUSTRIAL EDINGER AVE INDUSTRIAL AV MAJOR MAJOR MAJOR A A A AC AC AC 4 3 3 7 7 7 675 670 1,480 44 36 32 41,970 28,260 55,046 100 100 100 1/9/19 1/9/19 1/9/19 REDHILAV 2024 RED HILLAVENUE_ ------VALENCIA VALENCIA BELL AVE MAJOR A AC 3 7 1,320 36 57,800 99 3/8/19 RED HIL AV 2025 _ RED HILLAVENUE -AVE BELLAVE WARNER AVE _ MAJOR A AC 3 1,320 33 52,465 99 3/8/19 RED HIL AV 2026 RED HILLAVENUE WARNERAVE CARNEGIE AVE _ MAJOR A AC 3 1,330 32 54,682 99 3/8/19 RED HIL AV 2027 RED HILLAVENUE CARNEGIE AVE DYER RD MAJOR A AC 3 3 1,325 38 67,666 99 3/8/19 SEVENT ST 1208 SEVENTEENTH STREET HWY 55 BRIDGE E EDGE YORBA ST SOUTH MAJOR A AC 3 1 468 44 20,592 75 2/26/19 SEVENT ST 1209 SEVENTEENTH STREET YORBA ST SOUTH HWY 55 BRIDGE E EDGE MAJOR A AC 3 1 468 44 22,032 69 3/25/19 SEVENTST SEVENTST 1210 1211 _ SEVENTEENTH STREET SEVENTEENTH STREET YORBA ST SOUTH YORBA ST NORTH YORBA ST NORTH YORBA ST SOUTH MAJOR MAJOR A A AAC 1 AAC 3 3 1 1 628 628 41 32 27,188 21,536 83 89 2/26/19 2/26/19 SEVENTST 1212 SEVENTEENTH STREET YORBA ST NORTH TREEHAVEN DR MAJOR A AAC 3 1 730 40 30,640 92 2/26/19 SEVENTST 1213 SEVENTEENTH STREET TREEHAVEN DR YORBA ST NORTH MAJOR A AAC 3 1 730 32 26,240 87 2/26/19 SEVENTST 1214 SEVENTEENTH STREET TREEHAVEN DR _ PROSPECT AV SOUTH MAJOR A AAC 3 1 682 40 28,720 94 2/26/19 SEVENTST 1215 SEVENTEENTH STREET PROSPECT AV SOUTH TREEHAVEN DR MAJOR A AAC 3 1 '682 42 31,524 87 2/26/19 SEVENT ST 1216 SEVENTEENTH STREET PROSPECT AV SOUTH _ PROSPECT AV NORTH MAJOR A AC 2 1 563 33 20,019 93 2/26/19 SEVENTST 1217 SEVENTEENTH STREET PROSPECT AV NORTH PROSPECT AV SOUTH MAJOR A AC 2 1 '563 32 19,456 85 2/26/19 SYCAMO AV 1218 SYCAMORE AVENUE PASADENA AVE NEWPORTAV SECONDARY C AC 2 2 455 24 10,920 70 .2/25/19 SYCAMO AV 1219 SYCAMORE AVENUE NEWPORTAV PASADENA AVE SECONDARY C AC 2 2 466 24 11,184 64- 2/25/19 SYCAMO AV 1220 SYCAMORE AVENUE NEWPORTAV SCHOOLLN SECONDARY C AAC 2 4 1,295 37 47,915 93 1/9/19 SYCAMO AV 1221 SYCAMORE AVENUE SCHOOL LN RED HILL AV SECONDARY C AC 2 4 1,256 48 60,288 91 1/9/19 TUS AV,N 2100 TUSTIN AVENUE, NORTH FIRST ST 205 FT N/O FIRST ST PRIMARY B AAC 6 2 205 80 16,400 79 3/25/19 TUS RAN RD 1226 TUSTIN RANCH ROAD WALNUT AVE HWY 5 BRIDGE S EDGE MAJOR A AAC 3 . 6 2,845 39 110,955 86 3/12/19 TUS RAN RD 1227 TUSTIN RANCH ROAD HWY 5 BRIDGE 5 EDGE WALNUT AVE MAJOR A AAC 3 6 2,830 41 118,910 86 3/12/19 TUS RAN RD 1228 TUSTIN RANCH ROAD HWYBRIDGE N EDGE AUTO CENTER DR MAJOR A AAC 3 5 824 41 35,224 94 1/8/19 TUS RAN RD 1229 TUSTIN RANCH ROAD _5 AUTO CENTER DR _ HWY 5 BRIDGE N EDGE MAJOR A AAC 3 5 824 43 35,432 93 1/8/19 TUS RAN RD 1230 TUSTIN RANCH ROAD AUTO CENTER DR EL CAMINO REAL MAJOR A AAC 3 5 712 41 30,632 78 3/5/19 Page 4 of 15 City of Tustin, CA Pavement Condition index (PCI) Report - All streets Sorted by Rank, Name (A -Z) BranchlD TUS RAN RD Sec ID 1231 Name 'TUSTIN RANCH ROAD From EL CAMINO REAL To AUTO CENTER DR MPAH MAJOR Rank A Type AAC Lanes 3 Zone 5 L 712 W 41 Area 30,632 PCI 85 Insp.Date 3/5/19 TUS RAN RD _1232 TUSTIN RANCH ROAD EL CAMINO REAL BRYAN AV MAJOR A AAC 3 5 801 41 34,281 78 3/5/19 TUS RAN RD 1233 TUSTIN RANCH ROAD BRYAN AV _ EL CAMINO REAL _ MAJOR A AAC _ 3 5 _ 801 41 34,281 92 3/5/19 TUS RAN RD 1234 TUSTIN RANCH ROAD BRYAN AV PARKCENTER LN MAJOR A AC 3 5 1,327 41 55,847 94 1/18/19 TUS RAN RD 1235 TUSTIN RANCH ROAD PARKCENTER LN _ BRYAN AV MAJOR A AC 3 5 1,327 41 54,407 94 1/18/19 TUS RAN RD 1236 TUSTIN RANCH ROAD _ PARKCENTER LN _ IRVINE BLVD MAJOR A AC 3 S 1,385 41 59,665 93 1/18/19 TUS RAN RD 1237 TUSTIN RANCH ROAD IRVINE BLVD _ _ PARKCENTER LN MAJOR A AC 3 5 1,385 41 59,665 91 1/18/19 TUS RAN RD 1238 TUSTIN RANCH ROAD IRVINE BLVD ADAMS DR _ MAJOR A AC 3 5 1,288 41 54,248 95 1/18/19 TUS RAN RD 1239 TUSTIN RANCH ROAD ADAMS DR IRVINE BLVD MAJOR A AC 3 5 1,288 41 54,248 85 3/25/19 TUS RAN RD 1240 TUSTIN RANCH ROAD ADAMS DR LA COLINA DR MAJOR A AC 3 S 956 41 40,636 89 1/18/19 TUS RAN RD 1241 TUSTIN RANCH ROAD LA COLINA DR ADAMS DR MAJOR A AC 3 5 956 41 40,636 81 1/18/19 TUS RAN RD 1242 TUSTIN RANCH ROAD LA COUNA DR TOWNSHIP DR MAJOR A AC 3 5 1,119 41 47,319 95 1/18/19 TUS RAN RD 1243 TUSTIN RANCH ROAD TOWNSHIP DR LA COLINA DR MAJOR A AC 3 5 1,119 40 46,200 95 1/18/19 TUS RAN RD 1244 TUSTIN RANCH ROAD TOWNSHIP DR GALLERY WY MAJOR A AC 3 5 1,071 41 45,351 94 1/18/19 TUS RAN RD 1245 TUSTIN RANCH ROAD GALLERY WY TOWNSHIP DR MAJOR A AC 3 5 1,071 40 44,280 95 1/18/19 TUS RAN RD 1246 TUSTIN RANCH ROAD GALLERY WY RAWLINGS WY MAJOR A AC 3 5 1,101 41 46,581 94 1/18/19 TUS RAN RD 1247 TUSTIN RANCH ROAD RAWLINGS WY GALLERY WY MAJOR A AC 3 5 1,101 41 46,581 94 1/18/19 TUS RAN RD 1248 TUSTIN RANCH ROAD _ RAWLINGS WY _ PORTOLA PKWY MAJOR A AC 3 5 1,774 41 74,174 95 1/18/19 TUS RAN RD 1249 TUSTIN RANCH ROAD PORTOLA PKWY RAWLINGS WY MAJOR A AC 3 _ 5 1,774 41 74,174 94 1/18/19 TUS RAN RD 1250 TUSTIN RANCH ROAD PORTOLA PKWY JAMBOREE RD MAJOR A AC 3 5 1,970 41 90,948 95 1/18/19 TUS RAN RD 1251 TUSTIN RANCH ROAD JAMBOREE RD PORTOLA PKWY MAJOR A AC 3 5 2,020 41 85,700 94 1/18/19 TUS RAN RD 1313 TUSTIN RANCH ROAD BARRANCA PKWY_ _ PARK AVE MAJOR A AC 3 5 1,540 46 70,840 95 3/11/19 TUS RAN RD 1314 TUSTIN RANCH ROAD PARK AVE BARRANCA PKWY MAJOR A AC 3 6 1,580 46 72,680 95 3/11/19 TUS RAN RD 1315 TUSTIN RANCH ROAD PARK AVE _ _ BREAK IN CENTER MEDIAN MAJOR AC 3 5 1,010 51 51,510 88 3/11/19 TUS RAN RD 1316 TUSTIN RANCH ROAD BREAK IN CENTER MEDIAN WARNER AVE _ MAJOR _A A AC 3 6 1,084 51 55,284 84 _ 3/11/19 TUS RAN RD 1317 TUSTIN RANCH ROAD WARNER AVE BREAK IN CENTER MEDIAN_ MAJOR A AC 3 6 1,076 51 54,876 85 3/11/19 TUS RAN RD 1318 TUSTIN RANCH ROAD BREAK IN CENTER MEDIAN PARK AVE MAJOR A AC 3 6 1,012 51 51,612 81 3/11/19 TUS RAN RD 5003 TUSTIN RANCH ROAD WALNUTAVE EDINGER AVE BRIDGE_ MAJOR A AC 2 6 2,397 40 95,880 93 3/11/19 TUS RAN RD 5004 TUSTIN RANCH ROAD EDINGER AVE BRIDGE VALENCIAAVE MAJOR A AC 2 6 1,557 40 62,280 94 3/11/19 TUS RAN RD 5005 TUSTIN RANCH ROAD _ VALENCIA AVE WARNER AVE MAJOR A AC 2 6 3,558 40 142,320 85 3/11/19 [TEUSRAN RD 5006 TUSTIN RANCH ROAD WARNERAVE VALENCIA AV MAJOR A AC 2 6 3,596 40 143,840 93 3/12/19 RD 5007 TUSTIN RANCH ROAD VALENCIA AV EDINGER AVE BRIDGE MAJOR A AC 3 6 1,559 40 62,360 95 3/11/19 TUS RAN RD 5008 TUSTIN RANCH ROAD _ EDINGER AVE BRIDGE WALNUT AVE MAJOR A AC 3 6 2,389 40 95,560 95 3/11/19 VALENCAVE 1255 VALENCIAAVENUE ARMSTRONG AVE _ COLUMBUS SQUARE ST SECONDARY C AC 4 7 1,260 72 90,720 95 3/12/19 VALENC AVE 1256 VALENCIAAVENUE COLUMBUS SQUAREST KENSINGTON PARK RD SECONDARY C AC 4 7 1,288 73 94,024 95 3/12/19 VALENCAVE 1257 VALENCIAAVENUE RED HILL AVE NEWPORTAVE SECONDARY B AC 4 _ 7 1,660 60 99,600 88 3/8/19 VALENC AVE 1319 VALENCIAAVENUE RED HILL AVE LANSDOWNERD _ SECONDARY C AC 2 7 420 28 14,275 81 3/12/19 VALENC AVE 1320 VALENCIAAVENUE _ LANSDOWNE RD RED HILL AVE _ SECONDARY C AC 2 7 430 _ 21,395 79 3/12/19 VALENC AVE 1321 VALENCIAAVENUE LANSDOWNE RD ARMSTRONG AVE SECONDARY C AC 2 7 1,668 _32 32 53,376 -92 3/12/19 VALENC AVE 1322 VALENCIAAVENUE _ ARMSTRONG AVE LANSDOWNE RD SECONDARY C AC 2 7 1,660 32 53,120 90 3/12/19 VALENC AVE 5001 VALENCIAAVENUE NEWPORTAVE END _ SECONDARY C AC 2 7 859 60 51,540 85 3/8/19 VALENC AVE 5002 VALENCIAAVENUE KENSIGNTON PARK DR TUSTIN RANCH RD SECONDARY C AC 4 7 816 72 58,752 87 3/12/19 WALNUTAV 1258 WALNUTAVENUE MCFADDEN AV NEWPORT_A_V_ PRIMARY I AC 4 4 538 60 32,280 94 2/25/19 WALNUTAV 1259 WALNUTAVENUE NEWPORT AV ATHERTON LN PRIMARY I AC 4 4 1,523 60 91,380 74 _ 2/27/19 WALNUTAV 1260 WALNUTAVENUE ATHERTON LN RED HILL AV I AC 4 4 1,123 60 67,380 68 1/9/19 WALNUTAV 1302 WALNUTAVENUE RED HILL AVE OXFORD AVE _PRIMARY PRIMARY I AAC 4 4 1,625 60 97,500 83 3/11/19 WALNUTAV 1303 WALNUTAVENUE OXFORD AVE BROWNING AVE PRIMARY A AC 4 4 959 60 57,540 82 1/9/19 WALNUTAV 1304 WALNUTAVENUE BROWNING AV _ CHERRYWOOD AVE PRIMARY I AC 4 4 1,142 65 81,430 67 1/9/19 WALNUTAV 1_305 WALNUTAVENUE CHERRYWOOD AVE _ TUSTIN RANCH RD PRIMARY I AC 2 4 1,096 32 35,072 94 1/9/19 WALNUTAV 1306 WALNUTAVENUE TUSTIN RANCH RD CHERRYWOOD AVE _ 1 PRIMARY 1 AC 2 4 1,092 32 34,944 93 1/9/19 WALNUTAV 1307 WALNUTAVENUE TUSTIN RANCH RD FRANKLIN AVE PRIMARY C AC 2 6 870 36 31,320 86 3/25/19 WALNUTAV 1308 WALNUTAVENUE FRANKLIN AVE TUSTIN RANCH RD PRIMARY C AC 2 6 871 32 27,872 84 3/25/19 WALNUTAV 1309 WALNUTAVENUE FRANKLINAVE SINCLAIRCIR PRIMARY I AC 2 6_ 1,108 32 35,456 95 3/11/19 WALNUTAV 1310 WALNUTAVENUE SINCLAIR CIR _ FRANKLIN AVE I AC 2 6 1,103 32 35,296 95 3/11/19 WALNUTAV 1311 WALNUTAVENUE _ SINCLAIR CIR MYFORD RD _ _PRIMARY PRIMARY I AC 2 6 840 32 26,880 95 3/11/19 WALNUTAV 1312 WALNUTAVENUE MYFORD RD SINCLAIR CIR PRIMARY I AC 2 6 828 36 29,808 95 3/11/19 WARNER AV 1263 WARNER AVENUE PULLMAN ST HWY 55 BRIDGE E EDGE _ MAJOR A AC 3 1 7 815 40 32,600 90 3/8/19_ Page 5 of 15 City of Tustin, CA Pavement Condition Index (PCI) Report - All Streets Sorted by Rank, Name (A -Z) BranchlD WARNER AV Sec ID 1264 Name WARNERAVENUE From PARK AVE To TUSTIN RANCH RD MPAH MAJOR Rank A Type AC Lanes 2 ne '7 L 470 W 37 Area 21,660 PCI 94 Insp. Date 3/11/19 WARNER AV 1265 WARNER AVENUE HWY 55 BRIDGE E EDGE PULLMAN 5T _ _ MAJOR A AC 3 7 815 40 31,385 60 3/25/19 WARNER AV 1266 WARNERAVENUE RED HILL AV PULLMAN ST MAJOR A AC 3 7 1,672 41 72,872 90 3/8/19 WARNER AV 1267 WARNERAVENUE PULLMAN ST RED HILL AV _ MAJOR A AC 3 7 1,672 32 57,824 75 3/25/19 WARNER AV 1268 WARNER AVENUE TUSTIN RANCH RD PARK AVE MAJOR A AC 3 7 486 47 25,930 82 3/11/19 WARNER AV 5024 WARNERAVENUE RED HILL AV ARMSTRONG AV MAJOR A AC 3 7 1,835 42 77,070 95 3/8/19 WARNER AV 5025 WARNER AVENUE ARMSTRONG AV RED HILLAV MAJOR A AC 3 7 1,835 42 77,070 95 3/12/19 WARNER AV 5026 WARNER AVENUE ARMSTRONG AV LEGACY RD MAJOR A AC 3 7 2,036 42 85,512 95 3/8/19 WARNER AV _5027 WARNER AVENUE LEGACY RD ARMSTRONG AV MAJOR A AC 3 7 2,023 42 84,966 94 3/8/19 WARNER AV 5028 WARNER AVENUE LEGACY RD TUSTIN RANCH RD MAJOR A AC 3 7 1,611 40 64,440 92 3/11/19 WARNER AV 5029 WARNER AVENUE TUSTIN RANCH RD LEGACY RD MAJOR A AC 3 7 1,631 41 66,871 92 3/11/19 YORBA ST 1272 YORBA STREET FIRST ST WEST _ IRVINE BLVD _ SECONDARY C AC 5 2 842 60 50,520 79 3/25/19 YORBAST 1273 YORBA STREET IRVINE BLVD VILLAGE DR SECONDARY C AC 4 1 1,481 60 88,860 78 2/21/19 YORBA ST 1274_ YOR_BA STREET VILLAGE DR JACARANDAAV SECONDARY C AC 4 _ 1 1,318 60 79,080 84 2/21/19 YORBA ST 1275 YORBA STREET JACARANDAAV SEVENTEENTH ST SECONDARY C AC 5 1 1,411 60 84,660 _ 85 2/21/19 YORBA ST 1276 YORBA STREET SEVENTEENTH ST _ BONNER DR SECONDARY C AC 4 1 1,166 60 69,960 90 2/26/19 YORBA ST 1277 YORBA STREET _ BONNER DR_ LAURIE LN SECONDARY C AC 4 1 419 60 25,140 87 2/26/19 YORBA ST 1278 YORBA STREET LAURIE LN _ _ LEAFWOOD LN _. SECONDARY C AC 3 1 555 40 24,800 89 2/26/19 72.3 _ 17,088,467 LOCQIS AST,N 1500 ASTREET, NORTH FIRST ST IRVINE BLVD LOCAL E AC 2 2 842 30 25,260 91 1/3/17 A ST,S 1501 A STREET, SOUTH W MAIN ST THIRD ST _ LOCAL E AC 2 2 328 39 12,792 80 1/23/17 A ST,S-_ 20 A STREET, SOUTH THIRD ST SECOND ST LOCAL E AC 2 2 330 ___F_ 35 550 89 5/23/17 A ST,S 30 ASTREET, SOUTHSECOND ST FIRST ST LOCAL E AC 2 2 512 37 18,944 72 5/23/17 ACACIA DR 1502 ACACIA DRIVE AMAGANSET WY VILLAGE DR LOCAL E AC 2 1 1 339 37 12,543 87 12/29/16 ACACIA DR 1503 ACACIA DRIVE VILLAGE DR NORWOOD PARK PL LOCAL E AC 2 1 839 37 31,043 78 12/29/16 ACACIA DR 1504 ACACIA DRIVE SEND N CUL DE SAC LOCAL E AC 2 1 _ 614 36 26,588 57 1/3/17 ADAMS DR 1505 ADAMS DRIVE TUSTIN RANCH RD NW CUL DE SAC LOCAL E AC 2 5 671 37 26,806 97 1/18/19 ALDER 1506 ALDER LANE _ APPLE TREE DR _ SYCAMOREAV LOCAL E AC 2 4 895 37 33,115 90 3/15/19 ALDER 1507 ALDER LANE SYCAMORE AV FIG TREE DR LOCAL E AC 2 4 728 37 26,936 91 3/15/19 ALDER 1508 ALDER LANE FIG TREE LN _ NE CUL DE SAC LOCAL E AC 2 4 438 33 14,454 80 3/15/19 ALLIAN AVE 1509 ALLIANCE AVENUE WILLIAMS ST _ TUSTIN VILLAGE WY _ LOCAL E AC 2 2 1,058 37 39,146 89_ 2/27/19 ALMSID DR 1510 ALMSIDE DRIVE HAMLET LN _-_ KIPLING LN _ LOCAL E AC _ 2 4 189 33 6,105 _ 99 1/9/19 ALTADE DR 1511 ALTADENA DRIVE W CUL DE SAC PASADENA AV LOCAL E AAC 2 2 301 33 9,933 94 3/7/17 ALTADE DR 1512 ALTADENA DRIVE PASADENA AV MYRTLE AV LOCAL E AC 2 2 409 37 15,133 54 4/27/17 AMAGA WY 1513 AMAGANSET WAY W CUL DE SAC_ YORBA ST LOCAL E AC 2 1 202 33 6,666 89 1/3/17 AMAGA WY 1514 AMAGANSET WAY YORBA ST ACACIA DR LOCAL E AC 2 1 980 37 42,197 87 12/29/16 AMAGA WY 1515 AMAGANSET WAY ACACIA DR PROSPECT AV LOCAL E AC 2 1 1,347 33 44,451 88 12/29/16 AMAGA WY 5014 AMAGANSET WAY AMAGANSET WAY N CUL DE SAC LOCAL E AC 2 1 112 50 5,600 75 4/19/17 AMAGA WY 5015 AMAGANSET WAY AMAGANSET WAY N CUL DE SAC LOCAL E AC 2 1 112 50 5,600 75 4/19/17 AMAGA WY 5016 AMAGANSET WAY AMAGANSET WAY N CUL DE SAC LOCAL E AC 2 1 112 50 5,600 64 4/19/17 AMBERW LN 1516 AMBERWICK LANE SHEARBROOK DR CHATHAM DR LOCAL E AC 2 1 292 33 9,636 72 12/29/16 AMHERS RD 1517 AMHERST ROAD NW CUL DE SAC SE CUL DE SAC LOCAL E AC 2 4 911 35 36,060 80 1/9/19 ANA TRE PL 1518 ANA TREE PLACE RAINTREE RD SE CUL DE SAC LOCAL E AC 2 4 374 35 15,190 91 1/8/19 ANDREW ST 1519 ANDREWSSTREET NEWPORT AV _ ESTORO CIR - LOCAL E AC 2 3 471 33 17,635 51 4/27/17 ANDREW ST 1520 ANDREWS STREET NW CUL DE SAC UTT DR LOCAL E AC 2 3 1 724 33 26,248 86 1/9/19 ANDREW ST 1521 ANDREWS STREET FARMINGTON RD FALMOUTH DR LOCAL E AC 2 3 279 37 12,502 92 3/5/19 ANGLIN DR 1522 ANGLIN DRIVE MARSHALL LN _ E CUL DE SAC LOCAL E AC 2 1 138 33 6,759 93 1/6/17 ANGLIN LN 1523 ANGLIN LANE MALENA OR N. PROSPECT AV LOCAL E AC 2 1 797 33 26,301 76 1/4/17 APP TRE DR 1524 APPLE TREE DRIVE ALDER LN RAINTREE RD LOCAL E AC 2 4 905 37 33,485 88 1/8/19 APP TRE DR 1525 APPLE TREE DRIVE RAINTREE RD SE CUL DE SAC LOCAL E AC 2 4 354 33 13,782 90 1/8/19 ARBOLA WY 1526 ARBOLADA WAY PROSPECT AV W END LOCAL E AC 2 1 448 33 16,989 61 1/4/17 ARLOUR WY 1527 ARLOURA WAY WOODLAWN AV NW CUL DE SAC LOCAL E AC 2 3 234 33 10,105 78 2/27/19 ASHBUR AV 1529 ASHBURTON AVENUE BRAEBURN RD DEVONSHIRE AV LOCAL E AC 2 4 498 37 18,426 85 1/8/19 ATHERTLN 1530 ATHERTON LANE WALNUTAV LANGDALE LN LOCAL E AC 2 4 103 34 3,252 99 1/9/19 ATTBOR PL 1531 ATTBORO PLACE _ PENNINGTON AV NE CUL DE SAC LOCAL E AC 2 4 423 33 16,164 78 1/9/19 AUT CEN DR 1532 AUTO CENTER DRIVE TUSTIN RANCH RD SE CUL DE SAC _ LOCAL E AC 3 5 2,093 56 120,551 88 3/5/19 Page 6 of 15 City of Tustin, CA Pavement Condition Index (PCI) Report - All Streets Sorted by Rank, Name (A -Z) BranchID AUT CEN DR Sec ID 1533 Name AUTO CENTER DRIVE From EL CAMINO REAL To AUTO CENTER DR MPAH LOCAL Rank E Type AC Lanes 3 , 5 1,151 56 64,456 92 Date 3/5/19 AUT CEN DR 1534 AUTO CENTER DRIVE AUTO CENTER DR AUTO CENTER DR LOCAL E AC 2 5 869 56 48,664 94 3/5/19 8 ST 1535 B STREET_ MCFADDEN AV MITCHELLAV LOCAL E AC 2 2 1,054 37 38,998 95 2/27/19 B ST 1536 B STREET MITCHELLAV NISSON RD LOCAL E AC 2 2 453 36 16,308 88 4/19/17 B ST 1537 B STREET S CUL DE SAC SIXTH ST LOCAL E AC 2 2 576 38 24,067 79 3/1/17 B ST 1538 B STREET _ SIXTH ST _ _ MAIN ST LOCAL E AC 2 2 696 37 25,752 88 3/1/17 B ST 1539 B STREET MAIN ST _ _ THIRD ST LOCAL E AC 2 2 351 44 15,444 95 2/26/19 BST 1540 BSTREET THIRD ST FIRST ST LOCAL E AC 2 _ 2 908 37 33,596 88 2/26/19 B ST 1541 B STREET FIRST ST _ IRVINE BLVD _ LOCAL E AC 2 2 874 37 32,338 86 1/3/17 B ST 1542 8 STREET _ IRVINE BLVD WESTBURY LN LOCAL E AC 2 1 639 33 21,087 94 12/29/16 BASSWO CI 1543 BASSWOOD CIRCLE RAINTREE RD SE CUL DE SAC LOCAL E AC 2 4 343 33 13,524 85 1/8/19 BELL AV 1544 _ BELL AVENUE RED HILL AV _ NW CUL DE SAC LOCAL E AAC 2 7 2,406 44 110,140 92 3/8/17 BELLEF RD _ 1545 BELLEFORD ROAD BROWNING AV RANCHWOOD RD LOCAL E AC 2 5 462 36 16,632 92 1/7/19 BENETA WY 1546 BENETA WAY PROSPECT AV 150 FT W/O LIVINGSTON ST_ LOCAL E AC 2 1 1,204 37 44,548 78 1/3/17 BENTLE CI 1547 BENTLEY CIRCLE WALNUT AV SW CUL DE SAC LOCAL E AC 2 6 526 40 25,504 91 1/18/19 BERGEN CI 1548 BERGEN CIRCLE YORBA ST W CUL DE SAC LOCAL E AC 2 1 212 33 9,201 91 1/3/17 BERKSH PL 1549 BERKSHIRE PLACE DORCHESTER AV _ SW CUL DE SAC LOCAL E AC 2 4 403 33 15,504 74 3/15/19 BIRCHF DR 1550 BIRCHFIELD DRIVE SILVERBROOK DR SANDBROOK DR LOCAL E AC 2 4 284 33 9,372 78 1/8/19 BIRCHF DR 1551 BIRCHFIELD DRIVE SANDBROOK DR _ CUL DE SAC LOCAL E AC 2 4 1 287 33 11,571 92 1/8/19 BIRCHW PL 1552 BIRCHWOOD PLACE_ SUMMERV_ILLE AV NE CUL DE SAC LOCAL E AC 1 2 4 1 407 33 15,636 71 1/9/19 BIRMIN PL 1553 BIRMINGHAM PLACE WINDEMERE LN _ LANGDALE LN LOCAL E AC 2 4 380 33 12,408 99 1/9/19 BLISS LN1554 BLISS LANE ALTADENA DR S CUL DE SAC LOCAL E AC 2 2 199 33 8,860 78 3/7/17 BOLEYN CI 1555 BOLEYN CIRCLE CARLANN CIR N CUL DE SAC LOCAL E AC 2 2 212 33 6,996 95 2/27/19 BONITA ST 1557 BONITA_STREET _ NEWPORT AV ORANGE ST_ LOCAL E AC 2 _ 3 602 37 22,274 95 3/1/17 BONNER DR 1558 BONNER DRIVE MARSHALL LN E CUL DE SAC LOCAL E AC 2 1 163 33 7,584 93 1/6/17 BONNER DR 1559 BONNER DRIVE _ FAIRMONT WY N. YORBA ST LOCAL E AC 2 1 473 37 20,013 71 1/6/17 BONNER DR 1560 BONNER DRIVE _ N. YORBA ST LORETTA DR LOCAL E AC 2 1 502 33 16,566 87 1/5/17 BRAEBU RD 1561 BRAEBURN ROAD SW CUL DE SAC NE CUL DE SAC LOCAL E AC 2 4 1,034 33 38,532 62 4/19/17 BRANBU PLI 1562 BRANBURRY PLACE SUMMERVILLEAV NE CUL DE SAC LOCAL E AC 2 4 418 33 15,999 90 3/8/17 BRAZOS LN 1563 BRAZOS LANE SAN SABA ST _ SAN SIMON ST LOCAL E AC 2 5 201 33 6,633 100 1/18/19 BRENT LN 1564 BRENTLANE LORETTA DR W CUL DE SAC LOCAL E AC 2 1 448 33 17,077 74 1/4/17 BRIARC PL 1565 BRIARCLIFF PLACE SUMMERVILLE AV NE CUL DE SAC LOCAL E AC 2 4 310 33 12,435 71 3/8/17 BRIDGE RD 1566 BRIDGEPORT ROAD SW CUL DE SAC NE CUL DE SAC LOCAL E AC 2 4 1,032 33 38,466 62 4/27/17 BRISTO LN 1567 BRISTOW LANE COSTELLO DR BRUNS DR LOCAL E AC 2 5 281 37 10,397 97 1/15/19 BROOKL WY 1568 BROOKLINE WAY WESTBURY LN AMAGANSET WY LOCAL E AC 2 1 396 33 13,068 72 1/3/17 BROOKSAV 1569 BROOKSHIRE AVENUE GRANDOAKSCIR MUNTON CIR LOCAL E AAC 2 4 1,783 37 65,971 94 3/25/19 BRUNS DR 1570 BRUNS DRIVE BRISTOW LN BURRIER LN LOCAL E AC 2 5 976 37 36,112 98 1/15/19 BRYAN FR 1571 BRYAN (FRONTAGE) AVENUE STONEHENGE DR SE CUL-DE-SAC LOCAL E AAC 2 3 375 25 10,739 83 1/7/19 BUCKIN PL 1572 BUCKINGHAM PLACE DORCHESTER AV _ SW CUL DE SAC LOCAL E AC 2 4 499 33 18,672 84 1/9/19 BURLIN AV 1573 BURLIN_GAME AVENUE ROANOKEAV HAMPSHIRE RD LOCAL E AC 2 4 225 33 7,425 84 1/9/19 BUR MIL RD 1574 BURNT MILL ROAD BROWNING AV TIBURON WY LOCAL E AC 2 5 731 1 37 27,047 98 1/7/19 BURRIE LN 1575 BURRIER LANE COSTELLO DR BRUNS DR LOCAL E AC 2 5 281 37 10,397 98 1/15/19 CST,N 1576 CSTREET, NORTH E. FIRST ST IN END LOCAL E AC 2 2 737 37 27,269 86 1 1/3/17 C ST'S 1577 C STREET, SOUTH MITCHELLAV NE CUL DE SAC LOCAL E AC 2 2 285 33 9,405 91 3/7/17 C ST'S 1578 C STREET, SOUTH SIXTH ST N END LOCAL E AC 2 2 369 37 13,653 84 3/1/17 C ST'S 1579 C STREET, SOUTH SEND MAIN ST LOCAL E AC 2 - 2 133 37 5,757 90 3/1/17 C ST'S 1580 CSTREET, SOUTH MAIN ST SECOND ST LOCAL E AC 2 2 715 43 30,745 90 3/1/17 C ST,S 1581 CSTREET,SOUTH _ SECOND ST FIRST ST LOCAL E AAC 2 2 537 41 -22,017 95 2/26/19 CALAVE CI 1582_ _ CALAVERA CIRCLE SARATOGA DR _ SE CUL DE SAC LOCAL E AC 2 5 144 1 37 1 7,307 96 1/7/19 CALIFO ST 1583 CALIFORNIA STREET MEDALLION AV CORLA AV LOCAL E AC 2 2 779. 33 27,945 73 4/19/17 CALIFO ST 1584 CALIFORNIA STREET W. MAIN ST THIRD ST LOCAL E AC 2 2 331 33 10,923 93 3/1/17 CANTER AV 1585 CANTERBURY AVENUE MUNTON CIR KINGSBORO CIR LOCAL E AAC 2 4 1,521 37 56,277 94 3/25/19 CAP COD AV 1586 CAPE COD AVENUE CANTERBURYAV HYANNISPORT RD LOCAL E AC 2 4 478 37 17,686 73 1/9/19 CAP TRE DR 1587 CAPER TREE D_RIV_E ALDER LN RAINTREE RD LOCAL E AC 2 4 902 37 33,374 88 1/8/19 CAP TRE DR 1588 CAPER TREE DRIVE RAINTREE RD SE CUL DE SAC LOCAL E AC 2 4 222 33 9,531 86 1/8/19 CARFAX AV 1589 CARFAX AVENUE MITCHELLAV NISSON RD LOCAL E AC 2 4 984 33 32,472 81 1/7/19 CARFAX DR 1590 CARFAX DRIVE SW CUL DESAC SYCAMORE AV LOCAL E AC 2 4 786 33 26,774 64. 1/9/19 Page 7 of 15 City of Tustin, CA Pavement Condition Index (PCI) Report - All Streets Sorted by Rank, Name JA -Z) BranchlD CARFAX DRI Sec ID 1591 Name CARFAX DRIVE From SYCAMORE AV To NE CUL DE SAC MPAH LOCAL Rank E Type AC Lanes 2 Zone 4 L 1,123 W 33 Area 39,352 PCI 89 Insp. Date 1/9/19 CARLAN CI 1592 CARLANN CIRCLE BOLEYN CIR PASADENA AV LOCAL E AC 2 2 257 33 10,955 94 2/27/19 CARRER 1593 CARRERA SOUNDA CORTINA LOCAL E AC 2 5 367 37 13,579 99 1/7/19 CARROL WY 1594 CARROLL WAY SEVENTEENTH ST_ _ MEDFORD AV LOCAL E AC 2 1 643 37 23,791r7_6 1/6/17 CARROL WY 1595 CARROLL WAY LAURIE LN SANTA CLARA AV LOCAL E AC 2 1 1,067 37 39,479 1/6/17 CASTEN DR 1596 CASTENEDA DRIVE PIONEER RD COSTELLO DR LOCAL E AC 2 5 165 37 6,105 1/15/19 CASTLE AV 1597 CASTLEGATE AVENUE BROOKSHIRE AV PENNINGTON AV LOCAL E _ AC 2 4 225 36 8,100 3/8/17 CASTLW AV 1598 CASTLEWOOD AVENUE DORCHESTER AV _ _ ROANOKE AV LOCAL E AC 2 4 225 36 8,100 3/8/17 CEDAR LN CEDARCAV 1599 1600 CEDAR LANE _ CEDARCREST AVENUE POPLAR DR CANTERBURYAV CHERRYWOOD LN FOXCROFT RD LOCAL LOCAL E E AC AC 2 2 4 4 273 475 33 37 9,433 17,575 1/8/19 3/8/17 CENT_EN WY 1601 CENTENNIAL WAY E. MAIN 5T _ FIRST ST LOCAL I AAC 2 2 1,250 37 46,250 90 3/1/17 CHAMBE RD 1603 _ CHAMBERS ROAD MICHELLE DR_ FRANKLIN AV LOCAL E AC 2 6 2,596 40 103,840 91 1/18/19 CHARLO DR 1604 CHARLOMA DRIVE SYCAMORE AV NE END LOCAL E AC 2 4 643 33 21,219 86 2/25/19 CHARLO DR 1605 CHARLOMA DRIVE VEEH DR _ NISSON RD LOCAL E AC 2 4 B10 33 26,730 93 1/7/19 CHARLO DR 1606 CHARLOMA DRIVE SAN JUAN ST _ N CUL DE SAC LOCAL E AC 2 3 230 33 9,883 90 3/1/17 CHARLO DR 1607 CHARLOMA DRIVE ANDREWS ST LANCE DR LOCAL E AC 2 3 33 16,697 90 3/1/17 CHARLO DR 1608 CHARLOMA DRIVE BRYAN AV KALUA UN LOCAL E AC 2 3 _431 634 33 20,922 92 3_/1/17 CHARLO DR 1609 CHARLOMA DRIVE _ FIRST ST MAUNA LOA RD LOCAL E AAC 2 3 256 33 8,448 99 3/15/19 CHARLO DR 1610 CHARLOMA DRIVE OLWYN DR GARLAND AV LOCAL E AC 2 3 412 33 18,544 85 3/1/17 CHATHA DR 1611 CHATHAM DRIVE GALY ST AM BERWICK LN _ LOCAL E AC 2 1 856 33 28,248 73 12/29/16 CHERRY LN 1612 CHERRYWOOD LANE SYCAMOREAV NE CUL DE SAC LOCAL E AC 2 4 353 33 13,854 85 1/8/19 CHERRY LN 1613 CHERRYWOOD LANE FIG TREE DR WALNUTAV LOCAL E AC 2 4 477 37 17,649 88 1/8/19 CHERRYLN 1614 CHERRYWOOD LANE WALNUT AV MAPLE CT LOCAL E AC 2 4 1,233 36 44,388 84 1/8/19 CHERRY LN 1615 CHERRYWOOD LANE MAPLE CT RAINTREE RD LOCAL E AC 2 4 1,195 36 43,020 82 1/8/19 CHESHI PL 1616 CHESHIRE PLACE DORCHESTER AV SW CUL DE SAC LOCAL E AC 2 4 503 33 19,695 75 3/8/17 CINDY LN 1617 CINDY LANE BRYAN AV _ TIKI LN LOCAL E AC 2 3 533 33 20,063 92 3/1/17 CLOVER AV 1618 CLOVERBROOKAV WALNUTAV CULDESAC LOCAL E AC 2 4 1,177 33 41,134 86 1/8/19 COC PAL DR 1619 COCO PALM DRIVE APPLE TREE DR SE CUL DE SAC LOCAL E AC 2 4 1,166 33 40,683 83 1/8/19 CONTES 1620 CONTESSA MARSELINA PALERMO LOCAL E AC 2 5 278 37 10,286 96 1/7/19 COPPER DR 1621 COPPERFIELD DRIVE RED HILL AV _ SANDBROOK DR LOCAL E AC 2 4 856 33 30,722 89 1/8/19 COPPER DR 1622 COPPERFIELD DRIVE DEERFIELD AV OXFORD AV LOCAL E AC 2 4 379 33 17,455 90 1/8/19 COR REE RD 1623 CORAL REEF ROAD SW CUL DE SAC FIRST ST LOCAL E AC 2 3 262 33 10,939 92 3/1/17 COR REE RD 1624 CORAL REEF ROAD FIRST ST MAUNA LOA LOCAL E AAC 2 3 288 33 9,504 99 3/15/19 CORLA AV 1625 CORLA AVENUE MYRTLE AV EEND LOCAL E AC 2 2 654 33 21,582 95 2/27/19 CORTIN 1626 CORTINA SONBRIA VENTIA LOCAL E AC 2 S 1,054 37 38,998 97 1/7/19 COSTEL 1627 COSTELLO DRIVE BRISTOW LN BURRIER LN LOCAL E AC 2 5 735 37 27,195 96 1/15/19 CROMWE DR 1628 CROMWELL DRIVE SAYBROOK LN STONEHENGE DR LOCAL E AC 2 3 756 37 27,972 86 1/7/19 CROMWE DR 1629 CROMWELL DRIVE STONEHENGE DR NE CUL DE SAC _ LOCAL E AC 2 3 226 33 9,663 84 1/7/19 D ST 1630 D STREET LOCKWOOD PARK PL ORANGEWOOD LN LOCAL E AC 2 2 285 33 10,746 81 1/16/17 DANBER Cl 1631 DANBERRY CIRCLE HEATHER AV SW CUL DE SAC LOCAL E AC 2 4 515 33 20,091 74 3/8/17 DANBOR RD 1632 DANBOROUGH ROAD NANTUCKET PL SW CUL DE SAC LOCAL E AC 2 4 1,063 33 37,284 68 3/8/17 DARSY Cl 1633 DARSY CIRCLE ROANOKE AV NW CUL DE SAC LOCAL E AC 2 4 139 31 6,627 71 3/7/17 DARTMO Cl 1634 DARTMOUTH CIRCLE HEATHER AV SW CUL DE SAC LOCAL E AC 2 4 494 33 18,507 88 3/8/17 DEAN ST 1635 DEAN STREET LANCE DR NE CUL DE SAC LOCAL E AAC 2 3 371 33 14,448 92 1/7/19 DEBUSKLN 1636 DEBUSK LANE MITCHELLAV WALTER AV - LOCAL E AC 2 4 505 33 16,665 85 1/7/19 DEERFIAV 1637 DEERFIELD AVENUE HEATHER AV ROANOKE AV LOCAL E AC 2 4 225 36 8,100 92 1/9/19 DEERFIAV 1638 DEERFIELD AVENUE WALNUTAV COPPERFIELD DR LOCAL E AC 2 4 488 33 16,104 90 1/8/19 DELAMOAV 1639 DELAMOAVENUE SW CUL DE SAC VALENCIAAV LOCAL E AC 2 -7 372 40 19,592 86 3/15/19 - DEL AMO AV 1640 DEL AMO AVENUE DRATON AV MEAR LN LOCAL E AC 2 4 292 33 14,584 80 1/9/19 DEL AMO AV 1641 DEL AMO AVENUE SYCAMORE AV NE CUL DE SAC LOCAL E AC 2 4 580 33 21,433 84 1/9/19 DEL AMO AV 1642 DEL AMO AVENUE SCHERER PL WALNUT AV LOCAL E At 2 4 425 33 14,025 92 1/9/19 DEL AMO AV 1643 DEL AMO AVENUE MITCHELLAV NISSON RD LOCAL E AC 2 4 898 33 29,634 78 1/7/19 DELAMOAV 2012 DELAMO AVENUE EDINGER AVE NEWPORTAVE LOCAL C AC 5 7 1,280 74 94,720 86 - 4/6/17 DEL CER DR _1644 DEL CERRO DRIVE KALUA LN SW CUL DE SAC LOCAL E AAC 2 3 247 33 10,444 99 3/15/19 DENBIG LN 1645 DENBIGH LANE FORESTERRA LN PENRITH LN _ _ LOCAL E AC 2 4 154 33 5,082 99 1/9/19 DEVONS AV 1646 DEVONSHIRE AVENUE GRANDOAKS CIR DARSY CIR LOCAL E AAC 2 4 1,566 33 51,678 94 3/25/19 DIA HEA DR 1647 DIAMOND HEAD DRIVE SW END BRYAN AV LOCAL E AAC 2 3 612 33 20,196 85 1/7/19 Page 8 of 15 City of Tustin, CA Pavement Condition Index (PCI) Report - All Streets Sorted by Rank, Name (A -Z) DIA HEA DR 1648 DIAMOND HEAD DRIVE BRYAN AV KALUA _ _ LOCAL E AACne- 2 _PCI ,3 711 33 23,463 99 Insp. D. te 3/15/19 DIA HEA DR 1649 DIAMOND HEAD DRIVE _ KALUA LANAI WY E AAC 2 3 355 ---LOCAL 33 11,715 99 3/15/19 DORCHE_AV 1650 DORCHESTER AVENUE BERKSHIRE PL CHESHIRE PL_ LOCAL E AC 2 4 511 33 18,644 75 1/9/19 DOW AV 1651 DOW AVENUE FRANKLIN AV _ MYFORD RD LOCAL E AC 2 6 3,004 44 134,456 94 1/18/19 DRAYTON AV 1652 DRAYTON AVENUE DELAMO AV CARFAX DR LOCAL E AC 2 4 429 33 14,157 70 1/9/19 EL CAM WY 2010 EL CAMINO WAY EL CAMINO REAL S END LOCAL 1 AC 2 2 448 58 25,984 87 3/1/17 ELDER LN 1657 ELDER LANE MORNING GLORY RD RAIN TREE RD_ _ LOCAL E AC 2 4 235 33 7,755 91 3/15/19 ELIZAB WY 1658 ELIZABETH WAY LETTY LN TIKI LN _ _ LOCAL E AC 2 3 419 33 17,714 88 3/1/17 ELIZAB WY 1659 ELIZABETH WAY IRVINE BLVD WASS ST LOCAL E AC 2 3 616 31 19,096 88 1/16/17 EMERYW RD 1660 EMERYWOOD ROAD _ SW CUL DE SAC NE CUL DE SAC LOCAL E AC 2 4 1,106 33 40,723 76 3/7/17 END CEN DR EPPING WY 1661 1662 ENDERLE CENTER DRIVE EPPING WAY VANDENBERG LN LANCE OR SEVENTEENTH ST NE CUL DE SAC _ _ LOCAL LOCAL I E AC AAC 2 2 1 3 631 430 62 33 39,122 16,340 66 87 4/19/17 1/7/19 EPPING WY 1663 EPPING WAY _ BRYAN AV _ NE CUL DE SAC _ LOCAL E AC 2 3 601 33 19,833 86 1/7/19 ESTERO Cl 1664 _ ESTERO CIRCLE ANDREWS ST NE CUL DE SACLOCAL E AC 2 3 229 33 11,111 83 3/1/17 EVANST Cl 1665 EVANSTON CIRCLE WESTBURY LN N CUL DE SAC _ LOCAL E AC 2 1 244 33 10,257 65 1/3/17 FAIRMO WY 1666 FAIRMONT WAY S CUL DE SAC BONNER DR _ _ _ LOCAL E AC 2 1 368 37 18,271 81 1/6/17 FAIRMO WY FAIRMO WY 1667 1668 FAIRMONT WAY FAIRMONT WAY LAURIE LN LAURIE LN LAURIE LN _ _ SANTA CLARA AVE LOCAL LOCAL E E AC AAC 2 2 1 1 154 1,006 37 37 5,698 37,222 87 76 1/6/17 1/6/17 FAL LEA PL 1669 FALLEN LEAF PLACE NW CUL DE SAC _ SE CUL DE SACLOCAL E AC 2 4 757 33 29,391 69 3/8/17 FALMOU DR 1670 FALMOUTH DRIVE SW CUL DE SAC ANDREWS ST LOCAL E AC 2 3 468 32 17,238 84 3/5/19 FALMOU DR 1671 FALMOUTH DRIVE ANDREWS ST _ _ LANCE DR LOCAL E AC 2 3 268 37 9,916 85 1/7/19 FALMOU DR 1672 FALMOUTH DRIVE LANCE DR _ _ NE CUL DE SAC LOCAL E AC 2 3 467 32 15,206 91 1/7/19 FALMOU PL 1673 FALMOUTH PLACE _ STONEHENGE DR _ _ SW CUL DE SAC LOCAL E AAC 2 3 299 34 12,315 93 1/7/19 FARMIN RD FARMIN RD 1674 1675 FARMINGTON ROAD _ FARMINGTON ROAD SAN JUAN ST LANCE DR ANDREWS ST BRYAN AV _ LOCAL LOCAL E E AC AC 2 2 3 3 512 479 37 37 18,944 17,723 89 87 3/5/19 1/7/19 FARMIN RD 1676 FARMINGTON ROAD BRYAN AV STONHENGE DR LOCAL E AAC 2 3 538 37 19,906 87 1/7/19 FASHIO LN 1677 FASHION LANE _ FIRST ST IRVINE BLVD _ LOCAL E AC 2 2 1,058 37 38,186 87 1/16/17 FEATHE RD 1678 FEATHERHILL ROAD FALLEN LEAF PL _ NE CUL DE SAC LOCAL E AC 2 4 978 33 34,479 79 1/9/19 FERNBR DR 1679_ FERNBROOK DRIVE SANDFIELD PL CUL DE SAC_ LOCAL E AC 2 4 491 33 18,496 88 1/8/19 FIELDI DR 1680 FIELDING DRIVE ANDREWS ST NE CUL DE SAC LOCAL E AAC 2 3 178 33 8,167 95 3/1/17 FIESTA WY 1681 FIESTA WAY PROSPECT AV WCUL DE SAC LOCAL E AC 2 1 446 33 16,923 59 1/4/17 FIG TRE DR 1682 FIG TREE DRIVEALDER LN RAINTREE DR LOCAL E AC 2 4 731 37 27,047 84 1/8/19 FIG TRE DR 1683 FIG TREE DRIVE RAINTREE DR SE CUL DE SAC LOCAL E AC 2 4 364 33 14,217 72 1/8/19 FIRST ST 1029 FIRST STREET NEWPORTAV CHARLOMA DR _ LOCAL E AAC 2 3 1,410 60 84,600 96 1/16/17 FIRST ST 1030 FIRST STREET _ CHARLOMA DR REDHILL AV LOCAL E AC 2 3 1,145 60 68,700 95 1/16/17 FLINT DR 5009 FLINT DR S CUL DE SAC SANTA CLARA AVE LOCAL E AC 2 1 212 32 6,784 67 3/15/19 FOREST LN 1686 FORESTERRA LANE DENBIGH LN _ GRASSMERE LN LOCAL E AC 2 4 322 33 10,494 99 1/9/19 FOXCRO RD 1687 FOXCROFT ROAD _ FALLENLEAF PL _ NE CUL DE SAC _ LOCAL E AC 2 4 976 33 34,413 74 3/8/17 FRANKLAV 1688 FRANKLIN AVENUE DOW AV WALNUT AV LOCAL I AC 2 6 1,452 52 76,944 97 3/6/17 FRANKLAV 1689_ FRANKLIN AVENUE WALNUT AV_ CHAMBERS RD LOCAL E AC 2 6 305 60 18,300 93 1/18/19 FRANKLAV 1690 FRANKLIN AVENUE CHAMBERS RD _ MICHELLE DR LOCAL I AC 2 6 2,210 40 88,400 82 3/8/17 GALLER WY 1691 GALLERY WAY TUSTIN RANCH RD RAWLINGS WY LOCAL E AC 2 5 845 37 31,265 82 1/18/19 GALY ST 1692 GAILY STREET SHERBROOK DR N CUL DE SAC LOCAL E AC 2 1 1,591 33 54,708 67 12/29/16 GARLAN AV 1693 GARLAND AVENUE _ CHARLOMA DR WOODLAWN AV LOCAL E AC 2 3 396 33 15,601 85 3/1/17 GARLAN AV 1694 GARLAND AVENUE WOODLAWN AV RED HILL AV LOCAL E AC 2 3 754 33 24,882 86 3/1/17 GATEWAY Cl 2020 GATEWAY CIR BELL AVE _ S CDS LOCAL E AC 2 7 589 40 25,910 93 3/8/17 GLENAR AV 1695 GLENARBOR AVENUE BROOKSHIRE AV SUMMERVILLE AV LOCAL E AC 2 4 225 36 8,100 74 3/8/17 GRANDO Cl 1696 GRANDOAKSCIRCLE DEVONSHIRE AV NW CUL DE SAC LOCAL E. AC 2 4 122 31 6,100 75 1/8/19 GRASSM LN 1697 GRASSMERE LANE _ FORESTERRA LN WINDEMERE LN LOCAL E AC 2 4 380 33 12,540 99 1/9/19 GRE MEA AV 1698 GREEN MEADOW AVENUE NW CUL DE SAC SE CUL DE SAC LOCAL E AC 2 4 925 33 34,935 83 1/8/19 GREVALAV 1699 GREEN VALLEY AVENUE MITCHELLAV CUL DESAC LOCAL E AC 2 4 534 33 19,915 80 1/9/19 GRE VALAV 1700 GREEN VALLEY AVENUE SANJUAN ST LANCE DR LOCAL E AC 2 3 825 37 30,525 78 1/9/19 GREENW DR 1701 GREENWAY DRIVE TUSTIN RANCH RD LA COUNA DR LOCAL E AC 2 5 1,047 37 38,739 88 1/18/19 GROVES DR 1702 GROVESITE DRIVE MEDFORD AV _ N CUL DE SAC LOCAL E AC 2 1 417 33 15,966 84 1/4/17 GWYNET DR 1703 GWYNETH DRIVE OLWYN DR _ END LOCAL E AC 2 3 130 33 4,290 88 2/27/19 HALL Cl 1704 HALL CIRCLE FIRST ST NCUL DE SAC LOCAL E AC 2 2 224 44 10,918 93 1/16/17 HAMLET LN 1 1705 HAMLET LANE _ ALMSIDE DR WALDEN LN LOCAL E AC 2 4 391 33 12,903 99 3/15/19 Page 9 of 15 City of Tustin, CA Pavement Condition Index (PCI) Report - All Streets Sorted by Rank, Name (A -Z) Branch[D HAMPDE AV HAMPSH RD Sec ID 1706 1707 Name HAMPDEN AVENUE HAMPSHIRE ROAD From WESTFALL RD NW CUL DE SAC To DEVONSHIRE AV SE CUL DE SAC MPAH LOCAL LOCAL Rank E E Type AC AC Lanes 2 2 Zone 4 4 L 502 850 W 37 33 Area 18,574 32,460 PCI 73 72 Insp. Date 3/7/17 3/7/17 HEATH AV 1708 HEATHER AVENUE DANBERRY CIR KIMBERLY CIR E AC 2 4 517 33 18,842 71 3/8/17 HEATHE DR 1709 _ HEA_THERFIELD DRIVE SANDWOOD PL _ MITCHELLAV _LOCAL LOCAL_ E AC 2 4 502 16,566 72 1/8/19 HEIGHT DR 1710 HEIGHTS DRIVE YORBA ST _ N CUL DE SAC LOCAL E AC 2 1 743 _33 37 29,470 88 1/3/17 HENSTR Cl 1711 HENSTRIDGE CIRCLE MEDFORD AV N CUL DE SAC LOCAL E AC 2 1 224 33 9,597 89 1/4/17 HERITA WY 1712_ HERITAGE WAY _ TUSTIN RANCH RD MYFORD RD LOCAL I AC 2 5 1,770 36 84 2/6/17 HERITA WY 1713 HERITAGE WAY MYFORD RD BRYAN AV LOCAL I AC 2 5 1,671 36 _63,720 60,156 87 2/6/17 HID HIL _A_V 1714 HIDDEN HILLAVENUE ROYAL OAK PL _ BROOKSHIREAV LOCAL E AC 2 4 223 33 7,359 79 3/7/17 HILLSB PL 1715 HILLSBORO PLACE PENNINGTON AV NE CUL DE SAC LOCAL E AC 2 4 310 33 13,326 72 3/8/17 HOLLYH AV 1716 HOLLYHOCK AVENUE GREENMEADOW AV BROOKSHIRE AV LOCAL E AC 2 4 224 33 7,392 83 3/7/17 HYA POR RD 1717 HYANNIS PORT ROAD NANTUCKET PL SW CUL DE SAC LOCAL E AC 2 4 1,078 33 37,779 74 3/8/17 INDUST DR 1718 INDUSTRIAL DRIVE RED HILL AV WOOD LAWN AV LOCAL E AC 2 7 938 52 48,776 83 1/9/19 IVERNE WY 1719 IVERNESS WAY WESTBURY LN AMAGANSET WY LOCAL E AC 2 1 411 33 13,563 94 1/3/17 JACARA AV 2003 JACARANDA AVENUE ACACIA ST YORBA ST LOCAL E AC 1 1 1,023 24 24,552 56 1/3/17 JACARA AV 2004 JACARANDAAVENUE YORBAST ACACIA DR LOCAL E AC 1 1 1,023 24 24,552 63 4/27/17 JAN MAR PL 1720 JAN MARIE PLACE BROWNING AV NW END LOCAL E AAC 2 3 621 33 20,493 95 3/15/19 KALUA LN 1721 KALUA LANE CHARLOMA DR _ WHITE SANDS DR LOCAL E AC 2 3 606 33 19,998 91 2/27/19 KALUA LN 1722 KALUA LANE RED HILL AV DIAMOND HEAD DR LOCAL E AAC 2 3 467 33 15,411 99 3/15/19 KAREN WY 1723 KAREN WAY SIERRA VISTA DR JAN MARIE PL LOCAL E AAC 2 3 415 33 13,69_5 94 3/15/19 KELLER DR 1724 KELLER DRIVE ROBIN50N DR JAMBOREE RD LOCAL E Ac 2 5 1,455 37 53,835 82 3/1/17 KENS RD 1725 KENSINGTON PARK ROAD VALENCIA AVE EDINGER AVE LOCAL C AC 4 07 1,405 96 134,880 89 3/8/17 _KENT PL 1726 KENT PLACE _ CROMWELL DR _ SE CUL DE SAC LOCAL E AAC 2 3 160 33 7,380 99 3/15/19 KENYON DR 1727 KENYON DRIVE _ NEWPORT AV _ SCUL DE SAC E AC 2 2 805 33 28,858 85 2/25/19 KIMBER CI 1728 KIMBERLY CIRCLE HEATHER AV __ SW CUL DE SAC __LOCAL_ LOCAL E AC 2 4 390 33 16,515 80 1/9/19 KINGSB Cl 1729 KINGSBORO CIRCLE _ _ CANTERBURY AV _ NE CUL DE SAC LOCAL E AC 2 4 114 31 5,852 69 3/7/17 KINGST AV 1730 KINGSTON AVENUE ROANOKE AV AMHERST RD LOCAL E AC 2 4 225 33 7,425 78 3/7/17 KINSMA Cl 1731 KINSMAN CIRCLE TUSTIN RANCH RD SE CUL DE SAC LOCAL E AC 2 5 397 37 16,753 93 3/1/17 KIPLIN LN 1732 KIPLING LANE ALMSIDE DR WALDEN LN _ LOCAL E AC 2 4 391 33 12,903 99 1/9/19 LA COL DR 1142 LA COUNA DRIVE TUSTIN RANCH RD 770 FT N/O TUSTIN RANCH RD LOCAL I AC 1 5 770 15 11,550 97 3/1/17 LA COL DR 1143 LA COUNA DRIVE 770 FT N/O TUSTIN RANCH RD TUSTIN RANCH RD LOCAL I AC 1 5 770 15 11,550 96 3/1/17 LA COL DR 1144 LA COUNA DRIVE TUSTIN RANCH RD GREENWAY DR LOCAL I AC 2 5 1,267 37 46,879 91 3/1/17 LABURN DR 1733 LABURNUM DRIVE OLWYN DR NE CUL DE SAC LOCAL E AAC 2 3 356 33 13,812 84 2/27/19 LAGIE WY 1734 _ LAGIER WAY TUSTIN RANCH RD HERITAGE WY LOCAL I AC 2 5 1,055 37 39,035 85 2/6/17 LANAI WY 1735 LANAI WAY DIAMOND HEAD DR NW CUL DE SAC LOCAL E AAC 2 3 444 33 16,716 95 3/15/19 LANCE DR 1736 LANCE DRIVE CHARLOMA DR RED HILL AV LOCAL E AC 2 3 1,170 33 40,050 92 3/1/17 LANCE DR 1737 LANCE DRIVE RED HILL AV DIAMOND HEAD DR LOCAL E AAC 2 3 458 33 15,114 90 1/7/19 LANCE DR 1738 LANCE DRIVE WOODLAND DR _ _ FALMOUTH DR LOCAL E AC 2 3 945 37,202 83 1/7/19 LANGDA LN 1740 LANGDALE LANE WILDEVE LN BIRMINGHAM LN LOCAL E AC 2 4 202 _37 33 6,534 99 1/9/19 LANDSD RD 1739 LANSDOWNE ROAD VALENCIA AVE N END LOCAL E AC 2 07 700 33 23,100 93 3/6/17 LARACA ST 1741 LARACA STREET SAN SABA ST SAN SIMON ST LOCAL E AC 2 5 205 33 6,765 100 1/18/19 LAURIE LN 1742 LAURIE LANE MARSHALL LN FAIRMONT WY LOCAL E AC 2 1 570 37 21,090 91 1/6/17 LAURIE LN 1743 LAURIE LANE FAIRMONT WY N YORBA ST - LOCAL E AC 2 1 430 37 15,910 91 1/6/17 LAURIE LN 1744 LAURIE LANE ROSALIND DR LORETTA DR LOCAL E AC 2 1 219 33 7,227 85 1/5/17 LAURIE LN 1745 LAURIE LANE WHEELER PL MALENA DR LOCAL E AC 2 1 300 33 9,900 72 1/4/17 LAURIN WY 1746 LAURINDA WAY SEVENTEENTH ST N END LOCAL E AC 2 1 958 33 32,029 66 1/4/17 LAURIN WY 1747 LAURINDA WAY 317 FT S/O SANTA CLARA AV _ SANTA CLARA AV___ LOCAL E AC 2 - 1 317 33 10,461 86 1/4/17 LEAFWO LN 1748 LEAFWOOD LANE N YORBA ST LORETTA DR LOCAL- - E AC - 2 1 477 33 15,741 60 4/19/17 LEAR LN 1749 LEAR LANE UTT DR _ _ NW CUL DE SAC- LOCAL E AAC 2 3 201 33 8,926 90 3/15/19 LEAR LN 1750 LEAR LANE WOODLAND DR SE CUL DE SAC LOCAL E AAC 2 3 119 34 6,613 81 2/27/19 LEGACY RD 5031 LEGACY RD _ TUSTIN RANCH RD WARNER AV LOCAL E AC 4 7 1,538 50 76,900 94 5/18/17 LETTY LN 1751 LETTY LANE ELIZABETH WY CINDY LN LOCAL E AC 2 3 397 33 15,575 90 3/1/17 LIMETR WY 1752 LIMETREE WAY MALENA DR W CUL DE SAC_ _ LOCAL E AC 2 1 219 33 9,432 79 1/4/17 LINDA IN 1753 LINDA LANE N YORBA ST ROSALI_ND DR LOCAL_ E AC 2 1 241 33 7,953 76 1/5/17 LOC PAR PL 1754 LOCKWOOD PARK PLACE D ST PROSPECT AV LOCALE AC 2 2 470 33 15,510 95 1/16/17 LORELE LN 1755 LORELEI LANE WILLIAMS ST N END LOCAL E AC 2 2 352 33 11,616 94 2/27/19 LORETT DR 1756 LORETTA DRIVE MEDFORD AV 120 FT N/O BONNER DR LOCAL E AC - 2 1 513 33 16,929 81 1/4/17 Page 10 of 15 City of Tustin, CA Pavement Condition index (PCI) Report - All Streets Sorted by Rank, Name (A -Z) BranchID LORETT DR Sec ID 1757 Name --ETTA DRIVE From 120 FT N/0 BONNER DR To SANTA CLARA AV MPAH LOCAL Rank E Type AC Lanes 2 , ne 1 L 1,290 W 34 Area 43,860 PCI 71 Insp. D.te 1/4/17 LUCERO WY 175_8 LUCERO WAY W CUL DE SAC E CUL DE SAC _ LOCAL E AC 2 1 1,025 33 38,235 62 1/3/17 MALENA DR 1759 MALENA DRIVE SEVENTEENTH ST LIMETREE WY LOCAL E AC 2 1 460 33 15,180 86 1/4/17 MALENA DR 1760 MALENA DRIVE 5 CUL DE SAC LAURIE LN 5 EDGE LOCAL E AC 2 1 716 33 26,102 84 1/4/17 MALENA DR 1761 MALENA DRIVE LAURIE LN S EDGE _ _ SANTA CLARA AV LOCAL E AC _ 2 1 1,129 32 36,128 75 1/4/17 MAPLE CT 1762 MAPLE COURT CHERRYWOOD LN NW CUL DE SAC LOCAL E AC 2 4 321 33 12,886 77 1/8/19 MARSEL 1763 MARSELINA _ CONTESSA _ CORTINA LOCAL E AC 2 5 491 37 18,167 98 1/7/19 MARSHA LN 1764 MARSHALL LANE MEDFORD AV BONNER DR LOCAL E AC 2 1 494 37 18,278 93 1/6/17 MARSHA LN 1765 MARSHALL LANE LAURIE LN SANTA CLARA AV _ LOCAL E AC 2 1 1,076 27 29,052 90. 1/6/17 MARSHA LN 1766 MARSHALL LANE ETHELBEE WY _ N CUL DE SAC LOCAL E AC 2 1 2,205 33 76,345 69 1/6/17 MAU LOA RD 1767 MAUNA LOA ROAD CHARLOMA DR CORAL REEF RD LOCAL E AAC 2 3 959 33 31,647 98 3/15/19 ME_AR LN 1768 MEAR LANE DEL AMO AV CARFAX DR LOCAL E AC 2 4 429 33 14,157 84 1/9/19 MEDALL AV 1769 MEDALLION AVENUE PASADENA AV _ W CUL DE SAC LOCAL E AC 2 2 196 33 8,179 71 4/19/17 MEDALLAV 1770 _ MEDALLION AVENUE MYRTLE AV _ _ _ CALIFORNIA ST LOCAL E AC 2 2 526 33 19,833_ 89 3/7/17 MEDFOR AV 1771 MEDFORD AVENUE N YORBA ST _ CARROLLWY LOCAL E AC 2 1 625 37 23,125 93 1/6/17 MEDFOR AV 1772 MEDFORD AVENUE CARROLLWY MARSHALL LN LOCAL E AC 2 1 237 37 8,769 95 1/6/17 MEDFOR AV 1773 MEDFORD AVENUE W CUL DE SAC 134 FT W/O LORETTA DR LOCAL E AC 2 1 370 33 12,415 89 1/4/17 MEDFOR AV _ 1774 MEDFORD AVENUE 134 FT W/O LORETTA DR GROVESITE DR LOCAL E AC 2 1 404 34 13,736 90 1/4/17 MELVIN WY 1775 MELVIN WAY RED HILL AV 165 FT W/O DEAN ST LOCAL E AC 2 3 921 33 30,393 87 3/15/19 MICHEL DR 1776 MICHELLE DRIVE_ CHAMBERS DR FRANKLIN AV LOCAL 1 AC 2 6 604 40 26,560 82 3/8/17 MICHEL DR 1777 MICHELLE DRIVE FRANKLIN AV _ MYFORD RD LOCAL I AC 4 6 1,278 60 76,680 81 3/8/17 MILLER DR 1778 MILLER DRIVE B ST NORTH PROSPECT AV LOCAL E AC 2 1 989 33 32,637 94 1/3/17 MIMOSA LN 1779 MIMOSA LANE VINEWOODAV ROSELEAF AV LOCAL E AC 2 1 260 37 9,620 89 12/29/16 MIMOSA LN 1780 MIMOSA LANE _ ROSELEAF AV N CUL DE SAC LOCAL E AC 2 1 258 33 13,961 86 12/29/16 MIMOSA LN 1781 MIMOSA LANE S CUL DE SAC NORWOOD PARK PL LOCAL E AC 2 1 118 37 6,345 59 12/29/16 MITCHE AV 1782 MITCHELLAVENUE BST NEWPORT AV LOCAL I AC 2 2 416 30 12,480 83 1/23/17 MITCHE AV 1783_ _ MITCHELLAVENUE NEWPORTAV RED HILL AV LOCAL I AC 2 4 2,575 36 92,700 94 2/1/17 MITCHE AV 1784 MITCHELLAVENUE RED HILLAV _ BROWNING LOCAL I AAC 2_ 4 2,566 36 92,376 98 2/1/17_ MOFFETT 5020 MOFFETT DR HARVARDAV_ -AV _ SONORA ST_ _ LOCAL_ C AC 2 6 714 48 34,272 85 3/8/19 MOFFETT 5021 MOFFETT DR SONORA ST END LOCAL C AC 0 650 48 31,200 83 3/8/19 MONTER ST 1785 MONTEREY STREET TIBURON WY PARKCENTER LN LOCAL E AC 2 5 128 37 4,736 95 1/7/19 MOREL RD 1786 MOREL ROAD RAINTREE RD PINEWOOD RD LOCAL E AC 2 4 238 33 7,854 88 1/8/19 MORGAN CI 1787 MORGAN CIRCLE MOSHER AV _ SE CUL DE SAC LOCAL E AC 2 7 330 40 15,262 82 3/8/19 MOR GLO RD 1788 MORNING GLORY ROAD SW CUL DE SAC NE CUL DE SAC LOCAL E AC 2 4 1,139 33 39,792 85 1/8/19 MOSHER AV 1789 MOSHER AVENUE BELL AV VALENCIA AV LOCAL E AAC 2 7 1,265 40 50,600 96 3/8/17 MOU VIE DR 1790 MOUNTAIN VIEW DRIVE W FIRST ST IRVINE BLVD LOCAL E AC 2 2 838 30 25,140 87 1/3/17 MENTON CI 1791 MUNTON CIRCLE BROOKSHIRE AV SE CUL DE SAC LOCAL E AC 2 4 113 31 5,821 71 4/19/17 MYFORD RD 1792 MYFORD ROAD _ DOW AV WALNUT AV LOCAL E AC 5 6 1,191 70 87,990 90 3/11/19 MYFORD RD 1793 MYFORD ROAD WALNUTAV MICHELLE DR LOCAL C AC 5 6 2,749 45 123,705 92 3/8/17 MYFORD RD 1794 MYFORD ROAD PRIVATE ROAD EL CAMINO REAL LOCAL E AC 2 5 282 60 16,920 73 2/6/17 MYFORD RD 1795 MYFORD ROAD EL CAMINO REAL _ BRYAN AV LOCAL I AC 4 5 803 60 48,180 87 2/6/17 MYFORD RD 1796 MYFORD ROAD BRYAN AV HERITAGE WY LOCAL C AC 5 5 1,062 60 63,720 85 2/6/17 MYFORD RD 1797 MYFORD ROAD HERITAGE WY IRVINE BLVD LOCAL C AC 5 5 1,175 60 70,500 84 2/6/17 MYRTLE AV 1798 MYRTLE AVENUE_ NEWPORTAV MCFADDEN AV LOCAL E AC 2 2 1,188 33 39,204 69 4/19/17 MYRTLE AV 1799 MYRTLE AVENUE MCFADDEN AV N CUL DE SAC E AC 2 2 1,147 32 38,546 73 4/19/17 MYRTLE AV 1800 MYRTLE AVENUE MAIN 5T WEST FIRST ST WEST _LOCAL LOCAL E AC 2 2 1,242 36 44,712 94 1/9/17 MYRTLE AV 1801 MYRTLE AVENUE FIRST ST WEST N CUL DE SAC _ LOCAL E AC 2 2 515 37 21,034 91 1/16/17 NANTUC PL 1802 NANTUCKET PLACE HYANNUS PORT RD NW CUL DE SAC LOCAL E AC 2 - 4 478 33 19,419 81 1/9/19 NEWPOR AV 1161 NEWPORTAVENUE 15 NORTH ON RAMP NISSON RD _ LOCAL E AC 3 4 380 40 15,200 83 3/5/19 NEWPORAV 1169 NEWPORTAVENUE NISSON -RD IS NORTH ON RAMP LOCAL E AC 3 4 380 40 15,200 66 3/22/19 NISSON RD 1803 NISSON RD PASADENA AV BST LOCAL E AC 2 2 1,935 36 69,660 82 4/19/17 NISSON RD 1804 NISSON RD NEWPORTAV RED HILL RD LOCAL I AAC 2 4 2,689 37 99,493 100 11/15/16 NISSON RD 1805 NISSON RD RED HILL AVBROWNING AV LOCAL I AC 2 4 2,625 36 94,500 94 3/22/19 NIXON CI 1806 NIXON CIRCLE NW CUL-DE-SAC SE CUL-DE-SAC LOCAL E AAC_ 2 3 539 33 22,137 93 3/15/19 NOR PAR PL 1807 NORWOOD PARK PLACE W CUL DE SAC YORBA ST LOCAL E AC 2 1 195 33 8,640 _ 83 4/19/17 NOR PAR PL 1808 NORWOOD PARK PLACE YORBA ST ACACIA DR LOCAL E AC 2 1 988 37 36,556 68 12/29/16 NOR PAR PL 1809 NORWOOD PARK PLACE GA -LY ST PROSPECT AV I LOCAL E AC 2 1 1 988 33 32,604 89 12/29/16 Page 11 of 15 City of Tustin, CA Pavement Condition Index (PCi) Report - All Streets Sorted by Rank, Name (A -Z) Branchl!) OLI TRE CI Sec ID 1810 Name OLIVE TREE CIRCLE From WELLINGTON AV To S CUL DE SAC MPAH LOCAL Rank E Type AC Lar�es 2 • ne 1 L 220 W 33 Area 7,260 PCI 70 Insp. Date 12/29/16 OLWYN DR 1811 OLWYN DRIVE CHARLO_MA DR WOODLAWN AV NW EDGE LOCAL E AC 2 3 403 33 19,157 87 3/1/17 OLWYN DR 1812 OLWYN DRIVE WOODLAWN AV NW EDGE RED HILL AV LOCAL E AAC 2 3 845 33 27,885 95 3/1/17 ORANGE ST 1813 ORANGE STREET_ EL CAMINO REAL SAN JUAN ST____ LOCAL E AAC 2 3 1,302 37 48,174 99 3/15/19 ORA TRE LN 1814 ORANGE TREE LANE GALY ST PROSPECT AV LOCAL E AC 2 1 988 33 32,604 69 12/29/16 ORANGE LN 1815 ORANGEWOOD LANE _ D ST PROSPECTAV LOCAL E AC 2 2 470 33 19,872 81 1/16/17 OXFORD AV 1816 OXFORD AVENUE ROANOKEAV WALNUTAV LOCAL E AAC 2 4 380 60 22,800 95 3/25/19 OXFORD AV 1817 OXFORD AVENUE WALN UT AV COPPERFIELD DR LOCAL E AC 2 4 488 33 21,962 91 1/8/19 PACIFI ST 1818 PACIFIC STREET MEDALLION AV CORLA AV LOCAL E AC 2 2 762 33 25,146 90 3/7/17 PACIFI ST 1819 PACIFIC STREET SIXTH ST MAIN ST WEST _ LOCAL E AC 2 2 692 37 25,604 81 3/1/17 PACIFI ST 1820 PACIFIC STREET MAIN ST WEST _ FIRST ST LOCAL E AC 2 2 1,268 37 48,356 86 1/9/17 PACIFI ST 1821 PACIFIC STREET ROSELEAF AV N CUL DE SAC LOCAL E AC 2 1 242 33 10,553 87 12/29/16 PALACE WY 1822 _ PALACE WAY SCUL DE SAC_ BONNER DR _ _ _ LOCAL E AC 2 1 341 33 13,820 63 1/6/17 PALACE WY 1823 PALACE WAY_ S CUL DE SAC _ LAURIE LN _ _LOCAL E AC 2 1 131 67 10,852 73 1/6/17 PALERM 1824 PALERMO CONTESSA TUSTIN RANCH RD LOCAL E AC 2 5 605 37 22,080 98 1/7/19 PARK AV 1825 PARK AVE _ TUSTIN RANCH RD _ DISTRICT ST _ LOCAL C AC 4 07 1,349 26 33,462 82 4/6/17 PARK AV 2000 PARK AVE DISTRICT ST _ TUSTIN RANCH RD _ LOCAL C AC 4 6 1,304 26 32,292 93 3/6/17 PARK AV 2001 PARK AVE DISTRICT ST _ WARNER AVE LOCAL C AC 4 6 2,022 26 50,960 96 3/6/17 PARK AV 2002 PARK AVE _ WARNER AVE _ DISTRICT ST LOCAL C AC 4 6 1,996 26 50,284 94 3/6/17 PARK AV 5030 PARK AVE _ VICTORY RD WARNER AV LOCALC AC 2 7 1,586 29 57,920 93 5/18/17 PARK AV 5032 PARK AVE WARNER AV VICTORY RD LOCAL C AC 2 7 1,600 29 56,730 93 5/18/17 PARKCE LN 1826 PARKCENTER LANE EL CAMINO REAL _ BRYAN AV LOCAL I AC 2 5 1,940 36 69,840 77 1/24/17 PARKCELN 1827 PARKCENTER LANE _ BRYAN AV TUSTIN RANCH RD _ LOCAL_ 1 AC 2 _ 5 1,531 37 56,647 79 1/24/17 PARKER DR 1828 PARKER DRIVE_ YORBA ST ACACIA DR LOCAL E AC 2 1 1,062 37 44,324 76 12/29/16 PARKER DR 5010 PARKER DRIVE PARKER DR N CUL DESAC LOCAL E AC 2 1 123 50 6,150 90 12/29/16 PARKER DR 5011 PARKER DRIVE PARKER DR S CUL DE SAC LOCAL E AC 2 1 123 50 6,150 82 12/29/16 PARKA WY 1829 PARKVIEW WAY BROWNING AV _ PARKCENTER LN LOCAL E AC 2 5 538 37 19,906 95 1/18/19 PASADE AV 1831 PASADENA AVENUE SYCAMORE AV McFADDEN AVE LOCAL I AAC 4 2 1,211 60 72,660 84 1/23/17 PASADE AV 1832 PASADENA AVENUE McFADDEN AVE NISSON RD LOCAL E AC 2 2 1,677 32 53,664 84 1/23/17 PASADE AV 1833 PASADENA AVENUE S CULDESAC SECOND ST LOCAL E AC 2 2 712 37 28,672 83 1/9/17 PASADE AV 1834 PASADENA AVENUE SECOND ST _ N CUL DE SAC LOCAL E AC 2 2 369 37 15,467 83 1/9/17 PATRIO WY 1835 PATRIOT WAY PIONEER RD JAMBOREE RD LOCAL I AC 3 5 707 47 33,229 89 3/6/17 PENNIN AV 1836 PENNINGTON AVENUE HILLSBORO PL __ ATTBORO PL LOCAL E AC 2 4 511 33 19,743 72 4/27/17 PENRIT LN 1837 PENRITH LANE BIRMINGHAM PL GRASSMERE LN LOCAL E AC 2 4 524 33 17,292 99 1/9/19 PEP TRE Cl1838 PEPPER TREE CIRCLE SYCAMORE AV NE CUL DE SAC LOCAL E AC 2 4 458 33 17,500 89 4/19/17 PEP TRE Cl 1839 PEPPER TREE CIRCLE FIG TREE DR.- NE CUL DE SAC LOCAL E AC 2 4 285 33 11,610 93 1/8/19 PET CAN RD 1840 PETERS CANYON ROAD PIONEER RD ORCHARD DR LOCAL E AC_ 2 5 1,150 37 42,550 92 1/15/19 PET CAN RD 1841 PETERS CANYON ROAD ORCHARD DR NW CUL DE SAC _ LOCAL E AC 2 5 1,135 37 42,495 91 1/15/19 PINEBR DR 1842 PINEBROOK DRIVE BROWNING AV SW CUL DE SAC LOCAL E AC 2 4 534 33 21,355 90 1/8/19 PINEBR DR 1843 PINEBROOK DRIVE _ NISSON RD CUL DE SAC LOCAL E AC 2 4 204 33 7,025 61 1/8/19 PINEWO RD 1844 PINEWOOD ROAD SW CUL DE SAC NE CUL DE SAC LOCAL E AC 2 4 1,189 36 46,875 80 1/8/19 PIONEE RD 1845 PIONEER ROAD NW CUL DE SAC PIONEER WY LOCAL I AC 2 5 849 47 41,317 87 2/16/17 PIONEE RD 1846 PIONEER ROAD PIONEER WY BAXTER LOCAL 1 AC 3 5 1,586 47 74,542 86 2/16/17 PIONEE RD 1847 PIONEER ROAD BAXTER CARLSON CT LOCAL I AC 2 5 1,481 47 69,607 85 2/16/17 PIONEE RD 1848 PIONEER ROAD CARLSON CT BRAND DR LOCAL 1 AC 2 5 1,565 45 70,425 83 2/16/17 PIONEE RD 1849 PIONEER ROAD BRAND DR CASTENEDA DR LOCAL 1 AC 2 5 1,123 47 52,781 91 3/6/17 PIONEE RD 1850 PIONEER ROAD CASTENEDA DR CARSON DR_ LOCAL I AC 2 5 992 47 46,624 92 3/6/17 PIONEE RD PIONEE WY 1851 200S PIONEER ROAD PIONEER WAY CARSON DR PIONEER RD JAMBOREE RD TUSTIN RANCH RD LOCAL I I AC AC 2 2_ 5 5 1,483 608 47 32 69,701 20,896 93 89 3/6/17 3/6/17 PIONEE WY 2006 PIONEER WAY TUSTIN RANCH RD PIONER RD _LOCAL LOCAL I AC 1 2 5 608 32 20,896 85 3/6/17 PLAZA DR 1852 PLAZA DRIVE _ IRVINE BLVD N CUL DESAC LOCAL E AC 2 1 885 37 35,007 75 1/16/17 PLAZA WY 1853 PLAZA WAY HOLT AV PLAZA DR LOCAL E AC. 2 1 382 37 14,134 86 1/16/17 POMEGR RD 1854 _ POMEGRANATE ROAD _ CHERRYWOOD LN MORINING GLORY RD LOCAL E AC 2 4 228 33 7,524 92 1/8/19 POPLAR DR 1855 POPLAR DRIVE CEDAR LN NE CUL DE SAC LOCAL E AC2 4 323 33 14,304 93 1/8/19 PREBLE DR 1856 PREBLE DRIVE MAIN ST WEST SECOND ST_ LOCAL E AC 2 2 858 35 37,328 77 3/1/17 PRESID PL 1857 PRESIDIO PLACE BURNT MILL RD VALLEJO DR LOCAL E AC 2 5 657 37 24,309 - 96 1/7/19 PROSPE AV 1150 PROSPECT AVENUE MAIN ST _ THIRD ST LOCAL .A AC 2 2 324 37 8,100 92 4/19/17 Page 12 of 15 City of Tustin, CA Pavement Condition Index (PCI) Report - All Streets Sorted by Rank, Name (A -Z) BranchID PROSPE AV Sec ID 1151 Name _ PROSPECT AVENUE From THIRD ST To SECOND ST _MPAH LOCAL Rank A Type AC Lanes 2 , 2 '396 37 14,652 96 Date 3/1/17 PROSPE AV 1152 PROSZ AVENUE SECOND ST FIRST STLOCAL A AC 2 2 533 49 26,117 88 3/1/17 QUENT DR 1858 QUENT DRIVE MITCHELLAV CULDESAC LOCAL E AC 2 4 219 33 9,520 87 3/11/19 RAINTR LN 1859 RAINTREE LANE APPLE TREE DR ANA TREE CIR LOCAL E AC 2 4 989 37 36,593 83 1/8/19 RAINTR LN 1860 RAINTREE LANE ANA TREE CIR WALNUTAV LOCAL E AC 2 4 1,072 36 39,355 94 3/8/17 RAINTR LN 1861 RAINTREE LANE WALNUT AV DAHLIA DR __ LOCAL E AC 2 4 1,355 36 48,780 80 1/8/19 RAINTR LN 1862 RAINTREE LANE _ DAHLIA DR NW CUL DE SAC _ LOCAL E AC 2 4 1,626 36 60,572 84 1/8/19 RALEIG PL 1863 RALEIGH PLACE MITCHELLAV WALTER AV LOCAL E AC 2 4 519 33 17,127 86 3/15/19 RAN_CHW RD 1864 RANCHW_OOD ROAD IRVINE BLVD SW_ CUL DE SACLOCAL E AC 2 5 1,078 33 39,990 88 1/7/19 RAWLIN WY 1865 RAWLINGS WAY NW CUL DE SAC TUSTIN RANCH RD LOCAL E AC 2 5 587 37 23,698 95 1/18/19 RAWLIN WY 1866 RAWLINGS WAY _- _ _ TUSTIN RANCH RD GALLERY WY _ LOCAL E AC 2 5 1,317 37 48,729 84 1/18/19 RED HIL AV 1207_ RED HILL AVENUE _ IRVINE BLVD CITY LIMITS LOCAL BAC 4 3 270 60 16,200 83 3/4/19 RED MIL CI _ 1867 RED MILL CIRCLE _ _ BROWNING AV _ NW CUL DE SAC_ _ LOCAL E AAC 2 3 217 31 8,902 99 3/15/19 REN Cl 1868 REN CIRCLE __ BROWNING AV CUL DE SAC _ LOCAL E AC 2 4 210 33 9,223 92 1/8/19 RIDGEB PL 1869 RIDGEBORO PLACE PENNINGTON AV NE CUL DE SAC LOCAL E AC 2 4 408 33 15,669 74 3/8/17 RIDGEC Cl 1870 RIDGECREST CIRCLE ANGLIN LN S CUL DE SAC _ _ LOCAL E AC 2 1 389 33 15,311 77 1/4/17 RIV FOR RD 1871 RIVER FORD ROAD NIXON CIR 383 FT E/O NIXON CIR LOCAL E AAC 2 3 383 33 12,639 90 3/15/19 ROANOKAV 1872_ ROANOKEAVENUE _ DARSEY CIR KINGSBORO CIR LOCAL E AAC 2 4 1,773 37 65,601 94 3/25/19 ROBINS DR 1873 ROBINSON DR IRVINE BLVD JAMBOREE RD LOCAL E AC 3 5 2,831 46 130,226 89 3/1/17 RONDEL PL 1874 RONDEL PLACE_ S CUL DE SAC WELLINGTON AV LOCAL E AC 2 1 226 33 9,663 81 12/29/16 RONDEL PL 1875 RONDEL PLACE WELLINGTON AV N CUL DE SAC LOCAL E AC 2 1 177 33 8,046 88 12/29/16 _ROSALI PL 1876 ROSALIE PLACE MITCHELLAV CUL DE SAC _ LOCAL E AC 2 4 219 33 9,520 85 3/11/19 ROSALI DR 1877 ROSALIND DRIVE LAURIE LN LINDA LN LOCAL E AC 2 1 411 33 13,563 79 1/5/17 ROSELE AV 1878 ROSELEAF AVENUE W CUL DE SAC YORBA ST _ LOCAL E AC 2 1 217 34 9,614 94 4/19/17 ROSELE AV 1879 ROSELEAF AVENUE YORBAST MIMOSA LN LOCAL E AC 2 1 502 37 18,574 88R12/29/16 /16 ROSEWO Cl 1880 ROSEWOOD CIRCLE NORWOOD PARK PL S CUL DE SAC LOCAL E AC 2 1 132 37 6,863 76 ROY OAK PL 1881 ROYAL OAK PL NW CUL DE SAC SE CUL DE SAC LOCAL E AC 2 4 872 33 33,186 7317 SAB TRE CI 1882 SABLE TREE CIRCLE RAINTREE RD SE CUL DE SAC LOCAL E AC 2 4 337 33 13,326 8719 SAN JAC ST 1884 SAN JACINTO STREET HERITAGE WY SAN SABA ST LOCAL E AC 2 5 106 37 3,922 8617 SAN JUA ST 1885 SAN JUAN STREET NEWPORTAV RED HILL AV LOCAL I AC 2 3 2,560 36 92,160 89/17 SAN JUA ST 1886 SAN JUAN STREET RED HILL AV FARMINGTON RD LOCAL I AC 2 3 1,419 36 51,084 87/17 SAN JUA ST 1887 SAN JUAN STREET FARMINGTON RD BROWNING AV LOCAL I AC 2 3 1,145 36 41,220 88 1/24/17 SAN SAB ST 1888 SAN SABA STREET LARACA ST SE CUL DE SAC LOCAL E AC 2 5 794 33 28,407 99 1/18/19 SAN SIM 1883 SAN SIMON BRAZOS LN NW CDS LOCAL E AC 2 5 713 33 25,779 94 1/18/19 SANDER DR 1889 SAN_DBROOK DRIVE BIRCHFIELD DR COPPERFIELD DR LOCAL E AC 2 4 296 33 9,768 92 1/8/19 SANDFI PL 1890 SANDFIELD PLACE BROWNING AV FERNBROOK DR LOCAL E AC 2 4 475 33 15,675 83 1/8/19 SANDWO PL 1891 SANDWOOD PLACE HEATHERFIELD DR CLOVERBROOK DR LOCAL E AC 2 4 357 33 11,781 83 1/8/19 SAN CLA FR 1892 SANTA CLARA (FRONTAGE) AVENUE MARSHALL LN FAIRMONT WY LOCAL E AC 2 1 553 27 14,931 95 1/6/17 SAN FE DR 1893 SANTA FE DRIVE WOODLAWN AV RED HILL AV LOCAL E AC 2 7 938 52 48,776 84 3/15/19 SARATO DR 1894 _ SARATOGA DRIVE BURNT MILL RD VALLEJO_DR LOCAL E AC 2 5 632 37 23,384 96 1/7/19 SAYBRO LN 1895 SAYBROOK LANE CROMWELL DR FARMINGTON RD LOCAL E AC 2 3 332 37 12,284 83 1/7/19 SCHERE PL 1896 SCHERER PLACE DELAMO AV CARFAX DR LOCAL E AC 2 4 313 33 10,329 92 1/9/19 SCHOOL LN 1897 SCHOOL LANE SERVICE RD SYCAMOREAV LOCAL E AC 2 4 947 31 1 29,357 65 1/9/19 SECOND ST 1898 SECOND STREET _ PASADENA AV _ _ _ MYRTLE AV LOCAL E AC 2 2 302 33 9,966 91 1/9/17 SECOND ST 1899 SECOND STREET PACIFIC ST B ST LOCAL E AC 2 2 1,063 37 39,331 79 1/23/17 SECOND ST 1900 SECOND STREET _ C ST EL CAMINO REAL - LOCAL E AC 2 2 342 37 12,654 88 3/1/17 SECOND ST 1901 SECOND STREET _ EL CAMINO REAL PROSPECT AV LOCAL E AC 2 2 331 37 12,247 88 3/1/17 SECOND ST I- 1902 SECOND STREET PREBLE DR- CENTENNIAL WY LOCAL E AC 2 2 579 37 28,721 80 3/1/17 SERVIC RD 1903 SERVICE ROAD _ SCHOOL LN RED HILL AV LOCAL E AC 2 4 1,408 31 43,648 69 1/9/19 SEVERY RD 1904 SEVERYNS ROAD_ VALENCIA AVE _ CHARLESTON ST LOCAL E AC 2 07 1,120 38 42,560 94 3/8/17 SHADEL DR 1906 SHADEL DRIVE MALENA DR W CUL DE SAC LOCAL E AC 2 1 195 33 8,640 68 1/4/17 SHADYB DR 1907 SHADYBROOK DRIVE SANDFIELD PL CULDESAC LOCAL E AC 2 4 491 33 18,496 89 1/8/19 SHASTA WY 1908 SHASTA WAY BENETA WY LUCERO WY LOCAL E AC 2 1 250 37 9,250 72 1/3/17 SHERBR DR 1909 SHERBROOK DRIVE GALY ST PROSPECT AV LOCAL E AC 2 1 1,032 33 34,056_ 60 12/29/16 SIE VIS DR 1910 SIERRA VISTA DRIVE BROWNING AV NW END___ LOCAL E AAC 2 3 642 33 21,186 97 3/15/19 SIL TRE DR 1911 SILK TREE DRIVE ALDER LN SE CUL DE SAC LOCAL E AC 2 4 1,196 33 41,673 84 1/8/19 _511. BIR DR 1912 _ SILVER BIRCH DRIVE OLWYN DR _ NE CUL DE SAC LOCAL E AAC 2 3 394 33 15,295 92 3/1/17 Page 13 of 15 City of Tustin, CA Pavement Condition Index (PCI) Report - All Streets Sorted by Rank, Name (A -Z) orancnij SILVER DR bec ii 1913 name SILVERBROOK DRIVE From WALNUTAV To BIRCHFIELD DR MPAR LOCAL Rank E Type AC Lanes 2 Zone 4 L W Area 5,181 PCI Insp. Date 1/8/19 SILVER DR - 1914 SILVERBROOK DRIVE BIRCHFIELD DR _ GUL DE SAC LOCAL E AC 2 4 14,701 67 1/8/19 SINCLA Cl 1915 SINCLAIR CIRCLE WALNUTAV SW CUL DE _SAC LOCAL E AC 2 6 19,116 1/18/19 SIXTH STS-_ 1916 SIXTH STREET W CUL DE SAC _ PACIFIC ST LOCAL I AC 2 2 U31933 19,091 1/30/17 SIXTH ST 1917 SIXTH STREET PACIFIC ST EL CAMINO REAL LOCAL I AC 2 2 63,232 1/30/17 SIXTH ST 1918 SIXTH STREET EL CAMINO REAL _ _ NEWPORT AV LOCAL I AC 2 2 37,333 1/30/17 SNOWBE RD 1919 SNOWBERRY ROAD CHERRYWOOD LN NW CUL DE SAC LOCAL E AC 2 4 12,732 93 1/8/19 SOUND 1920__ SOUNDA _ CARRERA VENTIA LOCAL E AC 2 5 287 37 10,619 96 1/7/19 SONBRI 1921 SONBRIA CORTINA _ N_W_CULDESAC _ _ LOCAL E AC 2 5 619 37 24,882 98 1/7/19 STONEH DR 1922 STONEHENGE DRIVE CROMWELL DR_ BRYAN AV LOCAL E PJC 2 3 1,362 37 50,394 92 1/7/19 SUMMER AV 1923 SUMMERVILLE AVENUE BRANBURYPL BRIARCUFF PL OLCAL E AC 2 4 509 33 21,967 75 1/9/19 SWEETB RD 1924 SWEETBRIAR ROAD CHERRYWOOD LN _ NW CUL DE SAC LOCAL E AC 2 4 340 33 13,425 89 1/8/19 SYCAMO AV 1222 _ SYCAMORE AVENUE _ RED HILL AV_ _ DEVONSHIRE AV LOCAL C AAC 4 4 676 59 41,324 95 1/8/19 SYCAMO AV 1223 SYCAMORE AVENUE CANTERBURY AV SE DEAD END LOCAL E AC 2 4 634 57 36,138 25 1/9/19 SYCAMO AV 1224 SYCAMORE AVENUENW DEAD END ALDER LN LOCAL E AC 2 4 _ 112 57 5,934 85 3/15/19 SYCAMOAV 1225 SYCAMORE AVENUE _ ALDER LN PEPPER TREE CIR LOCAL E AC 2 4 493 33 21,439 89 1/8/19 TEN -BY LN 1925 TENBYLANE WALNUTAV FORASTERRA LN LOCAL E AC 2 4 106 33 3,248 99 1/9/19 THIRDST 1926 THIRD STREET MYRTLE AV PACIFIC ST LOCAL E AC 2 2 496 36 17,856 73 1/23/17 THIRD ST 1927 THIRDSTREET PACIFIC ST _ CALIFORNIAST LOCAL E AC 2 2 357 42 14,994 78 1/23/17 THIRD ST 1928 THIRD STREET CALIFORNIA ST BST _ LOCAL E AC 2 2 715 33 23,595 79 1/23/17 THIRD ST 1929 THIRD STREET CST _ EL CAMINO REAL LOCAL E AC 2 2 343 38 13,034 95 3/1/17 THIRD ST 1930 THIRD STREET EL CAMINO REAL _ PROSPECT AV LOCAL E AC 2 2 333 37 12,321 89 3/1/17 THIRD ST 1931 THIRD STREET PROSPECT AV_ PREBLE DR LOCAL E AC 2 2 478 37 17,686 90 3/1/17 THIRD ST 1932 THIRD STREET PREBLE DR _ EEND LOCAL E AC 2 2 151 37 5,587 95 3/1/17 TIBURO WY 1933 TIBURON WAY BURNT MILL RD _ SONBRIA LOCAL E AC 2 5 880 37 32,560 97 1/7/19 TIKI Cl 1934 TIKI CIRCLE WHITE SAND DR NW CUL DE SAC LOCAL E AC 2 3 174 33 8,309 2/27/19 TIKI LN 1935 TIKI LANE ELIZABETH WY CINDY LN LOCAL E AC 2 3 456 33 22,346 2/27/19 TREEHA DR 1936 TREEHAVEN DRIVE SEVENTEENTH ST _ PRIVATE GATE LOCAL E AC 2 1 227 34 7,718 1/4/17 TUPELO LN 1937 TUPELO LANE WALDEN LN MITCHELLAV LOCAL E AC 2 4 104 3S 3,390 K72 1/9/19 TUS EAS DR 1938 TUSTIN EAST DRIVE EL CAMINO REAL SANJUANST LOCAL E AAC 2 3 1,780 37 65,860 1/18/19 TUSVILWY 1939 TUSTIN VILLAGE WAY MCFADDEN AV 386 FT N/0 MCFADDEN AV LOCAL I AC 4 2 386 49 18,914 3/7/17 TUSVILWY 1940 TUSTIN VILLAGE WAY 386 FT N/0 MCFADDEN AV ALLIANCE AV LOCAL 1 AC 2 2 598 33 19,734 3/7/17 TUS VIL WY 1941 TUSTIN VILLAGE WAY ALLIANCE AV N END LOCAL I AC 2 2 625 33 20,625 91 3/7/17 UTT DR 1942 UTT DRIVE MITCHELLAV NISSON RD LOCAL E AC 2 1 4 1,130 37 41,810 77 1/7/19 LITT DR 1943 UTT DRIVE SAN JUAN ST LANCE DR LOCAL E AC 2 3 823 34 27,982 93 1/9/19 UTT DR 1944 LITT DRIVE LANCE DR BRYAN AV LOCAL E AAC 2 3 411 33 13,563 76 1/9/19 VALLEJ DR 1945 VALLEJO DRIVE PRESIDIO PL TIBURON WY LOCAL E AC 2 5 755 37 27,935 96 1/7/19 VANDEN LN 1946 VANDENBERG LANE YORBAST_ ENDERLE CENTER DR LOCAL I AC 2 1 859 48 41,232 92 12/29/16 VANDEN LN 1947 VANDENBERG LANE ENDERLE CENTER DR PROSPECT AV LOCAL I AC 2 1 1,407 47 66,129 92 12/29/16 VEEH DR 1948 VEEH DRIVE CHARLOMA DR _ WOODLAWN AVE LOCAL E AC 2 4 275 33 9,075 91 1/7/19 VEEH DR 1949 VEEH DRIVE WOODLAWN AVE _ _ UTT DR LOCAL E AC 2 4 283 33 9,339 72 1/7/19 VENTIA 1950 VENTIA SOUNDA CORTINA LOCAL E AC 2 5 353 37 13,061 84 1/7/19 VICTORY RD 2021 VICTORY ROAD PARK AV - TUSTIN RANCH RD LOCAL C AC 2 6 950 29 29,650 95 4/6/17 VICTORY RD 5017 - VICTORY ROAD TUSTIN RANCH RD _ PARK AV LOCAL C AC 2 6 926 28 31,860 95 4/6/17 VILLAG DR 1951 VILLAGE DRIVE YORBA ST _ ACACIA DR LOCAL E AC 2 1 1,065 37 51,219 60 4/19/17 VILLAG DR 5012 VILLAGE DRIVE VILLAGE DR N CUL DE SAC _ LOCAL E AC 2 1 123 50 6,150 77 4/19/17 VINEWO AV 1952 VINEWOOD AVENUE YORBAST MIMOSA LN LOCAL E AC 2 1 515 37 19,055 88 12/29/16 WALDEN LN 1953 WALDEN LANE HAMLET LN _ KIPLING LN LOCAL E AC 2 4 189 33 6,237 99 1/9/19 WALNUTST 1955 WALNUTSTREET NEWPORTAV ORANGEST LOCAL E AC 2 3 602 37 22,274 96 3/1/17 WALTER AV 1956 WALTER AVENUE RALEIGH PL DEL AMO AV LOCAL E AC 2 4 516 33 16,896_ 81 1/7/19 WARREN AV 1957 WARREN AVENUE HOLT AV 234FT E/O HOLT AV LOCAL E AC 2 1 234 37 8,658 86 1/9/17 WARREN AV 1958 WARREN AVENUE 294FT W/0 NEWPORT AV NEWPORTAV LOCAL E AC 2 1 294 32 9,408 97 3/1/17 WASS ST 1959 WASS STREET NEWPORTAV CHARLOMA DR_ LOCAL E AC 2 3 1,395 33 46,035 75 4/19/17 WELLIN AV 1960 WELLINGTON AVENUE GALY ST PROSPECT AV LOCAL E AC 2 1 1 1,046 33 34,518 77 12/29/16 WESTBU LN 1961 WESTBURY LANE _ _ BST NORTH PROSPECT AV LOCAL E 'AC 2 1 1,006 33 33,198 91 - 12/29/16 WESTFA RD 1962 WESTFALL ROAD SW CUL DE SAC _ _ NE CUL DE SAC LOCAL E - AC 2 4 1,112 33 41,282 73 3/7/17 WHEELE PL 1963 WHEELER PLACE SANTA CLARA AV LAURIE LN LOCAL E AC 2 1 1,124 33 37,092 67 1/4/17 Page 14 of 15 City of Tustin, CA Pavement Condition Index (PCI) Report -All Streets Sorted by Rank, Name (A -Z) BrambID WHITBY CI Sec ID 1964 Name WHITBY CIRCLE From PASADENA AV To - W CUL DE SAC MPAH LOCAL Rank E Type AC Lanes 2 •2 399 92 Date 2/27/19 WHI SAN DR 1965 WHITE SANDS DRIVE BRYAN AV FIRST ST _ _ {� E AC 2 3 776 93 3/1/17 WICKSH LN 1966 WICKSHIRE LANE _ SW CUL DE SAC NE CUL DE SAC _ _ _LOCAL �' LOCAL E AC 2 5 867 87 1/7/19 WILDEV LN 1967 _ WILDEVE LANE LANGDALE LN ALMSIDE DR _ _ LOCAL E AC 2 4 589 W13,20O95 99 1/9/19 WILLIAST 1269 _ WILLIAMS STREET MCFADDEN AV ALLIANCE AV LOCAL A AAC 2 2 1,012 95 2/27/19 WILLIAST 1270 WILLIAMS STREET ALLIANCE AV LORELEI LN LOCAL A AC 2 2 1,668 95 2/27/19 WILLIAST 1271 WILLIAMS STREET LORELEI LN MAIN ST WEST LOCAL A AC 3 2 264 95 2/27/19 WILLOW LN 1968 WILLOW LANE NORWOOD PARK PL S CUL DE SAC LOCAL E AC 2 1 123 37 6,530 71 12/29/16 WINDER LN 1969 IWINDERMERE LANE WILDEVE LN_ GRASSMERE LN LOCAL E AC 2 4 742 33 24,486 99 1/9/19 WISTE CIR 5013 WISTERIA CIRCLE VILLAGE DR _ _ S CUL DE SAC _ _- LOCAL E AC 2 1 121 50 6,050 77 4/19/17 WOODLA DR 1970 WOODLAND DRIVE LANCE DR BRYAN AV LOCAL E AAC 2 3 487 37 20,899 87 1/7/19 WOODLA DR 1971 WOODLAND DRIVE BRYAN AV _ NE CUL DE SAC LOCAL E AAC 2 3 1,208 35 45,513 99 3/15/19 WOODLA DR 1972 WOODLAND DRIVE MELVIN WY SW CUL DE SAC LOCAL E AAC 2 3 475 33 17,880 79 1/7/19 WOODLA AV 1973 WOODLAWN AVENUE SANTA FE DR_ IND_USTRIAL DR _ LOCAL E AC 2 7 636 52 33,072 87 1/9/19 WOODLA AV 1974 WOODLAWN AVENUE VEEH DR __ NISSON RD LOCAL E AC 2 4 790 33 26,070 82 1/7/19 WOODLA AV 1975 WOODLAWN AVENUE OLWYN DR OLD IRVINE BLVD LOCAL E AAC 2 3 888 33 29,304 92 3/1/17 YOLAND WY 1976 YOLANDA WAY BROWNING AV _ _ CUL DE SAC LOCAL E AC 2 4 210 33 9,223 93 1/8/19 YORBA ST 2028 YORBA STREET _ YORBA ST 440'S/JACARANDA AVE CDS LOCAL E AC 2 1 110 32 5,700 68 2/21/19 YORBAST 202.9 YORBA STREET _ YORBA ST 2_00'5/JACARANDA AVE CDS _ LOCAL E AC 2 1 100 37 5,530 59 2/21/19 66.1 13,542,951 Page 15 of 15 City of Tustin, CA Page 14 2019 Citywide Pavement Management Plan - OCTA Submittal Final Report - June 7, 2019 XIII. APPENDIX C - QUALITY ASSURANCE / QUALITY CONTROL PLAN Introduction When performing data collection in any field, the need for quality control is paramount as it is essential for accurate planning, analysis and design. This is particularly true for collecting pavement distress data for a pavement management program. The Quality Assurance / Quality Control (QA/QC) Plan establishes minimum quality standards for performance and procedures for update of the pavement management program. Obiectives This document constitutes a formal QA/QC Plan for the City of Tustin. It was prepared on March, 2018 and last revised in March, 2018. Specifically, it is intended for the 2019 Pavement Management Plan Update. The focus is on the collection of network -level pavement distress data (defined by National Cooperative Highway Research Program (NCHRP) Synthesis 401 Quality Management of Pavement Data Collection, as "Network -level data collection involves collection of large quantities of pavement condition data, which is often converted to individual condition indices or aggregated into composite condition indices". This document also addresses the QA/QC plan requirements of the Orange County Transportation Authority (OCTA)'s "Countywide Pavement Management Plan Guidelines" (Section 2.4), adopted in April, 2018. Structure of QA/QC Plan The following components are addressed in this QA/QC Plan: • Condition survey procedures used; • Accuracy required for data collection; • Inspector qualifications and experience; and • Safety. City of Tustin, CA Page 15 2019 Citywide Pavement Management Plan - OCTA Submittal Final Report -June 7, 2019 Condition Survey Procedures The governing document in performing condition surveys for the City of Tustin is ASTM D6433-16 "Standard Practice for Roads and Parking Lots Pavement Condition Index (PCI) Surveys." Both asphalt concrete (AC) and Portland cement concrete (PCC) pavements are included in this protocol. The following distresses are collected for each pavement type: 1. Blow-up/Buckling ......................................................................................................... 2. Corner Breaks ......................................................................................................... 3. Divided Slab ......................................................................................................... 4. Durability ("D") Cracking ......................................................................................................... 5. Faulting ......................................................................................................... 6. Joint Seal damage ......................................................................................................... 7. Lane/Shoulder Drop-off ......................................................................................................... 8. Linear Cracking ......................................................................................................... 9. Patching (large) and Utility Cuts ............................................................................ I ............................ 10. Patchine (small) 16. Scaling, map cracking and crazi ......................................................................................................... 17. Shrinkage Cracks ....................................................................................................... 18. Spalling (corner) ....................................................................................................... 19. Soalline (ioint) As required by the Orange County Transportation Authority (OCTA), the City of Tustin must prepare and implement a quality assurance / quality control (QA/QC) plan regarding pavement management inspection as they pertain to MicroPAVER. For the purposes of this report, Bucknam has demonstrated below how our project team implemented QA/QC procedures during the project. Our QA/QC plan focuses on the how each pavement inspection is performed, what distresses are collected and ensures that it complies with the OCTA guidelines defined within the "Countywide Pavement Management Plan Guidelines (CPMPG)". As shown within the OCTA (CPMPG), our staff followed and delivered on the requirements stated within Chapter 2, page 2-5 which require specific QA/QC data (Items A through G). Additionally, Chapter 3 requires numerous data/deliverables from local agencies for OC Go eligibility. All general PCI budgetary report submittals will follow the Chapter 3 guidelines. In conjunction with the outlined items within the CPMPG Section 2 we have summarized our QA/QC procedures below: City of Tustin, CA Page 16 2019 Citywide Pavement Management Plan - OCTA Submittal Final Report -June 7, 2019 a. Descriptions of condition survey - Our staff follows the required Condition Survey Protocols (CPMPG, Chapter 2); our staff assesses each pavement section for the minimum distresses outlined within Chapter 2, page 2-1. Additionally, based on the pavement conditions found, we collect all MicroPAVER/StreetSaver Army Corps of Engineers (ACOE) distresses, if found within the sample sections; for example, if slippage cracking, potholes, etc. are found our survey technicians record the proper information. b. How data was collected - Our surveys follow the OCTA accepted walking requirements. All sections that our staff surveys are performed through the walking method, approximately 10% of all sections surveyed were complemented with windshield surveys based on unique conditions found. Our staff physically measures the width of every section as well as measure for any square footage adjustment that need to be added or taken away from a sections "true area" (i.e. cul-de- sac, bus pads, street width variances, etc.). Samples taken always include a minimum of 2,500 SF coverage unless specific section limits prohibit this. Arterial section samples utilize a 3,500 SF sample size due to the larger section area (this is within the ASTM D6433-16 sample size calculation. Field crews typically include one individual for residential pavement sections while Arterial (MPRH) routes utilize a two -person crew for safety, traffic control and increases quality control. c. Accuracy required for data collection - We use a statistical sampling approach for measuring the quality of our field technician's work. In this manner, 10 percent of the original surveys are re- surveyed by a different survey crew than the original, supervised by a field supervisor, and the results are compared to the original surveys. Our QC process involves checking the field crews' work in a "blind study" fashion. Quality control checks are performed at the end of each survey week. This ensures that all field personnel are properly collecting section samples, distress types and distress severities for all street segments. When QA/QC issues are found, our staff documents the issues within MicroPAVER's user interface. If distress types found are not within the 97% accuracy our QA/QC is expanded beyond our minimum 10% resurvey to 20% of the original survey d. Random and Systematic Re -Inspections — As described above our staff re -inspects, as a minimum, 10% of the original survey (OCTA only requires 5%). Per the agencies requests, our staff will submit PCI reports to the agency as project status reports for their review. Agencies will typically review specific pavement sections for PCI accuracy based on recent overlay or slurry seal maintenance; this serves as an initial accuracy check on our surveys (outside Bucknam QC efforts). Additionally, our staff performs "ride -a -long" surveys with local agency staff to build consensus on how our Micro PAVER/StreetSaver ACOE surveys are performed, recorded and reported on. Random re -inspections will include a representative selection across the following categories: • Functional classed (i.e. MPAH, locals); • Surface types (e.g. AC or PCC); • Pavement conditions (e.g. good, fair, poor); • Inspectors; • Geographical areas, if applicable. City of Tustin, CA Page 17 2019 Citywide Pavement Management Plan - OCTA Submittal Final Report -June 7, 2019 For systematic re -inspections, this could be due to noticed trends such as specific treatment types (e.g. open -graded mixed), a specific inspector or geographical area. In these cases Bucknam continues to utilize a 10% re -inspection policy. PCI Comparison with Past Surveys - if previous inspection data is available, new PCI's calculated through the most recent inspections will be compared to previous PCI's. If the variance in PCI is greater than +/- 10 PCI points, these sections will be flagged for further investigation and/or re- inspection (In the cases that a PCI increases or decreases by 10 points follows the established CPMPG guidelines; Appendix A, page A-18). f. Schedule of data submittal — Pending on the City's last major PMP submittal, Bucknam will assist the agency in submitting the following: Master Plan of Arterial Highways (MPAH) routes will be surveyed and reported on at least once every two years Local streets will be surveyed and reported on every six years o Corresponding MPAH and local PCI reporting and budgetary reporting will be submitted every two years g. Experience of Inspectors — Bucknam staff have been trained on the use of MicroPAVER and the ACOE MicroPAVER segment calibration and inspection practices. Mr. Peter Bucknam (Project Manager) and Mr. Patrick Mullen (GIS Planner) have completed the MicroPAVER Certification of Professional Development courses. All Bucknam field technicians are trained using the ACOE survey methodologies and have passed OCTA's prequalification testing. Bucknam Infrastructure Group inspectors have attended formal training on pavement condition distress surveys. This training was conducted prior to performing any work using the ASTM D6433-16 protocols, consistent with OCTA's requirements. h. Field data collection safety procedures — Bucknam field survey techniques utilize the following procedures: a. All vehicles are properly marked or flagged with appropriate sign markings indicating that a "PAVEMENT SURVEY IS IN PROGRESS" b. All vehicles have the proper flashing amber light beacons placed on the top of the vehicle to allow for proper visibility and line -of -site warning c. Large MPAH routes are surveyed using two field technicians to increase traffic control warning and safety d. While parking or stopping along the survey route, vehicles legally park within the right- of-way or use a parking lot e. All field technicians wear ANSI —105 Class 11 safety vests City of Tustin, CA Page 18 2019 Citywide Pavement Management Plan - OCTA Submittal Final Report - June 7, 2019 XIV. APPENDIX D- PAVEMENT MANAGEMENT DATA FILES The City of Tustin MicroPAVER database (.e70 file) has been enclosed for City and OCTA use. This data and the associated reporting data includes: • Street names and limits for the City's public streets • Street identifiers (Branch ID, Section ID) • Direction • Begin and end of section • Length, width and true areas • Functional Classification (MPAH, Local) • Number of travel lanes • Pavement Condition Index (PCI) and date of inspection • Type of recommended treatment • Cost of recommended treatment City of Tustin, CA Page 19 2019 Citywide Pavement Management Plan - OCTA Submittal Final Report -June 7, 2019 XV. APPENDIX E - GIS MAPS/ CURRENT CONDITIONS City of Tustin, CA Pavement Condition 2019 A M �� ,"� ,•,tea ,,�,n d 1 PCI Ranges - tfi - 900 (''r'eF'j Good} - 75 - E5 (Good] - 60 - 74 (Fair) - 49 - 59 (Poor) ~!-~ 0 2;500 5,000 - 0 - 40 (Very Poor) Feet ". Irvine Buclimm Iriftaishudwe Gratp City of Tustin, CA March MIS Pavement CondTiion 2419 sot me: city of nraBn cls centemoe Created In arccls 1OA ATTACHMENT 2 Resolution No. 19-26 RESOLUTION NO. 19-26 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUSTIN CONCERNING THE STATUS AND UPDATE OF THE CIRCULATION ELEMENT, AND MITIGATION FEE PROGRAM FOR THE MEASURE M (M2) PROGRAM WHEREAS, the City of Tustin desires to maintain and improve the streets within its jurisdiction, including those arterials contained in the Master Plan of Arterial Highways (MPRH) and WHEREAS, the City of Tustin had endorsed a definition of and process for, determining consistency of the City's Traffic Circulation Plan with the MPRH, and WHEREAS, the City has adopted a General Plan Circulation Element which does not preclude implementation of the MPAH within its jurisdiction, and WHEREAS, the City is required to adopt a resolution biennially informing the Orange County Transportation Authority (OCTA) that the City's Circulation Element is in conformance with the MPAH and whether any changes to any arterial highways of said Circulation Element have been adopted by the City during Fiscal Years (FY) 2017-18 and FY 2018-19, and WHEREAS, the City is required to send biennially to the OCTA all recommended changes to the City Circulation Element and the MPAH for the purposes of re -qualifying for participation in the Comprehensive Transportation Funding Programs; WHEREAS, the City is required to adopt a resolution biennially certifying that the City has an existing Mitigation Fee Program that assesses traffic impacts of new development and requires new development to pay a fair share of necessary transportation improvements attributable to the new - development; and NOW, THEREFORE, BE IT RESOLVED that the City Council for the City of Tustin, does hereby inform OCTA that: a) The arterial highway portion of the City Circulation Element of the City is in conformance with the MPRH. b) The City attests that no unilateral reduction in through lanes has been made on any MPAH arterials during FY 2017-18 and FY 2018-19. c) The City reaffirms that Council concurs with the existing Mitigation Fee Program. PASSED AND ADOPTED at a regular meeting of the City Council of the City of Tustin held on the 18th day of June 2019. CHARLES E. PUCKETT, Mayor ATTEST: ERICA N. YASUDA City Clerk STATE OF CALIFORNIA COUNTY OF ORANGE ) SS CITY OF TUSTIN ) I, Erica N. Yasuda, City Clerk and ex -officio Clerk of the City Council of the City of Tustin, California, do hereby certify that the whole number of the members of the City Council is five; that the above and foregoing Resolution No. 19-26 was duly and regularly passed and adopted at a regular meeting of the City Council held on the 18th day of June, 2019 by the following vote: COUNCILMEMBER AYES: COUNCILMEMBER NOES: COUNCILMEMBER ABSTAINED: COUNCILMEMBER ABSENT: ERICA N. YASUDA, City Clerk ATTACHMENT 3 Resolution No. 19-27 RESOLUTION NO. 19-27 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUSTIN CONCERNING THE STATUS AND UPDATE OF THE PAVEMENT MANAGEMENT PLAN FOR THE MEASURE M2 (M2) PROGRAM WHEREAS, the local jurisdiction is required to meet eligibility requirements and submit eligibility verification packages to Orange County Transportation Authority (OCTA) in order to remain eligible to receive M2 funds. WHEREAS, the local jurisdiction is required to adopt and update a Pavement Management Plan (PMP), using the required format, regarding the status of road pavement conditions and implementation of the PMP on a biennial basis; and WHEREAS, the local jurisdiction is required to provide a plan that manages the preservation, rehabilitation, and maintenance of paved roads by analyzing pavement life cycles, assessing overall system performance costs, and determining alternative strategies and costs necessary to improve paved roads. NOW, THEREFORE, BE IT RESOLVED that the City Council for the City of Tustin, does hereby inform OCTA that: a) The PMP is in conformance with the PMP Submittal Template provided in the Countywide Pavement Management Plan Guidelines. b) The City/County hereby adopts a PMP and has provided an updated PMP report, using the required format, to OCTA. c) The Public Works Director, City Engineer or designee is authorized to sign the PMP certification form. PASSED AND ADOPTED at a regular meeting of the City Council of the City of Tustin held on the 18th day of June 2019. CHARLES E. PUCKETT, Mayor ATTEST: ERICA N. YASUDA City Clerk STATE OF CALIFORNIA ) COUNTY OF ORANGE ) SS CITY OF TUSTIN ) I, Erica N. Yasuda, City Clerk and ex -officio Clerk of the City Council of the City of Tustin, California, do hereby certify that the whole number of the members of the City Council is five; that the above and foregoing Resolution No. 19-27 was duly and regularly passed and adopted at a regular meeting of the City Council held on the 18th day of June, 2019 by the following vote: COUNCILMEMBER AYES: COUNCILMEMBER NOES: COUNCILMEMBER ABSTAINED: COUNCILMEMBER ABSENT: ERICA N. YASUDA, City Clerk