HomeMy WebLinkAbout06 SCHOOLSFIRST FEDERAL CREDIT UNION HEADQUARTERS CAMPUS PROJECTAgenda Item 6
AGENDA REPORT Reviewed:
City Manager
Finance Director NSA
MEETING DATE: JULY 2, 2019
TO: MATTHEW WEST, CITY MANAGER
FROM: ELIZABETH A. BINSACK, COMMUNITY DEVELOPMENT DIRECTOR
SUBJECT: SCHOOLSFIRST FEDERAL CREDIT UNION HEADQUARTERS CAMPUS
PROJECT
SUMMARY:
The project is a request to construct a new 180,000 square -foot headquarters office building
for the SchoolsFirst Federal Credit Union and includes a separate 5,000 square -foot credit
union branch building, a new parking structure and associated site improvements. The site
is located within Planning areas 7, 9, 11 and 14 of the Pacific Center East Specific Plan and
generally bounded by Edinger Avenue to the north, railroad right-of-way to the east,
Valencia Avenue to the south, and Newport and Del Amo Avenues to the west. The
proposed project requires approval of Development Agreement (DA) 2018-00001, Lot Line
Adjustment (LLA) 2018-00003, Concept Plan (CP) 2018-00001, Design Review (DR) 2018-
00023 and Conditional Use Permit (CUP) 2018-00015. On June 11, 2019, the Planning
Commission adopted Resolution No. 4379 determining that the associated disposition of
City property conforms to the Tustin General Plan, and adopted Resolution No. 4380
recommending that the City Council approve the proposed project.
APPLICANTS / SchoolsFirst Federal Credit Union City of Tustin
PROPERTY OWNERS: ATTN: Christina Quintero 300 Centennial Way
1200 Edinger Ave. Tustin, CA 92780
Tustin, CA 92780
FISCAL IMPACT:
The applicant has paid the required application fees for DA -2018-00001, LLA -2018-00003,
CP -2018-00001, DR -2018-00023 and CUP -2018-00015.
CORRELATION TO THE STRATEGIC PLAN:
The proposed project furthers the objectives of the following Strategic Plan goals:
Goal A.4: Economic and Neighborhood Development — The proposed project
would further the disposition and entitlement strategy for City -owned property in
Pacific Center East.
City Council Report
July 2, 2019
SchoolsFirst Headquarters Campus Project
Page 2
• Goal A. 14.b- Economic and Neighborhood Development — The proposed project
would contribute to diversification of economic sectors focusing on addition
corporate office development.
• Goal B.5.a: Public Safety and Protection of Assets — The proposed project would
contribute to capital improvement planning to ensure continuous maintenance and
improvement of traffic control and transportation facilities.
RECOMMENDATION:
1. Introduce and have first reading by title only of Ordinance No. 1501 for DA -2018-
00001 to facilitate the conveyance of an approximate 1.8 -acre site and
development of an office headquarters campus.
2. Adopt Resolution No. 19-32 approving:
a. Lot Line Adjustment (LLA) 2018-00003 to modify parcel lines to
accommodate the proposed project.
b. Concept Plan (CP) 2018-00001 for the overall concept of the office campus
facility including building design, site layout and public and private
improvements.
c. Design Review (DR) 2018-00023 for the design and site layout of the
180,000 square feet office building, 5,000 square feet credit union branch
building, parking structure and associated site improvements.
d. Conditional Use Permit (CUP) 2018-00015 for the establishment of joint -
use parking for shared parking.
APPROVAL AUTHORITY:
• Development Agreement:
Pursuant to Tustin City Code (TCC) Section 9607, the Planning Commission shall
consider the DA and make a recommendation thereon to the City Council.
• Lot Line Adjustment:
TCC Section 9321b authorizes the Community Development Director to review and
take action on Lot Line Adjustment; however, since the proposal includes other
entitlement applications that require City Council approval, LLA -2018-00003 is
forwarded to the City Council for concurrent consideration.
City Council Report
July 2, 2019
SchoolsFirst Headquarters Campus Project
Page 3
• Concept Plan:
Section 5.3 of the PCESP requires development projects to submit and obtain
approval of a Concept Plan showing conformity with the specific plan and coordinated
site improvements and phasing by the Planning Commission. This item is forwarded
to the City Council for concurrent consideration.
• Design Review:
Section 5.3 of the PCESP requires development projects to submit and obtain
approval of a Design Review pursuant to the TCC, by the Planning Commission. This
item is forwarded to the City Council for concurrent consideration of the project.
• Conditional Use Permit:
Section 4.6A3 of the PCESP and TCC Section 9264 authorizes the Planning
Commission to consider a Conditional Use Permit request for joint -use parking for
projects that share parking facilities. This item is forwarded to the City Council for
concurrent consideration.
BACKGROUND AND DISCUSSION:
Site Location
The proposed project is located within the PCESP, encompassing Planning Areas 7, 9,
11 and 14, involving five (5) properties including an area that is abandoned Del Amo
Avenue right-of-way (Figure 1). The abandoned right-of-way was a result from the
construction of Newport Avenue realignment between Edinger and Valencia Avenues and
the realignment of the SR 55 freeway ramps at this location.
rigure -i: Lana use rian
City Council Report
July 2, 2019
SchoolsFirst Headquarters Campus Project
Page 4
The project site property information is summarized in Table 1.
Table 1: Property Information
15442 Newport Avenue 14 Regional Center
15332 Newport Avenue 11 Regional Center
15222 Del Amo Avenue 9 Technology Center
1200 Edinger Avenue 7 Regional Center
Parcel 6 of PM 2010-127 (APN 430-251-28) 11 Regional Center
The project site land use designation is Regional Center and Technology Center. The
project site is bounded by Edinger Avenue to the northeast, the BNSF Railroad tracks to
the southeast, Valencia Avenue to the southwest, and Newport and Del Amo Avenues to
the northwest, encompassing approximately nineteen (19) acres. The applicant currently
owns four (4) of the five (5) properties- 15442 Newport Avenue, 15332 Newport Avenue,
15222 Del Amo Avenue and 1200 Edinger Avenue (Figure 2). The fifth property is a
triangle -shaped lot currently owned by the City and located at the corner of Newport and
Del Amo Avenues (Parcel 6/Assessor Parcel Number 430-251-28), with the abandoned
Del Amo Avenue located southeast of the City's property.
rF
E! OMA Print
s ship Cent.
T [ Oran9 �-/. dal _ \•/�. + t�F✓.e .
C
ff �
DelAm�nvn v rt cnA in Zwins:
rt �
3r
f5
f/J
�choolAt F deral� • Mmulnq � �'� ��
•ism Mori In ; I
Figure 2: Project Site Aerial
City Council Report
July 2, 2019
SchoolsFirst Headquarters Campus Project
Page 5
Project Description
The project is a proposal to construct a new headquarters office building for the
SchoolsFirst Federal Credit Union and includes a separate credit union branch building,
a new parking structure and associated site improvements.
The proposed office building will be three (3) stories, located at the corner of Newport
Avenue and Del Amo Avenue, and encompass 180,000 square feet of floor area. The
proposed 5,000 square foot credit union branch will be one-story and south of the
headquarters building. The proposed parking structure will be four (4) levels high, provide
921 parking spaces and located to the southeast of the proposed office building (Figure
3). Improvements to the project site includes walking paths, landscape areas, passive
outdoor seating areas, parking lot reconfiguration, fencing and vehicular gates and
gateway landscaping.
I 180,000 sq. ft. I
Office
r
1
5,000 sq. ft.
Credit Union
Branch %
1200 Edinger
15222 Del Amo
Parking Structure
H
15442 Newport
Figure 3 — Site Plan
City Council Report
July 2, 2019
SchoolsFirst Headquarters Campus Project
Page 6
Lot Line Adjustment
The proposed lot line adjustment involves four (4) parcels plus a portion of a previously
abandoned street. The properties included in LLA -2018-00003 are (see Figure 4 and
Attachment C):
• 15442 Newport Avenue
• 15332 Newport Avenue
• 15222 Del Amo Avenue
• Remnant parcel known as Parcel 6 of PM 2010-127. This parcel is a remnant
parcel resulting from the SR 55 freeway ramps realignment.
• Portion of abandoned Del Amo Avenue
The property located at 1200 Edinger Avenue is not included in the lot line adjustment.
Figure 4: Existing Parcels Configuration
The proposed lot line adjustment would revise property lines to accommodate the office
and credit union branch buildings on one parcel, shown in blue in Figure 5 and identified
as Parcel 1 on LLA -2018-00003 Exhibit B (Attachment C). Portions 15332 Newport
Avenue, 15442 Newport Avenue, 15222 Del Amo Avenue and abandoned Del Amo
Avenue would become part of Parcel 1. As proposed, the new buildings and parking
structure comply with the PCESP development standards and discussed further in this
report.
The property identified as Parcel 3 in Figure 5 would be the site for the parking structure.
The resulting parcel configurations accommodates the proposed buildings, simplifies the
site layout and complies with the Pacific Center East development standards.
Remnant
HEE-
P R C Pv Parcel
NEW
Or• F -E_
<I
--------------
� _--._
q MO AVENUE
LU
z
W
Qc
jOJ i
V
I
15442 -� N
1tr.5
15312
1 15222 1200
�z
J
>
A. T.
& S. F. RAILROAD
Figure 4: Existing Parcels Configuration
The proposed lot line adjustment would revise property lines to accommodate the office
and credit union branch buildings on one parcel, shown in blue in Figure 5 and identified
as Parcel 1 on LLA -2018-00003 Exhibit B (Attachment C). Portions 15332 Newport
Avenue, 15442 Newport Avenue, 15222 Del Amo Avenue and abandoned Del Amo
Avenue would become part of Parcel 1. As proposed, the new buildings and parking
structure comply with the PCESP development standards and discussed further in this
report.
The property identified as Parcel 3 in Figure 5 would be the site for the parking structure.
The resulting parcel configurations accommodates the proposed buildings, simplifies the
site layout and complies with the Pacific Center East development standards.
City Council Report
July 2, 2019
SchoolsFirst Headquarters Campus Project
Page 7
SHEET 2
SHEET 3 -� A SHEET 4
rsEw_Q° - �; _ �� WO AVENUE
i 115332,�
Q PARCEL 2 br1J I i ' FARCE �a
. Q .., ..
V I PARCEL 3 P�
W 15442 I ��9� NCI I 15222 1200
A. T. & S. F. RAILROAD
Figure 5: Proposed Parcel Configuration
Development Agreement
To strengthen the public planning process, encourage private participation in
comprehensive planning, and reduce the economic risk of development, the California
Legislature adopted the Development Agreement Statute of the Government Code.
Pursuant to the Statute, the City may enter into an agreement with any person having a
legal or equitable interest in real property and to provide for the development of such
property and to establish certain development rights therein.
DA -2018-00001 (Attachment E: Ordinance No. 1501) will provide for the orderly
implementation of the General Plan, PCESP, the phased development and completion in
accordance with the associated DDA, and certain assurances to the Developer and the
City. These assurances require the cooperation and participation of the City and
Developer and could not be secured without mutual cooperation and commitment to the
comprehensive planning effort that has resulted in the DA.
The DA will include, but will not be limited to, the following provisions:
• The term of the DA
• Public benefits
• The timing of development as set forth in the DDA
• Construction of infrastructure and public facilities
• Development rights, etc.
On June 11, 2019, the Planning Commission considered the DA and recommended the
City Council to adopt Ordinance No. 1501 (DA -2018-00001).
City Council Report
July 2, 2019
SchoolsFirst Headquarters Campus Project
Page 8
Concept Plan
The proposed project, as conditioned, addresses the project site's overall site design,
drainage plan, preliminary geologic and soils conditions, external/internal circulation,
median and parkway landscaping, master signage and project phasing. The project site
has existing drainage improvements, utilities and infrastructure. The proposed project
will tie into existing infrastructure where appropriate and install new connections and
improvements as needed. The applicant is planning to construct the structures and site
work in one phase and expects to complete construction in 2021.
The buildings located at 15442 Newport Avenue and 15222 Del Amo Avenue are existing
office buildings and no changes are proposed (Figure 6). The existing warehouse
building located at 1200 Edinger Avenue is currently used as a facility for storage and
maintenance of ATMs. The building is also used as the applicant's mail sorting facility at
which package deliveries and mail are received, sorted, then delivered to employees in
the office buildings by in-house staff. As conditioned in Resolution No. 4380 and DA -
2018 -00001, the applicant will implement minor improvements to the property located at
1200 Edinger Avenue with enhanced landscaping along the street fronts and new paint
on the building. The applicant does not have immediate plans to modify the current use
of 1200 Edinger Avenue. As conditioned, the applicant will establish and record
Covenants, Conditions & Restrictions on the subject parcels in order to ensure that the
campus facility will be maintained properly.
15442 Newport ry-
15222 Del Amo
a{r4 If12700dinger
7ti
Figure 6: Existing Buildings
City Council Report
July 2, 2019
SchoolsFirst Headquarters Campus Project
Page 9
The applicant has provided conceptual signage renderings on the building elevation
renderings. As conditioned, the applicant will be required to provide a master sign plan
for the campus facility for City review and approval prior to submitting for sign permits.
The master sign plan will address gateway signage, building signs, monument signs and
wayfinding signs.
The overall concept of the project site is to establish a headquarters facility to be occupied
by a single tenant and the proposed buildings and parking structure completes their
overall plans for a headquarters campus.
Development Capacity
The PCESP identified Planning Areas and development capacities that account for the
vision of the PCESP and the impacts identified in the project's environmental impact
report. The specific plan identifies maximum authorized square footage in PCESP Table
4, which was based on approximate acreage data of planning areas and assigned floor -
area ratios (F.A.R.). The project site involves four (4) planning areas and as part of the
project, the planning area square footage was calculated by registered civil engineers,
based on survey records and final parcel maps, to yield more accurate area calculations.
The resulting respective development capacities are summarized in Table 2 of this report.
Structures that do not contain building floor area such as the proposed parking structure
are not included in calculations for development capacity in that these structures are
accessory uses.
Table 2: Development Capacity Calculations
I=
0.65 0.40 0.65 0.40 0.54
181,497 143,987 295,410 210,327 831,221
192,016 84,131
38,478 60,212 0 97,828 196,518
0Mnt"MMI0��MMIIL85,756
38,478 60,212 180,753 102,831 382,274
79495
-10,054
(to PA 14)
69,441
'2,617 11,263 -18,700 69,441
+2,617 -2,617 +8,646
(from PA 11) (to PA 9) (from PA 11)
-8,646 +10,054
(to PA 14) (from PA 7)
0 0 0
69,441
City Council Report
July 2, 2019
SchoolsFirst Headquarters Campus Project
Page 10
The PCESP allows exchanges of square footage between planning areas, subject to City
approval. The applicant is requesting approval to exchange development capacities
Planning Areas 7, 9, 11 and 14. In summary, 11,263 square feet in Planning Area 11
would be transferred to Planning Areas 9 and 14, and 10,054 square feet from Planning
Area 7 would be transferred to Planning Area 14 to accommodate existing square footage
and the proposed credit union branch building. Figure 7 depicts the existing and proposed
buildings in relation to the Planning Areas, illustrating that the square footage exchanges
allows flexibility of the project site to function as a headquarters campus.
When viewed as a campus facility, the project site would be allowed a maximum 451,715
square feet of total building floor area based on the planning area F.A.R. As proposed,
the campus would have 382,274 square feet of building floor area, which is within the
development capacity identified in the PCESP. In the future, the applicant may apply for
approval to construct additional building square footage on the campus up to the
maximum 451,715 square feet allowed.
In accordance with the PCESP and project EIR, the Community Development and Public
Works Departments have reviewed the proposed square footage exchanges and
concluded that the proposed project complies with the PCESP development capacities
and trip generation allowances identified.
Figure 7: Planning Areas and Proposed Lot Lines
Planning Area 7
Planning Area 9
Planning Area 11
Planning Area 14
Parcel Boundary
Figure 7: Planning Areas and Proposed Lot Lines
City Council Report
July 2, 2019
SchoolsFirst Headquarters Campus Project
Page 11
Design Review
The proposed project encompasses several design review elements such as architecture,
site design, site access, vehicle parking configurations, passive outdoor amenities and
landscaping. The proposed building designs and site plan complies with the PCESP
regulations and is summarized in Table 3.
Table 3: Building / Site Design Summary
Land Use Development Standards Required i Proposed
Min. Building Site Area 20,000 184,283 sq. ft. (Office, Branch)
sq. ft. 103,356 sq. ft. (Parking Structure)
200,467 sq. ft. (15442 Newport)
160,460 sq. ft. (15222 Del Amo)
Min. Lot Width 100 ft. 318.85 ft. (Office, Branch)
250.67 ft. (Parking Structure)
Max. Building Height (Office) 65 ft. 58 ft. 4 in. (Office)
Max. Building Height (Commercial)
35 ft.
20 ft. 6 in. (Branch)
Min. Building Setback to Newport Ave.
35 ft.
35 ft.
Min. Building Setback to Del Amo Ave.
20 ft.
23 ft.
Min. Landscape Setback to Newport Ave.
20 ft.
45 ft.
Min. Landscape Setback to Del Amo Ave.
25 ft.
30 ft.
Building setbacks along interior and rear property lines are determined by the California
Building Code requirements.
Architecture and Site Design
The overall concept of the proposed project is to create an environment that
communicates transparency and openness. The proposed office building will present a
strong visual statement to passersby. The office building is in the general shape of an
eye, with the central area comprising of a large courtyard.
The overall look of the new buildings presents a contemporary style with its incorporation
of a glass building exterior, horizontal metal fins, and varying cantilevered sections of the
building. The architectural enhancements are subtle in nature and accomplished through
linear applications of building material, slight variations in glass hue, and the overall shape
of the buildings (Figure 8 and Attachment B).
City Council Report
July 2, 2019
SchoolsFirst Headquarters Campus Project
Page 12
Figure 8: Office Building Architectural Rendering
The interior space is designed to have work spaces, offices and full height walls
positioned away from the perimeter glass curtain walls in order to maintain the visual
connection and integration between the interior and exterior spaces. The following
images illustrate the way these interior spaces are envisioned to provide a sense of
openness and transparency (Figure 9).
City Council Report
July 2, 2019
SchoolsFirst Headquarters Campus Project
Page 13
Figure 9: Building Interior Architectural Renderings
The architect has incorporated interior features that offer employees areas for different
activities. Each floor offers spaces for open office areas, individual offices, social hubs,
break areas, collaboration areas, conference rooms, storage, mothers' rooms, restrooms
and shower rooms. The building is designed with a grand staircase that connects all three
(3) floors and is accessible from the employee lobby area on the first floor (Figure 10).
Collaboration Hub/
Grand Staircase
Figure 10: Employee Lobby and Main Staircase
City Council Report
July 2, 2019
SchoolsFirst Headquarters Campus Project
Page 14
The first floor also includes training rooms, a multipurpose room, reception area,
employee lobby, and cafeteria. This floor is designed with a breezeway that provides
direct connection between the central courtyard and the common outdoor area beyond
the office building; the second and third floors cover this breezeway area.
The third floor provides executive staff office spaces including a boardroom that has an
adjacent terrace to offer outdoor space. As proposed, approximately one-third of the top
floor will be improved as shell space and remain vacant. The applicant does not currently
have plans to fully improve this area in that the needs for this office space have not yet
been identified.
The proposed credit union branch building will be located south of the new office building
and will incorporate porcelain tile and metal facades to complement the glass walls while
creating distinction from the office building (Figure 11). The building entrance is designed
with an awning structure that is incorporated into the overall building design. The 5,000
square -foot building is proposed to have two (2) ATMs near the building entrance. The
interior of the building will be improved with an open office area for credit union member
services, restrooms, and back office spaces.
ri
�u+�hlq�€uiT UNir1H _
■
Figure 11: Credit Union Branch Building Architectural Rendering
The exterior improvements proposed for the office campus includes a central courtyard
in the new office building that include tables and chairs adjacent to the cafe area,
landscaping, planters and seating areas. The area east of the office building is designed
to have passive outdoor amenities such as walking paths, bench seating, trees and
landscaping to create a park -like environment for the employees.
The parking structure, located to the southeast of the proposed office building, will have
921 parking spaces among its four (4) levels (Figure 12). The structure is designed with
two (2) elevator towers, which are located on the northwest and southwest corners of the
structure. These towers are designed with architectural features that carry over the use
of glass and paint colors applied on the office and credit union branch buildings. The
structure will also have three (3) stair cases and secured areas for long-term bicycle
City Council Report
July 2, 2019
SchoolsFirst Headquarters Campus Project
Page 15
parking. Overall, the parking structure will be painted in color block patterns that help to
reduce the visual massing of the structure.
Figure 12: Parking Structure Architectural Rendering
The exterior areas are designed with walls and fences to separate general public areas
and employee -only areas, shown within the red -dashed line in Figure 13. The credit union
branch building and parking areas along Newport and Valencia Avenues are accessible
to the general public.
Circulation & Parking
The project is designed to have several access points onto the campus. There are
existing drive approaches from Valencia Avenue, Newport Avenue and Del Amo Avenue.
The Valencia Avenue and Del Amo Avenue access points will remain unchanged. The
driveway on Newport Avenue will be upgraded to be a fully signalized intersection.
The internal circulation consists of a perimeter drive that parallels Newport Avenue,
Valencia Avenue and the rear property line to the east. The drives and parking area
adjacent to the credit union branch building is intended for customer and visitor use. This
drive terminates into a round -about and drop-off area at the visitor entrance for the office
building. The applicant proposed to install vehicular gates at two (2) locations in the
parking lot area for employee parking only (Figure 13). One gate will be located near the
drive approach located on Valencia Avenue at 15442 Newport Avenue. The second gate
is proposed near the west corner of the existing office building at 15222 Del Amo Avenue.
The Public Works Department — Engineering Division has reviewed the proposed
vehicular gates and supports the proposal, as conditioned. The parking lot area to the
north of 15222 Del Amo will not be fenced or gated as part of this project.
City Council Report
July 2, 2019
SchoolsFirst Headquarters Campus Project
Page 16
Fire Access Gate
15332 Newport
(Proposed)!
' r
+r'
rf
+ r�
r+
Fenced Area
f -
V
15432 Newport
(Proposed)
15442 Newport
-7—
Vehicular Gate
15222 Del Amo
Vehicular Gate
15336 Newport
(Proposed)
Figure 13: Circulation and Employee Accessible Areas
In addition, dedicated fire access is proposed to be located between the new office
building and existing building at 15222 Del Amo Avenue. This area between the buildings
will be secured with fencing and a gate that will be provided with a Knox Box for fire
access.
City Council Report
July 2, 2019
SchoolsFirst Headquarters Campus Project
Page 17
The project is designed with 1,660 parking spaces, including six (6) spaces that are dual
use for loading and parking. The standard for parking space dimensions is nine (9) feet
wide by nineteen (19) feet long. The applicant has requested approval for parking space
dimensions of nine (9) feet wide by eighteen (18) feet long for parking spaces within the
parking structure. The parking spaces within the proposed surface parking lots provide
the required nine (9) feet wide by nineteen (19) feet long. Pursuant to PCESP Section
4.66.7. parking development standards are subject to design review criteria. Staff is in
support of the requested variation in that the parking structure spaces are accessible to
employees only and the intent of the parking standards in the Specific Plan are
accommodated in the proposed project.
Conditional Use Permit — Joint -Use Parking
The proposed project includes a request for joint -use parking to allow for parking spaces
to be shared among all properties on the project site. The project requires 1,407 parking
spaces between the existing and proposed buildings based on building square footage
and use (Table 4). The design provides 1,660 parking spaces, thus exceeding the
minimum requirement.
Table 4: Parkinq Sum
1200 Edinger Avenue 1 sp / 1,000 sq. ft.
(<20,000 sq. ft.)
39,478 1 30 1 237
As proposed, individual parcels would not provide the minimum number of parking spaces
required for the building on-site, with the exception of 1200 Edinger Avenue. Instead, the
majority of the parking spaces will be provided in the parking structure, which will be
located on an entirely separate parcel. The applicant submitted a joint -use parking study
in accordance with specific plan requirements (Attachment F, Exhibit A). The study
concluded that the PCESP requires a total 1,407 parking spaces for the existing and
proposed office uses. In addition to the office uses, the existing warehouse building on
1200 Edinger requires thirty (30) parking spaces. As conditioned, the joint -use parking
conditional use permit would require minimum 1,407 parking spaces to accommodate all
uses on the project site and the establishment of recorded parking and access
agreements to ensure continued shared access and parking between all properties within
the office campus.
1 sp / 2,000 sq. ft.
(>20,000 sq. ft.)
15222 Del Amo Avenue
1 sp / 250 sq. ft. 60,212
241
237
15332 Newport Avenue
1 sp / 250 sq. ft. 185,756
744
46
15442 Newport Avenue
1 sp / 250 sq. ft. 97,828
392
219
Parking Structure
N/A N/A
0
921
Total 383,274
1,407
1,660
As proposed, individual parcels would not provide the minimum number of parking spaces
required for the building on-site, with the exception of 1200 Edinger Avenue. Instead, the
majority of the parking spaces will be provided in the parking structure, which will be
located on an entirely separate parcel. The applicant submitted a joint -use parking study
in accordance with specific plan requirements (Attachment F, Exhibit A). The study
concluded that the PCESP requires a total 1,407 parking spaces for the existing and
proposed office uses. In addition to the office uses, the existing warehouse building on
1200 Edinger requires thirty (30) parking spaces. As conditioned, the joint -use parking
conditional use permit would require minimum 1,407 parking spaces to accommodate all
uses on the project site and the establishment of recorded parking and access
agreements to ensure continued shared access and parking between all properties within
the office campus.
City Council Report
July 2, 2019
SchoolsFirst Headquarters Campus Project
Page 18
Environmental Review
On December 18, 1990, the Tustin City Council certified Final Environmental Impact Report
(FEIR) 90-1 for the Pacific Center East Specific Plan. On May 5, 2003, the City Council
approved Supplement #1 to FEIR 90-1 for the Pacific Center East Specific Plan. The FEIR,
along with its supplement, is a Program El under the California Environmental Quality Act
(CEQA). The FEIR considered the potential environmental impacts associated with the
development of the Pacific Center East Specific Plan.
An Environmental Checklist (Attachment F, Exhibit A) has been prepared and concluded
that the proposed actions do not result in any new significant environmental impacts or a
substantial increase in the severity of any previously identified significant impacts in the
FEIR. Moreover, no new information of substantial importance has surfaced since
certification of the FEIR.
Planning Commission Action
On June 11, 2019, the Planning Commission considered the proposed project and
expressed the desire to have "Welcome to Tustin" signage at the southeast corner of
Newport and Del Amo Avenues. Initially the City considered including gateway signs at
the project location; however, after further review, gateway signage on medians or the
City -owned site across Newport Avenue would provide more opportunity for prominent
gateway signage for the offramp traffic.
The Commission adopted Resolution No. 4379 finding that the project is in conformity
with the adopted General Plan, and adopted Resolution No. 4380 recommending that the
City Council approve the proposed project.
CONCLUSION
The proposed DA -2018-00001, LLA -2018-00003, CP -2018-00001, DR -2018-00023 and
CUP -2018-00015 are consistent with the Pacific Center East Specific Plan and the
General Plan. Accordingly, staff recommends that the City Council introduce and hold the
first reading for Ordinance No. 1501 and approve the project.
/U/ _
kd lynne V. Hutter
Senior Planner
ll �
lizabeth A. Binsack
Director of Community Development
Attachments
A. Location Map & Land Use Application Fact Sheet
B. Submitted Plans
C. LLA -2018-00003 Application and Exhibits
City Council Report
July 2, 2019
SchoolsFirst Headquarters Campus Project
Page 19
D. Planning Commission (DRAFT) Minutes of June 11, 2019, and Resolution No. 4379
& 4380.
E. Ordinance No. 1501
• Exhibit A — Development Agreement 2018-00001
F. City Council Resolution No. 19-32
• Exhibit A: Pacific Center East Specific Plan FEIR Initial Study and Checklist; Joint
Use Area Parking Review Study dated May 3, 2019; Traffic Impact Study dated
January 3, 2019
• Exhibit B: Conditions of Approval