Loading...
HomeMy WebLinkAbout16 SANTA ANA DRAFT EIR 04-18-05 Agenda Item 16 A G END A REPORT Reviewed: ; ......-- City Manager ~ Finance Director ~ MEETING DATE: APRil 18, 2005 FROM: WilLIAM A. HUSTON, CITY MANAGER COMMUNITY DEVELOPMENT DEPARTMENT TO: SUBJECT: CITY OF TUSTIN RESPONSE TO CITY OF SANTA ANA DRAFT ENVIRONMENTAL IMPACT REPORT FOR MACARTHUR PLACE SOUTH SUMMARY City Council authorization is requested for the City of Tustin's response to the subject Draft Environmental Impact Report for the proposed MacArthur Place South project in the City of Santa Ana (Attachment A). RECOMMENDATION: That the City Council authorize staff to forward the attached response letter to the City of Santa Ana. FISCAL IMPACT: There are no fiscal impacts associated with this action. BACKGROUND AND DISCUSSION: The proposed project includes the development of a total of 791 residences and 10,000 square feet of office space in three 25-story residential towers, three 5-6 story residential buildings, and a 5-6 story office/loft building, and 13,871 square feet of restaurant and retail space in a one-story building, all located south of MacArthur Boulevard and east of Main Street in the City of Santa Ana (see location Map). A total of 47,000 square feet of existing land uses will be demolished as part of the construction, including a movie theater, a restaurant, and surface parking lots. The site is currently zoned C2 (General Commercial) and a zone change to SD (Specific Development) will be required. The Draft EIR concludes that the project would result in significant and unavoidable impacts to aesthetics, air quality, and traffic and transportation. City Council Report DEIR Santa Ana MacArthur Place April 18,2005 Page 2 The Community Development and Public Works Departments have reviewed the subject Draft EIR. Staff believes that all traffic impacts to the City of Tustin should be appropriately mitigated. Staff also believes that it is in the City's interest to be on record regarding this matter and has prepared correspondence expressing the City's concerns regarding the Draft EIR document (see Attachment A). Staff requests that the Tustin City Council review and consider these comments and, if acceptable, authorize their formal transmission to the City of Santa Ana. ~ tM;t; ~ Scott Reekstin Senior Planner å~¡i »t)~): Elizabeth A. Binsack Community Development Director Attachments: A. B. Draft Comment Response Letter Location Map S:\CddlCCReportsIDEIR Santa Ana MacArthur Place South.doc ATTACHMENT A DRAFT COMMENT RESPONSE LETTER April 19,2005 Dan Bott City of Santa Ana Planning Division P.O. Box 1988 (M-20) Santa Ana, CA 92702 SUBJECT: REVIEW OF DRAFT ENVIRONMENTAL IMPACT REPORT FOR MACARTHUR PLACE SOUTH PROJECT IN THE CITY OF SANTA ANA Dear Mr. Bott: Thank you for the opportunity to provide comments on the Draft Environmental Impact Report fpr the MacArthur Place South project in the City of Santa Ana. The project is proposed to include the development of a total of 791 residences and 10,000 square feet of office space in three 25-story residential towers, three 5-6 story residential buildings, and a 5-6 story office/loft building, and 13,871 square feet of restaurant and retail space in a one-story building, all located south of MacArthur Boulevard and east of Main Street in the City of Santa Ana. The City of Tustin has identified the following comments and concerns: 1. The Traffic Study contained a limited number of "cumulative projects." Some significant projects (Le., the Tustin Legacy, Pacific Center East, etc.) appear to have been excluded from the year 2007 analyses. All projects that may contribute significant traffic to the study intersections should be included in the Traffic Study to assure that all impacts have been fully addressed. 2. Please confirm that the traffic model used for the future conditions analyses accurately reflects the land use approvals for the Tustin Legacy project and other significant projects in the area (Le., Pacific Center East, etc.) 3. With the existing traffic congestion on State Route ("SR") 55 in the study area, there is added potential for traffic to use parallel arterials (Le., Red Hill Avenue, etc.). Potential traffic impacts (also see comments 1 and 2 above) related to these factors need to be included in the traffic analyses. This may require the inclusion of additional study intersections such as Red Hill/Dyer-Barranca, Red Hili/Warner, Red HiliNalencia, etc. The responses to the NOP indicate that SR-55 congestion is considered in the analysis, but the year 2007 and 2025 project traffic distributions provided in the DEIR, for SR-55 and Red Hill Avenue, are essentially the same. It is anticipated that increased congestion on the SR-55 may occur by year 2025. In addition, when considering if added intersections need to be analyzed as requested, the 0.03 ICU threshold is only Mr. Dan Bott Santa Ana MacArthur Place South Draft EIR April 19, 2005 Page 2 applicable to CMP locations. Other locations in the city of Tustin have a 0.01 ICU significance threshold. 4. All previously submitted comments on the NOP (see above) should be adequately addressed. The previous comments may need to be expanded with the inclusion of the added cumulative projects. 5. There should be a mitigation measure required of the project to contribute a "fair share" toward needed improvements in the City of Tustin, where the proposed project is expected to add traffic. If there are significant project impacts, then specific added improvements may be required. 6. Further detailed review will be completed upon inclusion of the requested materials. We would appreciate the opportunity to review the revised materials upon completion. We may have additional comments upon receipt of the updated analyses. Thank you again for the opportunity to provide comments on the Draft Environmental Impact Report for the MacArthur Place South project. The City of Tustin would appreciate receiving the Final EIR documents with the responses to our comments when they become available. If you have any questions regarding the City's comments, please call me at (714) 573-3016 or Terry Lutz, Principal Engineer, at (714) 573-3263. Sincerely, Scott Reekstin Senior Planner Terry Lutz Principal Engineer cc: Elizabeth Binsack Tim Serlet Dana Kasdan Doug Anderson Scott Reekstin SA:environiSanta Ana MacArthur Place South DEIA Comment Letter.doc ATTACHMENT B LOCATION MAP Section 4.2. Project location and Boundaries - 39 Chapte' 4. Proj",t Oemlptlon Exhibit 3 - Project Vicinity Map City of Santa Ana (Manoh 2005) 0'0" Envl,onmental Impact Report MacArthu, Place South