Loading...
HomeMy WebLinkAbout07-ATTACHMENT KATTACHMENT K PC STAFF REPORT DATED JUNE 11, 2019 AGENDA REPORI s� MEETING DATE: JUNE 11, 2019 TO: PLANNING COMMISSION FROM: COMMUNITY DEVELOPMENT DEPARTMENT SUBJECT: CONDITIONAL USE PERMIT 2018-00018 AND DESIGN REVIEW 2018-00026 APPLICANT: TERRY ODLE/MG2 3333 MICHELSON DRIVE, SUITE 100 IRVINE, CA 92612 PROPERTY OWNER: DIANA SALAZAR COSTCO DIRECTOR OF REAL ESTATE COSTCO WHOLESALE CORPORATION 9 CORPORATE PARK, SUITE 230 IRVINE, CA 92606 LOCATION: 2541 AND 2655 EL CAMINO REAL GENERAL PLAN: PLANNED COMMUNITY COMMERCIAL/BUSINESS ZONING: PLANNED COMMUNITY MIXED-USE EAST TUSTIN SPECIFIC PLAN ITEM 44 ENVIRONMENTAL: THIS PROJECT IS CATEGORICALLY EXEMPT PURSUANT TO THE CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) SECTION 15332, CLASS 32. PC Report June 11, 2019 CUP 2018-000181DR 2018-00026 Page 2 REQUEST: A REQUEST TO DEMOLISH THE EXISTING GOODYEAR TIRE CENTER AND ADJACENT PARKING AREA AT 2541 EL CAMINO REAL AND REPLACE WITH 56 NEW PARKING STALLS AND CONSTRUCT A NEW 16 PUMP COSTCO GASOLINE FUEL STATION WITH CANOPY AND RELATED EQUIPMENT AT 2655 EL CAMINO REAL. RECOMMENDATION: That the Planning Commission adopt Resolution No. 4385, approving Conditional Use Permit (CUP) 2018-00018 and Design Review (DR) 2018-00026 to demolish the existing Goodyear Tire Center and adjacent Goodyear parking area at 2541 EI Camino Real and replace with 56 new parking stalls and to construct a new 16 pump Costco Gasoline fuel station with canopy, related equipment and landscaping at 2655 El Camino Real. APPROVAL AUTHORITY: The project site is located within the Planned Community Mixed -Use (PCMU) zoning district of the East Tustin Specific Plan (ETSP) area. Pursuant to Section 3.8.2 and 3.7.2.A.1.0 of the ETSP, new service stations are subject to the approval of a CUP. Pursuant to Tustin City Code (TCC) Section 9291 c, the Planning Commission has the authority to review and act on CUPs. Pursuant to TCC Sections 9272, design review approval is required for new structures, major exterior alterations or enlargement of existing structures. BACKGROUND: Project Site and Surrounding Uses The shopping center, in which the proposed project is located, is improved with an existing Costco Warehouse building, Goodyear Tire Center, a major retail store (formerly Kmart/Sears/Ansar Gallery), McDonalds, and two (2) multi -tenant buildings. The site is located within the ETSP and is designated as Mixed -Use. To the north, across Bryan Avenue are single-family residences and to the west, across Tustin Ranch Road are condominiums. The Tustin Auto Center is to the south, across EI Camino Real; the Tustin Market Place is to the east beyond the EI Modena Flood Channel and Myford Road. Currently, there are two (2) Costco Warehouses within the City; one (1) at The District at Tustin Legacy shopping center and a second one at the subject property off EI Camino Real. The District location currently has a gasoline fuel station with eleven (11 ) fuel pumps with 22 fueling dispensers. The proposed project will consist of sixteen (16) pumps with 32 fueling dispensers, overhead canopy and associated equipment. PC Report. June 11, 2019 CUP 2018-000181DR 2018-00026 Page 3 Site Plan 2655 El Camino Real (Proposed Location) PC Report June 11, 2019 CUP 2018-0001 BOR 2018-00026 Page 4 2541 El Camino Real (Existing Building to be Demolished) East Tustin Specific Plan The ETSP was adopted by the City in 1986. In March 1992, an amendment to the East Tustin Development Agreement was approved which included a modification to the Sector 12 Concept Plan and approval of Vesting Tentative Tract Map 14610. The original Sector 12 Concept Plan included 19 -acres of commercial development and five (5) acres reserved for a hotel on the subject site. The 1992 modification eliminated the hotel use at the site and the tract map that was processed concurrently with a Design Review application subdivided the 12 -acre property into six (6) numbered lots to allow the ultimate construction of a 274,175 square foot retail commercial center. The commercial center was comprised of two (2) major retail tenants and five (5) individual pad tenants. Costco and K -Mast were the first anchor tenants within the center and both moved in following construction completion in 1993-1994. Costco has remained a major tenant, at the same location since 1993-1994. DISCUSSION: Proposal The shopping center has an overall site comprised of approximately twelve (12) acres; however, the addition of the gasoline station would be contained within an approximate one (1) acre portion of the site within the Costco parcel; more specifically the southeastern corner of the existing shopping center. The gasoline station would be developed as an accessory use to the existing Costco Warehouse business. The existing 9,136 square foot Goodyear Tire Center building and adjacent parking area is proposed to be removed as part of the project. Fifty-six (56) parking spaces will be striped in place of the building. PC Report June 11, 2019 CUP 2018-00018/DR 2018-00026 Page 5 The proposed project will consist of sixteen (16) pumps with 32 fueling dispensers, overhead canopy and associated equipment. 1 _ Proposed Site Plan Enlarged Site Plan PC Report June 11, 2019 CUP 2018-000181DR 2018-00026 Page 6 ANALYSIS: Business Hours of Operation The gasoline station is proposing to operate from 5:00 AM to 10:00 PM daily. The station will be available for Costco Warehouse members only and requires a Costco membership to access the fuel pumps. The proposed station would be manned by one (1) Costco employee who will oversee day-to-day operations and cleanliness at the site. No other automotive or retail sales will be available at the station. The gasoline station would be equipped with a red-light/green-light system to indicate which pump was open and available to the next person in line along with CostcoPay (a key -fob pay system), which, per the applicant, improves efficiency and helps shorten lines to waiting customers. Entry and exit for fuel deliveries to the site would be to and from Bryan Avenue. No deliveries of fuel would take place off EI Camino Real. The proposed business hours of the service station are compatible with the surrounding businesses in that the station provides a consumer service during typical service station hours. Modifications to the hours of operation may be limited by the Community Development Director if it is determined that impacts to the surrounding tenants or properties are occurring. Parking/Circulation/Queue Management The existing Costco Warehouse property features 623 parking spaces, which exceeds the City's minimum parking standard of 544 stalls (4.5 stalls/1,000 SF of building area). There is also a recorded Covenant, Conditions and Restriction (CC&R's) document between Costco and Sears (formally Kmart) and the adjacent leaseholder of the other major tenant building) that is more restrictive. The applicant has indicated that they plan to adhere to the existing CC&R conditions and do not intent to modify. Per this agreement, the parking standards require both large retail users to maintain a minimum parking ratio of 5 stalls/1,000 SF of building area. For the purpose of the CC&R's, the required number of parking stalls for Costco is 605 stalls and the total number of parking spaces with the proposed project will be 605 stalls, which adheres to this requirement. The Costco Warehouse and proposed project is part of a larger shopping center with other tenants. The existing overall parking for both Costco and the other retail commercial tenants within the shopping center is summarized below: Required (per TCC) Parking ProvidedParking Costco 544 605 Kmart 474 530 Pad B 37 32 Pad C 37 32 McDonalds 18 55 Total Parking 1110 1254 PC Report June 11, 2019 CUP 2018-000181DR 2018-00026 Page 7 A Traffic Analysis was prepared for the proposed project which analyzed trip impacts of the proposed station and accounted for the fact that an existing on-site use, the Goodyear Tire Center, would be replaced with parking area. The analysis also included an examination of traffic volumes and intersection Levels of Service (LOS) and concluded that additional trips generated by the proposed use would allow all studied intersections to continue to operate acceptably at (LOS) A or B. The location of the four (4) islands with sixteen (16) pumps and the site configuration on the property will accommodate the fueling for 32 vehicles, with additional stacking of another 40 vehicles east of the pump islands. The project would also provide a dedicated westbound right turn lane into the site at Auto Center Drive and EI Camino Real and restriping of EI Camino Real. vroposea stacKing vian Customers would enter the site traveling either west or eastbound on EI Camino Real via an existing driveway apron at the intersection of EI Camino Real and Auto Center Drive that would continue to provide access to the existing commercial tenants and proposed gasoline station. Customers could also enter the shopping center from Bryan Avenue and Tustin Ranch Road. Vehicular queueing data was collected at other Costco Gasoline fueling sites to determine the anticipated queues for the proposed station. Based on the comparable locations with PC Report June 11, 2019 CUP 2018-00018/DR 2018-00026 Page 8 22 or more fueling positions, the average 95th percentile queue was 26 vehicles with the highest recorded queue at 35 vehicles. With 32 vehicles fueling at one time with the proposed station and queueing for another 40 vehicles behind those fueling, a maximum of 72 vehicles can be accommodated without interfering with site operations. If queues should extend beyond the designated queue area, two (2) queue management plans has been included within the Traffic Analysis (Attachment D and E). If queues cannot be adequately managed by the strategies shown in the plan, the northbound right tum into the parking aisle adjacent to the fuel station would be closed using retractable bollards to route customers to the next parking aisle to provide more queueing area prior to affecting street operations. In addition to the queue management plan, the City has stipulated that during peak demands, three (3) on-site traffic attendants will be present to guide and direct traffic when fueling, which is specified in Condition 2.9 in the attached Resolution. Per Condition 2.13, if the City determines that a parking or traffic queuing problem exists on the site or in the vicinity because of the facility, the Community Development Director, Police Chief, and/or Public Works Department may require the applicant to prepare a parking demand analysis or traffic study queuing analysis and the applicant would be required to provide measures to alleviate the problem. Design Review The proposed project would be developed within the southeastern corner of the existing Costco Warehouse parking lot adjacent to El Camino Real and Myford Road. A grade change exists between EI Camino Real and the subject site and there is an existing CMU block wall that will provide added screening of the gasoline station from EI Camino Real. The project includes a.12,684 square foot canopy over the proposed fueling stations which will be supported by sixteen (16) CMU columns which will have an exterior treatment of split and smooth face to match the existing warehouse building. The canopy will be painted white with an area towards the center of the canopy (on each side) designated for future signage (see proposed elevation). There will be two (2) pieces of equipment on-site which include a clean air separator (approx. 204 square feet) which will be contained within a split -face masonry CMU block wall measuring six (6) feet in height with metal gates for access. Surrounding the separator will be new landscaping for additional' screening. The controller enclosure (approx. 117 square feet) will be painted Camel (#PCTT 20169) to coordinate with the columns and existing Costco Warehouse building and will measure 8'-6" in height with landscaping to provide screening. The clean air separator and controller enclosure will both be located east of the proposed pumps on a raised island. PC Report June 11, 2019 CUP 2018-000181DR 2018-00026 Page 9 SOUTH ELEVATION AND DISPENSER ISLANDS NORTH SIMILAR x SASS HEVATM AND DISPENSER ISL:WOS WEST SIMILHi Proposed Elevations No buildings are being proposed as part of this project aside from an equipment enclosure containing the equipment controllers. The site currently has some landscaping, and the proposed project includes the installation of new trees, planting and other types of landscaping throughout the existing Costco Warehouse parking lot and within the new fueling area. Additional landscaping will be added to the southeast comer of the shopping center/project site for added screening of the equipment enclosure. 3 EN_ LITE ELEL'TRICJK ENTRY ENCL45URE ELEVATION AWAY FROM CANOPY 5 ENCLOSURE ELEVATION FACING CANOPY 6 Fi1C105URE STORAGE WM MATEMALS S Q croir� .r•uea .,--,.. :4'�•,...c n..% wap rw�ou Proposed Equipment Enclosure & Materials/Colors PC Report June 11, 2019 CUP 2018-000181DR 2018-00026 Pagel 0 Signage As part of the development of the service station, the applicant will be required to have signs pursuant to State Law to advertise the type and pricing of the fuel. The applicant has indicated that the sign plans will be submitted later in time and in conjunction with construction drawings. Pursuant to TCC Section 9403h,. a master sign plan is required for developments in specific plan areas in the City. Accordingly, Condition 1.10 of Resolution 4385 will require the applicant to apply for a Master Sign Program for the property. PUBLIC HEARING NOTIFICATION: A public hearing notice identifying the time, date and location of the public hearing for the project was published in the Tustin News. The applicantlarchitect and property owner as well as property owners within 300 -feet of the site were also notified of the hearing by mail. in addition, hearing notices were physically posted at eight (8) locations throughout the property as well as on the City's website. ENVIRONMENTAL: This project is Categorically Exempt from further environmental review pursuant to the CEQA Class 32, "In -Fill Development Projects" in that the project is consistent with the City's General Plan and ETSP and occurs within city limits on a project site of no more than five (5) acres substantially surrounded by urban uses. The project site has no value as habitatfor endangered, rare, or threatened species. The project can be adequately served by all required utilities and public services. Approval of the project would not result in any significant effects relating to traffic, noise, air quality, or water quality as follows: Traffic A Traffic Analysis was included with the submittal application which analyzed anticipated trip generation & related impacts, LOS at different intersections and anticipated queueing. A detailed queueing management plan is incorporated into the analysis to accommodate peak demand scenarios at the gasoline station. In addition to the queue management plan, the City has stipulated that during peak demands, three (3) on-site traffic attendants will be present to guide and direct traffic which will mitigate any potential impacts to a less than significant level. Noise Per the TCC, residential properties are designated as Noise Zone 1 and commercial properties are designated Noise Zone 2. Based on these designations, any proposed uses shall be evaluated to ensure that the use not exceed specific noise standards. The PC Report June 11, 2019 CUP 2018-000181DR 2018-00026 Page 11 location of the proposed use is surrounded by an existing retail commercial area and is not located immediately adjacent to any sensitive uses. The nearest residential use is approximately 640 -feet to the north (across Bryan Avenue) and approximately 1,350 -feet away to the west of the subject property. As conditioned, any noise generated by the proposed gasoline station, including any construction, would adhere to the Tustin Noise Ordinance and General Plan Noise Element. The proposed gasoline station would be compatible with surrounding uses in that scope of operations would be compatible with other uses in the area. Air Quali The construction and operation of the gas station will operate within the ministerial requirements of the Air District and the project has been conditioned with the applicant obtaining approval from the Air Quality Management District (AQMD) prior to issuance of either building or grading permits. The project will require the issuance of an Authority to Construct (ATC) and Permit to Operate (PTO) based on the Air District's review of the project and will utilize the latest technology to meet all local, state, and federal regulations. All tanks and dispensers are equipped with latest Phase I and Phase 11 Enhanced Vapor Recovery (EVR) vapor recovery air pollution control equipment technology per CARE regulations and associated Executive Orders. The Phase I EVR equipment controls the vapors in the return path from the tanks back to the tanker truck during offloading filling operations. The Stage I EVR systems are 98 percent effective in controlling fugitive emissions from escaping into the environment. The Phase 11 EVR equipment controls the vapors in the return path from the vehicles back to the tanks and are 95 percent effective in controlling fugitive emissions from escaping,into the environment. Water Quality The application for the proposed project included a Preliminary Water Quality Management Plan (PWQMP) and Hydrology Report which addressed and analyzed water quality and on-site drainage. The submitted water quality analysis for the project was reviewed by City staff and demonstrated compliance with the requirements of State Water Quality Regional Control (SWRCB) and other Federal, State and local regulations relative to water quality and drainage. FINDINGS: In determining whether to approve the CUP for the project, the Planning Commission must determine whether the proposed use would be detrimental to the health, safety, morals, comfort, or general welfare of the persons residing or working in the neighborhood, nor be injurious or detrimental to the property and improvements in the neighborhood of the subject property, or to the general welfare of the City of Tustin. PC Report June 11, 2019 CUP 2018-000181DR 2018-00026 Page 12 1) Pursuant to Section 3.8.2 and 3.7.2.A.l .0 of the ETSP, the Specific Plan allows for service stations with the approval of a CUP. 2) Pursuant to TCC Section 9291c, the Planning Commission is authorized to act on CUPs and impose conditions deemed necessary to protect the public interest and ensure compliance with the General Plan. 3) The proposed use, as conditioned, would not be detrimental to surrounding properties in that the scope of operations for the proposed service station would be compatible and provide support services for the uses in the area. 4) The proposed use is not anticipated to result in parking impacts since the site provides more than the TCC required number of parking spaces to service the existing shopping center and proposed use. Demolition of the existing Goodyear Tire Center building will be replaced with additional parking spaces that will continue to provide adequate parking for the shopping center. 5) The proposed use is not anticipated to result in queueing or circulation impacts as the project has two (2) queue management plans incorporated into the Traffic Analysis to accommodate potential queueing demands. if queues cannot 'be adequately managed by the strategies in the plan, closure of the northbound right turn lane with retractable bollards and re-routing of customers to the next parking aisle will be implemented. In addition to the queuing management plans, the project has been conditioned to provide three (3) on-site .traffic attendants to guide and direct traffic. Through a combination of queueing plans and manned personal for traffic guidance, the use will not impact circulation on the site or within the existing shopping center. 6) The proposed project, as conditioned, adequately addresses anticipated off-site traffic impacts through the installation of a new westbound right tum lane along EI Camino Real'into the Costco Warehouse parking lot at the intersection of Auto Center Drive and EI Camino Real and lane restriping along El Camino Real to accommodate the new vehicle lane. 7) The proposed use, as conditioned, would not create a noise impact on the surrounding neighborhood since the service station would be subject to the Tustin Noise Ordinance and General Pian Noise Element. 8) The construction and operation of the gasoline station will operate within the ministerial requirements of the South Coast Air Quality Management District (SCAQMD) and the project has been conditioned to comply with SCAQMD air quality standards and all required permits. PC Report June 1.1, 2019 CUP 2018-000181DR 2018-00026 Page 13 9) The proposed use would not be detrimental to the surrounding properties in that the hours of operation of the instruction would be consistent with the general business hours of other businesses within the surrounding vicinity. In determining whether to approve the DR for the project, the Planning Commission must determine whether it can be found that the size, architectural features and general appearance of the proposal will not impair the orderly and harmonious development of the area, the present or future development therein, or the occupancy as a whole. A decision to approve this request may be supported by the following findings: 1) The location, size and general appearance of the proposed service station, canopy and equipment enclosure is compatible of the existing structures and surrounding area in that the proposed improvements, including the canopy, is proportionately sized for the site. 2) As conditioned, the applicant will be required to submit a Master Sign Plan. 3) The height, bulk, and area of proposed use is compatible with the existing Costco warehouse building. 4) Setbacks and site planning have been thoroughly evaluated in that the proposed project location, layout and proximity to the existing Costco Warehouse building has been analyzed and the proposed project complies with the requirements established in the ETSP. 5) Exterior material and colors have been reviewed for the proposed project and they are compatible with the existing warehouse building and other retail tenants within the shopping center. 6) Type and pitch of roofs have been reviewed for the proposed project and the proposed roofed canopy over the fuel pumps is compatible with the existing warehouse building and other retail tenants within the shopping center. 7) Landscaping, parking area design and traffic circulation have been reviewed and analyzed in that the project includes a Traffic Analysis that addressed overall on- site circulation. The installation of substantial new landscaping throughout the project area and within the remaining areas_of the existing Costco parking lot will improve and enhance the overall appearance. 8) Location and method of refuse storage has been adequately addressed in that the proposed project does not propose any changes to the existing refuse function and operation. PC Report June 11, 2019 CUP 2018-000181DR 2018-00026 Page 14 9) Physical relationship of proposed structures to existing structures has been evaluated in that the proposed canopy and small equipment will aid in the function of the gasoline station. The canopy will be proportional in height and area to the other buildings on the project site and within the existing shopping center overall. The location of the equipment is ancillary to the gasoline station and will be screened by either a wall and/or landscaping. 10) Appearance and design relationship of proposed structures to existing structures is consistent and compatible in that the proposed columns and colors for the canopy and equipment enclosure will correspond with the exterior of the existing warehouse building. Proposed landscaping will provide consistency throughout the parking lot and enhance the appearance of the proposed use. 11) Development guidelines and criteria for the ETSP Mixed -Use area as well as the City's Service Station Guidelines adopted by the City Council have been reviewed and incorporated into the project. 4Ena 1% 1;�i • r'_ . Senior Attachments: A. Location Map B, Land Use Fact Sheet C. Submitted Plans D. Costco Gas Addition Traffic Analysis E. Queue Management Plan 1 and 2 F. Resolution No. 4385 1111alk— El6beth A. Binsack Director of Community Development