Loading...
HomeMy WebLinkAboutCC RES 19-39RESOLUTION NO. 19-39 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUSTIN, CALIFORNIA UPHOLDING PLANNING COMMISSION APPROVAL OF CONDITIONAL USE PERMIT 2018-00018 AND DESIGN REVIEW 21018-00026, A REQUEST TO DEMOLISH THE EXISTING GOODYEAR TIRE CENTER AND ADJACENT GOODYEAR PARKING AREA AT 2541 EL CAMINO REAL AND REPLACE WITH 56 NEW PARKING STALLS AND TO CONSTRUCT A NEW 16 PUMP COSTCO GASOLINE FUEL STATION WITH CANOPY AND RELATED EQUIPMENT AT 2655 EL CAMINO REAL. The City Council does hereby resolve as follows: The City Council finds and determines as follows: A. That a proper application for Conditional Use Permit (CUP) 2018-00018 and Design Review (DR) 2018-00026 has been submitted by Terry Odle/MG2, applicant, requesting authorization to demolish the existing Goodyear Tire Center and adjacent Goodyear parking area at 2541 EI Camino Real and to construct a new 16 pump Costco gasoline fuel station with canopy and related equipment located at 2655 EI Camino Real. B. That the site is zoned as Planned Community Mixed -Use and within the East Tustin Specific Plan (ETSP) and has a General Plan land -use designation of Planned Community Commercial/Business. (PCCB). The project has been reviewed for consistency with the Air Quality Sub -element of the City of Tustin General Plan and has been determined to be consistent with the Air Quality Sub -element. C. That pursuant to ETSP Sections 3.8.2 and 3.7.2.A.1.u, new service stations are permitted subject to approval of a CUP. D. That a public hearing was duly called, noticed, and held on said application on June 11, 2019, by the Planning Commission at which the Planning Commission continued the project to the July 9, 2019, meeting. Following the public hearing, the Planning Commission adopted Resolution No. 4385 approving the proposed project. E. That on July 19, 2019, an appeal letter was filed by Charlie Mazza, on behalf of himself and other unidentified businesses and homeowners, appealing the decision of the Planning Commission. The appeal letter identified the following items: Resolution 19-39 Page 1 of 16 F Ee a) The project is over 5 acres in size and the CEQA exemption (Section 15332, Class 32) is incorrect. b) The added traffic, congestion and the number of vehicles waiting in line (idling) will create very unhealthful air and affect the quality of life to those that live and work nearby. c) The street width is not adequate to accommodate an additional right turn lane from EI Camino Real onto the property. d) The Planning Commission approved the project without taking any considerations to quality of life issues. That a public hearing was duly called, noticed, and held on said appeal on October 15, 2019, by the City Council. That the proposed project complies with General Plan Land Use Element Goals and Policies which include: a) Goal 1: Provide for a well-balanced land use pattern that accommodates existing and future needs for housing, commercial and industrial land, open space and community facilities and services, while maintaining a healthy, diversified economy adequate to provide future City services. Consistent — The project site is located in an existing retail shopping center with commercial zoning. The proposed gasoline station would be consistent with and support the existing commercial development. As it would not displace any residential or industrial uses, open space or community facilities, the proposed project would not alter the existing balance of land uses in the City. The proposed project would diversify the retail uses in the shopping center and would increase City sales tax revenues that can be used to fund future City services. b) Policy 1.5: Encourage compatible and complementary infill of previously by-passed parcels in areas already predominately developed. Consistent — The proposed project would provide complimentary and compatible infill development within an existing shopping center. The project site is located in an urbanized area of the City and is substantially surrounded by urban uses, including the remainder of the shopping center, the adjacent Tustin Marketplace shopping center, the Tustin Auto Center auto dealerships, condominiums, and single-family residences. The proposed gasoline station is located along a major commercial thoroughfare in the City and would be compatible with the shopping center and Resolution 19-39 Page 2 of 16 other surrounding uses. c) Policy 1.10: Ensure that the distribution and intensity of land uses are consistent with the Land Use Plan and classification system. Consistent — The proposed project would be consistent with the PCCB land use designation and, as discussed below, the ETSP that governs development on the project site. As part of the discretionary entitlements for the proposed project, consistent with the ETSP, the required CUP will ensure that the proposed gas station use is consistent with the City's development policies and compatible with the surrounding land uses. d) Goal 3: Ensure that new development is compatible with surrounding land uses in the community, the City's circulation network, availability of public facilities, existing development constraints and the City's unique characteristics and resources. Consistent — The proposed project consists of development of a gasoline station that would be compatible with the existing Costco Warehouse, shopping center, and other surrounding land uses. The proposed gasoline station would be located along a major commercial thoroughfare, compatible with the City's circulation network, and, as discussed in the consistency analysis for Policy 1. 10, above, the required conditional use permit will ensure that the proposed project is consistent with the City's development policies and compatible with the surrounding land uses. Therefore, the proposed project, as conditioned, would not be detrimental to surrounding properties. e) Policy 3.2: Locate major commercial uses in areas that are easily accessible to major transportation facilities. Consistent — The proposed project would be an infill development in an existing shopping center that is a major commercial use located along several major commercial thoroughfares and is easily accessible to major transportation facilities, including the Santa Ana freeway, located less than one mile from the project site. f) Policy 4.1: Mitigate traffic congestion and unacceptable levels of noise, odors, dust and light and glare which affect residential areas and sensitive receptors. Consistent — The proposed project adequately addresses Resolution 19-39 Page 3 of 16 anticipated off-site traffic impacts. The proposed plan has two (2) queue management plans to accommodate potential queueing demands. If queues cannot be adequately managed by the strategies in the plan, closure of the northbound right turn lane with retractable bollards and re-routing of customers to the next parking aisle will be implemented. In addition to the queueing management plans, the proposed project has been conditioned to provide three (3) on-site traffic attendants to guide and direct traffic during periods of peak demand. Through a combination of queueing plans and manned personnel for traffic guidance, the use will not impact circulation on the site or within the existing shopping center. Additionally, the proposed project, by means of regulatory compliance, would not create a significant noise impact on the surrounding neighborhood, because the fuel station would be subject to and would comply with the Tustin Noise Ordinance and General Plan Noise Element. The applicant is required to obtain approval from the South Coast Air Quality Management District (SCAQMD) prior to the issuance of building or grading permits. By complying with all applicable SCAQMD regulations and obtaining a ministerial Permit to Construct (PTC) and Permit to Operate (PTO), the proposed project will not create any unacceptable levels of odors or dust or other air quality impacts. In addition, as conditioned, the proposed project must provide adequate lighting to illuminate the fueling area, subject to Community Development Department review and approval. Such lighting must meet applicable requirements of the City's Building Regulations Code and the State Fire Code. Therefore, by means of regulatory compliance, the proposed project will not create any unacceptable levels of light and glare. g) Goal 7: Promote expansion of the City's economic base and diversification of economic activity. Policy 7.1: Broaden the City's tax base by attracting businesses which will contribute to the City's economic growth and employment opportunities while ensuring compatibility with other General Plan goals and policies. Consistent — The proposed project would expand the City's economic base by providing a new gas station that will serve Costco members. The gas station will contribute to the City's Resolution 19-39 Page 4 of 16 economic growth through increased economic activity and sales tax revenues. h) Policy 7.5(a): Focus retail development into consolidated, economically viable and attractive centers of adequate size and scale which offer a variety of retail goods and amenities. Consistent — The proposed project would be located within a portion of the existing shopping center, thereby maintaining the focused retail development in the City. The addition of the gasoline station would also enhance the economic viability of the existing shopping center, and provide for a new retail amenity within the existing shopping center to serve Costco members. i) Goal 9: Continue to provide for a planned community in East Tustin compatible with the land use characteristics of the local area and sensitive to the natural environment. Policy 9.1: Ensure the compatibility of development in East Tustin adjacent to existing developed areas. Consistent — The proposed project would provide for infill development within an existing shopping center located along major commercial thoroughfares in an urbanized area of East Tustin. The proposed project would be consistent with the ETSP, including obtaining the required CUP for the proposed gasoline fuel station in order to ensure compatibility with the land use characteristics of the local area and the adjacent existing development. H. That in approving the CUP for the establishment, maintenance, and operation of the proposed gasoline fuel station, the City Council determine that the project will not, under the circumstances of this case, be detrimental to the health, safety, morals, comfort, or general welfare of the persons residing or working in the neighborhood of such proposed use, nor be injurious or detrimental to the property and improvements in the neighborhood of the subject property, or to the general welfare of the City of Tustin in that: 1) Pursuant to Section 3.8.2 and 3.7.2.A.1.0 of the ETSP, the Specific Plan allows for service stations with the approval of a Conditional Use Permit. 2) Pursuant to Tustin City Code (TCC) Section 9291c, the Planning Commission is authorized to act on CUPs and impose conditions Resolution 19-39 Page 5 of 16 deemed necessary to protect the public interest and ensure compliance with the General Plan. The Planning Commission approved CUP 2018-00018 by adopting Resolution No. 4385 on July 9, 2019. 3) That on July 19, 2019, an appeal was filed by Charlie Mazza, on behalf of himself and unidentified homeowners and businesses. Pursuant to TCC Section 9294b, the City Council shall conduct a public hearing on the item and that the hearing shall be de novo. 4) The proposed use, as conditioned, would not be detrimental to surrounding properties in that: • The scope of operations for the proposed service station would be compatible and provide support services for the uses in the area. • The project site is located within an urban area of Tustin on a 2.38 -acre portion of an existing shopping center where existing infrastructure and support services are already in place. • The uses surrounding the project site include the remainder of the shopping center, the adjacent Tustin Auto Center auto dealerships, condominiums and single-family residences. • The proposed project does not involve the construction of any new buildings aside from the equipment enclosure containing the gas station equipment controllers and an overhead canopy. • The project site is zoned PC -MU and has a General Plan designation of PCCB which provides opportunities for a mixture of all the activities permitted within commercial land use designations in the City. • The proposed project is consistent with the ETSP and the required conditional use permit will ensure that the proposed gas station use is consistent with the City's development policies and compatible with the surrounding land uses. 5) The proposed use is not anticipated to result in parking impacts since the site provides more than the TCC required number of parking spaces to service the existing shopping center and proposed use. Demolition of the existing Goodyear Tire Center building will be replaced with additional parking spaces that will continue to provide adequate parking for the shopping center. 6) The proposed use is not anticipated to result in queueing or circulation impacts as the project has two (2) queue management Resolution 19-39 Page 6 of 16 plans to accommodate potential queueing demands. If queues cannot be adequately managed by the strategies in the plan, closure of the northbound right turn lane with retractable bollards and re- routing of customers to the next parking aisle will be implemented. In addition to the queuing management plans, the project has been conditioned to provide three (3) on-site traffic attendants to guide and direct traffic. Through a combination of queueing plans and manned personnel for traffic guidance, the use will not impact circulation on the site or within the existing shopping center. 7) The proposed project addresses anticipated off-site traffic impacts. The proposed plan includes an additional right turn lane within the existing EI Camino Real 64 -foot wide roadway by narrowing each of the existing lane widths to approximately 10-11 feet wide and restriping. The street width and additional lane configuration has been reviewed and approved by the City's Traffic Engineer. 8) The proposed use would not create a noise impact on the surrounding neighborhood since the service station would be subject to the Tustin Noise Ordinance and General Plan Noise Element. The ordinance provides specific noise standards to be applied for various land uses for both daytime and nighttime hours, prohibits certain noise sources, and describes the manner in which the noise standards are to be enforced. The proposed project is located along a major commercial thoroughfare, and the proposed fuel station would be compatible with surroundings uses in that the scope of operations would be compatible with other commercial uses in the area. Through regulatory compliance, noise impacts from project construction and onsite sources during operation would be less than significant. 9) The construction and operation of the gasoline station will operate within the ministerial requirements of the SCAQMD and the project has been conditioned to comply with SCAQMD air quality standards and all required permits. The submitted air quality and greenhouse gas (GHG) emissions analysis have determined that the proposed project would not cause significant impacts relative to GHG emissions or air quality. 10) The proposed use would not be detrimental to the surrounding properties in that the hours of operation would be consistent with the general business hours of other businesses within the surrounding vicinity. The proposed project constitutes infill development within an approximate 2.38 -acre portion of an existing commercial shopping center. The area is urbanized and is consistent with the physical arrangement of other properties within the vicinity of the project site. Resolution 19-39 Page 7 of 16 That in approving the DR for the establishment of a new fuel station, the City Council must determine whether it can be found that the location, size, and general appearance of the proposed project, as conditioned, is compatible with the surrounding area in that the proposed improvements, including the canopy and equipment enclosure, is proportionately sized to the site. The proposal will not impair the orderly and harmonious development of the area, the present or future development therein, or the occupancy as a whole. A decision to approve this request may be supported by the following findings: 1) That the location, size and general appearance of the proposed service station, canopy and equipment enclosure is compatible of the existing structures and surrounding area in that the proposed improvements, including the canopy, is proportionately sized for the site. 2) That as conditioned, the applicant will be required to submit a Master Sign Plan. 3) That the height, bulk, and area of proposed use is compatible with the existing Costco warehouse building. 4) That the setbacks and site planning have been thoroughly evaluated in that the proposed project location, layout and proximity to the existing Costco Warehouse building has been analyzed and the proposed project complies with the requirements established in the ETSP. 5) That exterior material and colors have been reviewed for the proposed project and they are compatible with the existing warehouse building and other retail tenants within the shopping center. 6) That the type and pitch of roofs have been reviewed for the proposed project and the proposed roofed canopy over the fuel pumps is compatible with the existing warehouse building and other retail tenants within the shopping center. 7) That the parking area design and traffic circulation have been reviewed and analyzed in the initial Traffic Analysis and supplemental memorandum which addressed overall on-site circulation and vehicular queueing for the proposed project. 8) That the location and method of refuse storage has been adequately addressed in that the proposed project does not propose any changes to the existing refuse function and operation. 9) That the physical relationship of proposed structures to existing structures has been evaluated in that the proposed canopy and small equipment will Resolution 19-39 Page 8 of 16 aid in the function of the gasoline station. The canopy will be proportional in height and area to the other buildings on the project site and within the existing shopping center overall. The location of the equipment is ancillary to the gasoline station and will be screened by either a wall and/or landscaping. 10)That appearance and design relationship of proposed structures to existing structures is consistent and compatible in that the proposed columns and colors for the canopy and equipment enclosure will correspond with the exterior of the existing warehouse building. 11)That development guidelines and criteria for the ETSP Mixed -Use area as well as the City's Service Station Guidelines adopted by the City Council have been reviewed and incorporated into the project. J. The proposed project is Categorically Exempt pursuant to Class 32 meeting all of the criteria prescribed under CEQA Guidelines Section 15332 described below: a) The proposed project is consistent with the applicable general plan designation and all applicable general plan policies as well as with applicable zoning designation and regulations. The project is consistent with the General Plan as identified in Section /G of this resolution, the ETSP as the project complies with all the development standards identified in the ETSP along with the goals and objectives as identified in the staff report to the City Council dated October 15, 2019, and applicable Tustin City Code regulations as the project is required to obtain design review approval and comply with other regulatory requirements associated with the project. Therefore, the proposed project satisfies this criteria for a Class 32 Exemption. b) The proposed development occurs within City limits on a project site of no more than five (5) acres substantially surrounded by urban uses. The project site (consisting of the area where the fueling station and the area where the existing Goodyear Tire Center building will be demolished and restriped with surface parking) has a total area of approximately 2.38 acres. No new development or construction activity related to the proposed project will occur in the other portions of the shopping center, including the existing Costco Warehouse, former K-mart/Ansar Gallery retail space, and other pad parcels, nor will the existing operations at these uses change Resolution 19-39 Page 9 of 16 as a result of the proposed project. These uses and areas are part of the existing environment prior to the project that will not change as a result of the project. Therefore, they comprise the environmental baseline and are not part of the proposed project. Therefore, the proposed project satisfies this criteria for a Class 32 Exemption. c) The project site has no value as habitat for endangered, rare or threatened species. The project site and the surrounding area are developed with buildings and other urban infrastructure and do not contain any significant areas of natural open space or areas of significant biological resource or habitat value. Improved with an asphalt - paved parking lot and the existing Goodyear Tire Center building, there are few trees and vegetation located on-site within the existing surface parking areas. According to the U.S. Fish and Wildlife Service (USFWS) Threatened and endangered Species Active Critical Habitat Report, no candidate, sensitive, or other special status species identified in local plans, policies or regulations, or by the California Department of Fish and Wildlife (CDFW) or the USFWS have been recorded or exist on the project site. Furthermore, no critical habitat was identified in the U.S. Environmental Protection Agency's NEPAssist mapping tool. The proposed project would also remove 48 non protected on-site trees and zero (0) non protected trees in the adjacent public right- of-way. While the removal of non -protected trees would not be considered a significant impact under CEQA, such removal has the potential to impact nesting bird species, if present at the time of removal. The project must comply with all applicable Federal laws and regulations, which would include adherence to the Federal Migratory Bird Treaty Act and the State Fish and Game Code. As a result, the project would have a less than significant impact on endangered, rare, or threatened species or their habitat and therefore, satisfies this criteria for a Class 32 Exemption. d) Approval of the proposed project would not result in any significant effects relating to traffic, noise, air quality, or water quality. Traffic: A Traffic Analysis analyzed anticipated trip generation & related impacts, LOS and queueing analysis at different intersections, fuel area layout, fuel delivery site circulation and on-site vehicle stacking and parking. Based on the Resolution 19-39 Page 10 of 16 study, all intersections operate at LOS A or B during the weekday a.m. and p.m. peak hours. Using the same methodology, the long-term buildout and buildout plus project analysis demonstrates that all study intersections will operate acceptably at LOS D or better. Based on these analyses, as well as the current roadway improvements taking place along Tustin Ranch Road and El Camino Real, the supplemental traffic analysis concludes that the proposed project is not expected to adversely affect intersection operations. • Implementation of the queue management plan will ensure that impacts of queued vehicles on access and circulation within the project site and the rest of the shopping center would be less than significant. The gas station would be equipped with a red-light/green-light system to indicate which pump was open and available to the next person in line. This system improves efficiency and helps shorten lines to waiting members. In addition, CostcoPay would be in place at the station. The CostcoPay system provides members with a key -chain fob that contains memberships and secure payment information. Using the fob instead of membership and credit cards reduces time at the pumps by approximately 35 seconds per transaction. The implementation of both these devices would help reduce time at the pumps which in turn reduces queues. Noise: • The proposed project is located along major commercial thoroughfare and the proposed hours of operation and operation of the fuel station would be compatible with the surrounding area. The project will be required to comply with the City's noise standard. Air Quality: • The Air Quality analysis was prepared to provide an air quality and greenhouse gas emissions assessment of the proposed project in compliance with the requirements of CEQA. Specifically, the proposed project's emissions of criteria air pollutants (CAP) and greenhouse gases (GHG) associated with construction and operation of the project were analyzed. The Air Quality analysis concludes that the proposed project would not cause significant air quality or GHG impacts. Resolution 19-39 Page 11 of 16 Hydrology and Water Quality. • The submitted WQMP for the proposed project has been reviewed and demonstrated compliance with the requirements of State Water Quality Regional Control (SWRCB) and other Federal, State and local regulations relative to water quality and drainage. Consistent with the Hydrology Report and WQMP, implementation of these regulatory compliance measures will ensure that the proposed project will not cause a significant impact to water quality. e) The project can be adequately served by all required utilities and public services. The project site is located in an urbanized area within a 2.38 -acre portion of an existing shopping center and does not involve the construction of any new buildings aside from the equipment enclosure containing the gas station equipment controllers and new canopy. Additionally, the infrastructure for the utilities required to serve the proposed project are already in place and serve the shopping center. The proposed project has no residential component and there will be only one (1) regular employee, and therefore can be adequately served by the existing police and fire services, schools, parks, libraries along with all required utilities and public services and satisfies this condition for a Class 32 Exemption. K. Section 15300.2 of the State CEQA Guidelines provides exceptions to the Class 32 Exemption including the following: a) The project and successive projects of the same type in the same place will result in cumulative impacts; There are no known related projects in the vicinity of the project site that will result in cumulative impacts with respect to traffic, noise, water quality and utilities and public services. If the vacant K -mart building were to be fully occupied, which may be the nearest and most realistic future project to the project site, all study locations would continue to operate at acceptable levels of service. Additionally, the long-term buildout and buildout plus project traffic analysis demonstrates that all study intersections will operate acceptably at LOS D or better. Given the excess capacity at the studied intersections, operation of the proposed project with any other projects would not result in cumulative traffic impacts. Resolution 19-39 Page 12 of 16 Regulatory compliance measures for noise will ensure that the proposed project's potential to contribute to substantial cumulative noise levels from construction or stationary sources during operation would be less than significant. A doubling of traffic volumes could result in a perceptible increase in traffic noise. Per the traffic analysis, the proposed project would not generate sufficient traffic to result in a doubling of traffic volumes. As shown in the supplemental traffic analysis memorandum, a possible reuse of the K -mart building would not generate sufficient trips that, coupled with the proposed project's trips, would result in a doubling of traffic volumes. As a result, cumulative noise levels from traffic would be less than significant. Cumulative air quality impacts from construction and operation of the proposed project, based on SCAQMD guidelines, are analyzed in a manner similar to project -specific air quality impacts. According to SCAQMD, individual development projects that generate construction or operational emissions that exceed the SCAQMD recommended daily thresholds for project -specific impacts would also cause a cumulatively considerable increase in emissions. The construction - related and operational daily emissions associated with the proposed project would not exceed the SCAQMD's recommended thresholds, thus the proposed project's emissions would not be cumulatively considerable. Therefore, cumulative air quality impacts would be less than significant. The proposed project would not result in any significant water quality impacts. Like the proposed project, any other future projects in the vicinity would be required to implement stormwater Best Management Practices (BMPs) pursuant to Water Quality Management Plans. Mandatory structural BMPs in accordance with the NPDES water quality program would result in a cumulative reduction of surface runoff, as the development in the vicinity of the project site is limited to infill development and redevelopment of an existing urbanized area. As a result, through means of regulatory compliance by the proposed project and for any other projects in the vicinity, cumulative water quality impacts would be less than significant. As noted, the proposed project is consistent with the General Plan and ETSP, the project site is served by existing utilities infrastructure, and the proposed project is not expected to result in significant new demand for public services. Adequate capacity exists to serve the proposed project, and it would not result in any significant cumulative impacts associated with utilities or public services. Resolution 19-39 Page 13 of 16 b) There are unusual circumstances creating the reasonable possibility of significant effects; Based upon staff analysis, there are no unusual circumstances that exist in connection with the proposed project or surrounding environmental conditions that have the potential to result in significant environmental impacts. The project site is located in an urbanized area of the City within the ETSP area and is consistent with the physical arrangement of the properties within the vicinity of the project site. The proposed project constitutes infill development within a portion of an existing shopping center along a major commercial thoroughfare and in close proximity to significant transportation facilities, including the Santa Ana freeway located less than one mile from the project site. There are no features of the proposed project, such as its size or location, that distinguish it from others in the exempt class. No unique or unusual circumstances exist with respect to the proposed project that would give rise to a reasonable possibility of a significant effect upon the environment c) The project may result in damage to scenic resources, including but not limited to, trees, historic buildings, rock outcroppings, or similar resources, within an officially designated scenic highway; The project site is not located within or bordered by the viewshed of any designated scenic highway as referenced in the City's General Plan or in the Orange County, California Scenic Highway Plan. Roadways immediately adjacent to the project site; E/ Camino Real, Bryan Avenue, Myford Road or Tustin Ranch Road are not designated as a scenic highway. There are no protected trees or unique geologic features on the site. As a result, the proposed project would not damage any scenic resources within an officially designated scenic highway. d) The project is located on a site that the Department of Toxic Substances Control and the Secretary of the Environmental Protection have identified, pursuant to Government code section 65962.5, as being affected by hazardous wastes or clean-up problems; or Based upon the submitted Phase / Environmental Site Assessment, the proposed project site is not located on a site that the Department of Toxic Substances Control and the Secretary of the Environmental Protection have identified as being affected by hazardous wastes or clean-up problems. _ Resolution 19-39 Page 14 of 16 e) The project may cause a substantial adverse change in the significance of an historical resource. Based upon the submitted Phase 1 Environmental Site Assessment, the proposed project will not cause a substantial adverse change in the significance of an historical resource. The project site was historically used for agricultural purposes between at least 1938 and 1985. The project site currently consists of a surface parking lot as well as a Goodyear Tire Center Building. The building was constructed as an automobile service center in 1997 and has operated under several different names. Accordingly, there are no historical resources on the project site. As a result, the project does not fall within any of the above -referenced exceptions and is therefore in compliance with Section 15300.2 of the State CEQA Guidelines (Class 32 Exemption Exceptions) which qualifies the proposed project for a Class 32 Exemption. II. The City Council hereby approves CUP 2018-00018 and DR 2018-00026, upholding the Planning Commission decision to approve a request authorizing the demolition of the existing Goodyear Tire Center and adjacent Goodyear parking area at 2541 EI Camino Real and construction of a new 16 pump Costco gasoline fuel station with canopy and related equipment located at 2655 EI Camino Real, subject to conditions listed in Exhibit A herein. PASSED AND ADOPTED by the City Council of the City of,Tustin, at a regul eeting on the 15th day of October, 2019. / CHARLES E. PUCKETT, Mayor AC da ERICA N. YASU City Clerk Resolution 19-39 Page 15 of 16 STATE OF CALIFORNIA ) COUNTY OF ORANGE ) CITY OF TUSTIN ) CERTIFICATION FOR RESOLUTION NO. 19-39 I, Erica N. Yasuda, City Clerk and ex -officio Clerk of the City Council of the City of Tustin, California, does hereby certify that the whole number of the members of the City Council of the City of Tustin is five; that the above and foregoing Resolution No. 19-39 was duly passed and adopted at a regular meeting of the Tustin City Council, held on the 15th day of October, 2019, by the following vote: COUNCILMEMBER AYES: Puckett, Bernstein, Clark, Lumbard (4 ) COUNCILMEMBER NOES: Cooper (1 ) COUNCILMEMBER ABSTAINED: (0 ) COUNCILMEMBER ABSENT: i n i �JAA' All ER rtA N. YAS 0A, City Clerk Resolution 19-39 Page 16 of 16 EXHIBIT A CONDITIONS OF APPROVAL CONDITIONAL USE PERMIT 2018-00018 DESIGN REVIEW 2018-00026 GENERAL (1) 1.1 The proposed project shall substantially conform to the submitted plans for the project date stamped October 15, 2019, on file with the Community Development Department, as herein modified, or as modified by the Community Development Director in accordance with this Exhibit. The Director may also approve subsequent minor modifications to plans during plan check if such modifications are consistent with provisions of the Tustin City Code or other applicable regulations. (1) 1.2 This approval shall become null and void unless the use is established within twelve (12) months of the date of this Exhibit. Time extensions may be granted if a written request and associated fee are received by the Community Development Department within thirty (30) days prior to expiration. (1) 1.3 Unless otherwise specified, the conditions contained in this Exhibit shall be complied with as specified, subject to review and approval by the Community Development Department. (1) 1.4 Approval of CUP 2018-00018/DR 2018-00026 is contingent upon the applicant returning to the Community Development Department a notarized "Agreement to Conditions Imposed" form and the property owner signing and recording with the County Clerk -Recorder a notarized "Notice of Discretionary Permit Approval and Conditions of Approval' form. The forms shall be established by the Director of Community Development, and evidence of recordation shall be provided to the Community Development Department. SOURCE CODES (1) STANDARD CONDITION (5) RESPONSIBLE AGENCY REQUIREMENT (2) CEQA MITIGATION (6) LANDSCAPING GUIDELINES (3) BUILDING CODE (7) PC/CC POLICY 1446918.1 Exhibit A Resolution No. 19-39 Page 2 (1) 1.5 CUP 2018-00018/DR 2018-00026 may be reviewed on an annual basis, or more often if necessary, by the Community Development Director. The Community Development Director shall review the use to ascertain compliance with conditions of approval and compatibility with the area. If the use is not operated in accordance with CUP 2018-00018/DR 2018-00026, or is found to be a nuisance or negative impacts are affecting the surrounding tenants or neighborhood, the Community Development Director shall impose additional conditions or the applicant may be required to implement other measures to eliminate the nuisance or negative impacts, or may initiate proceedings to revoke CUP 2018-00018/DR 2018-00026. Failure to comply with conditions of approval, or if the establishment creates undue burden to City resources, or if the CUP is abandoned for a twelve (12) month period, these circumstances shall be grounds for revocation of the CUP. (1) 1.6 Any transfer of ownership of the establishment and/or operator shall require the new owner and/or operator to sign and return an "Agreement to Conditions Imposed" form provided by the Community Development Department. Failure to do so would be a basis for revocation proceeding. (1) 1.7 Any violation of any of the conditions imposed is subject to the issuance of an Administrative Citation pursuant to TCC Section 1162(a). (1) 1.8 As a condition of approval of CUP 2018-00018/DR 2018-00026, the applicant shall agree, at its sole cost and expense, to defend, indemnify, and hold harmless the City, its officers, employees, agents, and consultants, from any claim, action, or proceeding brought by a third -party against the City, its officers, agents, and employees, which seeks to attack, set aside, challenge, void, or annul an approval of the City Council, the Planning Commission, or any other decision-making body, including staff, concerning this project. The City agrees to promptly notify the applicants of any such claim or action filed against the City and to fully cooperate in the defense of any such action. The City may, at its sole cost and expense, elect to participate in defense of any such action under this condition. (1) 1.9 The applicant shall be responsible for costs associated with any necessary code enforcement action, including attorney's fees, subject to the applicable notice, hearing, and appeal process as established by the City Council by ordinance. (1) 1.10 All on-site signs shall comply with the City's Sign Code. Prior to the issuance of a sign permit, the applicant must apply for a Master Sign 1446918.1 Exhibit A Resolution No. 19-39 Page 3 Program for the property. Any proposed painted wall signs, including murals or graphics to be added to the building or pump areas shall require a separate approval of a CUP. (1) 1.11 All final exterior colors and materials shall be subject to review and approval of the Community Development Department and final field inspection by the Planning Division. Colors, materials and textures shall be noted on the construction plans. (1) 1.12 The applicant shall obtain approval from the South Coast Air Quality Management District (SCAQMD) prior to the issuance of the building or grading permit. The applicant shall comply with all District regulations and shall acquire an Authority to Construct (ATC) and Permit to Operate (PTO). (1) 1.13 The applicant shall comply with all applicable Federal laws and regulations, which includes adherence to the Federal Migratory Bird Treaty Act and the California State Fish and Game Code. (1) 1.14 Any noise generated by the proposed gasoline station, including any noise associated with construction, shall comply with the City's Noise Ordinance and General Plan Noise Element. LANDSCAPING (1) 1.15 All proposed landscaping and irrigation plans shall comply with the approved plans and with the City's Water Efficiency Landscape Ordinance. A Landscape Installation Certificate of Completion, certifying that the landscaping was installed in accordance with the approved plans, shall be submitted to the City prior to the final inspections by Building and Planning Divisions. (1) 1.16 An irrigation plan should be provided which shows the location and control of backflow prevention devices at the meter, pipe size, sprinkler type, spacing, and coverage details for all equipment. Install efficient irrigation systems which minimize runoff and evaporation and maximize the amount of water which will reach the plant roots. Drip irrigation, soil moisture sensors, and automatic irrigation systems are a few methods of increasing irrigation efficiency. (1) 1.17 Backflow devices and double detector checks shall be painted to match surrounding landscaping when in planters or painted to match the building 1446918.1 Exhibit A Resolution No. 19-39 Page 4 when located adjacent to the building. Landscaping shall be utilized to screen the devices whenever possible. (1) 1.18 All plant materials shall be installed in a healthy and vigorous condition, typical to the species, and shall be maintained in a neat and healthy condition. Maintenance includes, but is not limited to, trimming, mowing, weeding, removal of litter, fertilizing, regular watering, and replacement of dead or diseased dying plants. (***) 1.19 Additional landscape screening shall be provided at the southeast corner of the Costco property (adjacent to the EI Modena -Tustin Channel) to screen the proposed controller enclosure and clean air separator. MISCELLANEOUS (1) 1.20 Adequate lighting shall be provided to illuminate the fueling area, subject to Community Development Department review and approval. Said lighting shall meet requirements set forth in the Building Security and California Fire Codes. (1) 1.21 Fire and Police access and passage shall be permitted at all times. (***) 1.22 An additional emergency accessway shall be provided for Police and Fire personnel off of EI Camino Real on the west side of the existing County of Orange Flood Control Channel. (1) 1.23 "No Loitering" signage shall be posted on the site (1) 1.24 Outdoor vending activities are prohibited. (1) 1.25 All utility services serving the site shall be installed and maintained underground. USE RESTRICTIONS (1) 2.1 Business hours are limited to the following: Monday — Friday: 5:30 a.m. to 9:30 p.m. Saturday: 6:00 a.m. to 8:00 p.m. Sunday 6:00 a.m. to 7:30 p.m. 1446918.1 Exhibit A Resolution No. 19-39 Page 5 Hours or operation may be modified by the Director of Community Development if it is determined that no impacts to surrounding tenants or properties will occur. (1) 2.2 Business operations shall be conducted in a manner that does not create a public or private nuisance. Any such nuisance must be abated immediately upon notice by the City. (1) 2.3 No outdoor storage is permitted or display of materials shall be permitted except allowed by the TCC. (1) 2.4 Storage and/or advertising of vehicles for sale or lease is not permitted. (1) 2.5 If water and air are to be provided to customers, then it shall be made available at no cost and for twenty-four (24) hours per day, seven (7) days per week. (1) 2.6 The subject property shall be maintained in a safe, clean and sanitary condition at all times. The property owners shall be responsible for the daily maintenance and up -keep of the businesses, including but not limited to trash removal, painting, graffiti removal, and maintenance of improvements to ensure that the facilities are maintained in a neat and attractive manner. Any graffiti painted or marked upon the premises or any adjacent area under control of the property owner or the business shall be removed or painted within 24 hours of being applied. (1) 2.7 All litter shall be removed from the exterior areas around the premises including public sidewalk areas, alleys and parking areas, no less frequently than once each day. (1) 2.8 Costco shall provide daily security patrols of the parking lot during operation of the gasoline station. (1) 2.9 Costco employees shall return all shopping carts to the Costco shopping cart receptacles at the end of each business day. Shopping carts shall not be "parked" in parking spaces overnight. (1) 2.10 To avoid conflict between fueling trucks and vehicle queues, fuel deliveries shall be limited to 1-2 delivers during peak hours of operation. Additional fuels deliveries shall take place during non -peak hours. 1446918.1 Exhibit A Resolution No. 19-39 Page 6 TRAFFIC. PARKING AND CIRCULATION (***) 2.11 Retractable bollards shall be installed within the northbound right-hand turn lane (within shopping center off Auto Center Drive and EI Camino Real) to the gas station/re- fueling area as part of the queue management plan. Use of bollards may be necessary during peak times, per the approved plan. (***) 2.12 In addition to the queue management plan contained within the Final Traffic Analysis date stamped April 17, 2019, the applicant, at a minimum, shall provide three (3) traffic attendants during peak periods; 1-2 attendants directing cars to a queue lane and 1-2 attendants near the pump entrance directing cars to a fueling position. The third attendant shall be a floater depending on the need and could either be placed near the pumps or at the front of the queue lanes. In addition, there shall be one (1) individual staffed at the station during all open business hours. Said individual shall manage the overall operations for the gas station. (***) 2.13 The 36 parking spaces in the first row directly north of the proposed gas station, 72 parking spaces in the second row and the 13 parking spaces along the east property line adjacent to the EI Modena -Tustin Channel shall be restricted to employee parking only. (***) 2.14 The words "KEEP CLEAR" shall be painted in large capitalized letters onto the pavement of the parking lot adjacent to the vehicular exit from the gas station per the approved plans. Said signage shall help to maintain an unobstructed opening adjacent to the gas station and allow for vehicles entering and exiting from the fueling area. (***) 2.15 A five (5) foot wide access stair shall be installed within the existing block wall along the south property line nearest the gas station adjacent to EI Camino Real. Said access stair will allow for emergency access (i.e. hose pull) by the Orange County Fire Authority (OCFA) in the event of an emergency. (***) 2.16 If, in the future, the City's Community Development Director, Police Chief and/or Public Works Department determine that a parking or traffic queuing problem exists on the site or in the vicinity as a result of the facility, the Community Development Director, Police Chief, and/or Public Works Department may require the applicant to prepare a parking demand 1446918.1 Exhibit A Resolution No. 19-39 Page 7 analysis or traffic study queuing analysis and the applicant shall be required to provide measures to alleviate the problem. Said measures shall be reviewed and approved by the Community Development Department, Police Chief, and/or Public Works Department. (***) 2.17 Per the approved plans, the applicant shall install a westbound right turn lane along EI Camino Real into the Costco Warehouse parking lot at the intersection of Auto Center Drive and EI Camino Real. A second designated right turn lane shall be installed on the site to funnel vehicles into the Costco Gasoline fueling area. Final lane striping plans for EI Camino Real shall be subject to the review and approval of the Public Works/Engineering Division. (***) 2.18 Following demolition of the Goodyear Tire Center building, the new parking lot shall be restriped in accordance with TCC Section 9266. PLANCHECK SUBMITTAL (1) 3.1 At the time of building or encroachment permit application, the plans shall comply with the latest edition of the codes, City Ordinances, State, Federal laws, and regulations as adopted by the City Council of the City of Tustin. (1) 3.2 Prior to issuance of any permits, the applicant shall submit for approval by the Community Development and Public Works Departments, a Water Quality Management Plan (WQMP). If the WQMP has been determined to be a Priority WQMP, it shall identify Low Impact Development (LID) principles and Best Management Practices (BMPs) that will be used on- site to retain storm water and treat predictable pollutant run-off. The Priority WQMP shall identify: the implementation of BMPs, the assignment of long-term maintenance responsibilities (specifying the developer, parcel owner, maintenance association, lessees, etc.), and reference to the location(s) of structural BMPs. (1) 3.3 Prior to submittal of a Water Quality Management Plan (WQMP), the applicant shall submit a deposit of $2,700.00 to the Public Works Department for the estimated cost of reviewing the WQMP. 1446918.1 Exhibit A Resolution No. 19-39 Page 8 (1) 3.4 Prior to issuance of any permits, the applicant shall record "Covenant and Agreement Regarding O & M Plan to Fund and Maintain Water Quality BMPs, Consent to Inspect, and Indemnification" with the County Clerk - Recorder. This document shall bind current and future owner(s) of the property regarding implementation and maintenance of the structural and non-structural BMPs as specified in the approved WQMP. (1) 3.5 Prior to any work in the public right-of-way, an Encroachment Permit shall be obtained from and applicable fees paid to the Public Works Department. (1) 3.6 Prior to issuance of an Encroachment Permit, the applicant shall submit to the Public Works Department 24" x 36" reproducible street improvement plans, as prepared by a California Registered Civil Engineer, for approval. The plans shall clearly show existing and proposed surface and underground improvements, including construction, restriping of EI Camino Real to accommodate a dedicated westbound right -turn lane, and/or replacement of any missing or damaged public improvements adjacent to this development. (1) 3.7 Prior to issuance of an Encroachment Permit for construction within the public right-of-way, a 24" x 36" construction area traffic control plan, as prepared by a California Registered Traffic Engineer, or Civil Engineer experienced in this type of plan preparation, shall be prepared and submitted to the Public Works Department for approval. (1) 3.8 Current Federal Americans with Disabilities Act (ADA) requirements shall be met at all driveways and sidewalks adjacent to the site. City of Tustin standards shall apply, unless otherwise approved by the City Engineer. (1) 3.9 Prior to issuance of a Building Permit, the applicant shall submit an underground storage tank plan to the Orange County Fire Authority (OCFA) for review and approval. (1) 3.10 In accordance with City policies, the developer shall post security for the grading permit in an amount to be determined by the Building Official. The required amount must include items relating to hazardous conditions such as erosion and air/dust control, the cost of completing any Mechanically -Stabilized Earth (MSE) walls, provisions for landscaping as relating to slope stability, compliance with approved landscape plans, and contingency funds which must include an allowance for site maintenance. 1446918.1 Exhibit A Resolution No. 19-39 Page 9 (1) 3.11 The developer shall submit a complete hydrology and hydraulic study (including off-site areas affecting the development), prepared by a California -registered professional civil engineer, consistent with the use of the criteria of the Orange County Hydrology Manual, to the City Building Official for review and approval. The study shall be consistent with the study submitted during the entitlement review process. The study report shall determine potential storm water runoff rates and peak flows for the City of Tustin and County of Orange design storms. Enough detail shall be provided to develop the existing conditions and proposed project conditions potential hydrograph and timing of peak flows. The study report shall demonstrate that the effect of storm water discharge to any City-, County-, or Other Agency -owned drainage or flood control facility as mitigated shall be designed and implemented to prevent post - construction storm flows from exceeding pre -construction volumes and rates. (1) 3.12 The developer shall submit storm drain plans, prepared by a California registered professional civil engineer, depicting proposed storm drain improvements for the project. All storm drain improvements shall comply with the City of Tustin Construction Standards for Private Streets, Storm Drain and On -Site Private Improvements Manual and the Orange County Local Drainage Manual. (1) 3.13 The developer shall submit precise grading plans, prepared by a California registered professional civil engineer, depicting proposed grading, erosion control and improvements for the project. All plans and design shall comply with the City of Tustin Grading Manual and requirements. (1) 3.14 Prior to approval of the final design plans and issuance of a grading permit, the developer shall conduct a site-specific geotechnical investigation for the entire site and prepare a report that fully assesses the geologic and soil conditions of the site. As part of the report preparation, soil sampling and any geotechnical testing will be completed at each location where structures are to be erected. The report shall provide grading and structural design recommendations for avoiding liquefaction, subsidence or collapse for each of the proposed structures. The recommendations shall be included in the plans submitted to the City. (1) 3.16 Construction and Demolition Waste Recycling and Reduction Plan (WRRP). 1446918.1 Exhibit A Resolution No. 19-39 Page 10 a. The applicant/contractor is required to submit a WRRP to the Public Works Department. The WRRP must indicate how the applicant will comply with the City's requirement (City Code Section 4351, et al) to recycle at least 65% of the project waste material or the amount required by the California Green Building Standards Code. b. The applicant will be required to submit a fifty -dollar $50.00 application fee and a cash security deposit. Based on the review of the submitted Waste Management Plan, the cash security deposit in the amount of five (5) percent of the project's valuation as determined by the Building Official, rounded to the nearest thousand. The deposit amount will be collected in accordance with the TCC. c. Prior to issuance of a permit, the applicant shall submit the required security deposit in the form of cash, cashier's check, personal check, or money order made payable to the "City of Tustin". (1) 3.17 Any damage done to existing public right-of-way improvements and/or utilities shall be repaired to the satisfaction of the City Engineer before final inspection. (1) 3.18 The applicant is responsible for all costs related to the installation, upgrade, alteration, relocation or abandonment of all existing City of Tustin public water facilities affected by the proposed project. FEES (1) 4.1 Within forty-eight (48) hours of approval of the subject project, the applicant shall deliver to the Community Development Department, a cashier's check payable to the COUNTY CLERK in the amount of fifty dollars ($50.00) to enable the City to file the appropriate environmental documentation for the project. If within such forty-eight (48) hour period the applicant has not delivered to the Community Development Department the above -noted check, the statute of limitations for any interested party to challenge the environmental determination under the provisions of the California Environmental Quality Act could be significantly lengthened. (1) 4.2 Prior to issuance of a Building Permit(s), payment of the most current Major Thoroughfare and Bridge Fees (for the Foothill/Eastern Transportation Corridor Agency (TCA)) to the City of Tustin (through the Public Works Department) shall be required. The fee rate schedule automatically increases on July 1St of each year. 1446918.1 Exhibit A Resolution No. 19-39 Page 11 (1) 4.3 The applicant shall pay are required fees to the City or the respective outside agency prior to the issuance of building permits. 1446918.1