HomeMy WebLinkAbout10 MEAS M GROWTH MGMT 06-20-05
AGENDA REPORT
Agenda Item
Reviewed: ,
City Manager
Finance Director
--111-
MEETING DATE:
JUNE 20, 2005
TO:
WilLIAM A. HUSTON, CITY MANAGER
FROM:
PUBLIC WORKS DEPARTMENT/ENGINEERING DIVISION
SUBJECT:
CITY OF TUSTIN MEASURE M GROWTH MANAGEMENT PROGRAM AND
CONGESTION MANAGEMENT PROGRAM ANNUAL COMPLIANCE,
FISCAL YEAR 2005-2006
SUMMARY
In order to maintain eligibility for the Measure M Growth Management Program, the City is
required to annually submit a compliance package to the Orange County Transportation
Authority (OCT A). For Fiscal Year 2005-2006, that package includes: (1) an updated Seven-
Year Capital Improvement Program, (2) a Maintenance of Effort Certification, (3) a Pavement
Management Program Certification, and (4) Congestion Management Program Monitoring
Checklists.
RECOMMENDATION
In order to maintain eligibility for the Measure M Growth Management Program (GMP) and the
Congestion Management Program (CMP), it is recommended that the City Council take the
following actions in compliance with the Measure M GMP and CMP requirements:
A.
Adopt the attached draft Measure M Growth Management Program Seven-Year
Capital Improvement Program (Fiscal Year 2005-2006 through Fiscal Year 2011-
2012).
B.
Authorize the Director of Public Works/City Engineer to submit the City of Tustin's
Measure M GMP and CMP eligibility packages, including certification of the City's
Maintenance of Effort (MOE), Pavement Management Program (PMP), and
Congestion Management Program (CMP) Monitoring Checklists to the Orange
County Transportation Authority.
FISCAL IMPACT
Compliance with Measure M requirements will ensure continued City eligibility for the Measure
M local Turnback Program, the Measure M Competitive Programs, and the Congestion
Management Program Gas Tax Subventions.
City of Tustin Measure M Growth Management Program and Congestion Management
Program Annual Compliance, Fiscal Year 2005-2006
June 20, 2005
Page 2
BACKGROUND
In June 1990, the voters of the State of California approved Proposition 111, under Section
2150 of the Streets and Highway Code, establishing a gas tax for the purpose of funding
statewide transportation improvements. This provided a mechanism for the County to establish
a region-wide CMP highway system that would be eligible to receive statewide funding for
roadway projects.
In November 1990, the voters of Orange County approved Measure M, the revised Traffic
Improvement and Growth Management Program (GMP), which established a one-half (1/2)
cent sales tax over a twenty-year period for local and regional transportation improvements
throughout Orange County. In order to receive revenue from these programs for facility
improvements, the City of Tustin and other Orange County cities must continue to meet certain
requirements.
Tustin's Measure M eligibility package for Fiscal Year 2004-2005 was approved by OCT A last
year. In order to maintain eligibility for these programs, the City is required to submit the
following items for the Fiscal Year 2005-2006 compliance submittal:
Seven-Year Capital Improvement Program (CIP)
The draft Capital Improvement Program (CIP) is a seven-year projection of specific projects
upon which Measure M funds may be expended. Adoption of the seven-year CIP is a
requirement of the Measure M GMP and CMP. Included in the plan are projects that could
be submitted to OCTA during future Measure M calls for projects and projects that have
identified Gas Tax funding. The proposed CIP is currently in draft form until the formal
adoption of the City's seven-year Capital Improvement Program as part of the Fiscal Year
2005-2006 budget process. The finalized seven-year CIP will be forwarded to OCTA when
the budget has been adopted by the City Council.
Maintenance of Effort (MOE)
A Maintenance of Effort (MOE) Reporting Form, with a statement certifying that the City will
meet its MOE expenditure in accordance with Measure M requirements for Fiscal Year
2005-2006, must be submitted with a copy of the City's draft budget sections showing
these expenditures. Upon authorization, the certification of the MOE will be executed by the
Director of Public Works/City Engineer and submitted to OCTA.
City of Tustin Measure M Growth Management Program and Congestion Management
Program Annual Compliance, Fiscal Year 2005-2006
June 20, 2005
Page 3
Pavement Management Plan (PMP)
The City of Tustin has had a Pavement Management Plan (PMP) in place since July 1989.
An updated five-year PMP was developed by Nichols Consulting Engineers in May 2005
and will be submitted to OCTA as part of the Measure M compliance package. To comply
with Measure M requirements, the City has to maintain and update the plan every two
years. Upon authorization, the certification of the PMP will be executed by the Director of
Public Works/City Engineer and submitted to OCTA.
Congestion Management Program (CMP)
In compliance with the Congestion Management Program (CMP), the City is required to
prepare a seven-year CIP and submit CMP Monitoring Checklists for the seven-year
Capital Improvement Program, Deficiency Plans, Land Use Coordination, Level of Service,
and Traffic Demand Management Ordinance. Upon authorization, the CMP Monitoring
Checklists and seven-year CIP will be submitted to OCTA.
Compliance with the Measure M GMP and CMP requirements will ensure the City's continued
eligibility for the various Measure M funding programs and the Congestion Management
Program.
~D.~
Tim D. Serlet
Director of Public Works/City Engineer
~d:r.~ ~
Engineering Services Manager
Attachment: Draft Seven-Year CIP (aCTA Format)
S:ICity Councilltems\2005 Councii ItemslMeasure M FY 05-06 Annual Compiiance.doc
08-Jun-O5
Agency:
Project Nnmber :
Project Name:
Tustin
ufa
Altadena Drive/Pasadena Avenue Pede"'ian
Enhancements (4063)
At the intersection of Alladena Drive andPasadena
Avenue
Other
other
Installation of in-pavement lighted clOsswalk and curb
bump outs
Project LimitsfLoc :
Type Of Work:
Additional TOW:
Project Description:
Measure M Growth Management Program
Congestion Management Program
Seven Year Capital Improvement Program (Sorted by Nune)
Fiscal Years 2005/2006 througII 201 1/2012
100%
$87,114
$87,114
Project Cost:
05/06 06/07 07/08 08/09 09/10 10/11 11/12
C I 87,114 0 I 0 I 0 0 I 0 0 I 87,114 87,114
$87,114 $0 $0 $0 $0 $0 $0 $87,114 $87,114
Agency: Tustin
Project Number: ufa
Project Name: Annual Major Maintenance Program (7001)
Project Limits/Loc: Various Locations within City Limit
Type Of Work: Road Maintenance
Additional TOW: rebabilitation of roadway
Project Description: Annual routine rehabilitation of street pavonent at
various locations throughout the City, including crack
sealing, skin patching, AC resurfacing, traffic loops and
Project Cost:
100%
$615,000
$615,000
05/06 06/07 07/08 08/09 09/10 1011 I 11/12
C I 525,000 0 0 +-~ I ~~! 0 ~:l 525,000
E 90,000 0 0 0 ~ 0 0 90,000 90,000
$615,000 $0 $0 $0 $0 $0 $0 $615,000 $615,000
MeasureM: Yes
08-Jun-O5
2
Agency: Tustin
Project Number: 97-TUST-SSP-2022
Project Name: Edinger Avenue Widening (7147)
Project LimitsiLoc: Between SR-55 and 1400' East of Red Hill Avenue
Type Of Work: Road Widening
Additional TOW: add 2 lanes to existing roadway in proj:ct limits
Project Description: Widen to major arterial highway smart :<reet standards
with dual left turn lanes and exclusive right hand turn
lanes. Construct inlets, curb & gutter, raised median,
sidewalks, signals, street lights and traffc striping.
Measure M Growth Management Program
Congestion Management Program
Seven Year Capital Improvement Program (Sorted by Nune)
Fiscal Years 2005/2006 througII 2011/2012
MPAH I 20% 1,660,440 1,660,440
SSP I 42% 3,505,139 3,505,139 !City of Santa Ana Smart Street
Turnback I 0% 4,641 4,641
SAD J 2% 178,715 178,715 Developer Bond - Specitl Assessment District
100% $8,390,393 $8,390,393
Project Cost:
Agency: Tustin
Project Number: 97-TUST-MPH-1I58
Project Name: Irvine Boulevard and Newport Avenue Intersection
Enhancement (7118)
Irvine Boulevard and Newport Avenue Intersection
Intersection
add through and left turn lanes to intersection
Project Dcscription: Widening and realignment to includedualletì turn lanes
and three through lanes on all approacho;. Traffic signal
modifications. Rehahilitation and resUlfacing AC
pavement.
Project Limits/Loc :
Type Of Work:
Additional TOW:
$0
$0
$0
$8,390,393
$0
$0
100%
$1,641,827
$1,641,827
Project Cost:
11/12
0
$1,641,827
$0
Measure M: Yes
07/08 08/09
0 I 0
~~..?
$0 $C
09/10
0
0
$0
$0
$1,641,827
10/11
0
Û
$0
08-Jun-O5
05/06 06/07 07/08 08/09
~ 720,000 I 0 I 0 E
0 0 0
$80,000 $720,000 $0 $0 $0 $0 $0
Agency: Tustin
Project Number: ufa
Project Name: Jamboree Road Rehabilitation (7183)
Project Limits/Loc: Between Peters Canyon Wash Bridge and Portola
Parkway
Type Of Work: Road Maintenance 100% $850,000 $892,900
Additional TOW: rehabilitation of roadway
Project Descriptiun: Removal and deep lift repairs of AC pavonent failure
areas, cold plane, AC resorfacing, traffic loops and
tram
Projcct Cost:
10/11 11/12
B 0 I 780,000
0 70,000
$780,000 $0 $0 $0 $0 $0 $850,000
Agency: Tustin
Project Number: ufa
Projcct Name: Jamboree Road Rehabilitation (7182)
Project LimitsfLoc: Between Irvine Boulevard and Peters C~on Wash
Bridge
Type orWork: Road Maintenance
Additional TOW: rehabilitation of roadway
Project Description: Removal and deep lift repairs of AC pavonent failure
areas, cold plane, AC resurfacing, tIafflic loops and
Project Cost:
Measure M Growth Management Program
Congestion Ma.1agement Program
Seven Year Cap.al Improvement Progrr.m (Sorted by Nune)
Fiscal Years 2005/2aa6 throug'. 2011/2012
CIP
100%
377,820
83,960
377,820
$839,600
AHRP Measure "M" Application
Measure M: Yes
08-Jun-O5
4
Measure 1\'1 Growth Management Program
Congestion Management Program
Seven Year Capital Improvement Program (SUIted by None)
Fiscal Years 2005/200GthlOugII 201112012
Ageucy: Tustin
Project Number: ufa
Project Name: Jamboree Road Rehabilitation (7184)
Project Limits/Loc: Between Portola Parkway and 1350 fret north ofTustin
Ranch Road
Typc Of Work: Road Maintenance
Additional TOW: rehabilitation of roadway
Project Description: Removal and deep lift repairs of AC pavonent failure
areas, cold plane, AC resurfacing, traffic loops and
Project Cost:
$540,000
Agency: Tustin
Project Number: ufa
ProjcctName: NewportAvenueExtension(7I31)
Project Limits/Loe: From current tenninus to Edinger AvolUe
Type Of Work: New Facility
Additional TOW: new 6 lane roadway between project liints
Projcct Description: Extension of Newport Avenue from curent tenninus,
south of Edinger Avenue including the railroad
underpass and the widening ofNew¡nrt Avenue from
Tustin Grove Drive to Myrtle Aveme. Includes
realignment of ftood control channel.
100%
$0
08/09
0
0
$0
CIP
AHRP Measure "M" Application
09/10
0
0
SO
10/11
0
0
SO
11/12
0
0
$0
! CDBG I 1% 199,877 I 244,241
I General I 11% 3,450,983 I 4,216,946 Tustin Community Redevelopment Agency-South
Central
Tumback I 1% 199,997 244,387
I Other I 15% 4,500,000 5,498,797 MPAH Measure "M" Application
Unfunded I 73% 22,500,000 1 27,493,986 Uncertain Funding
100% $30,850,857 $37,698,357
09/10 10/11
~ 21,000,000 I [
0
0
$1,500,000 $21,000,000 $0 $30,850,857 $37,698,357
Project Cost:
Measure M: Yes
08-Jun-O5
5
Measure M Growth Management Program
Congestion Management Program
Seven Year Capital Improvement Program (Sorted hy Nune)
Fiscal Years 2005/2006 througII 2011/2012
Agency: Tustin
Project Number: ufa
Project Name: Newport Avenue Rehabilitation (7165)
Project LimitsiLoc: Between Sycamore Avenue and McFadd:n Avenue
Type orWork: Road Maintenance
Additional TOW: rehabilitation of roadway
Project Description: Street rehabilitation & resurfacing including; repair and
grinding of existing pavement. crack seal, AC
resurfacing, traffic loops, traffic signing and traffic
striping.
General
Tumback
5%
95%
100%
Project Cost:
Agency: Tustin
Project Number: 00-TUST-RlP-3190
Project Name: Newport Avenue/SR-55 Northbound Ramp
Reconfiguration (7130)
Newport Avenue I SR-55 Northbound Rarq>
Interchange
reconfigure the interchange between street and freeway
to eliminate traffic conflicts
Project Description: Relocation of existing ramps, construction of new
ramps, construction of Newport betweO1 Edinger and
Valencia. Realignment ofDel Amo between Edinger
and ramp.
Project Limits/Loc :
Type Of Work:
Additional TOW:
08/09
0
0
$0
19,834
350,000
$369,834
09/10
0
0
$0
10111
0
0
$0
$0
$14,419,392
Gas Tax 5% 699,370 699,370
General 2% 318,000 318,000 Water CapitallmprovelTent Program
RIP 47% 6,715,986 6,715,986
Tumback 9% 1,277,188 1,277,188
Developer 14% 2,003,856 2,003,856 Bonds/Payments
Other 21% 3,000,000 3,000,000 RIP Measure "M" Application
SAD 3% 404,992 404,992 Tustin Cnmmunity Redevelopment Agency-South
Central
$0
$0
100%
$14,419,392
C
R
05/06
10,016,452
4,402,940
$14,419,392
Project Cost:
$0
Measure M: Yes
$0
$0
$0
10,016,452
4,402,940
$14,419,392
10,016,452
4,402,940
$14,419,392
08-Jun-O5
6
Agency: Tustin
Project Numher: ufa
Project Name: Old Town Tustin Commercial District Sign Program
(4065)
Old Town Tustin
Other
other
Project Description: Entry signs and directional signs forOld Town Tustin
Project Limits/Loc :
Type Of Work:
Additional TOW:
Measure M Growth Management Program
Congestion Management Program
Seven Year Capital Improvement Program (Sorted by Nune)
Fiscal Years 2005/2006 througII 2011/2012
100%
Project Cost:
05106 06/07 07/08 08/09 09/10 10/11 11112
C I 50,000 0 0 I 0 0 I 0 0 I 50,000 50,000
$50,000 $0 $0 $0 $0 SO $0 $50,000 $50,000
Agency: Tustin
Project Number: 00-TUST-RST-2020
Project Name: Red Hill Avenue Grade Separation (7175)
ProjcetLimits/Loc: Red Hill Avenue at aCTA I SCRRARailwayl Edinger
Avenue
Type Of Work: Intersection
Additional TOW: separate streets through an over or undequss (grade
separation) of the roadways
Project Description: Grade separation nfRed HillÆdingtY, Red HilVSanta
Ana-Santa Fe Channel, and Red Hill/OCT A-&:RRA
Railway. Edinger improvements in viciIity nf
Project Cost:
RSTP I 1% I 232,080 I 278,349
GMA I 1% 365,000 437,768 99-TUST-GMA-1193, 00-TUST-GMA-3189 & 03-
TUST-GMA-1222
liP 6% 1,400,000 1,679,112 03-TUST-IIP-1223
Tumback 0% 117,920 141,429
Other 4% 1,000,000 1,199,365 liP Measure "M" Applicaúon
Unfunded 88% 22,100,000 26,505,977 Uncertain Fuuding
100%
$25,215,000
S30,242,000
$440,000
$100,000
Measure M: Yes
$1,575,000
$22,100,000
SO
$0
22,100,000
2,115,000
1,000,000
$25,215,000
26,962,000
2,115,000
1,165,000
$30,242,000
08-Jun-O5
Ageney: Tustin
Project Numher: ufa
Project Name: Red Hill Avenue Widening at the 1-5 (7133)
Project Limits/Loc: Between EI Camino Real and Nisson Road (at the ]-5
Freeway)
Road Widening
add 2 lanes to existing roadway in proj:ct limits
Widening to major arterial highway ",",dards including
3 through lanes and bicycle lanes in beth directions.
Right turn only lanes onto the freeway ømps, dual left
turn lanes from northbound Red Hill Avenue to
westbound EI Camino Real.
Type Of Work:
Additional TOW:
Project Description:
Project Cost:
Measure M Growth Management Program
Congestion Management Program'
Seven Year Capital Improvement Program (Sorted by Nune)
Fiscal Years 2005/2006 througII 20 I 1/2012
250,000
26,293
$276,293
100%
05106 06/07 07/08 08/09 09/10 10/11 11/12
C I 276,293 0 I 0 I 0 0 I 0 0 I 276,293 I 276,293
$276,293 $0 $0 $0 $0 $0 $0 $276,293 $276,293
Total for Tustin
$61,759,381
$6,202,000
$5,530,000
$27,955,000
$28,762,000
$21,785,000
$8,350,000
$159,793,381
$180,034,481
Measure M: Yes
08-Jun-O5
Measure M Growth Management Program
Congestion Management Program
Seven Year Capital Improvement Program (Sorted by Nune)
Fiscal Years 2005/2006 througII 2011/2012
Agency: Tustin
Project Number: nla
Project Name: Edinger Avenue Beautification
Project Limits/Loc: Between east of Red Hill Avenue and wo;tof Jamboree
Road
Aesthetics
landscaping of roadway
North parkway and median island landscaping along
portion of Edinger Avenue.
Type Of Work:
Additional TOW:
Project Description:
Unfunded
100%
1,000,000
$1,000,000
100%
Project Cost:
C
E
05106
0
0
$Ò
06/07
0
0
$0
Agency: Tustin
Project Number: ufa
Project Name: EI Camino Real Widening (7116)
Project Limits/Loc: Betweeu Red Hill Avenue and 400' east ofBrowning
Avenue
Type Of Work: Road Widening
Additinnal TOW: add 2 lanes to existing roadway in proj:ct limits
Projcct Description: Widen east leg ofE! Camino Real &Red Hill Avenue
intersection. Street widening to four lanesecondary
arterial highway standards. Reconstruction & resurface
of AC pavement and signalization ora Camino Real &
Project Cost:
$0
Measure M: No
07/08
0
0
$0
08/09
0
0
$0
$0
$900,000
$1,297,000
5120,000
08/09
0
0
1,000,000
$1,000,000
100%
$9,370,000
$12,065,000
$1,000,000
$250,000
08-Jun-O5
2
Agcncy: Tustin
Project Number: ufa
Project Namc: First StreetIB Street Pedestrian Enhan:ements (4068)
Project Limits/Loc: At the intersection of First Street and B Steet
Type Of Work: Other
Additioual TOW: other
Project Description: Pedestrian enhancements at the inte~ection of First
Street and B Street
Measure M Growth Management Program
Congestion Management Program
Seven Year Capital Improvement Program (Sorted by Nune)
Fiscal Years 2005/2006 througII 201 1/2012
100%
Project Cost:
C
E
05106
200,000
30,000
$230,000
06/07
0
0
$0
Agency: Tustin
Project Numbcr: ufa
Project Name: Irvine Boulevard at Prospect Avenue Maliry/Upgrade
Traffic Signal (4052)
Irvine Boulevard at Prospect Avenue
Traffic Signals
replace and upgrade traffic signals ood equipment
Installation of left-turn phasing for north-south Prospect
Avenue at Irvine Boulevard
Project Limits/Loc :
Type Of Work:
Additional TOW:
Project Dcscription:
07/08
0
0
$0
08/09
0
0
SO
$0
100%
$212,000
$234,000
Project Cost:
$0
$0
Measure M: No
$200,000
08-Jun-O5
3
Agency: Tustin
Project Numbcr: ufa
Project Name: Irvine Boulevard Rehabilitation
Project LimitsfLoc: Between Prospect Avenue and Holt Avenue
Type Of Work: Road Maintenance
Additional TOW: rehabilitation of roadway
Project Description: Removal and deep lift repair ofpavanent failure areas,
repair curb and gutter, cold plane, crack seal, AC
resurfacing, traffic loops and traffic'
Project Cost:
Agency: Tustin
Project Number: ufa
PrujectName: IrvineBoulevardRehabilitation(7181)
Project Limits/Loc: Between Ranchwood Road and Jamboree Road
Type Of Work: Road Maintenance
Addilional TOW: rehabilitation of roadway
Project Dcscription: Removal and deep lift repair ofpavanent failure areas,
repair curb and gutter, cold plane, crack seal,AC
resmfacing, traffic loops and traffic
Project Cost:
$900,000
Measure M: No
Measure M Growth Management Program
Congestion Management Program
Seven Year Cap.allmprovement Program (Sorted byNune)
Fiscal Years 2005/2006 througII 2011/2012
100%
700,000
$700,000
836,400
$836,400
Uncertain Funding
07/08
0
0
SO
08/09
0
80,000
$80,000
$620,000
$0
$0
~
Gas Tax
General
Other
100%
$0
200;000
400,000
400,000
$1,000,000
09/10
0
0
$0
i
209,900
419,800
419,800
$1,049,500
10/11
0
0
$0
CIP
lA!IRP Measure "M" Appl ication
11/12
0
0
$0
08-Jun-O5
4
Agency: Tnstin
Project Numbcr: ufa
Project Name: Main Street at Williams Street ModityUpgrade Traffic
Signal
Main Street at Williams Street
Traffic Signals
replace and upgrade traffic signals IIld equipment
Modification and upgrade of existing traffic signal and
equipment at Main Street and Williams Street.
Agcncy:
Project Numher:
Project Name:
Project Limits/Loc :
Type OfWurk:
Additional TOW:
Project Description:
Project Cost:
Project Limits/Loc :
Type Of Work:
Additional TOW:
Project Description:
Project Cost:
Measure M: No
Measure M Growth Management Program
Congestion Management Program
Seven Year Capital Improvement Program (Sorted by Nune)
Fiscal Years 2005/2006 througII 2011/2012
Tustin
ufa
Jamboree Road Rehabilitation
Between 2750 feet north ofTustin Ranch Road and
north City limits
Road Maintenance
rehabilitation of roadway
Removal and deep lift repairs of AC pavement failure
areas, cold plane, AC resurfacing, traffic loops and
100%
05/06
0
0
$0
06/07 07/08 08/09
B 0 I 1,200,000 B
150,000 0
SO $150,000 SI,200,OOO $0
C
E
$0
$0
Uncertain Funding
100%
$0
$0
$0
$185,000
$0
$0
08-Jun-O5
Agency:
Project Number:
Project Name:
Project LimitsfLoc :
Type Of Work:
Additiooal TOW:
Project Description:
Tustin
ufa
Myrtle Avenue Rehabilitation
Between Main Street and First Stre<i
Road Maintenance
rehabilitation of roadway
Removal and replacement of pavement l\iIure areas,
construction of sidewalk, curb and gutter, street lights
and AC resu
Projcct Cost:
$0
Agency: Tustin
Project Number: nla
Project Name: Prospect Avenue Imprnvements (7177)
Project Limits/Loc: Between Main Street and Third Street
Type Of Work: Road Widening
Additional TOW: widen width of existing traffic lanes
Projeet Description: Improvements to the west side ofPrml'ectAvenue
including half street reconstrnction, remove and replace
sidewalk, curb and gutter, install street ights and
bollards, landscaping, decorative pavonent and storm
drain improvements.
Measure M Growth Management Program
Congestion Management Program
Seven Year Capital Improvement Program (Sorted by Nune)
Fiscal Years 2005/2006 througII 201 1/2012
100%
so
$0
11112
450,000
0
$450,000
450,000
80,000
$530,000
598,500
80,000
$678,500
CDBG ~ 0 0 L ~
100% $0 $0
Prujeet Cost:
05106 06/07 07/08 08/09 09/10 1011 I 11112
C 1495,000 010 10 0 I 0 I 010 0
E 55,000 0 0 0 0 0 0 0 0
S550,OOO $0 $0 $0 $0 $0 $0 $0 $0
Measore M: No
08-Jun-O5
6
Agency:
Project Number:
Project Name:
Tustin
ilia
Red Hill Avenue at Bell Avenue New Tralfc Signal
Installation
Red Hill Avenue at Bell Avenue
Traffic Signals
install new traffic signal and equipmert
Installation of new traffic signal and saf<ty lighting at
Red Hill Avenue and Bell Avenue.
Project Limits/Loc :
Type Of Work:
Additioual TOW:
Project Descriptiou:
Measure M Growth Management Program
Congestion Management Program
Seven Year Capital Improvement Program (Sorted by Nune)
Fiscal Years 2005/2006 througII 2011/2012
100%
Project Cost:
C
E
05106
0
0
$0
06/07
0
0
$0
Agency: Tustin
Project Number: ufa
Project Name: Red Hill Avenue at Service Road Modfy I Upgrade
Traffic Signal (4055)
Red Hill Avenue at Service Road
Traffic Signals
replace and upgrade traffic signals IIld equipment
Project Description: Modification and upgrade of existing traffic signal and
equiprnent at Red Hill Avenue and S<nice Road.
Project LimitsfLoc :
Type orWork:
Additional TOW:
07/08
0
15,000
$15,000
08/09
225,000
0
$225,000
09/10
0
0
$0
10111
0
0
$0
11/12
0
0
$0
225,000
15,000
$240,000
262,125
15,000
$277,125
100%
Uncertain Funding
Project Cost:
Measure M: No
$0
$200,000
$0
$0
08-Jun-O5
Agency:
Project Number:
Project Name:
Project Limils/Luc :
Type Of Work:
Additional TOW:
Prnject Description:
Measure M Growth Management Program
Congestion Management Program
Seven Year Capital Improvement Program (Sorted by Nune)
Fiscal Years 2005/2006 througII 201 1/2012
Tustin
ufa
Red Hill Avenue Widening
Between Melvin Way and 200 feet iDutherly
Road Widening
widen width of existing traffic lanes
Widening on easterly side of Red Hil. Sawcut &
removal of edge of pavement & pav<ment failure areas.
Clearing grubbing & excavation of native material.
Const. of curb & gutter, drive aprons & sidewalk, deep-
lift AC repair, AC resurfacing.
100%
Project Cost:
Agency:
Project Number:
Project Name:
Project LimitsfLuc :
Type Of Work:
Additional TOW:
Project Description:
Project Cost:
Measure M: No
05/06 06/07 07/08
§ 0 0 I 0 ~
0 0 20,000
0 0 0
$0 $0 520,000 $40,000
Tustin
ufa
Red Hill Avenue Widening
Between Edinger Avenue and ValenciaAvenue
Road Widening
widen width of existing traffic lanes
Widening of right-of-way to 6-lane full majJr arterial
standards. This project adds bicycle lano;, raised
median and landscaping, turn lanes at intersections and
modifications to ...
06/07
0
0
0
$0
$0
$200,000
$0
07/08
0
250,000
0
$250,000
58,603
Tustiu Community Redevelopment Agency-South
Central
Uncertain Funding
Unfunded
97%
1,900,000
$1,950,000
2,226,897
$2,285,500
100%
08/09
0
0
700,000
$700,000
$0
$0
$1,000,000
08-Jun-O5
8
Agency: Tustin
Project Numher: ufa
Project Name: Red Hill Avenue/Olwyn Drive Pedestrian
Enhancements (4067)
At the intersection of Red Hill Avenu: and IOlwyn Drive
Other
other
Project Description: Installation of in-pavement lighted crosswalk at the
intersection of red Hill Avenue and OlwynDrive
ProjcctLimits/Loc:
Type Of Work:
Additional TOW:
Project Cost:
Measure M Growth Management Program
Congestion Management Program
Seven Year Capital Improvement Program (Sorted by Nune)
Fiscal Years 2005/2006 througII 2011/2012
General
AB2766
43%
57%
100%
05106 06/07 07/08 08/09 09/10 10111 11/12
C I 115,000 0 I 0 0 0 I 0 0 I 115,000 115,000
$115,000 $0 $0 $0 $0 $0 $0 $115,000 $115,000
Agency:
Project Number:
Project Name:
Projcct Limits/Loc :
Type Of Work :
Additional TOW:
Project Description:
Tustin
ufa
Tustin Ranch Road Extension (7100)
Between Walnut Avenue and Valencia North Loop Road
New Facility
new 6 lane roadway between project linits
Construction of6-lane major arterial induding bridges
over Santa Fe Channel, SCRRAlOCT A Railway &
Edinger. Edinger Ave improvements induding oufofT
ramps. Tustin Ranch Rd improvements south of Edinger
.,.., - ,- "_L_'_'" --_nd.
Gas Tax 2% 552,375 639,279
General 0% 76,509 88,546 CIP
Developer 26% 5,695,000 6,590,985
Other 11% 2,500,000 2,893,321 MPAH Measure "M" Application
Unfunded 60% 13,305,000 15,398,253 Uncertain Funding
100%
$22,128,884
$25,610,384
Project Cost:
$928,884
Measure M: No
11/12
0
0
0
$0
21,500,000
428,884
200,000
$22,128,884
$100,000
$21,000,000
$0
08-Jun-O5
9
Ageney:
ProjectNumbcr:
Project Name:
Project LimitsfLoc :
Type Of Work :
Additional TOW:
Project Descriptiou:
Tustin
ufa
Tustin Ranch Road RebabiIitation (7179)
Between 1-5 and Bryan Avenue
Road Maintenance
rehabilitation of roadway
Removal and deep-lift repair ofpavonent failure areas,
cold plane, AC resurfacing, traffic loops and traffic
Projcct Cost:
$0
Agency: Tustin
Project Number: ufa
Projcct Name: Tustin Ranch Road Rehabilitation (7180)
Project Limits/Loc: Between Walnut Avenue and 1-5
Type Of Work: Road Maintenance
Additional TOW: rehabilitation of roadway
Project Description: Removal and deep lift repairs of AC pavonent failure
areas, cold plane, AC resurfacing, traffic loops and
Project Cost:
Measure M Growth Management Program
Congestion Management Program
Seven Year Capital Improvement Program (Sorted by Nune)
Fiscal Years 2005/2006 througII 2011/2012
100%
8,700
310,000
240,000
$558,700
C1P
AHRP Measure "M" Application
Other
so
$0
so
$0
CIP
AHRP Measure "M" Application
100%
$0
08/09 09/10 10/11 11112
B 0 0 1 0 0 I 540,000 ~
0 0 0 0 60,000 60,000
$0 $0 $0 $0 $0 5600,000 $600,000
Measure M: No
08-Jun-O5
Measure M Growth Management Program
Congestion Management Program
Seven Year Capital Improvement Program (Sorted by Nune)
Fiscal Years 2005/2006 througII 2011/2012
Ageney: Tustin
Project Number: ufa .
Project Name: Valencia Avenue Widening
Project LimitsILoc: Between Newport Avenue Extensionand Red Hill
Avenue.
Type orWork: Road Widening
Additional TOW: add 2 lanes to existing roadway in proj:ct limits
Project Description: Widening to 4-lane primary arterial roadwaywith
median. Includes improvements at ValercialRed Hill
including NB and SB dual left-turn lanes, SB right-turn
lane. Modification of traffic signals atValencialRed
Hill and Valencia/Newport.
Tostin Community Redevelopment Agency South
Central
Uncertain Fonding
100%
Project Cost:
$0
$100,000
$2,200,000 $0 $0
1% 300,000 300,000
1% 327,558 327,558 ÎCIP
98% 30,698,529 30,698,529 -1
100% $31,326,087 $31,326,087
$50,000
Agency: Tustin
Project Numbcr: ufa
Project Name: Valencia North Loop Road and AnnstlOng Avenue
(7139)
Within Tustin Legacy
New Facility
new 4 lane roadway between project linits
Project Description: Construction of roads, incloding select'" utilities for
Valencia North Loop Road ftom Red Hil Avenue to
Tustin Ranch Road extension. Inchrles West Connector
Road, Landsdowne Road, and Arm"'ong Avenue.
Project Limits/Loc :
Type Of Work:
Additiunal TOW:
Project Cost:
Total for Tustin
31,187,529 31,187,529
138,558 138,558
$0 $0 $0 $0 $0 $0 $31,326,087 $31,326,087
$61,759,381 $6,202,000 $5,530,000 $27,955,000 $28,762,000 $21,785,000 $8,350,000 $159,793,381 $180,034,481
Measure M: No
10