Loading...
HomeMy WebLinkAbout07 RED HILL/OLWYN DR 07-05-05 A G END A REPORT Agenda Item 7 Reviewed: ~. City Manager Finance Director MEETING DATE: JULY 5, 2005 TO: WilLIAM A. HUSTON, CITY MANAGER FROM: PUBLIC WORKS DEPARTMENT/ENGINEERING DIVISION APPROVAL OF PLANS AND SPECIFICATIONS AND AUTHORIZATION TO ADVERTISE FOR BIDS FOR THE RED Hill AVENUE/OlWYN DRIVE PEDESTRIAN ENHANCEMENT PROJECT (CIP NO. 4067) SUBJECT: SUMMARY The plans and specifications for the Red Hill Avenue/Olwyn Drive Pedestrian Enhancement Project (CIP No. 4067) have been prepared and the project is now ready to be bid. This project provides for the installation of an in-pavement lighted crosswalk system at the Red Hill Avenue/Olwyn Drive intersection. RECOMMENDATION It is recommended that the City Council adopt Resolution No. 05-54, approving the plans and specifications for the Red Hill Avenue/Olwyn Drive Pedestrian Enhancement Project (CIP No. 4067), and authorizing and directing the City Clerk to advertise for bids. FISCAL IMPACT The FY 2004/2005 CIP budget allocates $80,000 to the project. The proposed FY 2005/2006 CIP budget allocates additional monies in order to fully fund the construction phase of the project. The engineer's construction cost estimate to complete this work is $126,000. BACKGROUND The proposed project involves the installation of flashing lights within the pavement at an existing school crosswalk across the south leg of Red Hill Avenue at Olwyn Drive. The proposed flashing lights will be activated by pedestrians and serve to provide additional warning to drivers that a pedestrian is using the crosswalk. A contract for installation of a similar system was recently approved by the City Council for the intersection of Pasadena Avenue/Altadena Drive. The technology is being applied by various cities throughout the country and is intended to provide benefits for pedestrians under both daytime and nighttime conditions. The project also includes the modification of curb ramps to meet requirements of the federal Americans with Disabilities Act (ADA). Since this project involves the enhancement of existing facilities with minor modifications, it is categorically exempt under California Environmental Quality Act (CEQA) requirements. A Notice of Exemption has been recorded with the County of Orange. Approval Of Plans And Specifications And Authorization To Advertise For Bids For The Red Hill Avenue/Olwyn Drive Pedestrian Enhancement Project (CIP NO. 4067) July 5, 2005 Page 2 The tentative schedule for construction of the project is as follows: Authorization to Advertise for Bids .......................................................07/05/2005 First Legal Advertisement.....................................................................07/14/2005 Second Legal Advertisement................................................................ 07/21/2005 Bid Opening..........................................................................................08/16/2005 Award of Contract.................................................................................09/06/2005 Start Construction ................................................................................10/10/2005 Complete Construction ......................................................................... 12/12/2005 .. =,er/~ ~¿:/~k Director of Public Works/City Engineer Engineering Services Manager Attachments: Resolution No. 05.54 Location Map S:\City Councilltems\2005 CouncilltemslApproval of P&S Red Hill at Olwyn Ped Enhancements.doc RESOLUTION NO. 05-54 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUSTIN, CALIFORNIA APPROVING PLANS AND SPECIFICATIONS FOR THE RED HILL AVENUE/OLWYN DRIVE PEDESTRIAN ENHANCEMENT PROJECT (CIP NO. 4067), AND AUTHORIZING ADVERTISEMENT FOR BIDS WHEREAS, it is the intention of the City Council of the City of Tustin, California to contract for the construction of the Red Hill Avenue/Olwyn Drive Pedestrian Enhancement Project (CIP No. 4067); and WHEREAS, the City Engineer has presented plans and specifications for the construction of said work; and WHEREAS, this project is categorically exempt from the requirements of the California Environmental Quality Act; Class 1, Section 15301: Existing Facilities; NOW, THEREFORE, BE IT RESOLVED that the plans and specifications presented by the City Engineer are hereby approved as the plans and specifications for: Red Hill Avenue/Olwyn Drive Pedestrian Enhancement Project (CIP No. 4067) BE IT FURTHER RESOLVED that the City Clerk is hereby authorized and directed to advertise as required by law for the receipt of sealed bids or proposals for the performance of the work specified in the aforesaid plans and specifications; PASSED AND ADOPTED at a regular meeting of the City Council of the City of Tustin held on the 5th day of July 2005. Lou Bone, Mayor ATTEST: City Clerk Z -0:: ¡:: t- oo => .v' I-- LL 0 ~ () § ~ 2 II... g ß ~ II... !z w :::¡; w ~ « J: z W ~ ~ w 0 W II... ~ !ลก ~ - w => z ~ ...J ...J I 0 ~ LÜ :::¡; « z t¡ w ~