HomeMy WebLinkAboutCC RES 87-138
5
10
10
17
18
2O
RESOLUTION NO. 87-138
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
TUSTIN, CALIFORNIA ESTABLISHING BUILDING DIVISION FEES
AND SERVICE CHARGES.
The City Council of the City of Tusttn does hereby resolve as follows'
I. The City Council finds and determines as follows'
A. There are a number of services provided by the City in
processing applications for Building Division permits that are
of primary benefit to the applicant;
B. The cost of these services should be borne primarily by the
applicant receiving benefit from such services and so as to
insure timely and effective processing of applications;
C. The City can account for the actual costs of these services
provided to the appl i cant.
II. Pursuant to Section 8100 of the Tustin Municipal Code, as amended on
December 6, 1987, the Determination of Construction Valuation shall
be made by the Building Official who shall be guided by the most
recent valuation data published by the International Conference of
Building Officials (ICBO) in its Building Standards magazine.
Additional cost valuation multipliers shown in Exhibit A attached
hereto and made a part hereof by reference, shall also be utilized by
the Building Official.
III Pursuant to Section 8101 of the Tustin Municipal Code, as amended on
- December 6, 1987, Building Division permit fees and services charges
are hereby established as shown on Exhibit B through H, attached
hereto and made a part hereof by reference and shall supercede any
existing fee or charge and shall be applied uniformly except where in
the discretion of the City Manager, reduced fees or changes are
justi fled by special circumstances.
10
11
12
13
14
15
10
17
18
19
2O
21
23
25
26
27
28
Resolution No. 87-138
Page t~o
VI. Building Dtvtston fees and service charges"shall be automatically
changed on an annual basts to be effective beginning' ~anu~y 1, 1989
to ~eflect Inflationary o~ deflationary cost changes fo~ ~he p~evious
calenda~ yea~. Fo~ purposes of satd modificatlons, the Building
Dtvtslon shall uttltze the Consume~ P~tce Index.
PASSED AND ADOPTED by the City Council of the City of Tustin at a
regular meeting held on. the 21st day of December, 1987.
RiChard B
Mayor
,~/
M aryE ~~~)~ n n ~
EXHIBIT A
MISCELLANEOUS VALUATION RULTIPLIERS
Type_of Construction
Covered Pattos (wood or aluminum)
Greenhouse/so 1art um
Nood decks (30 inches or htgher)
Reroof~ng (75.00 mtnimum)
New commercial constuctt on
Tenant improvements
Swimmtng Pools - Spas
Retai n~ng Nalls
1-2 feet
2-3 feet
3-4 fee:
4-5 feet
5-6 feet
6-7 feet .
7-8 feet
Block walls
3-4 fee~
5 feet
6 feet plus
Wood fence (five feet plus)
Chain link fence (five feet plus)
Re'plastering, additional plastering,
or wet sand blasting
20 sq. ft. or less
Up to 200 sq. yards
Each addittonal square yard
11.50/sq. ft.
25.00/sq.ft or actual
contractors con'tract
value, whichever i s
higher.
8.00/sq. ft.
2.00/sq. ft.
66.84/sq. ft.
16-18/sq. ft.
24.75/sq. ft.
$12-18/1 i near foot
$18-25/1 inear foot
$25-35/linear foot
$35-42/linear foot
$42-50/linear foot
$50-58/1 inear foot
$58-66/li near foot
$17.00
$19.00
$22.00
$6.00 lineal
$12.00 lineal
foot
foot
no fee
$15 flat value
$.03 sq. yd.
EXHIBIT B'
BUILDING PERMIT AND PLAN CHECK FEES
Plan Permit Plan Permit
Valuation Check Fee Valuation Check Fee
-- -- -- IIIL III ~
1-500 9.75 15.00 29,001-30,000 184.95 284.50
501-600 11.05 17.00 30,001-31,000 189.15 291.00
601-700 12.35 19.00 31,001-32,000 193.40 297.50
701-800 13.65 21.00 32,001-33,000 197.60 304.00
801-900 14.95 23.00 33,001-34,000 201.85 310.50
901-1,000 16.25 25.00 34,001-35,000 206.05 317.00
1,001-1,100 17.55 27.00 35,001-36,000 210.30 323.50
1,101-1,200 18.85 29.00 36,001-37,000 214.50 330.00
1,201-1,300 20.15 31.00 37,001-38,000 218.75 336.50
1,301-1,400 21.45 33.00 38,001-39,000 222.95 343.00
1,401-1,500 22.75 .35.00 39,001-40,000 227.20 349.50
1,501-1,600 ° 24.05 37.00 40,001-41,000 231.40 356.00
1,601-1,700 25.35 39°00 41,001-42,000 235.30 362.50
1,701-1,800 26.65 41.00 42,001-43,000 239.85 369.00
1,801-1,900 27.95 43°00 43,001-44,000 244.10 375.50
1,901-2,000 29°25 45.00 44,001-45,000 248.30 382.00
2,001-3,000 ' 35.10 54.00 45,001-46,000 252.55 388.50
3,001-4,000 40.95 63.00 46,001-47,000 256.75 395.00
4,001-5,000 46.80 72.00 47,001-48,000 261.00 401.50
5,001-6,000 52.65 81.00 48,001-49,000 265.20 408.00
6,001-7,000 58.50 90°00 49,001-50,000 269.45 414.50
7,001-8,000 64.35 99.00 50,001-51,000 272.35 419.00
8,001-9,000 70.20 108.00 51,001-52,000 275.30 423.50
9,001-10,000 76.05 117.00 52,001-53,000 278.20 428.00
10,001-11,000 81.90 126o O0 53,001-54,000 281.15 432.50
11 , 001-12,000 87° 75 135. O0 54,001-55,000 284.05 437. O0
12, O01-I 3,000 9 3o 60 144o O0 55, O01-56,000 287. O0 441.50
13,001-14,000 99.45 153. O0 56,001-57,000 289.90 446. O0
14,001-15,000 105.30 162. O0 57, O01-58,000 29 2.85 450.50
15,001-16,000 111.15 171. O0 58,001-59,000 295.75 455. O0
16,001-17,000 117. O0 180. O0 59,001-60,000 298.70 459.50
17, O01-18,000 122.65 189. O0 60, O01-61,000 301.60 464. O0
18,001-19,000 128.70 198. O0 61,001-62,000 304.55 468.50
19,001-20,000 134.45 207. O0 62,001-63,000 307.45 473. O0
20,001-21,000 140.40 216.00 63,001-64,000 310.40 ' 477.50
21,001-22,000 146.25 225. O0 64,001-65,000 313.30 482. O0
22, O01-23,000 152.10 234. O0 65, O01-66,000 316.25 486.50
23,001-24,000 157.95 243. O0 66,001-67,000 319.15 491. O0
24, O01-25,000 163.80 252. O0 67, O01-68,000 322.10 49 5.50
25,001-26,000 168.05 258.50 68,001-69,000 325. O0 500. O0
26, O01-27,000 172.25 265. O0 69, O01-7 O, 000 327.95 504.50
27,001-28,000 176.50 271.50 70,001-71,000 330.85 509. O0
· ~
28,001-29,000 .~ 180.70 278.00 71,001-72,000 333.80 513.50
Va]uatton
72,001-73,000
73,001-74,000
74,001-75,000
75,001-76,000
7 6, O01.- 77,000
77,001-78,000
78,001-79,000
79,001-80,000
80,001-81,000
81,001-82,000
82,001-83,000
83,001-84,000
84, O01- 85,000
85,001-86,000
86,001-87,000
87, O01-88,000
88, O01- 89,000
89,001-90,000
~0,001-91,000
!1,001-92,000
'2,001-93,000
93,001-94,000
94,001-95,000
95,001-96,000
96,001-97,000
97,001-98,000
98,001-99,000
99,001-100,000
100,001.-101,000
101,001-102,000
102,001-103,000
103,001-104,000
104, O01-105,000
105,001-106,000
106,001-107,000
107,001-108,000
108, O01-109,000
109,001-110,000
110,001-111,000
111,001-112,000
112,001-113,000
113,001-114,000
Check
., ,
336.7O
339.65
342.55
345.50
348.40
351.35
354.25
357.20
360.10
363.05
365.95
368.90
371.80
374.75
377.65
380.60
383.50
386.45
389.35
392.30
395.20
398.15
401.05
404.00
406.90
409.85
412.75
415.70
417.95
420.23
422.50
424.78
427.05
429.33
431.60
433.88
436.15
438.43
440.70
442.98
445.25
447.53
EXHIBIT B
PAGE TWO
Plan
Fee
P 1 an Permi t
Valuation Check fee
i io i n I m I
~18. O0 114,001-115,000 449.80 692. O0
522.50 115 , O01-116,000 452.08 69.5.50
527.00 116,001-117,000 454.35 699.00
531.50 117,001-118,000 456.63 702.50
536. O0 118,001-119,000 458.90 706. O0
540.50 119,001-120,000 461o18 709.50
545. O0 120,001-121,000 463.45 713. O0
549.50 121,001-122,000 465.73 716.50
554. O0 122,001-123,000 468. O0 720. O0
558.50 123,001-124,000 470.28 723.50
563. O0 124,001-125,000 472.55 727. O0
567.50 125, O01-125,000 474.83 730.50
572. O0 126,001-127,000 477.10 734. O0
576.50 127,001-128,000 479.38 737.50
581.00 128,001-129,000 481.65 741.00
585.50 129,001-130,000 . 483.93 744.50
590. O0 130,001-131,000 486.20 748. O0
594.50 131,001-132,000 488.48 751.50
599. O0 132,001-133,000 490.75 75'5. O0
603.50 133, O01-134,000 49 3.03 758.50
608. O0 134,001-135,000 495. O0 762. O0
612.50 135,001-136,000 497.58 765.50
617.00 136,001-137,000 499.85 769.00
621.50 137,001-138,000 502.13 772.50
626.00 138,001-139,000 504.40 776.50
630.50 139, O01-140,000 506.68 779.50
635. O0 140, O01-141,000 508.95 783. O0
639.50 141,001-142,000 511.23 786.50
643. O0 142,001-143,000 513.50 790. O0
646.50 143,001-144,000 515.78 793.50
650. O0 144,001-145,000 518.05 797. O0
653.50 145,001-146,000 520.33 800.50
657. O0 146 , O01-147,000 522.60 804. O0
660.50 147,001-148,000 524.88 807.50
664.00 148,001-149,000 527.15 811.00
667.50 149,001-150,000 529.43 814.50
671.00 150,001-151,000 531.70 818.00
674.50 151,001-152,000 533.98 821.50
677. O0 152, O01-153,000 536.25 825. O0
681.50 153, O01-154,000 538.53 828.50
685. O0 154,001-155,000 540.80 832'. O0
688.~0 155,001-156,000 543.07 835.50
EXHIBIT B
PAGE THREE
Plan Perm1 t Plan Perm1 t
Valuation Check Fee Valuation Check fee
Ill ~
156 , 001-157,000 545°35 839.00 198,001-199,000 640.90 986.00
157,001-158,000 547063 842.50 199,001-200,000 643.18 989.50
158,001-159,000 549.90 846.00 200,001-201,000 645.45 993.00
159,001-160,000 552.18 849°50 201,001-202,000 647.73 996.50
160,001-161,000 554.45 .. 853.00 202,001-203,D00 650.00 1,000.00
161,001-162,000 556.73 856.50 203,001-204,000 652.28 1,003.50
162,001-163,000 559.00 860.00 204,001-205,000 654.55 1,007.00
163,001-164,000 561.28 863.50 205,001-206,000 656.83 1,010.50
164,001-165,000 563.55 867.00 206,001-207,000 659.10 1,014.00
165,001-166,000 565.50 870.50 207,001-208,000 661.38 1,017.50
166,001-167,000 568.10 874.00 208,001-209,000 663.65 1,021.00
167,001-168,000 570.08 877.50 209,001-210,000 665.93 1,024.50
168,001-169,000 572.65 881.00 210,001-211,000 668.20 1,028.00
169,001,170,000 574.93 '884.50 211,001-212,000 670.48 1,031.50
170,001,171,000 577.20 888.00 212,001-213,000 672.75 1,035.00
171,001-172,000 579.48 891.50 213,001-214,000 675.03 1,038.50
172,001-173,000 581.00 895.00 214,001-215,000 677.30 1,040.00
173,001-174,000 584.03 898.50 215,001-216,000 679.58 1,045.50
174,001-175,000 586.30 902.00 216,001-217,000 681.85 1,049.00
175,001-176,000 5880'58 905,50 217,001-218,000 684.13 1,052.50
176,001-177,000 590.85 909°00 218,001-219,000 686.40 1,056.00
177,001-178,000 593.13 912.50 219,001-220,000 688.68 1,059.50
178,001-179,000 595.40 916.00 220,001-221,000 690.95 1,063.00
179,001-180,000 597.68 919.50 221,001-222,000 693.23 1,066.50
180,001-181,000 599.95 923.00 222,001-223,000 695.50 1,070.00
181,001-182,000 602.23 926.50 223,001-224,000 697.78 1,073.50
182,001-183,000 604.50 930.00 224,001-225,000 700.05 1,077.00
183,001-184,000 606.78 933.50 225,001-226,000 702.33 1,080.50
184,001~-185,000 609.05 937.00 226,001-227,000 704.60 1,084.00
185,001-186,000 611.33 940.50 227,001-228,000 706.88 1,087.50
186,001-187,000 613.60 944.00 228,001-229,000 709.15 1,091.00
187,001-188,000 615.88 947.50 229,001-230,000 711.43 1,094.50
188,001-189,000 618.15 951.00 230,001-231,000 713.70 1,098.00
189,001-190,000 620.43 954.50 231,001-232,000 715.98 1,101.50
190,001-191,000 622.70 958.00 232,001-233,000 718.25 1,105.00
191,001-192,000 624.98 961.50 233,001-234,000 720.53 1,108.50
192,001-193,000 627.25 965.00. 234,001-235,000 722.80 1,112.00
193,001-194,000 629.53 968,50 235,001-236,000 725.08 1,115.50
194,001-195,000 631.80 972.00 236,001-237,000 727.35 1,119.00
195,001-196,000 634.08 975.50 237,001-238,000 729.63 1,122.50
196,001-197,000 636.35 979.00 238,001-239,000 731.90 1,126.0'0
197,001-198,000 638.63 982.50 239,001-240,000 734.18 1,129.50
EXHIBIT B
PAGE FOUR
valuation
240,001-241,
241,001-242,
242,001-242,
243,001-244,
244,001-245,
245,001-246,
246,001-247,
247,001-248,
248,001-249,
249,001-250,
250,001-251,
252,001-253,
253,001-254',
254,001-255,
255,001-256,
256,001-257,
257,001-258,
"'"58,001-259,
59,001-260,
! 60,001-261,
,,
261,001-262,
262,001-263,
263,001-264,
264,001-265,
265,001-266,
266,001-267,
267,001-268,
268,001--269,
269,001-270,
270,001-271,
271,001-272,
272,001-273,
273,001-274,
274,001-275,
275,001-276,
276,001-277,
277,001-278,
278,001-279,
279,001-280,
280,001-281,
281,001-282,
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
Check
ii
736.45
738.73
741.00
743.28
745.55
747.83
750.10
752.38
754.65
756.93
759.20
761.48
763.75
766.03
768.30
770.58
772.85
775.13
777.40
779.68
781.95
784.23
786.50
788.78
791.05
793.33
795.60
797.88
800.15
802.43
804.70
806.98
809.25
811.53
813.80
816.08
818.35
820.63
822.90
825.18
827.45
829.73
Perm11:
Fee
1,133.00
1,136.50
1,140.00
1,143.50
1,147.00
1,150.50
1,154. O0
1,157.50
1,161.00
1,164.50
1,168.00
1,171.50
1,175.00
1,178.50
1,182.00
1,185.50
1,189.00
1,192.50
1,196.00
1,199.50
1,203.00
1,206.50
1,210.00
1,213.50
1,217.00
1,220.50
1,224.00
1,227.50
1,231.00
1,234.50
1,238.00
1,241.50
1,245.00
1,248.50
1,252.00
1,255.50
1,259.00
1,262.50
1,266.00
1,269.50
1,273~00
1,276.50
Valuation
Ill I I I
282,001-283,000
283,001-284,000
284, O01-285,000
285, O01- 286,000
286,001-287,000
287, O01- 288,000
288, O01- 289,000
289,001-290,000
290,001-291,000
291, O01- 292,000
292,001-293,000
293,001-294,000
294,001-295,000
295,001-296,000
296,001- 297,000
297,001-298,000
298, O01- 299,000
299, O01- 300,000
300, O01- 301,000
301, O01- 302,000
302,001-303,000
303,001-304,000
304,001-305,000
305, O01- 306,000
306,001-307,000
307,001-308,000
308,001-309,000
309,001-310,000
310,001-311,000
311,001-312,000
312,001-313,000
313,001-314,000
314,001-315,000
315,001,316,000
316,001-317,000
31'/,001-318,000
318,001-319,000
319,001-320,000
320,001-321,000
321,001-322,000
322,001-323,000
323,001-324,000
Plan
Check
832.00
834.28
836.55
838.83
841.10
843 °38
845.65
847.93
850.20
852.48
854.75
857.03
859.30
861.38
863.85
866.13
868.40
870.68
872.45
875.23
877.50
879.78
882.05
884.33
886.60
888.88
891.15
893.93
895.70
897.98
900.25
902.53
904.80
907.08
909.35
910.98
913.90
916.18
918.45
920.73
923.00
925.25
Permi t
fee
1,280. O0
1,283.50
1,287.00
1,290.50
1,294.00
1,297.50
1,301.00
1,304.50
1,308.00
1,311.50
1,315.00
1,318.50
1,322.00
1,325.50
1,329.00
1,332.50
1,336.00
1,339.50
1,343.00
1,346.50
1,350.00
1,353.50
1,357.00
,360. o
1,364.00
1,367.50
1,371.00
1,374.50
1,378.00
1,381.50
1,385.00
1,388.50
1,392.00
1,395.50
1,399.00
1,401.50
1,406.00
1,409.50
1,413.00
1,416.50
1,420. O0
1,423.50
EXHIBIT B
PAGE FIVE
Valuation
Il I I I
324,001-325,000
325,001-326,000
326,001-327,000
327,001-328,000
328,001-329,000
329,001-330,000
330,001-331,000
331,001-332,000
332,001-333,000
333,001-334,000
334,001-335,000
335,001-336,000
336,001-337,000
337,001-338,000
338, O01- 339,000
339,001-340,000
340, O01- 341 , 000
341, O01- 342,000
342 ,.001-343., 000
343,001-344,000
344,001-345,000
345, O01- 346 , 000
346, O01- 347,000.
347, O01-348,000
348,001-349,000
349,001--350,000
350,001-351,000
351,001-352,000
352,001,-'353,000
353,001-354,000
354,001- 355,000
355,001-356,000
356,001-357,000
357,001-358,000
358,001-359,000
359,001-360,000
360,001-361,000
361,001-362,000
362,001-363,000
363,001-364,000
364, O01- 365,000
365,001-366,000
Plan
Check
927,55
9.29,83
932.16
934.38
936.65
938.93
941,20
943,48
945.75
948.03
950.30
952.58
954.85
957.13
959.40
961.68
963095
966.23
968.50
970,78
973.05
975.3,3
977,60
979 °88
982,15
984,43
986.70
988°98
991.25
993 °53
995.80
998.08
1,000o 35
1,002.63
1,004.90
1,007.18
1,009.45
1,011.73
1,014.00
1,016.28
1,018.55
1,020.88
Peru1 t
Fee
1,427.00
1,430.50
1,434. O0
1,437.50
1,441.00
1,444° 50
1,448. O0
1,451.50
1,455.00
1,458.50
1,462.00
1,465.50
1,469.00
1,472.50
1,476.00
1,479.50
1,483. O0
1,486o50
1,490.00
1,493.50
1,497o00
1,500.50
1,504. O0
1,507.50
1,511.00
1,514.50
1,518o00
1,521.50
1,525.00
1,528.50
1,532.00
1,525.50
1,539.00
1,542.50
1,546. O0
1,549.50
1,553.00
1,556.50
1,560.00
1,568.50
1,567.00
1,570.50
Plan Perm1 t
Valuation Check fee
I Il i
366,001-367,000 1,023.10 1,574.00
36'7,001-368,000 1,025.88 1,52'/ .50
368,001-369,000 1,02'7.65 1,581.00
369,001-370,000 1,029.93 1,584.50
370,001-371,000 1,032.20 1,588.00
371,001-372,000 1,034.48 1,591.50
372,001-373,000 1,036.75 1,595.00
373,001-374,000 1,039.25 1,598.50
374,001-375,000 1,041.30 1,602.00
375,001-376,000 1,043.58 1,605.50
376,001-377,000 1,045.85 1,609.00
377,001-378,000 1,048.13 1,612.50
378,001-379,000 1,050.40 1,616.00
379,001-380,000 1,052.68 1,619.50
380, O01- 381,000 1,054.95 1,623. O0
381,001-382,000 1,057.23 1,626.50
382,001-383,000 1,059.50 1,630.00
383,001-384,000 1,061.78 1,633.50
384,001-385,000 1,064.05 1,637.00
385,001-386,000 1,066.33 1,640.50
386,001-387,000 1,068.60 1,644.00
387,001-388,000 1,070.88 1,647.50
388,001-389,000 1,073.15 1,651.00
389,001-390,000 1,075.43 1,654.50
390,001-391,000 1,077.70 1,658.00
391,001-392,000 1,079.98 1,661.50
392,001-393,000 1,082.25 1,665.00
393,001-394,000 1,084.53 1,668.50
394,001-395,000 1,086.80 1,672.00
395,001-396,000 1,089.08 1,675.50
396,001-397,000 1,091.35 1,679.00
397,001-398,000 1,093.63 1,682.50
398,001-399,000 1,095.90 1,686.00
399,001-400,000 1,098.18 1,689.50
400,001-401,000 1,100.45 1,693.00
401,001-402,000 1,102.'/3 1,696.50
402,001-403,000 1,105.00 1,700.00
403,001-404,000 1,107.28 1,703.50
404,001-405,000 1,109.55 1,707.00
405, O01-406,000 1,111.80 1,710.50
406, O01-407,000 1,114.10 1,714. O0
407,001-408,000 1,116.38 1,717.50
, I
EXHIBIT B
PAGE SIX
P lan Perm1 t Plan Perm1 t
Valuation Check Fee Valuat.ton Check fee
.... II III I II II
408,001-409,000 1,118.65 1,721.00 451,001-452,000 1,216.48 1,871.50
409,001-410,000 1,120.93 1,724.50 452,001-453,000 1,218.75 1,875.00
410,001-411,000 1,123.20 1,728.00 453,001-454,000 1,218.75 1,878.50
411,001-412,000 1,125.48 1,731.50 454,001-455,000 1,223.30 1,882.00
412,001-413,000 1,127.75 1,735.00 455,001-456,000 1,225.58 1,885.50
413,001-414,000 1',130.03 1,738.50 456,001-457,000 1,227.85 1,889.00
414,001-415,000 1,132.30 1,742.00 457,001-458,000 1,230.13 1,892.50
415,001-416,000 1,134.58 1,745.50 458,001-459,000 1,232.40 1,896.00
416,001-417,000 1,136.85 1,749.00 459,001-460,000 1,234.68 1,899.50
417,001-418,000 1,139.13 1,752.50 460,001-461,000 1,234.95 1,908.00
418,001-419,000 1,141.40 1,756.00 461,001-462,000 1,239.23 1,906.50
419,001-420,000 1,143.68 1,756.50 462,001-463,000 1,241.50 1,910.00
420,001-421,000 1,145.95 1,763.00 463,001-464,000 1,243.78 1,913.50
421,001-422,000 1,148.23 1,766.50 464,001-465,000 1,246.05 1,917.00
422,001-423,000 1,150.50 1,770.00 465,001-466,000 1,248.33 1,920.50
423,001-424,000 1,152.78 1,773.50 466,001-467,000 1,250.60 1,924.00
424,001-425,000 1,155.05 1,777.00 467,001-468,000 1,252.88 1,927.50
425,001-426,000 1,157.33 1,780.50 468,001-469,000 1,255.15 1,931.00
·
,-,g26,001-427,000 " 1,159.60 1,784.00 469,001-470,000 1,257.43 1,924.50
:27 ,001-428 ,000 1,161.88 1,787.50 470,001-471,000 1,259.70 1,938.00
.28,001-429,000 1,164.15 1.,791.00 471,001-472,000 1,261.98 1,941.50
429,001-430,000 1,166.43 1,794.50 472,001-473,000 1,264.25 1,945.00
430,001-431,000 1,168.70 1,798' O0 473,001-474,000 1,266.53 1,948.50
431,001-432,000 1,170.98 1,801.50 474,001-475,000 1,268.80 1,952.00
432,001-433,000 1,173.25 1,805.00 475,001-476,000 1,271.08 1,955.50
433,001-434,000 1,175.53 1,808.50 476,001-477,000 1,273.35 1,959.00
434,001-435,000 1,177.80 1,812.00 477,001-478,000 1,275.63 1,962.50
435,001-436,000 1,180.08 1,815.50 478,001-479,000 1,277.90 1,966.00
436,001-437,000 1,182.35 1,819.00 479,001-480,000 1,280.18 1,969.50
437,001-438,000 1,184.63 1,822.50 480,001-481,000 1,282.45 1,973.00
438,001-439,000 1,186.90 1,826.00 481,001-482,000 1,284.73 1,976.50
439,001-440,000 1,189.18 1,829.50 482,001-483,000 1,287.00 1,980.00
440,001-441,000 1,191.45 1,833.00 483,001-484,000 1,289.28 1,983.50
441,001-442,000 1,193.73 1,836.50 484,001-485,000 1,291.55 1,987.00
442,001-443,000 1,196.00 1,840.00 485,001-486,000 1,293.83 1,990.50
443,001-444,000 ! ,198.28 1,843.50 486,001-487,000 1,296.10 1,994.00
444,001-445,000 1,200.55 1,847.00 487,001-488,000 1,298.38 1,997.50
445,001-446,000 ! ,202.83 1,850.50 488,001-489,000 1,300.65 2,001.00
446,001-447,000 1,205.10 1,854.00 489,001-490,000 1,302.93 2,004.50
447,001-448,000 1,207.38 1,857.50 490,001-491,000 1,305.20 2,008.00
448,001-449,000 1,209.65 1,861.00 491,001-492,000 1,307.48 2,011.50
449,001-450,000 1,211.93 1,864.50 '492,001-493,000 1,309.75 2,015.00
450,001-451,000 1,214.20 1,868.00 493,001-494,000 1,~12.03 2,018.50
EXHIBIT B
PAGE SEVEN
Valuation
i ii i
494, O01-495,000
495,001-496,000
496,001-497,000
497, O01-498,000
498,001-499,000
499,001-500,000
500,000-1,000,000
1,000,000 and up
P lan Perm1 t
Check Fee
i
1,314.30 2,022°00
1,316.58 2,025.50
1 , 318.85 2,029. O0
1,321.13 2,032.50
1,323o40 2,036.00
1,325.68 2,039.50
See Bel ow See Bel ow
(1) (2)
See Below See Bel ow
(1) (3)
(~)
(~_)
(3)
65% of Bull ding Permit Fee.
$2,039.50 for the first $500,000 plus
$3.00 for each additional $1,000 or
fraction thereof, to and including
$1,000,000.
$3539.50 for the first $1,000,000
plus $2.00 for each additional o$1,000
or fraction thereof°
..
Valuation
Plan
Check
Pemi t
fee
EXHIBZT C
ii i i i i
PROPOSED MISCELLANEOUS BUILDING DIVISION FEES
Other Inspections
Reinspection Fee per Section 305g (1) .................................. $30.00
Inspections outside of normal business
hours (2 hour mi ni mum) (2) .................... , .................... $50 Hr.
Real Estate Inspection:
Occupancy Group R ............................ $120.00 up to 4 units plus
$15.00 per unit
Others: Less than 5,000 sq. ft ................................. $225.00
5,000 to 10,000 sq. ft ................................. : ....... $300. O0
10,000 sq ft. and over ...................................... $425.00
Relocation Butiding Investigation
· . .................. $60.00
Less than $,000 sq. ft ................ ~;~):~) + $1.00
More than 5,000 sq.f t ' m ........ ~ i 6666 over 5,000 sq. ft.
Substandard Structure Inspections ................................... $60.00
Inspection or Permit' Trailor Coac~ . $60.00
Search and Single copy of:
Search for Mi crofi 1 med Permit ............... $4.00
Photo Copy per Permit ............................... , ............ $2.00
Temporary Certificate of Occupancy ................................... $60.00
P1 an Check
ii
Standardized Plan - Plan Check (Structural) ................ 70~ of Plan Check
Landscaping and Irri gati on plan check ...........................
. (! hour minimum) ............................................. $60.00 Hr.
Energy Plan Check (Non-residential) .......................... ~~ $70 O0 Hr.
....... O0 ~i nimum
Seismic (Structural) ............................................. State Adopted
Review of A!quist-Priolo Report ........................ $70/hr $300.00 minimum
Plan check outside of normal business hours
or requested fast-tracking (one hour minimum) (2) .............. $50.00 Hr.
Addttional plan check (structural) requi red by changes,
additions or revisions to approved plans {1/2 hr. minimum) ..... $45.00 Hr.
'i
Exhi bi t C
Page two
Miscellaneous
(1)
(2)
Performance Bond Processing ...................................... 1% of bond
Other Miscellaneous Document Preparation ....... ' ....................$150.00
Board of Appeal Determination ....................................... $1SO.O0
Microfilm Fee for Bui. lding Documents (standard sheet size)o..$1.00 per sheet
Each permittee shall be entitled to one correction inspection in addition to. the
required number of inspections established. If more than one inspection is
required due to fault or error on part of an installer, permittee or his
employee, an additional $30.00 fee may be required for each additional
inspection trip. The number of inspections will .not be limited on pr. ogress
jobs. However, one inspection is permitted for checking a correction with ir)o
addi ti onal fee.
Only when authorized by the Director of Community Development.
EXHZBZT D
i ill i
ELECTRICAL PERNIT FEES
Zssu~ng Permtts, Each ............. -.: .................................. $15.00
SYSTEM FEE SCHEDULE
imm l
For New Mul ti-Famt ly Resl dentt al But 1 dtngs (Apartments & Condomi ni ums)
Three Units or More not including attached garages or carports
per square foot ....................................................... 03
For New Single and Two-Family Residential not including
garages, carports, accessory buildings, per square foot ..............
.O3
For Other Types of Occupancies and Alteration, Additions and
Modifications to Existing Buildings, Use Unit Fee Schedule
For New Residential SWimming Pools, Each ................................ 30.00
For Spas, Hot Tub, Above Grade Swimming Pools, Alterations to Existing
Pool s .' .............. : ........................................... Unit Fee
Carni va'l s and Circuses-
For electric generators and electrically driven rides, Each ........ 15.00
For mechanically driven rides and. walk-through attractions with
lighting, Each ...................................................... 4.50
For area and booth lighting, Each ................................... 4.50
For permanently installed rides, booths, displays, and attractions
use Unit Fee Schedule
i mm
Temporary P ~wer Servt ce-
For temporary service pole or Pedestal and Appurtenances, Each .... 15.00
For temporary power distribution system, Each ...................... 7.50
q ~
Exhibit D
Page two
UN IT FEE- SCHEDULE
........ ~m m
For Receptacle, Switch Lighting Outlets, first 20, Each ................ $
Additional, Each
® · · · o · · ® · · · · · e o e o · e o o e e o o e e e e ® o o o o o o o ® o o o o o o o e o e o o e e e
.75
.45
For Lighting Fixtures, Sockets, or Other Lamp Holding Devices, First 20
Each .......................................................... 75
Addition~i ~ixtures, ~~ .......... 45
For Pole or Platform Mounted Fixtures, Each ................................ 75
For Theatrical-type Lighting Fixtures or Assemblies, Each .................. 75
For Fixed Residential Appliances not Exceeding 1HP, Each 3.00
· · · · · · ®~e · · ® o e o e e
NOTE- For other types of air cofldttioners and other motor riven
appliances having larger electrical ratings, See Power Apparatus.
POWER APPARATUS
ii -
For Motors, Generators, Transformers, Rectifiers, Converters, Capacitors,
Industrial 'Heating, Air Conditioners and Heat Pumps, Cooking or
Equipment, and Other Apparatus, As Follows-
Baking
Rating in HP, KW, KVA, KVAR, or refrigeration-tons.
Up to and including 1, Each ........................................ 3.00
Over ! and not over 10, Each ....................................... 7.50
Over 10 and not over 50, Each ..................................... 15.00
Over 50 and not over 100, Each .................................... 30.00
Over 100, Each .................................................... 45.00
NOTE- 1. For equipment or appliances having more than one motor,
transformer, heater, etc., the sum of the combined ratings
may be used.
®
These fees include all switches, circuit breakers, contractors,
thermostats, relays and other directly related control equip-
ment.
Exhibtt D
Pa ge three
BUSWAYS
m i
For Trolley and Plug-in Type Busways, Each 100 feet or Fraction Thereof . 4.50'
NOTE' An additonal fee will be required for lighting fixtures,
motors and other appliances that are connected to trolley
and plug-in type busways. No fee is required for portable
tool $.
Signs, Outl i ne Li ghtl ng and Marquees'
For one sign and one branch circuit, Each ...................... m . . 15 . 00
.
For additional branch circuits, Each .............................. 3.00
Servl ces, swl tchboard Sections, Panel boards'
For services of 600 V or less and not over 200 Amps. in rating,
Each ..............................................................
18.50
For services of 600 V or less and over 200 Amps. to 1,000 Amps. in
~.ati rig,' Each
37.50
For services over 600 V or over 1,000 Amps. in rating, Each ....... 75.00~
For mi scel laneous condui ts and conductors ......................... 11.00
OTHER
Plan check'is 50% of permit fee for services, panelboards, motors,
etc., when 600 Amp~ or over.
Other inspections and miscellaneous fees as shown in Exhibit
app 1 i cable here.
shall
be
i :
EXHiBiT E
PLUI~BING PER~IT FEES
TABLE
i
For t ssut ng each .perm1 t ............................................... $15.00
In addition'
For each plumbing fixture or trap or set of fixtures on one trap
{including drainage, vent, water piping and backflow
prevention devices thereof) ....................................... 6.00
Repiping of portable water system (per dwelling unit) .................. 60.00
(6.00 per fixture with a maximum fee of $60.00)
For each permanent-type dishwasher, whether individually trapped
or not ............................................................. 6. O0
For each industrial waste pretreatment interceptor, including its
trap and vent, excepting kitchen-type grease interceptors
functioning as ficture traps ........
12.00
Fo~ each swimming pool drainage trap and receptor, whether connected to a building drain or a building sewer (water supply for pool
included) ' 7 50
not .... ,,,,,,,,,,.,.,o,,.,,, ....... ,,,., ..... ......, ......
For each gas piping system of one to four outlets, or alteration
or retest of existing gas piping system ..........
3.00
For each additional outlet over four ...................................... 75
For each gas pressure regulator other than appliance regulators
·
For each water heater and/or vent ....................................... ?.50
For repair o'r alteration of drainage and/or piping ...................... 6.00
For each piece of water-treating equipment and/or water piping
installed without accompanying plumbing ............................ 6.00
For lawn sprl nkler systems on any one meter, including
backfl ow prevention devices thereof ................................ 9.00
For'installation of each solar heating system, domestic or
pool system ........................................................ 30.00
m m m ~<~m mm ~m,~ * m mm m m ~m]
Exhibtt E
Page two
For backflow prevention devices on unprotected water supplies,
pools, tanks, vats, etc. (including incidental water piping),
one to five .............................................. $ 7.50
For each addttional device over five .................................... 1.50
For each building drain installed without accompanying plumbing ......... 6.00
Solar portable water heating system, including water heater and vent ... 30.00
For each fire sprinkler head up to five ................................. 2.00
For each additional fire sprinkler head over five .......
.25
TABLE I I
For issuing each permit ................................................ 15.00
In addition'
For the connection of a house sewer to a public sewer, or for the
extension of a house lateral onto a lot for future use (separate
permit required for each such connection or extension) ............ 15.00
For installation of a section of house sewer for future use ............ 15.00
..
For the connection of each additional building or additional work
~ to a house sewer .................................................. 10.00
For each private sewage disposal system (septic tank and seepage
pit or pits and/or drainfield) .......................
45.00
For each ce'sspool, overflow seepage pit, percolation test pit,
swimming pool drywall, or drainfield extension or replacement ..... 45.00
For disconnection, abandonment, alteration or repair of and house
sewer or private sewage disposal system or part thereof ........... 15.00
ii ·
Exhibit E'
Page three
OTHER FEES
Plan check - Applicant to pay a plan check fee of 50~; of the plumbing
permit fee.
Other ~nspection
appl i cable here.
and miscellaneous fees as shown in Exhibit B shall be
When identical plumbing design is evident in more that one building on a
single project and the building official so finds, plan check fees may be
waived for other than the representative sample.
EXH[B[T F
I~ECHANICAL PERHIT FEES'
For the issuance of each permit ......... . .......,.' ................ ' ..... $15.00
For the installation, alteration or relocation of each refrigerator
compressor or absorption unit, and for each fuel burning
furnace, heater, boiler, and vented decorative appliance
including vents attached thereto:
Up to and including 100,000 BTU .................................... 9.00
More than 100,000 BTU to and including 1,000,000 BTU .............. 11.00
More than 1,000,000 BTU ........................................... !3. O0
For each air inlet and air outlet served by any air conditioning
system ............................................................. 2.00
Or for each 1,000 square feet or fraction thereof of conditioned area:
NOTE: When a permit is applied for and the total number of air
inlet and air outlets is unknown, the fees shall be based
on the square feet of conditioned area.
For the installation, relocation or replacement of each appliance vent
installed and not included in an appliance perm, it .................. 4.50
For the installation or alteratio*n of each air handling unit for air
conditioning including ducts attached thereto-
Up to and including 2,000 CFM
Each unit up to 10 ................................................. 4.00
Each unit over 10 .................................................. 1.00
i.
More than 2,000 CFM to and including 10,000 CFM ................. 6.50
More than 10 000 CFM m 11 O0
.NOTE- This fee shall not apply to an air handling unit which
'is a portion of a factory assembled air conditioned
appliance for which a permit is required elsewhere in
this Code.
For each evaporative cooler other than portable type .................... 6.50
For required ventilation fans which serve a single register'
Each fan up to 10 .................................................. 4.50
Each fan over !0 ................................................... 2.00
Exhi b'i t F
Page two
For each required .ventilation system which is not a portion of any
air condi tioni ng system for whi ch a permit i s required el sewhere
in this Code ..................................... -.' .............. $ 6,50
For the installation of each commercial kitchen hood or spray booth
served by mechanical exhaust, including the fans and ducts
attached thereof ................................................... 6.50
For the installation of each fire damper ................................ 4.00
For the alteration of an existing duct system for which a permit is
not required elsewhere in this Code ................................ 6.50
OTHER FEES
For all project with the exception of SFR the applicant shall pay a plan check
fee of 50~; of the mechanical permit.
Other inspection and miscellaneous fees 'as
applicable here.
shown in Exhibit B
shall also be
EXHXBZT G
SZGN PERMIT FEES
Permtt !ssuance ...........
............... $ 1S.O0 ·
Combination sign, final sign, .................................. $ 20.00
projecting sign or roof sign up
up to 30 square feet
Pole sign up to 50 square feet ................................. $ 20.00
Wall sign up to 200 square feet ................................ $ 25.00
A11 signs, each additional 100 ................................. $ 30.00
square feet or fraction thereof
over the above.respective 30, 50,
or 200 square feet
Sign code exception hearing .................................... $ 100.00
Plan check fee required for ground base signs.
Fees are based on building plan check construction valuation - See Exhibit A.
.i
EXHIBIT H
GRADING AND "PRIVATE
IMPROVEHENT FEES
ROUGH
PLAN CHECK GRADING ONLY (1)
i ii il i i i I i
(per sq. ft. of site area)
PRECISE GRAD i'NG AND ANY
PRIVATE IMPROVEMENTS (1)
-- -- ~ Ifil Il
(per sq. ft. of site area)
less than 5 acre sites
5-25 acres
.003 with $300 minimum fee
.002 wi th $300 mi nimum fee
$.014 wi th $300 mi ni mum
fee
$.016 wi th $500 minimum
fee
26 acres +
$70/hr. with $500 minimum fee $70/hr with $500 minimum
fee
Plan check fees include plan checks 1-3. Subsequent plan checks shall be charged at
$70 per hour.
PERM IT FEES
.........
Rough grading
o001 per sq. ft. of Site
area
Preci se grading only
.014 per sq. ft of site
area
New construction on-site
improvements {curb and
gu rte r, si dewa ilk S,
pavement, catch basins,
storm drains, etc.
.0145 per sq. ft. of site
area
Exi sting repair of on-si te
improvements
curb and gutter
sidewalk
pavement
OTHER FEES
.085 linear foot
· 03 sq. ft.
.01 sq. ft.
Addi ti onal plan check requi red by
changes, additions or revisions to
approved plans (1/2 hour minimum)
Plan check outside of normal
business hour or requested
fast tracking (1 hour m.inimum) (1)
Inspecti OhS outsi dJ'°f norma 1
business hours (2 hour minimum) (1)
$70/hour
$105/hour
$50/hour
(1) When approved by Director of Community Development
STATE OF CALIFORNIA )
COUNTY OF ORANGE ) §
CITY OF TUSTIN )
MARY E. WYNN, City Clerk and ex-officio Clerk of the City Council of the City of
Tustin, California, does hereby certify that the whole number of the members of
the City Council of the City of Tustin is five; that the above and foregoing
Resolution No. 87-138 was duly and regularly introduced, passed and adopted at a
regular meeting Of the City Council held on the 21st day of Dece~lber, 1987, by the
~ ,
fol 1 owing vote'
AYES : COUNCILPERSONS' Edgar, Hoesterey, Kelly, Kennedy, Prescott
NOES · COUNCILPERSONS- None
ABSENT' COUNCILPERSONS' None
....
MARY E. WYN~, Cfty Clerk -
City of Tus'tin, Califo'rnia