Loading...
HomeMy WebLinkAboutCC RES 87-138 5 10 10 17 18 2O RESOLUTION NO. 87-138 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUSTIN, CALIFORNIA ESTABLISHING BUILDING DIVISION FEES AND SERVICE CHARGES. The City Council of the City of Tusttn does hereby resolve as follows' I. The City Council finds and determines as follows' A. There are a number of services provided by the City in processing applications for Building Division permits that are of primary benefit to the applicant; B. The cost of these services should be borne primarily by the applicant receiving benefit from such services and so as to insure timely and effective processing of applications; C. The City can account for the actual costs of these services provided to the appl i cant. II. Pursuant to Section 8100 of the Tustin Municipal Code, as amended on December 6, 1987, the Determination of Construction Valuation shall be made by the Building Official who shall be guided by the most recent valuation data published by the International Conference of Building Officials (ICBO) in its Building Standards magazine. Additional cost valuation multipliers shown in Exhibit A attached hereto and made a part hereof by reference, shall also be utilized by the Building Official. III Pursuant to Section 8101 of the Tustin Municipal Code, as amended on - December 6, 1987, Building Division permit fees and services charges are hereby established as shown on Exhibit B through H, attached hereto and made a part hereof by reference and shall supercede any existing fee or charge and shall be applied uniformly except where in the discretion of the City Manager, reduced fees or changes are justi fled by special circumstances. 10 11 12 13 14 15 10 17 18 19 2O 21 23 25 26 27 28 Resolution No. 87-138 Page t~o VI. Building Dtvtston fees and service charges"shall be automatically changed on an annual basts to be effective beginning' ~anu~y 1, 1989 to ~eflect Inflationary o~ deflationary cost changes fo~ ~he p~evious calenda~ yea~. Fo~ purposes of satd modificatlons, the Building Dtvtslon shall uttltze the Consume~ P~tce Index. PASSED AND ADOPTED by the City Council of the City of Tustin at a regular meeting held on. the 21st day of December, 1987. RiChard B Mayor ,~/ M aryE ~~~)~ n n ~ EXHIBIT A MISCELLANEOUS VALUATION RULTIPLIERS Type_of Construction Covered Pattos (wood or aluminum) Greenhouse/so 1art um Nood decks (30 inches or htgher) Reroof~ng (75.00 mtnimum) New commercial constuctt on Tenant improvements Swimmtng Pools - Spas Retai n~ng Nalls 1-2 feet 2-3 feet 3-4 fee: 4-5 feet 5-6 feet 6-7 feet . 7-8 feet Block walls 3-4 fee~ 5 feet 6 feet plus Wood fence (five feet plus) Chain link fence (five feet plus) Re'plastering, additional plastering, or wet sand blasting 20 sq. ft. or less Up to 200 sq. yards Each addittonal square yard 11.50/sq. ft. 25.00/sq.ft or actual contractors con'tract value, whichever i s higher. 8.00/sq. ft. 2.00/sq. ft. 66.84/sq. ft. 16-18/sq. ft. 24.75/sq. ft. $12-18/1 i near foot $18-25/1 inear foot $25-35/linear foot $35-42/linear foot $42-50/linear foot $50-58/1 inear foot $58-66/li near foot $17.00 $19.00 $22.00 $6.00 lineal $12.00 lineal foot foot no fee $15 flat value $.03 sq. yd. EXHIBIT B' BUILDING PERMIT AND PLAN CHECK FEES Plan Permit Plan Permit Valuation Check Fee Valuation Check Fee -- -- -- IIIL III ~ 1-500 9.75 15.00 29,001-30,000 184.95 284.50 501-600 11.05 17.00 30,001-31,000 189.15 291.00 601-700 12.35 19.00 31,001-32,000 193.40 297.50 701-800 13.65 21.00 32,001-33,000 197.60 304.00 801-900 14.95 23.00 33,001-34,000 201.85 310.50 901-1,000 16.25 25.00 34,001-35,000 206.05 317.00 1,001-1,100 17.55 27.00 35,001-36,000 210.30 323.50 1,101-1,200 18.85 29.00 36,001-37,000 214.50 330.00 1,201-1,300 20.15 31.00 37,001-38,000 218.75 336.50 1,301-1,400 21.45 33.00 38,001-39,000 222.95 343.00 1,401-1,500 22.75 .35.00 39,001-40,000 227.20 349.50 1,501-1,600 ° 24.05 37.00 40,001-41,000 231.40 356.00 1,601-1,700 25.35 39°00 41,001-42,000 235.30 362.50 1,701-1,800 26.65 41.00 42,001-43,000 239.85 369.00 1,801-1,900 27.95 43°00 43,001-44,000 244.10 375.50 1,901-2,000 29°25 45.00 44,001-45,000 248.30 382.00 2,001-3,000 ' 35.10 54.00 45,001-46,000 252.55 388.50 3,001-4,000 40.95 63.00 46,001-47,000 256.75 395.00 4,001-5,000 46.80 72.00 47,001-48,000 261.00 401.50 5,001-6,000 52.65 81.00 48,001-49,000 265.20 408.00 6,001-7,000 58.50 90°00 49,001-50,000 269.45 414.50 7,001-8,000 64.35 99.00 50,001-51,000 272.35 419.00 8,001-9,000 70.20 108.00 51,001-52,000 275.30 423.50 9,001-10,000 76.05 117.00 52,001-53,000 278.20 428.00 10,001-11,000 81.90 126o O0 53,001-54,000 281.15 432.50 11 , 001-12,000 87° 75 135. O0 54,001-55,000 284.05 437. O0 12, O01-I 3,000 9 3o 60 144o O0 55, O01-56,000 287. O0 441.50 13,001-14,000 99.45 153. O0 56,001-57,000 289.90 446. O0 14,001-15,000 105.30 162. O0 57, O01-58,000 29 2.85 450.50 15,001-16,000 111.15 171. O0 58,001-59,000 295.75 455. O0 16,001-17,000 117. O0 180. O0 59,001-60,000 298.70 459.50 17, O01-18,000 122.65 189. O0 60, O01-61,000 301.60 464. O0 18,001-19,000 128.70 198. O0 61,001-62,000 304.55 468.50 19,001-20,000 134.45 207. O0 62,001-63,000 307.45 473. O0 20,001-21,000 140.40 216.00 63,001-64,000 310.40 ' 477.50 21,001-22,000 146.25 225. O0 64,001-65,000 313.30 482. O0 22, O01-23,000 152.10 234. O0 65, O01-66,000 316.25 486.50 23,001-24,000 157.95 243. O0 66,001-67,000 319.15 491. O0 24, O01-25,000 163.80 252. O0 67, O01-68,000 322.10 49 5.50 25,001-26,000 168.05 258.50 68,001-69,000 325. O0 500. O0 26, O01-27,000 172.25 265. O0 69, O01-7 O, 000 327.95 504.50 27,001-28,000 176.50 271.50 70,001-71,000 330.85 509. O0 · ~ 28,001-29,000 .~ 180.70 278.00 71,001-72,000 333.80 513.50 Va]uatton 72,001-73,000 73,001-74,000 74,001-75,000 75,001-76,000 7 6, O01.- 77,000 77,001-78,000 78,001-79,000 79,001-80,000 80,001-81,000 81,001-82,000 82,001-83,000 83,001-84,000 84, O01- 85,000 85,001-86,000 86,001-87,000 87, O01-88,000 88, O01- 89,000 89,001-90,000 ~0,001-91,000 !1,001-92,000 '2,001-93,000 93,001-94,000 94,001-95,000 95,001-96,000 96,001-97,000 97,001-98,000 98,001-99,000 99,001-100,000 100,001.-101,000 101,001-102,000 102,001-103,000 103,001-104,000 104, O01-105,000 105,001-106,000 106,001-107,000 107,001-108,000 108, O01-109,000 109,001-110,000 110,001-111,000 111,001-112,000 112,001-113,000 113,001-114,000 Check ., , 336.7O 339.65 342.55 345.50 348.40 351.35 354.25 357.20 360.10 363.05 365.95 368.90 371.80 374.75 377.65 380.60 383.50 386.45 389.35 392.30 395.20 398.15 401.05 404.00 406.90 409.85 412.75 415.70 417.95 420.23 422.50 424.78 427.05 429.33 431.60 433.88 436.15 438.43 440.70 442.98 445.25 447.53 EXHIBIT B PAGE TWO Plan Fee P 1 an Permi t Valuation Check fee i io i n I m I ~18. O0 114,001-115,000 449.80 692. O0 522.50 115 , O01-116,000 452.08 69.5.50 527.00 116,001-117,000 454.35 699.00 531.50 117,001-118,000 456.63 702.50 536. O0 118,001-119,000 458.90 706. O0 540.50 119,001-120,000 461o18 709.50 545. O0 120,001-121,000 463.45 713. O0 549.50 121,001-122,000 465.73 716.50 554. O0 122,001-123,000 468. O0 720. O0 558.50 123,001-124,000 470.28 723.50 563. O0 124,001-125,000 472.55 727. O0 567.50 125, O01-125,000 474.83 730.50 572. O0 126,001-127,000 477.10 734. O0 576.50 127,001-128,000 479.38 737.50 581.00 128,001-129,000 481.65 741.00 585.50 129,001-130,000 . 483.93 744.50 590. O0 130,001-131,000 486.20 748. O0 594.50 131,001-132,000 488.48 751.50 599. O0 132,001-133,000 490.75 75'5. O0 603.50 133, O01-134,000 49 3.03 758.50 608. O0 134,001-135,000 495. O0 762. O0 612.50 135,001-136,000 497.58 765.50 617.00 136,001-137,000 499.85 769.00 621.50 137,001-138,000 502.13 772.50 626.00 138,001-139,000 504.40 776.50 630.50 139, O01-140,000 506.68 779.50 635. O0 140, O01-141,000 508.95 783. O0 639.50 141,001-142,000 511.23 786.50 643. O0 142,001-143,000 513.50 790. O0 646.50 143,001-144,000 515.78 793.50 650. O0 144,001-145,000 518.05 797. O0 653.50 145,001-146,000 520.33 800.50 657. O0 146 , O01-147,000 522.60 804. O0 660.50 147,001-148,000 524.88 807.50 664.00 148,001-149,000 527.15 811.00 667.50 149,001-150,000 529.43 814.50 671.00 150,001-151,000 531.70 818.00 674.50 151,001-152,000 533.98 821.50 677. O0 152, O01-153,000 536.25 825. O0 681.50 153, O01-154,000 538.53 828.50 685. O0 154,001-155,000 540.80 832'. O0 688.~0 155,001-156,000 543.07 835.50 EXHIBIT B PAGE THREE Plan Perm1 t Plan Perm1 t Valuation Check Fee Valuation Check fee Ill ~ 156 , 001-157,000 545°35 839.00 198,001-199,000 640.90 986.00 157,001-158,000 547063 842.50 199,001-200,000 643.18 989.50 158,001-159,000 549.90 846.00 200,001-201,000 645.45 993.00 159,001-160,000 552.18 849°50 201,001-202,000 647.73 996.50 160,001-161,000 554.45 .. 853.00 202,001-203,D00 650.00 1,000.00 161,001-162,000 556.73 856.50 203,001-204,000 652.28 1,003.50 162,001-163,000 559.00 860.00 204,001-205,000 654.55 1,007.00 163,001-164,000 561.28 863.50 205,001-206,000 656.83 1,010.50 164,001-165,000 563.55 867.00 206,001-207,000 659.10 1,014.00 165,001-166,000 565.50 870.50 207,001-208,000 661.38 1,017.50 166,001-167,000 568.10 874.00 208,001-209,000 663.65 1,021.00 167,001-168,000 570.08 877.50 209,001-210,000 665.93 1,024.50 168,001-169,000 572.65 881.00 210,001-211,000 668.20 1,028.00 169,001,170,000 574.93 '884.50 211,001-212,000 670.48 1,031.50 170,001,171,000 577.20 888.00 212,001-213,000 672.75 1,035.00 171,001-172,000 579.48 891.50 213,001-214,000 675.03 1,038.50 172,001-173,000 581.00 895.00 214,001-215,000 677.30 1,040.00 173,001-174,000 584.03 898.50 215,001-216,000 679.58 1,045.50 174,001-175,000 586.30 902.00 216,001-217,000 681.85 1,049.00 175,001-176,000 5880'58 905,50 217,001-218,000 684.13 1,052.50 176,001-177,000 590.85 909°00 218,001-219,000 686.40 1,056.00 177,001-178,000 593.13 912.50 219,001-220,000 688.68 1,059.50 178,001-179,000 595.40 916.00 220,001-221,000 690.95 1,063.00 179,001-180,000 597.68 919.50 221,001-222,000 693.23 1,066.50 180,001-181,000 599.95 923.00 222,001-223,000 695.50 1,070.00 181,001-182,000 602.23 926.50 223,001-224,000 697.78 1,073.50 182,001-183,000 604.50 930.00 224,001-225,000 700.05 1,077.00 183,001-184,000 606.78 933.50 225,001-226,000 702.33 1,080.50 184,001~-185,000 609.05 937.00 226,001-227,000 704.60 1,084.00 185,001-186,000 611.33 940.50 227,001-228,000 706.88 1,087.50 186,001-187,000 613.60 944.00 228,001-229,000 709.15 1,091.00 187,001-188,000 615.88 947.50 229,001-230,000 711.43 1,094.50 188,001-189,000 618.15 951.00 230,001-231,000 713.70 1,098.00 189,001-190,000 620.43 954.50 231,001-232,000 715.98 1,101.50 190,001-191,000 622.70 958.00 232,001-233,000 718.25 1,105.00 191,001-192,000 624.98 961.50 233,001-234,000 720.53 1,108.50 192,001-193,000 627.25 965.00. 234,001-235,000 722.80 1,112.00 193,001-194,000 629.53 968,50 235,001-236,000 725.08 1,115.50 194,001-195,000 631.80 972.00 236,001-237,000 727.35 1,119.00 195,001-196,000 634.08 975.50 237,001-238,000 729.63 1,122.50 196,001-197,000 636.35 979.00 238,001-239,000 731.90 1,126.0'0 197,001-198,000 638.63 982.50 239,001-240,000 734.18 1,129.50 EXHIBIT B PAGE FOUR valuation 240,001-241, 241,001-242, 242,001-242, 243,001-244, 244,001-245, 245,001-246, 246,001-247, 247,001-248, 248,001-249, 249,001-250, 250,001-251, 252,001-253, 253,001-254', 254,001-255, 255,001-256, 256,001-257, 257,001-258, "'"58,001-259, 59,001-260, ! 60,001-261, ,, 261,001-262, 262,001-263, 263,001-264, 264,001-265, 265,001-266, 266,001-267, 267,001-268, 268,001--269, 269,001-270, 270,001-271, 271,001-272, 272,001-273, 273,001-274, 274,001-275, 275,001-276, 276,001-277, 277,001-278, 278,001-279, 279,001-280, 280,001-281, 281,001-282, 000 000 000 000 000 000 000 000 000 000 000 000 000 000 000 000 000 000 000 000 000 000 000 000 000 000 000 000 000 000 000 000 000 000 000 000 000 000 000 000 000 000 Check ii 736.45 738.73 741.00 743.28 745.55 747.83 750.10 752.38 754.65 756.93 759.20 761.48 763.75 766.03 768.30 770.58 772.85 775.13 777.40 779.68 781.95 784.23 786.50 788.78 791.05 793.33 795.60 797.88 800.15 802.43 804.70 806.98 809.25 811.53 813.80 816.08 818.35 820.63 822.90 825.18 827.45 829.73 Perm11: Fee 1,133.00 1,136.50 1,140.00 1,143.50 1,147.00 1,150.50 1,154. O0 1,157.50 1,161.00 1,164.50 1,168.00 1,171.50 1,175.00 1,178.50 1,182.00 1,185.50 1,189.00 1,192.50 1,196.00 1,199.50 1,203.00 1,206.50 1,210.00 1,213.50 1,217.00 1,220.50 1,224.00 1,227.50 1,231.00 1,234.50 1,238.00 1,241.50 1,245.00 1,248.50 1,252.00 1,255.50 1,259.00 1,262.50 1,266.00 1,269.50 1,273~00 1,276.50 Valuation Ill I I I 282,001-283,000 283,001-284,000 284, O01-285,000 285, O01- 286,000 286,001-287,000 287, O01- 288,000 288, O01- 289,000 289,001-290,000 290,001-291,000 291, O01- 292,000 292,001-293,000 293,001-294,000 294,001-295,000 295,001-296,000 296,001- 297,000 297,001-298,000 298, O01- 299,000 299, O01- 300,000 300, O01- 301,000 301, O01- 302,000 302,001-303,000 303,001-304,000 304,001-305,000 305, O01- 306,000 306,001-307,000 307,001-308,000 308,001-309,000 309,001-310,000 310,001-311,000 311,001-312,000 312,001-313,000 313,001-314,000 314,001-315,000 315,001,316,000 316,001-317,000 31'/,001-318,000 318,001-319,000 319,001-320,000 320,001-321,000 321,001-322,000 322,001-323,000 323,001-324,000 Plan Check 832.00 834.28 836.55 838.83 841.10 843 °38 845.65 847.93 850.20 852.48 854.75 857.03 859.30 861.38 863.85 866.13 868.40 870.68 872.45 875.23 877.50 879.78 882.05 884.33 886.60 888.88 891.15 893.93 895.70 897.98 900.25 902.53 904.80 907.08 909.35 910.98 913.90 916.18 918.45 920.73 923.00 925.25 Permi t fee 1,280. O0 1,283.50 1,287.00 1,290.50 1,294.00 1,297.50 1,301.00 1,304.50 1,308.00 1,311.50 1,315.00 1,318.50 1,322.00 1,325.50 1,329.00 1,332.50 1,336.00 1,339.50 1,343.00 1,346.50 1,350.00 1,353.50 1,357.00 ,360. o 1,364.00 1,367.50 1,371.00 1,374.50 1,378.00 1,381.50 1,385.00 1,388.50 1,392.00 1,395.50 1,399.00 1,401.50 1,406.00 1,409.50 1,413.00 1,416.50 1,420. O0 1,423.50 EXHIBIT B PAGE FIVE Valuation Il I I I 324,001-325,000 325,001-326,000 326,001-327,000 327,001-328,000 328,001-329,000 329,001-330,000 330,001-331,000 331,001-332,000 332,001-333,000 333,001-334,000 334,001-335,000 335,001-336,000 336,001-337,000 337,001-338,000 338, O01- 339,000 339,001-340,000 340, O01- 341 , 000 341, O01- 342,000 342 ,.001-343., 000 343,001-344,000 344,001-345,000 345, O01- 346 , 000 346, O01- 347,000. 347, O01-348,000 348,001-349,000 349,001--350,000 350,001-351,000 351,001-352,000 352,001,-'353,000 353,001-354,000 354,001- 355,000 355,001-356,000 356,001-357,000 357,001-358,000 358,001-359,000 359,001-360,000 360,001-361,000 361,001-362,000 362,001-363,000 363,001-364,000 364, O01- 365,000 365,001-366,000 Plan Check 927,55 9.29,83 932.16 934.38 936.65 938.93 941,20 943,48 945.75 948.03 950.30 952.58 954.85 957.13 959.40 961.68 963095 966.23 968.50 970,78 973.05 975.3,3 977,60 979 °88 982,15 984,43 986.70 988°98 991.25 993 °53 995.80 998.08 1,000o 35 1,002.63 1,004.90 1,007.18 1,009.45 1,011.73 1,014.00 1,016.28 1,018.55 1,020.88 Peru1 t Fee 1,427.00 1,430.50 1,434. O0 1,437.50 1,441.00 1,444° 50 1,448. O0 1,451.50 1,455.00 1,458.50 1,462.00 1,465.50 1,469.00 1,472.50 1,476.00 1,479.50 1,483. O0 1,486o50 1,490.00 1,493.50 1,497o00 1,500.50 1,504. O0 1,507.50 1,511.00 1,514.50 1,518o00 1,521.50 1,525.00 1,528.50 1,532.00 1,525.50 1,539.00 1,542.50 1,546. O0 1,549.50 1,553.00 1,556.50 1,560.00 1,568.50 1,567.00 1,570.50 Plan Perm1 t Valuation Check fee I Il i 366,001-367,000 1,023.10 1,574.00 36'7,001-368,000 1,025.88 1,52'/ .50 368,001-369,000 1,02'7.65 1,581.00 369,001-370,000 1,029.93 1,584.50 370,001-371,000 1,032.20 1,588.00 371,001-372,000 1,034.48 1,591.50 372,001-373,000 1,036.75 1,595.00 373,001-374,000 1,039.25 1,598.50 374,001-375,000 1,041.30 1,602.00 375,001-376,000 1,043.58 1,605.50 376,001-377,000 1,045.85 1,609.00 377,001-378,000 1,048.13 1,612.50 378,001-379,000 1,050.40 1,616.00 379,001-380,000 1,052.68 1,619.50 380, O01- 381,000 1,054.95 1,623. O0 381,001-382,000 1,057.23 1,626.50 382,001-383,000 1,059.50 1,630.00 383,001-384,000 1,061.78 1,633.50 384,001-385,000 1,064.05 1,637.00 385,001-386,000 1,066.33 1,640.50 386,001-387,000 1,068.60 1,644.00 387,001-388,000 1,070.88 1,647.50 388,001-389,000 1,073.15 1,651.00 389,001-390,000 1,075.43 1,654.50 390,001-391,000 1,077.70 1,658.00 391,001-392,000 1,079.98 1,661.50 392,001-393,000 1,082.25 1,665.00 393,001-394,000 1,084.53 1,668.50 394,001-395,000 1,086.80 1,672.00 395,001-396,000 1,089.08 1,675.50 396,001-397,000 1,091.35 1,679.00 397,001-398,000 1,093.63 1,682.50 398,001-399,000 1,095.90 1,686.00 399,001-400,000 1,098.18 1,689.50 400,001-401,000 1,100.45 1,693.00 401,001-402,000 1,102.'/3 1,696.50 402,001-403,000 1,105.00 1,700.00 403,001-404,000 1,107.28 1,703.50 404,001-405,000 1,109.55 1,707.00 405, O01-406,000 1,111.80 1,710.50 406, O01-407,000 1,114.10 1,714. O0 407,001-408,000 1,116.38 1,717.50 , I EXHIBIT B PAGE SIX P lan Perm1 t Plan Perm1 t Valuation Check Fee Valuat.ton Check fee .... II III I II II 408,001-409,000 1,118.65 1,721.00 451,001-452,000 1,216.48 1,871.50 409,001-410,000 1,120.93 1,724.50 452,001-453,000 1,218.75 1,875.00 410,001-411,000 1,123.20 1,728.00 453,001-454,000 1,218.75 1,878.50 411,001-412,000 1,125.48 1,731.50 454,001-455,000 1,223.30 1,882.00 412,001-413,000 1,127.75 1,735.00 455,001-456,000 1,225.58 1,885.50 413,001-414,000 1',130.03 1,738.50 456,001-457,000 1,227.85 1,889.00 414,001-415,000 1,132.30 1,742.00 457,001-458,000 1,230.13 1,892.50 415,001-416,000 1,134.58 1,745.50 458,001-459,000 1,232.40 1,896.00 416,001-417,000 1,136.85 1,749.00 459,001-460,000 1,234.68 1,899.50 417,001-418,000 1,139.13 1,752.50 460,001-461,000 1,234.95 1,908.00 418,001-419,000 1,141.40 1,756.00 461,001-462,000 1,239.23 1,906.50 419,001-420,000 1,143.68 1,756.50 462,001-463,000 1,241.50 1,910.00 420,001-421,000 1,145.95 1,763.00 463,001-464,000 1,243.78 1,913.50 421,001-422,000 1,148.23 1,766.50 464,001-465,000 1,246.05 1,917.00 422,001-423,000 1,150.50 1,770.00 465,001-466,000 1,248.33 1,920.50 423,001-424,000 1,152.78 1,773.50 466,001-467,000 1,250.60 1,924.00 424,001-425,000 1,155.05 1,777.00 467,001-468,000 1,252.88 1,927.50 425,001-426,000 1,157.33 1,780.50 468,001-469,000 1,255.15 1,931.00 · ,-,g26,001-427,000 " 1,159.60 1,784.00 469,001-470,000 1,257.43 1,924.50 :27 ,001-428 ,000 1,161.88 1,787.50 470,001-471,000 1,259.70 1,938.00 .28,001-429,000 1,164.15 1.,791.00 471,001-472,000 1,261.98 1,941.50 429,001-430,000 1,166.43 1,794.50 472,001-473,000 1,264.25 1,945.00 430,001-431,000 1,168.70 1,798' O0 473,001-474,000 1,266.53 1,948.50 431,001-432,000 1,170.98 1,801.50 474,001-475,000 1,268.80 1,952.00 432,001-433,000 1,173.25 1,805.00 475,001-476,000 1,271.08 1,955.50 433,001-434,000 1,175.53 1,808.50 476,001-477,000 1,273.35 1,959.00 434,001-435,000 1,177.80 1,812.00 477,001-478,000 1,275.63 1,962.50 435,001-436,000 1,180.08 1,815.50 478,001-479,000 1,277.90 1,966.00 436,001-437,000 1,182.35 1,819.00 479,001-480,000 1,280.18 1,969.50 437,001-438,000 1,184.63 1,822.50 480,001-481,000 1,282.45 1,973.00 438,001-439,000 1,186.90 1,826.00 481,001-482,000 1,284.73 1,976.50 439,001-440,000 1,189.18 1,829.50 482,001-483,000 1,287.00 1,980.00 440,001-441,000 1,191.45 1,833.00 483,001-484,000 1,289.28 1,983.50 441,001-442,000 1,193.73 1,836.50 484,001-485,000 1,291.55 1,987.00 442,001-443,000 1,196.00 1,840.00 485,001-486,000 1,293.83 1,990.50 443,001-444,000 ! ,198.28 1,843.50 486,001-487,000 1,296.10 1,994.00 444,001-445,000 1,200.55 1,847.00 487,001-488,000 1,298.38 1,997.50 445,001-446,000 ! ,202.83 1,850.50 488,001-489,000 1,300.65 2,001.00 446,001-447,000 1,205.10 1,854.00 489,001-490,000 1,302.93 2,004.50 447,001-448,000 1,207.38 1,857.50 490,001-491,000 1,305.20 2,008.00 448,001-449,000 1,209.65 1,861.00 491,001-492,000 1,307.48 2,011.50 449,001-450,000 1,211.93 1,864.50 '492,001-493,000 1,309.75 2,015.00 450,001-451,000 1,214.20 1,868.00 493,001-494,000 1,~12.03 2,018.50 EXHIBIT B PAGE SEVEN Valuation i ii i 494, O01-495,000 495,001-496,000 496,001-497,000 497, O01-498,000 498,001-499,000 499,001-500,000 500,000-1,000,000 1,000,000 and up P lan Perm1 t Check Fee i 1,314.30 2,022°00 1,316.58 2,025.50 1 , 318.85 2,029. O0 1,321.13 2,032.50 1,323o40 2,036.00 1,325.68 2,039.50 See Bel ow See Bel ow (1) (2) See Below See Bel ow (1) (3) (~) (~_) (3) 65% of Bull ding Permit Fee. $2,039.50 for the first $500,000 plus $3.00 for each additional $1,000 or fraction thereof, to and including $1,000,000. $3539.50 for the first $1,000,000 plus $2.00 for each additional o$1,000 or fraction thereof° .. Valuation Plan Check Pemi t fee EXHIBZT C ii i i i i PROPOSED MISCELLANEOUS BUILDING DIVISION FEES Other Inspections Reinspection Fee per Section 305g (1) .................................. $30.00 Inspections outside of normal business hours (2 hour mi ni mum) (2) .................... , .................... $50 Hr. Real Estate Inspection: Occupancy Group R ............................ $120.00 up to 4 units plus $15.00 per unit Others: Less than 5,000 sq. ft ................................. $225.00 5,000 to 10,000 sq. ft ................................. : ....... $300. O0 10,000 sq ft. and over ...................................... $425.00 Relocation Butiding Investigation · . .................. $60.00 Less than $,000 sq. ft ................ ~;~):~) + $1.00 More than 5,000 sq.f t ' m ........ ~ i 6666 over 5,000 sq. ft. Substandard Structure Inspections ................................... $60.00 Inspection or Permit' Trailor Coac~ . $60.00 Search and Single copy of: Search for Mi crofi 1 med Permit ............... $4.00 Photo Copy per Permit ............................... , ............ $2.00 Temporary Certificate of Occupancy ................................... $60.00 P1 an Check ii Standardized Plan - Plan Check (Structural) ................ 70~ of Plan Check Landscaping and Irri gati on plan check ........................... . (! hour minimum) ............................................. $60.00 Hr. Energy Plan Check (Non-residential) .......................... ~~ $70 O0 Hr. ....... O0 ~i nimum Seismic (Structural) ............................................. State Adopted Review of A!quist-Priolo Report ........................ $70/hr $300.00 minimum Plan check outside of normal business hours or requested fast-tracking (one hour minimum) (2) .............. $50.00 Hr. Addttional plan check (structural) requi red by changes, additions or revisions to approved plans {1/2 hr. minimum) ..... $45.00 Hr. 'i Exhi bi t C Page two Miscellaneous (1) (2) Performance Bond Processing ...................................... 1% of bond Other Miscellaneous Document Preparation ....... ' ....................$150.00 Board of Appeal Determination ....................................... $1SO.O0 Microfilm Fee for Bui. lding Documents (standard sheet size)o..$1.00 per sheet Each permittee shall be entitled to one correction inspection in addition to. the required number of inspections established. If more than one inspection is required due to fault or error on part of an installer, permittee or his employee, an additional $30.00 fee may be required for each additional inspection trip. The number of inspections will .not be limited on pr. ogress jobs. However, one inspection is permitted for checking a correction with ir)o addi ti onal fee. Only when authorized by the Director of Community Development. EXHZBZT D i ill i ELECTRICAL PERNIT FEES Zssu~ng Permtts, Each ............. -.: .................................. $15.00 SYSTEM FEE SCHEDULE imm l For New Mul ti-Famt ly Resl dentt al But 1 dtngs (Apartments & Condomi ni ums) Three Units or More not including attached garages or carports per square foot ....................................................... 03 For New Single and Two-Family Residential not including garages, carports, accessory buildings, per square foot .............. .O3 For Other Types of Occupancies and Alteration, Additions and Modifications to Existing Buildings, Use Unit Fee Schedule For New Residential SWimming Pools, Each ................................ 30.00 For Spas, Hot Tub, Above Grade Swimming Pools, Alterations to Existing Pool s .' .............. : ........................................... Unit Fee Carni va'l s and Circuses- For electric generators and electrically driven rides, Each ........ 15.00 For mechanically driven rides and. walk-through attractions with lighting, Each ...................................................... 4.50 For area and booth lighting, Each ................................... 4.50 For permanently installed rides, booths, displays, and attractions use Unit Fee Schedule i mm Temporary P ~wer Servt ce- For temporary service pole or Pedestal and Appurtenances, Each .... 15.00 For temporary power distribution system, Each ...................... 7.50 q ~ Exhibit D Page two UN IT FEE- SCHEDULE ........ ~m m For Receptacle, Switch Lighting Outlets, first 20, Each ................ $ Additional, Each ® · · · o · · ® · · · · · e o e o · e o o e e o o e e e e ® o o o o o o o ® o o o o o o o e o e o o e e e .75 .45 For Lighting Fixtures, Sockets, or Other Lamp Holding Devices, First 20 Each .......................................................... 75 Addition~i ~ixtures, ~~ .......... 45 For Pole or Platform Mounted Fixtures, Each ................................ 75 For Theatrical-type Lighting Fixtures or Assemblies, Each .................. 75 For Fixed Residential Appliances not Exceeding 1HP, Each 3.00 · · · · · · ®~e · · ® o e o e e NOTE- For other types of air cofldttioners and other motor riven appliances having larger electrical ratings, See Power Apparatus. POWER APPARATUS ii - For Motors, Generators, Transformers, Rectifiers, Converters, Capacitors, Industrial 'Heating, Air Conditioners and Heat Pumps, Cooking or Equipment, and Other Apparatus, As Follows- Baking Rating in HP, KW, KVA, KVAR, or refrigeration-tons. Up to and including 1, Each ........................................ 3.00 Over ! and not over 10, Each ....................................... 7.50 Over 10 and not over 50, Each ..................................... 15.00 Over 50 and not over 100, Each .................................... 30.00 Over 100, Each .................................................... 45.00 NOTE- 1. For equipment or appliances having more than one motor, transformer, heater, etc., the sum of the combined ratings may be used. ® These fees include all switches, circuit breakers, contractors, thermostats, relays and other directly related control equip- ment. Exhibtt D Pa ge three BUSWAYS m i For Trolley and Plug-in Type Busways, Each 100 feet or Fraction Thereof . 4.50' NOTE' An additonal fee will be required for lighting fixtures, motors and other appliances that are connected to trolley and plug-in type busways. No fee is required for portable tool $. Signs, Outl i ne Li ghtl ng and Marquees' For one sign and one branch circuit, Each ...................... m . . 15 . 00 . For additional branch circuits, Each .............................. 3.00 Servl ces, swl tchboard Sections, Panel boards' For services of 600 V or less and not over 200 Amps. in rating, Each .............................................................. 18.50 For services of 600 V or less and over 200 Amps. to 1,000 Amps. in ~.ati rig,' Each 37.50 For services over 600 V or over 1,000 Amps. in rating, Each ....... 75.00~ For mi scel laneous condui ts and conductors ......................... 11.00 OTHER Plan check'is 50% of permit fee for services, panelboards, motors, etc., when 600 Amp~ or over. Other inspections and miscellaneous fees as shown in Exhibit app 1 i cable here. shall be i : EXHiBiT E PLUI~BING PER~IT FEES TABLE i For t ssut ng each .perm1 t ............................................... $15.00 In addition' For each plumbing fixture or trap or set of fixtures on one trap {including drainage, vent, water piping and backflow prevention devices thereof) ....................................... 6.00 Repiping of portable water system (per dwelling unit) .................. 60.00 (6.00 per fixture with a maximum fee of $60.00) For each permanent-type dishwasher, whether individually trapped or not ............................................................. 6. O0 For each industrial waste pretreatment interceptor, including its trap and vent, excepting kitchen-type grease interceptors functioning as ficture traps ........ 12.00 Fo~ each swimming pool drainage trap and receptor, whether connected to a building drain or a building sewer (water supply for pool included) ' 7 50 not .... ,,,,,,,,,,.,.,o,,.,,, ....... ,,,., ..... ......, ...... For each gas piping system of one to four outlets, or alteration or retest of existing gas piping system .......... 3.00 For each additional outlet over four ...................................... 75 For each gas pressure regulator other than appliance regulators · For each water heater and/or vent ....................................... ?.50 For repair o'r alteration of drainage and/or piping ...................... 6.00 For each piece of water-treating equipment and/or water piping installed without accompanying plumbing ............................ 6.00 For lawn sprl nkler systems on any one meter, including backfl ow prevention devices thereof ................................ 9.00 For'installation of each solar heating system, domestic or pool system ........................................................ 30.00 m m m ~<~m mm ~m,~ * m mm m m ~m] Exhibtt E Page two For backflow prevention devices on unprotected water supplies, pools, tanks, vats, etc. (including incidental water piping), one to five .............................................. $ 7.50 For each addttional device over five .................................... 1.50 For each building drain installed without accompanying plumbing ......... 6.00 Solar portable water heating system, including water heater and vent ... 30.00 For each fire sprinkler head up to five ................................. 2.00 For each additional fire sprinkler head over five ....... .25 TABLE I I For issuing each permit ................................................ 15.00 In addition' For the connection of a house sewer to a public sewer, or for the extension of a house lateral onto a lot for future use (separate permit required for each such connection or extension) ............ 15.00 For installation of a section of house sewer for future use ............ 15.00 .. For the connection of each additional building or additional work ~ to a house sewer .................................................. 10.00 For each private sewage disposal system (septic tank and seepage pit or pits and/or drainfield) ....................... 45.00 For each ce'sspool, overflow seepage pit, percolation test pit, swimming pool drywall, or drainfield extension or replacement ..... 45.00 For disconnection, abandonment, alteration or repair of and house sewer or private sewage disposal system or part thereof ........... 15.00 ii · Exhibit E' Page three OTHER FEES Plan check - Applicant to pay a plan check fee of 50~; of the plumbing permit fee. Other ~nspection appl i cable here. and miscellaneous fees as shown in Exhibit B shall be When identical plumbing design is evident in more that one building on a single project and the building official so finds, plan check fees may be waived for other than the representative sample. EXH[B[T F I~ECHANICAL PERHIT FEES' For the issuance of each permit ......... . .......,.' ................ ' ..... $15.00 For the installation, alteration or relocation of each refrigerator compressor or absorption unit, and for each fuel burning furnace, heater, boiler, and vented decorative appliance including vents attached thereto: Up to and including 100,000 BTU .................................... 9.00 More than 100,000 BTU to and including 1,000,000 BTU .............. 11.00 More than 1,000,000 BTU ........................................... !3. O0 For each air inlet and air outlet served by any air conditioning system ............................................................. 2.00 Or for each 1,000 square feet or fraction thereof of conditioned area: NOTE: When a permit is applied for and the total number of air inlet and air outlets is unknown, the fees shall be based on the square feet of conditioned area. For the installation, relocation or replacement of each appliance vent installed and not included in an appliance perm, it .................. 4.50 For the installation or alteratio*n of each air handling unit for air conditioning including ducts attached thereto- Up to and including 2,000 CFM Each unit up to 10 ................................................. 4.00 Each unit over 10 .................................................. 1.00 i. More than 2,000 CFM to and including 10,000 CFM ................. 6.50 More than 10 000 CFM m 11 O0 .NOTE- This fee shall not apply to an air handling unit which 'is a portion of a factory assembled air conditioned appliance for which a permit is required elsewhere in this Code. For each evaporative cooler other than portable type .................... 6.50 For required ventilation fans which serve a single register' Each fan up to 10 .................................................. 4.50 Each fan over !0 ................................................... 2.00 Exhi b'i t F Page two For each required .ventilation system which is not a portion of any air condi tioni ng system for whi ch a permit i s required el sewhere in this Code ..................................... -.' .............. $ 6,50 For the installation of each commercial kitchen hood or spray booth served by mechanical exhaust, including the fans and ducts attached thereof ................................................... 6.50 For the installation of each fire damper ................................ 4.00 For the alteration of an existing duct system for which a permit is not required elsewhere in this Code ................................ 6.50 OTHER FEES For all project with the exception of SFR the applicant shall pay a plan check fee of 50~; of the mechanical permit. Other inspection and miscellaneous fees 'as applicable here. shown in Exhibit B shall also be EXHXBZT G SZGN PERMIT FEES Permtt !ssuance ........... ............... $ 1S.O0 · Combination sign, final sign, .................................. $ 20.00 projecting sign or roof sign up up to 30 square feet Pole sign up to 50 square feet ................................. $ 20.00 Wall sign up to 200 square feet ................................ $ 25.00 A11 signs, each additional 100 ................................. $ 30.00 square feet or fraction thereof over the above.respective 30, 50, or 200 square feet Sign code exception hearing .................................... $ 100.00 Plan check fee required for ground base signs. Fees are based on building plan check construction valuation - See Exhibit A. .i EXHIBIT H GRADING AND "PRIVATE IMPROVEHENT FEES ROUGH PLAN CHECK GRADING ONLY (1) i ii il i i i I i (per sq. ft. of site area) PRECISE GRAD i'NG AND ANY PRIVATE IMPROVEMENTS (1) -- -- ~ Ifil Il (per sq. ft. of site area) less than 5 acre sites 5-25 acres .003 with $300 minimum fee .002 wi th $300 mi nimum fee $.014 wi th $300 mi ni mum fee $.016 wi th $500 minimum fee 26 acres + $70/hr. with $500 minimum fee $70/hr with $500 minimum fee Plan check fees include plan checks 1-3. Subsequent plan checks shall be charged at $70 per hour. PERM IT FEES ......... Rough grading o001 per sq. ft. of Site area Preci se grading only .014 per sq. ft of site area New construction on-site improvements {curb and gu rte r, si dewa ilk S, pavement, catch basins, storm drains, etc. .0145 per sq. ft. of site area Exi sting repair of on-si te improvements curb and gutter sidewalk pavement OTHER FEES .085 linear foot · 03 sq. ft. .01 sq. ft. Addi ti onal plan check requi red by changes, additions or revisions to approved plans (1/2 hour minimum) Plan check outside of normal business hour or requested fast tracking (1 hour m.inimum) (1) Inspecti OhS outsi dJ'°f norma 1 business hours (2 hour minimum) (1) $70/hour $105/hour $50/hour (1) When approved by Director of Community Development STATE OF CALIFORNIA ) COUNTY OF ORANGE ) § CITY OF TUSTIN ) MARY E. WYNN, City Clerk and ex-officio Clerk of the City Council of the City of Tustin, California, does hereby certify that the whole number of the members of the City Council of the City of Tustin is five; that the above and foregoing Resolution No. 87-138 was duly and regularly introduced, passed and adopted at a regular meeting Of the City Council held on the 21st day of Dece~lber, 1987, by the ~ , fol 1 owing vote' AYES : COUNCILPERSONS' Edgar, Hoesterey, Kelly, Kennedy, Prescott NOES · COUNCILPERSONS- None ABSENT' COUNCILPERSONS' None .... MARY E. WYN~, Cfty Clerk - City of Tus'tin, Califo'rnia