Loading...
HomeMy WebLinkAbout09 FY 05/06 DBE 08-01-05 AGENDA REPORT Agenda Item 9 Reviewed: Jdt City Manager Finance Director ~ MEETING DATE: AUGUST 1, 2005 FROM: WilLIAM A. HUSTON, CITY MANAGER PUBLIC WORKS DEPARTMENT/ENGINEERING DIVISION TO: SUBJECT: APPROVAL OF DISADVANTAGED BUSINESS ENTERPRISE (DBE) PROGRAM AND OVERAll ANNUAL DBE GOAL OF TEN PERCENT (10%) FOR FEDERAL FISCAL YEAR 2005/2006 SUMMARY The City's annual Disadvantaged Business Enterprise (DBE) Program has been prepared and identifies an Overall Annual DBE Goal of ten percent (10%) for Federal Fiscal Year 2005/2006. The required public participation process has been completed and the final DBE Program is ready for City Council approval. RECOMMENDATION It is recommended that the City Council adopt Resolution No. 05-88 approving the Disadvantaged Business Enterprise (DBE) Program and Overall Annual DBE Goal of ten percent (10%) for Federal Fiscal Year 2005/2006. FISCAL IMPACT City Council adoption of Resolution No. 05-88 will ensure the City's continued receipt of federal funding for various Capital Improvement Projects that are partially funded through the United States Department of Transportation. BACKGROUND The attached Disadvantaged Business Enterprise (DBE) Program and Overall Annual DBE Goal for Federal Fiscal Year 2005/2006 addresses critical components and elements of the Federal Department of Transportation regulations. The City of Tustin's Overall Annual DBE Goal for Federal Fiscal Year 2005/2006 is ten percent (10%). Upon approval, it will be annually calculated to maintain relevancy to local market conditions and factors impacting DBE availability. The Draft DBE Program was submitted to Caltrans on May 2, 2005 and that agency has determined that it complies with Federal DBE Program requirements. The required 45-day public review and comment period began on May 5, 2005 and was concluded without receipt of any comments. Approval of Disadvantaged Business Enterprise (DBE) Program and Overall Annual DBE Goal of Ten Percent (10%) for Federal Fiscal Year 2005/2006 August 1,2005 Page 2 Since no comments were received during the public participation process, the final Disadvantaged Business Enterprise (DBE) Program is ready for City Council approval. In order to ensure the City's continued receipt of federal funding for various Capital Improvement Projects, the finalized DBE Program must be approved by the City Council and submitted to Caltrans prior to September 15, 2005. Çl:~~ Director of Public Works/City Engineer C;7~ ~~ ) Dana R. Kasdan Engineering Services Manager Attachment: Resolution No. 05-88 Caltrans Confirmation Letter Annual DBE Goal Program S:\City Councilltems12005 CouncilltemslApproval of DBE FY 2005-2006 & Reso 05-88.doc RESOLUTION NO. 05-88 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUSTIN, CALIFORNIA, APPROVING THE DISADVANTAGED BUSINESS ENTERPRISE (DBE) PROGRAM AND OVERALL ANNUAL GOAL OF TEN PERCENT (10%) FOR FEDERAL FISCAL YEAR 2005/2006, FOR ADOPTION AND SUBMISSION TO THE CALIFORNIA DEPARTMENT OF TRANSPORTATION (CAL TRANS) WHEREAS, the City of Tustin is required to develop and submit a Disadvantaged Business Enterprise (DBE) Program and Overall Annual Goal for DBE participation for United States Department of Transportation (DOT) assisted contracts, as a condition of federal financial assistance, pursuant to Title 49 Code of Federal Regulations (CFR) Part 26; Participation by Disadvantaged Business Enterprises (DBE) in DOT Programs; and WHEREAS, in accordance with DBE regulations, the City of Tustin has developed a DBE Program and Overall Annual DBE Goal of ten percent (10%) for Federal Fiscal Year 2005/2006; and WHEREAS, City Council adoption is required to ensure compliance with Department of Transportation federal funding requirements, provisions and financial responsibilities. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Tustin that the DBE Program and Overall Annual Goal for Federal Fiscal Year 2005/2006 are hereby approved. AND BE IT FURTHER RESOLVED that the City Engineer acting as the City's DBE Liaison Officer is hereby authorized to execute the Disadvantaged Business Enterprise (DB E) Program and Overall Annual Goal for Federal Fiscal Year 2005/2006, and submission to the California Department of Transportation (Caltrans) on behalf of the City for funding authority approval. PASSED AND ADOPTED at a regular meeting of the City Council of the City of Tustin held on the 1st day of August 2005. Lou Bone, Mayor ATTEST: City Clerk STA'!1'. OF CAI.lFORNIA-BUSINESS TRANSI'ORtATION ANn HOUsING AGENCY DEPARTMENT OF TRANSPORTATION DISTRICT 12 3337 MICHELSON DRIVE SUITE 380 IRVINE. CA 92612-8894 PHON]¡: (949) 756-7805 FAX (949) 724-2592 Mr. Tim Serlet DBE Liaison Officer City of Tustin 300 Centennial Way Tustin, CA 92780 May 5, 2005 Subject; Disadvantaged Business Enterprise (DBE) Program Submittal Fiseal Year 200511J6 Dear Mr. Serlet: Arnold Soh,"""""...... O""""'M . Flex your po.....' .... """"!l'J '~n" In accordance with the 49 Code of Federal Regulations part 26, this letter serves as confinnation that CALTRANS Local Assistance received and reviewed your proposed overall annual DBE goal. The City's overallllllI1ua1 DBE goal and goal setting meets the DBE requirements. The next step towards approval Is to begin the Public Patticfpation process. As a reminder, you are required to advertise your overall annual DBE goal for a minimum of one day in a general-media circulation paper and one day in a minority or £ocu¡¡ed media circulation paper. Your program mutt be available for review for 30 d3y& and an additional IS days is required for public comments. Any public comments received in our office will be forwarded to the n R F: J,iaison Officer. The final DBE program must be adopted by City Counca prior to Caltrans approval. [fyou require any further assistance, please contact Homa Noun at: Phone: 949-724-2410 Fax; 949-724-2592 Email: homa_nouri@dot.ca.gov Sincerely ~fM<v. Alan WilliLun, Chief Local Assistance Branch District 12 'Çaltra.. impro... mobility across Ç,lIfomi<;¡> Public Works / Engineering -"~_.- City of Tustin TO: CAL TRANS DISTRICT 12 District Local Assistance Engineer - Alan Williams 300 Centennial Way Tustin, CA 92780-3715 (714) 573-3150 FAX (714) 734-8991 ANNUAL OVERALL GOAL INFORMATION (Exhibit 98) The amount of overall goal, methodology, breakout of estimated race-neutral and race- conscious participation, and any DBE program updates are presented herein in accordance with Title 49 of the Code of Federal Regulations Part 26, and as described in the Local Assistance Procedures Manual. The City of Tustin submits our annual overall goal information and any needed updates of our DBE program for your review and comment. We propose an Annual Overall DBE Goal of 10% for the Federal Fiscal Year 2005-2006, beginning on October 1. 2005 and ending on September 30, 2006. MethodoloQY Refer to the attached Overall Annual DBE Goal Setting Methodology enclosure. Breakout of Estimated Race-Neutral and Race-Conscious Participation Refer to the attached Overall Annual DBE Goal Setting Methodology enclosure. DBE Proqram Updates: No programmatic changes to the City's DBE Program with the specified fiscal year. -a~ ¡( Á.~~) íÞe- -r;:", D. Jèri/-- DBE Liaison Officer ~¡t a(e S:IMiscelianeous EngineeringID.B.E\DBE 2005-2006\Caltrans Exibit 9B.doc CITY OF TUSTIN Proposed Overall Annual DBE Goal Setting Methodology Federal Fiscal Year 2005-2006 Submiued in fulfillment of: Section 1101 of the Transportation Equity Actfor the 21st Century 49 Code of Federal Regulations Part 26 and Caltrans Local Assistance Procedures Manual . This analysis is prepared exclusively for the City of Tustin, it is non-transferable and is not to be duplicated. CITY OF TUSTIN DISADVANTAGED BUSINESS ENTERPRISE (DBE) PROGRAM OVERALL ANNUAL DBE GOAL SETTING METHODOLOGY FOR FEDERAL FISCAL YEAR (FFY) 2005/06 (For the period of October 1, 2005 through September 30, 2006) I. DOT-ASSISTED CONTRACTING PROGRAM FOR FFY 2005/06 Table 1 serves to identify the City of Tustin's DOT-assisted contracting program for FFY 2005/06 considered in developing its Overall Annual DBE Goal. Three projects are listed in Table 1, however, only two of the three, the Pavement Rehabilitation from Walnut Ave to 1-5 Fwy and the Pavement Rehabilitation from 1-5 to Bryan Ave. projects were considered in the federally prescribed DBE goal-setting analysis, based on DOT-assisted funding and contract award dates anticipated within the respective federal fiscal year 2005/06. Although the Pasadena Ave. & Altadena Drive Lighted Crosswalk project (shaded) was considered in the former year's goal analysis due to a change in funding from federal (DOT-assisted) to local and State funding, the project was not included in this analysis. Both of these projects have viable contracting and subcontracting possibilities, a required criterion for goal setting consideration. Table 1 Table 2 provides a summary of work grouped into one primary category: Construction Services, utilizing the CUCP 2002 North American rndustry Classification System (NArCS) work categories and comparable 2002 Census Business Patterns NArCS. Table 2 also serves to identify the estimated Federal Dollar Share and the Percent of Federal Funding as follows: City of Tustin DBE Goal Melhodology FFY 2005/06 Page 2 of7 COMPARABLF. ESTIMATEB 'y., OF CONTRACT TYPE CliO' 21U12 NAICS WORK 211112 NAICS FI-:m.:l{AL FEBERAL C-\TE<;ORyl CTNSlS BOLLAR FUNIJIN(; DATAl SHARE Coo Dstructioo no 2373101 234' 1101 $',5101,010101.0101 1010IO'!!o, Table 2 Professional Services TOTAL N/A N/A $0.00 $510,000.00 N/A 100% II. GOAL-METHODOLOGY Step 1: Determination of a Base Figure (26.45/ To establish the City of Tustin's Base Figure of the relative availability of DBEs to all comparable firms (DBEs and Non-DBEs) available to bid or propose on the City of Tustin's FFY 2005/06 DOT -assisted contracting opportunities projected to be solicited, the City of Tustin followed one of the five prescribed federal goal-setting methodologies in Caltrans Local Assistance Procedures Manual. This was accomplished by accessing the California Unified Certification Program (CUCP) DBE Database of Certified Firms and the 2002 u.S. Census Bureau County Business Patterns (CBP) Database. Comparisons were made by corresponding zip codes within the City of Tustin's market area (defined as Orange County) and by the specified industries and types of businesses identified in Table 2. The City of Tustin made a concerted effort to ensure that the scope of businesses included in the numerator was as close as possible to the scope included in the denominator. For corresponding detail of all work category classifications grouped, refer to Attachments 1 and II. The City's local market area represents where the substantial majority of the City's dollars are expended and/or where the substantial majority of contractors and subcontractor bids or quotes are received. <:::> For the numerator: California UCP DBE Database of Certified Firms <:::> For the denominator: 2002 U.S. Census Bureau's Business Pattern Database (CBP) To determine the relative availability of DBEs, the City of Tustin divided the numerator representing the ratio of ready, willing and able DBE firms by the denominator representing all firms (DBEs and Non-DBEs) available, within the City's defined market area for each of the work categories. Application ofthis formula yielded the following baseline information: Number of Ready, Willing, and Able DBEs Number of All Available Firms (Including DBEs and Non-DBEs) BASE FIGURE 1 Refer to Attachments I and II for corresponding detail of all work trades grouped under the primary NAtCS Codes. 226.45 represents Title 49 CFR Part 26 regulatory reference. City ofTustin DBE Goal Methodology FFY 2005/06 Page3 of7 Step I: Base Figure (weighted by type of work to be performed and corresponding contracting dollars) Base Figure = [100 % (DBEs in NAICS 237310 *) (CBPs in NArCS 234110 **) Base Figure = [ 100 am J 1,999 J J Base Figure = [ Base Figure = [ 100 (.0910) .0910 J Base Figure = (.0910) 100=9.10=9% ... For additional NAICSCodesfrom the California Unified DBE Directory, refer to Attachment 1. For additional NAICS Codes. refer to Attachment II. Rounded to the nearest whole number. Step 2: Adjusting the Base Figure Upon establishing the Base Figure, the City of Tustin reviewed and assessed other known evidence potentially impacting the relative availability of DBEs within the City of Tustin's market area, in accordance with prescribed narrow tailoring provisions set forth under 49 CFR Part 26.45, Step II DBE Goal Adjustment guidelines. Evidence considered in making an adjustment to the Base Figure included the City of Tustin's Past DBE Goal Attainments on Similar Type Projects, Bidders List. Disparity Studies, Other Cities'DBE Goals and attainments and Other Relevant Evidence within the City of Tustin's jurisdiction. A summary of these considerations follows: A. Past DBE Goal Attainments on Similar Type Projects The following table reflects the demonstrated capacity of DBEs (measured by actual historical DBE participation commitments and/or attainments) on DOT-assisted contracts awarded by the City of Tustin within the last three fiscal years: City of Tustin DBE Goal Methodology FFY 2005/06 Page 4 of? Table 3 13% 13% 4% 11% 11.82% 10.5% 11% 11.82% 10.5% 11% 11.82% 10.5% 11% 11.82% 10.5% 12% 12% 18% 9% 18% 18% The City of Tustin considered past attainments as tangible evidence of DBE availability beyond availability identified in the Step 1 calculation, which strictly utilized the 2002 U.S. Census information and CUCP DBE database. Eight projects are listed in table 3, however, only seven (7) of the eight were considered in this analysis due to the Jamboree Road Median Barrier Project scope being dissimilar to the Federally-Assisted projects the City anticipates releasing in FFY 2005/06. To determine the Average Past DBE Participation Percentage the City included the seven (7) relevant closed-out projects with actual DBE goal attainment data (11.7%). The Average Past DBE Participation Percentage was added to the Step I Base Figure (9%) and divided by two (2) to calculate the average. The application of this formula is provided below: Step I Ease Figure + Past Average DEE Participation Commitment = ADJUSTED BASE FIGURE 2 9% + 11.7% = 20.7% 2 = 10.35 % = 100/. rounded to tbe nearest wbole number The formula resulted in an upward adjustment to the Base Figure from 9% to 10%. City of Tustin DBE Goal Methodology FFY 2005106 Page 5 of7 B. City of Tustin's Bidders List The City of Tustin's Bidders List was considered in adjusting the base figure and while a Bidders List would serve as quantifiable evidence of DBEs demonstrated interest and capacity; the City of Tustin has not collected sufficient data to date to merit consideration for an adjustment. However, the City of Tustin will continue to capture such infonnation from all bidders at the time of bid/proposal submission and will utilize such infonnation in future goal-setting analysis. C. Evidence from Disparity Studies The City of Tustin is not aware of any current disparity studies within the City of Tustin's jurisdiction and/or market area to consider in this step of the goal setting analysis. D. Other Agencies DBE Goals The City of Tustin surveyed other DOT-recipients (local agencies) within its jurisdiction, with similar contracting programs to assess their DBE goals and attainments toward making an adjustment. Agencies included in the survey were the Cities of Garden Grove, La Habra, and Laguna Niguel. Using the most current data available, DBE Goals established for these cities ranged from 10% to 12% for FFY 2004. Since the goal projections and attainments are in line with the City of Tustin's DBE goal of 10%, no further adjustment will be made at this time. E. Other Relevant Evidence The City of Tustin is not aware of any additional relevant data; including anecdotal evidence over and above those factors considered that would sufficiently merit an adjustment to the Base Figure at this time. However, the City will continue to explore and consider all available evidence that could have a potential impact on the DBE goal setting process (i.e. relative availability ofDBEs within the City's market area in future goal setting analysis). Overall Resultant Goal Adjustment Based on the City of Tustin's review and consideration of the above factors, particularly the City's historical DBE participation/attainments, the evidence considered supported an upward adjustment of the 9% Base Figure to 10% as detennined by the calculation above (Refer to A.). III. OVERALL ANNUAL DBE GOAL AND PROJECTION OF RACE-NEUTRAL AND RACE-CONCIOUS PARTICIPATION: The Overall Annual (FFY 2005/06) DBE Goal for the City of Tustin's DOT-assisted contract is 10%. The Overall Goal is expressed as a percentage of all DOT -assisted funds that the City will expend in DOT-assisted contracts in the forthcoming fiscal year. City of Tustin DBE Goal Methodology FFY 2005/06 Page60f7 This goal further serves to identify the relative availability of DBEs based on evidence of ready, willing, and able DBEs to all comparable firms, which are known to be available to compete for and perform on the City's DOT-assisted contracts. The Overall Annual Goal reflects a determination of the level of DBE participation, which would be expected absent the effects of discrimination. To determine the race-neutral and race-conscious projections, the City of Tustin considered historical race neutral attainments for the City during the past three years. The table below represents such attainments in relationship to the established contract goals: 13% 4% 0% 0% 11% 10.5% 0% 0% 11% 10.5% 0% 0% 11% 10.5% 0% 0% 11% 10.5% 0% 0% 12% 18% 6% 33% 9% 18% 9% 50% Tutal 7WY" S2'Yo, 15% S3% The City considered in this race-neutral and race-conscious assessment seven (7) of the eight closed-out DOT-assisted projects. The Jamboree Road Median Barrier Project (shaded) has been excluded from the goal-setting analysis due to this project having a dissimilar scope of 3 Negative percentages changed to 0% for Race-Neutral Purposes (not possible to have negative Race-Neutral Attainmenls). City of Tustin DBE Goal Methodology FFY 2005/06 Page 7 of? work to the Federally-Assisted projects the City anticipates releasing in FFY 2005-2006. The application of the formula is provided below: Total Goal % Achieved tbroul!b Race Neutral Means Total Projects = Average % of Goal Acbieved througb Race-Neutral Means 8~% = 1\ (Average % of Goal Acbieved througb race-neutral means) 10% (Adjusted Base Figure) X .119 = 1.19 % = 1 % (Rounded to the nearest whole number) Therefore, the City of Tustin projects to meet 9% ofthe 10% proposed Overall Annual DBE Goal for FFY 2005-2006 utilizing Race-Conscious measures, including utilizing contract specific numeric goals, as necessary to achieve the overall goal. The remaining 1 % will be achieved utilizing Race-Neutral methods in accordance with Title 49 CFR Part 26.51, including: Arranging timely solicitations, times for the presentation of bids, quantities, specifications, and delivery schedules in ways that facilitate DBE, and other small business participation and by requiring or encouraging prime contractors to subcontract portions of work that they might otherwise perform with their own forces. The application of race-conscious goals on the City's DOT-assisted contracts will continue to be used only to the extent necessary to achieve the City's approved Overall Annual DBE goal. Should the initial contract's actual DBE commitments exceed projections, adjustments will be made accordingly. IV. PUBLIC PARTICIPATION AND FACILITATION In accordance with Public Participation Regulatory Requirements of 49 CFR Part 26 and Caltrans Local Assistance Procedures Manual (LAPM), minority, women, local business chambers, and community organizations within the City of Tustin's market area will be provided an opportunity to review and provide input into this goal analysis. The City will prepare and send an Outreach Consultation Letter advising the aforementioned business community of the proposed DBE goal analysis and its availability for review. The City of Tustin will also publish a Public Notice in general circulation media and in at least one other minority focused media announcing the City of Tustin's proposed Overall Annual Goal for the FFY 2005-2006 DOT-assisted contracts. Such Notice will inform the public that the proposed goal and its rationale is available for inspection at the City of Tustin's Public Works Department during normal business hours for 30 days following the date of the Public Notice and that the City of Tustin will accept comments on the goal analysis for 45 days from the date of the Public Notice. The required public participation provisions will be fully satisfied prior to submitting the City of Tustin's Overall Annual DBE Goal to Caltrans for final review and approval. ATTACHMENT I CITY OF TUSTIN DBE OVERALL ANNUAL GOAL ANALYSIS FOR FFY 2005/06 ESTABLISHMENT OF THE NUMERATOR: # OF ESTABLISHED DBE FIRMS BY PRIMARY WORK CATREGORY (CONSTRUCTION) AND CORRESPONDING NAtCS WITHIN THE CITY OF TUSTIN'S MARKET AREA (DEFINED AS THE COUNTY OF ORANGE)1 CO, NSTR" UCTIO' N: B: Y CO. R" R" ESp. O. NDtlNG ZIp. CO. Dt E i COUNTY . .. BUSINESS . I , PATTERNS . ! ! USING 2002 . . ¡ ¡NAICS 2002 NAICS NAICS DESCRIPTION 906 907 926 927 928 TOTAL I 237310 235210, Highway, Street, and Bridge 5 5 9 3 10 32 234110 Construction 212321 212321 Construction Sand and Gravel 0 0 0 0 0 0 Minin 237130 234920 Power and Communication Line and 0 0 0 2 Related Structures Construction 237990 234990 Other Heavy and Civil Engineering 2 0 0 4 Construction 238110 235710 Poured Concrete Foundation and 3 2 5 2 6 18 Structure Contractors 238120 235910 Structural Steei and Precast 4 3 2 7 17 Concrete Contractors 238140 235410 Mason Contractors 2 0 3 0 2 7 238210 235310 Electrical Contractors 1 2 4 2 5 14 238330 235520 Floorin Contractors 0 1 1 0 0 2 238910 235940, Site Preparation Contractors 3 2 2 3 6 16 234990 238990 235710 13 6 19 6 24 68 324122 324122 0 0 0 0 0 0 327332 327332 0 0 2 0 0 2 334519 334519 0 0 0 0 0 0 0 0 0 0 0 0 34 ŒJ[ID 18 182 ': DATA SOURCE: California UCP DBE Database of Certified Firms. ATTACHMENT II CITY OF TUSTIN DBE OVERALL ANNUAL GOAL ANALYSIS FOR FFY 2005/06 ESTABLISHMENT OF THE DENOMINATOR: # OF ALL ESTABLISHED FIRMS (DBEs and Non-DBEs) BY WORK CATEGORY WITHIN THE CITY OF TUSTIN'S MARKET AREA (DEFINED AS THE COUNTY OF ORANGE)' CONSTRUCTION: Major Category: NAICS CODE 234110 212321 234920 234990 235210 235310 235410 235520 235710 235910 235940 324122 327332 334519 335932 . ' 234110: HIGHWAY, STREET & BRIDGE CONSTRUCTION 39 39 109 109 451 451 662 662 137 137 150 150 292 292 36 36 29 29 1 1 0 0 15 15 3 3 1999 1999 ': DATA SOURCE: 2002 U.S. Census Bureau: County Business Pattems, NAICS Work Category Codes,