Loading...
HomeMy WebLinkAbout09 SIDEWALK REPAIR 09-06-05 AGENDA REPORT Agenda Item 9 Reviewed: 1//11 ~ii~:::n~~:~tor ~ MEETING DATE: SEPTEMBER 6, 2005 WILLIAM A. HUSTON, CITY MANAGER TO: FROM: SUBJECT: PUBLIC WORKS DEPARTMENT/ENGINEERING ACCEPTANCE OF PUBLIC IMPROVEMENTS AND AUTHORIZATION TO FILE THE NOTICE OF COMPLETION FOR THE ANNUAL MAJOR MAINTENANCE PROJECT, FY 2004-2005 (CIP NO. 7001), AND THE ANNUAL SIDEWALK REPAIR PROJECT, FY 2004-2005 (PROJECT NO. 402-6235) SUMMARY Construction of the Annual Major Maintenance Project, FY 2004-2005 (CIP No. 7001), and the Annual Sidewalk Repair Project, FY 2004-2005 (Project No. 402-6235) have been completed to the satisfaction of the City Engineer and are now ready for City Council acceptance. RECOMMENDATION It is recommended that the City Council adopt Resolution No. 05-92 accepting the Annual Major Mainten~nce Project, FY 2004-2005 (CIP No. 7001), and the Annual Sidewalk Repair Project,. FY 2004-2005 (Project No. 402-6235), and authorizing the recordation of the Notice of Completion, and direct the City Clerk to: 1. Relea~e the Labor and Materials Bond not sooner than thirty-five (35) days after the date of recordation of the Notice of Completion; and 2. ReleaSe the Faithful Performance Bond not sooner than one year after the date of recordation of the Notice of Completion; and Assuming no claims or stop payment notices are filed, it is further recommended that thirty- five (35) days after the date of recordation of the Notice of Completion, the City Council authorize payment of the final 10% retention in the amount of $58,169.41 to Hardy & Harper, Inc. The total final construction contract cost for the project is $581,694.14. FISCAL IMPACT The final construction contract cost for the Annual Major Maintenance Project is $469,579.62. It was funded by the City's Capital Improvement Program (CIP No. 7001). The final construction contract cost for the Annual Sidewalk Repair Project is $112,114.52. It was funded by the Engineering Division's Annual Sidewalk Repair Operating Budget (Project No. 402-6235). Acceptance of public Improvements and Authorization to File the Notice of Completion for the Annual Major Maintenance Project, FY 2004-2005 (CIP No. 7001), and the Annual Sidewalk Repa~r Project, FY 2004-2005 (Project No. 402-6235) September 6, 2P05 Page 2 Project constru9tion, along with design and construction management, has increased the City's infrastructure a~sets by $830,000. The increased infrastructure valuation will be added to the City's infrastructure inventory as required by Statement 34 of the Governmental Accounting Standards Boa~d (GASB 34). Detailed cost information is shown on the attached GASB 34 Infrastructure In~entory Valuation Forms. BACKGROUND AND DISCUSSION The constructiqn of the Annual Major Maintenance Project (CIP No. 7001), and the Annual Sidewalk Repair Project (402-6235) were completed on June 30, 2005. Both of these projects are part of the City's ongoing Maintenance of Effort (MOE) requirement to maintain eligibility for Measure M funding. All of the work for this project has been completed to the satisfaction of the City Engineer and is now ready for dity Council acceptance. c~~ Director of PUblic Works/City Engineer ~L~ Engineering Services Manager Attachments: Resolulion No. 05.92 Location Exhibit GASB 34 Infrastructure Inventory Valuation Forms TDS:TL:ccg:NOC Annual Pvmt Main! Sidewalk Repair 04/05 Reso 05-92.doc RESOLUTION NO. 05-92 A RgSOLUTION OF THE CITY COUNCIL OF THE CITY OF TUSTIN, CALIFORNIA, ACCEPTING THE WORKS OF IMPROVEMENT AND AUTIt-IORIZING THE RECORDATION OF THE NOTICE OF COMIPLETION FOR THE CONSTRUCTION OF THE ANNUAL MAJOR MAINTENANCE PROJECT, FY 2004-2005 (CIP NO. 7001), AND THE ANNUAL SIDEWALK REPAIR PROJECT, FY 2004-2005 (PROJECT NO. 402-$235) WHEREAS, Hardy & Harper, Inc., having a contract with the City of Tustin to construct the hereinafter described public works and improvement; and WHEREAS, the City Engineer has duly certified to the construction and completion of said public improvement hereinafter mentioned in a manner satisfactory to the City Council of the City of Tustin; and WHElREAS, the City Council finds that said contractor has completed said public improvement hereinafter more particularly described in accordance with the provisions of the contrlict documents and the Notice of Completion, and acceptance of said public works and improvement should be filed and payment of the balance due said contract authorized in accordance with the contract documents; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Tustin that said public works and improvement is found to be complete, and the same is hereby accepted. Said public works and improvement is more particularly described as follows: Annual Major Maintenance Project, FY 2004-2005 (CIP No. 7001) and Annual Sidewalk Repair Project, FY 2004-2005 (Project No. 402-6235) BE IT FURTHER RESOLVED that the City Engineer of the City of Tustin is hereby aut~orized to execute and file a Notice of Completion for the acceptance of said public work ; and improvement described herein as required by law. PAS::/ED AND ADOPTED at a regular meeting of the City Council of the City of Tustin held on the 6th day of September 2005. Lou Bone, Mayor ATTEST: City Clerk CITY OF TUSTIN GASB 34 INFRASTRUCTURE INVENTORY VALUATION FORM Department: Public Works Division: EnQineerinQ I Prepared by: Jon DrauQelis Phone/Extension: 714/573-3164 Date Prepared: Julv 26. 2005 Description of the Asset: Annual Maior Maintenance Proiect. FY 2004-2005 (CIP No. 7001) Date: D Acq(Jired IZI Constructed D Removed: I June 30, 2005 I Basis of Valuatipn: (Please check one) . IZI D Act\Jal Cost (should include design, construction mgmt, fees, transportation, etc.) Estimated Cost If Estimated Cost, describe the method used: Quantity: Descrictio[1 Quantitv Total Amount Asphalt Concrete Pavement 214,846 SF $630,000 $630,000 TOTAL Source of Document /Information: Actual Contract Cost Total Valuation Amount $630,000 S:\GASBIGASB - clP 7001 FYO4-O5.doc GASB 34 INFRASTRUCTURE INVENTORY VALUATION FORM Department: Public Works Division: Enaineerina Prepared by: Jon DrauQelis Phone/Extension: 714/573-3164 Date Prepared: July 26. 2005 Description of t~e Asset: Annual Sidewalk Recair Proiect. FY 2004-2005 (Proiect No. 402-6235) Date: D AcqIJired IZI Constructed D Removed: June 30, 2005 Basis of Valuation: (Please check one) IZI D Act~al Cost (should include design, construction mgmt, fees, transportation, etc.) Estimated Cost If Estimated Cost, describe the method used: Quantity: Descrictior Quantity Total Amount Concrete Sidewalk Concrete Curb & Gutter 19,844 SF 203 LF $188,000 $12.000 $200,000 TOTAL Source of Document /Information: Ac~ual Contract Cost Total Valuation Amount $200,000 S:IGASBIGASB - CIP 70b1 FY04-05.doc